Design-Build Consolidated Support Functions (CSF)
Solicitation number
W912LP-17-R-0002
Issued by

About this file

Phase 2 Solicitation (Conformed copy of solicitation including Amendment 0002) with all attachments EXCEPT Attachment #1, Project Requirements Manual (PRM). PRM will be provided via DVD to the Phase 2 contractors.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912LP-17-R-0002-0002

F8Z3CE7047AW01

Design and Construction of the Consolidated Support Functions (CSF), located at the 185th Air Refueling Wing (185ARW), Iow a Air National Guard Base, Sioux City, Iow a. Project No. VSSB099014.

This project is being solicited using the tw o-phase design-build selection procedures authorized by FAR 36.3. The project is being solicited UNRESTRICTED. The North American Industry Classification System (NAICS) Code is 236220 and the Small Business Size Standard is $36,500,000.00 in average annual receipts for the past three years. FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns is applicable to this project. A Small Business Subcontracting Plan w ill be required from Large Business concerns selected to submit proposals in Phase Tw o, and the plan must be submitted w ith their Phase Tw o proposals. Construction project magnitude is betrw een $10,000,000.00 and $25,000,000.00.

MARK L. THOMPSON 515-252-4248

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-May-2017

(RFP)

(IFB)

X

CALL:

Consolidated Support Functions

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 Jul 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USPFO FOR IOWA

7105 NW 70TH AVE

CAMP DODGE

JOHNSTON IA 50131-1824

W912LP

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

VSSB099014

8. ADDRESS OFFER TO (If Other Than Item 7)

515-252-4617FAX:TEL: 515-252-4248 TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912LP-17-R-0002

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Consolidated Support Functions Facility

FFP

Provide the total cost for the design and construction cost for the Consolidated Support Functions Facility at the Sioux City Air National Guard Base to include design, permitting, site preparation, construction and commissioning of the facility in accordance with the Project Requirements Manual. The cost should not include the Offerors Betterment and Deviations.

FOB: Destination

PURCHASE REQUEST NUMBER: F8Z3CE7047AW01

NET AMT

TABLE OF CONTENTS

1. TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00010 - PRICING SCHEDULE, NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS SECTION

00600 – REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

ATTACHMENT 1 – Project Requirements Manual (PRM) ATTACHMENT 2 – Supplement to the PRM

EXHIBIT D – Cost Breakdown Form EXHIBIT E – Betterments and Deviations Schedule EXHIBIT F – Pre-Proposal Inquiry Format EXHIBIT G – Wage Determination

2. NOTES

2.1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.

2.2. This procurement is being solicited using the Two-Phase solicitation process authorized by FAR 36.3. This process requires potential contractors to submit their past performance, basic technical approach and capability information initially for review and consideration by the Government. Following the review, evaluation, and rating of these proposals, the Government intends to select three, but no less than two and not to exceed five, of the highest rated contractors to receive the Project Requirements Manual and to participate in the Phase Two solicitation. All offerors will be notified of their selection or non-selection to Phase Two. The names of the offerors selected to participate in Phase Two will be published in the Federal Business Opportunities website, https://www.fbo.gov.

2.3. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

2.4. Reference DFARS Provision 252.236-7008, CONTRACT PRICES – BIDDING SCHEDULES (DEC 1991). The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.

2.5. For those contractors who compete in both Phase One and Phase Two, the contractor’s proposal shall be defined as all information that was submitted in response to the requirements of both phases of the solicitation.

End of Section 00010

Section 00100 - Bidding Schedule/Instructions to Bidders

SECTION 00100

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1. SCOPE

1.1. You are invited to submit a proposal in response to our design-build Request for Proposal (RFP) W912LP- 17-R-0002 for Project Number VSSB099014, Title: Consolidated Support Functions (CSF) at the 185th Air Refueling Wing (185ARW), Iowa Air National Guard Base, Sioux City, Iowa. As a result of this Solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

1.2. This solicitation is Unrestricted. The HUBZone preference of 10% is applicable to the solicitation in accordance with FAR 52.219-4.

1.3. This solicitation is for the design, permitting, site preparation, construction and commissioning of the facility in accordance with the Project Requirements Manual (PRM). Scope of the project includes the design and construction of a one- or two-story facility consisting of administrative offices, medical clinic spaces, dining room, training, classroom, kitchen, toilet and shower, storage, locker, and support spaces to be constructed on approximately 5.3 acres at the 185th Air Refueling Wing, Iowa Air National Guard Base, located at Sioux Gateway Airport/Col Bud Day Field, Iowa. The approximate size of the building is not to exceed 37,060 SF. Site work will include, but is not limited to, site preparation and improvement, utilities, roadways, parking, sidewalks, storm drainage, security lighting, landscaping and demolition.

1.4. Design and construction shall comply with the Project Requirements Manual (PRM) contained in the Phase Two RFP. The contract award for design and construction should not exceed $11,040,000.00. Sections 00110 and 00120 provide details on price/cost proposal requirements and evaluation.

1.5. Two-Phase Design-Build Solicitation Process

1.5.1. This procurement is being solicited using the Two-Phase solicitation process authorized by FAR 36.3. As part of Phase One, potential contractors shall submit their past/present performance and technical capability information for review and consideration by the Government. Following the review, evaluation, and rating of Phase One proposals the Government intends to select three (3); but not less than two (2) and not to exceed five (5), of the highest rated contractors to receive a Phase Two RFP. Phase Two offerors shall provide a technical proposal (Management & Execution Plan and Technical Data) and cost/price proposal for consideration by the Government.

The Government will review the technical and cost/price proposals of the Phase Two offerors in accordance with FAR Part 15 and the evaluation criteria set out in Section 00120 – PROPOSAL EVALUATION AND BASIS FOR AWARD. The final evaluation will consider the past/present performance from Phase One, and the technical and cost/price proposals from Phase Two. Price information, provided during Phase Two, will not be rated but will be evaluated in response to the funding limitations set out in this section and Section 00120 cost/price evaluation.

1.5.2. Firms formally organized as design/build entities, or by design firms and construction contractors that have associated specifically for this project, may submit proposals. For the purpose of this solicitation, no distinction is made between formally organized design/build entities and project-specific design/build associations. Both are referred to as the Design-Builder or the Design/Build offeror, (or simply "offeror"). All designs must be accomplished under the direct supervision of licensed professionals registered in the appropriate technical disciplines, and meeting other certification and licensing requirements specified in the request for proposal.

1.5.3. All Phase One offerors will be notified of their selection or non-selection to Phase Two. The names of the offerors selected to participate in Phase Two will be published on the Federal Business Opportunities (FBO) at https://www.fbo.gov.

1.6. The Project Requirements Manual (PRM) has been developed based on the specific criteria as defined by, and in accordance with, Air National Guard Engineering Technical Letter (ANGETL) 15-01, ANG Design Policy dated 01 May 2015, and associated ETL’s. The design is developed to approximately 5%. The PRM will include general project description, relationship diagrams, data on existing site conditions (existing utility plan, geotechnical exploration report, topographical survey, etc.), programming documents, and other performance requirements.

These documents will be made available to the selected offerors as part of the Phase Two RFP.

2. NOTICE OF PRE-PROPOSAL CONFERENCE

2.1. A Phase Two pre-proposal conference will be conducted on 30 May 2017 at 10:30 AM at the 185ARW, Iowa Air National Guard Base, Bldg. 220, 2920 Headquarters Avenue, Sioux City, Iowa, for the purpose of briefing on the Phase Two proposal requirements and answering questions regarding this solicitation. Interested Contractors are encouraged to attend the scheduled pre-proposal conference and are strongly encouraged to bring members of their intended design and construction team to this conference.

2.2. To enter the military installation, individuals must have a picture identification card available when entering the front gate. Due to security conditions, all offerors must register to attend this conference and site visit.

Email the following information for all attendees to vicky.l.williams10.civ@mail.mil.

2.2.1. Visitor’s Name

2.2.2. Company Name

2.3. This information must be provided in advance, not later than two (2) business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base, you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Security Forces who will authorize your entrance to the site.

2.4. Visitors must present Government-issued photo identification at the Installation’s Main Entry Gate upon arrival. You may be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental Agreement, if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.6. Offerors are requested to submit questions for the conference to Ms. Vicky Williams at vicky.l.williams10.civ@mail.mil not later than two (2) business days prior to the conference. Information provided at this conference or on site shall not qualify the terms and conditions of the solicitation and PRM. Terms of the solicitation and PRM remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of solicitation amendments shall apply.

2.7. A record of the pre-proposal conference shall be made and furnished to all prospective offerors via posting to FBO https://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers, and a list of attendees.

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS

3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the

A&E or Engineering personnel directly. Doing so will only delay the response to your question.

Subject Line: Reference No. W912LP-17-R-0002 Email: vicky.l.williams10.civ@mail.mil

INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION

WITHIN THE BODY OF THE EMAIL:

Date of Proposal Inquiry: ____________________ From: __________________________________ Company Name: ___________________________ Phone Number: ____________________________ Email address: _____________________________ Proposal Inquiry: Be specific as to part of solicitation you are questioning.

3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation or PRM must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.

3.3. All questions and requests for information (RFI) must be received NOT LATER THAN five (5) calendar days prior to closing of each phase of the two-phase process and answers will be posted not later than three (3) calendar days prior to closing of the applicable phase. The Contracting Officer reserves the right to address questions received after this time following solicitation closing with those offerors in the competitive range should one be established. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN

THIS PROCESS.

3.4. Any clarifications made will be in the form of an amendment to the solicitation (Phase One and Phase Two) or PRM (Phase Two only) and will be furnished to all prospective offerors via posting to FBO (https://www.fbo.gov).

3.4.1. Offeror must acknowledge receipt of amendments in the space provided on the SF 1442, or by returning a signed copy of the amendment, by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via posting to FBO (https://www.fbo.gov).

3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed via FBO), a web-based portal designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.

3.4.2.1. Registration instructions can be found on the FBO website at https://www.fbo.gov/?s=getstart&mode=list&tab=list. (Please note that registration for access to the secure site takes approximately 15 business days, so plan accordingly.)

3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.

4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS

4.1. The Government reserves the right to revise or amend the solicitation or PRM prior to and/or after the date set for receipt of proposals as necessary. Such revisions, if any, will be announced by an amendment or amendments to this RFP. All information relating to this RFP, including pertinent changes/amendments and other information applicable prior to the date set for receipt of proposals will be posted to FBO https://www.fbo.gov.

4.2. Offerors are strongly cautioned to check FBO frequently and to “refresh” their web page to ensure they have the latest information.

5. HAND CARRIED PROPOSALS

5.1. A repository is provided for hand carried proposals and is located at USPFO for Iowa, Camp Dodge, Bldg.

3475, 7105 NW 70th Ave, Johnston, Iowa 50131-1824.

5.2. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals. For confirmation of delivery, contact Ms. Vicky Williams at phone (515) 252-4615 or email vicky.l.williams10.civ@mail.mil.

5.3. Offerors are cautioned that approval to enter Camp Dodge requires a valid Government identification to be presented at the gate. Delays are probable at the entry point and should be accommodated for. Late receipt of proposals due to entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.

6. WAGE DETERMINATION (Applicable to Phase Two Only)

6.1. The Construction Wage Rate Requirements, formerly known as Davis Bacon Wage Rates, are applicable to this project. The current prevailing wage determination(s) at time of issuance of solicitation is IA170148, for Woodbury County, Iowa. In the event the current prevailing Wage Determination is revised by the Department of Labor prior to closing date of the Phase Two portion of this solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the Wage Determination Revision does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.

6.2. Applicable wage rates can be found at http://wdol.gov/dba.aspx

7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.

8. REMOVAL OF SECTIONS AT TIME OF AWARD.

Sections 00100, 00110, 00120, and 00600 will be physically removed from the resulting award, but will be deemed to be incorporated by reference in that award.

9. DISPOSITION OF UNSUCCESSFUL PROPOSALS:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.

10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES

It has been determined that all temporary utilities shall be the responsibility of the contractor. The contractor will pay all charges (hookup fees, metering, monthly usage, etc.) resulting from temporary utilities. The offerors shall take this into consideration when computing their offers. (FAR Clause 52.236-14, Availability and Use of Utility Services.)

11. EXCEPTIONS. If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00700) and supporting rationale shall be included in an addendum to the proposal and clearly labeled

"Exceptions." An addendum is only required if the offeror takes exception to any requirement in the solicitation.

(The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions, except where indicated, may render an offeror's proposal unacceptable and ineligible for award.

12. CLAUSES

12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

12.2. Clauses and provisions in this document may not appear in consecutive order.

13. BRAND NAME REQUIREMENTS

13.1. Corbin Russwin – Key cores

13.2. E-Mon – Smart Meters

13.3. Monaco Enterprises Inc. – Fire Alarm Systems

13.4. Schneider Electric – DDC Controls

13.5. Advantor – Intrusion Detection System (IDS)

14. A&E FIRM INELIGIBLE TO COMPETE. In accordance with FAR 9.505-2(b)(1) and (2), the A&E firm FEH Design and their subcontractors (to include any satellite or branch offices of these firms), the preparers of the PRM for this project, have been determined to be ineligible to compete for the design/build contract to be awarded via this solicitation.

End of Section 00100

SECTION 00110

SECTION 00110 - SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. PROPOSAL PREPARATION INSTRUCTIONS

1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00100, FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition.

1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.

1.3. Proposal Due Date Schedule. The entire Phase Two proposal, (Volumes 1, 2 and 3) is due by the date and time set for the receipt of proposals shown in Block 13 of the Standard Form (SF) 1442.

2.0 PROPOSAL CONTENT

2.1. Prospective offerors shall submit the following volumes in separate packages, for each phase.

2.1.1. Phase One Proposal - Paragraphs/Instructions pertaining to Phase One are deleted and incorporated by reference.

2.1.2. Phase Two Proposal

2.1.2.1. Volume 1 – Pro Forma Documents

2.1.2.1.1. SF 1442, Solicitation, Offer & Award

2.1.2.1.2. Section 00600 - Representations & Certifications (Changes if applicable)

2.1.2.1.3. Bid Bond

2.1.2.1.4. Compliance Statement

2.1.2.1.5. Price Proposal Schedule

2.1.2.1.6. Exhibit D – Cost Breakdown Form

2.1.2.1.7. Exhibit E – Betterments and Deviation Schedule

2.1.2.2. Technical Proposal Volume 2 – Management & Execution Plans

2.1.2.2.1. Subfactor 2-1: Project Management Plan

2.1.2.2.2. Subfactor 2-2: Design & Construction Schedule

2.1.2.3. Technical Proposal Volume 3 – Subfactor 2-3, Technical Data Proposal

2.1.2.3.1. Element 3-1: Site Development Design

2.1.2.3.2. Element 3-2: Architectural Design

2.1.2.3.3. Element 3-3: Mechanical Design

2.1.2.3.4. Element 3-4: Electrical Power, Lighting, Grounding, Communications, and Electronic Safety and Security Systems

2.1.2.3.5. Element 3-5: LEED, Energy/Economic Analyses Systems Design

3. Written Proposal Format. (Unless noted otherwise these general instructions apply to both Phase One and Phase Two proposals.)

3.1. Purpose. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough evaluation.

3.2 Offerors are cautioned to submit enough information to enable the Government to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.

3.3 Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10 min.). Type size for graphics, charts, diagrams and tables, shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Page size for schedules may be up to 11” x 17” and all other charts, tables etc. must not exceed normal legal size (8.5”x14”). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. To the maximum extent practicable, proposal submission shall be double sided. Where page limits exist, a page is defined as one single side of a page. Double sided pages count as two pages. Unless otherwise stated, tabs, indexes and dividers do not count in the page count.

3.4 Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate.

3.5 Page limits include all appendices, charts, graphs, diagrams, tables, photographs, etc. except as noted elsewhere in the instructions. Failure to observe these requirements may result in non-compliant proposals being evaluated at the maximum number of pages had the instructions been followed. All pages in excess of the stated limits will not be evaluated.

3.6 Binding. Elaborate format and binding are neither necessary nor desirable. Binders (3-ring “D” or slant ring preferred) shall be capable of lying flat when opened. The cover and spine of each binder will clearly identify the offeror’s name, Volume number(s), Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3).

The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.

3.7 If revised proposals are requested, narrative revisions shall be identified with pipelines in the margin of the revised pages. Revised pages shall be printed on one side and hole-punched along the left margin. The number of revised copies to be submitted is the same as the initial proposal.

3.8 Electronic Copy. Provide one (1) electronic copy of the entire proposal (Volumes 1, 2 and 3). Electronic copies may be submitted on CD/DVD, readable in Microsoft Word or Adobe Acrobat (11.0) (“Read Only” files are acceptable). All disks shall be virus checked prior to submission.

3.9 Phase Two Drawing sheets - use drawings no larger than ANSI “D” size (22” x 34”) or smaller than size ANSI “B” (11” x 17”). No electronic drawing files are required to be submitted at the proposal stage. Drawings are NOT required in Phase One.

3.10 Offeror may, at the discretion of the Government, be asked to provide clarifications regarding their proposals in accordance with FAR 15.306(a). Requests for such information do not constitute discussions.

3.11 The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.

4. PHASE ONE –SUBMITTAL CONTENTS. Phase One Proposal - Paragraphs/Instructions pertaining to Phase One are deleted and incorporated by reference.

5. PHASE TWO - TECHNICAL & COST PROPOSAL

5.1. General Requirements.

5.1.1. Who May Submit? Proposals may be submitted by the offerors who receive written notification from the Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation. The Government intends to select three (3) of the highest rated Phase One offerors to receive the technical requirements package and to participate in the Phase Two process of this solicitation; but shall select not less than two (2) and not to exceed five (5). Ideally, three (3) offerors will compete in Phase Two.

5.1.2. Submission Deadline. Proposals shall be received no later than the time and date specified by the Phase Two solicitation.

5.1.3. Compliance Statement. In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate the materials, equipment, methods, functions, and schedules proposed. The offeror is required to certify that all items submitted in its technical proposal comply with the RFP requirements and any differences, deviations or exceptions have been identified and explained as required by the solicitation. Offerors are required to complete the statement and submit it with their Phase Two proposal.

Even if there are no differences, deviations or exceptions, the offeror must submit the Compliance Statement and state that none exist. Offerors are cautioned that any differences, deviations or exceptions that have not been identified and explained as required by the solicitation are not considered accepted even if the proposal is incorporated into the award.

5.1.3.1. Statement of Compliance: [Insert name of the offeror] hereby certifies that all items submitted in this proposal and final design documents (after contract award) comply with the solicitation requirements. The criteria specified in Request for Proposal No. W912LP-17-R-0002 are binding contract criteria and in case of any conflict after award, between W912LP-17-R-0002 and the contractor's proposal, the Request for Proposal criteria shall govern unless there is a written and signed agreement between the contractor and the Government waiving a specific requirement.

5.1.3.2. Should this proposal result in the award of a contract this statement will be included on each sheet of drawings and on the cover of the project/performance documents.

5.1.4. Cost Information. The technical proposal shall not include any cost information. The technical and cost proposals shall be submitted as two separate documents.

5.2. Volume 1 - Pro Forma Documents, Price Proposal. This information should be submitted in an envelope labeled "Pro Forma Requirements." Provide an original and three (3) copies of the requirements in this volume. This category consists of:

5.2.1. Completed Standard Form 1442 (SF 1442). Complete in its entirety the “Offeror” portion of the SF 1442.

An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR

4.102. One copy of the SF 1442 is required to have an original signature.

5.2.2. Section 00600 Representations and certifications, (include any updated information only). Indicate if any changes were made to the Annual Representations and Certifications in SAM.

5.2.3. Bid bonds in accordance with FAR Provision 52.228-1.

5.2.4. Executed Compliance Statement.

5.2.5. Price Proposal Information. Offerors shall complete all portions of the Price Proposal Schedule and furnish it in the Pro Forma Documents envelope. Phase Two offerors’ attention is directed to Section 00120, Phase Two Evaluation, for important information concerning pricing.

5.2.6. Exhibit D, Cost Breakdown, in the format prescribed in this package.

5.2.7. Exhibit E, Betterments and Deviation Schedule in the format prescribed in this package.

5.3. Technical Proposal. Volumes 2 and 3 comprise the full Technical Proposal. Volume 2 consists of Subfactors 2-1, Project Management Plan and 2-2, Design & Construction Schedule. Volume 3 consists of Subfactor 2-3, Technical Data Proposal with various Elements. Evaluation criteria for the Phase Two Proposal, Subfactor 2-3, Technical Data Proposal, will be provided with the Phase Two Solicitation, Section 00120. The Government reserves the right to change Phase Two proposal requirements prior to closing of the Phase Two solicitation if necessary.

5.4. Oral Presentation

5.4.1. Oral Presentation: The Government intends that offerors selected to submit Phase Two proposals will be given an opportunity to present and expand upon the information contained in the written proposals to further the Government’s understanding of the technical data proposed. Oral presentations may be held independent of, as clarifications to, or in conjunction with discussions if the Contracting Officer has determined discussions are necessary.

5.4.1.1. The Government will inform offerors of the oral presentation time and date after receipt of Phase Two proposals. A maximum of eight (8) personnel of the offerors choosing, from the prime and/or proposed subcontractors, will be allowed; however, offerors are cautioned to bring personnel who are capable of discussing their understanding of the proposed approach and methodology of completing the project. Oral presentations are limited to one (1) hour.

5.4.1.2. Presentations will normally be followed by a government question and answer period for clarification purposes. The location for presentations will be provided with the presentation date assignment. Early access to the presentation facility may be requested in advance through the Contracting Officer.

5.4.1.3. Available equipment will include a projector and a screen. Additional equipment may be brought to the presentation location with prior approval of the Contracting Officer. The Government will videotape the oral presentations and make two (2) copies. The Government will retain one (1) copy and the second copy will be provided to the offeror. The Government reserves the right to make additional copies if required.

5.4.1.4. The purpose of the oral presentations is to provide the offeror with the opportunity to briefly explain any specific documentation provided, to highlight the special features of their proposal, and to identify the benefits of the offeror’s technical data proposal. Presentation of information on Technical Subfactors 2-1 and 2-2 should be limited to not more than 15 minutes. Any betterments or alternatives that the offeror wishes the Government to consider should be discussed in detail during the presentation. The offeror is expected to highlight significant technical points contained in their proposal and will not be permitted to submit anything new, but may expand on anything contained in the proposal. The oral presentation is primarily to provide details on the Technical Data Proposal, Subfactor 2-3 (offeror please note that award without discussions is contemplated). NOTE: Offerors shall not discuss price in their oral presentations.

5.4.2. Offerors are cautioned that all information provided, regardless of the format (i.e. written proposal, oral presentation), shall be considered as proposal information, and used in the evaluation process.

5.5. Technical Proposal: Volume 2 – Management & Execution Plan. Provide original and three (3) copies of the requirements in this volume. The following technical subfactors shall be addressed in sufficient detail so as to provide the Government with a clear understanding of the offeror’s intended performance and shall take into consideration the material provided in the technical data proposal (Volume 3).

5.5.1. SUBFACTOR 2-1: Project Management Plan. Narrative for this Subfactor shall be limited to a maximum of twenty-five (25) pages, exclusive of table of contents, tabs and Subcontracting Plan. This is an overall plan showing how the offeror will control the job. The term "management plan" is defined as a plan that includes the following, as a minimum:

5.5.1.1. Organization, Management and Subcontractor Management:

5.5.1.1.1. Discuss lines of authority, responsibilities and communications. Discussion should address how you will respond to changes. Discuss your team and corporate support.

5.5.1.1.2. Provide resume and qualifications of key project personnel including name and previous project assignments, and firm association. Qualifications should highlight key personnel experience with projects of similar complexity, size, scope, and delivery method (performance-based design build). In addition, provide evidence that the key personnel have the qualifications outlined within the project requirements manual (PRM), section 2 – 01 45 10, page 4 of 9, paragraph 1.03 D. 4. a. Project key personnel shall include the engineering disciplines and key subcontractors to be utilized on the design and oversight team. As a minimum, discuss the project manager; the project architect; the engineers responsible for civil, electrical, mechanical, fire protection (demonstrate that a registered Fire Protection Engineer (F.P.E.) will accomplish the Fire protection design); the quality control manager;

and the construction manager and/or project superintendent.

5.5.1.1.3. Demonstrate that all lead design personnel are registered and/or certified in their discipline and have experience and technical competence in assigned roles on projects of similar complexity, size, scope and delivery method (performance-based design build). Identify architects and engineers that have USGBC LEED Accredited Professional BD+C credentials and demonstrate experience with LEED-certified projects.

5.5.1.1.4. At a minimum, discuss key construction subcontractors that have entered into agreements to be part of the design build team. Provide qualifications for their key personnel and discuss the extent of their roles with respect to the design and construction phases of this project. Discuss how your firm will select and incorporate construction subcontractors that are not part of the original design build team. Describe your plans for management of subcontractors.

5.5.1.2. Quality Control Procedures. Provide a Summary of the Quality Control Plan that will be implemented if awarded the contract. Consider the alliance of the project designer and builder on this performance-based design build project. Do not merely provide a boiler plate QC Plan; the QC Summary shall be specific to this project. The Summary of the Quality Control plan shall address the requirements of Project Requirements Manual (PRM), Section 01440 – Contractor Quality Control, to include as a minimum the following characteristics:

5.5.1.2.1. A clear identification of the personnel responsible for quality control and a clear policy establishing their authority. The quality control group shall be separate from (not the same personnel) those that are performing the construction;

5.5.1.2.2. A specific description of the tasks and functions of the quality control personnel;

5.5.1.2.3. A specific policy establishing schedules for the performance of quality control tasks;

5.5.1.2.4. A policy for reporting quality control findings to the Contracting Officer. A procedure whereby the Contracting Officer may resolve disputes that have not received satisfactory responses from the first levels of quality control personnel;

5.5.1.2.5. The names of testing laboratories to be used and the procedures for test data reporting;

5.5.1.2.6. A plan for material storage and protection;

5.5.1.2.7. The plan for review, evaluation, and offeror quality control of the Design Submittals prior to Government receipt. The plan for review of submittals and extensions of design. Of particular interest is the role of the Designer of Record in all design and construction progress;

5.5.1.2.8. Procedures for compliance with local codes as required;

5.5.1.2.9. Procedures for contract closeout;

5.5.1.2.10. Procedures for involving Key Subcontractors in the design development;

5.5.1.2.11. Procedures for successful integration of the Offeror’s Quality Control Program with the Government’s Quality Assurance Program;

5.5.1.3. Small Business Participation

5.5.1.3.1. (NOTE: Required for both Small and Large Business Offerors). The Small Business Participation is separate and distinct from the Subcontracting Plan required for Large Business. The Small Business Participation will gage the Offeror’s commitment to utilization of Small and other Socioeconomic businesses.

5.5.1.3.2. Provide the names of the Subcontractors/Teaming Partners to be utilized on this contract, their business size, and the products/services they are to provide.

5.5.1.3.3. If Subcontractors/Teaming Partners have not been established, describe the procedures that will be utilized to ensure your firm meets the minimum Small Business requirements of 50%.

5.5.1.3.4. Minimum Small Business requirements for this acquisition have been established at 50% of the subcontracted dollars. Offerors shall state total dollar value to be awarded to Small Business and the total dollar value to be subcontracted.

5.5.1.4. Subcontracting Plan

5.5.1.4.1. (NOTE: Only required of Large Business Offerors). If required, offerors shall prepare and submit their subcontracting plan in accordance with FAR Clause 52.219-9 Alt II and DFARS Clause 52.219-7003.

5.5.1.4.2. Goals established on previous acquisitions are as follows: Small Business, 67.4%; Small Disadvantaged Business 6.0 %; Woman Owned 9%; Veteran Owned Small Business 3.0%; Service Disabled Veteran Owned Business 3.0%, and Hub Zone firms. 3.2%. Firms should utilize these goals as a base line for establishing their proposed goals. Goals established below those referenced should be justified.

5.5.1.4.3. In accordance with FAR 19.7 – The Small Business Subcontracting Program. Subcontracting plans shall be evaluated by the Contracting Officer, or designated representative/agency for acceptability using the criteria set forth in AFAR Appendix DD-Subcontracting Plan Evaluation Guide, found at http://farsite.hill.af.mil/vfafara.htm. Subcontracting goals shall be consistent with National Guard Bureau Goals unless well justified. To receive an “Acceptable” rating, the contractor must satisfy all objectives in Part 2 and meet each statutory subcontracting plan requirement outlined in Part 3.

5.5.1.4.4. In accordance with 52.219-9, Small Business Subcontracting Plan (DEVIATION 2016-O0009), failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract. Small Businesses are not required to submit a plan.

5.5.2. SUBFACTOR 2-2: Design and Construction Schedule. Construction Schedule and commissioning approach/timeline is obtained for the purposes of evaluating an offeror’s understanding of the requirements of the schedule and commissioning. The Schedule itself is not subject to page limits; however any provided narrative to the schedule submission is limited to five (5) single pages, exclusive of table of contents, tabs, and dividers. Pages in excess of the limit will not be evaluated. Provide an integrated preliminary Design and Construction Schedule with all “Fast Tracking” areas clearly identified, if proposed. The NTP date to be used in the development of the Schedule will be provided in the Phase two solicitation.

5.5.2.1. Provide Construction Schedules using a critical path (Critical Path Method (CPM)) a scheduling approach considering a performance period of 540 calendar days from issuance of the Notice to Proceed. The Construction Schedule is an integrated and networked multi-layered schedule of program/project tasks. It identifies project events, accomplishment, and criteria and the expected dates of each. These dates are based on the calendar dates provided as the starting point and the logical flow of dates provided by calculating the addition of duration of all tasks using typical schedule networking tools. Each major task will be directly traceable to the requirements of the project. The NTP date for the schedule is for the purpose of evaluation only.

5.5.2.2. The offeror shall also submit a rationale explaining how the schedules will be achieved. Offerors providing an alternate schedule* shall discuss the perceived benefits to the Government. *The Government desires a performance period within the number of calendar days noted in paragraph 5.5.2.3. If the offeror proposes a shorter performance period, the offeror’s proposed performance period will be used to calculate the new completion date and incorporated into any resulting award.

5.5.2.3. In accordance with FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK, ALT. I:

The Contractor shall be required to:

(a) Commence work under this contract within 30 days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work, to include design and construction, ready for use not later than 540 calendar days after Notice to Proceed (NTP). See also Project Requirements Manual Part 2, Section 2 - 013200, Project Schedule, for detailed design and construction schedule. The time stated for completion shall include final cleanup of the premises.

5.6. Technical Proposal Volume 3– Technical Data. Provide original and three (3) copies of the requirements in this volume.

5.6.1. Technical Subfactor 2-3, Technical Data Proposal. Technical Data Proposal shall be submitted in separate three-ring binders labeled "Phase Two, Volume 3 - Technical Data Proposal." This proposal consists of, but is not limited to: design documents, sketches, outline specifications, design…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .