Package 3 - Arch Int Kitchen.pdf
PDF 31 MB Posted
- Solicitation number
- W912LC-11-R-0006
About this file
FINAL DESIGN-DRAWINGS 3 OF 4
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
DN
A-500
A-501
11 14
AA
CC
J
P
Q
R
G.5
M.5
N
S.5
172 174
165 164
176 177
161 160
154 152
114 115
110108
A -10
A -10
A -10
A -10
A -1
A -1
A -1
A -1
A-401
A-400
A-400
A-401
137138
148150 149
119 120
144 146
A-501
A-501
A-501
106 113
A-400
A-500
A-500
A-500
A-501
A-501
A-501
A-502
A-502
A-502
S
171 173 175
E
F
BB
H
L
M
G
D D
K
1'
/8
194' - 8" 90' - 6 7/8" 103' - 11 1/4"
' - 3
1/4
' - 11 5
/8
A-401
532' - 0 1/8"
3' - 4"
' - 2
L.5
A-612
N.5
N.2
A-611
A-611
A-500
A-501
A A
CC
J
P
Q
R
G.5
M.5
N
S.5
208 210
A -110
A -111
A -110
A -111
A-401
A-400
A-400
A-401
243244
223225 224
214 215
A-501
A-501
A-501
237238239
A-400
A-500
A-500
A-500
A-501
A-501
A-501
A-502
A-502
A-502
S
E
F
BB
H
L
M
G
DD
194' - 8"
1'
12' - 1" 178' - 7" 64' - 0" 28' - 0"
42' - 9 1/4" 66' - 9 3/4"
55' - 10 7/8
41' - 8 5/8"
K
64' - 0"
/8
90' - 6 7/8" 103' - 11 1/4" 109' - 9 1/4"
A-401
532' - 0 1/8"
L.5
N.5
N.2
A-810 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-100
COMPOSITE
FLOOR PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/64" = 1'-0"A-100
1 COMPOSITE FIRST FLOOR PLAN
3/64" = 1'-0"A-100
2 COMPOSITE SECOND FLOOR PLAN
0' 10' 20' 40' 80' 5°
N
0' 10' 20' 40' 80' 5°
N
FD
FD
DN
FD
CAGES
LOCKERS
LOCKERS
CONTROLLED
WASTE
FLAMMABLE
MATERIALS
MECHANICAL
VAULT
DISTRIBUTION
VAULT
DISTRIBUTION
ELECTRICAL
LOCKERS
AA
CC
JJ
PP
NN
A -1
A -1
A -1
A -1
A-401
FAC. MAINT
HALLWAY
ALCOVE
178 A-600
A
A
A
A
A
A
A
A
A
A
A
A
HALLWAY
A
A
CAGES
CAGES
CAGES
B
A
B
A
B
A
B
A
B
A
B
A
B
A
16' - 0" 6' - 8" 6' - 8" 3' - 4" 1' - 4" 8' - 0" 13' - 4" 3' - 4"1' - 4" 8' - 0" 13' - 4" 3' - 4"1' - 4" 8' - 0" 13' - 4" 3' - 4" 1' - 4" 8' - 0" 13' - 4" 3' - 4"1' - 4" 8' - 0" 8' - 8" 6' - 8" 5' - 4" 3' - 4" 20' - 8"
HALLWAY
25' - 8"16' - 3"23' - 3"25' - 7"26' - 1"25' - 10"25' - 11"7' - 9"14' - 8"
/4
181 LOCKERS131 LOCKERS
33 LOCKERS
194' - 8"
EE
FF
BB
HH
LL
MM
GG
DD
11' - 5 5/8" 72' - 0" 4' - 0" 32' - 0" 4' - 0" 32' - 0" 4' - 0" 32' - 0" 3' - 2 3/8"
A-511
A-512
A-510
A-511
A-510
A-511
A-512
B
B
1'
20' - 0" 20' - 11"
A-710
A-400
A-511
KK
A-510
A-510
A-511
A-511
SIM.
190' - 8"
11"41' - 11"22' - 11"25' - 10"25' - 10"25' - 10"25' - 11"26' - 5"
A-710
A
A
ROOF HATCH
LADDER
1H
1H
1H
1H
1H 1H
1H
1H 1H
1H
1H
3A
1H
1H
2 2
6A
6A4' - 6"6' - 4"3' - 10"
20' - 0"
E Q
R .O
E Q
E Q
R .O
E Q
MENS
RESTROOM
WOMENS
RESTROOM
99' - 8"
99' - 8"
100' - 0"
10' - 0"
166' - 6"
A-711
4' - 0" 35' - 4"
HALLWAY
HALLWAY
A-121
A-121
SIM
A-121
SIMA-121
SIM
A-711
MOP SINK
A-711
FEC
FEC
FEC
1H
3' - 4"
ROOF DRAIN
LEADERS
(PRIME & PAINT PT-1)
A-710
CAGES
A
A-602
A-602
EXTENDED
GUARDRAIL
9' - 7"
EXTENDED
GUARDRAIL
30' - 7"
STEEL COLUMN RE: STRUCTURAL
PRIME & PAINT PT-4 (TYP)
SOLAR WALL SOLAR WALL
TYP.
TYP.
A-611
A-611
ROOF LEADERS
REFER TO A-121 FOR
DETAILED INFORMATION
ON THE CAGES
& REQ'D SHELVING
REFER TO A-121 FOR
DETAILED INFORMATION
ON THE CAGES
& REQ'D SHELVING
REFER TO A-121 FOR
DETAILED INFORMATION
ON THE CAGES
& REQ'D SHELVING
REFER TO A-121 FOR
DETAILED INFORMATION
ON THE CAGES
& REQ'D SHELVING
REFER TO A-121 FOR
DETAILED INFORMATION
ON THE CAGES
& REQ'D SHELVING
A-511
SIM.
NOTE:
REFER TO A-122 FOR
DETAILED INFORMATION ON
TA-50 LOCKERS
NOTE:
REFER TO A-122 FOR
DETAILED INFORMATION ON
TA-50 LOCKERS
NOTE:
REFER TO A-122 FOR
DETAILED INFORMATION ON
TA-50 LOCKERS
1"
LOADING DOCK
(RE: STRUCTURAL)
LOADING DOCK
(RE: STRUCTURAL)
5' - 1"
ROOF DRAIN
LEADERS
(PRIME & PAINT PT-1)
ROOF DRAIN
LEADERS
(PRIME & PAINT PT-1)
ROOF DRAIN
LEADERS
(PRIME & PAINT PT-1)
ROOF DRAIN
LEADERS
(PRIME & PAINT PT-1)
6 6 2
55 3
A-101 A-102 A-103 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-101
SECTOR 1
FIRST FLOOR
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-101
1 SECTOR 1 - FIRST FLOOR PLAN
0' 4' 8' 16'2' 5°
N
KEY PLAN
NOTE:
1. REFER TO SHEET G-02 FOR GENERAL NOTES.
2. REFER TO A-121 FOR DETAILED INFORMATION ON
METAL CAGE LAYOUT AND DETAILS
3. REFER TO A-122 FOR DETAILED INFORMATION ON
TA-50 LOCKER LAYOUT AND DETAILS
4. REFER TO SHEET A-121 FOR SHELVING LEGEND #
FD
FD
DN
FD
MAINTENANCE
BAY
TABLE / CHAIR
DRILL HALL
FACILITY MAINT.
SIM CENTER
STORAGE
TRAINING DEV /
SIM. CENTER
FAMILY
RECRUITING
LOBBY
AIR LOCK
AIR LOCK
11 14
AA
CC
J
P
Q
RR
G.5
M.5
N
A -10
A -10
A -1
A -1
A -1
A -1
A -10
A -10
A-601
6" SLAB DEPRESSION
W/ RAISED ACCESS FLOOR
SEE NOTE #5 FOR GROMMETS
IN ACCESS FLOORING
A
B
A
A
A
A
A
A
A
A
B
C
B
DRY STORAGE
KITCHEN
RESTROOM
KITCHEN OFFICE
FRIDGE &
FREEZER
SCULLERY
KITCHEN
HALLWAY
A-611
A-611
" 1'
1' "4
1'
1'
1'
1'
1'
"2
1' 1'
1'
1' "4
1'
1'
4' - 4" 1' - 8" 6' - 8" 8' - 8" 6' - 8" 8' - 8" 6' - 8" 14' - 4" 4' - 0" 12' - 4" 14' - 9 1/2" 2' - 2 1/2"
6' - 0"14' - 0"3' - 4"3' - 4"
1' - 4"
3' - 4"6' - 8" 4' - 0"
14' - 0"34' - 8"
S
A
B
TELECOM
CLOSET
1' - 3 7/8"15' - 8"41' - 6"14' - 10"17' - 0"
28' - 0"62' - 8"
/4
1' /2
/8
/8
' - 6
1/2
' - 0
EE
F
BB
H
L
M
G
DD
KITCHEN
JANITOR
A-512
A-512
A-512
A-514
A-513
A-512
A-514
A
B
B
B
B
A
A
A
A
C
C
A-515
A-710
P
G
Q
E
D
F
A-401
K
A-512
A-513
A-514
A-515
A-513
A-514
11"
A-710
A-710
A-710
A-710
A-710
A
C
A
A
B
A
6A
6A
6A
6A 7
1A 1G
1G
1A
6A
BB
1A
85°
A-710
TRENCH DRAIN
RE: 6/S-501
TRENCH DRAIN
RE: 6/S-501
30' - 11 7/8"18' - 7"4' - 0"67' - 8 1/4"
RAISED PLATFORMS
RE: 3/A-620
TIME CAPSULE
CABINET15' - 1 5/8"
1' - 8"
13K
13K
A-520
99' - 8"
100' - 0"
PROJECTION
SCREENS N.I.C.
DISPLAY
CASE
SIM. &
A-710
A-710
OPP.
6" BOLLARDS
(PRIME & PAINT PT-6)
RE: 4B/AS101
RECESSED
WALKOFF MAT
RE: 13/A-620
RECESSED
WALKOFF MAT
RE: 13/A-620
A-520
FEC
FEC
FEC
A-831
ADA OPERATORS
MOUNTED TO
ALUMINUM PEDISTAL
(RE: 11/A-620)
ADA OPERATOR (CARD READER AT
EXTERIOR PEDESTAL) MOUNTED TO
ALUMINUM PEDESTAL
(RE: 11/A-620)
EQ. EQ.
' - 0
1' - 0"
ADA OPERATOR AND
CARD READER
MOUNTED TO
ALUMINUM PEDISTAL
(RE: 11/A-620)
6" BOLLARDS
(PRIME & PAINT PT-6) RE: 4B/AS101
6" BOLLARDS
(PRIME & PAINT PT-6)
RE: 4/AS101
6" BOLLARDS (PRIME &
PAINT PT-6) RE: 4B/AS101
KITCHEN HALL
A-821
12" COLUMN
COVER
12" COLUMN
COVER
ROOF LEADERS
MAIN SPRINKLER LINE
ROOF LEADERS
ROOF DRAIN
LEADERS
(PRIME & PAINT PT-1)
COLUMN
PRIME & PAINT
PT #1
MOP SINK
EMBLEM RECESSED IN
STAINED CONCRETE
FLOOR WITH RESIN
SEALER RE: 7/A-620
A-519
A-710
L.5
12" COLUMN
COVER
12" COLUMN
COVER
BIKE RACK
RE: LANDSCAPE
A
A-601
T Y P
T Y P
8" GROUND
FACED CMU
8" GROUND
FACED CMU
85°
EQ.
EQ.
N.5
N.2
1'
1'
TYP.
UNIT CABINET HEATER
RE: MECH.
GRAVEL
RE: LANDSCAPE
A-620
ROOF LEADERS COLUMN
PRIME & PAINT
PT #1
COLUMN
PRIME & PAINT
PT #1
Y
6 2
5 3
8 8
WALK OFF MAT EDGE
TO MATCH PROJECTED
ANGLE OF CONTROL
JOINT (TYP. @ AIR LOCK
100,102)
WALK OFF MAT EDGE
TO MATCH PROJECTED
ANGLE OF CONTROL
JOINT (TYP. @ AIR LOCK
100,102)
A-101 A-102 A-103 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-102
SECTOR 2
FIRST FLOOR
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-102
1 SECTOR 2 - FIRST FLOOR PLAN
0' 4' 8' 16'2' 5°
N
KEY PLAN
NOTE:
1. REFER TO SHEET G-02 FOR GENERAL NOTES.
2. ALL COLUMN COVERS ARE TO BE 12" DIAMETER
UNLESS OTHERWISE NOTED
3. REFER TO A-120 FOR CONTROL JOINT LAYOUT FOR
EXPOSED INTERIOR CONCRETE SLABS.
4. REFER TO SHEET A-121 FOR SHELVING LEGEND #
5. CONTRACTOR TO PROVIDE AND INSTALL (14) 3"
ROUND GROMMETS IN ACCESS FLOORING (RE: SPECS).
EXACT LOCATION OF GROMMETS TO BE FILED
DETERMINED WITH COARNING REPRESENTATIVES.
6. COLUMN COVERS TO BE 12" UNLESS NOTED
OTHERWISE.
F D
F D
UP
FD FD
FD
FD
FD
FD
FD
FDFDFDFD
ELEVATOR
MENS LOCKER
FITNESS
WOMENS
RESTROOM
116 MECHANICAL
OFFICES HHC
AIR LOCK
BREAK
LIBRARY /
COMPUTER
OFFICES ALPHA
GREAT HALL
HALLWAY
CLASSROOM
139 HALLWAY
STAIRS
FAC. MAINT.
R
G.5 G.5
M.5 M.5
S.5 S.5
ELEVATOR
SERVICE
MENS
RESTROOM
WOMENS
RESTROOM
A
- 10
A -1 0
A
- 10
A -1 0
A-401
CLASSROOM
SECTION S2
INTELLIGENCE
CLASSROOM
CLASSROOM
FAC. MAINT
OFFICE RNCO
OFFICE 1SG
OFFICE CDR
SECTION
SECTION
OFFICE ADMIN
NCO
OFFICE XO
OFFICE 1SG
OFFICE CDR
OFFICE
READINESS NCO
OFFICE CO XO
SECTION
A-400
MENS SHOWER
MENS SHOWER
MENS LOCKER
HALL
A-600
A-600
A-602
A-601
FAC. MAINT.
A 149
A 148 A
A
A
A
A
A
A
B
A
B
A
A
A
A
A
A
A
A
A
A-612
A-612
ELEC.
S
PRINTER
A-612
B
109' - 1 1/2" 3' - 11" 7' - 4 1/2" 3' - 4" 6' - 8" 34' - 8"
6' - 7 1/2" 47' - 3 7/8" 22' - 5 7/8" 6' - 11 1/2" 20' - 10 1/2" 3' - 0 1/2"
71' - 6" 48' - 11" 44' - 8" 10' - 9 5/8" 10' - 3" 20' - 1 1/2" 14' - 0"
/2
1"
/2
"10' - 10"
13' - 0" 12' - 8"
17' - 0"
/2
/2
/8
72' - 6" 1' - 2 3/4" 5' - 4" 3' - 0" 8' - 9 1/2" 3' - 0" 5' - 9 1/2" 3' - 0" 8' - 9 1/2" 3' - 0" 5' - 4 1/2" 22' - 5 7/8" 7' - 2" 20' - 8" 1' - 4 3/8" 7' - 0" 14' - 0"
/8
/4
/4
/8
/2
3' - 0"
17' - 0" 15' - 0" 12' - 3 1/4" 5' - 10 1/2"
A-517
A-516
A-518
A
A
B
A
A
A-516
F Y Y
X
Y X
R
Y
K
S T
6' - 10 5/8" 8' - 0"
4' - 0"
4' - 0" 4' - 0"
4' - 0"
8' - 0" 8' - 0"
4' - 0" 4' - 0"
4' - 0" 4' - 0"
4' - 0" 4' - 0"
Y
ABOVE
Y
ABOVE
A-518
A-517
A-518
A-519
A-517
A-516
SIM. 1
A-516
SIM.
A-518
A-518
A-519
A-612
10' - 2 3/4" 10' - 2 1/2" 16' - 4 3/4"
/2
/2
1' /8
/4
/8
OFFICE ALPHA
ALCOVE
ALCOVE
HALLWAY
WOMENS
SHOWER
A
CONFERENCE
A-710
A-710
A-710
A-710
A-710
A
A
A
A
A
A
A
B
A
A
A
A-710
A-711
A-710
A-710
1A 8B
8A
8A
13P 13P
13J13P
1A 13
1A
1A
13P
13P
13P
13P
13P
1A
1A
131A
1A
1A
7A
77B
1A
1A
1A
1A
1J
1A
1A
10 10 1A
1J1J1J
1A
AA
BB
1A
1' 1"
/8
1' - 4" 3' - 4" 40' - 0"
30' - 5 3/4"
7 3/4"
9' - 3 1/2"
12' - 0" 12' - 10"
/8
13' - 7 1/8"
24' - 0" 8' - 0" 3' - 8"
1' 1"
/2
A-711
A-711
95°
ROOF DRAIN LEADERS
RE: PLUMBING
2A
A-710
N.I.C.
N.I.C. N.I.C.
Y
ABOVE
CONC. PATIO
RE: LANDSCAPE
A-400
N L
A-710
A-711
A-711
A-710
OPP.
H
A-710
B
A-520
A-520
A-519
DISPLAY CABINET
A-711
1A
A-520
RECESSED
WALKOFF MAT
FEC
FEC
A-400
89' - 4"
A-711
A-711
1'
1' /4
COLUMN
COVER
20' - 6" 3' - 9 1/2" 48' - 10" 20' - 9" 26' - 0" 19' - 11 3/4" 32' - 1 3/4" 9' - 5 7/8" 36' - 8 3/4"
FOLDING PARTITION
WALL W/ POCKET
DOORS
COL. COVER
ROOF LEADERS
MOP SINK
COL. COVER
COL. COVER
/8
A-711
A-711
FOLDING PARTITION
WALL W/ POCKET DOORS
FOLDING PARTITION
WALL W/ POCKET
DOORS
1" RECESSED
SLAB FOR
CARPET
/8
CT CABINET
COLUMN
COVER
L.5 L.5
MECH. UNITS
COL. COVER
COL. COVER
A-601
A-612
B
A-612
A-612
32' - 9 1/2" 6' - 3 1/4"95
85°
A-620
TYP
N.5 N.5
N.2 N.2
A
A
2D 2D
SMARTBOARD
N.I.C.
SMARTBOARD
N.I.C.
SMARTBOARD
N.I.C.
SMARTBOARD N.I.C. SMARTBOARD N.I.C.
9' - 9 5/8"
SUNSHADE-2
11' - 4"10' - 0"
E Q
E Q
BUILT-IN
LAPTOP TABLE
(RE: A-623)
A-101 A-102 A-103 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-103
SECTOR 3
FIRST FLOOR
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-103
1 SECTOR 3 - FIRST FLOOR PLAN
0' 4' 8' 16'2' 5°
N
KEY PLAN
NOTE:
1. REFER TO SHEET G-02 FOR GENERAL NOTES.
2. ALL COLUMN COVERS ARE TO BE 12" DIAMETER UNLESS OTHERWISE NOTED
3. REFER TO A-120 FOR CONTROL JOINT LAYOUT FOR EXPOSED INTERIOR
CONCRETE SLABS.
4. REFER TO SHEET A-121 FOR SHELVING LEGEND #
5. COLUMN COVERS TO BE 12" UNLESS NOTED OTHERWISE.
DN
A-110 A-111
AA
CC
J
P
Q
R
N
A-400
A-611
S
EE
FF
BB
HH
L
M
GG
DD
A-512
A-512
A-514
A-512
A-512
A-516
K
A-519
A-510
A-513
ROOF LADDER
A-511
A-512
A-514
A-513
A-513
A-711
A-520
OPP.
A-711
A-711
SIM
/4
5" 11' - 3 7/8" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 11 3/8" 7 1/2"
/4
/8 "5
/8
/4
27' - 1 7/8"30' - 5 1/8"30' - 0"11"41' - 11"22' - 11"
A-711
MECHANICAL DUCT
V
W
U
/4
62' - 5 3/4"
/4
A-721
8" 62' - 8" 8"
STEEL BOX BEAM TRUSSES
RE: STRUCTURAL
PRIME & PAINT PT-1 (TYP.)
S
S
A-301
A-712
R
G.5
M.5
A-611
A-514
A-516
A-519
A-515
MECH.
SCREEN WALL
A-513
A-515
A-513
A-514
A -111
A -111
A -110
A -110
23' - 7"
/4
A-710
A-831
A-710
OPP.
A-710
OPP.
A-710
A-520
COLUMN
COVER
STEEL GRATING
RE: A-622
GUARDRAIL
A-519
A-301
L.5
COLUMN
COVER
COLUMN
COVER
COLUMN
COVER
N.5
N.2
OPEN TO
BELOW
STEEL GRATING
RE: A-622
A
A-810 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-110
SECTOR 2
SECOND FLOOR
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
0' 4' 8' 16'2' 5°
N
KEY PLAN
1/8" = 1'-0"A-110
1 SECTOR 2 - SECOND FLOOR PLAN
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
1. COLUMN COVERS TO BE 12" UNLESS NOTED
FD
FD
FACILITY MAINT.
WOMENS
RESTROOM
MENS
RESTROOM
SECTION MDAY
MORTARS
CLASSROOM
CLASSROOM
CLASSROOM
SECTION S4
SUPPLY
STAIRS
SECTION S6
COMMUNITCATIONS
TELECOM
LIBRARY /
COMPUTER
SECTION S3
PLANS
OFFICES HQ
SECTION MDAY
MEDICAL
R
G.5
M.5
S.5
HALLWAY
HALLWAY
A-401
HALLWAY
OFFICE AS3
OFFICE AS3
OFFICE S4
OFFICE S1
OFFICE S3
OFFICE BN CSM
OFFICE XO
OFFICE BNCDR
OFFICE S6
S1 PS NCO
OFFICE
MEDICAL
EXAM ROOM
EXAM ROOM
SECTION MDAY
FIRE
OFFICE S4
OFFICE S4
SENIOR SUPPLY
OFFICE S2
OFFICE
CHAPLAIN
OFFICE OPS
NCOIC
OFFICE AS3
OFFICE AS3
234a
ASSISTANT
OPS
NCO
SECTION S1
PERSONNEL
SECTION MDAY
SCOUTS/SNIPERS
NURSING
A/V STORAGE
A-400
A-600
A-602
A-601
A-400
B
A
A
A
A
A
A
A
B
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A210
A
A
A
A
A-610
A-610
S
A-612
A-610
PRINTER
42' - 11" 26' - 7" 6' - 0" 35' - 7 1/8" 9' - 3 7/8" 21' - 5 1/8" 5' - 3" 7' - 0" 11' - 0" 12' - 3" 4' - 6"
8 3/8"
4' - 8 5/8" 11' - 7" 10' - 9" 10' - 8"
/4
/4
14' - 4" 10' - 2" 10' - 0" 10' - 0" 10' - 0" 10' - 6" 10' - 6" 10' - 6" 10' - 6" 17' - 2"
17' - 11 1/8" 12' - 0" 8' - 6" 27' - 11 3/8" 14' - 0 5/8" 22' - 7" 11' - 6" 6' - 11" 13' - 6" 15' - 0 1/2" 12' - 7 1/2" 11' - 1"
1' /2
/2
/2
1' /8
/2
/8
/2
1"
/8
/8
1"
25' - 8" 15' - 4" 13' - 6" 7' - 6" 7' - 6 1/2" 20' - 8"
8' - 0"
8' - 0" 8' - 0"
HALLWAY
HALLWAY
A-516
A-516
A
A
A
A-516
S C
T
K
R
Y
X
Y
Y
4' - 0" 4' - 0" 4' - 0" 8' - 0"
8' - 0" 4' - 0"
4' - 0" 4' - 0"
Y
BELOW ABOVE
ABOVE
Y
A-518
A-517
A-610
A-518
A-519
A-517
A-516
A-518
A-518
13' - 3 1/4" 8' - 0" 27' - 11 3/4"
A
A
A
A
A
A
A
A
A
- 11 1
A -11 1
A
- 11 0
A -11 0
A
1A
1A
1A
1 8A
1A 12
8B
8B
1A
1A
12A
1A 1A
10B
10 10
10 10
1A
1A
8 8E
1010101010101010
1A10
1A
10 10
1J 1J
1A
2E
1A
1A
1A
1A
1A
1A
1A
10 10
1A
1A
1A
10 10 10 10 10 10 10 10
1A
13' - 4" 21' - 7"
25' - 1 3/4"
/2
/8
/4
/8
A-518
A-400
SMARTBOARD
N.I.C.
8B
42' - 8 3/4" 65' - 10 3/4" 11' - 9 1/2" 3' - 4" 12' - 0" 2' - 8" 8' - 0" 2' - 8" 12' - 0" 3' - 11 7/8" 41' - 2"
ROOF LEADERS
RE: PLUMBING
ROOF LEADERS
RE: PLUMBING
1A
/4
/4
1'
GUARD RAIL
WB
WB
WBWB
A-710
A-710
SIMSIM.
BA
H
10B
ROOF
ACCESS
LADDER
A-730
A-730
A-710
OPP.
A-710
A-710
A-711
A-711
A-711
A-711
A-710
A-710
A-710
A-520
A-520
A-520
A-711
A-711
A-711
A-710
A-711
SIM
SIM
A-711
A-730
F.E.C.
F.E.C.
F.E.C.
5' - 0"
1' /8
/8
/8
20' - 6" 3' - 9 1/2" 16' - 8 1/2" 32' - 1 1/2" 20' - 9" 26' - 0" 19' - 11 3/4" 32' - 1 3/4" 9' - 5 7/8" 36' - 8 3/4"
218' - 2 3/4"
1' /4
/4
/8
/8
2' - 10 1/2"
6' - 0 3/8" 8" 88' - 0" 8"
ROOF LEADERS
RE: PLUMBING
ROOF LEADERS
RE: PLUMBING
ROOF LEADERS
RE: PLUMBING
12" COLUMN
COVER
COLUMN
COVER
12" COLUMN
COVER
A-711
GUARDRAIL
COL. COVER
WB
WB
SUNSHADE-2
(BELOW)
COL. COVER
A-711
A-711
A-711 20 3
A-516
ABOVE
L.5
COL. COVER
OPEN TO BELOW
N.5
N.2
ROOF CANOPY
SLOPED 1/4" PER
FOOT. APPLY FULLY
ADHERED TPO
ROOFING MEMBRANE
(COLOR: CHARCOAL)
A-741
1A
2' - 3"
A-610
A-610
SMARTBOARD
N.I.C.
SMARTBOARD
N.I.C.
SMARTBOARD
N.I.C.
A
A-711
A-517
1J
NOTE: COORDINATE
LOCATION OF WIRE
DUCT FOR ANTENNA
CONDUIT RUNS WITH
OWNER PRIOR TO
INSTALLATION
(RE: 7/A-620)
9A 3 SIDES OF
COL.
9A
A
A-810
A-110 A-111 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-111
SECTOR 3
SECOND FLOOR
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-111
1 SECTOR 3 - SECOND FLOOR PLAN
0' 4' 8' 16'2' 5°
N
KEY PLAN
NOTE:
1. REFER TO SHEET G-02 FOR GENERAL NOTES.
2. ALL COLUMN COVERS ARE TO BE 12" DIAMETER
UNLESS OTHERWISE NOTED. REFER TO DETAILS
3. REFER TO SHEET A-121 FOR SHELVING LEGEND #
4. COLUMN COVERS TO BE 12" UNLESS NOTED
DN
11 14
AA
CC
J
P
Q
R
G.5
M.5
N
S.5
S
EE
F
F
BB
H H
L
M
G G
D D
K
L.5
N.5
N.2
20' - 0" 20' - 8" 20' - 0"
C.J. C.J.
C.J. C.J.
C.J. C.J.
C.J. C.J.
C.J. C.J.
C.J. C.J.
85°
85°
C.J.
C.J.
SLAB
DEPRESSION
C.J.
C.J.
C.J.
17' - 2 7/8"5' - 10 1/4"
95°
7' - 0"
85°
5' - 7" 16' - 10"
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
3'
- 0
C.J.
C.J.
GENERAL NOTES:
REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION ON THE CONCRETE
FLOOR SLABS
STAIN AND FINISH CONCRETE SLAB UP TO ISOLATION JOINT OF COLUMN WHERE
COLUMN COVERS OCCUR
ENSURE SAME LEVEL OF FINISH FOR EDGE TROWELING IN S.C.-2 (IF HAND
TROWELING OCCURS ADJACENT TO WALLS) AND FIELD TROWELING IN S.C.-1 (IF
POWER TROWELED). CONTRACTOR TO ENSURE LEVEL OF CRAFTSMANSHIP AND
FINISH TO THE SATISFACTION OF OWNER.
C.J.
C.J.
CONC.-3 (CONCRETE FINISH & DYE)
STANDARD DEPTH GRIND AND CREAM
PASTE POLISH WITH MIDNIGHT BLACK DYE
CONTROL JOINT
DECORATIVE JOINT
(NOTE: DECORATIVE JOINTS TO BE CUT IN
PLACE AFTER INITIAL NOMIAL 28 DAY
CURE PERIOD)
CONC.-2 (CONCRETE FINISH)
STANDARD DEPTH GRIND AND CREAM
PASTE POLISH (NO DYE)
FLOOR EMBLEM
(RE: 2/A-120)
CENTER FLOOR
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
D.J.
D.J.D.J.
D.J.
D.J.
D.J.
C.J.
D.J.
D.J.
C.J.
C.J.
D.J. C.J.
D.J.
D.J.
1 ' - 6
1' - 4"
1 ' - 6
C.J.
D.J.
6' - 11" 15' - 4 5/8"
6' - 7"
' - 0
1/
5' - 10"
EQ.
EQ.
6' - 2" 5' - 4"
4' - 6"
EQ.
EQ.1' - 6"
1'
1' - 6"
1 ' - 6
11' - 0 " 1 ' - 6
5' - 10 1/4" 7' - 0"
LOBBY
HALLWAY
AIR LOCK
AIR LOCK
GREAT HALL
ALCOVE
WOMENS
RESTROOM
MENS
RESTROOM
ALCOVE
HALLWAY
HALLWAY
HALLWAY
BREAK
STAIRS
10' - 0"
C.J.
4' - 0" 4' - 0"
USE OF S.C.-1 AND S.C.-2
IN DRILL HALL IN O.L.I.#7
USE OF S.C.-1 AND S.C.-2
IN DRILL HALL IN O.L.I.#7
USE OF S.C.-1 AND S.C.-2
IN DRILL HALL IN O.L.I.#7
DRILL HALL
D.J.
D.J.
D.J.
D.J.
D.J.
9' - 8"D.J.
C.J
' - 8
C.J.
STAIN CONCRETE - 2
"COLORADO" TEXT AND
CIRCLE IN THE C
COLOR = TAN/GOLD
TEXT BACKGROUND
COLOR = BLACK
LOGO ARTWORK TO BE
PROVIDED BY OWNER
PRIOR TO FABRICATION.
STRIPES AND "C"
COLOR = RED
STRIPES AND BACKGROUND
OF "C"
COLOR = WHITE
' - 0
PLAN NORTH
TOWARD AIR LOCK 102
MINUTE MAN
COLOR: GREY AND BLACK
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-120
CONTROL JOINT
LAYOUT
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/32" = 1'-0"A-120
1 SECTOR 2 & 3 CONTROL JOINT LAYOUT
1/2" = 1'-0"A-120
2 EMBLEM
5°
HOLLOW STEEL
COLUMN, RE:
STRUCT.
CAGE METAL WALL
CC
JJ
EE
FF
HH
GG
DD
KK
5A
5A 5A 5A 5A 5A
5A 5A 5A 5A
A-121
SIM
CAGE
171A
CAGE
171B
CAGE
171C
CAGE
171D
CAGE
171E
CAGE
171F
HALL
CAGE
172A
CAGE
172B
CAGE
172C
CAGE
172D
CAGE
172E
CAGE
172F
HALL
CAGE
173A
CAGE
173B
CAGE
173C
CAGE
173D
CAGE
173E
CAGE
173F
HALL
CAGE
174A
CAGE
174B
CAGE
174C
CAGE
174D
CAGE
174E
CAGE
174F
HALL
CAGE
175A
CAGE
175B
CAGE
175C
CAGE
175D
CAGE
175E
CAGE
175F
HALL
CC
DD
BB
EE
AA
FF
CC
DD
BB
EE
AA
FF
CC
DD
BB
EE
AA
FF
CC
DD
BB
EE
AA
FF
CC
DD
BB
EE
AA
FF
5 5 5 5 5
5 5 5 5 5
5A 5A 5A 5A 5A
5A
5A 5A 5A 5A5 5 5 5 55 5 5 5
5 5 5 5
5 5 5 5
5A 5A 5A 5A
5 5 5 5
5 5 5 5
5 5 5 5 5
17' - 2 3/4"5' - 9"5' - 9"14' - 4"5' - 9"5' - 9"14' - 4"5' - 9"5' - 9"14' - 4"5' - 9"5' - 9"14' - 5"5' - 9"
22' - 11"25' - 10"25' - 10"25' - 10"25' - 11"
9' - 8" 6' - 7" 9' - 8" 9' - 8" 6' - 6" 9' - 8" 9' - 8" 6' - 6" 9' - 8" 9' - 8" 6' - 6" 9' - 8" 9' - 2" 6' - 6" 7' - 4"
GG
GG
GG
GG
GG
NOTE: SEE SHELVING
LEGEND FOR SIZING
5A
5A ABOVE5A ABOVE5A ABOVE5A ABOVE5A ABOVE
CAGE WALL
METAL FRAME
TO MATCH
CAGE FINISH
110-0"
CAGE CEILING
EXTEND CAGE WALL
TO STRUCTURE AND
ATTACH AT WALL
TYPE 5A
5A
CC
JJ
EE
FF
HH
GG
DD
KK
Room
CAGE
171A
CAGE
171B
CAGE
171C
CAGE
171D
CAGE
171E
CAGE
171F
HALL
CAGE
172A
CAGE
172B
CAGE
172C
CAGE
172D
CAGE
172E
CAGE
172F
HALL
CAGE
173A
CAGE
173B
CAGE
173C
CAGE
173D
CAGE
173E
CAGE
173F
HALL
CAGE
174A
CAGE
174B
CAGE
174C
CAGE
174D
CAGE
174E
CAGE
174F
HALL
CAGE
175A
CAGE
175B
CAGE
175C
CAGE
175D
CAGE
175E
CAGE
175F
HALL
(TYP.)
10' - 0"
DOOR TYPE 10
WIRE MESH DOOR AT
STORAGE CAGE
3' - 0"
4' - 0"
DOOR TYPE 11
SLIDING WIRE MESH DOOR
AT STORAGE CAGE
24"x48"x84"
24"x72"x84"
24"x60"x84"
SHELVING LEGEND
24"x84"x84"
18"x72"x84"
24"x48" WORKBENCH
8 36"x72"x84"
36"x60"x84"7 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-121
SECTOR 1 -
METAL CAGE
DETAILED
FLOOR PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1 1/2" = 1'-0"A-121
3 INTERIOR METAL CAGE INTERSECT
1/8" = 1'-0"A-121
1 METAL CAGES - FIRST FLOOR PLAN
1 1/2" = 1'-0"A-121
4 METAL CAGE PARTITION TYPE
1/8" = 1'-0"A-121
2 METAL CAGES - REFLECTED CEILING PLAN
METAL CAGES - DOOR SCHEDULE
Door Number Type
Door Width
Door
Hardware CommentsHeight Thickness Material
171 AA 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
171 BB 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
171 CC 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
171 DD 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
171 EE 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
171 FF 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
171 GG 10 (2) 3' - 0" (2) 7' - 0" 1 3/4" WIRE 113
172 AA 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
172 BB 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
172 CC 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
172 DD 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
172 EE 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
172 FF 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
172 GG 10 (2) 3' - 0" (2) 7' - 0" 1 3/4" WIRE 113
173 AA 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
173 BB 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
173 CC 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
173 DD 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
173 EE 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
173 FF 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
173 GG 10 (2) 3' - 0" (2) 7' - 0" 1 3/4" WIRE 113
174 AA 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
174 BB 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
174 CC 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
174 DD 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
174 EE 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
174 FF 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
174 GG 10 (2) 3' - 0" (2) 7' - 0" 1 3/4" WIRE 113
175 AA 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
175 BB 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
175 CC 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
175 DD 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
175 EE 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
175 FF 11 4' - 0" 7' - 0" 1 3/4" WIRE SLIDING CAGE DOOR
175 GG 10 (2) 3' - 0" (2) 7' - 0" 1 3/4" WIRE 113
1/2" = 1'-0"A-121
5 CAGE DOOR SCHEDULE
1. ALL SHELVING IS TO BE ANCHORED TO THE
CONCRETE FLOOR SLAB PER MANUF. STANDARD
DETAIL
2. CONTRACTOR TO FIELD VERIFY FINAL LOCATION
OF SHELVING UNITS WITH OWNER PRIOR TO
INSTALLATION
3. CONTRACTOR TO FIELD VERIFY SHELVING
DIMENSIONS W/ ACTUAL LOCATIONS PRIOR TO
ORDERING SHELVING
4. REFER TO SHELVING SPECIFICATION FOR MORE
INFORMATION.
PP
Q
NN
LL
MM
LOCKERS
LOCKERS
LOCKERS
HALLWAY
A
/8
181 LOCKERS131 LOCKERS
33 LOCKERS
6' - 3 1/2" 6' - 4"
/8
4' - 10" 5' - 6 1/4" 5' - 6"
1H
/4
B
A
B
A
A
NOTE:
REFER TO A-101 FOR ADDITIONAL DETAILED
FLOOR PLAN INFORMATION
5' - 2" 3' - 9"
LOCKER
ALL WELDED
CONSTRUTCTION
1' - 3" 1' - 3"
DIAMOND VENTS
FRONT AND SIDE
COAT ROD
SHELF
1'
BASE
2' - 6"
1' 1/
1/
2' - 6"
1'
2x2 ANGLE BEYOND
2"x2"x1/8"
ANGLE (TYP.)
BUTCHER BLOCK
FASTENED FROM
UNDERSIDE. FINISH
WITH CLEAR
POLYURETHANE
SEALER. PROVIDE 1/2" DRILLED BOLT
HOLES FOR CABLE LOCKS.
FRONT TOP SIDE
1' - 2" 2' - 0"
1/
1' 1/
2"x2"x1/8"
ANGLE (TYP.)
2"x2"x1/8"
ANGLE (TYP.)
BUTCHER BLOCK FASTENED
FROM UNDERSIDE. FINISH WITH
CLEAR POLYURETHANE
SEALER.
LOCKER
RE: 2/A-122
1' 1/
CLEAR
2' - 2"
2x1/8" FLAT
STOCK
PRIME STEEL ANGLES
WITH RUST RESISTANT
PAINT (TYP.) P-5
1/8" RADIUS @
FRONT TO EDGE
1/8" RADIUS @
FRONT TO EDGE
BOLT TO FLOOR WITH
EXPANSION BOLT
EVERY 4 LOCKERS
1/2" DRILLED HOLES
(VERIFY WITH LOCKER MANUF.
STANDARD LAYOUT.)
PROVIDE 1/2" DRILLED
BOLT HOLES FOR GANGING
AS REQD. (TYP.)
FINISHED LENGTH
9 1/4"
FINISHED LENGTH
1' - 7"
PROVIDE FACTORY CRIMPED
2" LOOP WITH PLATIC SLEEVE
CABLE A CABLE B CONTRACTOR TO FIELD
INSTALL THROUGH 1/2"
DIAMETER PRE-DRILLED HOLE
EACH ASSEMBLY SHALL CONSIST OF ONE CABLE A AND
ONE CABLE B. REFER TO ASI #67 NARRATIVE FOR
SPECIFICATIONS AND LISTING OF REQUIRED COMPONENTS
CONTRACTOR TO FIELD
INSTALL THROUGH 1/2"
DIAMETER PRE-DRILLED HOLE
PAD LOCK BY
COARNG (N.I.C.)
CABLE PLAN
CONTICO SHOWN
DASHED (N.I.C.)
20 1/4"H x 23"W x 37"D
CONTICO SHOWN
DASHED (N.I.C.)
20 1/4"H x 23"W x 37"D
1"
1" nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-122
TA-50 LOCKER
LAYOUT AND
DETAILS
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-122
1 TA-50 LOCKERS - FIRST FLOOR PLAN
1" = 1'-0"A-122
2 TA-50 LOCKER ELEVATION
1 1/2" = 1'-0"A-122
3 TA-50 LOCKER BASE DETAILS
A-500
A-501
1 2 9 11
A
C
J
P
Q
R
G.5
M.5
N
S.5
A-501
A-501
A-501
A-500
A-500
A-500
A-501
A-501
A-501
A-502
A-502
A-502
172 174
176 177
118 121
133143
139 131
163 162
110108
137138
148150 149
119 120
147 140
A -2
A -2
A -2
A -2
A -2
A -2
A -2
A -2
S
4 6
3 5 7 10 12
E
F
B
H
L
M
G
D
K
109 117
175173171
L.5
N.5
N.2
A-501
AA
CC
JJ
R
G.5
M.5
NN
S.5
A-400
A-400
A-401
A-501
A-501
A-501
A-400
A-500
A-501
A-501
A-501
A-502
A-502
A-502
234 219
223225 224 222
214 215
238 237241
A -2 1 1
A -2
A -2 1 1
A -2
S
EE
FF
BB
HH
LL
MM
GG
DD
KK
L.5
N.5
N.2
A-810 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-200
COMPOSITE
RELFLECTED
CEILING PLANS
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/64" = 1'-0"A-200
1 COMPOSITE - FIRST FLOOR REFLECTED CEILING PLAN
3/64" = 1'-0"A-200
2 COMPOSITE - SECOND FLOOR REFLECTED CEILING PLAN
0' 10' 20' 40' 80'
0' 10' 20' 40' 80'
5°
N
5°
N
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
SEE WALL TYPES AND ENLARGED PLANS FOR LOCATIONS OF WALLS
THAT TERMINATE AT THE UNDERSIDE OF CEILING GRID. BATT INSULATION
IS TO BE PROVIDED ABOVE CEILING GRID AT THESE LOCATIONS A MIN.
OF 2 FT ON EITHER SIDE OF THE WALL.
REFER TO G-03 (CODE PLAN) AND A-910 (WALL TYPES) FOR
INFORMATION ON RATED WALLS
AA
CC
JJ
PP
Q
NN
161 160
A -2
A -2
A -2
A -2
8' - 8"
8' - 8"
9' - 0"
9' - 0"
9' - 0"
8' - 6"
OPEN TO STRUCTURE
OPEN TO STRUCTURE
OPEN TO STRUCTURE
OPEN TO STRUCTURE
OPEN TO STRUCTURE
171 173 174 175
EE
FF
BB
HH
LL
MM
GG
DD
A-510
A-511
A-511
A-512
9' - 0"
A-510
A-511
KK
A-510
A-510
A-511
179' - 3"
1"
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
SOFFIT METAL PANELS
SMP - 2
9' - 0" 9' - 0"
A-741
MATCHLINE
PERFORRATED SOFFIT
METAL PANEL EVENLY
SPACED (TYP.)
A-730
S
S
S
SSSSSSSS
S S S S
SSSSS
S
S
ZEE-VENT
(RE:9/A-730)
ZEE-VENT
(RE:9/A-730)
A-201 A-202 A-203
S
2'-0" x 4'-0" RECESSED
FLUORESCENT LIGHT
FIXTURE RE: ELEC. SOLAR TUBES
CAN LIGHT FIXTURE
RE: ELEC.
1'-0" x 4'-0" PENDANDT
LIGHT FIXTURE RE: ELEC.
2'-0" x 2'-0" ACT
RCP LEGEND
1 HR RATED WALL
ASSEMBLY
RETURN AIR
RE: MECH.
SUPPLY AIR
RE: MECH.
METAL SOFFIT
PANELS
EPIC METAL
DECK
PERFORATED
ACOUSTICAL METAL
CEILING
B.A.F.
CEILING FAN
ROOF HATCH
RECESSED LINEAR
FLUORESCENT LIGHT
RE: ELEC.
FLUORESCENT LIGHT
RE: ELEC.
CONTINUOUS GRID,
RE:A-910 PARTITION
TYPE 10
2'-0"x2'-0" VINYL
FACED ACT
PERFORATED METAL
SOFFIT PANEL
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-201
SECTOR 1
FIRST FLOOR
RELFECTED
CEILING PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-201
1 SECTOR 1 - FIRST FLOOR REFLECTED CEILING PLAN
0' 4' 8' 16'2' 5°
N
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
SEE WALL TYPES AND ENLARGED PLANS FOR LOCATIONS OF WALLS THAT
TERMINATE AT THE UNDERSIDE OF CEILING GRID. BATT INSULATION IS TO
BE PROVIDED ABOVE CEILING GRID AT THESE LOCATIONS A MIN. OF 2 FT
ON EITHER SIDE OF THE WALL.
ALL SUSPENDED CEILINGS MUST BE BRACED TO MEET SEISMIC DESIGN
CRITERIA (RE: SPEC)
REFER TO A-301 & A-302 FOR LOCATIONS OF SOLAR TUBES (TYP.)
REFER TO A-121 FOR CAGE LID LAYOUT IN ROOMS 171, 172, 173, 174, 175.
AA
CC
J
P
Q
RR
G.5
M.5
N
161 160
A -2
A -2
A -2
A -2
A -2
A -2
A -2
A -2
8' - 6"
9' - 0"
9' - 0"
9' - 8"
OPEN TO
STRUCTURE
S
9' - 0"
9' - 0"
EE
FF
BB
HH
LL
MM
GG
DD
OPEN TO STRUCTURE
(RE: A-210)
OPEN TO STRUCTURE
A-512
A-512
A-512
A-514
A-512
A-514
A-519
A-515
KK
A-512
A-513
A-514
A-515
A-513
A-513
A-513
A-514
9' - 0"
10' - 0"
PERFORATED
ACOUSTICAL
METAL CEILING
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
MECH. DUCT
RE: MECH.
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
OPEN TO STRUCTURE
A-520
A-740
A-740
A-520
A-730
9' - 0"
OPENING FOR
HOOD
A-519
MATCHLINE
MATCHLINE
A-740
A-740
A-740
L.5
BREAK METAL
N.5
N.2
12' - 2 1/2"
10' - 0"
PERFORATED
ACOUSTICAL METAL
CEILING
A-620
PERFORATED
ACOUSTICAL METAL
CEILING
S
S
S
S
S
S
S
PERFORATE
D
METAL CEIL
ING
ZEE-VENT
(RE:9/A-730)
ZEE-VENT
(RE:9/A-730)
A-201 A-202 A-203
S
2'-0" x 4'-0" RECESSED
FLUORESCENT LIGHT
FIXTURE RE: ELEC.
SOLAR TUBES
CAN LIGHT FIXTURE
RE: ELEC.
1'-0" x 4'-0" PENDANDT
LIGHT FIXTURE RE: ELEC.
2'-0" x 2'-0" ACT
RCP LEGEND
1 HR RATED WALL
ASSEMBLY
RETURN AIR
RE: MECH.
SUPPLY AIR
RE: MECH.
METAL SOFFIT
PANELS
EPIC METAL
DECK
2' X 4' PERFORATE
ACOUSTICAL METAL
CEILING
B.A.F.
CEILING FAN
ROOF HATCH
RECESSED LINEAR
FLUORESCENT LIGHT
RE: ELEC.
FLUORESCENT LIGHT
RE: ELEC.
CONTINUOUS GRID,
RE: A-910 PARTITION
TYPE 10
2'-0" x 2'-0" VINYL
FACED ACT
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-202
SECTOR 2
FIRST FLOOR
RELFECTED
CEILING PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-202
1 SECTOR 2 - FIRST FLOOR REFLECTED CEILING PLAN
5°
N
0' 4' 8' 16'2'
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
SEE WALL TYPES AND ENLARGED PLANS FOR LOCATIONS OF WALLS
THAT TERMINATE AT THE UNDERSIDE OF CEILING GRID. BATT
INSULATION IS TO BE PROVIDED ABOVE CEILING GRID AT THESE
LOCATIONS A MIN. OF 2 FT ON EITHER SIDE OF THE WALL.
ALL SUSPENDED CEILINGS MUST BE BRACED TO MEET SEISMIC DESIGN
CRITERIA (RE: SPEC)
R
G.5 G.5
M.5 M.5
S.5
110108
137138
119 120
A -2
A -2
A -2
A -2
9' - 0"
9' - 6"
10' - 0"
9' - 0"
10' - 0"
10' - 0"
9' - 6"
10' - 0"
OPEN TO ABOVE
9' - 0"
S
10' - 0"
9' - 0"
9' - 6"
10' - 0" 9' - 0"10' - 0"
9' - 0"
12' - 7 1/4"
A-516
A-516
A-518
A-517
A-517
A-516
A-518
A-517
9' - 6"
9' - 6"9' - 6"
A-518
9' - 0"
A-519
A-516
A-518
A-517
A-518
A-519
9' - 0"
10' - 0"
9' - 0"
9' - 0" 9' - 0" 10' - 0"
10' - 0"
PERFORATED
METAL CEILING
SMP-2
7' - 1 1/4"
A-730
5' - 0 3/4" 3' - 8 1/2"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
EQ. EQ. 17' - 0" EQ. EQ. 17' - 0" EQ. EQ.
7' - 0 1/2"
17' - 0" 4' - 10" 17' - 0"
2' - 9 1/2"
A-740
A-740
A-740
A-740
A-740
A-740
SIM
A-740
A-740
A-740
ROOF OVERHANG
ABOVE
ROOF
OVERHANG
ABOVE
A-740
A-519
A-520
A-520
A-520
A-730
A-741
A-741
A-740
EQ. EQ.
E Q
E Q
9' - 9" 8' - 0" 5' - 0" 5' - 0" 8' - 0" 5' - 0" 5' - 0" 8' - 0" 5' - 0" 5' - 0"
EQ. 5' - 0" 5' - 0" EQ.
E Q
E Q
EQ. 5' - 0" 5' - 0" EQ.
2' - 2" 5' - 0" 5' - 0"
/2
A-711
SIM
A-740
A-740
MATCHLINE
L.5 L.5
PERFORRATED SOFFIT
METAL PANEL (TYP.)
A-741
A-731
SIM 3
A-741
SIM
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
OPEN TO
STRUCTURE
N.5 N.5
N.2 N.2
A-741
A-741
A-517
E Q
E Q
EQ. EQ.
5' - 0" 5' - 0" 2' - 2"
" 2
EQ. EQ.
9' - 6"
E Q
E Q
A-741
A-741
S O F F
IT
S O F F
IT
8' - 10"
BLKHD
PERFORATED
METAL CEILING
E Q
E Q
EQ. EQ.
A-741
E Q
E Q
EQ. EQ.
B L K H D
EQ. EQ.
E Q . E Q
MECH. SHAFT TO
SECOND FLOOR
A-201 A-202 A-203
S
2'-0" x 4'-0" RECESSED
FLUORESCENT LIGHT
FIXTURE RE: ELEC. SOLAR TUBES
CAN LIGHT FIXTURE
RE: ELEC.
1'-0" x 4'-0" PENDANDT
LIGHT FIXTURE RE: ELEC.
2'-0" x 2'-0" ACT
RCP LEGEND
1 HR RATED WALL
ASSEMBLY
RETURN AIR
RE: MECH.
SUPPLY AIR
RE: MECH.
METAL SOFFIT
PANELS
EPIC METAL
DECK
PERFORATED
ACOUSTICAL METAL
CEILING
B.A.F.
CEILING FAN
ROOF HATCH
RECESSED LINEAR
FLUORESCENT LIGHT
RE: ELEC.
FLUORESCENT LIGHT
RE: ELEC.
CONTINUOUS GRID,
RE:A-910 PARTITION
TYPE 10
2'-0"x2'-0" VINYL
FACED ACT
PERFORATED METAL
SOFFIT PANEL
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-203
SECTOR 3
FIRST FLOOR
RELFECTED
CEILING PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-203
1 SECTOR 3 - FIRST FLOOR REFLECTED CEILING PLAN
5°
N
0' 4' 8' 16'2'
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
SEE WALL TYPES AND ENLARGED PLANS FOR LOCATIONS OF WALLS
THAT TERMINATE AT THE UNDERSIDE OF CEILING GRID. BATT INSULATION
IS TO BE PROVIDED ABOVE CEILING GRID AT THESE LOCATIONS A MIN.
OF 2 FT ON EITHER SIDE OF THE WALL.
ALL SUSPENDED CEILINGS MUST BE BRACED TO MEET SEISMIC DESIGN
CRITERIA (RE: SPEC)
RR
G.5
M.5
A -2
A -2
A -2
A -2
SS
9' - 0"
A-514
A-519
A-515
A-515
A-514
9' - 0"
9' - 0"
A-740
A-740
A-519
A-722
A-520
1 ' - 9 /8
1' - 6"
' - 11 5
"1 ' - 6
S
1-1/2" PER
FOOT SLOPE
1/2" PER
FOOT SLOPE
1/2" PER
FOOT
SLOPE
CEILING
SMP-1
/8
PERFORATED
METAL SOFFIT
PANEL VENT
EVENLY SPACED
(TYP.)
L.5
1' - 11"
1' - 6"
N.5
N.2
A-722
10' - 11 3/4"
8' - 5"
1/2" PER
FOOT
SLOPE
CEILING
EQ. EQ.
A-210 A-211
AA
CC
JJ
NN
EE
FF
BB
HH
LL
MM
GG
DD
EPIC DECK
A-512
A-514
A-512
B.A.F.
B.A.F.
KK
A-512
A-513
DUCT
RE: MECH.
ROOF DRAIN LEADERS
MAIN SPRINKLER LINE
SPRINKLER LINES
(TYP.)LIGHT FIXTURES AT
BOTTOM OF TRUSS
(SHOWN DASHED)
GAS UNIT HEATER RE: MECH
BOTTOM OF HEATER TO BE
MOUNTED WITH BOTTOM OF
BOX TRUSSES MINIMUM
SPRINKLER BRANCH LINES (TYP.)
GAS LINE
TO SUPPLY
UNIT HEATER
S
2'-0" x 4'-0" RECESSED
FLUORESCENT LIGHT
FIXTURE RE: ELEC. SOLAR TUBES
CAN LIGHT FIXTURE
RE: ELEC.
1'-0" x 4'-0" PENDANDT
LIGHT FIXTURE RE: ELEC.
2'-0" x 2'-0" ACT
RCP LEGEND
1 HR RATED WALL
ASSEMBLY
RETURN AIR
RE: MECH.
SUPPLY AIR
RE: MECH.
METAL SOFFIT
PANELS
EPIC METAL
DECK
PERFORATED
ACOUSTICAL METAL
CEILING
B.A.F.
CEILING FAN
ROOF HATCH
RECESSED LINEAR
FLUORESCENT LIGHT
RE: ELEC.
FLUORESCENT LIGHT
RE: ELEC.
CONTINUOUS GRID,
RE:A-910 PARTITION
TYPE 10
2'-0"x2'-0" VINYL
FACED ACT
PERFORATED METAL
SOFFIT PANEL
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-210
SECTOR 2
SECOND FLOOR
REFLECTED
CEILING PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-210
1 SECTOR 2 - SECOND FLOOR REFLECTED CEILING PLAN
5°
N
0' 4' 8' 16'2'
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
SEE WALL TYPES AND ENLARGED PLANS FOR LOCATIONS OF WALLS
THAT TERMINATE AT THE UNDERSIDE OF CEILING GRID. BATT INSULATION
IS TO BE PROVIDED ABOVE CEILING GRID AT THESE LOCATIONS A MIN.
OF 2 FT ON EITHER SIDE OF THE WALL.
ALL SUSPENDED CEILINGS MUST BE BRACED TO MEET SEISMIC DESIGN
CRITERIA (RE: SPEC)
PAINT EPIC DECK, ALL EXPOSED STEEL STRUCTURE, EXPOSED ROOF
DRAIN LEADERS AND EXPOSED FIRE SPRINKLER PIPES PT-1
R
G.5 G.5
M.5 M.5
S.5
231 230
243244
223225 224 222
214 215
239 238 237
A -2
A -2
A -2
A -2
9' - 0"
9' - 0" 10' - 0"
10' - 0" 10' - 0"
9' - 0"
9' - 0"
SKYLIGHT
S
9' - 0"
9' - 4"
9' - 0" 9' - 0" 9' - 0"
A-516
A-516
A-516
A-518
A-517
A-516
A-518
A-517
A-518
A-516
A-518
A-517
A-518
9' - 0"
9' - 0" 9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
10' - 0" 10' - 0" 10' - 0"
9' - 0"
10' - 0"
A-740
9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"
A-740
A-740
A-740
A-740
A-740
A-740
A-740
A-740
A-722
A-722
A-520
A-520
A-520
/8
1'
A-741
A-722
A-722
S
S
A-516
A-517
9' - 0 1/4"
10' - 0"
PERFORRATED METAL
SOFFIT PANEL VENT
EVENLY SPACED (TYP.)
PERFORRATED
SOFFIT METAL
PANEL VENT (TYP.)
L.5 L.5
SUNSHADE (TYPE 2)
HORIZONTAL ORIENTATION
N.5 N.5
N.2 N.2
SUNSHADE (TYPE 2)
VERTICAL ORIENTATION
2' - 9 5/8"
SOFFIT METAL PANEL
(SMP-1)
9' - 2"
A-740
SIM.
A-211
10' - 3 3/4"
A-740
TYP.
8' - 5"
1/2" PER
FOOT
SLOPE
CEILING
1/2" PER
FOOT
SLOPE
CEILING
SMP-1
SOFFIT METAL
PANEL SMP-1
9' - 4 1/4"
11' - 2 3/4"
9' - 8 1/2"
A-741
A-741EQ. EQ.
E Q
E Q
EQ. EQ.
E Q
E Q
EQ. EQ.
E Q
E Q
EQ EQ EQ EQ
EQ EQ
EQ EQ 2' - 0" EQ.EQ. 2' - 0"
SUNSHADE (TYPE 2)
VERTICAL ORIENTATION
A-210 A-211
S
2'-0" x 4'-0" RECESSED
FLUORESCENT LIGHT
FIXTURE RE: ELEC. SOLAR TUBES
CAN LIGHT FIXTURE
RE: ELEC.
1'-0" x 4'-0" PENDANDT
LIGHT FIXTURE RE: ELEC.
2'-0" x 2'-0" ACT
RCP LEGEND
1 HR RATED WALL
ASSEMBLY
RETURN AIR
RE: MECH.
SUPPLY AIR
RE: MECH.
METAL SOFFIT
PANELS
EPIC METAL
DECK
PERFORATED
ACOUSTICAL METAL
CEILING
B.A.F.
CEILING FAN
ROOF HATCH
RECESSED LINEAR
FLUORESCENT LIGHT
RE: ELEC.
FLUORESCENT LIGHT
RE: ELEC.
CONTINUOUS GRID,
RE:A-910 PARTITION
TYPE 10
2'-0"x2'-0" VINYL
FACED ACT
PERFORATED METAL
SOFFIT PANEL
A-51913
A-740
A-723
A-723
A-723
N.2
LINEAR LIGHTING FIXTURES
ATTACHED TO THE BOTTOM
ALUMINUM RAFTERS
(CENTER UNDER 3"X4"
ALUMINUM PURLINS)
TRANSLUCENT
POLYCARBONATE
SKYLIGHT PANELS (TYP)
DAYLIGHT
SENSOR (DS)
(DS)
EQ. 24' - 6" EQ.
LINEAR LIGHTING FIXTURES
ATTACHED TO THE BOTTOM
ALUMINUM RAFTERS
(CENTER UNDER 3"X4"
ALUMINUM PURLINS)
3"X7" ALUMINUM RAFTERS
EMPTY FIXTURE HOUSING WITH
ALUMINUM COVER TO MATCH
HEIGHT/WIDTH AND FINISH OF
LIGHT FIXTURE (SHOWN
SHADED, TYP. AT ENDS)
NOTE:
REFER TO ELECTRICAL DRAWINGS FOR MORE
INFORMATION ON LIGHTING FIXTURE TYPE AND
DAYLIGHT SENSORS
(DS)
EMPTY FIXTURE HOUSING WITH
ALUMINUM COVER TO MATCH
HEIGHT/WIDTH AND FINISH OF
LIGHT FIXTURE (SHOWN
SHADED, TYP. AT ENDS)
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-211
SECTOR 3
SECOND FLOOR
RELFECTED
CEILING PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
1/8" = 1'-0"A-211
1 SECTOR 3 - SECOND FLOOR REFLECTED CEILING PLAN
5°
N
0' 4' 8' 16'2'
NOTE:
REFER TO SHEET G-02 FOR GENERAL NOTES.
SEE WALL TYPES AND ENLARGED PLANS FOR LOCATIONS OF WALLS
THAT TERMINATE AT THE UNDERSIDE OF CEILING GRID. BATT
INSULATION IS TO BE PROVIDED ABOVE CEILING GRID AT THESE
LOCATIONS A MIN. OF 2 FT ON EITHER SIDE OF THE WALL.
ALL SUSPENDED CEILINGS MUST BE BRACED TO MEET SEISMIC DESIGN
CRITERIA (RE: SPEC)
REFER TO A-301 & A-302 FOR LOCATIONS OF SOLAR TUBES (TYP.)
1/4" = 1'-0"A-211
3 ENLARGED SKYLIGHT RCP
A-500
A-501
11 14
AA
CC
J
P
Q
R
G.5
M.5
N
S.5
A-401
A-401
A-400
A-400
A-401
A-501
A-501
A-501
A-400
A-500
A-500
A-500
A-501
A-501
A-501
A-502
A-502
A-502
A -3
A -3
A -3
A -3
S
E
F
BB
H
L
M
G
DD
K
L.5
N.5
N.2
RM 234
SECTIONS S3 PLANS
(2ND FLOOR BELOW)
A-610
A-610
A-810
TPO ROOFING MEMBRANE ON
ROOF UNDERLAYMENT OVER
1/2" COVER BOARD ON 5"
RIGID INSULATION ON 1 1/2"
METAL DECKING
PLUMBING VENT
STACK
DRAWBAND
TPO ROOFING MEMBRANE
ON ROOF UNDERLAYMENT
OVER 1/2" COVER BOARD
ON 5" RIGID INSULATION ON
1 1/2" METAL DECKING
ROOF DRAIN
LEADER
STRAINER
DECK CLAMP
FLASHING
TPO ROOFING MEMBRANE ON
ROOF UNDERLAYMENT OVER
1/2" COVER BOARD ON 5"
RIGID INSULATION ON 1 1/2"
METAL DECKING
PRE-FABRICATED
ROOF HATCH UNITS
(RE: SECIFICATIONS)
STEEL ANGLES
(RE: STRUCTURAL)
WOOD BLOCKING
COUNTER-FLASHING W/
CONTINUOUS SEALANT
EXTEND TPO FLASHING
MEMBRANE OVER BUILT
UP CURB
WALL AS SCHEDULED
3" 3"
1'
1'
1'
ROOF LADDER
3" X 3/8" FLAT BAR STRINGS
3" X 3/8" FLAT BAR WALL
SUPPORTS @ 4'-0" O.C. 3" X 3/8" FLAT BAR FLOOR
SUPPORTS W/ 1/2" DIA.
EXPANSION ANCHORS IN
CONC. FLR.-TYP.
TPO ROOFING MEMBRANE ON
ROOF UNDERLAYMENT OVER
1/2" COVER BOARD ON 5"
RIGID INSULATION ON 1-1/2"
METAL DECKING
STEEL ANGLES
(RE: STRUCTURAL)
ROOF CURB AS REQ'D BY
MANUFACTURER
COUNTER-FLASHING W/
CONTINUOUS SEALANT
EXTEND ROOFING MEMBRANE
OVER BUILT UP CURB
A S R E Q 'D B Y M A N
UF
A C T
UR
E R
TPO ROOFING MEMBRANE ON
ROOF UNDERLAYMENT OVER
1/2" COVER BOARD ON 5"
RIGID INSULATION ON 1 1/2"
METAL DECKING
SOLAR TUBE DOME
(PROVIDE 48" EXTENSION WHERE
INDICATED ON ROOF PLAN)
EXTENSION TUBE
4x4x1/4 STEEL ANGLE FRAME
TYP. @ ALL LOCATIONS
(RE: STRUCTURAL)
COUNTER-FLASHING
TPO FLASHING
WRAP UP OVER METAL
CURB AND BLOCKING
FILL VOIDS WITH
BATT INSULATION
AROUND TUBE
ROOF LEGEND
SOLAR TUBE
SEE 6/A300 FOR
FRAMING REQUIREMENTS
ROOF DRAIN
(RE: PLUMGING)
OVERFLOW DRAIN,
MOUNT 2" HIGHER
THAN ROOF
DRAIN, TYP.
TAPERED
INSULATION
MIN. 1/4" PER
FOOT SLOPE
1/4" PER FT SLOPE
ROOF SLOPE
ROOF HATCH
PROVIDE 3' TYP.
WALKWAY WITH
ADDITIONAL LAYER
OF 60 MIL. TPO
S
TPO ROOFING MEMBRANE ON
ROOF UNDERLAYMENT OVER
1/2" COVER BOARD ON 5"
RIGID INSULATION ON 1 1/2"
METAL DECKING
4" ANTENNA CONDUIT FROM
ROOF DOWN TO SECTION S3
PLANS (RM 234). RE: ELECT. FOR
CONDUIT REQUIREMENTS
DRAWBAND
4"
1' -4 nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-300
COMPOSITE
ROOF PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/64" = 1'-0"A-300
1 COMPOSITE ROOF PLAN
0' 10' 20' 40' 80' 5°
N
1 1/2" = 1'-0"A-300
2 PLUMBING PENETRATION - TPO ROOFING
1 1/2" = 1'-0"A-300
3 ROOF DRAIN - TPO ROOFING
1" = 1'-0"A-300
5 ROOF HATCH
1 1/2" = 1'-0"A-300
4 RTU CURB DETAIL
1 1/2" = 1'-0"A-300
6 SOLAR TUBE PENETRATION
1 1/2" = 1'-0"A-300
7 CONDUIT PENETRATION - TPO ROOFING
NOTE
ALL TPO TO BE WHITE UNLESS NOTED OTHERWISE
REFER TO A-310 FOR INFORMATION ON THE BUILDING LIGHTNING PROTECT
SYSTEM
AA
CC
JJ
PP
RR
NN
A-400
SS
EE
FF
BB
HH
LL
MM
R.D.
O.D.
R.D.
O.D.
O.D.
R.D.
3 SIDED MECHANICAL
SCREEN ENCLOSURE.
SEE SPECIFICATIONS
FOR RTU. SCREEN.
COORDINATE HEIGHT
AND LENGTH WITH RTU.
ERU-5
(RE: MECH)
1/ P E R F T S L O P E
1/ P E R F T S L O P E
1/ P E R F T S L O P E
1/ P E R F T S L O P E
1/4" PER FT SLOPE
FULLY ADHERED TPO
ROOFING MEMBRANE
FULLY ADHERED TPO
ROOFING MEMBRANE
FULLY ADHERED TPO
ROOFING MEMBRANE
FULLY ADHERED TPO
ROOFING MEMBRANE
FULLY ADHERED TPO
ROOFING MEMBRANE
1/4" PER FT SLOPE
1/4" PER FT
SLOPE
FUTURE ROOF MOUNTED PHOTOVOLTAIC
ARRAY (SHOWN DASHED FOR
REFERENCE ONLY)
FUTURE ROOF MOUNTED
PHOTOVOLTAIC ARRAY (SHOWN
DASHED FOR REFERENCE ONLY)
GG
DD
ERU-7
(RE: MECH)
MUA-1
(RE: MECH)
MUA-2
(RE: MECH)
A-519
A-515
A-511
ERU-8
(RE: MECH)
S.T.S.T.
S.T.
O.D.
R.D.
O.D.
R.D.
O.D.
3 SIDED MECHANICAL
SCREEN ENCLOSURE.
SEE SPECIFICATIONS
FOR RTU. SCREEN.
COORDINATE HEIGHT
AND LENGTH WITH
RTU.
ROOF HATCH
SOLAR WALL
R.D.O.D.
16' - 0"12' - 6"16' - 0"20' - 0"24' - 0"20' - 0"20' - 0"24' - 0"24' - 0"9' - 6"
R.D.O.D.
KK
A-510
A-510
A-511
A-512
A-513
A-514
24' - 0"28' - 0"24' - 0"28' - 0"33' - 8 1/4"4' - 0"
40' - 0"40' - 0"28' - 0"40' - 0"25' - 7"4' - 0"
/2
/4
R.D.
A -3
A -3
A -3
A -3
A-511
A-512
A-510
A-511
A-512
A-513
A-512
A-514
A-513
A-512
A-401
A-720
A-720
OPP.
A-720
A-720
A-720
A-721
A-720
SIM
A-722
A-720
A-720
A-720
A-720
A-519
A-720
A-721
A-720
A-720
A-720
A-720
A-720
A-513
SOLAR WALL
O.D R.D.
A-720
OPP.
A-720
A-513
A-720
A-720
20' - 2 1/2"
A-401
A-301
R.D. O.D
O.D R.D.R.D. O.D
40' - 0"
EF-2
EF-4
REINFORCED MEMBRANE WALKWAY. SEE ROOF LEGEND
A-720
CONDENSER UNITS
FOR WALK IN
FRIDGE & FREEZER
RE: MECH
R.D.
O.D.
R.D.
O.D.
CONTRACTOR TO
FIELD COORDINATE
FINAL LOCATION OF
SOLAR TUBE PRIOR TO
INSTALLATION.
PROVIDE 48"
EXTENSION KIT.
1/ P E R F T S L O P E
ATTACH MECH. SCREEN
TO CMU VENEER.
CONCEAL ALL
FASTERNS FROM VIEW
TO THE SOUTH
4' - 0"
4' - 0"4' - 0"
3' - 5"
A-301 A-302
ROOF LEGEND
SOLAR TUBE
SEE 6/A300 FOR
FRAMING REQUIREMENTS
ROOF DRAIN
(RE: PLUMGING)
OVERFLOW DRAIN,
MOUNT 2" HIGHER
THAN ROOF
DRAIN, TYP.
TAPERED
INSULATION
MIN. 1/4" PER
FOOT SLOPE
1/4" PER FT SLOPE
ROOF SLOPE
ROOF HATCH
PROVIDE 3' TYP.
WALKWAY WITH
ADDITIONAL LAYER
OF 60 MIL. TPO
S
3' - 0" 3 1/2" 5' - 10 1/2" 5' - 10" 5' - 10" 5' - 10"
A-519
STEEL TUBE PRIME & PAINT
RE: STRUCTURAL (TYP) CMU WALL
A-300
SIM.
(TYP)
MP-4
CMU
VENEER
4" CONDUIT W/ SERVICE CAP
ATTACH STEEL
TUBE TO CMU WALL
119' - 4" nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-301
PARTIAL ROOF
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/32" = 1'-0"A-301
1 PARTIAL ROOF PLAN - 1
0' 4' 8' 16'2' 5°
N
3/8" = 1'-0"A-301
3 SCREEN WALL ELEVATION
NOTE:
1. USE TAPERED INSULATION AT ROOF EDGE TO MAINTAIN CONSTANT
ELEVATION AT THE VARIOUS LEVELS WHERE THERE IS NO PARAPET.
2. ALL TPO TO BE WHITE UNLESS NOTED OTHERWISE
3. ALL ROOF CRICKETS SHALL HAVE A MINIMUM SLOPE OF 1/4" PER
FOOT. SLOPE TO DRAIN.
4. ALL MECHANICAL EQUIPMENT ON ROOF MUST BE LOCATED 10'-0"
MIN. AWAY FROM THE OUTSIDE EDGE OF ROOF CAPFLASHING.
5. OVERFLOW DRAINS SHALL BE MOUNTED 2" ABOVE (HIGHER) THAN
THE ADJACENT ROOF DRAINS (TYP.)
6. COORDINATE SIZE (HEIGHT/LENGTH) OF MECHANICAL
EQUIPMENT SCREENS WITH SIZE (HEIGHT/WIDTH) OF
MECHANICAL EQUIPMENT. ENSURE ALL MECHANICAL
EQUIPMENT IS CONCEALED FROM VIEW.
7. CONTRACTOR TO COORDINATE ROOF TOP
MECHANICAL UNIT PLACEMENT WITH STRUCTURAL FIELD
CONDITIONS. MECHANICAL SHOP DRAWINGS TO INCLUDE
FULLY DIMENSIONED ROOF PLAN INDICATING ALL ROOF
TOP MECHANICAL UNITS AND MECHANICAL SCREENS WITH
DIMENSIONED OFFSETS TO ADJACENT COLUMN LINE
REFERENCES.
A
C
J
P
Q
R
G.5
M.5 N
S.5
A-400
A-401
A-400
S
E
F
B
H
L
M
R.D.
O.D.
1/ P E R F T S L O P E
R.D.
O.D.
R.D.
O.D.
1/ P E R F T S L O P E
1/ P E R
F T S L O P E
R.D.
O.D.
FULLY ADHERED TPO
ROOFING MEMBRANE
FULLY ADHERED TPO
ROOFING MEMBRANE
FULLY ADHERED TPO
ROOFING MEMBRANE
TRANSLUCENT
SKYLIGHT SYSTEM
G
D
A-516
A-519
A-515
A-517
ROOF HATCH
FULLY ADHERED TPO
ROOFING MEMBRANE
K
A-518
A-518
A-518
A -3
A -3
A -3
A -3
/2
A-513
A-516
A-516
A-516
A-518
A-516
A-518
A-517
A-517
:1 S
LO
P E
A-721
A-720
SIM
A-720
A-720
A-720
A-519
A-720
A-721
A-721
A-720
A-722
A-722
A-722
A-722
A-520
A-722
A-721
OPP.
A-721
OPP.
S.T.
S.T.
1/ P E R
F T S L O P E
1/ P E R
F T S L O P E
1/ P E R
F T S L O P E
1/ P E R
F T S L O P E
1/ P E R
F T S L O P E
A-720
31' - 0"
1/ P E R F T S L O P E
/8
6' - 9 1/2"
3' - 2"
80' - 0" 80' - 0" 16' - 6 3/4"
EQ. 74' - 6" 74' - 6" EQ.
A-400
NOTE:
1. USE TAPERED INSULATION AT ROOF EDGE TO MAINTAIN CONSTANT ELEVATION AT THE VARIOUS LEVELS WHERE THERE IS NO
PARAPET.
2. ALL TPO TO BE WHITE UNLESS NOTED OTHERWISE
3. ALL ROOF CRICKETS SHALL HAVE A MINIMUM SLOPE OF 1/4" PER FOOT. SLOPE TO DRAIN.
4. ALL MECHANICAL EQUIPMENT ON ROOF MUST BE LOCATED 10'-0" MIN. AWAY FROM THE OUTSIDE EDGE OF ROOF CAPFLASHING.
5. OVERFLOW DRAINS SHALL BE MOUNTED 2" ABOVE (HIGHER) THAN THE ADJACENT ROOF DRAINS (TYP.)
6. COORDINATE SIZE (HEIGHT/LENGTH) OF MECHANICAL EQUIPMENT SCREENS WITH SIZE (HEIGHT/WIDTH) OF MECHANICAL EQUIPMENT.
ENSURE ALL MECHANICAL EQUIPMENT IS CONCEALED FROM VIEW.
7. CONTRACTOR TO COORDINATE ROOF TOP MECHANICAL UNIT PLACEMENT WITH STRUCTURAL FIELD CONDITIONS. MECHANICAL
SHOP DRAWINGS TO INCLUDE FULLY DIMENSIONED ROOF PLAN INDICATING ALL ROOF TOP MECHANICAL UNITS AND MECHANICAL
SCREENS WITH DIMENSIONED OFFSETS TO ADJACENT COLUMN LINE REFERENCES.
L.5
R.D.
O.D.
R.D.
O.D.
N.5
N.2
A-712
A-722
4' - 0" 4' - 0"
ANTENNA RACK
A-723
A-610
32 A-610
A-722
27' - 0"
A-810
5"
A-301 A-302
ROOF LEGEND
SOLAR TUBE
SEE 6/A300 FOR
FRAMING REQUIREMENTS
ROOF DRAIN
(RE: PLUMGING)
OVERFLOW DRAIN,
MOUNT 2" HIGHER
THAN ROOF
DRAIN, TYP.
TAPERED
INSULATION
MIN. 1/4" PER
FOOT SLOPE
1/4" PER FT SLOPE
ROOF SLOPE
ROOF HATCH
PROVIDE 3' TYP.
WALKWAY WITH
ADDITIONAL LAYER
OF 60 MIL. TPO
S nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay
C o lo ra d o S pr in gs C O
A-302
PARTIAL ROOF
PLAN
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .