FINAL DESIGN-DRAWINGS 4 OF 4

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS 08102011 Addendum.docx DOCX document
Addendum 2 080911.pdf PDF
Addendum 1 080911.pdf PDF
QUESTIONS AND ANSWERS 08092011 Addendum.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
Addendum__2.docx DOCX document
NCSRC Development Fees 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED 1600.docx DOCX document
Soils Report NCSRC.pdf PDF
LEED 2009 NCSRC Scorecard 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED.docx DOCX document
760092813_dsc_0253.jpg JPG image
QUESTIONS AND ANSWERS 07292011 REVISED.doc DOC document
QUESTIONS AND ANSWERS 07272011.doc DOC document
QUESTIONS AND ANSWERS 07262011 revised.doc DOC document
QUESTIONS AND ANSWERS 07262011.doc DOC document
Preproposal conference 072211 —
ATTENDANCE PRE-PROPOSAL CONF JULY 22 2011.pdf PDF
QUESTIONS AND ANSWERS 07222011.doc DOC document
W912LC-11-R-0006 MOD 0001.pdf PDF
QUESTIONS AND ANSWERS 07082011.doc DOC document
Package 2 - Site.pdf PDF
SOLICITATION W912LC-11-R-0006.pdf PDF
080201 - Final Design - Specifications Vol 1.pdf PDF
Package 3 - Arch Int Kitchen.pdf PDF
080201 - Final Design - Specifications Vol 2.pdf PDF
Exhibit C SSS NCOSPR Final.doc DOC document
Exhibit D and F NCOSPR Final.doc DOC document
Package 1 - General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10.

11.

SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, 2005. ALLOWABALE STRENGTH DESIGN METHOD."

ALL PLAIN WELDED WIRE FABRIC FLAT SHEETS SHALL CONFORM TO ASTM A185.

ALL REINFORCING STEEL SHALL BE ASTM A615 GRADE 60 DEFORMED BARS.

"STRUCTURAL WELDING CODE - REINFORCING STEEL" AWS D1.4 - LATEST EDITION.

IN CONFORMANCE WITH THE AMERICAN WELDING SOCIETY (AWS)

WELDING OF DEFORMED BAR ANCHORS SHALL BE DONE WITH E80XX ELECTRODES

DEFLECTION, IN ADDITION TO CAMBER SPECIFIED ON THE DRAWINGS.

OPERATIONS (PRIOR TO INITIAL SET) TO COMPENSATE FOR FORMWORK

FORMWORK SHALL BE ADJUSTED BEFORE AND AFTER CONCRETE PLACING

HOLLOW MASONRY CONSTRUCTION) OR APPROVED EQUAL, WITH TYPE, DIAMETER, AND EMBEDMENT AS ANCHOR (FOR CONCRETE AND GROUTED MASONRY CONSTRUCTION) AND HILTI HIT HY20 ANCHOR (FOR ADHESIVE ANCHOR SYSTEM SHALL BE "ADHESIVE ANCHOR" TYPE HILTI HIT HY150 INJECTION ADHESIVE

TYPE, DIAMETER AND EMBEDMENT LENGTH AS NOTED ON THE DRAWINGS.

EXPANSION ANCHORS SHALL BE "WEDGE" TYPE (HILTI "KWIK BOLT 3") OR APPROVED EQUAL, WITH

FOR STANDARD HEADED STUDS.

CONCRETE SHEAR ANCHORS SHALL CONFORM TO A.W.S. D1.1 - LATEST EDITION REQUIREMENTS

SHALL BE PROVIDED ON THE FLOOR SLAB AND SHORING PROVIDED BENEATH THE

LOCATION, OR TEMPORARILY STORED, EXCEEDS THE DESIGN LIVE LOAD, PLANKING

WHERE THE WEIGHT OF EQUIPMENT OR MATERIALS BEING TRANSPORTED TO

(NOT USED)

STRENGTH DESIGN METHOD.

REINFORCED CONCRETE HAS BEEN DESIGNED IN ACCORDANCE WITH ACI 318 - LATEST EDITION, DEFORMED BAR ANCHORS SHALL CONFORM TO ASTM A706.

12.

10.

11.

9.

FLOOR.

8.

7.

6.

4.

2.

3.

BASE PLATE HOLE AND WASHER SIZES FOR ANCHOR RODS:

THE ENGINEERING FOUNDATION.

ALL FIELD CONNECTIONS SHALL BE MADE WITH 3/4-INCH DIAMETER ASTM A325

TIGHTENED IN CONFORMANCE WITH "SPECIFICATION FOR STRUCTURAL JOINTS

USING ASTM A325 OR A490 BOLTS" RESEARCH COUNCIL ON STRUCTURAL

CONNECTIONS OF THE ENGINEERING FOUNDATION.

WHEN SLIP CRITICAL CONNECTIONS ARE SPECIFIED USE 3/4-INCH DIAMETER ASTM

OF NUT" METHOD OR DIRECT TENSION INDICATING WASHERS CONFORMING TO ASTM

F959 AND IN CONFORMANCE WITH "SPECIFICATION FOR STRUCTURAL JOINTS USING

ASTM A325 OR A490 BOLTS", RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS OF

STRUCTURAL TUBING SHALL CONFORM TO ASTM A500, GRADE B WITH A MINIMUM

YIELD STRENGTH OF 46,000 PSI.

BOLTS (BEARING TYPE CONNECTION), UNLESS NOTED OTHERWISE. BOLTS SHALL BE

A325 BOLTS UNLESS NOTED OTHERWISE. BOLTS SHALL BE TIGHTENED BY THE "TURN

ALL ANCHOR RODS SHALL BE ASTM F1554, GRADE 36 UNLESS NOTED OTHERWISE.

STEEL LINTELS, FOR OPENINGS NOT DETAILED AND MAXIMUM 4'-0" WIDE, SHALL BE L4x4x1/4.

8.

9.

7.

6.

4.

3.

ALL STRUCTURAL CONCRETE SHALL BE DESIGNED FOR A 28-DAY COMPRESSIVE STRENGTH OF:

f'c EQUALS 4000 PSI (NORMAL WEIGHT) [UNLESS NOTED OTHERWISE]

REINFORCED CONCRETEB.

1.

STRUCTURAL STEEL

ALL STRUCTURAL STEEL W SHAPES SHALL BE ASTM A992 (U.N.O.).

STRUCTURAL STEEL FOR CHANNELS, ANGLES AND PLATES SHALL BE ASTM A36 (U.N.O.).

STRUCTURAL STEEL HAS BEEN DESIGNED IN ACCORDANCE WITH "AISC

THROUGH ANY STRUCTURAL MEMBER SHALL BE MADE WITHOUT APPROVAL BY THE ARCHITECT.

NO PENETRATIONS (SUCH AS PIPE SLEEVES, ELECTRICAL CONDUITS, ETC.)

2.

D.

1.

16.

H.

CAST BELOW THE BARS IN QUESTION.

AND SCHEDULES. TOP BARS ARE BARS WITH MORE THAN 12 INCHES OF CONCRETE

PROVIDE LAP SPLICES, DEVELOPMENT LENGTHS, AND HOOKS AS INDICATED BELOW UNLESS NOTED OTHERWISE IN DETAILS

PROVIDE CONCRETE PROTECTION FOR REINFORCEMENT (CLEAR COVER) AS INDICATED

BELOW UNLESS NOTED OTHERWISE.

SIZE

REINFORCING AT ALL FOUNDATION WALLS - LAP AS PER TABLE BELOW

PROVIDE EXTERIOR CORNER BARS SAME SIZE AND SPACING AS HORIZONTAL

#4

#8 #7 #6 #5

#3

BAR

15.

14.

13.

5'-10"

LAP SPLICE LENGTHS

f'c = 4000 psi

TOP BARS OTHER BARS

2'-1"2'-8"

5'-2" 4'-6" 3'-1" 2'-7"

6'-8"

4'-0" 3'-4"

G.

1'-7"2'-0" p = FOR POSITIVE BENDING

METAL DECK SHALL BE CONTINUOUS OVER A MINIMUM OF 2 SPANS.

6.

7.

DECK SHALL BE GALVANIZED IN ACCORDANCE WITH THE SPECIFICATIONS.

METAL ROOF DECK SHALL HAVE A MINIMUM YIELD STRENGTH OF 33000 PSI.

SECTION PROPERTIES SHALL CONFORM TO THE "SPECIFICATION FOR THE DESIGN OF

COLD-FORMED STEEL STRUCTURAL MEMBERS" OF AISI.

ROOF DECK (TYPE 1 ) SHALL BE 1 1/2 INCH, 20 GAGE WIDE RIB

METAL DECK WITH THE FOLLOWING MINIMUM SECTION PROPERTIES:

p = FOR POSITIVE BENDING n = FOR NEGATIVE BENDING n = FOR NEGATIVE BENDING

1.

Sn = 0.247 IN^3/FT Sp = 0.234 IN^3/FT

I = 0.212 IN^4/FT

2.

METAL DECK

CORRUGATED METAL FORMS SHALL HAVE A MINIMUM YIELD STRENGTH OF

CORRUGATED METAL FORMS SHALL BE 2 INCH, 20 GAGE HAVING THE

50,000 PSI AND SHALL BE GALVANIZED.

ALL WELDING SHALL BE DONE WITH E70XX ELECTRODES IN CONFORMANCE WITH THE

AMERICAN WELDING SOCIETY (AWS) "STRUCTURAL WELDING CODE" AWS D1.1 - LATEST

EDITION.

GENERAL CONTRACTOR SHALL REMOVE EARTH OR DEBRIS FROM TOP OF

CORRUGATED METAL FORMS

FOLLOWING MINIMUM SECTION PROPERTIES:

Ip = 0.409 IN^4/FT

Sn = 0.346 IN^3/FT Sp = 0.341 IN^3/FT In = 0.406 IN^4/FT

1.

2.

FOUNDATION AS REQUIRED TO INSTALL COLUMN.

ANCHOR ROD SIZE MIN. WASHER DIAMETER

1 9/16"Ø

1 13/16"Ø

1 5/16"Ø

BASE PLATE HOLE DIAMETER

7/8"Ø

3/4"Ø

1"Ø

2 1/2"Ø

3"Ø

2"Ø

12. ALL RE-ENTRANT CORNERS OF BEAM COPES AND PLATE CUTS MUST BE SHAPED NOTCH-FREE

PER AWS D1.1 TO A RADIUS.

AN APPROXIMATE MINIMUM RADIUS TO WHICH THIS CORNER MUST BE SHAPED IS 1/2 INCH.

ANCHOR DECK AT ROOF TO RESIST A GROSS UPLIFT AS INDICATED IN NOTE M.7.

STRUCTURAL GENERAL NOTES

FOR STRUCTURAL DESIGN OF WALL = 60 PCF

FOR STRUCTURAL DESIGN OF WALL = 40 PCF

MINIMUM 7 DAYS BEFORE BACKFILLING.

WHERE WALLS ARE SUPPORTED BY CONCRETE SLABS, SLABS SHALL HAVE CURED A

BACKFILL BOTH SIDES SIMULTANEOUSLY.

SHORED OR BRACED. WHERE BACKFILL IS REQUIRED ON BOTH SIDES OF WALLS,

CONCRETE HAS ATTAINED SUFFICIENT STRENGTH AND WALLS ARE PROPERLY

BACKFILLING AGAINST WALLS AND GRADE BEAMS SHALL NOT BE DONE UNTIL

WALLS LATERALLY SUPPORTED AT THE TOP AND BOTTOM (AT-REST CONDITION):

CANTILEVERED RETAINING WALLS (ACTIVE CONDITION):

EQUIVALENT FLUID PRESSURE FOR EARTH PRESSURE ON WALLS (DRAINED CONDITION):

ALL FOUNDATIONS SHALL BEAR ON 24 INCHES OF PROPERLY COMPACTED STRUCTURAL FILL

BOTTOM OF ALL EXTERIOR FOUNDATIONS SHALL BE AT LEAST 36 INCHES BELOW FINISHED GRADE.

ELEVATIONS OF BOTTOM OF ALL FOOTINGS HAVE BEEN ESTIMATED BASED ON AVAILABLE INFORMATION AND SHALL NOT BE CONSTRUED AS WAIVING ANY OF THE MINIMUM REQUIREMENTS ON THESE DRAWINGS AND IN THE SPECIFICATIONS. ALL FOOTING EXCAVATIONS SHALL BE INSPECTED AND APPROVED BY THE

7.

6.

5.

3.

FOUNDATIONS

2.

A.

1. THE FOUNDATION INVESTIGATION WAS MADE BY KLEINFELDER AND DATED SEPTEMBER 24, 2010.

THIS REPORT IS AVAILABLE IN THE OFFICE OF THE ARCHITECT AND IS INCLUDED IN THE SPECIFICATIONS.

MIN. WASHER THICKNESS

5/16"

3/8"

1/4"

NOTED ON THE DRAWINGS.

(CAPILLARY WATER BARRIER) AND 10 MIL MOISTURE BARRIER. THE MOISTURE BARRIER SHALL BE PLACED DIRECTLY 6x6-W3xW3 OVER 4 INCHES OF OPEN GRADED, WASHED PEA GRAVEL (OR CRUSHED STONE)

SLABS ON GRADE, UNLESS NOTED OTHERWISE, SHALL BE 5 INCHES THICK WITH5.

ALLOWABLE SOIL BEARING PRESSURES:

SPREAD AND CONTINUOUS FOOTINGS (ON STRUCTURAL FILL) = 2500 PSF (D + L)

ALLOWABLE FRICTION COEFFICIENT FOR SLIDING = 0.404.

13. ALL STRUCTURAL STEEL EXPOSED TO WEATHER, LOCATED OUTSIDE THE BUILDING ENVELOPE, OR AS NOTED

IN DRAWINGS SHALL BE PAINTED WITH A ZINC-RICH PRIMER. ALL FASTENERS SUBJECT TO

WEATHER SHALL BE STAINLESS STEEL (WHEN AVAILABLE) OR HOT-DIPPED GALVANIZED.

f'c EQUALS 3000 PSI (LIGHT WEIGHT) [SLABS OVER METAL DECK]

DECK SHALL BE GALVANIZED IN ACCORDANCE WITH THE SPECIFICATIONS.

COMPOSITE FLOOR DECK (TYPE 2 ) SHALL BE 2 INCH, 20 GAGE WITH 3 1/4 INCHES

LIGHTWEIGHT CONCRETE FILL (5 1/4" TOTAL DEPTH) AND 6x6 - W2.1xW2.1 HAVING

THE FOLLOWING MINIMUM SECTION PROPERTIES:

p = FOR POSITIVE BENDING n = FOR NEGATIVE BENDING

Sn = 0.346 IN^3/FT Sp = 0.341 IN^3/FT

Ip = 0.409 IN^4/FT

3.

In = 0.406 IN^4/FT

GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION OF THE FOOTINGS.

BENEATH THE CONCRETE SLAB. THE SLAB REINFORCEMENT SHALL BE PLACED 2 INCHES FROM THE TOP OF THE SLAB.

4.

DRAINAGE AND DEWATERING: ALL EXCAVATIONS SHALL BE PERFORMED SO THAT THE SITE AND THE AREA IMMEDIATELY SURROUNDING THE SITE WHICH AFFECTS CONSTRUCTION OPERATIONS WILL BE CONTINUALLY AND EFFECTIVELY DRAINED. THE CONTRACTOR SHALL PROVIDE DRAINAGE AND DEWATERING AS REQUIRED TO ENSURE THAT ALL FOOTING EXCAVATIONS ARE ACCOMPLISHED WITH THE SUBGRADE SOILS REMAINING DRY AND FIRM UNTIL AFTER FOOTINGS ARE PLACED AND BACKFILLED. REMOVAL OF SURFACE WATER, GROUND WATER, AND ANY PERCHED WATER CONDITIONS, WHICH MIGHT BE ENCOUNTERED DURING EXCAVATIONS SHALL BE ACCOMPLISHED BY APPROVED MEANS. REFER TO SPECIFICATION 31 00 00 "EARTHWORK" FOR ADDITIONAL REQUIREMENTS.

8.

METAL FLOOR DECK SHALL HAVE A MINIMUM YIELD STRENGTH OF 50000 PSI.

14. STEEL GRATING (TYPE 5 ): USE 1 1/2 INCH, TYPE 'B' WITH A BEARING BAR SIZE 3/16 INCH AT 1 3/16 INCHES c/c AND CROSS BARS AT 4 INCHES c/c AS MANUFACTURED BY IKG INDUSTRIES OR McNICHOLS CO. GRATING SHALL BE BOLTED DOWN AS REQUIRED BY MANUFACTURER.

DECK SHALL BE FASTENED TO SUPPORTS WITH 5/8" PUDDLE WELDS AT 36/5 PATTERN

AND 4 WELDED SIDELAPS TO ACHIEVE A MINIMUM DIAPHRAGM CAPACITY OF 550 PLF. SEE

DECK SHALL BE FASTENED TO SUPPORTS WITH 5/8" PUDDLE WELDS AT 36/4 PATTERN

AND 4 WELDED SIDELAPS TO ACHIEVE A MINIMUM DIAPHRAGM CAPACITY OF 550 PLF.

15. BEARING SURFACES OF COLUMNS SHALL BE FINISHED TO PROVIDE FULL BEARING CONTACT WITH BASE PLATE.

5. BEAM SIZE FOLLOWED BY A NUMBER IN PARENTHESES ON THE FRAMING PLANS [E.G.

W16x26 (32) c=1] SHALL BE COMPOSITE, WITH THE INDICATED NUMBER OF 3/4-INCH DIAMETER SHEAR STUDS APPROXIMATELY EQUALLY SPACED AND CAMBERED UPWARD AS NOTED. IF NECESSARY, TWO SHEAR STUDS MAY BE PLACED IN ONE DECK FLUTE. THE HEIGHT OF THE STUDS AFTER WELDING SHALL BE 4 INCHES. STUDS ON W10x12, W10X15, W12X14, AND W12x16 SHALL BE PLACED DIRECTLY OVER THE

BEAM WEB.

16. CONTRACTOR SHALL COORDINATE OPENINGS THROUGH STEEL BEAM WEBS (2 INCHES IN DIAMETER OR LESS) WITH STEEL FABRICATOR. OPENINGS LARGER THAN 2 INCHES IN DIAMETER SHALL BE APPROVED BY THE ENGINEER.

DECK SHALL BE GALVANIZED IN ACCORDANCE WITH THE SPECIFICATIONS.

ACOUSTICAL ROOF DECK (TYPE 3 ) SHALL BE 3 1/2" INCH, 17 GAGE EPICORE-ER3.5A (100% ACOUSTIC) AS MANUFACTURED BY EPIC METALS CORPORATION, WITH THE FOLLOWING MINIMUM SECTION PROPERTIES:

p = FOR POSITIVE BENDING n = FOR NEGATIVE BENDING

Sn = 1.09 IN^3/FT Sp = 1.13 IN^3/FT Ip = 2.78 IN^4/FT

DECK SHALL BE FASTENED TO SUPPORTS WITH 3/4" PUDDLE WELDS AT 24/4 PATTERN

AND WELDED SIDELAPS SPACED AT 18" c/c TO ACHIEVE A MINIMUM DIAPHRAGM CAPACITY OF 550 PLF.

PIKES PEAK REGIONAL BUILDING CODE (PPRBC), 2010.

I. APPLICABLE CODES

LOCATION OF WALL, ROOF, AND FLOOR OPENINGS AND SLEEVES, AND CONCRETE

PADS UNDER EQUIPMENT. THE CONTRACTOR SHALL VERIFY EXACT SIZE AND

LOCATION WITH EQUIPMENT FURNISHED.

IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING

AND BRACING OF THE STRUCTURE FOR ALL LOADS THAT MAY BE IMPOSED DURING CONSTRUCTION.

THE DIAPHRAGM PROVIDED BY THE METAL ROOF/FLOOR DECK IS REQUIRED TO BRACE THE COLUMNS AND COMPLETE THE LATERAL LOAD RESISTING SYSTEM OF THE STRUCTURE. THE CONTRACTOR SHALL PROVIDE LATERAL BRACING AS REQUIRED DURING CONSTRUCTION UNTIL THE METAL DECK HAS BEEN CONSTRUCTED.

REVIEWED BY THE ENGINEER PRIOR TO SAWCUTTING.

AS REQUIRED AT CORNERS. A LAYOUT OF ALL PROPOSED OPENINGS SHALL BE

THE CONTRACTOR SHALL NOT OVER CUT AT CORNERS. CORE-DRILL, CHIP AND GRIND

WHEN CUTTING A NEW OPENING IN EXISTING CONCRETE OR MASONRY,

SPECIAL INSPECTIONSL.

5.

4.

3.

THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS (INCLUDING FIELD VERIFICATIONS

OF EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS) BEFORE STARTING WORK OR

FABRICATING ANY REINFORCING STEEL OR STRUCTURAL STEEL.

THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES FOUND.

SEE ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR SIZE AND

GENERAL

1.

2.

K.

(REFER TO SHEET S-003 FOR SPECIAL INSPECTION REQUIREMENTS)

UFC 3-301-01 - STRUCTURAL ENGINEERING

UFC 3-310-04 - SEISMIC DESIGN FOR BUILDINGS

UFC 4-010-01 - DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS

UFC 1-200-01 - GENERAL BUILDING REQUIREMENTS

10.

E.

SPLICING OF AXIAL LOADED MEMBERS IS NOT PERMITTED.

MEMBERS OR, WHEN REQUIRED, FOR AN ANGULAR FIT TO ABUTTING MEMBERS.

TO THE REQUIREMENTS OF ASTM A446, WITH A MINIMUM YIELD STRENGTH OF 33,000 PSI.

PLUMB, SQUARE, TRUE TO LINE AND BRACED AGAINST RACKING. PERFORM LIFTING OF PREFABRICATED FRAMING COMPONENTS MAY BE PREFABRICATED INTO PANELS PRIOR TO ERECTION. FABRICATE PANELS

OF THE BUILDING ENVELOPE, COAT SCREWS WITH BITUMINOUS OR ZINC-RICH PAINT. WIRE TYING OF ALL WELDS SHALL BE TOUCHED UP WITH A ZINC-RICH PAINT. AT EXTERIOR WALLS THAT ARE PART MANUFACTURER. SCREWS SHALL BE OF SUFFICIENT SIZE TO ENSURE STRENGTH OF THE CONNECTION.

FASTENING OF COMPONENTS SHALL BE WITH SELF-DRILLING SCREWS OR WELDING AS STANDARD WITH

ALL METAL FRAMING COMPONENTS SHALL BE CUT SQUARELY FOR ATTACHMENT TO PERPENDICULAR

ALL METAL FRAMING COMPONENTS SHALL HAVE A GALVANIZED FINISH COMPLYING WITH ASTM A525

ALL METAL FRAMING COMPONENTS SHALL BE FORMED FROM STRUCTURAL STEEL SHEET CONFORMING

PROCEDURES WHICH HAVE BEEN LISTED BY UL OR TESTED IN ACCORDANCE WITH ASTM E119

BY GOVERNING AUTHORITIES AND CODES. PROVIDE MATERIALS, ACCESSORIES, AND INSTALLATION

DESIGN: ALL LIGHTGAUGE METAL FRAMING AND CONNECTIONS SHALL BE DESIGNED FOR THE SPACINGS

FIRE-RESISTANCE RATINGS: COMPLY WITH FIRE-RESISTANCE RATINGS AS INDICATED AND AS REQUIRED

STATE OF COLORADO. DESIGN SHALL BE IN ACCORDANCE WITH AMERICAN IRON AND

AND LOADS INDICATED, BY A PROFESSIONAL ENGINEER REGISTERED IN THE

STEEL INSTITUTE (AISI) "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL

PROVIDE TEMPORARY BRACING, WHEN REQUIRED, UNTIL ERECTION IS COMPLETE.

INSTALL FRAMING MEMBERS AS PER MANUFACTURER'S DESIGN AND RECOMMENDATIONS.

PANELS IN A MANNER TO PREVENT DAMAGE OR DISTORTION.

COMPONENTS IS NOT PERMITTED.

FOR A MINIMUM G60 COATING.

8.

9.

7.

6.

5.

MEMBERS". STAMPED CALCULATIONS SHALL ACCOMPANY THE LIGHTGAUGE METAL FRAMING SHOP DRAWINGS.

FOR THE TYPE OF CONSTRUCTION SHOWN.

4.

3.

2.

LIGHTGAUGE METAL FRAMING

1.

C. OPEN WEB STEEL JOISTS AND JOIST GIRDERS

1. STEEL JOISTS SHALL BE DESIGNED FOR A BASIC ALLOWABLE FLEXURAL STRESS OF

30000 PSI AND A MAXIMUM LIVE LOAD DEFLECTION OF L/360.

2. STEEL JOISTS AND BRIDGING SHALL COMPLY WITH "STANDARD SPECIFICATIONS FOR

OPEN WEB STEEL JOISTS" OF THE STEEL JOIST INSTITUTE.

3. STEEL ROOF JOISTS SHALL BE DESIGNED FOR A GROSS UPLIFT AS INDICATED IN NOTE M.7.

ACOUSTIC METAL ROOF DECK SHALL HAVE A MINIMUM YIELD STRENGTH OF 40000 PSI.

INTERNATIONAL BUILDING CODE (IBC), 2009.

J. DELEGATED DESIGN ITEMS

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF THE FOLLOWING ITEMS:

-STEEL JOIST FRAMING AND JOIST BRIDGING - SEE SPECIFICATION SECTION 052100

-COLD-FORMED STEEL FRAMING - SEE SPECIFICATION SECTION 054000

-METAL STAIRS - SEE SPECIFICATION SECTION 055100

-HANDRAILS AND GUARDRAILS - SEE SPECIFICATION SECTION 055100

-BLAST-RESISTANT STORE-FRONT AND CURTAINWALL SYSTEMS - SEE SPECIFICATION DIVISION 8

-NON-STRUCTURAL SEISMIC RESTRAINTS - SEE SPECIFICATIONS

2. FOR ALL ITEMS LISTED AS DELEGATED-DESIGN ITEMS, STAMPED ENGINEERING CALCULATIONS SHALL BE SUBMITTED FOR REVIEW AT THE SAME TIME THAT SHOP DRAWINGS ARE ISSUED FOR REVIEW.

OVER SCARIFIED, MOISTURE-CONDITIONED AND COMPACTED NATIVE FILL.

FOR STRUCTURAL DESIGN OF WALL = 360 PCF

SOIL RESISTANCE TO LATERAL LOADS (PASSIVE CONDITION):

STRUCTURAL FILL SHALL CONSIST OF ON-SITE SAND SOIL OR IMPORTED NON-EXPANSIVE GRANULAR FILL.

f'c = 4000 psi

TOP BARS OTHER BARS

2'-1"

5'-2" 4'-6" 3'-1" 2'-7"

1'-7"

DEVELOPMENT LENGTHS

1'-8"

4'-0" 3'-6" 2'-5" 2'-0"

1'-3"

F. CONCRETE MASONRY

1. HOLLOW CONCRETE MASONRY UNITS SHALL CONFORM TO ASTM C90.

2. MORTAR SHALL CONFORM TO ASTM C270, TYPE S.

3. NET AREA OF COMPRESSIVE STRENGTH OF CONCRETE MASONRY ASSEMBLY, f'm = 1500 PSI.

4. PROVIDE GALVANIZED HORIZONTAL JOINT REINFORCING EVERY 16 INCHES IN HEIGHT IN ALL

WALLS, NO. 9 GAGE MINIMUM.

5. GROUT ALL CELLS FULL UNDER STEEL BEAMS BEARING ON CONCRETE MASONRY WITHIN AN

AREA 24 INCHES WIDE BY 24 INCHES HIGH UNLESS OTHERWISE NOTED.

6. REINFORCE ALL 8 INCH CMU WALLS WITH 1-#5 VERTICAL BAR AT 32 INCHES O.C. IN GROUTED

CELLS. LAP 45 INCHES AS REQUIRED UNLESS OTHERWISE DETAILED.

REINFORCE ALL 12 INCH CMU WALLS WITH 2-#5 VERTICAL BARS AT 32 INCHES O.C. IN GROUTED

CELLS. LAP 45 INCHES AS REQURIED UNLESS OTHERWISE DETAILED.

7. LINTELS FOR OPENINGS NOT DETAILED SHALL BE 8 INCHES DEEP WITH 2-#5 BOTTOM BARS.

8. PROVIDE CONTINUOUS BOND BEAM COURSES AT THE TOP OF ALL CMU WALLS AND AT ALL FLOOR

AND ROOF DIAPHRAGM LOCATIONS. BOND BEAM COURSES SHALL BE REINFORCED WITH 2-#5

CONTINUOUS BOTTOM BARS UNLESS OTHERWISE NOTED.

9. WHERE OPENINGS OCCUR IN CMU WALLS, PROVIDE BOND BEAM COURSE ABOVE AND BELOW OPENING EXTENDING 24 INCHES BEYOND OPENING IN BOTH DIRECTIONS. GROUT AND REINFORCE VERTICAL CELLS

ON EITHER SIDE OF THE OPENING.

10. ALL WALLS SHALL BE LAID IN TRADITIONAL RUNNING BOND.

11. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING NECESSARY TO LATERALLY SUPPORT ALL

CONCRETE MASONRY WALLS AS REQURIED.

12. ALL CONCRETE MASONRY BELOW ELEVATION 100'-0" SHALL BE GROUTED FULL.

13. THE LAST TWO CELLS OF ALL WALLS (ENDS/CORNERS) SHALL BE REINFORCED AND GROUTED.

ELEMENT CLEAR COVER

SPREAD FOOTING REINFORCEMENT - AT BOTTOM AND SIDES 0'-3"

FOUNDATION WALL REINFORCEMENT - AT SIDES 0'-1 1/2"

SLAB ON GRADE REINFORCEMENT

CONCRETE WALL ABOVE GRADE REINFORCEMENT - AT SIDES 0'-1"

0'-3" FROM BOTTOM U.N.O.

DECK SHALL BE GALVANIZED IN ACCORDANCE WITH THE SPECIFICATIONS.

FORM DECK (TYPE 4 ) SHALL BE 3 INCH, 18 GAGE WITH 5 INCHES NORMALWEIGHT

CONCRETE FILL (8" TOTAL DEPTH) WITH #5 @ 12" c/c PARALLEL TO DECK FLUTES AND #3 @ 12" c/c PERPENDICULAR TO DECK HAVING THE FOLLOWING MINIMUM SECTION PROPERTIES:

p = FOR POSITIVE BENDING n = FOR NEGATIVE BENDING

Sn = 0.797 IN^3/FT Sp = 0.770 IN^3/FT

Ip = 1.254 IN^4/FT

5.

In = 1.252 IN^4/FT

DECK SHALL BE FASTENED TO SUPPORTS WITH 5/8" PUDDLE WELDS AT 36/4 PATTERN

AND 4 WELDED SIDELAPS TO ACHIEVE A MINIMUM DIAPHRAGM CAPACITY OF 550 PLF.

11. PER METAL PANEL MFR., PROVIDE 6" 18 GA DOUBLE STUDS BEHIND METAL PANEL VERTICAL

JOINTS. SEE DETAIL 23/A-711 FOR MORE INFORMATION.

f'c = 4000 psi

Ldh Ldh2

0'-6 3/4"

1'-1 3/8" 0'-11 3/4"

0'-10" 0'-8 3/8"

0'-6"

90 DEGREE STD. HOOK

0'-6"

1'-0" 0'-10 1/2"

0'-9" 0'-7 1/2"

0'-4 1/2"

Ldh2

Ld h

CONCRETE PILASTERS - AT SIDES 0'-2"

REINFORCMENT SHALL BE CENTERED IN SLAB.

ASSEMBLY HALL SLAB ON GRADE SHALL BE 8 INCHES THICK WITH #4 @ 12" c/c EACH WAY.

VAULT SLABS ON GRADE SHALL BE 6 INCHES THICK WITH 6x6-W4xW4 W.W.R.

REINFORCMENT SHALL BE CENTERED IN SLAB.

(STRUCTURAL GENERAL NOTES CONTINUED ON SHEET S-002)

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:1 P

M

S-001

STRUCTURAL

GENERAL NOTES

280-01

Concept Design JUNE 2010

Prelim Design Submittal 27 SEPT 2010

Interm. Design Submittal 04 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp ri ng s, C

O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

Bid Final Documents 5 JUL 2011

STRUCTURAL ACRONYMS AND SYMBOLSO.

ALT = ALTERNATE

ARCH. = ARCHITECTURAL

B.O.S. = BOTTOM OF STEEL

BRG. = BEARING

c/c = CENTER TO CENTER

C.J. = CONTROL JOINT

CL = CENTER LINE

CLR. = CLEAR

CMU = CONCRETE MASONRY UNITS

CONC. = CONCRETE

CONN. = CONNECTION

CONST. = CONSTANT

CONT. = CONTINUOUS

COORD. = COORDINATE

DEPR. = DEPRESSION

do = DITTO/DO OVER

E.F. = EACH FACE

ELEC. = ELECTRICAL

EL./ELEV. = ELEVATION

EMBED = EMBEDDED

E.O.D. = EDGE OF DECK

EQ. = EQUAL

E.W. = EACH WAY

EXP./EXPN. = EXPANSION

FNDN. = FOUNDATION

FTG. = FOOTING

GALV. = GALVANIZED

HORIZ. = HORIZONTAL

I.J. = ISOLATION JOINT

K.C.J. = KEYED CONSTRUCTION JOINT

L.W. = LIGHT WEIGHT

MAX. = MAXIMUM

MECH. = MECHANICAL

MFR./MFRS. = MANUFACTURER

MIN. = MINIMUM

NOM. = NOMINAL

N.T.S. = NOT TO SCALE

N.W. = NORMAL WEIGHT

OPP. = OPPOSITE

PERP. = PERPENDICULAR

PL = PLATE

PLF = POUNDS PER LINEAL FOOT

PSF = POUNDS PER SQUARE FOOT

REINF. = REINFORCEMENT

SIM. = SIMILAR

SSTL = STAINLESS STEEL

T.O.S. = TOP OF STEEL

TYP. = TYPICAL

U.N.O. = UNLESS NOTED OTHERWISE

VERT. = VERTICAL

w/ = WITH

W.W.R. = WELDED WIRE REINFORCEMENT

Ø = DIAMETER

LIVE LOAD REDUCTIONS HAVE NOT BEEN MADE.

20 PSF MINIMUM ROOF LIVE LOAD

5 PSF LATERAL LOAD IN THE ABSENCE OF ANY WIND LOAD EFFECTS

WIND LOADS. APPLIED IN ACCORDANCE WITH THE BUILDING CODE INDICATED HEREIN.

SEISMIC LOADS. APPLIED IN ACCORDANCE WITH THE BUILDING CODE INDICATED HEREIN.

ONE-SECOND PERIOD S1 = 0.060 g (PER UFC 3-301-01) SHORT PERIOD Ss = 0.220 g (PER UFC 3-301-01)

MAPPED SPECTRAL RESPONSE ACCELERATIONS

OCCUPANCY CATEGORY = IV (SEISMIC PURPOSES ONLY - AT REQUEST OF CLIENT)

IMPORTANCE FACTOR, Ie = 1.25

8.

ROOF LIVE LOADS

INTERIOR WALLS5.

6.

3.

2.

100 PSF TYPICAL (UNLESS OTHERWISE NOTED)

LIVE LOADS USED FOR DESIGN

1. FLOOR LIVE LOADS

M.

ONE-SECOND PERIOD Sd1 = 0.068 SHORT PERIOD Sds = 0.176

SPECTRAL RESPONSE COEFFICIENTS

SEISMIC DESIGN CATEGORY = C

BASIC SEISMIC-FORCE-RESISTING SYSTEM(S) = ORDINARY REINFORCED MASONRY SHEAR WALLS DESIGN BASE SHEAR = 193 KIPS (WEST OF EXPANSION JOINT), 206 KIPS (EAST OF EXPANSION JOINT) SEISMIC RESPONSE COEFFICIENT(S), Cs = 0.11 (PER ASCE 7-05, EQUATION 12.8.1)

RESPONSE MODIFICATION FACTOR, R = 2

ANALYSIS PROCEDURE USED = EQUIVALENT LATERAL FORCE PROCEDURE

7. COMPONENTS AND CLADDING ELEMENTS SHALL BE DESIGNED FOR THE FOLLOWING

MINIMUM WIND PRESSURES (PSF) APPLIED PERPENDICULAR TO THE INDICATED SURFACE:

ROOF PLAN

WALL ELEVATION

GROUND

150 PSF MECHANICAL ROOMS, DRILL HALL*

C + C WIND PRESSURES COMPONENT TRIBUTARY AREA (sq. ft)

RO

OF

W

AL

LS

< 10 20 50 100 200 > 500(PSF)

GROUND SNOW LOAD, Pg = 27 psf (PER PPRBC)

SNOW LOADS4.

BASIC WIND SPEED, V = 100 mph (PER PPRBC) IMPORTANCE FACTOR, Iw = 1.15

INTERNAL PRESSURE COEFFICIENT, GCpi = +/- 0.18

EXPOSURE CATEGORY = C

SITE CLASS = C (PER GEOTECHNICAL REPORT)

*DRILL HALL FLOOR DESIGNED FOR 2.5 TON STANDARD CARGO

MEDIUM TACTICAL VEHICLE.

11.8

28.9

11.8

48.6

11.8

73.1

28.9

31.4

28.9

38.7

11.0

28.2

11.0

43.7

11.0

60.8

27.7

30.2

27.7

36.3

10.1

27.2

10.1

36.3

10.1

43.7

25.3

28.9

25.3

32.6

9.3

26.5

9.3

31.4

9.3

31.4

24.0

27.7

24.0

30.2

22.8

25.3

22.8

27.7

21.6

24.0

21.6

24.0

FLAT ROOF SNOW LOAD, Pf = 40 psf (PER PPRBC) SNOW EXPOSURE FACTOR, Ce = 1.0 (PER PPRBC)

SNOW LOAD IMPORTANCE FACTOR, I = 1.0 (PER PPRBC)

THERMAL FACTOR, Ct = 1.0 (PER PPRBC)

9.3

26.5

9.3

31.4

9.3

31.4

9.3

26.5

9.3

31.4

9.3

31.4

9'-0"9'-0"

2000 LB CONCENTRATED LOAD AT OFFICES AND CORRIDORS

1000 LB CONCENTRATED LOAD AT CLASSROOMS

SECTOR 1 ROOF IS DESIGNED TO ACCOMODATE AN ADDITIONAL 10 PSF FOR FUTURE PHOTOVOLTAIC CELLS.

BASIS OF DESIGN PV CELLS ARE THE T5 AND T10 MODELS AS MANUFACTURED BY SUNPOWER CORPORATION.

OCCUPANCY CATEGORY = III (UNLESS NOTED OTHERWISE)

SEISMIC DESIGN REQUIREMENTS FOR NONSTRUCTURAL COMPONENTSN.

1. ALL NON-STRUCTURAL COMPONENTS SHALL BE SEISMICALLY RESTRAINED IN ACCORDANCE

WITH ASCE 7 (LATEST EDITION).

2. FOR THE PURPOSES OF NON-STRUCTURAL SEISMIC RESTRAINTS, THE SEISMIC DESIGN

CATEGORY = "C" AND THE OCCUPANCY CATEGORY = "IV".

3. DESIGN OF SEISMIC RESTRAINTS FOR ALL NON-STRUCTURAL COMPONENTS IS DELEGATED TO

THE CONTRACTOR. COMPLETE SHOP DRAWINGS AND CALCULATIONS SHALL BE SUBMITTED

FOR REVIEW.

(STRUCTURAL GENERAL NOTES CONTINUED ON SHEET S-003)

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:1 P

M

S-002

STRUCTURAL

GENERAL NOTES

280-01

Concept Design JUNE 2010

Prelim. Design Submittal 27 SEPT 2010

Interm. Design Submittal 04 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp in gs

, C O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

AND EXPERIENCED IN THE SPECIFIC CONSTRUCTION TYPE PER SECTION 1704.1 OF IBC 2009.

AGENCY OR INSPECTOR, PERFORMING THE SPECIAL INSPECTION, SHALL BE QUALIFIED

AGENCY EMPLOYED BY THE OWNER.

ALL SPECIAL INSPECTIONS SHALL BE PERFORMED BY AN INDEPENDENT INSPECTION

PER CHAPTER 17 OF THE IBC-2009.

MASONRY, STRUCTURAL STEEL, STRUCTURAL WELDING, AND STRUCTURAL BOLTING SHALL BE PERFORMED

1.

3.

2.

SPECIAL INSPECTIONSL.

SPECIAL INSPECTION FOR EARTHWORK, REINFORCED CONCRETE, REINFORCING STEEL, REINFORCED

4. SPECIAL INSPECTOR SHALL FURNISH REPORTS TO THE OWNER AND CONTRACTOR.

SPECIAL INSPECTOR SHALL ALSO GENERATE AND REGULARLY UPDATE A DISCREPANCY REPORT

(INCLUDING THE ITEMS THAT WERE CORRECTED). THIS REPORT SHALL BE SENT TO THE ENGINEER

FOR REVIEW.

5. SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE SHALL BE IN COMPLIANCE WITH SECTION

1707 OF IBC 2009.

6. SPECIAL INSPECTIONS SHALL BE PERFORMED ON THE PORTIONS OF WORK AND AT

AT THE TIMES INDICATED IN THE FOLLOWING TABLES:

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:1 P

M

S-003

STRUCTURAL

GENERAL NOTES

280-01

Concept Design JUNE 2010

Prelim. Design Submittal 27 SEPT 2010

Interm. Design Submittal 20 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp ri ng s, C

O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

Bid Final Documents 5 JUL 2011

TABLE 1704.3 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION

Verification and Inspection Continuous Periodic Referenced Standard IBC Reference

1. Material Verification of high-strength bolts, nuts and washers:

a. Identification markings to conform to ASTM standards specified in the apporved construction documents.

-- X AISC 360, Section A3.3 and applicable ASTM material standards

b. Manufacturer's certificate of compliance required -- X -- --

2. Inspection of high-strength bolting:

a. snug-tight joints -- X AISC 360, Section M2.5 1704.3.3

b. Pretensioned and slip-critical joints using turn-of-nut with matchmarking, twist-off bolt or direct tension indicator methods of installation

-- X AISC 360, Section M2.5 1704.3.3

c. pretensioned and slip-critical joints using turn-of-nut without matchmarking or calibrated wrench methods of installation

X -- AISC 360, Section M2.5 1704.3.3

3. Material verification of structural steel and cold-formed steel deck:

a. For structural steel, identification markings to conform to AISC 360. -- X AISC 360, SECTION M5.5

b. for other steel, identification markings to conform to ASTM standards specified in the approved construction documents.

-- X Applicable ASTM material standards

c. Manufacturer's certified test reports -- X

4. Material verification of weld filler materials:

a. Identification markings to conform to AWS specification in the approved construction documents. -- X AISC 360, Section A3.5 and applicable

AWS A5 documents

b. Manufacturer's certificate of compliance required. -- X -- --

5. Inspection of welding:

a. Structural steel and cold-formed steel deck:

1) Complete and partial joint penetration groove welds. X -- AWS D1.1 1704.3.1

2) Multipass fillet welds. X -- AWS D1.1 1704.3.1

3) Single-pass fillet welds >5/16" x -- AWS D1.1 1704.3.1

4) Plug and slot welds. X -- AWS D1.1 1704.3.1

5) Single-pass fillet welds < or equal to 5/16" -- X AWS D1.1 1704.3.1

6) Floor and roof deck welds. -- X AWS D1.3

b. Reinforcing steel:

1) Verification of weldability of reinforcing steel other than ASTM A 706. -- X AWS D1.4 ACI 318: Section 3.5.2 --

2) Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames, and boundary elements of special structural walls of concrete and shear reinforcement

X -- AWS D1.4 ACI 318: Section 3.5.2 --

3) Shear reinforcing steel. X -- AWS D1.4 ACI 318: Section 3.5.2 --

4) Other reinforcing steel. -- X AWS D1.4 ACI 318: Section 3.5.2 --

6. Inspection of steel frame joint details for compliance:

a. Details such as bracing and stiffening. -- X -- 1704.3.2

b. Member locations. -- X -- 1704.3.2

c. Application of joint details at each connection. -- X -- 1704.3.2

TABLE 1704.4 REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION

VERIFICATION AND INSPECTION CONTINUOUS PERIODIC

REFERENCE

STANDARD IBC REFERENCE

1. Inspection of reinforcing steel, including prestressing tendons, and placement. -- X ACI 318: 3.5, 7.1-7.7

1913.4

2. Inspection of reinforcing steel welding in accordance with Table 1704.3, Item 5b. -- -- AWS D1.4, ACI 318: 3.5.2

3. Inspection of bolts to be installed in concrete prior to and during placement of concrete where allowable loads have been increased or where strength design is used.

X -- ACI 318: 8.1.3,

21.2.8

1911.5, 1912.1

4. Inspection of anchors installed in hardened concrete. -- X ACI 318: 3.8.6., 8.1.3, 21.2.8

1912.1

5. Verifying use of required design mix. -- X ACI 318: Ch. 4, 5.2-5.4

1904.2.2, 1913.2, 1913.3

6. At the time fresh concrete is sampled to fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.

X -- ASTM C 172,

ASTM C 31, ACI

318: 5.6, 5.8

1913.10

7. Inspection of concrete and shotcrete placement for proper application techniques. X -- ACI 318: 5.9, 5.10 1913.6, 1913.7, 1913.8

8. Inspection for maintenance of specified curing temperature and techniques. -- X ACI 318: 5.11-5.13 1913.9

9. Inspection of prestressed concrete:

a. Application of prestressing forces. X -- ACI 318: 18.20 --

b. Grouting of bonded prestressing tendons in the seismic-force-resisting system. X -- ACI 318: 18.18.4 --

10. Erection of precast concrete members. -- X ACI 318: Ch. 16 --

11. Verification of in-situ concrete strength, prior to stressing of tendons in psttensioned concrete and prior to removal of shores and forms from beams and structural slabs.

-- X ACI 318: 6.2 --

12. Inspect formwork for shape, location and dimensions of the concrete member being formed. -- X ACI 318: 6.1.1 --

TABLE 1704.7 REQUIRED VERIFIATION AND INSPECTION OF SOILS

VERIFICATION AND INSPECTION TASK

CONTINUOUS

DURING TASK

LISTED

PERIODICALLY

DURING TASK

LISTED

Verify materials below shallow foundations are adequate to achieve the design bearing capacity. -- X

Verify excavations are extended to proper depth and have reached proper material -- X

Perform classification and testing of compacted fill materials. -- X

Verify use of proper materials, densities and lift thicknesses during placement and compaction of compacted fill. X --

Prior to placement of compacted fill, observe subgrade and verify that site has been prepared properly -- X

TABLE 1704.5.1 LEVEL 1 REQUIRED VERIFICATION AND INSPECTION OF MASONRY CONSTRUCTION

VERIFICATION AND INSPECTION CONTINUOUS PERIODIC IBC SECTION

TMS 402/ACI

530/ASCE 5

TMS 602/ACI

530.1/ASCE 6

1. Compliance with required inspection provisions of the construction documents and the approved submittals shall be verified.

-- X -- -- Art. .5

2. Verification of f'M and f'AAC prior to construction except where specifically exempted by this code. -- X -- -- Art. 1.4B

3. Verification of slump flow and VSI as delivered to the site for self-consolidating grout X -- -- -- Art. 1.5B.1.b.3

a. Proportions of site-prepared mortar. -- X -- -- Art. 2.6A

b. Construction of mortar joints. -- X -- -- Art. 3.3B

c. Location of reinforcement, connectors, prestressing tendons and anchorages. -- X -- -- Art. 3.4, 3.6A

d. Prestressing technique. -- X -- -- Art. 3.6B

e. Grade and size of prestressing tendons anchorages. -- X -- -- Art. 2.4B, 2.4H

a. Size and location of structural elements. -- X -- -- Art. 3.3F

b. Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames or other construction.

-- X -- Sec. 1.2.2(e), 1.16.1

c. Specified size, grade and type of reinforcement, anchor bolts, prestressing tendons and anchorages. -- X -- Sec. 1.15 Art. 2.4, 3.4

d. Welding of reinforcing bars. X -- -- Sec. 2.1.9.7.2, 3.3.3.4(b)

e. Preparations, construction and protection of masonry during cold weather (temperature below 40ºF) or hot weather (temperature above 90ºF)

-- X Sec. 2104.3, 2104.4 -- Art. 1.8C, 1.8D

f. Application and measurement of prestressing force. X -- -- -- Art. 3.6B

a. Grout space is clean. -- X -- -- Art. 3.2D

b. Placement of reinforcement and connectors, and prestressing tendons and anchorages. -- X -- Sec. 1.13 Art 3.4

c. Proportions of site-prepared grout and prestressing grout for bonded tendons -- X -- -- Art. 2.6B

d. Construction to mortar joints. -- X -- -- Art. 3.3B

X -- -- -- Art. 3.5

a. Grouting of prestressing bonded tendons. X -- -- -- Art. 3.6C

-- X Sec. 2105.2.2, 2105.3

-- Art. 1.4

1 7

A

B

C

M

P

Q

R

N

K

2 3 4 5 6 22' - 11"25' - 10"25' - 10"25' - 10"25' - 11"26' - 5"

190' - 8"

SE

CT

OR

SE

CT

OR

6" SLAB ON GRADE w/ 6x6-W4xW4 CENTERED

IN SLAB

5" SLAB ON GRADE

1' - 4"

3' - 0"

2' - 8"

8"

3' - 0"

8"

8" 3'

- 0

1'

- 4

4'

- 0

4"

3' - 0"

5'

- 1

0"

0"

4"

21' - 0"

1'

- 0

5'

- 1 0"

3'

- 0

1' - 0"

3' - 0"

1'

- 0

3'

- 0

2'

- 7

2 1

/8" 4'

- 2 7/

8"

0"

21' - 0"7' - 4"

1' - 0"

3' - 0"

1'

- 0

3'

- 0

1' - 0"

3' - 0"

1'

- 0

3'

- 0

97' - 0"

99' - 0" 99' - 0"

99' - 0" 99' - 0"

99' - 0"

0"

99' - 0"

93' - 0"

97' - 0

97'

- 0

ELEV. = 100'-0"

ELEV. = 100'-0"

4' - 0 3/8"

G

11"41' - 11"

SE

CT

OR

SE

CT

OR

7'

- 8

D

E

F

H

L

5'

- 2

7'

- 0

7/

8"

2 1

/8" 4'

- 4

6'

- 4

3'

- 6

5'

- 2

2"

4'

- 9

7/ 8"

0"

6"

6"

0"

0'

- 0

1' - 4" 4"

8" 4"

S-510

S-510

S-501

S-501

93' - 0"

97' - 0"

95' - 0

93' - 0"

S-501

S-501

STEPPED FOOTING -

SEE 3

S-502

STEPPED FOOTING -

SEE

S-502

97' - 0

S-502

S-503

DD D D D D

B

B

B

B

B

B

B

NON-LOADBEARING

CMU WALL

TYP.

98'

- 0

4'

- 0

1' - 8 3/4"

5' - 0"

5' - 0"

4' - 6"

7'

- 8

3'-4" WIDE x

7'-0" TALL DOOR

5'-0" WIDE x

7'-0" TALL DOOR

6'

- 1

0" 6'

- 1 0"

6'

- 1

0" 3'

- 4

6'

- 1

0"

5'

- 0

J

3' - 4"5' - 4"6' - 8"8' - 8"8' - 0"

1' - 4"

3' - 4"13' - 4"8' - 0"

1' - 4"

3' - 4"13' - 4"8' - 0"

1' - 4"

3' - 4"13' - 4"8' - 0"

1' - 4"

3' - 4"13' - 4"8' - 0"

1' - 4"

3' - 4"6' - 8 1/8"6' - 8"

5'

- 0

6'

- 8

2' - 2 3/4" 4' - 0"

4' - 0"

S-502

6'

- 0

4'

- 0

1'

- 1

0 1 /2"

1/

4"

0"

30' - 5 1/2"

8"

3 1 /4"

8"

S-502

18' - 0 1/4"

S-502

95' - 0"

93' - 0"

93' - 0"

93' - 0"

97' - 0"

97' - 0"

95' - 0"

S-502

99' - 0"

7 7 /8"

STEPPED FOOTING -

SEE 3

S-502

STEPPED FOOTING -

SEE 3

S-502

STEPPED FOOTING -

SEE

4'

- 0

4' - 0"2' - 0"

S-502

S-502

S-502 8"

1' - 4 7/8"

1' - 6 5/8"

95'

- 0

97'

- 0

6" SLAB ON GRADE w/ 6x6-W4xW4 CENTERED

IN SLAB

ELEV. = 100'-0"

8"

7 1

/4"

5" SLAB ON GRADE

ELEV. = 99'-8"

6'

- 0

3'

- 2

8 1 /8"

6'

- 8

4' - 0"

95' - 0"

3/4" EXPANSION JOINT

w/ BITUMINOUS JOINT

FILLER (ALL SIDES OF

VAULT TYP.)

3'

- 4

S-502

S-502

S-503

97' - 0"

8" NOM. CMU WALL

w/ #5 @ 24" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

S-503

6'

- 8

4'

- 6

10' - 1 1/2"

8" 9'

- 8

S-502

S-503

5' - 0"

5'

- 1

1 1 /4"

14' - 2" 8"

S-501

SIM. TO

98' - 0

1' - 2"

1'

- 2

S-503

TYP.

4"

5" SLAB ON GRADE

ELEV. = 100'-0"

5" SLAB ON GRADE

ELEV. = 99'-8"

FOUNDATION PLAN NOTES:

1. FOR STRUCTURAL GENERAL NOTES - SEE SHEETS

S-001 - S-003

2. EL. 100'-0" = CIVIL EL. 6604.25'

3.

4.

97' -0"

A INDICATES SPREAD FOOTING TYPE -

FOR SIZE AND REINFORCING

SEE SCHEDULE ON SHEET S-601

INDICATES TOP OF FOOTING EL.

6. FOR STEEL COLUMN SIZES -

SEE SCHEDULE ON SHEET S-601

7. FOR SLAB ON GRADE JOINT DETAILS - SEE

8. ALL INTERIOR TOP OF FOOTING ELEVATIONS ARE 99'-0"

UNLESS NOTED OTHERWISE. ALL EXTERIOR TOP OF

FOOTING ELEVATIONS ARE 97'-0" UNLESS NOTED OTHERWISE.

9. INDICATES 5" N.W. CONCRETE FILL OVER 3" METAL FORM

DECK w/ #5 @ 12" c/c PARALLEL TO DECK AND #3 @ 12" c/c

PERPENDICULAR TO DECK

10. FOR OPENINGS IN FOUNDATION WALLS FOR

PIPING - SEE

11. FOR EQUIPMENT/HOUSEKEEPING PAD DETAIL, SEE

S-501

5. FOR SLAB ON GRADE REINFORCEMENT

SEE STRUCTURAL GENERAL NOTES. 9

S-501

S-510

S-501

SECTOR 1 SECTOR 2

SECTOR 3

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:1

P M

S-101

FOUNDATION

PLAN - SECTOR

280-01

Concept Design JUNE 2010

Prelim. Design Submittal 27 SEPT 2010

Interm. Design Submittal 04 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp ri ng s, C

O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

Bid Final Documents 5 JUL 2011

SCALE: 1/8" = 1'-0"

FOUNDATION PLAN - SECTOR 1

UP

11 13

A

B

C

M

P

Q

S

RR

G.5

M.5

N

S.5

K

N.5

SE

CT

OR

SE

CT

OR

9 10 12

G

SECTOR 2

SECTOR 3

SECTOR 2

SECTOR 3

11"

SE

CT

OR

SE

CT

OR

2' - 7 3/4"27' - 2"30' - 5"30' - 0"

64' - 0" 28' - 0"

7'

- 8

90' - 2 5/8"

8'

- 2

1/ 4"

21' - 4 5/8" 8' - 9 3/8"

20' - 7" 19' - 2 3/4"

5.00°

4 3/8" 10' - 3 5/8"

9' - 4" 8' - 7 7/8"

D

E

F

H

L

0'

- 0

1'

- 8

2 1

/4"

1' - 4" 4"

1'

- 1

0 1 /4"

2'

- 1

3/ 4"

1'

- 4

1' - 4"10"

8" 4"

5" SLAB ON GRADE

EL. = 100'-0"

5" SLAB ON GRADE

EL. = 99'-6"

S-501

S-501

S-501

97' - 0"

95' - 0

98' - 0"

93' - 0"

97' - 0"

97' - 0"

3' - 8"

STEPPED FOOTING -

SEE

STEPPED FOOTING -

SEE

STEPPED FOOTING -

SEE 3

S-502

S-502

S-502

S-503

2'

- 1

1 1 /4"

5'

- 2

7'

- 0

7/

8"

2 1

/8" 4'

- 4

6'

- 4

3'

- 6

5'

- 2

2"

4'

- 9

7/ 8"

0"

6"

6"

0"

7 7 /8"

8" SLAB ON GRADE

EL. = 100'-0"

B

B

B

B

B

B

B

B

B

B

B

B

B B B

B

A

C

C

8" SLAB ON GRADE

EL. = 100'-0"

L.5

98'

- 0

6'

- 1

0" 3'

- 4

6'

- 1

0"

5'

- 0

J

5" SLAB ON GRADE

EL. = 99'-8"

7 5 /8"

17' - 6"

4'

- 0

4' - 8"5' - 6 1/4"

8' - 11 1/4"

8"

3 1 /4"

8"

93' - 0"

93' - 0"

97' - 0"

97' - 0"

S-502

4'

- 0

STEPPED FOOTING -

SEE 3

S-502

98'

- 0

D

S-502

S-502

4' - 0"

S-502

S-502

S-502

S-502

1' - 5"

1'

- 5

21' - 0"3' - 7 1/2"

8"

1'

- 4

3'

- 0

1' - 4 7/8"

1' - 6 5/8"

6'

- 0

S-501

S-501

S-50195'

- 0

97'

- 0

10"

1' - 5 3/4"

4' - 0"

3/

8"

5.00°

S-520

12 TYP.

6'

- 0

3'

- 2

8 1 /8"

6'

- 8

4' - 0"

1'

- 1

0"

0"

1'

- 2

2'

- 6

3'

- 4

4'

- 6

3'

- 4

6' - 8"4' - 0"14' - 0"3' - 1"

3' - 4" 3' - 4" 14' - 0" 5' - 4"

EQ.

4' - 0"

95' - 0"

S-502

S-501

TYP.

1' - 5 5/8"

97'

- 0

S-503

S-503

1'

- 1

0 1 /2"

STEPPED FOOTING -

SEE 3

S-502

4'

- 0

97' - 0"

S-503

S-503

S-503

3'

- 4

"4' - 9"

4'

- 0

1'

- 1

0"

4' - 0"

10"

S-502

5' - 0 1/2"

S-502

3'

- 1

7/ 8"

2'

- 2

3'

- 4

8" NOM. CMU WALL

w/ #5 @ 32" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

SLAB DEPRESSION

FOR WALK OFF MAT -

COORD. w/ ARCH.

SLAB DEPRESSION

FOR WALK OFF MAT -

COORD. w/ ARCH.

S-503

6'

- 8

4'

- 6

10' - 1 1/2"

8" 9'

- 8

S-502

7'

- 5

3/ 4"

3'

- 6

3/ 4"

11 5/8"

4'

- 0

3'

- 4

" 5' - 3 3/4"

S-503

TYP.

9" 9"

9" 7 3

/8"

18"x18" PILASTER

(TYP. U.N.O.) G

G

G

9" 9"

4' - 0"

18"x48" PILASTER w/

(20)-#6 VERTS AND #3

TIES - SEE 9/S-503 FOR

REINFORCEMENT LAYOUT

S-550

S-503

4'

- 4

" 95.00°

6' - 8"8' - 8"6' - 8"8' - 8"6' - 8"5' - 0"

3'

- 4

.6

'- 8

3'

- 4

2' - 4"7' - 4" STOOP SLAB TO MATCH SLOPE

OF ADJACENT PAVING

A

A

9"

9"

BOLLARDS - 4 TOTAL

(SEE CIVIL)

18"x18" BOLLARD

FOUNDATION

BOLLARDS - 4 TOTAL

(SEE CIVIL)

18"x18" BOLLARD

FOUNDATION

9" 9"

SLOPE CONCRETE

IN THIS AREA - SEE

ARCH. SLOPE CONCRETE IN THIS

AREA - SEE ARCH.

7"

97' - 0"

99' - 4"

99' - 0

TYP. AT INTERIOR

U.N.O.

97'

- 0

TYP. A

T EXTE

RIOR

U.N.O.

5'

- 1

1 1 /4"

18' - 0"

4' - 4"

96' - 0

8' - 8" 7' - 4"

10' - 8"

4' - 8"

4' - 4"

S-503

SIM. TO

S-502

100' - 0"

STOOP SLAB TEXTURE TO MATCH

WALKWAY TEXTURE

98' - 0

1' - 2"

1'

- 2

" 1'

- 2

" 1' - 2"

S-503

11 TYP.

HSS6x4x5/16

POST (5 TOTAL)

EQ.

S-501

FOUNDATION PLAN NOTES:

1. FOR STRUCTURAL GENERAL NOTES - SEE SHEETS

S-001 - S-003

2. EL. 100'-0" = CIVIL EL. 6604.25'

3.

4.

97' -0"

A INDICATES SPREAD FOOTING TYPE -

FOR SIZE AND REINFORCING

SEE SCHEDULE ON SHEET S-601

INDICATES TOP OF FOOTING EL.

6. FOR STEEL COLUMN SIZES -

SEE SCHEDULE ON SHEET S-601

7. FOR SLAB ON GRADE JOINT DETAILS - SEE

8. ALL INTERIOR TOP OF FOOTING ELEVATIONS ARE 99'-0"

UNLESS NOTED OTHERWISE. ALL EXTERIOR TOP OF

FOOTING ELEVATIONS ARE 97'-0" UNLESS NOTED OTHERWISE.

9. INDICATES 5" N.W. CONCRETE FILL OVER 3" METAL FORM

DECK w/ #5 @ 12" c/c PARALLEL TO DECK AND #3 @ 12" c/c

PERPENDICULAR TO DECK

10. FOR OPENINGS IN FOUNDATION WALLS FOR

PIPING - SEE

11. FOR EQUIPMENT/HOUSEKEEPING PAD DETAIL, SEE

S-501

5. FOR SLAB ON GRADE REINFORCEMENT

SEE STRUCTURAL GENERAL NOTES. 9

S-501

S-510

S-501

SECTOR 1 SECTOR 2

SECTOR 3

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:1

P M

S-102

FOUNDATION

PLAN - SECTOR

280-01

Concept Design JUNE 2010

Prelim Design Submittal 27 SEPT 2010

Interm. Design Submittal 04 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp ri ng s, C

O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

Bid Final Documents 5 JUL 2011

FOUNDATION PLAN - SECTOR 2

UP

14 18 2423

R

G.5

M.5

S.5

20 2216

N.5

SE

CT

OR

SE

CT

OR

SE

CT

OR

SE

CT

OR

20' - 6" 3' - 9 1/2" 16' - 8 1/2" 32' - 1 1/2" 20' - 9" 26' - 0" 19' - 11 3/4" 32' - 1 7/8" 9' - 5 7/8" 36' - 8 3/4"

4 5 /8"

8'

- 9

3/ 8"

7"

2"

5.0 0 °

54' - 10 3/8"

3/

8"

49' - 7 3/8"

10 3/4"

100' - 4 5/8"

1'

- 4

5/ 8"

1'

- 3

1/ 4"

1'

- 5

1/ 4"

1' - 10 1/4"

1'

- 3

1/ 4"

8" 3'

- 0

2"

3 3

/4"

1'

- 5

1'

- 4 5/

8"

3 3 /4"

45' - 3 7/8"

21' - 4" 1' - 6 1/2"

7 7 /8"

0 1 /8"

8'

- 6

7/ 8"

4 3/8" 10' - 3 5/8"

9'

- 4

8'

- 7 7/

8"

7' - 1 3/8"

7' - 1 1/4"

5" SLAB ON GRADE

EL. = 100'-0"

S-501

96'

- 0

97' - 0"

97' - 0"

97' - 0"

97' - 0"

97' - 0

S-501

S-502 STEPPED FOOTING -

SEE 3

S-502

STEPPED FOOTING -

SEE 3

S-502

S-502

S-502

S-502

S-503

A

C C D

D

DD

EE

D

C D

C

C

C

E F D

L.5

5" SLAB ON GRADE

EL. = 99'-8"

(COORDINATE SLAB

DEPRESSION LOCATION

WITH SHOWER ROOMS)

8'

- 1

1 1 /4"

D

C

E

TYP. AT INTERIOR

U.N.O.

97'

- 0

97'

- 0

4'

- 0

4'

- 0

8' - 3 1/2"

GRID

INTERSECTION

TYP. AT EXTERIOR

U.N.O.

D

99'

- 0

99' - 0"

99'

- 0

6' - 4"

TYP. AT

STOOP

5" SLAB ON GRADE

EL. = 100'-0"

5" SLAB ON GRADE

EL. = 100'-0"

1'

- 2

3/ 8"

8"

3' - 0"

8"

3' - 0"

8"

8"

1'

- 4

5/ 8"

3'

- 0

S-502

3'

- 0

8"

1'

- 5

1/ 4"

3'

- 0

C C

1'

- 4

3/ 8"

1'

- 4

3/ 4"

8"

S-502

S-502

S-502

8"

45' - 3 7/8"120' - 5 1/8"

4' - 0" 4' - 0"

4'

- 0

4' - 0" 7' - 4" 2' - 10 1/2"

7' - 0"

4'

- 0

4'

- 0

4'

- 0

1/ 2"

1' - 6 1/4"

S-503

10"

1' - 5 3/4"

4' - 0" 4' - 6" 3' - 6" 4' - 6" 4' - 0" 3' - 6" 8' - 6" 7' - 6" 12' - 6" 3' - 6" 8' - 6"

3/

8"

S-550

HSS4x4x1/4 WINDOW

SUPPORT TUBES (TYP.

ALONG GRIDLINE 'R')

S-550

1/

4"

6' - 8 3/4" 3' - 8"

12' - 4" 3' - 8" 8' - 4"

5.0 0°

2' - 8 5/8" 6' - 8"

EQ.

4' - 0"

3' - 4" 1' - 3 5/8"

1' - 6"

S-503

99' - 0

TYP.

S-503

1' - 3 1/4"

4' - 0"

4'

- 0

8" CMU w/ #5 @ 24" c/c

S-503 8

S-503

S-502

S-502

18"x18" PILASTER

(TYP. U.N.O.)

S-503

C

D

PROVIDE CORNER

BARS AT FOUNDATION

WALL AND FOOTING

PER 2

S-502

TYP.

SEE SHEET S-560

FOR STAIR AND DETAILS

10"

5' - 0 1/2"

S-502

3'

- 1

7/ 8"

5 1 /8"

12" NOM. CMU WALL w/ 2-#5 @ 8" c/c

(TYP. AT ELEVATOR). LAST 3 CELLS OF

ALL ELEVATOR WALLS SHALL BE

REINFORCED WITH 2-#6 BARS.

8" NOM. CMU WALL

w/ #5 @ 16" c/c (TYP. AT

STAIR TOWER)

8" NOM. CMU WALL

w/ #5 @ 32" c/c (TYP. AT

MECHANICAL ROOM)

SLAB DEPRESSION FOR WALK

OFF MAT - COORD. w/ ARCH.

SLAB DEPRESSION FOR WALK

OFF MAT - COORD. w/ ARCH.

1" SLAB DEPRESSION FOR CARPET -

(COORD. w/ ARCH.). FORM AND POUR

THIS AREA SEPARATELY FROM MAIN

SLAB.

SEE ARCH. FOR FLOOR

JOINTING PATTERN

(TYPICAL)

S-5511

S-551

S-551

1' - 7 1/4"

95.00°

30.00°

95.00°

EXTERIOR CONCRETE JOINT

PATTERN - SEE LANDSCAPE DWGS. (TYP.)

1 3 /8"

3'

- 5

5/ 8"

8'

- 7

1/ 8"

S-501

S-501

EQUIPMENT PAD (TYP.) - SEE

S-501

0"

20' - 0" 4'

- 4

4' - 8"

96' - 0"

96' - 0

8' - 8"

7'

- 4

10' - 8"

4' - 8"

4'

- 4

S-502

97'

- 0

FORMED EDGE SHALL BE

2" INSIDE OF FINAL FINISHED

EDGE. AFTER POUR, FINAL EDGE

WILL BE ACHIEVED BY SAWCUTTING

AND CHIPPING - SEE ARCH.

FINAL SAWCUT EDGE

PER ARCH.

97'

- 0

95'

-0"

2' - 0" 20' - 0"

S-552

EQ.

2"

4"

24' - 8 1/8"9' - 0 7/8"

7' - 9 3/4"

WHERE HORIZ. ELECTRICAL CONDUIT IS

REQUIRED, PROVIDE SHOP DRILLED HOLES

OR FIELD DRILL AS NEEDED (CONTRACTOR'S OPTION)

THROUGH HSS WINDOW SUPPORTS

HSS6x6x1/4 WINDOW

SUPPORT TUBES (TYP.

ALONG GRIDLINE 'S.5')

HSS4x4x1/4 WINDOW

SUPPORT TUBES (TYP.

ALONG GRIDLINE 'M.5')

HSS6x4x5/16 WINDOW

SUPPORT TUBES (TYP.

ALONG GRIDLINE 'G.5' U.N.O.)

HSS6x6x1/4 WINDOW

SUPPORT TUBE

HSS6x6x1/4 WINDOW

SUPPORT TUBE

FOUNDATION PLAN NOTES:

1. FOR STRUCTURAL GENERAL NOTES - SEE SHEETS

S-001 - S-003

2. EL. 100'-0" = CIVIL EL. 6604.25'

3.

4.

97' -0"

A INDICATES SPREAD FOOTING TYPE -

FOR SIZE AND REINFORCING

SEE SCHEDULE ON SHEET S-601

INDICATES TOP OF FOOTING EL.

6. FOR STEEL COLUMN SIZES -

SEE SCHEDULE ON SHEET S-601

7. FOR SLAB ON GRADE JOINT DETAILS - SEE

8. ALL INTERIOR TOP OF FOOTING ELEVATIONS ARE 99'-0"

UNLESS NOTED OTHERWISE. ALL EXTERIOR TOP OF

FOOTING ELEVATIONS ARE 97'-0" UNLESS NOTED OTHERWISE.

9. INDICATES 5" N.W. CONCRETE FILL OVER 3" METAL FORM

DECK w/ #5 @ 12" c/c PARALLEL TO DECK AND #3 @ 12" c/c

PERPENDICULAR TO DECK

10. FOR OPENINGS IN FOUNDATION WALLS FOR

PIPING - SEE

11. FOR EQUIPMENT/HOUSEKEEPING PAD DETAIL, SEE

S-501

5. FOR SLAB ON GRADE REINFORCEMENT

SEE STRUCTURAL GENERAL NOTES. 9

S-501

S-510

S-501

SECTOR 1 SECTOR 2

SECTOR 3

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:2

P

M

S-103

FOUNDATION

PLAN - SECTOR

280-01

Concept Design JUNE 2010

Prelim Design Submittal 27 SEPT 2010

Interm. Design Submittal 04 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp ri ng s, C

O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

Bid Final Documents 5 JUL 2011

FOUNDATION PLAN - SECTOR 3

1 7

B

C

M

P

Q

S

R

N

K

2 3 4 5 6

W24X68 W27X84 W27X84 W27X84 W27X84

LH

LH

LH

12 do do do do do do do do do do do do do do do do do do do do do do do do do

LH

LH

do do do do do do do do do do do do do do do do do do do do do do do do do do do do do do

G

W36X135W27X84 do do do do do do do do do do do do do do

LH

22' - 11"25' - 10"25' - 10"25' - 10"25' - 11"26' - 5"

190' - 8" 3' - 4 3/8"

8"

7 1

/4"

11"41' - 11"

SE

CT

OR

SE

CT

OR

SE

CT

OR

SE

CT

OR

D

E

F

H

L

2'

- 1

1 1 /4"

5'

- 2

7'

- 0

7/

8"

2 1

/8" 4'

- 4

6'

- 4

3'

- 6

5'

- 2

2"

4'

- 9

7/ 8"

0"

6"

6"

0"

S-510

S-510

S-520

S-520

S-530

S-530

S-5305

S-530

S-530

(114'-9 1/4")

TOP OF JOIST ELEV. = 114'-4 1/2"

(AT WALL CL) - PROVIDE 6 1/2" JOIST

SHOE DEPTH AT SLOPING JOIST.

TYPICAL ALONG GRIDLINE 'P'

8" NOM. CMU WALL

w/ #5 @ 32" c/c

TOP OF WALL

ELEV. = 116'-0"

(TYP. U.N.O.)

J do do do do do do dodo do do do do do dodo

TYP. OPENING FOR SOLATUBE

SKYLIGHT - COORDINATE

SOLATUBE LOCATIONS w/ ARCH.

SEE

OPENING FOR

ROOF HATCH -

COORD. w/ ARCH.

SEE

(114'-2 1/2")

LH

LH

do

LH

SP

-4

SP

-4

SP

-3

2' - 0"2' - 0"

2' - 0"

2' - 0"

44 EQ. SPACES

176' - 0"3' - 8 1/4"

3' - 8 1/4"

LH

11"

1/

8"

1 7

/8"

(114'-9 1/4") (114'-9 1/4") (114'-9 1/4") (114'-9 1/4") (114'-9 1/4") (114'-9 1/4")

TOP OF JOIST

EL. = 114'-2"

(AT WALL CL)

S-531

S-531

S-530

195' - 3 5/8"

4' - 0" 4' - 3 7/8"

S-531

EDGE OF DECK

8" NOM. CMU WALL

w/ #5 @ 24" c/c

TOP OF WALL

ELEV. = 118'-0"

TOP OF WALL

ELEV. = 118'-0"

TOP OF WALL

ELEV. = 118'-0"

TOP OF WALL

ELEV. = 118'-0"

7 5/8" 10' - 8" 72' - 0" 4' - 0" 32' - 0" 4' - 0" 32' - 3 7/8" 3' - 8" 32' - 0 1/8" 4' - 11"

TOP OF JOIST

ELEV. = 115'-2"

L8X6X3/4 L8X6X3/4

L8 X6

X3 /4

L8X6X3/4 L8X6X3/4

L8 X6

X3 /4

ERU UNIT - VERIFY

PLACEMENT AND

SIZE WITH MECH.

VE

RI

FY

4'

- 8 3/

8"

VE

RI

FY

3"

5' - 6"11' - 9 3/4"

ERU UNIT - VERIFY

PLACEMENT AND

SIZE WITH MECH.

ERU UNIT - VERIFY

PLACEMENT AND

SIZE WITH MECH.

TOP OF WALL

ELEV. = 114'-2"

12' - 0"

TOP OF WALL

ELEV. = 116'-0"

2' - 4 1/4"

W16X40W16X40W16X40W16X40W16X40

(B.O.S. EL. = 108'-0") (B.O.S. EL. = 108'-0") (B.O.S. EL. = 108'-0") (B.O.S. EL. = 108'-0") (B.O.S. EL. = 108'-0")

S-520

TYP. AT

STEEL BEAM

LINTEL

TYP.

S-530

8" NOM. CMU WALL

w/ #5 @ 32" c/c

S-531

S-520

OPP.

S-531

S-530

8" NOM. CMU WALL

w/ #5 @ 32" c/c

S-530

TYP.

L-

L-5

L-

L-4

L-

L-

L4x4x1/4 BETWEEN JOISTS -

INSTALL BELOW ROOF CURB

(TYP.)

VE

RI

FY

5'

- 6 7/

8"

8' - 2 5/8"20' - 8 3/4" 3' - 7 1/8"23' - 0 3/8"2' - 9 5/8"

4 1 /4"

5' - 6"11' - 9 3/4" do

SP

-3

LH

SP

-5

SP

-5

4' - 0"

9'

- 1

L-2

STEEL BEAM SHALL SPAN OVER

OVERHEAD DOOR AND PEDESTRIAN

DOOR. PROVIDE L-1 LINTEL BETWEEN

STEEL BEAM AND PEDESTRIAN DOOR (TYP.)

L-2

5' - 0" 3' - 0"3' - 4" 4' - 8"

L8X6X3/4 L8X6X3/4

L8 x6 x3 /4

L8 x6 x3 /4

SECOND FLOOR/LOW ROOF FRAMING PLAN NOTES:

1. FOR STRUCTURAL GENERAL NOTES - SEE SHEETS

S-001 - S-003

7. FOR STEEL COLUMN SIZES -

SEE SCHEDULE ON SHEET S-601

2. TOP OF STEEL EL. = 113'-6 3/4" U.N.O.

3. FINISHED SECOND FLOOR EL. = 114'-0"

4. INDICATES 1 1/2" METAL

ROOF DECK

5. INDICATES 3 1/4" LW CONCRETE FILL

OVER 2" COMPOSITE METAL DECK

(5 1/4" TOTAL)

8. INDICATES STRUCTURE SLOPE

9. FOR TYPICAL BEAM CONNECTION SCHEDULES AND DETAILS

SEE SHEETS S-602

11. "24K6 SP-1" INDICATES SPECIAL STEEL JOIST -

SEE SHEET S-540 FOR JOIST

DIAGRAMS

6. INDICATES 1 1/2" METAL GRATING5

10. INDICATES MOMENT CONNECTION

SEE DETAILS ON SHEET S-602

12. "L-2" INDICATES MASONRY LINTEL -

SEE DETAIL 9/S-520

SECTOR 2 SECTOR 2

SECTOR 3

nu mb er

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch kd dr aw n job iss ue / r ev isi on de sc rip tio n se al as so cia ted w ith pr oje ct ar ch ite ct issue / revision date:

BI

D

FI

NA

L

DO

CU

ME

NT

S

/3

/2

:5

:2

P M

S-111

LOW ROOF

FRAMING PLAN -

SECTOR 1

280-01

Concept Design JUNE 2010

Prelim Design Submittal 27 SEPT 2010

Interm. Design Submittal 04 JAN 2011

Final Design Submittal 31 MAR 2011

NO

R

TH

C

O

LO

R A D

O S

PR

IN

G S

R

EA

D

IN

ES

S

C

EN

TE

R

V oy ag er

P ar kw ay

C ol or ad o Sp ri ng s, C

O

AWJ

SAJ

Final Design Submittal 31 MAY 2011

Bid Final Documents 5 JUL 2011

LOW ROOF FRAMING PLAN - SECTOR 1

DN

A

B

C

M

P

Q

S

R

G.5

M.5

N

S.5

K

N.5

9 10 12

W21X44 W21X44

W12X16

W

X5

W

X3

W

X2

G

W12X30 do do do do do do do do do do do

K7

W

X4 do do do do do do do do do do do do do do do do do do do do do do do

24K6

20' - 6"

SE

CT

OR

SE

CT

OR

D

E

F

H

L

5'

- 2

7'

- 0

7/

8"

2 1

/8" 4'

- 4

6'

- 4

3'

- 6

5'

- 2

2"

4'

- 9

7/ 8"

0"

6"

6"

0"

7 7

/8" 2'

- 1 1 1

/4"

11" 30' - 0" 30' - 5" 27' - 2" 2' - 7 3/4"

S-530

S-530

21' - 4 5/8" 8' - 9 3/8"

20' - 7"

28' - 2"

SECTOR 2

SECTOR 3

SECTOR 2

SECTOR 3

L.5

J

K7

W12X30

2'

- 8

2'

- 8

8 E Q .

S

PA

CE

S

0"

W12X30

1'

- 8

1/ 2" do

SP

-2

SP

-2

(1

'-1 0 1

/2"

(1

'-3 3/

4"

(1

'-3 3/

4"

JOIST BEARING ELEV. = 114'-8"

(114'-8")

(114'-2 1/2")

(114'-0")(114'-0")

(114'-1")

(113'-6")

T.O.S. ELEV. = 114'-1"

T.O.S. ELEV. = 113'-6"

T.O. CMU WALL

ELEV. = 119'-4"

T.O. CMU WALL

ELEV. = 119'-4"

T.O. CMU WALL

ELEV. = 119'-4"

(116'-7") (116'-0")

(116'-7") (116'-0")

W

X3

11"

14 EQ. SPACES

56' - 0"

2' - 0 3/4"

S-532

HS

S8

X6 X1

/4 (1

'-0

2" BUILDING

EXPANSION JOINT -

SEE ARCH. FOR

DETAILS

OPEN TO BELOW

OPEN TO BELOW

S-530

HIGH

AND LOW

S-532

5.00°

(113'-2 1/4")

W12X19 (113'-2 1/4")

W

X1

(1

'-2 1/

4"

(113'-2 1/4")

W12X19

(113'-2 1/4")

S-531

S-531

85.

00°

1'

- 0

5/ 8"

S-520

12TYP.

7' - 8 1/8" 7 3/8"

S-531

T.O. CMU WALL

ELEV. = 117'-4"

S-530

60' - 8"

3'

- 4 1/

2"

3'

- 2

3/ 8"

1'

- 7

7/ 8"

5.00°

5' - 11 3/4" 11 1/8"

8' - 8"

7' - 4"

10 5/8"

7 5/8"

4' - 11"

2' - 4 1/4"

8" NOM. CMU WALL

w/ #5 @ 32" c/c

W12X30

24K6 SP-1

8" NOM. CMU WALL

w/ #5 @ 32" c/c

4'

- 0 do

E

Q .

S

PA

CE

S

0"

S-531

S-531

S-531

S-520

12 OPP.

W16X40

(B.O.S. EL. = 114'-0")

W

X4

L-

(B .O

.S . E

L.

8'-

0"

S-531

7" E

.O .D

0" E.O.D.

S-530

S-530

S-530

S-530

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

12" NOM. CMU WALL

w/ (2) - #5 @ 24" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

8" NOM. CMU WALL

w/ #5 @ 32" c/c

S-530 E.O.D.

6 3/8"

4" E.O.D.

S-530

S-520

TYP.

S-532

W12X19 x C

ON

T.

L-

W12X19

(1

'-2 1/

4"

7'

- 0

5/ 8"

SE

CT

OR

SE

CT

OR

1 62' - 7 1/4" 28' - 0"

3 5 /8"

5'

- 3 3/

4"

MECHANICAL UNIT - VERIFY

PLACEMENT AND SIZE

WITH MECH.

W 8X

W8X10 W8X10

W 8X

W

8X

W 8X

W 8X

W

8X

W 8X

W

8X

W 8X

W

8X

W 8X

W

8X

W 8X

W

8X

W 8X

W

8X

3' -

1/

2"

3'

- 1 0"

3'

- 8 3/

4"

3'

- 7 3/

8"

4' - 6 7/8"5' - 6"5' - 6 1/8"5' - 6"

S-550

1'

- 0

HSS4x4x1/4 SCREEN WALL

SUPPORT TUBES (4

TOTAL)

S-533

S-531

S-533

L-4 L-4 L-4

L-

L-

L-

L-

L-4

W16X40 (B.O.S. EL. = 114'-0")

HSS6x4x5/16

POST (5 TOTAL)

do

SP

-3

LH

SP

-5

8 1 /2"

S-532

W T4X9

W T4X9

4' - 6 1/2"

W T4X9

W T4X9

8' - 0" 8' - 0"

W T4

X9

6' - 7 3/4"

W T4

X9

W T4

X9

8' -…