Amendment 0005 The purpose of this amendment is to 1. Post Set Five Q A 2. Replace all references of 00010 w ith 00100 Revise Section 00115 Paragraph 2.3 and Revise Section 00130 Paragraphs 4.1 4.6 and 4.7 3. Revise Technical Specifications 4. Update Price Schedule and Price Schedule Information 5. Include PDF editable version of PPQ 6. FAR clause 52.209-7 made full text 7. Revise DFARS clause 252.236-7001 and FAR clause52.252-3 and 8. Change proposal due date to August 31 2016 at 1 00.

View the file

Other files

File Type Posted
W912P5-16-R-0002-0008.pdf PDF
W912P5-16-R-0002TSpecsAm8Page.pdf PDF
W912P5-16-R-0002TSpecsAm7Pages.pdf PDF
W912P5-16-R-0002-0007.pdf PDF
W912P5-16-R-0002ContDrawsAm6Sheets.pdf PDF
W912P5-16-R-0002RefDrawsAm6Sheets.pdf PDF
W912P5-16-R-0002TSpecsAm6Pages.pdf PDF
W912P5-16-R-0002-0006.pdf PDF
W912P5-16-R-0002_Price_Schedule-Am6_protected.xlsx XLSX spreadsheet
W912P5-16-R-0002TSpecsAm5Pages.pdf PDF
PPQ_Editable_protected.pdf PDF
W912P5-16-R-0002_Price_Schedule-Am5.xlsx XLSX spreadsheet
W912P5-16-R-0002-0004.pdf PDF
W912P5-16-R-0002-0003.pdf PDF
W912P5-16-R-0002-0002.pdf PDF
W912P5-16-R-0002ContDrawsAm2Sheets.pdf PDF
W912P5-16-R-0002RefDrawsAm2Sheets.pdf PDF
W912P5-16-R-0002TSpecsAm2Pages.pdf PDF
Pre-Proposal_Site_Visit_Minutes.pdf PDF
Pre-Proposal_Site_Visit_Sign-In_Sheet.pdf PDF
W912P5-16-R-0002-0001.pdf PDF
W912P5-16-R-0002_TSpecs.pdf PDF
Foreign_National_Pre-Proposal_Meeting_Request_Form.pdf PDF
GeneratorCommissioningReport-1957.pdf PDF
W912P5-16-R-0002_Contract_Drawings_D_Size.pdf PDF
W912P5-16-R-0002.pdf PDF
W912P5-16-R-0002_Reference_Dwgs.pdf PDF
Pre-Proposal_Meeting_and_Site_Visit_Request_Form.pdf PDF
W912P5-16-R-0002_AppA.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING DIVISION (JD9)

JAMIE.DAVIES@USACE.ARMY.MIL

(615) 736-7921

(615) 736-7124

NASHVILLE TN 37202-1070

W38XDD50719840

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Post Set Five Q&A,

2. Replace all references of "00010" w ith "00100"; Revise Section 00115, Paragraph 2.3; and Revise Section 00130, Paragraphs 4.1, 4.6 and 4.7;

3. Revise Technical Specifications;

4. Update Price Schedule and Price Schedule Information;

5. Include PDF editable version of PPQ;

6. FAR clause 52.209-7 made full text;

7. Revise DFARS clause 252.236-7001 and FAR clause52.252-3; and

8. Change proposal due date to August 31, 2016 at 1:00 PM CDT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-R-0002

X 9B. DATED (SEE ITEM 11)

06-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2016

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37202-1070

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

W912P5-16-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMEND 0005 TECHNICAL CHANGES

RFP No. W912P5-16-R-0002 Amendment No. 0005 Unit 4 Rehabilitation

Old Hickory Powerhouse Sumner County, Tennessee

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. Section 01 11 10 SUMMARY OF WORK

1. Remove Section 01 11 10 pages 3 and 4, and replace with revised Section 01 11 10 pages 3 and 4.

B. Section 01 22 00.00 MEASUREMENT AND PAYMENT

1. Remove Section 01 22 00.00 in its entirety (pages 1 through 26), and replace with revised Section 01 22 00.00 (pages 1 through 26).

C. Section 09 97 02.23 PAINTING

1. Remove Section 09 97 02.23 in its entirety (pages 1 through 37), and replace with revised Section 09 97 02.23 (pages 1 through 37).

D. Section 48 13 13.02 DISASSEMBLY AND REASSEMBLY OF HYDRAULIC

TURBINE GENERATOR UNIT

1. Remove Section 48 13 13.02 in its entirety (pages 1 through 36), and replace with revised Section 48 13 13.02 (pages 1 through 36).

E. Section 48 13 13.04 EXISTING TURBINE COMPONENT, REFURBISHMENT AND

REPLACEMENT

1. Remove Section 48 13 13.04 in its entirety (pages 1 through 40), and replace with revised Section 48 13 13.04 (pages 1 through 40).

F. Section 48 13 16.00 GENERATOR REWIND AND REFURBISHMENT

1. Remove Section 48 13 16.00 in its entirety (pages 1 through 40), and replace with revised Section 48 13 16.00 (pages 1 through 40).

--- END OF AMENDMENT NO. 0005 TECHNICAL CHANGES---

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 17-Aug-2016 01:00 PM to 31-Aug-2016 01:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

Q&A SET FIVE

Old Hickory Unit #4 Rehabilitation Solicitation Number: W912P5-16-R-0002

Questions and Answers Set Five

37. Question: Question is regarding the measurement performed by USACE specialists on the measured gap in the machine unit4 before to be stopped and possibly unit3. Can we have a copy of all available information gathered by USACE on the history on the unit to approach the technical issue?

Answer: No additional information will be made available.

38. Question: In the specification it indicates a .250 out of plumb condition of the unit.

Descriptions of concrete movement is explained. Is the concrete now stable and did the Corps perform an internal study of the condition and if so can contractors receive a copy for reference?

Answer: See responses to Questions #19, #21, and #37.

39. Question: Section 09 97 02.23 paragraph 1.1.1 c states that "On-site lead based paint

Removal" shall be used for components... such as...stator frame...". Please clarify if it is the Government's intention to abate and repaint the ENTIRE stator frame. Additionally, the upper/lower bearing brackets, intermediate/Inner head covers will be removed from the unit and stored at field. Can the government confirm if there will be any inspection and paining requirements on these components?

Answer: Section 09 97 02.23, Paragraph 1.1.1c has been revised. Painting of the intermediate and inner head covers is covered in Section 09 97 02.23, Paragraph 3.5, SYSTEM NO. 5-E-Z. The upper and lower bearing brackets will not be painted. Inspection of components during disassembly will be performed as defined in Section 48 13 13.02, Paragraph 3.7.

40. Question: Section 09 97 02.23 page 37, the paragraph under "SYSTEM NO. 23-C-Z", states that "The generator air housing and components shall be painted." Please confirm if both the outside and the inside of the generator air housing shall be entirely painted.

Answer: See Response to Question 26 in Amendment 0002. Section 09 97 02.23, Paragraph 3.5, SYSTEM NO. 23-C-Z has been updated.

41. Question: As per Section 09 97 02.23, the turbine pit above the steel liner shall be completely re-painted. From the site visit, it looks like the entire height of turbine pit is covered by steel liners. Please clarify which area "the turbine pit above the steel liner" refers to.

Answer: Section 09 97 02.23, "SYSTEM NO. 18" has been revised to remove this requirement.

42. Question: Technical Spec Section 48 13 16 article 3.19.5 a: requires factor test IR to be >

400 M-ohms (Described as a Factory Test- assume individual pole criteria). However, article 3.19.9.a requires complete winding IR to be > 400 M-ohms (all poles installed on Rotor Rim and pole to pole connections made) . Given the assumption in 5a to test one pole at a time and the need in 9a to test all poles together to ground, one of the requirements must be incorrect. Please provide the clarity to perform these tests - IEEE 43-2000 is the latest standard applicable.

Answer: Section 48 13 16, paragraph 3.19.5 has been revised. The contractor shall submit pass/fail criteria for approval.

43. Question: Section 48 13 16.00 page 27, Article 3.14.d.1 & 3: "Coil jacks shall be used to press the coils..." This Contractor is proposing to pack the slot by hand via filler and ripple springs. Given the small size of this multi-turn coil this Contractor proposes to insert these windings by hand. A winding pusher or jack will not be needed. Given the geometry of a multi-turn coil it is desirable to place by hand to protect the insulation of the winding during installation. The requirements for packout (check with a 0.003" feeler gauge) can be accomplished without forcing the coil placement. Respectfully request that the requirement above to use "coil jacks" to install the coils is removed from the solicitation.

Answer: Offerors shall propose on the job per the specifications. Value engineering change proposals may be submitted post-award during the submittal process under FAR 52.248-3.

44. Question: Section 48 13 13.02 paragraph 3.9.1e states that "...It may be necessary to move the generator stator. This will be dealt with as an as needed item." The CLIN 0008 also calls for an As Needed price for this work. To make sure all proposals can be evaluated equally, can the Government provide a detailed requirement on how this work shall be performed in the technical specification? Shall the work scope include excavation of existing soleplates, furnishing new soleplates and re-grouting?

Answer: Section 48 13 13.02, Paragraph 3.9.1.e has been revised. Additionally, the line item "Move Generator Stator for Unit 4 (As Needed)" has been removed. Recentering the unit is part of the rewind scope already covered in Section 48 13 16.00, Paragraph 3.10.4.

45. Question: Section 48 13 13.02. article 3.9.1 item e) states that it may be necessary to move the generator stator and this will be dealt with as an as needed item. Price item 0008 corresponds to this requirement. However, in section 48 13 16.00, article 3.10.4, it is stated that “The Contractor shall center and round the stator frame to the new unit centerline” as part of the base scope, without mention of being ‘as needed’. Please clarify.

Answer: Section 48 13 13.02, paragraph 3.9.1.e has been revised. Additionally, the "Move Generator Stator for Unit 4 (As Needed)" line item has been removed since this work is already part of the stator work under section 48 13 16.00, Paragraph 3.10.4.

46. Question: Section 48 13 13.02 Paragraph 3.1.3 d Measurements that require sweep checks.

Section 48 13 13.02 Paragraph 3.3 Pre-disassembly Alignment Checks. Question: Sweep check such as the rotor/stator air gaps will be very difficult to obtain because the unit is out of alignment, and there is no high pressure lift system on this unit. Though the unit can be lifted before each rotation to get oil onto the thrust bearing but pulling this unit for rotation will not provide accurate readings. There is vertical misalignment of U-4 and it known that the unit stator is not concentric with the turbine distributor by as much of 0.250".

Additionally the rotor poles are being rehabilitated and the stator will be re-centered to a new unit centerline. What useful purpose will a pre-disassembly sweep check be on this unit?

Answer: Section 48 13 13.02 Paragraph 3.1.3 has been updated. An alternative procedure for collecting measurement data for the generator rotor and stator as required in Paragraph 3.1.3d has been added.

47. Question: Section 48 13 13.04 paragraph 3.18.1 states that "The contractor shall refurbish the bottom ring in the field". In other places, it is implied that the bottom ring is removable and can be shipped to a shop for refurbishment and line boring. Please clarify if the bottom ring can be refurbished in an offsite shop.

Answer: Section 48 13 13.04, Paragraph 3.18.1 has been revised. It will be at the Contractors discretion whether the bottom ring will be refurbished in the field or in the shop.

48. Question: With regard to the Section 48 13 13.04 Paragraph 3.18.5 Machining of Upper

Horizontal Surface of the Discharge Ring (As needed), please confirm which CLIN should be used for this work scope.

Answer: CLIN 0073 "Machining of the Upper Horizontal Surface of the Discharge Ring (As Needed)" has been added.

49. Question: Section 48 13 13.04 paragraph 3.16.5 states that "machine up to 0.040 inches off the surface of the stay ring flange to restore the flanges to a flat and level condition." This statement is confusing because this paragraph is supposed to describe the machining of the head cover flange, as a subset of paragraph 3.16 Head Cover. Please clarify whether the flange mentioned in this paragraph refers to the mounting flange on the head cover or the mounting flange on the stay ring. If it refers the mounting flange on the stay ring, please specify which CLIN should be used. Please note that CLIN 0069 and 0070 are specified for machining the head cover flange only per description in Section 01 22 00.00.

Answer: The general inspection of the stay ring is performed in paragraph 3.11 but no machine work is called out in this paragraph. The machining of the stay ring flange is called out in the paragraph 3.16, Headcover, since the stay ring flange is critical to the flatness, runout and elevation of the headcover. Machining CLINs in Section 01 22 00.00 (now CLINs 0068 and 0069) have been updated accordingly.

50. Question: Will you be staying with the Bronze bearings for the wicket gates and other locations, or are you also considering using greaseless self lubricating composite bearings?

Answer: Bushings will be replaced as defined in Section 48 13 13.04.

51. Question: Are there any civil works (works with concrete) in spiral case required to smooth out the spiral case concrete walls?

Answer: There is no concrete work currently in the specifications for spiral case repair.

52. Question: Are Winter-Kennedy connections operable (usable) or do they need rework?

Answer: The Winter-Kennedy taps have not been used in a long time and their condition is unknown. However, there is no requirement in the specifications to measure relative efficiency since the runner is not being replaced.

53. Question: Are there any other measuring taps besides Winter Kennedy taps; where and how man?

Answer: There are no other taps available.

54. Question: Most of drawings for generator guide bearings and thrust bearing are missing.

Can we get those?

Answer: The Government has no additional drawings of the generator guide bearing or thrust bearing.

55. Question: Is it defined what kind of pneumatic shear pin detection system should be used?

Answer: The pneumatic shear pin detection system design is to be submitted for Government approval with requirements described in 48 13 13.04-3.22.

56. Question: With regard to the CLIN #0073 Provide New Bottom Ring Facing Plates (As Needed), please provide a detailed technical description of this scope. It doesn't exist in Section 48 13 13.04 and any other sections.

Answer: Section 48 13 13.04, Paragraph 3.18.6 has been added. Welding details are shown on existing reference drawing #39107.

57. Question: With regard to the CLIN #0068 Furnish New Head Cover Facing Plates (As Needed), please provide a detailed technical description of this scope. It doesn't exist in Section 48 13 13.04 and any other sections.

Answer: Section 48 13 13.04, Paragraph 3.16.6 has been added. Welding details are shown on existing reference drawings #39124 and 39124A.

58. Question: 48 13 13.06 "Tolerances for Stationary Thrust Bearing Shoe Segments..."

P517/684 – Respectfully request that the tolerance on Babbitt flatness be revised. In the 1st paragraph of "1. Dish Flatness", Contractors are to use a planekator. However, in the 3rd paragraph Contractors are asked to "zero the measuring device using the same location in the center of the shoe." This request to "zero the measuring device" cannot be done with a planekator.

Answer: Offerors shall propose on the job per the specifications. Alternative flatness measurement techniques may be submitted by the Contractor for approval post-award during the submittal process.

59. Question: With regard to CLIN 0090 Brake and Jack Cylinder Repair (As Needed), please provide a detailed description of the expected repair scope and technical requirement. Section 48 13 13.25 paragraph 3.3.6 mentions that "The Contracting Officer will direct the Contractor as to which repair to make." This is interpreted that the repair scope is uncertain.

Without a clear scope, the bidder won't be able to provide a fixed price for this CLIN.

Answer: The complete condition of the cylinders cannot be known without disassembling them. There is a base scope of refurbishment that is listed in paragraph 3.3.6. Expected repairs that could be performed if the inspections reveal damage include, but may not be limited to: honing of cylinder, re-chroming of pistons, and or smoothing of scratches or other minor damage.

60. Question: Section 48 13 16.00 paragraph 2.6.6 requires 3 new current transformers to replace existing transformers. The in-kind replacements requested are not available on the market today, however, equivalent window-type transformers are available. Will the contractor be allowed to use equivalent window-type CTs?

Answer: Section 48 13 16.00 Paragraph 2.6.6 has been updated. The new current transformers shall be of the wound type and match the existing CT ratings.

61. Question: Did the alarms or trip signal will be used to drive relays for machine protection or will they be acquired via a PLC or other digital mean?

Answer: Reference Section 48 13 16.01. The condition monitoring system will only be used for trending and analysis as described in paragraph 2.2.

62. Question: Section 01 11 10 paragraph 1.2.2.q Perform pre and post operational tests on Unit

No. 4. Comment: This paragraph shall be revised because there will be no pre operational tests on Unit 4.

Answer: Section 01 11 10, paragraph 1.2.2.q has been revised. No pre-operational testing will be performed on this unit since this unit is not currently able to produce power.

63. Question: Far 52.246-21 (Warranty of Construction): duration is 12 months from the date of unit acceptance. Sections 48 13 13.06 and Section 48 13 13.07 both contain warranty language that is 3 years in duration or 8000 hours of operation. Bearing surfaces are considered wear parts and are dependent on operating characteristics (oil cleanliness, oil temperature, load rejections, etc.). Please measure and record all pertinent operating data during the warranty duration so as to help define the cause of any warranty breach.

Answer: The 12 month warranty described in FAR 52.246-21 is applicable to all work covered under this contract. In accordance with Section 48 13 13.06 and 48 13 13.07, the generator guide bearings and thrust bearings shall be warranted to conform to these specifications for three years after receipt and acceptance at delivery site or 8000 hours of unit operation after installation, whichever comes first.

64. Question: Because no response has been received regarding our questions submitted three weeks ago and the responses may trigue more reviews and questions, the bidder requests the government to extend the question deadline (currently June 30, 2016) by two weeks.

Answer: An offeror may submit questions beyond the cutoff date for questions. The Government will review the question and decide whether to answer based upon the significance of the question. The Government will only answer the question and consider an extension of the due date for proposals if a follow up question/response is significant enough to substantially affect an offeror's proposal. If the Government decides to address questions received after the cutoff date they will be issued in a forthcoming amendment.

65. Question: Question regarding answer to Q23. It is stated the powerhouse personnel will only support 6-12, does this mean that we can’t work on 2 shifts? , That we can’t work outside of the 12hrs per day?

Answer. Reference Section 01 10 10, Paragraph 1.37.2. Powerhouse staff can support no more than 6-12 hour days for the duration of the contract. Under certain conditions and with prior coordination additional hours may be supported for specific items of work but the Government makes no guarantee that requests will be granted.

66. Question: Question regarding volume 4 price. What are the required financial status to answer item F. Proof of financial capability?

Answer: This includes any documentation the offeror deems appropriate to show their financial capability, which can include, but is not limited to, recent financial audit reports or bank statements.

67. Question: Are there or will there be specific bond forms that we need to use? If so, will you provide them?

Answer: In accordance with FAR clause 52.228-15, performance bonds shall be on Standard Form 25 and Payment Bonds shall be on Standard Form 25-A. FAR clause 52.228- 1 lists acceptable bid guarantees. However, Standard Form 24 is typical.

68. Question: On page 26 of the solicitation, it is required that "The Small Business

Participation Plan shall be based on the offeror's best effort; however it must meet the minimum total small business participation goal of 23% of the total contract value"?

However, according to the FAR52.219.9 (d)(1), "Goals" shall be "expressed in terms of percentage of total planned subcontracting dollars, for the sue of small business..." The goal of 23% of the total contract value is unachievable because of the specialty required by the work scope and also because of the fact that most of the work scope will be performed by the prime contractor to bring the lowest risk to the government. By referencing to other USACE projects with similar work scope, the bidder requests to change the mandatory minimum goal to 15% of total planned subcontracting value."

Answer: Per Amendment 0005, Factor 6 has been revised. It now states "the minimum total Small Business Participation goal of 23% of the total contract value to be subcontracted."

69. Question: 2.3.1 Factor 6 -Small Business Participation Plan (FAR Clause 52.219-9):

"minimum total Small Business Participation goal of 23% of the total contract value." As a large business and an original equipment manufacturer in the Hydroelectric Industry, this contractor self performs most of the tasks required to refurbish Hydroelectric equipment.

Small Business participation within the remaining subcontracted work typically involves transportation, consumables, bearing work, NDE and some local machine shop activities as applicable. Consequently, the SB goal of 23% of contract value is unreasonable. The requirement for participation of small businesses in Government contracts is consistent, however, the magnitude of participation goals are escalating beyond feasibility. Respectfully request that the small business participation plan goals are derived as a percentage of the total subcontracting value and not the total contract value.

Answer: See Response to Question #68.

70. Question: Question is regarding the document (form PPQ -0) past performance questionnaire. We understand this document has to be filled in by our customer as references.

Can you submit to us the document in Word format for an easier used by our customer?

Answer: An Editable PPQ PDF has been posted with Amendment 0005.

71. Question: Section 00115, article 1, Factor 7, Tab C: refers to Section 00010. Please confirm that this section reference is correct.

Answer: Section reference has changed to 00100. See Amendment 0005.

72. Question: Question on Insurance requirement. Litostroj will be compliant with the requirement and we would like to know the detailed about the USACE site insurance and deductible, also do you have a wrap up in place and deductible.

Answer: The Government is self-insured and therefore the site does not have insurance and deductible information to provide. However, the contractor will be required to have insurance (FAR clause 52.228-5).

73. Question: May we have the excel version of the price schedule?

Answer: An Excel version of the bid schedule is provided with Amendment 0005.

The following have been modified:

PRICE SCHEDULE

PRICE SCHEDULE

OLD HICKORY UNIT NO. 4

TURBINE GENERATOR REHABILITATION

(July 2016)

Item No. Description Est.

Qty.

UOM Unit Price Amount

0001-0010 SITE WORK AND STRUCTURAL

0001 Site Mobilization to Accomplish Work;

Site Demob to Remove Equipment, Cleanup and Restore Site to Original condition

1 Job $ $

0002 Disassemble Hydraulic Turbine/Generator Unit and Inspect Components

1 Job $ $

0003 Reassemble Generating Unit 1 Job $ $

0004 Furnish Center Hole Jacking System 1 Job $ $ 0005 Investigate the Condition of Generating

Unit Prior to Disassembly 1 Job $ $

0006 Determine Unit Centerline with Benchmarks, Unit 4

1 Job $ $

0007 Operational Testing After Reassembly of Generating Unit

1 Job $ $

0008 Painting 1 Job $ $ 0009 On-site Lead Based Paint Removal and

Disposal 1 Job $ $

0010 Furnish New Draft Tube Platform 1 Job $ $

0011-0030 TURBINE RUNNER

REFURBISHMENT

0011 Disassembly and Reassembly of Turbine Runner in the Field

1 Job $ $

0012 Shipment of Turbine Runner and Blades to/from Contractor’s Shop

1 Job $ $

0013 Inspection of Blade Servo Piston and Cylinder, Piston Rod and Piston Cap

1 Job $ $

0014 Furnish Blade Servomotor Piston Rings 1 Job $ $ 0015 Furnish Blade Servo Piston Rod Rings 1 Job $ $

0016 Furnish Blade Servo Piston Rod Bushing

1 Job $ $

0017 Furnish Superbolt Nuts for Blade Piston Rod

1 Job $ $

0018 Furnish New Blade Piston Rod (As Needed)

1 Job $ $

0019 Furnish New Runner Hub Bushings and Operating Rod Bushings

1 Job $ $

0020 Furnish Superbolt Nuts for Blade Operating Mechanism

1 Job $ $

0021 Inspection of Runner and Blades and Components

1 Job $ $

0022 Furnish All Steel Components for Blade Operating Mechanism

1 Job $ $

0023 Machine Runner Flange Face

0023A Machine Runner Flange Face 1 Job $ $

0023B Additional Machining Runner Flange Face (As Needed)

2 EA $ $

0024 Machine Runner Flange Face For Double O-Ring Installation And Provide O-Rings

1 Job $ $

0025 Machine O-Ring Grooves In The Runner Fastener Bores For 18 Runner To Main Shaft Fasteners And Provide O-Rings

1 Job $ $

0026 Machine Blade Inner And Outer Bushings after Installation And Provide and Install Radial Dowel Pins For Inner Blade Bushing

1 Job $ $

0027 Blade Packing Box Modification To Blade Trunnion

1 Job $ $

0028 Blade Packing Box Modification To Blade Retaining Rings

1 Job $ $

0029 Crosshead Eye End Bore Chamfer Modification

1 Job $ $

0030 Polish Blade Trunnions 1 Job $ $

0031-0091 MECHANICAL WORK

0031 Refurbish Oil Head 1 Job $ $ 0032 Furnish New Oil Head Bushings 1 Job $ $

0033 Ship Intermediate Shaft and Main Shaft To Contractor’s Shop

1 Job $ $

0034 Inspect Intermediate and Generator Shafts

1 Job $ $

0035 Inspect Turbine Shaft 1 Job $ $

0036 Machine Main Shaft Below Shaft Sleeve

0036A Machine Main Shaft Below Shaft Sleeve

1 Job $ $

0036B Additional Machine Main Shaft Below Shaft Sleeve (As Needed)

3 EA $ $

0037 Machine Main Shaft Flange Face to Runner Hub

0037A Machine Main Shaft Flange Face to Runner Hub

1 Job $ $

0037B Additional Machine Main Shaft Flange Face to Runner Hub (As Needed)

3 EA $ $

0038 Machine Outer Diamter (OD) of New Turbine Shaft Sleeve

1 Job $ $

0039 Hone Blade Servomotor Cylinder 1 Job $ $ 0040 Machine Blade Servomotor Cylinder

(As Needed) 1 Job $ $

0041 Assembly/Disassembly Turbine Runner, Blades and Shafts for Pressure Testing in Shop

1 Job $ $

0042 Pressure Test Blade Servo Operating System

1 Job $ $

0043 Static Pressure Test Assembled Turbine Runner, Blades and Shafts

1 Job $ $

0044 Hydraulic Turbine Test Oil

0044A Provide Hydraulic Turbine Oil for Pressure Testing

1 Job $ $

0044B Package and Ship Turbine Test Oil to Old Hickory Powerhouse (As Needed)

1 Job $ $

0045 Inspect and Refurbish Upper Generator Guide Bearing Pads

0045A Inspect and Ship Upper Generator

1 Job $ $

0045B Refurbish Upper Generator Guide Bearing Pads

1 Job $ $

0046 Inspect and Refurbish Lower Generator

0046A Inspect and Ship Lower Generator

1 Job $ $

0046B Refurbish Lower Generator Guide Bearing Pads

1 Job $ $

0047 Inspect Turbine Guide Bearing Housing and Inspect and Refurbish Turbine Guide Bearing

0047A Inspect Turbine Guide Bearing Housing 1 Job $ $ 0047B Inspect and Ship Turbine Guide Bearing 1 Job $ $ 0047C Refurbish Turbine Guide Bearing 1 Job $ $ 0048 Inspect and Refurbish Spare Upper

Generator Guide Bearing Pads

0048A Inspect and Ship Spare Upper Generator

1 Job $ $

0048B Refurbish Spare Upper Generator Guide Bearing Pads

1 Job $ $

0049 Inspect and Refurbish Spare Lower Generator Guide Bearing Pads

0049A Inspect and Ship Spare Lower Generator

1 Job $ $

0049B Refurbish Spare Lower Generator Guide Bearing Pads

1 Job $ $

0050 Inspect and Refurbish Spare Turbine Guide Bearing

0050A Inspect and Ship Spare Turbine Guide Bearing

1 Job $ $

0050B Refurbish Spare Turbine Guide Bearing 1 Job $ $ 0051 Generator Thrust Bearing Phase 1

Inspection 1 Job $ $

0052 Generator Thrust Bearing Phase 2 Inspection (As Needed)

1 Job $ $

0053 Refurbishment of Thrust Bearing Shoes 0053A Shipment of Thrust Bearing Shoes 1 Job $ $ 0053B Refurbish Thrust Bearing Shoes 1 Job $ $ 0053C Machine Shoe Backside (As Needed) 1 Job $ $ 0054 Refurbishment of Thrust Bearing

Runner (As Needed)

0054A Shipment of Thrust Bearing Runner (As Needed)

0054B Resurface Running Face and Backside of Thrust Bearing Runner (As Needed)

1 Job $ $

0054C Runner Face Resurfacing (As Needed) 1 Job $ $ 0054D Rework The Split Faces Of The Thrust

Bearing Runner (As Needed) 1 Job $ $

0054E Furnish New Thrust Bearing Runner Split Line Keys and Perform Related Keywork (As Needed)

1 Job $ $

0054F Furnish and Install New Fasteners for Joining Runner Halves (As Needed)

1 Job $ $

0055 Inspect and Refurbish Air Valve Assembly

1 Job $ $

0056 Refurbish Wicket Gate Servomotors 1 Job $ $ 0057 Chrome Plate Gate Servo Piston Rod

(As Needed) 1 Job $ $

0058 Wicket Gates (Alternates) 0058A Inspect and Refurbish Existing Wicket

Gates (Alternate) 1 Job $ $

0058B Provide New Stainless Steel Wicket Gates (Alternate)

1 Job $ $

0059 Replace Wicket Gate Mechanism Grease System

1 Job $ $

0060 Provide New Bronze Bushings/Bearing Plate for Wicket Gate Linkage, Operating Mechanism, Gate Stem, Wicket Gate Servos and Vacuum Valve

1 Job $ $

0061 Wicket Gate Operating Mechanism Refurbishment

1 Job $ $

0062 Provide a Pneumatic Shear Pin Detection System with Alarms

1 Job $ $

0063 Furnish Spare Set of Shear Pins 1 Job $ $ 0064 Stay Ring Inspection 1 Job $ $ 0065 Headcover and Facing Plate Inspection and Refurbishment 1 Job $ $

0066 Machining of Headcover Facing Plates (As Needed)

4 Job $ $

0067 Furnish New Headcover Facing Plates (As Needed)

3 EA $ $

0068 Machining of Stay Vane Mounting Flange to Headcover

1 Job $ $

0069 Additional Stay Vane Flange Machining (As Needed)

0070 Bottom Ring and Facing Plate Inspection and Refurbishment

1 Job $ $

0071 Machining of Bottom Ring Facing Plates (As Needed)

4 Job $ $

0072 Provide New Bottom Ring Facing Plates (As Needed)

3 EA $ $

0073 Machining of Upper Surface of Discharge Ring (As Needed)

1 Job $ $

0074 Operating Ring Refurbishment 1 Job $ $ 0075 Line Bore Wicket Gate Stem Bushing

Housings 1 Job $ $

0076 Provide New Packing Box, Gland and Lantern

1 Job $ $

0077 Provide Shaft Sleeve 1 Job $ $ 0078 Furnish Mandrel and Clamps for Shaft

Sleeve (As Needed) 1 Job $ $

0079 Discharge Ring Cavitation Repair 0079A Machine and Overlay with Stainless

Steel a 48 inches Wide by ¼ inch Deep Band - Basic Repair

1 Job $ $

0079B Additional 1 inch Wide Bands by ¼ inch Deep (As Needed)

12 Inch $ $

0079C Additional 1 inch Wide Bands by 1/8 inch Deep (As Needed)

60 Inch $ $

0080 Base Metal Spot Repair Discharge Ring 0080A First 100 Pounds of Base Metal Repair 100 LB $ $ 0080B Over 100 Pounds (As Needed) 75 LB $ $ 0081 Discharge Ring Anchorage 0081A First 288 Anchors Installed 288 EA $ $ 0081B Over 288 Anchors Installed (As

Needed)

150 EA $ $

0082 Discharge Ring Epoxy-Injection 0082A First 5 Cubic Feet of Epoxy 5 CF $ $ 0082B Over 5 Cubic Feet of Epoxy (As

Needed)

5 CF $ $

0083 Base Metal Spot Repair Runner Hubs, Blades, Seal Ring Segments

0083A First 100 Pounds 100 LB $ $ 0083B Over 100 Pounds (As Needed) 75 LB $ $ 0084 Removal, Inspection, and Reinstallation of Cooling Water, Oil, Carbon Dioxide, and Pneumatic Piping Systems

0085 Replace Turbine Guide Bearing Oil System

1 Job $ $

0086 Thrust Bearing Oil Cooler 1 Job $ $ 0087 High Pressure Lift System 1 Job $ $ 0088 Braking System Refurbishment 1 Job $ $ 0089 Brake Ring Field Inspection 1 Job $ $ 0090 Brake and Jack Cylinder Repair (As

Needed)

12 EA $ $

0091 Brake Ring Refurbishment (As Needed) 1 Job $ $

0092-0104 ELECTRICAL WORK

0092 Furnish Complete Set Of Stator Coils

Including Supplies and Accessories For A Complete New Winding Including Factory Testing

1 Job $ $

0093 Furnish For Accelerated Life Test and Have Tested Prototype Coils Identical To Coils Supplied In Item 0092

1 Job $ $

0094 Furnish For Thermal Cycle Test and Have Tested Prototype Coils Identical To Coils Supplied In Item 0092

1 Job $ $

0095 Furnish Spare Parts 1 Job $ $ 0096 Cleaning Rotating Main And Pilot

Exciters And Truing Collector Rings 1 Job $ $

0097 Re-insulate Rotor Field Poles 1 Job $ $ 0098 Furnish and Install New Stator Core 1 Job $ $ 0099 Install and Test New Stator Winding 1 Job $ $ 0100 Furnish and Install New Generator

Terminal Box 1 Job $ $

0101 Rewire Turbine and Generator 1 Job $ $ 0102 Perform Special Field Tests 1 Job $ $ 0103 Furnish and Install Complete New

Machine Condition Monitoring System 1 Job $ $

0104 Furnish and Install New High Resistance Grounding System

0105-0117 AS NEEDED LABOR

0105 Miscellaneous Welding (As Needed) 100 LBS $ $ 0106 Machinist Hire (As Needed) 100 HRS $ $ 0107 Electrician Hire (As Needed) 100 HRS $ $ 0108 Welding Services (As Needed) 100 HRS $ $ 0109 Painter Hire (As Needed) 50 HRS $ $

0110 Other Skilled Craftsmen Hire (As

100 HRS $ $

0111 General Laborer Hire (As Needed) 100 HRS $ $ 0112 Liquid Penetrant Method (As Needed) 40 HRS $ $ 0113 Magnetic Particle Method (As Needed) 40 HRS $ $ 0114 Ultrasonic Method (As Needed) 40 HRS $ $ 0115 Radiographic Method (Shop Only) (As

Needed)

10 HRS $ $

0116 Thermal Spraying (As Needed) 25 HRS $ $ 0117 Miscellaneous Parts and Materials (As

1 Job NTE $ 100,000.00

0118 Contractor Coordination 0118 Contractor Coordination 1 Job $ $

Total $

PRICE SCHEDULE INFORMATION

ALTERNATE ITEMS - The Government will require the delivery of one but not both of the numbered sub-contract line items identified in the Price Schedule as an "(Alternate") item. For example, one of sub-contract line items 0058A and 0058B will be authorized but not both. The Contracting Officer, or his representative, will authorize an "(Alternate)" item by written notice to the Contractor on or before sixty (60) days from award.

AS NEEDED ITEMS - The Government may require the delivery of the numbered line item(s) identified in the Price Schedule as an "(As Needed)" item depending on factors such as the findings documented in an as-found condition inspection report. The Contracting Officer, or his representative, will authorize an "(As Needed)" item by written notice to the Contractor from the date of contract award through the date of contract completion, unless otherwise specified herein.

If an "(As Needed)" item is authorized, the contract completion date will not be extended, however, with mutual agreement, the schedule of work may be modified.

SECTION 00100

SECTION 00100

INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS

1.0 GENERAL REQUIREMENTS

1.1 Intent: The intent of this solicitation is to select one contractor for the Old Hickory Turbine-Generator Unit #4 Rehabilitation project.

1.2 Project Description: The Nashville District U.S. Army Corps of Engineers (USACE) has a requirement for Construction Services for turbine-generator Unit #4 located in the Old Hickory Powerhouse in Hendersonville, Tennessee. Unit #4 is 58 years old and was taken out of service in July 2013 because of two problems, an alignment issue and an oil leak. The scope of this construction project is to repair, refurbish, and modernize real property at the Old Hickory Power Plant, specifically turbine-generator Unit #4. The contractor will supply all labor, materials, and supplies to disassemble, repair and replace parts, and reassemble turbine-generator Unit #4.

The scope of work for the Old Hickory turbine-generator Unit #4 rehabilitation generally consists of rewinding and restacking the generator, realigning the unit, refurbishing the existing turbine and ancillary associated work. Details are included in the technical specifications.

1.3 Disclosure of Magnitude of Construction Project: The estimated magnitude of this requirement is between $10,000,000 and $25,000,000.

1.4 Basis of Selection of Award: This is “Best Value – Tradeoff” solicitation, as it may be in the best interest of the Government to consider award to other than the lowest priced offeror or other than the highest technically rated offeror.

1.5 Type of Contract: The Government intends to award one firm-fixed price contract.

1.6 Who May Submit: The procurement is a full and open competition. Small businesses may submit proposals.

1.7 North American Industry Classification System (NAICS) Code and Small Business Size Standard: The NAICS code for this project is 237990, Other Heavy and Civil Engineering Construction is applicable to this project.

1.8 Pre-Proposal Site Visit: An organized site visit has been scheduled to occur during the solicitation period. Offerors should inspect the job site prior to submitting a proposal.

Offerors should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve offerors from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents. Please refer to the Federal Acquisition Regulations (FAR) clause 52.236-27 Alt I, incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.

REGISTRATION: Only registered persons will be permitted to attend the site visit. In addition to the information below, please also provide your firm’s name, firm’s CAGE and/or DUNS number, and name and position title of primary point-of-contact and their telephone number and email address. Please provide this information via email to Jamie.Davies@usace.army.mil.

Contractors and/or potential contractors wishing to attend a pre-proposal meeting held at or in LRN restricted/controlled areas (such as a Power Plant or Navigation Lock) shall submit a Nashville District (LRN) Security Access Form to the Contract Specialist five (5) days (or two weeks for foreign nationals) prior to the site visit or meeting. If submitting the document in less than five days (or two weeks for foreign nationals), the Offeror may not receive approval for participation. The Contract Specialist will notify the Contractor if the request is approval or denied. Any pre-proposal meeting which will cover anything other than public domain information shall be limited to US Citizens, except under unique circumstances. The Security Access Form and guidance is available at http://www.lrn.usace.army.mil/BusinessWithUs/Contracting/Contract Security Requirements.

U.S. CITIZENS: The Offeror shall submit a Nashville District (LRN) Security Access Form to the Nashville District Point of Contact (LRN POC), Contract Specialist Jamie Davies, no later than five (5) days prior to the site visit or any meeting held at or in LRN restricted/controlled areas (such as a Power Plant or Navigation Lock). If submitting the document in less than five days, the Offeror may not receive approval for participation. The LRN POC will notify the individual(s) if the request is approved or denied. The Security Access Form and guidance is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Pre-Proposal Meeting and Site Visit Request Form.

FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Pre- Proposal Meeting Request Form and legible color copies of two of the following documents:

Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I- 551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I- 688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I-571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN Point of Contact, Contract Specialist Jamie Davies, who will forward the documents to the LRN-SM mailbox (dll-celrnsm@usace.army.mil) for approval. These documents must be submitted two (2) weeks prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQUSACE) level. Exceptions will be considered on a case by case basis but will be limited. The form is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Foreign National Pre-Proposal Meeting Request Form.

POINT-OF-CONTACT: For questions and /or concerns regarding the site visit, please contact Contract Specialist Jamie Davies via email at the address referenced above.

This will be the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.

1.9 POC for Communication/Questions: Any communications regarding this procurement must be made in writing to the Nashville Contracting Branch, Attn: Jamie Davies at email Jamie.Davies@usace.army.mil or facsimile: (615) 736-7124. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, telephone and facsimile numbers to include area code.

Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be scheduled.

QUESTIONS: Questions regarding the solicitation must be submitted to Jamie Davies via email at Jamie.Davies@usace.army.mil no later than 2:00 PM CT on June 30, 2016.

1.10 Amendments Prior to Date Set for Closing of RFP. The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of proposal. Such revisions and amendments, if any will be announced by an amendment or amendments to this RFP. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of proposals may be postponed by such number of days as in the opinion of the issuing officer will enable offeror to revise their proposal. In such cases, the amendment will include an announcement of the new date for receipt of proposals.

2.0 WHERE TO SUBMIT & SUBMITTAL DEADLINE

2.1 Offerors shall submit their proposals no later than the time and date specified in Block 13 of Standard Form 1442 (SF 1442) of this solicitation to:

If being hand delivered:

Arrive at address shown below (USPS) and call Jamie Davies at 615-736-7921 or Karen Benninghoven-Nell at 615-736-7917 to gain access to the 6th floor from elevator lobby.

U.S. Army Corps of Engineers Nashville District Contracting Branch, CLENR-RC-N Attn: Mrs. Jamie Davies

Solicitation Number W912P5-16-R-0002 110 9th Avenue South, Room A680, Sixth Floor Nashville, TN 37203

Physical Address for mail delivery (USPS or carrier):

U.S. Army Corps of Engineers Nashville District Contracting Branch, CLENR-RC-N Attn: Mrs. Jamie Davies Solicitation Number W912P5-16-R-0002 110 9th Avenue South, Room A405

Faxed or emailed proposals will not be accepted.

3.0 SUBMISSION FORMAT AND NUMBER OF SUBMITTALS

3.1 Offerors are required to submit a proposal made up of four (4) volumes as shown in Table 00100-1 below. All proposal materials shall be in binders with a table of contents and tabbed section dividers. All pages in each binder shall be numbered to correspond with a table of contents.

Table 00100-1

Proposal Requirements (Evaluation Factors) Quantity to be Submitted

Volume I – Past Performance Proposal

Factor I – Performance Confidence Assessment

Original and six (6) numbered copies and one electronic copy on labeled

CD

Volume II – Technical Proposal

Factor 2 – Turbine Refurbishment Subfactor 2A – Disassembly, Repair, and Assembly Plan and Field Machining Capability Subfactor 2B -- Turbine Component Machining and Manufacturing Capability Factor 3 – Generator Stator Rewind Subfactor 3A – Stator Winding Losses Subfactor 3B – Stator Winding Manufacturing and Installation Details Factor 4 – Corporate Approach Subfactor 4A – Safety Management Subfactor 4B – Quality Management Factor 5 – Schedule

Original and six (6) numbered copies and one electronic copy on labeled

CD

Volume III – Small Business

Factor 6 – Small Business Participation Plan

Original and one (1) numbered copy and one

Participation Plan electronic copy on a labeled

CD

Volume IV– Price Proposal

Factor 7 – Price A. Proposal Data Sheet B. SF 1442 and acknowledged amendments (if any) C. Section 00100 D. Section 00600 (unless available at SAM) E. Bid Guarantee F. Proof of Financial Capability G. Joint Venture Agreement, if applicable

Original only and one electronic copy on labeled CD (Electronic copy shall include Excel version of Price Schedule)

3.2 The proposal volumes shall be submitted in separate three-ring binders with a table of contents and tabbed section dividers. Each binder shall be clearly labeled as follows:

Volume I – Past Performance Proposal - Old Hickory Unit #4 Turbine-Generator Rehabilitation Project.

Volume II – Technical Proposal - Old Hickory Unit #4 Turbine-Generator Rehabilitation Project.

Volume III – Small Business Participation Plan - Old Hickory Unit #4 Turbine- Generator Rehabilitation Project.

Volume IV – Price Proposal - Old Hickory Unit #4 Turbine-Generator Rehabilitation Project.

The sections in each volume shall be organized and tabbed by Factor and Subfactor in the order shown in Table 00100-1. Volume IV shall be packaged separately from the other volumes, in a sealed envelope or box, and shall be clearly marked on the outside of the package, “Volume IV – Price”. The CD for Volume IV which shall include an Excel version of the Price Schedule shall be included in the package with the Price binder. The sealed Volume IV package shall also be labeled with the name, address and telephone number of the Offeror. No mention of price shall be included in Volumes I or II. The originals of Volumes I, II, and III shall be clearly marked “ORIGINAL” on the front cover of the binders. All copies shall be labeled on the front cover “Set 1 of 6”, “Set 2 of 6”, etc. The name, address and telephone number of the Offeror or shall be identified on the cover of each binder. The Compact Discs shall be labeled likewise.

3.3 Volume I, Past Performance Proposal shall be limited to no more than 50 pages, 8-1/2” by 11”, printed on the front side only. Illustrations, tables and charts printed on 11” by 17” paper will count as 2 pages. Pages should have a one-inch margin on all sides. Text should be 12-point, Times New Roman. (Captions for drawings and tables may be 10-point.) Pages exceeding the page limit will be removed and not evaluated.

3.4 Volume II – Technical Proposal shall not exceed 100 – 8 1/2” by 11” pages printed on the front side only, excluding the cover page, table of contents, list of tables and list of acronyms. Illustrations, tables and charts printed on 11” by 17” paper will count as 2 pages.

Pages should have a one-inch margin on all sides. Text should be 12-point, Times New Roman. (Captions for drawings and tables may be 10-point.) Pages exceeding the page limit will be removed and not evaluated.

3.5 Volume III, Small Business Participation Plan shall be limited to no more than 50 pages, 8-1/2” by 11”, printed on the front side only. Illustrations, tables and charts printed on 11” by 17” paper will count as 2 pages. Pages should have a one-inch margin on all sides. Text should be 12-point, Times New Roman. (Captions for tables may be 10-point.) Pages exceeding the page limit will be removed and not evaluated.

3.6 Volume IV, Price Proposal should be limited to no more than 300 pages, 8-1/2” by 11”, printed on the front side only. Pages should have a one-inch margin on all sides. Text should be 12-point, Times New Roman. Pages exceeding the page limits will be removed and not evaluated.

4.0 INSURANCE/BONDS:

4.1 BID BONDS (SF 24). All offerors are required to submit bid bonds with their proposal.

In accordance with FAR 52.228-1, Bid Guarantee, the bid guarantee amount shall be at least 20 percent of the base bid price but shall not exceed $3,000,000.00.

4.2 INSURANCE. Contractor shall carry Liability and Insurance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .