RFP_W912LP-17-R-0002_Amendment_0004.pdf
PDF 1 MB Posted
- Attached to
- Design-Build Consolidated Support Functions (CSF) Federal contract opportunity
- Solicitation number
- W912LP-17-R-0002
About this file
Amendment 0004 to Solicitation W912LP-17-R-0002.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_W912LP-17-R-0002_Amendment_0005.pdf | ||
| RFP_W912LP-17-R-0002_Phase_2_QandA_1.pdf | ||
| Amendment_0003_to_W912LP-17-R-0002.pdf | ||
| Phase_2_Solicitation_W912LP-17-R-0002_with_Attachments.pdf | ||
| RFP_W912LP-17-R-0002_QandA_2017-04-27.pdf | ||
| RFP_W912LP-17-R-0002_QandA_2017-04-24.pdf | ||
| RFP_W912LP-17-R-0002_QandA_2017-04-14.pdf | ||
| W912LP-17-R-0002-0001_Conformed_Copy.pdf | ||
| W912LP-17-R-0002-0001_with_Atch1.pdf | ||
| EXHIBIT_C_-_Performance_Evaluation_Package.doc | DOC document | |
| EXHIBIT_B_-_Subcontractor_Information_and_Consent.doc | DOC document | |
| EXHIBIT_A_-_Performance_Relevancy_Questionnaire.pdf | ||
| Consolidated_Brand_Name_J&A_17-008_Redacted.pdf | ||
| W912LP-17-R-0002_Final_Combined.pdf | ||
| EXHIBIT_F_-_Pre-Proposal_Inquiry_Format.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F8Z3CE7047AW01 VSSB099014
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0004 to W912LP-17-R-0002, Consolidated Support Functions project at the Sioux City Air Base is changed as follow s:
(Continued on Page 2)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LP-17-R-0002
X 9B. DATED (SEE ITEM 11)
23-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2017
CODE
USPFO FOR IOWA
7105 NW 70TH AVE
CAMP DODGE
JOHNSTON IA 50131-1824
W912LP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912LP-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0004
1. As a result of the Interim Interviews and questions received to date, the Project Requirements Manual (PRM) for the Consolidated Support Functions facility is hereby amended. Reference Attachment #1, CSF Amendment 04, dated 6-26-17 for changes/clarifications.
2. Attachment #2, AF Form 66, Schedule of Material Submittals CSF, is hereby incorporated into this Requst for Proposal (RFP).
3. The wage determination applicable to this solicitation has been modified effective 05/12/2017. Reference Attachment #3, WD IA170148, Mod 4 05-12-2017 for the updated wage determination.
4. All other terms and conditions of the solicitation remain unchanged.
Consolidated Support Functions Amendment No. 04
IA Air National Guard Base, Sioux City
FEH Project No. 2013008.01 Page 1 of 8
7 1 0 PI E R CE S T. , S UI T E 1 0 0
S I O U X CI T Y, I O W A 51 1 0 1
7 1 2 . 2 5 2. 3 8 8 9
AMENDMENT NO. 04
GENERAL CONTRACT
Design and Construction of the Consolidated Support Functions (CSF)
185th Air Refueling Wing (185A RW)
Iowa Air National Guard Base
Sioux City, Iowa
Project Number: VSSB099014
ARCHITECTS PROJECT # 2013008.01
FEH DESIGN
701 Pierce Street, Suite 100
PHONE (712) 252-3889
DATE ISSUED: June 26, 2017
TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:
Acknowledge receipt of this Amendment in the space provided on the Bid Form. Failure to do so may subject
Bidder to disqualification. This Amendment forms a part of the Proposal Documents and modifies them as follows:
PROJECT REQUIREMENTS MANUAL ITEMS
1) Part 2 - General Requirements
a) Clarification: Any reference in any of the Part 2 – General Requirements or Part 3 – 3.4 Performance
Requirements requiring the engineer, architect or designer of record to be registered or licensed in the “State of Iowa” shall be deleted. The professional requirement for the engineer, architect or designer of record to be registered or licensed shall be in accordance with Part 2 Section “Design
After Award”, paragraph 1.01-C.1.
b) Section 2 – 01 45 10 Contractor Quality Control: Paragraph 1.03-D.2.a.: Delete fourth sentence ( The
CQC System Manager shall be assigned no other Project duties.) and replace with the following:
W912LP-17-R-0002 AMENDMENT 0004
ATTACHMENT #1
FEH Project No. 2013008.01 Page 2 of 8
7 1 0 PI E R CE S T. , S UI T E 1 0 0
S I O U X CI T Y, I O W A 51 1 0 1
7 1 2 . 2 5 2. 3 8 8 9
“The CQC System Manager may perform other duties, including Health & Safety Manager, but shall not perform the duties of Construction Superintendent, Construction Foreman or construction laborer.”
2) Part 3, Section 3.1-A Site & Exterior Facilities:
a) Paragraph G Anti-Terrorism & Force Protection: Add sub-paragraph 8) as follows:
8) Existing Buildings around perimeter of CSF site cannot be “hardened” under this Project.
This shall include Building 261. Design-Builder’s solution for site parking and roadways shall meet “Conventional Construction Standoff” requirements of adjacent facilities as well as the new CSF facility standoff requirements.
b) Paragraph F.5)-b.: Clarification; the on-site storm piping is defined by G33 1.02.B CULVERTS, which requires concrete pipe, as does this Paragraph F.5)-b. – under “Additional Storm Water Drainage
Provisions”: which states “…storm piping shall be concrete pipe (RCP); (no HPDE).” Add the following sentence to paragraph F.5)-b.:
“The City standard is RCP and that is the requirement of this Project. NOTE: the minimum diameter for RCP is 15 inches, per City Standards.”
c) Paragraph F.6): Add new sub-paragraph F.6).f. as follows:
“f. Delivery Truck Access: Food delivery truck s will need access to building to facilitate food deliveries for the Kitchen spaces. Loading dock shall not be provided. Truck delivery building access to be designed to handle all truck sizes up to and including semi-tractor trailer deliveries.”
d) Paragraph H.1), 100-year runoff vs 5-year release rate has been further reviewed with the City of
Sioux City.
Delete sentence:
“These facilities will have to be underground as no standing water will be permitted on site.”
Add the following to this paragraph:
“If the project does not change the impervious area of the site by more than 5,000 SF, the requirements of this Paragraph do not go into effect; if the impervious area changes by more than 5,000 SF, the requirements of this Paragraph apply. Note: if the impervious area change is more than 5,000 SF, a variance may be requested of the City, but even with the variance, some sort of retention will be required. Retention can be in the form of utilizing existing adjacent drainage ways, on site retention or underground retention. Above ground retention shall not have any long term standing water and short term standing water to be limited to a duration of 24 hours maximum”.
FEH Project No. 2013008.01 Page 3 of 8
7 1 0 PI E R CE S T. , S UI T E 1 0 0
S I O U X CI T Y, I O W A 51 1 0 1
7 1 2 . 2 5 2. 3 8 8 9
e) Paragraph K.11.f. Natural Gas: Add sub-paragraph 2. as follows:
“2. The gas service to Building 263 is a high-pressure service.”
f) Paragraph K.11.g. Electric: Clarification - The only requirement per the PRM is to provide underground electric service to the new CSF facility. Overhead service from the power pole to the
CSF facility would be a deviation. Other existing power utility poles have no requirement per the PRM to be removed. Installation of additional underground electric services would be preferred and a possible a betterment. The base is currently pursuing a possible project with MidAmerican to facilitate removal of some of the existing power poles prior to the CSF construction. If power pole removal by Mid America were to take place, the Contracting Officer will notify the successful Design-
Builder and review the change in site conditions to determine it affects their original proposal and any required contract modifications are justified.
g) Paragraph K.11.h. Communications:
i) Paragraph K.11.h.3.a.: Delete and replace with the following: “The 100 Meter (Max) reference to communication lines from Building 251 and 278 is not applicable”
ii) Paragraph K.11.h.4.a: Change “MH 6” to “MH 33” so it reads “…. line south from MH-33 to Bldg
251…...”
iii) Paragraph K.11.h.4.a: Change “MH 33” to “MH 6” so it reads “…. line north from MH-6 to Bldg
278…...”
iv) Paragraph K.11.h.4.a.i: Add the following sentence: “The existing ducts have capacity for the new cables.”
3) Part 3, Section 3.2-A Project Book – Interior Spaces:
a) General Item – Part 3, Section 3.2-A Project Book – Interior Spaces & 3.2-B Space Templates:
Design-Builder shall lay out space designs with the emphasis on the square foot area of each space listed with secondary emphasis on insertion of furniture templates. In situations where the furniture templates don’t layout efficiently for the area indicated, slight variations on the furniture templates are acceptable if general intent of the furniture templates are met.
b) General item: under paragraph C.30. (page 4 of 9) at front of section 3.1-A, add note that the
“authorized total strength of the Units is 136 personnel. (Doesn’t include Dining or Clinic visitors)”
c) See paragraph footnotes at end “F Space Summary” (page 8 of 9) for allowed area variations for each space.
d) General: At paragraph “G” for rooms A-1, A-2, B-1, B-4 & B-6; Change “Flat screen monitor & GFGI brackets” to read “Flat screen monitors and monitor wall brackets to be G.F.G.I.” Clarification: All
FEH Project No. 2013008.01 Page 4 of 8
7 1 2 . 2 5 2. 3 8 8 9 monitors to be GFGI as indicated in Part 3, Section 3.4 D72 Audio / Visual, paragraph 4.01 A. and sub-paragraphs. See Part 3 Section 3.4 C11 Partitions, paragraph 1.01 – E.2. for support blocking of equipment (monitor) loads on partitions.
e) Space B-11 Services Flight Storage Garage:
i) Paragraph G.1). Add size as follows: “SPEK is 7’-2”l. x 8’-11” w. x 7’- 7” h. “
ii) Add paragraph G.5) as follows:
“Additional equipment and size with dimensions (l x w x h) are:
NORI Bunk Bed Container – 8’-2” x 7’-3” x 7’-5.5”
Tent container – 8’-2” x 7’-3” x 7’-8”
Mortuary Container – 8’-2” x 7’-3” x 7’-8”
2nd Mortuary Container – 7’ x 3’-4” x 5’-6.5”
Air Compressor – 1’-6” x 3’-3” x 2’- 4”
Propane Storage – 2’-6” x 2ft 8in x 2’-9”
Grill – 15’-7” x 5’-4” x 5’-3”
Rubbermaid Tanks (5) – 4’-4.5” x 2’-8” x 2’- 2”
Storage Conex – 6’-5.5” x 11’-11” x 7’-1.5”
Ladder – 1’-5.5” x 4’-2” x 6’-1.5”
Orange Dolly – 1’-11.5” x 1’-10” x 4’-6”
Silver Dolly – 1’-7.5” x 1’-10” x 5’-4”
Corrosive Locker – 2’ x 1’-6.5” x 3’-9”
Flammable Locker – 2’ x 1’-7” x 3’
f) Space D-1 Dining Facility: Delete paragraph “A.” reference to “Total: Varies (300-400)” and replace with the following: “Total: Seating for 240 at G.F.G.I . tables; base will access Dining Hall in three shifts at meal time with approximately 350-500 lunch time meals served from 10:45 to 12:30 in 15 shifts of 50-75 members.”
g) Space D-1 Dining Facility: Number of Tables provided by Government is per Item #60 in Part 4
Appendix, Section 4.2-A.2 Kitchen Equipment Descriptions (thirty 60” tables x 8 chairs per table, change to “6 chairs per table” )
h) Space D-2 Kitchen: Paragraph E. 4): Delete reference to “loading dock” and replace with “truck delivery access”. Clarification – there is no requirement for a loading dock with a vertical offset for unloading trucks.
i) Space E-1 Group Commander Office: Paragraph E.2): Change reference “3.2-C.5 ” to “3.2-C.6 ”.
j) Space E-2 First Sergeant Office: Paragraph E.2): Change reference “3.2-C.5 ” to “3.2-C.6 ”.
FEH Project No. 2013008.01 Page 5 of 8
7 1 2 . 2 5 2. 3 8 8 9
k) Space E-5 Health Service Administrator / Medical Ed. Training Manager:
i) Paragraph E.1): Change reference “3.2-C.5 ” to “3.2-C.6 ”.
ii) Paragraph G.1).: Change “eight” person table to “four to six” person table. Add sentence: “Table size to be approximately 5’-0” l. x 2’-6” w..”
iii) Paragraph G.: Add sub=paragraph 3). As follows: “3). See Office Type H for 3 open office workstations.”
l) Space E-7Group Superintendent: Paragraph E.1): Change reference “3.2-C.5” to “3.2-C.6”.
m) Space F-1a – Laboratory: Paragraph E.1): Add the following sentence as follows:
“If combined with Clinical Laboratory, only one set of lab equipment is required for the combined lab space. If spaces combined, intent is to create an “Admin. Side” and a “Testing /
Lab side” separated by a wall opening between. The Restroom F-1b to be on the “Lab side”.”
n) Space F-8: Medical Uni-Sex Restrooms:
i) Paragraph B.; clarification – Area listed is for Two Uni-Sex restrooms as noted in paragraph “F
Space Summary” at front of this section.
ii) Paragraph B.; clarification: Total area proposed by Design Builder can be less than the -10% maximum area variation provided all Accessibility & space program requirements are met.
iii) Paragraph D.: Change to read “Two Public Restrooms in Medical/Clinic Section”.
o) Space G-11 Clinic Laboratory: See comments above for Space F-1a for combining spaces.
p) Space G-5 Dental X-Ray: Paragraph G.1; Add note that “X-Ray Equipment is ceiling mounted”
q) Space H-4 Operations, Plans & Resource Chief Office:
i) Paragraph G.4).: Change to read “Briefing Seating for 4 at round table.”
ii) Paragraph G.5).: Change to read “Seating for 2 people min. waiting to enter located in corridor outside this space. Seating GFGI.”
iii) Paragraph G.; Add the following sub-paragraph;
“6) See Office Template Type C description for furniture requirements.”
r) Space H-7 Client Service Center: Clarification paragraph G.1) Change Office Type A” template to open (unenclosed) “Office Type E” template.”
s) Space H-10 Base Support (SCXS): Paragraph H. 3).: Change “Section 3.2-C” to “Section 3.4-C
Interiors”.
t) Space H-11 – UTC, Preventative Maint. Inspection, CA/CRL Stor. / ITE Staging:
i) Delete Paragraph G. 4). Delete Mezzanine storage, GFGI
FEH Project No. 2013008.01 Page 6 of 8
7 1 2 . 2 5 2. 3 8 8 9
u) Space I-3/4 Breakroom / Vending: Paragraph G.7): Change to read “ Two Vending machines – GFGI.”
v) Space I-8 Facility Circulation:
1) Paragraph H.13)a.4. Main Entry & Main Corridor Walls: Add the following allowable wall construction at this area:
“It is acceptable to provide a mixture of decorative burnished block, wall tile on gypsum board & metal stud or wall tile on CMU walls, or similar decorative finishes that require little cleaning & maintenance up to wainscot height minimum. Decorative masonry walls are preferred.”
2) Paragraph H.13) b. 4. Secondary Entry & Administrative Corridor Walls: Add the following allowable wall construction at this area:
“At Secondary Public Entries, it is acceptable to provide a mixture of decorative burnished block, wall tile on gypsum board & metal stud or wall tile on CMU walls, or similar decorative finishes that require little cleaning & maintenance up to wainscot height minimum. Decorative masonry walls are preferred.”
“At Administrative Office Circulation and Medical Clinic corridor walls, it is acceptable to provide painted gypsum board & metal stud walls. Masonry walls are NOT preferred.”
3) Paragraph H.13) c. 4. Back Utilitarian Corridor Walls: Add the following allowable wall construction at this area:
“It is acceptable to provide painted gypsum board & metal stud walls.”
4) Part 3, Section 3.2-B TEMPLATES – Interior Project Book Spaces:
a) At template drawing 3.2-B Template “J” Office Suite – Generic layout: Change “C.F.C.I.” (two locations) at open planning table & chairs to “G.F.G.I.”
5) Part 3, Section 3.4 Performance Requirements:
a) Section B3 – Roofing:
i) Paragraph 1.01-D.1.b.1).(b): Change “prohibited” to ”not preferred”.
ii) Paragraph 1.01-D.1.b.1).(c): Change “minimum”” to” maximum preferred”.
iii) Paragraph 1.01-D.1.b.1).(d): Add “ 1’-6” high” before the word “parapet”.
iv) Paragraph 1.01-D.1.b.2).(a): Delete in its entirety.
b) Section B31 – Roof Coverings:
FEH Project No. 2013008.01 Page 7 of 8
7 1 2 . 2 5 2. 3 8 8 9
i) Paragraph 1.01-B.1.b.: Delete in its entirety.
ii) Paragraph 1.01-B.2.c.: Delete in its entirety.
iii) Paragraph 1.02-A.1.a.2).(c): Add the following sub-paragraphs as follows:
“1. TPO single ply membranes approved meeting this section requirements, but not less than 60 mil. thickness with specified warranty. Firestone UltraPly TPO approved. Equal products by
Carlisle SynTec, Genflex and Verisco”.
iv) Paragraph 1.02-F.1.a.: Delete and replace with the following:
“a. Cover Board: At locations the Design Builder elects to use cover boards or at locations as required by roof manufacturer’s warranty, cover boards shall be minimally as follows. If roof manufacturer does not approve of the noted cover board material for use for their roof membrane, Design-Builder to submit roof manufacturer’s recommendations in writing for review.”
c) Section C11 -Partitions
i) Paragraph 1.02-A.e.: Delete “not part of Corridors”
ii) Paragraph 1.02-A.e.1).: Delete and replace the following:
“1) Gypsum board and metal stud framed partitions not allowed at these spaces: main toilet / shower room, main mechanical & electrical rooms.”
d) Section C16 – Interior Finishes:
i) Delete paragraph 1.02-B.1.(Clarification–Quarry Tile is permitted Spaces noted in Section 3.2-A).
e) Section D1 – Services:
i) Paragraph 1.01-A.2. g.1).: Delete and replace with the following: “Provide a 36 strand single mode cable from Bldg. 251 and one from Bldg. 278.”
ii) Paragraph 1.01-A.2. g.2).: Delete and replace with the following: “Provide a 36 strand multi-mode fiber from Bldg. 251 and one from Bldg. 278.”
f) Section D2 Water & Drainage:
i) Clarification – separate water service lines required for fire protection and domestic water
(Paragraph 1.03 – A.d.)
g) Section D6 – Artificial Lighting:
i) Paragraph 1.01 – F.4.: Clarification – There are no site lighting circuits available. Delete “and not fed from facility circuits where base site lighting circuit is available.”
h) Section D71 Voice 7 Data:
FEH Project No. 2013008.01 Page 8 of 8
7 1 2 . 2 5 2. 3 8 8 9
i) Paragraph 4.01-P.1.: Delete this paragraph.
ii) Paragraph 4.01-P.6.: Add sentence as follows: “Install the innerduct in 2 of the 6 new conduits and in one of the existing conduits from MH6 to Bldg. 278 and from MH33 to Bldg. 251.”
iii) Paragraph 4.01-P.7.: Change first sentence to read “Provide 100 pair copper from Building 251.”
iv) Paragraph 4.01-P.8.: Delete and change to the following: “The Government will provide and install
Cable TV cable from new Cable TV Demarcation in the New CSF Building back to the existing Bldg.
261 utilizing existing duct with additional capacity.
v) Paragraph 4.02-D.: Add to the end of the first sentence: “……base copper new 100 pair installed per Section D71 – Paragraph 4.01-P.7.”
i) Section G33 Storm Sewer:
i) Paragraph 1.02 – A.: Replace the word “Pipe” with the following: “Site Storm Water Piping”
ii) Paragraph 1.02 – A.1.b.: Delete (ABS piping not permitted)
iii) Paragraph 1.02 – A.1.c.: Delete (PVC piping not permitted)
iv) Paragraph 1.02 – A.2b.: Add “ABS piping not permitted”
v) Paragraph 1.02 – A.2c.: Add “PVC piping not permitted”
vi) Paragraph 1.02 – C. Replace the word “Storm Drains” with the following: “Storm Drain Inlets and
Grating.”
SCHEDULE OF MATERIAL SUBMITTALS (SUBSTANTIATIONS) - PROJECT REQUIREMENTS MANUAL
PROJECT No:
VSSB 099014
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S U B S T A N T I A T I O N
U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D es ig n
Su bm itt al
D ra w in gs
D es ig n
Su bm itt al
Sp ec s
D es ig n
Su bm itt al
C al cs
C od e
C he ck s
/ R es po ns es
D es ig n
An al ys is
LE
ED
S U
BM
IT
TA
L
IN
FO
R M
AT
IO
N
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G /P
R O
D U
C T
D
AT
A
C O
LO
R
B O
AR
D
R
EP
O R
TS
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
O
PE
R
AT
IN
G
M
AI
N
T.
IN
ST
R
U C
TI
O
N S
SC
H
ED
U
LE
S
O
TH
ER
AS
N O
TE
D
AS
-B
U
IL
T R
EC
O
R D
W
G S/
IN
FO
/S
PE
C S
SUB-1 PRM Section 00830 - Substantiation / Submittal Schedule X
SUB-2 PRM Section 00830 - Hazardous Material Usage Form - Attachment A X
SUB-3
PRM Section 010120 Design After Award - Site Preliminary Design Submittal Plans, Narrative, Checklist (to NGB)
X Plans & Narratives
SUB-4
PRM Section 010120 Design After Award - Site Preliminary Design Submittal Plans, Narrative, Checklist (to NGB)
X Plans & Narratives
SUB-5
PRM Section 010120 Design After Award / B shell / G Sitework: ATFP Analysis Narrative, Calculations, Checklist & Site Plan
X
SUB-6
PRM Section 010120 Design After Award / B shell / G Sitework: ATFP Analysis Narrative, Calculations, Checklist & Site Plan
X
SUB-7
PRM Section 010120 Design After Award / A - Site Preliminary Submittal Design Builder Soil Borings (to NGB)
X
SUB-8 PRM Section D - Sitework; Soil Bearing Declaration Form ( See appendix 4.3 - E) X
SUB-9
PRM Section 010120 Design After Award - Preliminary Design Submittal - SITE RENDERING Updated & Bldg 3D Perspective
X
SUB-10
PRM Section 010120 Design After Award - Preliminary Design Submittal Power Point Presentation PDFs
X
SUB-11
PRM Section 010120 Design After Award - Preliminary Design Submittal Power Point Presentation PDFs
X
SUB-12
PRM Section 010120 Design After Award & 000111 - Preliminary Design Submittal - Sustainable Design ANG & LEED Checklist, Narrative, Epact2005 , EISA Report
X
SUB-13
PRM Section 010120 Design After Award /B - Shell - Preliminary Design Submittal Package #1 Plans, Narrative, Checklist (Non Site) (to NGB)
X
SUB-14
PRM Section 010120 Design After Award /B - Shell - Preliminary Design Submittal Package #1 Plans, Narrative, Checklist (Non Site) (to NGB)
X
SUB-15
PRM Section 010120 Design After Award /B - Shell
- Preliminary Design Submittal Package #2 Plans, Narrative, Checklist (Non Site) (to NGB) (If more than 1 package)
X
SUB-16
PRM Section 010120 Design After Award /B - Shell
- Preliminary Design Submittal Package #2 Plans, Narrative, Checklist (Non Site) (to NGB) (If more than 1 package)
X
SUB-17 PRM Section 010120 Design After Award - A/E Designers of Record X
SUB-18
PRM Section 010120 Design After Award - Site Preliminary Design Submittal Comments with Responses
X
SUB-19
PRM Section 010120 Design After Award - Site Preliminary Design Submittal Review Conference Meeting Minutes
X
SUB-20
PRM Section 010120 Design After Award - Preliminary Design Submittal Package #1 Comments with RESPONSES (Non Site)
X
SUB-21
PRM Section 010120 Design After Award - Preliminary Design Submittal Package #2 Comments with RESPONSES (Non Site)
X
SUB-22
PRM Section 010120 Design After Award - Preliminary Design Submittal Review Conference Meeting Minutes
X
SUB-23
PRM Section 010120 Design After Award / 000111/A /C- Preliminary Design Submittal -CODE
CHECK & DESIGN ANALYSIS
X
SUB-24
PRM Section 010120 Design After Award - Site Design Development Submittal Plans, Narrative, Checklist
X
SUB-25
PRM Section 010120 Design After Award / B shell / D Sitework: ATFP Analysis Narrative, Calculations, Checklist & Site Plan Updated
X
SUB-26
PRM Section 010120 Design After Award / B shell / D Sitework: ATFP Analysis Narrative, Calculations, Checklist & Site Plan Updated
X
SUB-27
PRM Section 010120 Design After Award /B - Shell - Design Development Submittal Package #1 Plans, Narrative, Checklist (Non Site)
X
SUB-28
PRM Section 010120 Design After Award /B - Shell
- Design Development Submittal Package #2 Plans, Narrative, Checklist (Non Site) (If more than 1 package)
X
SUB-29 PRM Section 010120 Design After Award / C1 - Const. Doc. INTERIOR DESIGN Submittal X
SUB-30 PRM Section 010120 Design After Award / C1 - Const. Doc. INTERIOR DESIGN Submittal X
SUB-31 PRM Section 010120 Design After Award / C1 - Const. Doc. INTERIOR DESIGN Submittal X
Design Builder to submit required PDF documentation to Base Civil Engineer as indicated in the Construction Document Submittal Checklist..
Design Builder to Determine Number of Submittal Packages the "Preliminary Design " Submittal will be sub-divided into and provide each Package as a required submittal.
Design Builder to Determine Number of Submittal Packages the "Preliminary Design" Submittal will be sub-divided into and provide each Package as a required submittal.
Design Builder to submit required PDF documentation to Base Civil Engineer as indicated in the Construction Document Submittal Checklist..
Number of Responses to Comments to match number of "Preliminary Design" packages
Number of Responses to Comments to match number of "Preliminary Design" packages
DESIGN DEVELOMENT SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF DESIGN DEVELOPMENT SUBMITTALS) LOCAL REVIEW
Design Builder to Determine Number of Submittal Packages the " Design Development" Submittal will be sub-divided into and provide each Package as a required submittal.
Design Builder to Determine Number of Submittal Packages the " Design Development" Submittal will be sub-divided into and provide each Package as a required submittal.
Provide Code Check as appropriate to each "Preliminary Design" packages
PROJECT TITLE - Consolidated Support Functions
Remarks / Comments
Design Builder to Determine Number of Submittal Packages the "Preliminary Design " Submittal will be sub-divided into and provide each Package as a required submittal.
Design Builder to Determine Number of Submittal Packages the "Preliminary Design" Submittal will be sub-divided into and provide each Package as a required submittal.
PRELIMINARY DESIGN SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF PRELIM. DESIGN SUBMITTALS) - NGB REVIEW
ATTACHMENT #2
PROJECT No:
VSSB 099014
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S U B S T A N T I A T I
M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D es ig n
Su bm itt al
D ra w in gs
D es ig n
Su bm itt al
Sp ec s
D es ig n
Su bm itt al
C al cs
C od e
C he ck s
/ R es po ns es
D es ig n
An al ys is
LE
ED
S U
BM
IT
TA
L
IN
FO
R M
AT
IO
N
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G /P
R O
D U
C T
D
AT
A
C O
LO
R
B O
AR
D
R
EP
O R
TS
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
O
PE
R
AT
IN
G
M
AI
N
T.
IN
ST
R
U C
TI
O
N S
SC
H
ED
U
LE
S
O
TH
ER
AS
N O
TE
D
AS
-B
U
IL
T R
EC
O
W
G S/
IN
FO
/S
PE
C S
PROJECT TITLE - Consolidated Support Functions
Remarks / Comments
SUB-32 PRM Section 010120 Design After Award / B Shell - Const. Doc. EXTERIOR DESIGN FINISH Submittal X
SUB-33 PRM Section 010120 Design After Award / B Shell - Const. Doc. EXTERIOR DESIGN FINISH Submittal X
SUB-34 PRM Section 010120 Design After Award / B Shell - Const. Doc. EXTERIOR DESIGN FINISH Submittal X
SUB-35
PRM Section 010120 Design After Award & 000111- Design Development Submittal - Sustainable Design ANG & LEED Checklist, Narrative, Epact2005 , EISA Report
X
SUB-36
PRM Section 010120 Design After Award - Design Development Submittal Review Conference Meeting Minutes
X
SUB-37
PRM Section 010120 Design After Award - Site Design Development Submittal Comments with Responses
X
SUB-38
PRM Section 010120 Design After Award - Design Development Submittal Package #1 Comments with RESPONSES (Non Site)
X
SUB-39
PRM Section 010120 Design After Award - Design Development Submittal Package #2 Comments with RESPONSES (Non Site)
X
SUB-40
PRM Section 010120 Design After Award / 000111/A /C- Design Development Submittal - CODE CHECK & DESIGN ANALYSIS - Updated
X
SUB-41
PRM Section 010120 Design After Award - Site Const. Doc. Submittal Plans, Spec., Narrative, Checklist
X
SUB-42
PRM Section 010120 Design After Award - Site Const. Doc. Submittal Plans, Spec., Narrative, Checklist
X
SUB-43
PRM Section 010120 Design After Award - Site Const. Doc. Submittal Plans, Spec., Narrative, Checklist
X
SUB-44 PRM Section 010120 Design After Award - Site Const. Doc. Submittal Comments with Responses X
SUB-45
PRM Section 010120 Design After Award - Site Construction Document Submittal Review Conference Meeting Minutes
X
SUB-46
PRM Section 010120 Design After Award / B shell / D Sitework: ATFP Analysis Narrative, Calculations, Checklist & Site Plan Updated
X
SUB-47
PRM Section 010120 Design After Award / B shell / D Sitework: ATFP Analysis Narrative, Calculations, Checklist & Site Plan Updated
X
SUB-48
PRM Section 01012 Design After Award - Const.
Doc. Submittal Plans, Spec., Narrative, Checklist (Non-Site)
X
SUB-49
PRM Section 01012 Design After Award - Const.
Doc. Submittal Plans, Spec., Narrative, Checklist (Non-Site)
X
SUB-50
PRM Section 01012 Design After Award - Const.
Doc. Submittal Plans, Spec., Narrative, Checklist (Non-Site)
X
SUB-51
PRM Section 010120 Design After Award - Construction Document Submittal Power Point Presentation PDFs
X
SUB-52
PRM Section 010120 Design After Award - Construction Document Submittal Power Point Presentation PDFs
X
SUB-53 PRM Section 010120 Design After Award / C1 - Const. Doc. INTERIOR DESIGN Submittal X
SUB-54 PRM Section 010120 Design After Award / C1 - Const. Doc. INTERIOR DESIGN Submittal X
SUB-55 PRM Section 010120 Design After Award / C1 - Const. Doc. INTERIOR DESIGN Submittal X
SUB-56 PRM Section 010120 Design After Award / B Shell - Const. Doc. EXTERIOR DESIGN FINISH Submittal X
SUB-57 PRM Section 010120 Design After Award / B Shell - Const. Doc. EXTERIOR DESIGN FINISH Submittal X
SUB-58 PRM Section 010120 Design After Award / B Shell - Const. Doc. EXTERIOR DESIGN FINISH Submittal X
SUB-59
PRM Section 010120 Design After Award / 000111/A / C / C1 - Construction Document Submittal -CODE CHECK & DESIGN ANALYSIS
X
SUB-60
PRM Section 010120 Design After Award & 000111
- Construction Document Submittal - Sustainable Design ANG & LEED Checklist, Narrative, Epact2005 , EISA Report
X
SUB-61
PRM Section 010120 Design After Award - Construction Document Submittal Review Conference Meeting Minutes
X
SUB-62 PRM Section 010120 Design After Award - Const.
Doc. Submittal Comments with Responses X
SUB-63 PRM Section 010120, 01780 - Site Final Const.
Doc. Submittal Plans, Spec., Narrative, Checklist X
Design Builder to Determine Number of Submittal Packages the "Construction Document" Submittal will be sub-divided into
Design Builder to submit required PDF documentation to Base Civil Engineer as indicated in the Construction Document Submittal Checklist..
Design Builder to Determine Number of Submittal Packages the "Construction Document" Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Construction Document" Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Construction Document" Submittal will be sub-divided into
Provide Code Check as appropriate to each "Design Development" packages
Design Builder to submit required PDF documentation to Base Civil Engineer as indicated in the Construction Document Submittal Checklist..
FINAL CONSTRUCTION DOCUMENT SUBMITTALS
Provide Code Check as appropriate to each "Preliminary Design" packages. Provide systems analysis for each discipline: Architectural, Structural, Mechanical, Plumbing, Electrical, Telecommunications, Fire Protection, Security, Civil, etcetera.
Design Builder to Determine Number of Submittal Packages the "Construction Document" Submittal will be sub-divided into
Design Builder to Determine Number of Submittal Packages the "Construction Document" Submittal will be sub-divided into
Number of Responses to Comments to match number of "Preliminary Design" packages
Number of Responses to Comments to match number of "Preliminary Design" packages
CONSTRUCTION DOCUMENT SUBMITTALS (NOT ALL INCLUSIVE - SEE BELOW FOR OTHER COMPONENTS OF CONST. DOCUMENT SUBMITTALS) - NGB REVIEW
PROJECT No:
VSSB 099014
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S U B S T A N T I A T I
M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D es ig n
Su bm itt al
D ra w in gs
D es ig n
Su bm itt al
Sp ec s
D es ig n
Su bm itt al
C al cs
C od e
C he ck s
/ R es po ns es
D es ig n
An al ys is
LE
ED
S U
BM
IT
TA
L
IN
FO
R M
AT
IO
N
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G /P
R O
D U
C T
D
AT
A
C O
LO
R
B O
AR
D
R
EP
O R
TS
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
O
PE
R
AT
IN
G
M
AI
N
T.
IN
ST
R
U C
TI
O
N S
SC
H
ED
U
LE
S
O
TH
ER
AS
N O
TE
D
AS
-B
U
IL
T R
EC
O
W
G S/
IN
FO
/S
PE
C S
PROJECT TITLE - Consolidated Support Functions
Remarks / Comments
SUB-64 PRM Section 010120, 01780 - Site Final Const.
Doc. Submittal Plans, Spec., Narrative, Checklist X
SUB-65 PRM Section 010120, 01780 - Site Final Const.
Doc. Submittal Plans, Spec., Narrative, Checklist X
SUB-66 PRM Section 010120, 017800 /B - Shell - Final Const. Doc. Submittal Plans, Narrative, Checklist X
SUB-67 PRM Section 010120, 017800 /B - Shell - Final Const. Doc. Submittal Plans, Narrative, Checklist X
SUB-68 PRM Section 010120, 017800 /B - Shell - Final Const. Doc. Submittal Plans, Narrative, Checklist X
SUB-69
PRM Section 010120, 017800 - Final Const. Doc. - Electronic Submittal Plans, Spec., Narrative, Checklist
X
SUB-70
PRM Section 010120, 017800 - Final Const. Doc. - Electronic Submittal Plans, Spec., Narrative, Checklist
X
SUB-71
PRM Section 010120, 017800 - Final Const. Doc. - Electronic Submittal Plans, Spec., Narrative, Checklist
X
SUB-72 PRM Section 010120 - Architectural Photography Submittal X
SUB-73 PRM Section 017800 - Site Utility Locates for Owner to track w/ GPS X
SUB-74 PRM Section 010120, 017800 /B - Shell - Final Record Doc. Submittal X
SUB-75 PRM Section 010120, 017800 /B - Shell - Final Record Doc. Submittal X
SUB-76 PRM Section 010120, 017800 /B - Shell - Final Record Doc. Submittal X
SUB-77 PRM Section 010120, 017800 - Final Record Doc.
- Electronic Submittal X
SUB-78 PRM Section 010120, 017800 - Final Record Doc.
- Electronic Submittal X
SUB-79 PRM Section 010120, 017800 - Final Record Doc.
- Electronic Submittal X
SUB-80 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-81 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-82 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-83 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-84 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-85 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-86 PRM Section 010120, 017800 - Final Electronic Website Electronic Submittal X
SUB-87 PRM Section 013200 - Preliminary Project / Construction Schedule X
SUB-88 PRM Section 013200 - Periodic Project / Construction Schedule X
SUB-89 PRM Section 013200 - Initial Progress Report Breakdown for Approval X
SUB-90 PRM Section 013200 - Shop Drawing Submittal Schedule - AF Form 66 X
SUB-91 PRM Section 01 45 10 - Contractor Quality Control Plan X
SUB-92 PRM Section 01 45 10 - Design Quality Control Plan X
SUB-93 PRM Section 014510 - Special Inspection Test List by Designers of Record X
SUB-94 PRM Section 014510 - Contractor QC - Pre-Final Inspection - SITE/BLDG X
SUB-95 PRM Section 014510 - Contractor QC - Final Inspection - SITE/BLDG X
SUB-96 PRM Section 017419 - Construction Waste Management Plan X
SUB-97 PRM Section 017419 - Construction Waste Recycling LEED Forms - Monthly X
SUB-98 PRM Section 017800 - DB Project Closeout - Completed Closeout Checklist X
SUB-99 PRM Section 017800 - DB Project Closeout - Architectural Photos X
SUB-100 PRM Section 017800 - DB Project Closeout - Energy Rebate Forms X
SUB-101 PRM Section 017800 - DB Project Closeout - Real Property Capitalization Information Forms X
SUB-102 PRM Section 017800 - DB Project Closeout - Real Property Equipment List Information X
SUB-103 PRM Section 017800 - DB Project Closeout - Infrared Roof Survey Warranty Report X
Other Requirements
RECORD DOCUMENTS SUBMITTALS
PROJECT No:
VSSB 099014
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S U B S T A N T I A T I
M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D es ig n
Su bm itt al
D ra w in gs
D es ig n
Su bm itt al
Sp ec s
D es ig n
Su bm itt al
C al cs
C od e
C he ck s
/ R es po ns es
D es ig n
An al ys is
LE
ED
S U
BM
IT
TA
L
IN
FO
R M
AT
IO
N
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G /P
R O
D U
C T
D
AT
A
C O
LO
R
B O
AR
D
R
EP
O R
TS
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
O
PE
R
AT
IN
G
M
AI
N
T.
IN
ST
R
U C
TI
O
N S
SC
H
ED
U
LE
S
O
TH
ER
AS
N O
TE
D
AS
-B
U
IL
T R
EC
O
W
G S/
IN
FO
/S
PE
C S
PROJECT TITLE - Consolidated Support Functions
Remarks / Comments
SUB-104 PRM Section 017800 - DB Project Closeout - Warranty Management Plan X
SUB-105 PRM Section B3 Roofing - - Roof Manufacture Report: Project Closeout X
SUB-106 PRM Section 017800 - DB Project Closeout - HVAC Testing & Balance Report X
SUB-107 PRM Section 017800 - DB Project Closeout - Operation & Maintenance Manuals X
SUB-108 PRM Section 017800 - DB Project Closeout -Field Training Plan & Agenda X
SUB-109 PRM Section 017800 - DB Project Closeout -Field Training Instructions X
SUB-110 PRM Section 017800 - DB Project Closeout -Field Training Instruction Video Recording X
SUB-111 PRM Section 000111 - Facility Performance - LEED Checklist - Preliminary Design X
SUB-112 PRM Section 000111 - Facility Performance - LEED Checklist - Construction Document Submittal X
SUB-113 PRM Section 000111 - Facility Performance - LEED Certification - SILVER X
SUB-114
PRM Section 000111 - Facility Performance / A / B Shell / C Interiors - Construction Documents:
Sealed Structural Calculations
X
SUB-115
PRM Section 000111 - Facility Performance - Construction Documents: Sealed Electrical Lightning Hazard Calculations & Drawings / Details
X
SUB-116
PRM Section 000111 - Facility Performance - Construction Documents: Sealed Electrical Lightning Hazard Calculations & Drawings / Details
X
SUB-117
PRM Section 000111 - Facility Performance - Commissioning: Electrical Lightning Hazard Continuity tests
X
SUB-118
PRM Section 000111 - Facility Performance - Commissioning: Electrical Lightning Hazard Certification of Compliance
X
SUB-119
PRM Section 000111 - Facility Performance - Closeout: Electrical Lightning Hazard O&M and Record Drwgs
X
SUB-120
PRM Section 000111 - Facility Performance - Closeout: Electrical Lightning Hazard O&M and Record Drwgs
X
SUB-121 PRM Section 000111 - Facility Performance - - Space Areas Preliminary Design Submittal X
SUB-122
PRM Section 000111 - Facility Performance - Energy Efficiency Criteria & Costs / Mech. Eng Sealed: - Preliminary Design Submittal
X
SUB-123
PRM Section 000111 - Facility Performance - - Energy Efficiency Criteria & Costs / Mech. Eng Sealed: - Construction Document Submittal
X
SUB-124 PRM Section B - Shell: Thermal Performance - Preliminary Design Submittal X
SUB-125
Section A - Sub-Structure / B - Shell: Thermal Performance/ Cont. Insulation- Construction Document Submittal
X
SUB-126 PRM Section B Shell - S - Moisture Vapor Barrier transmission: Preliminary Design X
SUB-127 PRM Section B Shell - S - Moisture Vapor Barrier transmission: Preliminary Design X
SUB-128 PRM Section B1 Superstructure - Fire Rating of Systems: Preliminary Design X
SUB-129 PRM Section B1 Superstructure - Fire Rating of Systems: Preliminary Design X
SUB-130 PRM Section B Shell - - ATFP Window System & Window Frame Anchorages: Preliminary Design X
SUB-131 PRM Section B Shell - - ATFP Window System & Window Frame Anchorages: Preliminary Design X
SUB-132 PRM Section B Shell - - ATFP Window System & Window Frame Anchorages: Preliminary Design X
SUB-133 Section B21 Exterior Walls - Exterior Wall Mock-up:
Construction X
SUB-134
Section B22 WNDWS& Openings - - ATFP Window System & Window Frame Anchorages:
Construction Documents
X
SUB-135
Section B22 WNDWS& Openings - - ATFP Window System & Window Frame Anchorages:
Construction Documents
X
SUB-136
Section B22 WNDWS& Openings - - ATFP Window System & Window Frame Anchorages:
Construction Documents
X
SUB-137
Section B22 WNDWS& Openings - - Window / Louver / Intake System Water Resistance / Air leakage: Construction Documents
X
SUB-138
Section B22 WNDWS & Openings - ATFP Blast Window Sealed Calculations: Construction Documents
X
SUB-139 Section B23 Exterior Doors - ATFP Blast Door Sealed Calculations: Construction X
SUB-140 Section B23 Exterior Doors - ATFP Blast Door Frame Anchorages: Construction Documents X
Identification of moisture barrier and materials used
Identification of moisture barrier and materials used
By licensed mechanical engineer
PROJECT No:
VSSB 099014
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S U B S T A N T I A T I
M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D es ig n
Su bm itt al
D ra w in gs
D es ig n
Su bm itt al
Sp ec s
D es ig n
Su bm itt al
C al cs
C od e
C he ck s
/ R es po ns es
D es ig n
An al ys is
LE
ED
S U
BM
IT
TA
L
IN
FO
R M
AT
IO
N
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G /P
R O
D U
C T
D
AT
A
C O
LO
R
B O
AR
D
R
EP
O R
TS
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
O
PE
R
AT
IN
G
M
AI
N
T.
IN
ST
R
U C
TI
O
N S
SC
H
ED
U
LE
S
O
TH
ER
AS
N O
TE
D
AS
-B
U
IL
T R
EC
O
W
G S/
IN
FO
/S
PE
C S
PROJECT TITLE - Consolidated Support Functions
Remarks / Comments
SUB-141 Section B23 Exterior Doors - ATFP Blast Door Frame Anchorages: Construction Documents X
SUB-142 Section B23 Exterior Doors - ATFP Blast Door Frame Anchorages: Construction Documents X
SUB-143 Section B23 Exterior Doors - Door hardware, Doors & Frames: Construction Documents X
SUB-144 Section B23 Exterior Doors - Door hardware, Doors & Frames: Construction Documents X
SUB-145 Section B23 Exterior Doors - Door hardware, Doors & Frames: Construction Documents X
SUB-146 Section B23 Exterior Doors -Hardware Consultant Installation Report: Project Closeout X
SUB-147 PRM Section B3 Roofing - Roof Assemblies Construction: Preliminary Design X
SUB-148 PRM Section B3 Roofing - Roof Assemblies Construction: Preliminary Design X
SUB-149
PRM Section B3 Roofing / B31 Roof Covering - Post Roof Installation Inspection Report by Roof Manufacture; Construction
X
SUB-150 PRM Section B3 Roofing - - Roof Warranties - Each system: Project Closeout X
SUB-151
PRM Section B31 Roof Covering - - Gutter / Downspout & Roof Drain Capacity Calculations:
Preliminary Design
X
SUB-152
PRM Section B32 Roof Openings - Roof Openings / Skylight System Water Resistance / Air leakage:
Construction Documents
X
SUB-153
PRM Section B32 Roof Openings - Roof Openings / Skylight System Water Resistance / Air leakage:
Construction Documents
X
SUB-154 PRM Section C Interiors -Natural Light Updated Calculations & details: Construction Documents X
SUB-155 PRM Section C Interiors -Natural Light Updated Calculations & details: Construction Documents X
SUB-156 PRM Section C Interiors - Warranty for all Interior Products: Closeout X
SUB-157
PRM Section C1 Interior Construction; STC Values Proven in use STC Values for wall details:
Preliminary Design
X
SUB-158 PRM Section C12 Interior Doors -Door hardware, doors and frames: Construction Documents X
SUB-159 PRM Section C12 Interior Doors -Door hardware, doors and frames: Construction Documents X
SUB-160 PRM Section C12 Interior Doors -Door hardware, doors and frames: Construction Documents X
SUB-161 PRM Section C12 Interior Doors -Hardware Consultant Installation Report: Project Closeout X
SUB-162
PRM Section C16 Interior Finishes -Floor Finish Mock-up of Exposed Concrete decorative finishes (if Any): Construction
X
SUB-163
PRM Section C2 Interior Fixtures -Details of interior fixture hardware & movable components:
Construction Documents
X
SUB-164
PRM Section C2 Interior Fixtures -Details of interior fixture hardware & movable components:
Construction Documents
X
SUB-165
PRM Section C221 Metal Shelves -Shelving Schedule and Product Data: Construction Documents
X
SUB-166
PRM Section C221 Metal Shelves -Shelving Schedule and Product Data: Construction Documents
X
SUB-167 PRM Section C23 Window Treatment -Product data on window treatments: Construction Documents X
SUB-168 PRM Section C23 Window Treatment -Product data on window treatments: Construction Documents X
SUB-169
PRM Section C24 Accessory Fixtures - A/V Equipment layout / space layouts: Preliminary Design
X
SUB-170
PRM Section C24 Accessory Fixtures - A/V Projection Screen / Surfaces Suitability Certification: Construction Documents
X
SUB-171 PRM Section D Services - Overall Lighting Scheme & lamps: Preliminary Design X
Materials, moisture barriers, air barriers, warranties
Wood Doors - Lifetime, Ceilings 15yrs - Humidity, Flooring 10 years functional warranty, other interiors - 15 years functional warranty.
Materials, moisture barriers, air barriers, warranties
Materials, moisture barriers, air barriers, warranties
PROJECT No:
VSSB 099014
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
S U B S T A N T I A T I
M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
D es ig n
Su bm itt al
D ra w in gs
D es ig n
Su bm itt al
Sp ec s
D es ig n
Su bm itt al
C al cs
C od e
C he ck s
/ R es po ns es
D es ig n
An al ys is
LE
ED
S U
BM
IT
TA
L
IN
FO
R M
AT
IO
N
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G /P
R O
D U
C T
D
AT
A
C O
LO
R
B O
AR
D
R
EP
O R
TS
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
O
PE
R
AT
IN
G
M
AI
N
T.
IN
ST
R
U C
TI
O
N S
SC
H
ED
U
LE
S
O
TH
ER
AS
N O
TE
D
AS
-B
U
IL
T R
EC
O
W
G S/
IN
FO
/S
PE
C S
PROJECT TITLE - Consolidated Support Functions
Remarks / Comments
SUB-172 PRM Section D Services - Overall Lighting Scheme & lamps: Preliminary Design X
SUB-173 PRM Section D Services - - Lighting Calculations - Sealed by Engineer: Construction Documents X
SUB-174 PRM Section D Services - Vibration Isolation detail methods: Construction Documents X
SUB-175 PRM Section D Services - Vibration Isolation detail methods: Construction Documents X
SUB-176
PRM Section D Services -Fire rated Wall penetrations details & UL Labels: Construction Documents
X
SUB-177
PRM Section D Services -Fire rated Wall penetrations details & UL Labels: Construction Documents
X
SUB-178
PRM Section D Services -Mechanical, Plumbing and Electrical system Structural Support details & Engineering as Req'd: Construction Documents
X
SUB-179
PRM Section D Services -Mechanical, Plumbing and Electrical system Structural Support details & Engineering as Req'd: Construction Documents
X
SUB-180
PRM Section D Services -Mechanical, Plumbing and Electrical system Structural Support details & Engineering as Req'd: Construction Documents
X
SUB-181
PRM Section D Services - Mechanical, Plumbing and Electrical system Engineering Calculations:
Preliminary Design
X
SUB-182
PRM Section D Services - - Mechanical, Plumbing and Electrical system Complete Details:
Construction Documents
X
SUB-183
PRM Section D Services / D3 HVAC - - Mechanical, Plumbing and Electrical Functional Performance testing: Construction Closeout
X
SUB-184
PRM Section D Services - - Mechanical, Plumbing and Electrical - Identification of Systems to be Commissioned: Preliminary Design
X
SUB-185
PRM Section D Services - - Mechanical, Plumbing and Electrical - Training & Demonstration Schedule:
Construction
X
SUB-186
PRM Section D Services - - Mechanical, Plumbing and Electrical - Equipment Service Schedule / List:
Closeout
X
SUB-187
Section D1 Elevator Equip.- Product description/capacity/details/finishes: Construction Documents
X
SUB-188
Section D1 Elevator Equip.- Product description/capacity/details/finishes: Construction Documents
X
SUB-189
Section D1 Elevator Equip.- Product description/capacity/details/finishes: Construction Documents
X
SUB-190
Section D1 Elevator Equip.- Product description/capacity/details/finishes: Construction Documents
X
SUB-191 Section D1 Elevator Equip.- State Elevator Inspection Report & Certifications: Project Closeout X
SUB-192 Section D1 Elevator Equip.- Proposed Maintenance Contract: Project Closeout X
SUB-193 PRM Section D2 Water & Drainage - Site - Pressure & Flow Tests Reports: Preliminary Design X
SUB-194 PRM Section D2 Water & Drainage - Site - Pump Equipment Pump Curves: Construction Documents X
SUB-195 PRM Section D2 Water & Drainage - Site - Pressure & Flow Tests Reports: Construction X
SUB-196
PRM Section D2 Water & Drainage / G3 Site Services - Site - Piping Design Calculations:
Preliminary Design
X
SUB-197
PRM Section D2 Water & Drainage -Water Flow - Field Water tight Pressure Test Reports of Piping:
Construction Documents
X
SUB-198
PRM Section D2 Water & Drainage - Site - Water Flow - Functional Fixtures / Equip. Tests Reports:
Construction
X
SUB-199
PRM Section D2 Water & Drainage - Waste Piping - Drainage Piping Design Calculations: Preliminary Design
X
SUB-200
PRM Section D2 Water & Drainage / G3 Site Services - Site - Waste Piping Flow - Functional Fixtures / Equip. Tests Reports: Construction
X
SUB-201
PRM Section D2 Water & Drainage - Rain Water Piping - Drainage Piping Design Calculations:
Preliminary Design
X
SUB-202
PRM Section D2 Water & Drainage / G3 Site Services - Site - Rain Water Piping Flow - Functional Fixtures / Equip. Tests Reports:
Construction
X
SUB-203
PRM Section D2 Water & Drainage / G3 Site Services - Site - Piping Design Layout & Details:
Construction Documents
X
2 hour test at 110% design pressure
Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications
Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications
In-put and Out-Put: Water and Drainage, HVAC, Fire Suppression, Electrical, Telecommunications
PROJECT No:
VSSB 099014
SOLICIT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .