QUESTIONS AND ANSWERS 07292011 REVISED.doc

DOC document 136 KB Posted

Attached to
NORTH COLORADO SPRINGS READINESS CENTER SOLICITATION
Solicitation number
W912LC-11-R-0006
Issued by

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS 08102011 Addendum.docx DOCX document
Addendum 2 080911.pdf PDF
Addendum 1 080911.pdf PDF
QUESTIONS AND ANSWERS 08092011 Addendum.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
Addendum__2.docx DOCX document
NCSRC Development Fees 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED 1600.docx DOCX document
Soils Report NCSRC.pdf PDF
LEED 2009 NCSRC Scorecard 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED.docx DOCX document
760092813_dsc_0253.jpg JPG image
QUESTIONS AND ANSWERS 07272011.doc DOC document
QUESTIONS AND ANSWERS 07262011 revised.doc DOC document
QUESTIONS AND ANSWERS 07262011.doc DOC document
Preproposal conference 072211 —
ATTENDANCE PRE-PROPOSAL CONF JULY 22 2011.pdf PDF
QUESTIONS AND ANSWERS 07222011.doc DOC document
W912LC-11-R-0006 MOD 0001.pdf PDF
QUESTIONS AND ANSWERS 07082011.doc DOC document
Package 2 - Site.pdf PDF
SOLICITATION W912LC-11-R-0006.pdf PDF
080201 - Final Design - Specifications Vol 1.pdf PDF
Package 3 - Arch Int Kitchen.pdf PDF
Package 4 - Structural Mech Pumb Elec FP.pdf PDF
080201 - Final Design - Specifications Vol 2.pdf PDF
Exhibit C SSS NCOSPR Final.doc DOC document
Exhibit D and F NCOSPR Final.doc DOC document
Package 1 - General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO: NORTH COLORADO SPRINGS READINESS CENTER-SYNOPSIS

SOLICITATION: W912LC-11-R-0006

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload” Dated: July 8, 2011

1. Is the new Readiness Center at Buckley AFB a design/build project? If yes, when will bridging documents be available? If not, when will contract documents be available?

A. This is not a design build requirement, nor will it be on Buckley AFB. The project is located on the United States Air Force Academy. Drawings and specifications will be posted with the solicitation on fbo.gov as stated in the synopsis.

2. Do you have an estimated date of release?

A. The Solicitation will be posted on fbo.gov as stated in the synopsis.

3. We may be interested in bidding on the solar PV portion of the work at the North Colorado Springs Readiness Center. Would you please let me know the estimated size in DC kW that the solar PV amount to? Thank you very much.

A. Please review Solicitation on fbo.gov when posted.

4. Can you please advise if we are able to submit an RFI directly to you, or must we go through a general contract bidding this job?

A. All RFI’s are submitted to the email address previously identified: ngco_contracts@ng.army.mil

5. We may be interested in bidding on the solar PV portion of the work at the North Colorado Springs Readiness Center. Would you please let me know the estimated size in DC kW that the solar PV amount to?

A. Please review Solicitation on www.fbo.gov when posted.

6. I am writing you in regards to some specs in the North Colorado Springs Readiness Center project. Spec section 033650 - Concrete Flooring Polish / Stain, calls out for the system to only be done by a Bomanite contractor with only Bomanite material and equipment and says no equal can be used. I have contacted the Architect as well as the PM from the Colorado Army National Guard and both have indicated to me that I need to email you to request that an equal system, equipment, and material be used. My company has been contracted to do several polish and dye jobs for the military and we have always had several options of systems to use. We do not work with Bomanite due to the fees and royalties requested by Bomanite in order to use their name. If we could have an addendum come out allowing for an equal system it would be very much appreciated.

A. Please do not contact the PM OR A/E. Send all questions to the email address: ngco_contracts@ng.army.mil

7. Is a bid bond required? If so FAR 52.228-1 was not included in the RFP?

A. Yes a bid bond is required per solicitation, 52.228-1

8. EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE, Part 1, D states the following as assessing “relevancy” for this project:

“…size between 128,000 and 166,000SF; project scope to include billeting, schools, kitchen and cafeteria and storage; cost magnitude between $25,000,000 and $100,000,000…”

The solicitation states that this project should be between $10,000,000 and $25,000,000 and the size is closer to 70,000SF. Are the stated qualification the ones we need to abide by or do we need to be closer to the specs of the actual project? This factor will determine our firm’s ability to meet the qualifications.

A. Modification P0001 is posted on www.fbo.gov that corrects this.

9. Lately it seems every RFP requires Past Performance Questionnaires, so much so that I imagine our POCs are besieged with them. As much as we might beg them to respond to them, this is not something we can guarantee. Because of this, I’m wondering if we might substitute CCASS reports instead. They are often filled out by the same folks we’re asking for PPQs, and the evaluation is the same. Thank you in advance for your reply A. Request Past Performance Questionaires

10. I was looking at this project and it said that the Access control and CCTV was not in the project. Could you tell me what the status is on them? And if there is someone I could contact about the Access Control and CCTV?

A. Only infrastructure for CCTV and Access Control is included in the project. All required information is in the drawings and specification.

11. I am trying to get information on the New Readiness Center in the North Colorado Springs area. Could you please let me know how to obtain the needed information to be able to bid on this project?

A. Review the solicitation at www.fbo.gov, solication W912LC-11-R-0006

12. Request for approval for Bradley toilet accessories for this job?

A. All materials must meet the project specification. Specific products will be evaluated during the submittal process with the successful offeror.

13. Is there a cost limitation?

A. NO

14. What is the size standard for small business?

A. As stated in the solicitation $33.5 million

15. What must Joint ventures do?

Must submit Joint Venture Certification with proposal.

16. Who will administer the N. Colorado Springs Readiness Center?

A. USPFO/Colorado National Guard

17. Who is the Code Authority?

A. State of Colorado

18. What about the building permits?

A. PENDING ANSWER

19. Is this project Tax Exempt?

A. Yes

20. What about a development fee?

A. PENDING ANSWER

21. Commissioning Agent on board?

A. Commissioning Agent will be Pahl Architecture.

22. Is there a LEED check list available yet? What points are we targeting?

A. PENDING ANSWER

23. Can you verify the timing for procurement of the testing services on this project?

A. Spec section 014000 (1.6, 1.7) calls for the Contractor to engage an independent testing agency to perform QC and special inspections.

24. In section 00110 – Submission Requirements and Instructions, paragraph 3.4.3.9.1, it states, “Provide three (3) references, for each Predecessor Company, Subcontractor or Key Personnel. Clearly identify the contractor/individual for whom the reference information concerns.” Please clarify what key personnel you would like Exhibit B completed for.

A.

25. We do intent to form a prime contractor-subcontractor teaming arrangement in accordance with FAR 9.6 – Contractor Team Arrangements, part 9.601 (2). It appears you would like us to include at least one Exhibit A and Exhibit C from our teaming partner per section 00110, paragraph 3.4.3.3. Please verify that a maximum of 5 exhibit A should be submitted for both the prime contractor and the teaming partner and not 5 for each firm.

A.

26. Is it acceptable to submit previously obtained past performance questionnaires in lieu of Exhibit C? Many owners’ have filled out performance questionnaires many times and are burdened by the large amount of projects we are pursuing.

A.

27. Section 00110, paragraph 3.3.7 requires us to provide an electronic copy of all of the proposal information. It is difficult to provide an electronic copy of the pricing schedule because bids are received up until the proposal is submitted. Pricing is typically not finalized until minutes before the proposal is submitted and it would be very difficult to burn a CD when the final pricing has not been completed. Would you allow us to provide only Volume 2 on CD and Volume 1 hard copy? This would allow us to be more competitive in our pricing.

A.

28. Is it acceptable to submit CCASS performance evaluations in lieu of Exhibit C? Many government agencies have policies against filling out performance evaluations once the CCASS evaluation has been filed. The CCASS evaluation contains all the information on exhibit C and should satisfy the government’s desire to evaluate our past performance.

A.

29. In section 00110 – Submission Requirements and Instructions, paragraph 3.4.1.10, it requires those companies forming a joint venture to submit the joint venture agreement. We do not intend to form a joint venture, but we do intent to form a prime contractor-subcontractor teaming arrangement in accordance with FAR 9.6 – Contractor Team Arrangements, part 9.601 (2). Would you like us to include our formal teaming arrangement in this area of the proposal?

A.

30. In solicitation section 3.4.1.10 joint venture, shows that any jv would need to be approved by SBA if a small buisness and a large buisness established a JV. In CFAR 121.103 affiliation determination by SBA, section 4(h) shows a JV can carry out 3 projects over a to year period with no intention of a longer affiliation, and that a prime and a subcontractor mat be considered a JV by same section.

A.

31. Does a small buisness JV with a large buisness work with the size standards of 33.5 million? I have info from SBA that this would be a large buisness and would only work with 8a exemption, is this correct?

A.

32. Is the 18th of oct 2011 anticipated notice to proceed correct, or do you expect that start date to push back?

A. The notice to proceed date will be dependent on the actual award date.

33. Solicitation shows that project is not funded yet. Is there a anticipated date that it may be funded?

A. The project is authorized and the funding has been appropriated by Congress.

34. The bids that are due August 12th on the above project, is that for construction or architectural? If it is architectural, would you please send us the bid information or where I would be able to find it.

A . Please review the solicitation pertaining to this new Construction project for the North Colorado Readiness Center at www.fbo.gov, the solicitation number is W912LC-11-R-0006

35. Door Schedule: Door 115A shows type 4 wood door, material column shows alum/glass door floor plan shows that this is a double door opening but hardware group 116 calls for 2 locksets but no way to secure doors.

A. a. Change Door Types to Aluminum Door Type 1, provide removable center mullion as indicated, locksets will attach to removable center mullion.

36. Door Schedule: Door 126A shows type 4 wood door, material column shows alum/glass door. Hardware group 114 is for single aluminum door.

A. Change Door Types to Aluminum Door Type 1, Hardware group is correct.

37. Door Schedule: Door 126B calls for alum/glass door to be hung on hollow metal frame. Hardware group 11 has hardware for wood or hollow metal door.

A. Add: Single Aluminum Frame to fit specified door size | Change: Hardware group 16

38. Door Schedule: Door 130A shows type 4 wood door, material column shows alum/glass door. Hardware 16 is for single aluminum door.

A. Change Door Type to Aluminum Door Type 1

39. Door Schedule: Door 138B shows material of alum/glass to be hung on hollow metal frame. Hardware 12 is for wood or hollow metal door.

A. . Add: Single Aluminum Frame to fit specified door sizes | Change: to Door type 1 | Change: Hardware group 16

40. Door Schedule: Door 138HH shows 3070 door but no other information and cannot be found on floor plan.

A. a. Delete Door from Schedule.

41. Door Schedule: Door 140A lists hardware set 118 for double door not single door.

A. a. Door Schedule should read 3'-0"(2). Door 140A is a double door, hardware set correct.

42. Door Schedule: Doors 183A and 183C shows door material of alum/glass to be hung on hollow metal frame. Hardware set 14 is for aluminum door and aluminum frame.

A. Add: Single Aluminum Frame to fit specified door sizes. Hardware is correct.

43. Door Schedule: Doors 216A and 245A calls for type 4 wood door, material column shows alum/glass door. Hardware set 135 is for wood or hollow metal door.

A. Material Column to read "WD", door type and hardware are correct.

44. Specification section 01 4000 8, Statement of Special Inspections, page 2of10 indicates the contractor is responsible for soils inspection/testing, however spec. section 31 2000 8 states the owner will provide soils testing, which is correct?

A. 014000 is correct.

45. Can the wood bench seats for the Unit Lockers, Rooms 162, 164 & 165, be provided in lengths as long as possible? Installed to the locker base after it is anchored, providing long, clean sight lines?

A. Longer lengths can be provided by installer granted all seams occur between two lockers

46. Is there a contractor bidder's list that is available on this project? We would like to get our proposal for materials testing services to all of the submitting general contractors if possible.

A.

47. I am a local rep for Tandus Flooring, a commercial carpet manufacturer. I was hoping to find out basis of design for the carpet specification as well as GC's who will be bidding the project?

A.Pending

48. 05 7500 – 4 DECORATIVE FORMED METAL

PERFORATED IMAGE METAL ACOUSTICAL WALL PANELS

Please provide a high resolution picture of the image that will be perforated into the metal panels.

It is needed to provide an accurate quote?

A. File is attached (desired image will be without the background trees but with the rock base).

49. Do you anticipate future amendments and any potential changes to the proposal due date?

A. Any and all amendments will be posted on www.fbo.gov, solicitation W912LC-11-R-0006

50. Please provide a schedule indicating which items are supplied and installed by Owner and which items are supplied by Owner installed by General Contractor. Thank you.

A. Responsibility for identifying material requirements is the contractor's. All necessary information is contained in the drawings and specification.

PAGE

File details come from the government source that posted it. Updated .