CONTRACTING DIVISION (JD9)
JAMIE.DAVIES@USACE.ARMY.MIL
(615) 736-7921
(615) 736-7124
NASHVILLE TN 37202-1070
W38XDD50719840
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to:
1. Revise the technical specifications and
2. Update clauses 52.252-3 and 252.236-7001.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-R-0002
X 9B. DATED (SEE ITEM 11)
06-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2016
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-16-R-0002
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0007 TECHNICAL CHANGES
RFP No. W912P5-16-R-0002 Amendment No. 0007 Unit 4 Rehabilitation
Old Hickory Powerhouse Sumner County, Tennessee
I. CHANGES TO TECHNICAL SPECIFICATIONS
A. Section 48 13 16.00 GENERATOR REWIND AND REFURBISHMENT
1. Remove Section 48 13 16.00 pages 23 and 24, and replace with revised Section 48 13 16 00 pages 23 and 24.
--- END OF AMENDMENT NO. 0007 TECHNICAL CHANGES---
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001: The purpose of this amendment is to:
1. Change the site visit date;
2. Answer questions regarding the site visit;
3. Revise 52.252-3; and
4. Revise 52.236-27 Alt I
Amendment 0002: The purpose of this amendment is to:
1. Update Specifications (Sections 01 11 10, 26 11 15.00, 48 13 16.00, and Appendix A)
2. Replace drawings (Q15-79/1021 and Q15-79/1022)
3. Add drawings (Q15-79/772, 162D132, 162D598, and T-5139635)
4. Post Set Two Q&A
5. Change Section 00115, 2.2.2.1 Subfactor 3A "42,000 kVA" changed to "45,000 kVA"
6. Update clauses 52.252-3 and 252.236-7001.
Amendment 0003: The purpose of the amendment is to:
1.Post Set Three Q&A and
2. Update FAR Clause 52.252-3.
Amendment 0004: The purpose of this amendment is to:
1.Post Set Four Q&A and
2. Update FAR Clause 52.252-3.
Amendment 0005: The purpose of this amendment is to:
1. Post Set Five Q&A,
2. Replace all references of "00010" with "00100"; Revise Section 00115, Paragraph 2.3; and Revise Section 00130, Paragraphs 4.1, 4.6 and 4.7;
3. Revise Technical Specifications;
4. Update Price Schedule and Price Schedule Information;
5. Include PDF editable version of PPQ;
6. FAR clause 52.209-7 made full text;
7. Revise DFARS clause 252.236-7001 and FAR clause52.252-3; and
8. Change proposal due date to August 31, 2016 at 1:00 PM CDT.
Amendment 0006: The purpose of this amendment is to:
1. Post Set Six Q&A;
2. Revise Price Schedule;
3. Update/Add drawings;
4. Update technical specifications;
5. Add Paragraph 6, Failure to Meet Performance Guarantees in Special Instructions;
6. Section 00115 Proposal Content Paragraph 2.1.1: Update similar in magnitude language;
7. Section 00115 Paragraph 2.2.3.1 and 00130 Paragraph 4.4.1: Add joint venture language;
8. Update Section 00130 Paragraph 4.7;
9. Add "Building" wage determination; and
10. Update clauses 52.252-3 and 252.236-7001.
Amendment 0007: The purpose of this modification is to:
1. Revise the technical specifications and
2. Update clauses 52.252-3 and 252.236-7001.
(End of Provision)
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Technical Specifications: W912P5-16-R-0002 TSpecs.pdf W912P5-16-R-0002TSpecsAm2Pages.pdf
W912P5-16-R-0002TSpecsAm5Pages.pdf W912P5-16-R-0002TSpecsAm6Pages.pdf W912P5-16-R-0002TSpecsAm7Pages.pdf
Drawings: W912P5-16-R-0002 Contract Drawings D Size.pdf W912P5-16-R-0002 Reference Dwgs.pdf W912P5-16-R-0002RefDrawsAm2Sheets.pdf W912P5-16-R-0002Cont DrawsAm2Sheets.pdf W912P5-16-R-0002RefDrawsAm6Sheets.pdf W912P5-16-R-0002Cont DrawsAm6Sheets.pdf
Appendix A: W912P5-16-R-0002 AppA.pdf
Reference Document: GeneratorCommissioningReport-1957.pdf
Drawing Number Description
Q15-79/1020 PROJECT LOCATION AND VICINITY MAP
Q15-79/1021 DRAWING INDEX - SHEET 1
Q15-79/1022 DRAWING INDEX - SHEET 2
Q15-79/1023 MECHANICAL GENERAL NOTES AND LEGEND
Q15-79/1023.1 ELECTRICAL GENERAL NOTES AND LEGEND
Q15-79/1024 LOCATION OF CONTRACTOR OUTSIDE TRAILERS AND STORAGE
Q15-79/1025 HIGH PRESSURE LIFT SYSTEM PLAN VIEW
Q15-79/1026 HIGH PRESSURE LIFT SYSTEM EQUIPMENT DETAILS
Q15-79/1027 HIGH PRESSURE LIFT SYSTEM THRUST TUB SECTION
Q15-79/1028.1 HIGH PRESSURE LIFT SYSTEM HYDRAULIC SCHEMATIC SHEET 1
Q15-79/1028.2 HIGH PRESSURE LIFT SYSTEM HYDRAULIC SCHEMATIC SHEET 2
Q15-79/1029 BLADE LINKAGE MODIFICATION - LINK PIN & KEY DETAILS
Q15-79/1030 BLADE LINKAGE MODIFICATION - EYE END DETAILS
Q15-79/1031 BLADE LINKAGE MODIFICATION - LINK BARS, STUD BOLT & STUD SLEEVE
DETAILS
Q15-79/1032 BLADE LINKAGE MODIFICATION - BLADE LINKAGE ASSEMBLY DETAILS
Q15-79/1033 DISCHARGE RING ANCHOR PATTERN
Q15-79/1034 DISCHARGE RING ANCHOR BAR SECTION
Q15-79/1035 TEMPLATE POSITIONING
Q15-79/1036 GENERATOR THRUST BEARING HIGH PRESSURE LIFT PUMP CONTROL
SCHEMATIC
Q15-79/1037 GENERATOR NEUTRAL GROUNDING EQUIPMENT REMOVAL DRAWING
Q15-79/1038 HIGH RESISTANCE GROUNDING NEW EQUIPMENT
Q15-79/1039 CONDUIT AND CABLE SCHEDULE
CUMBERLAND RIVER, OLD HICKORY POWER PLANT
DRAWING NUMBER INFORMATIONAL REFERENCE DRAWINGS
Q15-79/1 TITLE
Q15-79/2 INDEX - GENERAL, ARCHITECTURAL, STRUCTURAL
Q15-79/3 INDEX - STRUCTURAL
Q15-79/4.1 INDEX - MECHANICAL
Q15-79/11.2 INDEX - ELECTRICAL
Q15-79/16.3 GENERAL, LOCATION AND ACCESS PLAN
Q15-79/50.1 GENERAL, PLAN, SECTION AND DETAILS
Q15-79/52.2 EQUIPMENT TRANSVERSE SECTION
Q15-79/53.2 EQUIPMENT PLAN -ENTRANCE LEVEL, EL 447.0
Q15-79/54.3 EQUIPMENT PLAN - GENERATOR FLOOR, EL 428.0
Q15-79/55.1 EQUIPMENT PLAN - TURBINE FLOOR, EL 413.0
Q15-79/56.3 EQUIPMENT PLAN - CL OF DISTRIBUTOR AND ACCESS GALLERY
Q15-79/101.3 EQUIPMENT LONGITUDINAL SECTION
Q15-79/102.3 ARCHITECTURAL, ENTRANCE LEVEL - EL 447.0, PLAN OF SERVICE BAY
Q15-79/103.4 ARCHITECTURAL, ENTRANCE LEVEL - EL 447.0, PLAN OF UNITS 1 AND 2
Q15-79/104.2 ARCHITECTURAL, GENERATOR ROOM FLOOR - EL 428.0, PLAN OF SERVICE
BAY
Q15-79/105.1 ARCHITECTURAL, GENERATOR RM FLOOR - EL 428.0, PLAN OF UNITS 1 AND 2
Q15-79/106 ARCHITECTURAL, GENERATOR RM FLOOR - EL 428.0, PLAN OF UNITS 3 AND 4
Q15-79/107.2 ARCHITECTURAL, GENERATOR ROOM FLOOR - EL 413.0, PLAN OF SERVICE
BAY
Q15-79/108.3 ARCHITECTURAL, GENERATOR RM FLOOR - EL 413.0, PLAN OF UNITS 1 AND 2
Q15-79/510.2 PLANT ARCHITECTURAL, GENERATOR RM FLOOR - EL 4138.0, PLAN OF UNITS
3 AND 4
Q15-79/512.2 VALVE OPERATION DIAGRAM GOVERNOR AND LUBRICATING OIL
Q15-79/513.6ab MECHANICAL, VALVE OPERATION DIAGRAM, RAW WATER
Q15-79/520.3 MECHANICAL, VALVE OPERATION DIAGRAM, COMPRESSED AIR
Q15-79/521.3 MECHANICAL, PIPING ARRANGEMENTS AT UNITS, SHEET 1
Q15-79/522.3 MECHANICAL, PIPING ARRANGEMENTS AT UNITS, SHEET 2
Q15-79/533.2 MECHANICAL, PIPING ARRANGEMENTS AT UNITS, SHEET 3
Q15-79/534.3 MECHANICAL, GENERATOR COOLING WATER ARRANGEMENT, SHEET 1
Q15-79/535.4 MECHANICAL, GENERATOR COOLING WATER ARRANGEMENT, SHEET 2
Q15-79/536 MECHANICAL, GENERATOR COOLING WATER ARRANGEMENT, SHEET 3
Q15-79/537 MECHANICAL, GENERATOR COOLING WATER SYSTEM, GENERATOR AIR
COOLER - ASSBLY & DETAILS
Q15-79/538 MECHANICAL, THRUST BEARING OIL COOLER ASSEMBLY AND SECTIONS
Q15-79/701.2 MECHANICAL, GENERATOR COOLING WATER SYSTEM, GENERATOR AIR
COOLER - COOLER TUBE
Q15-79/713.4 ELECTRICAL, NEUTRAL REACTOR AND EXCITATION CUBICLE
Q15-79/750.14ab OUTLINE OF INSTRUMENT AND BENCH BOARD
Q15-79/753.8 CONNECTION DIAGRAM GENERATOR NO. 3 AND 4 AND TRANSFORMER 2
Q15-79/756.8ab ELECTRICAL, MAIN SINGLE LINE DIAGRAM Q15-79/757.10ab 125 VOLT DC SCHEMATIC DIAGRAM, SHEET 1 Q15-79/760.7ab 125 VOLT DC SCHEMATIC DIAGRAM, SHEET 2
Q15-79/763.4 DC SCHEMATIC AND ONE LINE DIAGRAM
Q15-79/766.10ab 440 VOLT AUXILIARY POWER SYSTEM SCHEMATIC, SHEET 1
Q15-79/767.13 ELECTRICAL, MISC. CONNECTION DIAGRAM, SHEET 2
Q15-79/769.6 DEVICE SCHEDULE, SHEET 1
Q15-79/770.4 DEVICE SCHEDULE, SHEET 2
Q15-79/772 STATOR WINDING DIAGRAM GENERATOR #2,3 & 4
Q15-79/806.6 CONDUIT AND GROUNDING GENERATOR NO. 4 AREA EL. 428.0
Q15-79/807.6 CONDUIT AND GROUNDING SECTIONS - EL. 428.0
Q15-79/808.5 CONDUIT AND GROUNDING GENERATOR HOUSING DETAILS
Q15-79/810.6 CONDUIT AND GROUNDING EQUIPMENT BAY EL. 428.0 - SHEET 2
Q15-79/818.17 CONDUIT AND GROUNDING UNIT 4 AREA EL. 413.0
Q15-79/819.6 CONDUIT AND GROUNDING DETAILS - EL. 413.0 SHEET 1
Q15-79/820.6 CONDUIT AND GROUNDING DETAILS - EL. 413.0 SHEET 2
Q15-79/828.7 CABLE ARRANGEMENT ON TRAYS PLAN AND SECTIONS - SHEET 2
Q15-79/852.1 GENERATOR ROOM LIGHTING PLANS, SECTIONS, AND DETAILS
Q15-79/860.3 TURBINE FLOOR EL. 413.0 UNIT 4 LIGHTING PLAN
Q15-79/862.8 GENERATOR AND TURBINE PIT LIGHTING PLANS
970839-4.N ACTUATOR WIRING DIAGRAM UNIT #4
CONT. BALDWIN - LIMA - HAMILTON REFERENCE DRAWINGS
DRAWING NUMBER TITLE
39100 DETAILS OF WICKET GATES
39107 DETAILS OF BOTTOM RING AND FACING PLATE
39110 PLAN OF CONCRETE CASING
39110-A ELEVATION OF CONCRETE CASING
39111 CONCRETE DRAFT TUBE PLAN AND ELEVATION
39111-A CONCRETE DRAFT TUBE DEVELOPMENT
39112 DETAIL OF PIER NOSE FOR DRAFT TUBE
39113 DETAILS OF DRAFT TUBE LINER
39114 DETAILS OF STAY RING PLAN
39114-A DETAILS OF STAY RING SECTIONAL ELEVATION
39115 DETAILS OF DISCHARGE RING
39115-A DETAILS OF DISCHARGE RING SECTIONS
39115-B FABRICATION DRAWING OF DISCHARGE RING
39115-C DETAILS OF FABRICATED DISCHARGE RING
39115-D DETAILS OF FABRICATED DISCHARGE RING
39115-E DETAILS OF FABRICATED DISCHARGE RING
39116 PLAN OF PIT LINER UPPER SECTION
39116-A PLAN OF PIT LINER LOWER SECTION
39116-B ELEVATIONS OF PIT LINER LOWER SECTION
39116-C ELEVATION OF PIT LINER UPPER SECTION
39117 METHOD OF SETTING STAY RING DISCHARGE RING AND DRAFT TUBE LINER
ELEVATION
39117-A METHOD OF SETTING STAY RING DISCHARGE RING AND DRAFT TUBE LINER
PLAN "A-A"
AND SECTION "B-B"
39117-B METHOD OF SETTING STAY RING DISCHARGE RING AND DRAFT LINER
SECTIONS "C-C" AND "D-D"
39118 35000HP TURBINE OLD HICKORY POWER PLANT USACE LIST OF DRAWINGS
39119 LAYOUT OF LEVER AND LINK MECHANISM
39120 RELATION BETWEEN WICKET GATES AND STAY VANE & WICKET GATE
OPENINGS
39121 RELATION BETWEEN WICKET GATES, GATE LEVER, SHEAR LEVER,
OPERATING RING AND GATE LINK
39122 DETAILS OF COUPLINGS, LEVERS, LINKS, PINS AND BUSHINGS
39123 DETAILS OF OPERATING RING
39123-A DETAILS OF OPERATING RING
39124 DETAILS OF HEAD COVER
39124-A FACING PLATE - BUSHINGS AND GLAND FOR OUTER HEAD COVER
39125 DETAILS OF WEARING STRIPS, FLOOR PLATES ETC. FOR INTERMEDIATE AND
INNER HEAD COVER
39126 PLAN OF INTERMEDIATE HEAD COVER
39126-A SECTIONAL ELEVATION AND SECTIONS OF INTERMEDIATE HEAD COVER
39127 DETAILS OF INNER HEAD COVER
39128 ARRANGEMENT OF MAIN GUIDE BEARING WIRING AND STUFFING BOX
PIPING
39129 DETAILS OF MAIN GUIDE BEARING HOUSING
39130 DETAILS OF MAIN GUIDE BEARING
39131 DETAILS OF MAIN GUIDE BEARING COVER AND OIL CATCHER
39132 DETAILS OF PACKING BOX LANTERN AND GLAND
39132-A DETAILS OF SEALING DEVICE FOR REPACKING BOX
39133 ARRANGEMENT OF SERVO MOTORS
39134 PIPING ARRANGEMENT FOR SERVO MOTORS
39135 DETAILS OF SERVOMOTOR CYLINDERS
39136 DETAILS OF CYLINDER HEAD, PISTON LOCKNUT, ETC.
39137 DETAILS OF PISTON RODS, REACH RODS, FORKED ROD ENDS, STOP NUT,
CONNECTING
ROD PINS, ETC.
39139 DETAILS AND ARRANGEMENT OF SUMP PUMPS AND PIPING
39140 PUMPS AND OIL PIPING FOR GUIDE BEARING LUBRICATION
39140-A OIL PIPING FOR GUIDE BEARING LUBRICATION
39141 ARRANGEMENT OF 12" AUTOMATIC AIR VALVE
39142 DETAILS OF VALVE BODY, DISCHARGE BODY VALVE DISC., DISC. SEAT,
BUSHING AND SPRING
FOR 12" AUTOMATIC AIR VALVE
39142-A DETAILS OF DASH POT, YOKE, SHAFT, BUSHINGS ETC. FOR 12" AUTOMATIC
AIR VALVE
39143 ARRANGEMENT AND DETAILS OF AIR VALVE PIPING
39144 MANUAL CENTRAL LUBRICATION SYSTEM SCHEMATIC
39144-A MANUAL CENTRAL LUBRICATION SYSTEM ELEVATION AND DETAILS
39145 DETAILS OF UNDERFRAME FOR FLOOR PLATES AROUND TURBINE PIT AND
MAIN SHAFT
39146 DETAILS OF FLOOR PLATES, HAND RAILING STANCHION
39147 DETAILS AND ARRANGEMENT 0F SUPPORT FUR RUNNER AND SHAFT
DURING ERECTION
39148 ARRANGEMENT AND DETAILS OF LIFTING DEVICE FOR INTERMEDIATE
SHAFT AND GUIDE BEARING
39149 ARRANGEMENT AND DETAILS OF STAIRWAY
39150 WRENCH BOARD
39152 RUNNER SECTIONAL ELEVATION
39153 PLAN OF TURBINE
39154 35,000 HP TURBINE, CUMBERLAND RIVER, OLD HICKORY POWER PLANT,
PLAN
VIEW OF POWERHOUSE
39154-A 35,000 HP TURBINE, CUMBERLAND RIVER, OLD HICKORY POWER PLANT.
SECTIONAL ELEVATION OF POWERHOUSE
39155 ARRANGEMENT OF STAIRWAY BRIDGES AND WALKWAYS TURBINE PIT
39155-A ARRANGEMENT AND DETAILS OF BRIDGE AND LADDER
39157 DETAILS OF FOUNDATION PLATE PEDESTAL FOR ASSEMBLING RUNNER
39158 SECTIONAL PLAN AND ELEVATION ADJUSTABLE BLADE RUNNER
39159 DETAILS OF INTERMEDIATE SHAFT
39160 DETAILS OF MAIN SHAFT
39161 FORGING DETAILS OF MAIN AND INTERMEDIATE SHAFTS
39162 DETAILS OF MAIN SHAFT SLEEVES AND NUT GUARD
39163 DETAILS OF RUNNER HUB
39164 DETAILS OF UPPER AND LOWER CONES FOR RUNNER
39165 DETAILS OF RUNNER BLADES
39165-A DETAILS OF CUTOUTS FOR RUNNER BLADE
39166 DETAILS OF PRE-WELDING RUNNER BLADES WITH STAINLESS STEEL
39167 METHOD OF CHIPPING RUNNER BLADE FOR WELDING STAINLESS STEEL
STRIPS
39168 DETAILS OF SEAL RINGS FOR RUNNER HUB
39169 DETAILS OF RETAINING RINGS FOR RUNNER HUB
39170 DETAILS OF LEVER, LINK, PIN, LOCK NUT, ET. FOR RUNNER
39171 DETAILS OF BUSHING IN RUNNER HUB
39172 DETAILS OF CROSSHEAD
39173 DETAILS OF PISTON ROD, PISTON, PISTON CAP, PIPE HEAD ETC.
39174 FORGING DETAILS OF PISTON ROD
39175 DETAILS OF OIL PIPES IN INTERMEDIATE AND GENERATOR SHAFT
39176 DETAILS OF GASKETS FOR RUNNER HUB
39177 ARRANGEMENT OF WIRING ON OIL HEAD SUPPORT
39178 ARRANGEMENT OF RUNNER BALANCING BLADE OPERATING AND BLADE
LOCKING DEVICES
39178-A DETAILS OF RUNNER BALANCING BLADE OPERATING AND BLADE LOCKING
DEVICES
39179 HYDROSTATIC TEST OF RUNNER HUB
39181 ARRANGEMENT OF GUARD, OIL CATCHER AROUND SHAFT AT SERVO
MOTOR
39182 DETAILS OF OIL CATCHER AND GUARD
39183 ARRANGEMENT AND DETAILS OIL CATCHER AND GUARD SUPPORT
39184 ARRANGEMENT OF OIL HEAD AND SUPPORT
39184-A PLAN OF OIL HEAD AND SUPPORT
39185 DETAILS OF OIL HEAD TOP
39186 DETAILS OF OIL HEAD SUPPORT
39187 OIL HEAD DETAILS
39188 DETAILS OF OIL HEAD SUPPORT
39188-A INSPECTION DOOR AND DETAILS FOR OIL HEAD SUPPORT
39189 LADDER WALKWAY AND HANDRAIL FOR OIL HEAD SUPPORT
39190 ARRANGEMENT AND DETAILS OF UNWATERING VALVE
39621 DIAPHRAGM BOX FOR HEAD COVER PRESSURE AND VACUUM GAUGE
39622 DETAILS OF PISTON ROD AND LOCKING DEVICE
39634 ARRANGEMENT OF WIRING AND CONDUIT FOR TEMPERATURE DETECTORS,
RELAYS AND MERCOID SWITCHES
39660 ARRANGEMENT OF GOVERNOR PIPING ON OIL HEAD
40027 DETAILS AND ASSEMBLY OF LIFTING RIG FOR PIPES IN MAIN SHAFT
40027-A DETAILS AND ASSEMBLY OF LIFTING RIG FOR PIPES IN MAIN SHAFT
40034 METHOD OF ERECTING RUNNER, SHAFT, INNER HEAD COVER, ETC.
41463 DETAIL AND ASSEMBLY OF HIGH LEVEL FLOAT SWITCH FOR OIL HEAD
41608 ARRANGEMENT OF GATE LOCKING DEVICE
41609 GATE LOCK HOUSING
41610 GATE LOCK DETAILS
41611 GATE LOCK DETAILS
GENERAL ELECTRIC REFERENCE DRAWINGS
DRAWING NUMBER TITLE
109C312 SURFACE AIR COOLER
109C377 BEARING OIL COOLER
161D619 BRAKE PIPING UNITS 2 & 4
161D221 PEDESTAL
162D132 WRENCH BOARD
162D321 YOKE (FOR GENERATOR ROTOR LIFTING DEVICE)
162D390 INSTRUMENTS IN BEARINGS, UNITS #2 AND #4
162D603 THERMOMETER
162D598 CO2 FIRE EXTINGUISHER PIPING
181C516 AIR COOLER PIPING DIAGRAM
182C573 RTD & ACCESSORIES UNITS 1 AND 3
182C674 DOOR AND FRAME
182C801 LIFTING DEVICE (FOR GENERATOR ROTOR)
209B315 LIST OF MATERIAL
214B204 FLOWMETER PIPING ARRANGEMENT
266A147 ADJUSTABLE TEMP. SWITCH
528E274 PIPING DIAGRAM SCHEMATIC
528E516 OUTLINE HYDRAULIC TURBINE DRIVEN GENERATOR OLD HICKORY POWER
PLANT
528E565 AIR COOLER PIPING
528E588 STATOR COIL DIAGRAM OLD HICKORY UNIT 4
528E637 INSTRUMENTS & ACCESSORIES CONDUIT CONNECTIONS SHEET 1
528E637 INSTRUMENTS & ACCESSORIES CONDUIT CONNECTIONS SHEET 2
528E565 AIR COOLER PIPING
528E576 STATOR CONNECTIONS
528E679 ASSEMBLY HYDRAULIC TURBINE DRIVEN GENERATOR OLD HICKORY
POWER PLANT
528E594 PIPING PLAN, UNIT 4
T-5139635 HANDLING OF GENERATOR PARTS
T-5139659 TERMINAL BOARD ARRANGEMENT
WOODWARD GOVERNOR REFERENCE DRAWINGS
DRAWING NUMBER TITLE
970839-SHT-1 WIRING DIAGRAM FOR UNITS #1 THROUGH #4
970839-SHT-2 WIRING DIAGRAM FOR UNITS #1 THROUGH #4
982408-SHT-2 ACUATOR ARRANGEMENT FOR UNITS #1 THROUGH #4
(End of clause)
(End of Summary of Changes)