VTANG_B385_B3_Vol2_Nov2017.pdf
PDF 2 MB Posted
- Attached to
- F-35 ALTER AIRCRAFT SHELTER B385, FUEL CELL
- Solicitation number
- W912LN-18-B-5001
About this file
Volume 2 of 3
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-35 Phase 2 Bldg. 385 Vermont Air National Guard Base, VT
Vermont Air National Guard
CRUZ152806
Type B-3 Submittal
Specifications
Specifications Volume 2
20 November 2017
W9133L-15-D-0003 Delivery Order ZT01
PN 92654
This page was intentionally left blank for duplex printing.
F-35 Phase 2 Bldg 385 CURZ 152812
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 13.00 10 ASBESTOS ABATEMENT
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE
FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 35 43 POLISHED CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 19 SPRAYED POLYURETHANE FOAM INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER
07 42 13 METAL WALL PANELS
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 72 00 ROOF ACCESSORIES
07 72 13 PREFABRICATED ROOF CURBS
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 81 17 FIRE-RATED GLASS
08 91 00 METAL WALL LOUVERS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 09 - FINISHES
09 06 90 SCHEDULES FOR PAINTING AND COATING
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23 RESINOUS COATING SYSTEMS
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 11 - EQUIPMENT
11 01 50 RIGID RAIL FALL PROTECTION SYSTEMS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 25.00 10 HIGH EXPANSION FOAM (HI EX. HEF) FIRE PROTECTION SYSTEM
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 4
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 00 99 AIRCRAFT, PRECONITIONED AIR UNITS, PIPING, AND
ACCESSORIES
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 23 00 REFRIGERANT PIPING
23 52 00 HEATING BOILERS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 AUTOMATIC TEMPERATURE CONTROLS
25 10 10.10 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS**
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 35 44.00 20 270VDC SOLID STATE GROUND POWER UNIT FOR F-35
AIRCRAFT
26 36 23.00 20 MANUAL TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 5
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD-MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 BASE COURSE FOR RIGID PAVING
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 16 13 CONCRETE SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 BARRIER GATE OPERATOR
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
F- 35 Phase 2 Bl dg 385 CURZ 152812 Ver mont Ai r Nat i onal Guar d Base, VT
SECTI ON 09 06 90
SCHEDULES FOR PAI NTI NG AND COATI NG
05/09
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on cover s onl y t he col or of ext er i or and i nt er i or mat er i al s and pr oduct s t hat ar e exposed t o v i ew i n t he f i ni shed const r uct i on. The wor d " col or , " as used her ei n, i ncl udes sur f ace col or and pat t er n. Requi r ement s f or qual i t y , pr oduct speci f i cat i ons, and met hod of i nst al l at i on ar e cover ed i n ot her appr opr i at e sect i ons of t he speci f i cat i ons. Speci f i c l ocat i ons wher e t he var i ous mat er i al s ar e r equi r ed ar e shown on t he Dr awi ngs i f not i dent i f i ed i n t hi s speci f i cat i on. I t ems not desi gnat ed f or col or i n t hi s sect i on may be speci f i ed i n ot her sect i ons. When col or i s not desi gnat ed f or i t ems, pr opose a col or f or appr oval .
PART 2 PRODUCTS
2. 1 COLOR SCHEDULE
The col or schedul e i nf or mat i on pr ovi ded i n t he f ol l owi ng par agr aphs l i s t s t he col or s, pat t er ns and t ext ur es r equi r ed f or ext er i or and i nt er i or f i ni shes, i ncl udi ng bot h f act or y appl i ed and f i el d appl i ed col or s. Wher e col or i s shown as bei ng speci f i c t o one manuf act ur er , an equi val ent col or by anot her manuf act ur er may be submi t t ed f or appr oval . Manuf act ur er s and mat er i al s speci f i ed ar e not i nt ended t o l i mi t t he sel ect i on of equal col or s f r om ot her manuf act ur er s. I n t he case of di f f er ence bet ween t he dr awi ngs and speci f i cat i ons, col or s i dent i f i ed i n t hi s speci f i cat i on gover n.
2. 2 EXTERI OR FI NI SHES
Ref er ence dr awi ngs f or manuf act ur er and col or i nf or mat i on.
2. 3 I NTERI OR FI NI SHES
2. 3. 1 I nt er i or Fl oor Fi ni shes
Pr ovi de f l oor i ng mat er i al s t o mat ch t he col or s l i s t ed bel ow.
2. 3. 1. 1 Car pet Ti l e ( CPT- 1)
Shaw Cont r act , Sea Ti l e 5T173- 72481 Advent ur e.
2. 3. 1. 2 Ent r ance Mat ( WOM- 1)
Const r uct i on Speci al t i es, Pedi gr i d G1, 7323 Cast l e Gr ay.
2. 3. 1. 3 Concr et e Pol i shed ( CP- 1)
2. 3. 1. 4 I ndust r i al Fl oor Coat i ng ( RES- 1, RES- 2)
RES- 1: St onhar d, St onshi el d HRI , Fl agst one.
RES- 2: St onhar d, 5- Coat Syst em, Whi t e.
92654Bldg385 SECTI ON 09 06 90 Page 1
2. 3. 2 I nt er i or Base Fi ni shes
Pr ovi de base mat er i al s t o mat ch t he col or s l i s t ed bel ow.
2. 3. 2. 1 Resi l i ent Base and Mol di ngs ( RB- 1)
Johnsoni t e, 71 St or m Cl oud, 4 I nch Cove Base.
2. 3. 2. 2 I nt egr al Cove Base ( RES- 1)
St onhar d, St onshi el d HRI , Fl agst one.
2. 3. 3 I nt er i or Wal l Fi ni shes
Appl y i nt er i or wal l col or t o t he ent i r e wal l sur f ace, i ncl udi ng r eveal s, ver t i cal f ur r ed spaces and col umns, gr i l l es, di f f user s, el ect r i cal and access panel s, and pi pi ng and condui t adj acent t o wal l sur f aces unl ess ot her wi se speci f i ed. Pai nt i t ems not speci f i ed i n ot her par agr aphs t o mat ch adj acent wal l sur f ace. Pr ovi de wal l mat er i al s t o mat ch t he col or s l i s t ed bel ow.
2. 3. 3. 1 Pai nt ( PA- 1, PA- 2, PA- 3, PA- 4, PE- 1)
Sher wi n Wi l l i ams, SW7656 Rhi nest one ( PA- 1, PE- 1) .
Sher wi n Wi l l i ams, SW7066 Gr ay Mat t er s ( PA- 2) .
Sher wi n Wi l l i ams, SW6453 Ci l ant r o ( PA- 3) .
Sher wi n Wi l l i ams, SW6531 I ndi go ( PA- 4) .
2. 3. 3. 2 Resi nous Wal l Syst em
RES- 3: St onhar d, St onGl aze, Ash.
2. 3. 3. 3 Exposed St r uct ur al Col umns ( PA- 1)
Sher wi n Wi l l i ams, SW7656 Rhi nest one.
2. 3. 4 I nt er i or Cei l i ng Fi ni shes
Appl y cei l i ng col or s t o cei l i ng sur f aces i ncl udi ng sof f i t s , f ur r ed down ar eas, gr i l l es, di f f user s, r egi st er s, and access panel s. I n addi t i on, appl y cei l i ng col or t o j oi st s, under si de of r oof deck, and condui t and pi pi ng wher e j oi st s and deck ar e exposed and r equi r ed t o be pai nt ed.
Pr ovi de cei l i ng mat er i al s t o mat ch t he col or s l i s t ed bel ow.
2. 3. 4. 1 Acoust i cal Ti l e and Gr i d ( ACT- 1)
Ar mst r ong, Ci r r us Angl ed Tegul ar , 584HRC, Whi t e 15/ 16 I nch Whi t e Frame.
2. 3. 4. 2 Pai nt ( Cei l i ngs) ( PA- 5, PE- 2)
Sher wi n Wi l l i ams, SW7007 Cei l i ng Br i ght Whi t e.
92654Bldg385 SECTI ON 09 06 90 Page 2
2. 3. 4. 3 Pai nt ( Sof f i t s) ( PA- 5, PE- 2)
Sher wi n Wi l l i ams, SW7007 Cei l i ng Br i ght Whi t e.
2. 3. 4. 4 Met al Deck ( PA- 5)
Sher wi n Wi l l i ams, SW7007 Cei l i ng Br i ght Whi t e.
2. 3. 4. 5 St r uct ur al Fr ami ng ( PA- 5)
Sher wi n Wi l l i ams, SW7007 Cei l i ng Br i ght Whi t e.
2. 3. 5 I nt er i or Tr i m
Pr ovi de i nt er i or t r i m t o mat ch t he col or s l i s t ed bel ow.
2. 3. 5. 1 St eel Door s ( PA- 6)
Sher wi n Wi l l i ams, SW7075 Web Gr ay.
2. 3. 5. 2 St eel Door Fr ames ( PA- 6)
Sher wi n Wi l l i ams, SW7075 Web Gr ay.
2. 3. 5. 3 Al umi num Door s and Door Fr ames
Dar k Br onze.
2. 3. 5. 4 Al umi num Wi ndows ( mul l i on, munt i n, sash, t r i m, and st ool )
Dar k Br onze.
2. 3. 5. 5 Exposed Duct wor k ( PA- 5)
Sher wi n Wi l l i ams, SW7007 Cei l i ng Br i ght Whi t e.
2. 3. 5. 6 Bollards
Saf et y Yel l ow.
2. 3. 6 I nt er i or Wi ndow Tr eat ment
Pr ovi de wi ndow t r eat ment s t o mat ch t he col or s l i s t ed bel ow.
2. 3. 6. 1 Hor i zont al Bl i nds ( HB- 1)
Level or Cont r act - 1 I nch Ri v i er a Cl assi c, Dar k Br onze.
2. 3. 7 I nt er i or Mi scel l aneous
Pr ovi de mi scel l aneous i t ems t o mat ch t he col or s l i s t ed bel ow.
2. 3. 7. 1 Toi l et Par t i t i ons and Ur i nal Scr eens
Scr ant on Pr oduct s, Hi ny Hi der s, Char coal Gr ey, Or ange Peel Text ur e.
2. 3. 7. 2 Pl ast i c Lami nat e ( PLAM- 1)
Wi l sonar t , 4880- 38 Car bon Mesh.
92654Bldg385 SECTI ON 09 06 90 Page 3
2. 3. 7. 3 Sol i d Sur f aci ng Mat er i al ( SSF- 1)
Cor i an, Si l ver Bi r ch.
2. 3. 7. 4 Wi ndow Si l l s Sol i d Sur f ace ( SSF- 2)
Avoni t e, F1- 7556 Shar k Ski n.
2. 3. 7. 5 Cor ner Guar ds ( CG- 1)
Const r uct i on Speci al t i es, CO- 8 St ai nl ess St eel , 304 Sat i n Fi ni sh, Mechani cal l y Fast ened.
2. 3. 7. 6 Si gnage Message Col or
Takef or m, CO101 Bl ack.
2. 3. 7. 7 Si gnage Backgr ound Col or
Takef or m, LM104 Br ushed Al umi num.
2. 3. 7. 8 Mar ker boar d ( MB- 1)
Cl ar i dge, COM48L, Whi t e, Por cel ai n Enamel St eel Magnet i c, s i ze as shown on Dr awi ngs.
2. 3. 7. 9 Locker s ( L- 1, L- 2)
Republ i c St or age Pr oduct s, 85 Tr ue Navy.
2. 3. 7. 10 Benches
Republ i c St or age Pr oduct s, 85 Tr ue Navy Legs wi t h Wood Seat .
2. 3. 7. 11 Wal l Swi t ch Handl es and St andar d Recept acl e Bodi es
Manuf act ur er ' s St andar d Gr ey.
2. 3. 7. 12 El ect r i cal Devi ce Cover Pl at es
Br ushed St ai nl ess St eel .
2. 3. 7. 13 El ect r i cal Panel s
Manuf act ur er ' s St andar d Gr ey.
2. 3. 7. 14 Shower Cur t ai n
Bobr i ck, Opaque Whi t e Vi nyl ( Mat t e) , s i zed t o f i t .
PART 3 EXECUTI ON
Not Used.
- - End of Sect i on - -
92654Bldg385 SECTI ON 09 06 90 Page 4
SECTI ON 09 22 00
SUPPORTS FOR PLASTER AND GYPSUM BOARD
02/10
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM A463/ A463M ( 2010) St andar d Speci f i cat i on f or St eel Sheet , Al umi num- Coat ed, by t he Hot - Di p Process
ASTM A653/ A653M ( 2015; E 2016) St andar d Speci f i cat i on f or St eel Sheet , Zi nc- Coat ed ( Gal vani zed) or Zi nc- I r on Al l oy- Coat ed ( Gal vanneal ed) by t he Hot - Di p Pr ocess
ASTM C645 ( 2014) Nonst r uct ur al St eel Fr ami ng Member s
ASTM C754 ( 2015) I nst al l at i on of St eel Fr ami ng Member s t o Recei ve Scr ew- At t ached Gypsum Panel Pr oduct s
NATI ONAL ASSOCI ATI ON OF ARCHI TECTURAL METAL MANUFACTURERS ( NAAMM)
NAAMM EMLA 920 ( 2009) Gui de Speci f i cat i ons f or Met al Lat hi ng and Fur r i ng
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 3- 310- 04 ( 2016) Sei smi c Desi gn f or Bui l di ngs wi t h Change 1, 20 June 2016
UNDERWRI TERS LABORATORI ES ( UL)
UL Fi r e Resi st ance ( 2014) Fi r e Resi st ance Di r ect or y
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Met al suppor t syst ems; G
Submi t f or t he er ect i on of met al f r ami ng, f ur r i ng, and cei l i ng suspensi on syst ems. I ndi cat e mat er i al s, s i zes, t hi cknesses, and fastenings.
92654Bldg385 SECTI ON 09 22 00 Page 1
1. 3 DELI VERY, STORAGE, AND HANDLI NG
Del i ver mat er i al s t o t he j ob s i t e and st or e i n vent i l at ed dr y l ocat i ons.
St or age ar ea shal l per mi t easy access f or i nspect i on and handl i ng. I f mat er i al s ar e st or ed out door s, st ack mat er i al s of f t he gr ound, suppor t ed on a l evel pl at f or m, and f ul l y pr ot ect ed f r om t he weat her . Handl e mat er i al s car ef ul l y t o pr event damage. Remove damaged i t ems and pr ovi de new i t ems.
PART 2 PRODUCTS
2. 1 MATERIALS
Pr ovi de st eel mat er i al s f or met al suppor t syst ems wi t h gal vani zed coat i ng ASTM A653/ A653M, G- 60; al umi num coat i ng ASTM A463/ A463M, T1- 25; or a 55- per cent al umi num- zi nc coat i ng. Pr ovi de suppor t syst ems and at t achment s per UFC 3- 310- 04, " Sei smi c Desi gn f or Bui l di ngs" i n sei smi c zones.
2. 1. 1 Mat er i al s f or At t achment of Gypsum Wal l boar d
2. 1. 1. 1 Suspended and Fur r ed Cei l i ng Syst ems
ASTM C645.
2. 1. 1. 2 Nonl oad- Bear i ng Wal l Fr ami ng and Fur r i ng
ASTM C645, but not t hi nner t han 0. 0179 i nch t hi ckness, wi t h 0. 0329 i nch mi ni mum t hi ckness suppor t i ng wal l hung i t ems such as cabi net wor k, equi pment and f i x t ur es. The ASTM cer t i f i ed t hi r d par t y t est i ng st at ement f or equi val ent t hi cknesses shal l not appl y.
2. 1. 1. 3 Fur r i ng St r uct ur al St eel Col umns
ASTM C645. St eel ( f ur r i ng) c l i ps and suppor t angl es l i s t ed i n UL Fi r e Resi st ance may be pr ovi ded i n l i eu of st eel st uds f or er ect i on of gypsum wal l boar d ar ound st r uct ur al st eel col umns.
2. 1. 1. 4 Z- Fur r i ng Channel s wi t h Wal l I nsul at i on
Not l i ght er t han 26 gage gal vani zed st eel , Z- shaped, wi t h 1- 1/ 4 i nch and 3/ 4 i nch f l anges and dept h as r equi r ed by t he i nsul at i on t hi ckness pr ovi ded.
PART 3 EXECUTI ON
3. 1 INSTALLATION
3. 1. 1 Syst ems f or At t achment of Lat h
3. 1. 1. 1 Non- Loadbear i ng Wal l Fr ami ng
NAAMM EMLA 920, except pr ovi de f r ami ng member s 16 i nches o. c. unl ess i ndi cat ed ot her wi se.
3. 1. 2 Syst ems f or At t achment of Gypsum Wal l boar d
3. 1. 2. 1 Suspended and Fur r ed Cei l i ng Syst ems
ASTM C754, except pr ovi de f r ami ng member s 16 i nches o. c. unl ess i ndi cat ed otherwise.
92654Bldg385 SECTI ON 09 22 00 Page 2
3. 1. 2. 2 Non- Loadbear i ng Wal l Fr ami ng and Fur r i ng
ASTM C754, except as i ndi cat ed ot her wi se.
3. 1. 2. 3 Fur r i ng St r uct ur al St eel Col umns
I nst al l s t uds or gal vani zed st eel c l i ps and suppor t angl es f or er ect i on of gypsum wal l boar d ar ound st r uct ur al st eel col umns i n accor dance wi t h t he UL Fi r e Resi st ance, desi gn number ( s) of t he f i r e r esi st ance r at i ng indicated.
3. 1. 2. 4 Z- Fur r i ng Channel s wi t h Wal l I nsul at i on
I nst al l Z- f ur r i ng channel s ver t i cal l y spaced not mor e t han 24 i nches o. c.
Locat e Z- f ur r i ng channel s at i nt er i or and ext er i or cor ner s i n accor dance wi t h manuf act ur er ' s pr i nt ed er ect i on i nst r uct i ons. Fast en f ur r i ng channel s t o masonr y wal l s wi t h powder - dr i ven f ast ener s or har dened concr et e st eel nai l s t hr ough nar r ow f l ange of channel . Space f ast ener s not mor e t han 24 i nches o. c.
3. 2 ERECTI ON TOLERANCES
Pr ovi de f r ami ng member s whi ch wi l l be cover ed by f i ni sh mat er i al s such as wal l boar d, pl ast er , or cer ami c t i l e set i n a mor t ar set t i ng bed, wi t hi n t he f ol l owi ng l i mi t s:
a. Layout of wal l s and par t i t i ons: 1/ 4 i nch f r om i nt ended posi t i on;
b. Pl at es and r unner s: 1/ 4 i nch i n 8 f eet f r om a st r ai ght l i ne;
c. St uds: 1/ 4 i nch i n 8 f eet out of pl umb, not cumul at i ve; and
d. Face of f r ami ng member s: 1/ 4 i nch i n 8 f eet f r om a t r ue pl ane.
Pr ovi de f r ami ng member s whi ch wi l l be cover ed by cer ami c t i l e set i n dr y- set mor t ar , l at ex- por t l and cement mor t ar , or or gani c adhesi ve wi t hi n t he f ol l owi ng l i mi t s:
a. Layout of wal l s and par t i t i ons: 1/ 4 i nch f r om i nt ended posi t i on;
b. Pl at es and r unner s: 1/ 8 i nch i n 8 f eet f r om a st r ai ght l i ne;
c. St uds: 1/ 8 i nch i n 8 f eet out of pl umb, not cumul at i ve; and
d. Face of f r ami ng member s: 1/ 8 i nch i n 8 f eet f r om a t r ue pl ane.
92654Bldg385 SECTI ON 09 22 00 Page 3
SECTI ON 09 29 00
GYPSUM BOARD
08/16
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM C1002 ( 2014) St andar d Speci f i cat i on f or St eel Sel f - Pi er c i ng Tappi ng Scr ews f or t he Appl i cat i on of Gypsum Panel Pr oduct s or Met al Pl ast er Bases t o Wood St uds or St eel Studs
ASTM C1047 ( 2014a) St andar d Speci f i cat i on f or Accessor i es f or Gypsum Wal l boar d and Gypsum Veneer Base
ASTM C1177/ C1177M ( 2013) St andar d Speci f i cat i on f or Gl ass Mat Gypsum Subst r at e f or Use as Sheat hi ng
ASTM C1396/ C1396M ( 2014a) St andar d Speci f i cat i on f or Gypsum Board
ASTM C475/ C475M ( 2015) Joi nt Compound and Joi nt Tape f or Fi ni shi ng Gypsum Boar d
ASTM C840 ( 2013) Appl i cat i on and Fi ni shi ng of Gypsum Board
ASTM C954 ( 2015) St eel Dr i l l Scr ews f or t he Appl i cat i on of Gypsum Panel Pr oduct s or Met al Pl ast er Bases t o St eel St uds f r om
0. 033 i n. ( 0. 84 mm) t o 0. 112 i n. ( 2. 84 mm) i n Thi ckness
CALI FORNI A DEPARTMENT OF PUBLI C HEALTH ( CDPH)
CDPH SECTI ON 01350 ( 2004; Add 2004- 01) St andar d Pr act i ce f or t he Test i ng Of Vol at i l e Or gani c Emi ssi ons f r om Var i ous Sour ces Usi ng Smal l - Scal e Envi r onment al Chamber s
FM GLOBAL ( FM)
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/
GREEN SEAL ( GS)
GS-36 ( 2011) Commer ci al Adhesi ves
92654Bldg385 SECTI ON 09 29 00 Page 1
GYPSUM ASSOCI ATI ON ( GA)
GA 214 ( 2010) Recommended Level s of Gypsum Boar d Finish
GA 216 ( 2010) Appl i cat i on and Fi ni shi ng of Gypsum Panel Pr oduct s
GA 253 ( 2012) Appl i cat i on of Gypsum Sheat hi ng
GA 600 ( 2009) Fi r e Resi st ance Desi gn Manual
SCI ENTI FI C CERTI FI CATI ON SYSTEMS ( SCS)
SCS Sci ent i f i c Cer t i f i cat i on Syst ems ( SCS) I ndoor Advant age
SOUTH COAST AI R QUALI TY MANAGEMENT DI STRI CT ( SCAQMD)
SCAQMD Rul e 1168 ( 1989; R 2005) Adhesi ve and Seal ant Applications
UNDERWRI TERS LABORATORI ES ( UL)
UL 2818 ( 2013) GREENGUARD Cer t i f i cat i on Pr ogr am For Chemi cal Emi ssi ons For Bui l di ng Mat er i al s, Fi ni shes And Fur ni shi ngs
UL Fi r e Resi st ance ( 2014) Fi r e Resi st ance Di r ect or y
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 03 Pr oduct Dat a
Wat er - Resi st ant Gypsum Backi ng Boar d
Gl ass Mat Cover ed or Rei nf or ced Gypsum Sheat hi ng
Gl ass Mat Cover ed or Rei nf or ced Gypsum Sheat hi ng Seal ant
Accessories
Submi t f or each t ype of gypsum boar d and f or cement i t i ous backer units.
Certifications
Gypsum Boar d
SD- 07 Cer t i f i cat es
Asbest os Fr ee Mat er i al s; G
92654Bldg385 SECTI ON 09 29 00 Page 2
Cer t i f y t hat gypsum boar d t ypes, gypsum backi ng boar d t ypes, cement i t i ous backer uni t s, and j oi nt t r eat i ng mat er i al s do not cont ai n asbest os.
I ndoor Ai r Qual i t y; G
SD- 08 Manuf act ur er ' s I nst r uct i ons
Mat er i al Saf et y Dat a Sheet s
SD- 10 Oper at i on and Mai nt enance Dat a
Manuf act ur er Mai nt enance I nst r uct i ons
1. 3 CERTIFICATIONS
1. 3. 1 I ndoor Ai r Qual i t y Cer t i f i cat i ons
Submi t r equi r ed i ndoor ai r qual i t y cer t i f i cat i ons i n one submi t t al package.
1. 3. 1. 1 Cei l i ng and Wal l Syst ems
Pr ovi de pr oduct s cer t i f i ed t o meet i ndoor ai r qual i t y r equi r ement s by UL 2818 ( Gr eenguar d) Gol d, SCS Gl obal Ser vi ces I ndoor Advant age Gol d or pr ovi de val i dat i on by ot her t hi r d- par t y pr ogr am t hat pr oduct s meet t he r equi r ement s of t hi s par agr aph. Pr ovi de cur r ent pr oduct cer t i f i cat i on document at i on f r om cer t i f i cat i on body. Gypsum wal l boar d and panel s must meet t he emi ssi ons r equi r ement s of CDPH SECTI ON 01350 ( l i mi t r equi r ement s f or ei t her of f i ce or c l assr oom spaces r egar dl ess of space t ype) .
1. 3. 1. 2 Adhesi ves and Seal ant s
Pr ovi de pr oduct s cer t i f i ed t o meet i ndoor ai r qual i t y r equi r ement s by UL 2818 ( Gr eenguar d) Gol d, SCS Gl obal Ser vi ces I ndoor Advant age Gol d or pr ovi de val i dat i on by ot her t hi r d- par t y pr ogr am t hat pr oduct s meet t he r equi r ement s of t hi s par agr aph. Seal ant s and non- aer osol adhesi ve pr oduct s used on t he i nt er i or of t he bui l di ng ( def i ned as i nsi de of t he weat her pr oof i ng syst em) must meet ei t her emi ssi ons r equi r ement s of CDPH SECTI ON 01350 ( l i mi t r equi r ement s f or ei t her of f i ce or c l assr oom spaces r egar dl ess of space t ype) or VOC cont ent r equi r ement s of SCAQMD Rul e 1168. Aer osol adhesi ve pr oduct s used on t he i nt er i or of t he bui l di ng ( def i ned as i nsi de of t he weat her pr oof i ng syst em) must meet ei t her emi ssi ons r equi r ement s of CDPH SECTI ON 01350 ( l i mi t r equi r ement s f or ei t her of f i ce or c l assr oom spaces r egar dl ess of space t ype) or VOC cont ent r equi r ement s of GS-36. Pr ovi de cur r ent pr oduct cer t i f i cat i on document at i on f r om cer t i f i cat i on body.
1. 4 DELI VERY, STORAGE, AND HANDLI NG
1. 4. 1 Delivery
Del i ver mat er i al s i n t he or i gi nal packages, cont ai ner s, or bundl es wi t h each bear i ng t he br and name, appl i cabl e st andar d desi gnat i on, and name of manuf act ur er , or suppl i er .
1. 4. 2 Storage
Keep mat er i al s dr y by st or i ng i ns i de a shel t er ed bui l di ng. Wher e necessar y
92654Bldg385 SECTI ON 09 29 00 Page 3 t o st or e gypsum boar d and cement i t i ous backer uni t s out s i de, st or e of f t he gr ound, pr oper l y suppor t ed on a l evel pl at f or m, and pr ot ect ed f r om di r ect exposur e t o r ai n, snow, sunl i ght , and ot her ext r eme weat her condi t i ons.
Pr ovi de adequat e vent i l at i on t o pr event condensat i on. St or e per manuf act ur er ' s r ecommendat i ons f or al l owabl e t emper at ur e and humi di t y r ange.
Do not st or e gypsum wal l boar d wi t h mat er i al s whi ch have hi gh emi ssi ons of vol at i l e or gani c compounds ( VOCs) or ot her cont ami nant s. Do not st or e panel s near mat er i al s t hat may of f gas or emi t har mf ul f umes, such as ker osene heat er s, f r esh pai nt , or adhesi ves. Do not use mat er i al s t hat have vi s i bl e moi st ur e or bi ol ogi cal gr owt h.
1. 4. 3 Handling
Neat l y st ack gypsum boar d and cement i t i ous backer uni t s f l at t o pr event saggi ng or damage t o t he edges, ends, and sur f aces.
1. 5 QUALIFICATIONS
Fur ni sh t ype of gypsum boar d wor k speci al i zed by t he i nst al l er wi t h a mi ni mum of 3 year s of document ed successf ul exper i ence.
1. 6 SCHEDULING
The gypsum wal l boar d must be t aped, f i ni shed and pr i med bef or e t he i nst al l at i on of t he hi ghl y- emi t t i ng mat er i al s. The gypsum wal l boar d must be i nst al l ed af t er t he i nst al l at i on and vent i l at i on per i od of t he hi ghl y- emi t t i ng mat er i al s.
Commence appl i cat i on onl y af t er t he ar ea schedul ed f or gypsum boar d wor k i s compl et el y weat her t i ght . The heat i ng, vent i l at i ng, and ai r - condi t i oni ng syst ems must be compl et e and i n oper at i on pr i or t o appl i cat i on of t he gypsum boar d. I f t he mechani cal syst em cannot be act i vat ed bef or e gypsum boar d i s begun, t he gypsum boar d wor k may pr oceed i n accor dance wi t h an appr oved pl an t o mai nt ai n t he envi r onment al condi t i ons speci f i ed bel ow.
Appl y gypsum boar d pr i or t o t he i nst al l at i on of f i ni sh f l oor i ng and acoust i c cei l i ng.
1. 7 ENVI RONMENTAL REQUI REMENTS
Do not expose t he gypsum boar d t o excessi ve sunl i ght pr i or t o gypsum boar d appl i cat i on. Mai nt ai n a cont i nuous uni f or m t emper at ur e of not l ess t han 50 degr ees F and not mor e t han 80 degr ees F f or at l east one week pr i or t o t he appl i cat i on of gypsum boar d wor k, whi l e t he gypsum boar d appl i cat i on i s bei ng done, and f or at l east one week af t er t he gypsum boar d i s set .
Shi el d ai r suppl y and di st r i but i on devi ces t o pr event any uneven f l ow of ai r acr oss t he pl ast er ed sur f aces. Pr ovi de vent i l at i on t o exhaust moi st ai r t o t he out s i de dur i ng gypsum boar d appl i cat i on, set , and unt i l gypsum boar d j oi nt i ng i s dr y. I n gl azed ar eas, keep wi ndows open t op and bot t om or s i de t o s i de 3 t o 4 i nches. Reduce openi ngs i n col d weat her t o pr event f r eezi ng of j oi nt compound when appl i ed. For encl osed ar eas l acki ng nat ur al vent i l at i on, pr ovi de t empor ar y mechani cal means f or vent i l at i on.
I n ungl azed ar eas subj ect ed t o hot , dr y wi nds or t emper at ur e di f f er ent i al s f r om day t o ni ght of 20 degr ees F or mor e, scr een openi ngs wi t h cheesecl ot h or s i mi l ar mat er i al s. Avoi d r api d dr y i ng. Dur i ng per i ods of l ow i ndoor humi di t y, pr ovi de mi ni mum ai r c i r cul at i on f ol l owi ng gypsum boar di ng and unt i l gypsum boar d j oi nt i ng compl et e and i s dr y.
92654Bldg385 SECTI ON 09 29 00 Page 4
1. 8 FI RE RESI STI VE CONSTRUCTI ON
Compl y wi t h speci f i ed f i r e- r at ed assembl i es f or desi gn number s i ndi cat ed per UL Fi r e Resi st ance or FM APP GUI DE.
PART 2 PRODUCTS
2. 1 PRODUCT SUSTAI NABI LI TY CRI TERI A
For pr oduct s i n t hi s sect i on, wher e appl i cabl e and t o ext ent al l owed by per f or mance cr i t er i a, pr ovi de and document t he f ol l owi ng:
2. 2 MATERIALS
Conf or m t o speci f i cat i ons, st andar ds and r equi r ement s speci f i ed. Pr ovi de gypsum boar d t ypes, gypsum backi ng boar d t ypes, cement i t i ous backi ng uni t s, and j oi nt t r eat i ng mat er i al s manuf act ur ed f r om asbest os f r ee mat er i al s onl y.
Submi t Mat er i al Saf et y Dat a Sheet s and manuf act ur er mai nt enance i nst r uct i ons f or gypsum mat er i al s i ncl udi ng adhesi ves.
2. 2. 1 Gypsum Boar d
ASTM C1396/ C1396M. Gypsum boar d must cont ai n a mi ni mum of 10 per cent post - consumer r ecycl ed cont ent , or a mi ni mum of 40 per cent post - i ndust r i al r ecycl ed cont ent . Pr ovi de dat a i dent i f y i ng per cent age of r ecycl ed cont ent f or gypsum boar d. Paper f aci ngs must cont ai n a mi ni mum of 100 per cent post - consumer r ecycl ed paper cont ent . Gypsum cor es must cont ai n a mi ni mum of 95 per cent post - i ndust r i al r ecycl ed gypsum cont ent . Pr ovi de dat a i dent i f y i ng per cent age of r ecycl ed cont ent f or paper f aci ng and gypsum cor es. Pr ovi de cer t i f i cat i on of i ndoor ai r qual i t y f or gypsum boar d.
2. 2. 1. 1 Regular
48 i nch wi de, 1/ 2 i nch t hi ck f or gypsum boar d cei l i ngs and 5/ 8 i nch t hi ck f or gypsum boar d wal l s, t aper ed edges.
2. 2. 1. 2 Type X ( Speci al Fi r e- Resi st ant )
48 i nch wi de, 5/ 8 i nch t hi ck, t aper ed edges.
2. 2. 2 Regul ar Wat er - Resi st ant Gypsum Backi ng Boar d
ASTM C1396/ C1396M.
2. 2. 2. 1 Regular
48 i nch wi de, 1/ 2 i nch t hi ck f or gypsum boar d cei l i ngs and 5/ 8 i nch t hi ck f or gypsum boar d wal l s, t aper ed edges.
2. 2. 2. 2 Type X ( Speci al Fi r e- Resi st ant )
48 i nch wi de, 5/ 8 i nch t hi ck, t aper ed edges.
2. 2. 3 Gl ass Mat Cover ed or Rei nf or ced Gypsum Sheat hi ng
Exceeds physi cal pr oper t i es of ASTM C1396/ C1396M and ASTM C1177/ C1177M.
Pr ovi de 1/ 2 i nch, gypsum sheat hi ng at r oof as i ndi cat ed on dr awi ngs.
Pr ovi de gypsum boar d of wi t h a noncombust i bl e wat er - r esi st ant cor e, wi t h gl ass mat sur f aces embedded t o t he gypsum cor e or r ei nf or c i ng embedded
92654Bldg385 SECTI ON 09 29 00 Page 5 t hr oughout t he gypsum cor e. War r ant gypsum sheat hi ng boar d f or at l east t wel ve mont hs agai nst del ami nat i on due t o di r ect weat her exposur e. Pr ovi de cont i nuous, asphal t i mpr egnat ed, bui l di ng f el t t o cover ext er i or f ace of sheathing.
2. 2. 4 Joi nt Tr eat ment Mat er i al s
ASTM C475/ C475M. Pr oduct must be l ow emi t t i ng VOC t ypes wi t h VOC l i mi t s not exceedi ng 50 g/ L. Pr ovi de dat a i dent i f y i ng VOC cont ent of j oi nt compound. Use al l pur pose j oi nt and t ext ur i ng compound cont ai ni ng i ner t f i l l er s and nat ur al bi nder s, i ncl udi ng l i me compound. Pr e- mi xed compounds must be f r ee of ant i f r eeze, v i nyl adhesi ves, pr eser vat i ves, bi oci des and ot her s l ow r el easi ng compounds.
2. 2. 4. 1 Embeddi ng Compound
Speci f i cal l y f or mul at ed and manuf act ur ed f or use i n embeddi ng t ape at gypsum boar d j oi nt s and compat i bl e wi t h t ape, subst r at e and f ast ener s.
2. 2. 4. 2 Fi ni shi ng or Toppi ng Compound
Speci f i cal l y f or mul at ed and manuf act ur ed f or use as a f i ni shi ng compound.
2. 2. 4. 3 Al l - Pur pose Compound
Speci f i cal l y f or mul at ed and manuf act ur ed t o ser ve as bot h a t api ng and a f i ni shi ng compound and compat i bl e wi t h t ape, subst r at e and f ast ener s.
2. 2. 4. 4 Set t i ng or Har deni ng Type Compound
Speci f i cal l y f or mul at ed and manuf act ur ed f or use wi t h f i ber gl ass mesh t ape.
2. 2. 4. 5 Joi nt Tape
Use cr oss- l ami nat ed, t aper ed edge, r ei nf or ced paper , or f i ber gl ass mesh t ape r ecommended by t he manuf act ur er .
2. 2. 5 Fasteners
2. 2. 5. 1 Screws
ASTM C1002, Type " G, " Type " S, " or Type " W" st eel dr i l l scr ews f or f ast eni ng gypsum boar d t o gypsum boar d, wood f r ami ng member s and st eel f r ami ng member s l ess t han 0. 033 i nch t hi ck. ASTM C954 st eel dr i l l scr ews f or f ast eni ng gypsum boar d t o st eel f r ami ng member s 0. 033 t o 0. 112 i nch t hi ck. Pr ovi de cement i t i ous backer uni t scr ews wi t h a pol ymer coat i ng.
2. 2. 6 Accessories
ASTM C1047. Fabr i cat e f r om cor r osi on pr ot ect ed st eel or pl ast i c desi gned f or i nt ended use. Accessor i es manuf act ur ed wi t h paper f l anges ar e not accept abl e. Fl anges must be f r ee of di r t , gr ease, and ot her mat er i al s t hat may adver sel y af f ect bond of j oi nt t r eat ment . Pr ovi de pr ef i ni shed or j ob decor at ed mat er i al s.
2. 2. 7 Water
Pr ovi de c l ean, f r esh, and pot abl e wat er .
92654Bldg385 SECTI ON 09 29 00 Page 6
PART 3 EXECUTI ON
3. 1 EXAMINATION
3. 1. 1 Fr ami ng and Fur r i ng
Ver i f y t hat f r ami ng and f ur r i ng ar e secur el y at t ached and of s i zes and spaci ng t o pr ovi de a sui t abl e subst r at e t o r ecei ve gypsum boar d and cement i t i ous backer uni t s. Ver i f y t hat al l bl ocki ng, header s and suppor t s ar e i n pl ace t o suppor t pl umbi ng f i x t ur es and t o r ecei ve soap di shes, gr ab bar s, t owel r acks, and si mi l ar i t ems. Do not pr oceed wi t h wor k unt i l f r ami ng and f ur r i ng ar e accept abl e f or appl i cat i on of gypsum boar d and cement i t i ous backer uni t s.
3. 1. 2 Bui l di ng Const r uct i on Mat er i al s
Do not i nst al l bui l di ng const r uct i on mat er i al s t hat show vi sual evi dence of bi ol ogi cal gr owt h.
3. 2 APPLI CATI ON OF GYPSUM BOARD
Appl y gypsum boar d t o f r ami ng and f ur r i ng member s i n accor dance wi t h ASTM C840 or GA 216 and t he r equi r ement s speci f i ed. Appl y gypsum boar d wi t h separ at e panel s i n moder at e cont act ; do not f or ce i n pl ace. St agger end j oi nt s of adj oi ni ng panel s. Neat l y f i t abut t i ng end and edge j oi nt s.
Use gypsum boar d of maxi mum pr act i cal l engt h; sel ect panel s i zes t o mi ni mi ze wast e. Cut out gypsum boar d t o make neat , c l ose, and t i ght j oi nt s ar ound openi ngs. I n ver t i cal appl i cat i on of gypsum boar d, pr ovi de panel s i n l engt hs r equi r ed t o r each f ul l hei ght of ver t i cal sur f aces i n one cont i nuous pi ece. Lay out panel s t o mi ni mi ze wast e; r euse cut of f s whenever f easi bl e. Sur f aces of gypsum boar d and subst r at e member s may not be bonded t oget her wi t h an adhesi ve. Tr eat edges of cut out s f or pl umbi ng pi pes, scr ewheads, and j oi nt s wi t h wat er - r esi st ant compound as r ecommended by t he gypsum boar d manuf act ur er . Mi ni mi ze f r ami ng by f l oat i ng cor ner s wi t h s i ngl e st uds and dr ywal l c l i ps. I nst al l 1/ 2 i nch cei l i ng boar d over f r ami ng at 16 i nches on cent er . Pr ovi de t ype of gypsum boar d f or use i n each syst em speci f i ed her ei n as i ndi cat ed.
3. 2. 1 Appl i cat i on of Gypsum Boar d t o St eel Fr ami ng and Fur r i ng
Appl y i n accor dance wi t h ASTM C840, Syst em VI I I or GA 216.
3. 2. 2 Gl ass Mat Cover ed or Fi ber Rei nf or ced Gypsum Sheat hi ng
Appl y gl ass mat cover ed or f i ber r ei nf or ced gypsum sheat hi ng i n accor dance t o gypsum associ at i on publ i cat i ons GA 253. Fol l ow gypsum sheat hi ng manuf act ur er ' s r equi r ement s of desi gn det ai l s f or j oi nt s and f ast ener s and be pr oper l y i nst al l ed t o pr ot ect t he subst r at e f r om moi st ur e i nt r usi on. Do not l eave exposed sur f aces of t he gl ass mat or f i ber r ei nf or ced gypsum sheat hi ng uncover ed beyond t he manuf act ur er ' s r ecommendat i on wi t hout a weat her bar r i er c l addi ng.
3. 2. 3 Fl oat i ng I nt er i or Angl es
Mi ni mi ze f r ami ng by f l oat i ng cor ner s wi t h s i ngl e st uds and dr ywal l c l i ps.
Locat e t he at t achment f ast ener s adj acent t o cei l i ng and wal l i nt er sect i ons i n accor dance wi t h ASTM C840, Syst em XI I or GA 216, f or s i ngl e- pl y t wo- pl y appl i cat i ons of gypsum boar d t o wood f r ami ng.
92654Bldg385 SECTI ON 09 29 00 Page 7
3. 2. 4 Cont r ol Joi nt s
I nst al l expansi on and cont r act i on j oi nt s i n cei l i ngs and wal l s i n accor dance wi t h ASTM C840, Syst em XI I I or GA 216. Fi l l cont r ol j oi nt s bet ween st uds i n f i r e- r at ed const r uct i on wi t h f i r esaf i ng i nsul at i on t o mat ch t he f i r e- r at i ng of const r uct i on.
3. 3 FI NI SHI NG OF GYPSUM BOARD
Tape and f i ni sh gypsum boar d i n accor dance wi t h ASTM C840, GA 214 and GA 216.
Fi ni sh pl enum ar eas above cei l i ngs t o Level 1 i n accor dance wi t h GA 214.
Fi ni sh wat er r esi st ant gypsum backi ng boar d, ASTM C1396/ C1396M, t o r ecei ve cer ami c t i l e t o Level 2 i n accor dance wi t h GA 214. Fi ni sh wal l s and cei l i ngs t o r ecei ve a heavy- gr ade wal l cover i ng or heave t ext ur ed f i ni sh bef or e pai nt i ng t o Level 3 i n accor dance wi t h GA 214. Fi ni sh wal l s and cei l i ngs wi t hout cr i t i cal l i ght i ng t o r ecei ve f l at pai nt s, l i ght t ext ur es, or wal l cover i ngs t o Level 4 i n accor dance wi t h GA 214. Unl ess ot her wi se speci f i ed, f i ni sh al l gypsum boar d wal l s, par t i t i ons and cei l i ngs t o Level 5 i n accor dance wi t h GA 214. Pr ovi de j oi nt , f ast ener depr essi on, and cor ner t r eat ment . Tool j oi nt s as smoot hl y as possi bl e t o mi ni mi ze sandi ng and dust . Do not use sel f - adher i ng f i ber gl ass mesh t ape wi t h convent i onal dr y i ng t ype j oi nt compounds; use set t i ng or har deni ng t ype compounds onl y.
Pr ovi de t r eat ment f or wat er - r esi st ant gypsum boar d as r ecommended by t he gypsum boar d manuf act ur er . Pr ot ect wor ker s, bui l di ng occupant s, and HVAC syst ems f r om gypsum dust .
3. 3. 1 Uni f or m Sur f ace
Wher ever gypsum boar d i s t o r ecei ve eggshel l , semi gl oss or gl oss pai nt f i ni sh, or wher e sever e, up or down l i ght i ng condi t i ons occur , f i ni sh gypsum wal l sur f ace i n accor dance t o GA 214 Level 5. I n accor dance wi t h GA 214 Level 5, appl y a t hi n ski m coat of j oi nt compound t o t he ent i r e gypsum boar d sur f ace, af t er t he t wo- coat j oi nt and f ast ener t r eat ment i s compl et e and dr y.
3. 4 SEALING
Seal openi ngs ar ound pi pes, f i x t ur es, and ot her i t ems pr oj ect i ng t hr ough gypsum boar d and cement i t i ous backer uni t s as speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS. Appl y mat er i al wi t h exposed sur f ace f l ush wi t h gypsum boar d or cement i t i ous backer uni t s.
3. 5 FI RE- RESI STANT ASSEMBLI ES
Wher ever f i r e- r at ed const r uct i on i s i ndi cat ed, pr ovi de mat er i al s and appl i cat i on met hods, i ncl udi ng t ypes and spaci ng of f ast ener s, wal l f r ami ng i n accor dance wi t h t he speci f i cat i ons cont ai ned i n UL Fi r e Resi st ance f or t he Desi gn Number ( s) i ndi cat ed, or GA 600 f or t he Fi l e Number ( s) i ndi cat ed.
Joi nt s of f i r e- r at ed gypsum boar d encl osur es must be c l osed and seal ed i n accor dance wi t h UL t est r equi r ement s or GA r equi r ement s. Seal penet r at i ons t hr ough r at ed par t i t i ons and cei l i ngs t i ght i n accor dance wi t h t est ed systems.
3. 6 PATCHING
Pat ch sur f ace def ect s i n gypsum boar d t o a smoot h, uni f or m appear ance, r eady t o r ecei ve f i ni shes.
92654Bldg385 SECTI ON 09 29 00 Page 8
3. 7 SHAFTWALL FRAMI NG
I nst al l t he shaf t wal l syst em i n accor dance wi t h t he syst em manuf act ur er ' s publ i shed i nst r uct i ons. Coor di nat e bucks, anchor s, bl ocki ng and ot her i t ems pl aced i n or behi nd shaf t wal l f r ami ng wi t h el ect r i cal and mechani cal wor k. Pat ch or r epl ace f i r epr oof i ng mat er i al s whi ch ar e damaged or r emoved dur i ng shaf t wal l const r uct i on.
92654Bldg385 SECTI ON 09 29 00 Page 9
SECTI ON 09 51 00
ACOUSTI CAL CEI LI NGS
08/10
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM A489 ( 2012) St andar d Speci f i cat i on f or Car bon St eel Li f t i ng Eyes
ASTM A641/ A641M ( 2009a; R 2014) St andar d Speci f i cat i on f or Zi nc- Coat ed ( Gal vani zed) Car bon St eel Wi r e
ASTM C423 ( 2009a) Sound Absor pt i on and Sound Absor pt i on Coef f i c i ent s by t he Rever ber at i on Room Met hod
ASTM C635/ C635M ( 2013a) Manuf act ur e, Per f or mance, and Test i ng of Met al Suspensi on Syst ems f or Acoust i cal Ti l e and Lay- I n Panel Cei l i ngs
ASTM C636/ C636M ( 2013) St andar d Pr act i ce f or I nst al l at i on of Met al Cei l i ng Suspensi on Syst ems f or Acoust i cal Ti l e and Lay- I n Panel s
ASTM C834 ( 2014) Lat ex Seal ant s
ASTM E1264 ( 2014) Acoust i cal Cei l i ng Pr oduct s
ASTM E1414/ E1414M ( 2011a; E 2014) Ai r bor ne Sound At t enuat i on Bet ween Rooms Shar i ng a Common Cei l i ng Plenum
ASTM E1477 ( 1998a; R 2013) Lumi nous Ref l ect ance Fact or of Acoust i cal Mat er i al s by Use of I nt egr at i ng- Spher e Ref l ect omet er s
ASTM E580/ E580M ( 2014) Appl i cat i on of Cei l i ng Suspensi on Syst ems f or Acoust i cal Ti l e and Lay- I n Panel s i n Ar eas Requi r i ng Moder at e Sei smi c Restraint
ASTM E795 ( 2005; R 2012) Mount i ng Test Speci mens Dur i ng Sound Absor pt i on Test s
SCI ENTI FI C CERTI FI CATI ON SYSTEMS ( SCS)
SCS Sci ent i f i c Cer t i f i cat i on Syst ems ( SCS) I ndoor Advant age
92654Bldg385 SECTI ON 09 51 00 Page 1
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 3- 310- 04 ( 2016) Sei smi c Desi gn f or Bui l di ngs wi t h Change 1, 20 June 2016
UL ENVI RONMENT ( ULE)
ULE Gr eenguar d UL Gr eenguar d Cer t i f i cat i on Pr ogr am
UNDERWRI TERS LABORATORI ES ( UL)
UL Fi r e Resi st ance ( 2014) Fi r e Resi st ance Di r ect or y
1. 2 SYSTEM DESCRI PTI ON
Pr ovi de sound cont r ol l i ng uni t s mechani cal l y mount ed on a cei l i ng suspensi on syst em f or acoust i cal t r eat ment . The uni t s i ze, t ext ur e, f i ni sh, and col or must be as speci f i ed. The l ocat i on and ext ent of acoust i cal t r eat ment shal l be as shown on t he appr oved det ai l dr awi ngs.
Submi t dr awi ngs showi ng suspensi on syst em, met hod of anchor i ng and f ast eni ng, det ai l s , and r ef l ect ed cei l i ng pl an. Coor di nat e wi t h par agr aph RECLAMATI ON PROCEDURES f or r ecl amat i on of mi ner al f i ber acoust i cal cei l i ng panel s t o be r emoved f r om t he j ob s i t e.
1. 2. 1 Cei l i ng At t enuat i on Cl ass and Test
Pr ovi de a cei l i ng syst em wi t h an at t enuat i on c l ass ( CAC) of 35 f or ACT- 1 when det er mi ned i n accor dance wi t h ASTM E1414/ E1414M. Pr ovi de f i x t ur e at t enuat or s over l i ght f i x t ur es and ot her cei l i ng penet r at i ons, and pr ovi de acoust i cal bl anket i nsul at i on adj acent t o par t i t i ons, as r equi r ed t o achi eve t he speci f i ed CAC. Pr ovi de t est cei l i ng cont i nuous at t he par t i t i on and assembl ed i n t he suspensi on syst em i n t he same manner t hat t he cei l i ng wi l l be i nst al l ed on t he Pr oj ect .
1. 2. 2 Cei l i ng Sound Absor pt i on
Det er mi ne t he Noi se Reduct i on Coef f i c i ent ( NRC) i n accor dance wi t h ASTM C423 Test Met hod.
1. 2. 3 Li ght Ref l ect ance
Det er mi ne l i ght r ef l ect ance f act or i n accor dance wi t h ASTM E1477 Test Method.
1. 2. 4 Ot her Submi t t al s Requi r ement s
The f ol l owi ng shal l be submi t t ed:
a. Manuf act ur er ' s dat a i ndi cat i ng per cent age of r ecycl e mat er i al i n acoust i c cei l i ng t i l es t o ver i f y af f i r mat i ve pr ocur ement compl i ance.
b. Tot al wei ght and vol ume quant i t i es of acoust i c cei l i ng t i l es wi t h r ecycl e mat er i al .
c. Manuf act ur er ' s cat al og showi ng UL cl assi f i cat i on of f i r e- r at ed cei l i ngs gi v i ng mat er i al s , const r uct i on det ai l s , t ypes of f l oor and r oof const r uct i ons t o be pr ot ect ed, and UL desi gn number and f i r e pr ot ect i on t i me r at i ng f or each r equi r ed f l oor or r oof const r uct i on and acoust i c
92654Bldg385 SECTI ON 09 51 00 Page 2 cei l i ng assembl y.
d. Repor t s by an i ndependent t est i ng l abor at or y at t est i ng t hat acoust i cal cei l i ng syst ems meet speci f i ed sound t r ansmi ssi on r equi r ement s. Dat a at t est i ng t o conf or mance of t he pr oposed syst em t o Under wr i t er s Labor at or i es r equi r ement s f or t he f i r e endur ance r at i ng l i s t ed i n UL Fi r e Resi st ance may be submi t t ed i n l i eu of t est r epor t s.
e. Cer t i f i cat e at t est i ng t hat t he mi ner al based acoust i cal uni t s f ur ni shed f or t he pr oj ect cont ai n r ecycl ed mat er i al and showi ng an est i mat ed per cent of such mat er i al .
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Appr oved Det ai l Dr awi ngs; G
SD- 03 Pr oduct Dat a
Acoust i cal Cei l i ng Syst ems; G
Certification
SD- 04 Sampl es
Acoust i cal Uni t s ; G
Acoust i c Cei l i ng Ti l es; G
SD- 06 Test Repor t s
Cei l i ng At t enuat i on Cl ass and Test
SD- 07 Cer t i f i cat es
Acoust i cal Uni t s
Acoust i c Cei l i ng Ti l es
1. 4 SUSTAI NABLE DESI GN CERTI FI CATI ON
Pr oduct shal l be t hi r d par t y cer t i f i ed i n accor dance wi t h ULE Gr eenguar d, SCS Sci ent i f i c Cer t i f i cat i on Syst ems I ndoor Advant age, or equal .
Cer t i f i cat i on shal l be per f or med annual l y and shal l be cur r ent .
1. 5 DELI VERY, STORAGE AND HANDLI NG
Del i ver mat er i al s t o t he s i t e i n t he manuf act ur er ' s or i gi nal unopened cont ai ner s wi t h br and name and t ype c l ear l y mar ked. Car ef ul l y handl e and st or e mat er i al s i n dr y, wat er t i ght encl osur es. I mmedi at el y bef or e i nst al l at i on, st or e acoust i cal uni t s f or not l ess t han 24 hour s at t he same t emper at ur e and r el at i ve humi di t y as t he space wher e t hey wi l l be i nst al l ed
92654Bldg385 SECTI ON 09 51 00 Page 3 i n or der t o assur e pr oper t emper at ur e and moi st ur e accl i mat i on.
1. 6 ENVI RONMENTAL REQUI REMENTS
Mai nt ai n a uni f or m t emper at ur e of not l ess t han 60 degr ees F nor mor e t han 85 degr ees F and a r el at i ve humi di t y of not mor e t han 70 per cent f or 24 hour s bef or e, dur i ng, and 24 hour s af t er i nst al l at i on of acoust i cal uni t s.
1. 7 SCHEDULING
Compl et e and dr y i nt er i or f i ni sh wor k such as pl ast er i ng, concr et e and t er r azzo wor k bef or e cei l i ng i nst al l at i on. Compl et e mechani cal , el ect r i cal , and ot her wor k above t he cei l i ng l i ne; i nst al l and st ar t oper at i ng heat i ng, vent i l at i ng, and ai r condi t i oni ng syst ems i n or der t o mai nt ai n t emper at ur e and humi di t y r equi r ement s.
1. 8 WARRANTY
Pr ovi de manuf act ur er ' s st andar d per f or mance guar ant ees or war r ant i es t hat ext end beyond a one year per i od. I ncl ude an agr eement t o r epai r or r epl ace acoust i cal panel s t hat f ai l wi t hi n t he war r ant y per i od i n t he st andar d per f or mance guar ant ee or war r ant y. Fai l ur es i ncl ude, but ar e not l i mi t ed t o, saggi ng and war pi ng of panel s; r ust i ng and manuf act ur er s def ect s of gr i d syst em.
1. 9 EXTRA MATERI ALS
Fur ni sh spar e t i l es, f r om t he same l ot as t hose i nst al l ed, of each col or at t he r at e of 5 t i l es f or each 1000 t i l es i nst al l ed.
PART 2 PRODUCTS
2. 1 ACOUSTI CAL UNI TS
Submi t t wo sampl es of each t ype of acoust i cal uni t and each t ype of suspensi on gr i d t ee sect i on showi ng t ext ur e, f i ni sh, and col or . Conf or m acoust i cal uni t s t o ASTM E1264, Cl ass A, and t he f ol l owi ng r equi r ement s:
2. 1. 1 Af f i r mat i ve Pr ocur ement
Mi ner al Wool , Cel l ul ose, and Lami nat ed Paper boar d used i n acoust i c cei l i ng t i l es ar e mat er i al s l i s t ed i n t he EPA' s Compr ehensi ve Pr ocur ement Gui del i nes ( CPG) ( http://www.epa.gov/cpg/ ) . EPA' s r ecommended Recover ed Mat er i al s Cont ent Level s f or Mi ner al Wool , Cel l ul ose, St r uct ur al Fi ber boar d and Lami nat ed Paper boar d ar e:
Product Material Per cent of Post Consumer Mat er i al s
Per cent of Tot al Recover ed Mat er i al s
Lami nat e Paper boar d Post Consumer Paper 100 100
Rock Wool Slag 75
Cellulose Post Consumer Paper 75 75
a. The r ecommended r ecover ed mat er i al s cont ent l evel s ar e based on t he wei ght ( not vol ume) of mat er i al s i n t he i nsul at i ng cor e onl y.
92654Bldg385 SECTI ON 09 51 00 Page 4
b. Submi t r ecycl ed mat er i al cont ent dat a f or acoust i c cei l i ng t i l es i ndi cat i ng compl i ance wi t h af f i r mat i ve…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.