DEPARTMENT OF THE AIR FORCE
158TH FIGHTER WING (ACC)
SOUTH BURLINGTON VERMONT
13 June 2018
MEMORANDUM FOR FILE
FROM: 158 MSG/MSC
SUBJECT: Questions and Answers for CURZ 152812, F-35 Alter Aircraft Shelter B385, Fuel
Cell as of 13 June 2018
1. Solicitation states, “FAR 52.216-1 TYPE OF CONTRACT (APR 1984) The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.” Is an electronic copy of the Fixed Price Contract available for review?
A. No, an electronic copy of the contract award is not available. The resultant contract is essentially the solicitation document after the removal of solicitation provisions. All other terms and conditions and clauses carry over from the solicitation to the contract.
2. Builder’s Risk: Neither FAR 52.228-5 or FAR 28.307-2 contemplate Builder’s Risk coverage for this project. Assuming the Government carries the Builder’s Risk Policy, what is the policy deductible, and is the Contractor required to insure down the policy deductible?
A. Please see FAR Clause 52.236-7 Permits and Responsibilities.
3. Specification Section 01 00 00 – Special Contract Requirements is listed in the Table of
Contents, but is not included - is this section available?
A. Section 01 00 00 is not labeled by mistake. It starts on .pdf page 11 of the specification document volume 1.
4. Solicitation No. W912LN-18-B-5001 Paragraph 11. SUBCONTRACTING PLAN calls for the offerors to prepare and submit their subcontracting plan “if required”. Please advise if the plan is required for this project.
A. Subcontracting Plan is only required of Large Business Bidders if requested by the
Contracting Officer. Subcontracting Plan is not required at the time of bid opening. If the apparent low bidder is a Large Business, the Contracting Officer will then request the Bidder submit a Subcontracting Plan by a specified date and time in accordance with Solicitation No.
W912LN-18-B-5001 Paragraph 11. The plan shall be included in and made a part of the resultant contract. Failure to submit the Subcontracting Plan shall make the Bidder ineligible for the award of the contract.
5. Are these Q&A's to be considered Amendments to be acknowledged in Item 18 of the
Solicitation Form?
A. No, you do not need to acknowledge on the SF18. I have no other way to post the answers than to amend the FBO posting. I will issue a formal solicitation amendment incorporating all
Q&As after the question deadline. You will need to acknowledge that amendment.
6. Does the double wall duct in the hanger need to receive liner and exterior insulation? Spec section 23.00.00 – 2.9.1.1 calls out 1” fiberglass liner inside the double wall duct and spec section 23.07.00 – 3.3.1 calls for 2” insulation on all warm and cold air ducts.
A. Double wall duct shall be constructed per Spec section 23.00.00 – 2.9.1.1. Exterior insulation is not required.
7. Detail A1, on drawing M503, calls for flexible elastomeric insulation (Armaflex) with .040 aluminum shop fabricated jacketing. Spec section 23.07.00 – 3.3.6.4 contradicts this detail calling for weatherproof mastic or roofing membrane. Neither the spec nor the detail indicates the insulation thickness required. Please clarify jacketing type, insulation type, and insulation thickness the outdoor ductwork serving DOAS 1 & 2.
A. Construct per detail on the drawings. Insulation thickness of 2".
8. Please confirm that none of the existing rooftop equipment needs to be removed/ replaced in the roofing alternate bid.
A. Existing fans on roof to be removed per mechanical demolition drawings.
9. Please provide the size of the existing water heater used to wash planes.
A. Size is estimated at approximately 100 gallons.
10. Please provide the thickness of the new bent plate at the top of the wall per detail B2/A-581
ROOF EAVE – OPTION 4
A. Bent plate to be ¼” galvanized steel. Dimensions of plate to be 5” x 13”.
11. In addition to risk category II, what is the seismic importance factor and/or seismic performance requirement for the HVAC equipment scheduled.
A. HVAC equipment importance factor is 1.0.
12. In order to properly price the fall protection system, the subcontractor needs to know the distance from top of plane to beam. Please advise.
A. The aircraft tail height is approximately 14'-3" tall, and the fuselage is approximately 11'-0" tall. Contractor shall coordinate exact aircraft dimensions with user during fall protection system design. Fall restraint beam depth is determined by fall restraint system provider per spec section
11 01 50.
13. E-601-C & ES-101_C: What is the required transformer size for T-12? E-601-C states the transformer is 750 KVA. While ES-101-C States the Transformer is 1500KVA. Please advise.
A. Transformer shall be a 750 KVA Transformer as indicated on E-601-C.
14. Head detail 1/A511, and Base Detail 2/A512 for partition type S2AB do not exist on the current drawings. Also, in the comments box this partition is described as “partial height” which seems inconsistent with the floor plans. Please confirm and/or provide additional information for this partition type.
15. Section 00010 – Solicitation Contract Form, page 3 of 46, Item No 0001 refers to “a new
11,070 SF facility in accordance with specs dated 20 November 2017 and drawings dated 20
November 2017, PSC CD: Z2EB” This does not match the description of the project on page 9
Section 00010 Instructions, Conditions, and Notices to Offerors, and only the specs are date 20
November 2017. Please clarify.
A. ITEM 0001 language will be updated to match project description on page 9 Section 00010.
16. Item 0002 of the Solicitation Contract Form refers to Contractor Manpower Reporting for contractor and subcontractor labor hours. Please clarify what the offeror is to provide for pricing.
A. Contractor Manpower Reporting is a required administrative function for the contractor.
Estimate the cost of complying with the requirement.
17. E-101-C Keyed Note 9: Looking for information regarding to the PCA Master Control Panel.
What is its function? Who supplies this? What if supplied by subcontractor are its required specs?
A. Power is for the Preconditioned Air Control Panel to control the Preconditioned Air system.
Refer to detail B2 on sheet P-502 for location and spec 230099 for additional information about the functionality of the panel.
18. Is data/information available and/or have test cuts been taken to verify the roof compositions on Building 385?
A. Not Available.
19. Please clarify what elevations on drawing A741-C are the exterior signage referred to in
101400.10? Also, A1 on the same drawing calls for painted letters. Are those “just” painted or are they looking for painted aluminum letters?
A. D3/A-201 & C1/A-201 – Sign type H; See A-721 for all other exterior sign type locations. A1 detail shall be painted on floor.
20. Please advise the spacing for the duct support at the roof per detail A4/ S-009.
A. Installation of duct supports is to be according to SMACNA Duct Construction Standards per specification 230000-3.2.5. This includes location and number of duct supports.
21. Would it be acceptable to core through the foundation wall to install the electrical conduits in lieu of the details as shown on SD100 detail A1 and S-300 detail A1?
A. Per Note 1/SD100, “Contractor’s option to provide alternative solution to support wall above for approval. Contractor shall submit calculations signed and sealed by an engineer licensed in the state of Vermont, demonstrating the alternative solution is acceptable.
22.Spec section 211313 1.4.1 notes that drawings must be stamped by a fire protection specialist who is accredited by NCEES. Is a NICET stamp acceptable, or do the drawings need to be stamped by a PE?
A. NICET is not equivalent to NCEES. The fire protection specialist shall meet the requirements of 21 13 13.00 10 1.4.1 and UFC 3-600-01 1-7.2, 1-7.3, 2-1.15.2.
23. Dwg FX0001- Rev C note 1 under design criteria notes that existing equipment may be reused if found to be in working order. Does this include existing sprinkler system piping and heads? If so, do you have as-builts of the existing system showing the existing design criteria so we can determine how much can be reused?
A. Existing sprinkler system piping may be reused if they meet requirements for new. Existing as-builts are not available.
24. Dwg FX001-Rev C note 7 under general notes calls for (2) fire pumps to be installed, but there are no details or specs for the pumps. Spec section 211313 1.2.1.1 notes that the calculations shall be based on fire pumps in Building 360. Please clarify. Are the pumps existing in B360?
A. Fire Suppression General Note 7 on FX001 is in error, and should be deleted. Currently there is one pump in B385, which feeds B385 and B360. This pump is not adequate for the new pressures. Two new fire pumps will be provided in B360, to serve B360 and B385 through the existing underground.
25. Dwg FX601-C Detail A1 notes that the existing 100 gallon surge tank can be reused if it meets the requirements on the new. What are the specs of the existing?
A. Existing as-builts are not available.
26. Drawing E-010 identifies the hazardous location areas. The note indicate the hazardous area extends to 18" above the floor level. However, there are electrical outlets shown at 48" above the floor, but still identified as being explosion proof. They are also indicated to have an "In-
Use" cover. Do these devices need to be explosion proof if installed above the hazardous area? If so, can a part number be provided for the preferred assembly? Second, if the wiring is outside this identified hazardous area, does it still need to be rigid / IMC conduit?
A. 1) Yes. Per UFC 4-211-01 section 5-12.7.1 requires explosion proof fixtures in the fuel cell maintenance hangar bay to ensure worker safety even when located above the 18” hazardous classification.
2) N/A
3) UFC 4-211-01 section 3-13.4 requires galvanized rigid steel conduit for hangars with limited aircraft wash.
27. What is the conductor layout/design for the Secondary side of transformer T-12? The prints show 10 parallel 4" conduit runs. What is the desired design for the conductors related to the conduits? How many parallel runs, what Wire size, etc.
A. Refer to sheet E-601 keyed note 2 for secondary conductors and conduit requirements.
28. What is the winding configuration of transformer T-12. The drawings show symbols for
Delta/Wye, and the description shows 12470Y/7200 - 480Y/277. Please clarify
A. Provide Wye/Wye configuration.