FINAL DESIGN-DRAWINGS 1 OF 4
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE
B R
IA
R G A
TE PK
W Y.
V O Y A G
ER
P K W Y
I-2
SPRINGCREST RD
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O
G-01
COVER SHEET
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
NORTH COLORADO SPRINGS READINESS CENTER
PROJECT TEAMVICINITY MAPS
OWNER:
COLORADO ARMY
NATIONAL GUARD
Richard Burtt, MAJ, EN MILCON Project Manager Ph: 720-250-1389 Fax: 720-250-1369
ARCHITECTURE:
HB&A, LLC
Gene Leavines, AIA Associate Principal 102 East Moreno Avenue Colorado Springs, CO 80903
Ph: 719-473-7063 Fax: 719-473-7092 www.hbaa.com
M.E.P. ENGINEERING:
LEO A DALY
8600 Indian Hills Drive Omaha, NE 68114-4039 Ph: 402-391-8111 Fax: 402-391-8564 www.leoadaly.com
Mike Brady, PE Mechanical Engineer
Chad Schock Plumbing Designer
Jergen Noetzel, PE Electrical Engineer
STRUCTURAL ENGINEERING:
LEO A DALY
Susan A. Jorgensen, PE, LEED AP Principal, Structural Engineer 2000 South Colorado Boulevard Annex Building, Suite 300 Denver, CO 80222-7940 Ph: 303.756.2100 Fax: 303.757.2350 www.leoadaly.com
CIVIL ENGINEERING:
FARNSWORTH GROUP, INC.
Ted Barela, PE Engineering Manager 3538 JFK Parkway, Suite 3 Fort Collins, CO 80525 Ph: 970-266-1066 Fax: 970-266-1075 www.f-w.com
LANDSCAPE ARCHITECTURE:
Thomas & Thomas Jim Houk, ASLA Land Planner 614 N. Tejon Colorado Springs, CO 80903 Ph: 719-578-8777 Fax: 719-578-8495
INTERIOR DESIGNER:
Senger Design Group Cindy Senger, ASID 523 S Cascade Ave #B Colorado Springs, CO 80903 Ph: 719-522-1520 Fax: 719-522-1584
COLORADO ARMY NATIONAL GUARD
OPTIONAL LINE ITEM LIST (OLI)
West section of loop access drive paving as indicated on Drawing AS-100. The Base Bid shall include all grading and base course required to install the indicated section of the loop access road. OLI # 1 shall upgrade the western section of the loop access road to include asphalt paving. Should OLI #2 be selected then OLI #1 shall be upgraded to provide concrete paving. Required paving sections are noted on Drawing C-102. Note that both the northeast and southwest access control gates are included in the Base Bid.
The Base Bid includes rigid concrete paving at the Military Vehicle Parking, North and South Access entry aprons at Voyager Parkway, and the apron adjacent to the trash enclosure. The remainder of the vehicle paving in the Base Bid is asphalt paving. OLI #2 upgrades all asphalt paving to concrete using the same cross section and sub-base specified for the Military Vehicle Parking Area. Required paving sections are noted on Drawing C-102.
Covered Military Vehicle Parking structures as described by Drawings A-1000 & A-1001. All underground infrastructure required to support the Covered Military Vehicle Parking structures shall be included in the Base Bid including all underground conduit for power (block heaters), underground conduit for lighting, underground conduit for security monitoring, and underground conduit for the photovoltaic arrays included in OLI #4. All rigid concrete paving beneath the covered parking structures shall be included in the Base Bid.
Roof-mounted photovoltaic arrays on the covered Military Vehicle Parking structures. As noted in OLI #3, all underground conduits for the photovoltaic arrays shall be installed with the Base Bid.
Roof-mounted photovoltaic arrays located on the west wing of the primary Readiness Center building. Note that all internal conduit runs serving the roofmounted photovoltaic arrays shall be included in the Base Bid.
Unit ERU-5A to be provided in lieu of ERU-5. ERU-5A shall be heating only and shall be factory piped without reversing valve for heating only application.
Provide cream paste polish at the Drill Hall concrete floor (Room 183) in lieu of the Base Bid concrete sealer.
Main entry sidewalk shall be amended to include bronze lettering and contrasting integral concrete tint to create the memorial sidewalk as defined on Drawing AS-103. Memorial Walk Anchor Area shall be amended to include integral colored concrete (Re: AS-103)
1.
2.
3.
4.
5.
6.
7.
8.
EARTH
ROCK
CONCRETE
BRICK
CEMENT, SAND, GROUT,
PLASTER
STONE
STEEL
FINISHED WOOD
ROUGH WOOD
SHIMS
PLYWOOD
GLASS
ALUMINUM
GYPSUM BOARD
(GYP. BD.)
CONCRETE BLOCK
BATT INSULATION
RIGID INSULATION
FIRESAFING
CERAMIC TILE
POROUS FILL
STRUCTURAL GLAZED TILE
G
ROOM NAME
A
B
MATCH LINE
PROPERTY, BOUNDARY
LINES
CENTERLINE, GRIDS
PARTITION TYPES
ENLARGED PLAN
OR ELEVATION
NEW OR REQ'D.
ELEVATION
EXISTING CONTOURS
NEW CONTOURS
LEVEL/ELEV. INDICATOR
16.58
WINDOW TYPE
GRID LINE
ROOM/SPACE NUMBER
DOOR NUMBER
DETAIL
WALL SECTIONS
ELEVATIONS
KEYNOTE (DEMOLITION)26
A1.1
A6.2
FRAME TYPE
A7.1
DETAIL NUMBER
SHEET WHERE DRAWN
BUILDING SECTIONS5
A6.1
A
1/A-100
FLOOR DRAINFD
R's
REFER, REFERENCE
MARKER BOARDMB
MECHANICAL CONTRACTORMC
ELECTRICAL CONTRACTOREC
RELOCATEDRELOC
CENTER POINTCP
FLOOR MATF.M.
AFF
AP
ACOUST
ADD
ADJ
ALT
ALUM/AL
AB
APPROX
ARCH
AD
ABOVE FINISHED FLOOR
ACCESS PANEL
ACOUSTICAL
ADDENDUM
ADJUSTABLE/ADJACENT
ALTERNATIVE, ALTERNATE
ALUMINUM
ANCHOR BOLTS
ANGLE
APPROXIMATE
ARCHITECTURAL/ARCHITECT
AREA DRAIN
BR
BM
B.M.
BLKG
BD
BOT
BLDG
BLK
BACKER ROD
BEAM
BENCH MARK
BLOCKING
BOARD
BOTTOM
BUILDING
BLOCK
CAB'T
CPT
CI
CB
CLG
CEM
CEM PLAS
C
CR
CT
CLR
COL
COMP
CONC
CMU
CONST
CONT
CONTR
CJ
CORR
CTSK
CABINET
CARPET
CAST IRON
CHALKBOARD
CEILING
CEMENT
CEMENT PLASTER
CENTER LINE
CLASSROOM
CERAMIC TILE
CLEAR
COLUMN
COMPOSITE
CONCRETE
CONCRETE MASONRY UNIT
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CONTROL JOINT
CORRIDOR
COUNTERSINK
AUTO AUTOMATIC
DEG
DET/DTL
DIA
DIAG
DIM
DR
DO
DN
DS
DWG
DEGREE
DETAIL
DIAMETER
DIAGONAL
DIMENSION
DOOR
DOOR OPENING
DOWN
DOWNSPOUT
DRAWING
EA
EW
ELEC
EP
EWC
EL
ELEV
EMER
EQ
ETC
EF
EX, EXIST
EXP
EJ
EXT
EACH
EACH WAY
ELECTRIC
ELECTRIC PANEL
ELECTRIC WATER COOLER
ELEVATION
ELEVATION/ELEVATOR
EMERGENCY
EQUAL
ETCETERA
EXHAUST FAN
EXISTING
EXPANSION
EXPANSION JOINT
EXTERIOR
FT
FIN
FF
FEC
FR
F.R.
FLASH
FLR
FD
FS
FLUOR
FTG
FURR
FEET/FOOT
FINISH
FINISH FLOOR
FIRE EXTINGUISHER CABINET
FRAME
FIRE RESISTANT
FLASHING
FLOOR
FLOOR DRAIN
FLOOR SINK
FLUORESECENT
FOOTING
FURRING
GALV
GI
GA
GB/GYP BD
GYP PLAS
GALVANIZED
GALVANIZED IRON/STEEL
GUAGE/GAGE
GYPSUM BOARD
GYSPUM PLASTER
HC
HDWE
HR
HT
HDR
HM
HORIZ
HB
HANDICAPPED
HARDWARE
HOUR
HEIGHT
HEADER
HOLLOW METAL
HORIZONTAL
HOSE BIB
INCL
ID
INSUL
INT
INCLUSIVE
INSIDE DIAMETER
INSULATION
INTERIOR
JAN
JT
JANITOR
JOINT
KO KNOCK OUT
LD BRG
LAV
LT
LOUV
LOAD BEARING
LAVATORY
LIGHT
LOUVER
MAT'L
MANUF/MANF
MO
MAX
MAS
MECH
MTL/MET
MIN
MISC
MT/MNT
MATERIAL
MANUFACTOR
MASONRY OPENING
MAXIMUM
MASONRY
MECHANICAL
METAL
MINIMUM
MINUS
MISCELLANEOUS
MOUNT, MOUNTED
NOM
NIC
NTS
NO
NOMINAL
NOT IN CONTRACT
NOT TO SCALE
NUMBER
OC
OPNG
OPP
OD
ORIG
ON CENTER
OPENING
OPPOSITE
OUTSIDE DIA/OVERFLOW DRAIN
ORIGINAL
PNT
PR
PLAS LAM
PL
PAINTED
PAIR
PLASTIC LAMINATE
PLATE
PLUS
PLBG
PLYWD
PVC
PT
PTN
PRPT
PLUMBING
PLYWOOD
POLYVINYLCLORIDE
POINT
PARTITION
PARAPET
QT QUARRY TILE
RAD/R
RECPT
REFIN
REFL
REINF
REQ'D
RF
RTU
REV
R&R
RD
RM
RO
RE:
RADIUS
RECEPTACLE
REFINISH
REFLECTED
REINFORCEMENT/REINFORCING
REQUIRED
ROOF, ROOFING
ROOF TOP UNIT
REVISED/REVISION
REMOVE AND REPLACE
ROOF DRAIN
ROOM
ROUGH OPENING
RISERS
SCHED
SHT
SIM
SPEC
SQ
SQ FT/SF
SQ IN
SQ YD
SS
STD
STL
STRUC
SEP
ST
SCHEDULES
SHEET
SIMILAR
SPECIFICATIONS/SPECIFIED/
SQUARE
SQUARE FOOT/SQUARE FEET
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STANDARD
STEEL
STRUCTURAL
SEPERATE
STRAIGHT
TELE
TB
THK
T&B
T.O.
TS
T's
TOW
TRANSF
TYP
TELEPHONE
TACK BOARD
THICK
TOP AND BOTTOM
TOILET
TOP OF
TUBE STEEL
TREADS
TOP OF WALL
TRANSFORMER
TYPICAL
TLT / TOIL
UNF
UNO
UBC
UNFINISHED
UNLESS NOTED OTHERWISE
UNIFORM BUILDING CODE
VCT
VERT
VS
VINYL COMPOSITION TILE
VERTICAL
VENT STACK
WC
W
WDW/WIND
W/ W/O
WD
WATER CLOSET
WASHER
WINDOW
WITH
WITHOUT
WOOD
SAT SUSPENDED ACOUSTICAL TILE
BRG BEARING
DEMO DEMOLITION
DBL DOUBLE
DF DRINKING FOUNTAIN
E EAST
JST JOIST
PL PROPERTY LINE
SAG SUSPENDED ACOUSTICAL GRID
SALV SALVAGE
T&G TONGUE & GROOVE
VWC VINYL WALL COVERING
WK
WF WIDE FLANGE
WORK
@ AT
T.O.M. TOP OF MASONRY
STOR STORAGE
RDL ROOF DRAIN LEADER
PRIN PRINCIPAL
POLYISO POLYISOCYANURATE
FIELD VERIFYF.V.
F.O.M. FACE OF MASONRY
PLN PLAN
MIL / MM MILLIMETER
MTG MOUNTING / MEETING
LMC LIBRARY MEDIA CENTER
INST INSTRUMENT
ENCL ENCLOSURE
ENG ENGINEER/ENGINEERING
EDUCATIONED
ABV ABOVE
A.V. AUDIO VIDEO
CONF CONFERENCE
CL CLOSET
OF, OFD OVER FLOW DRAIN
CIP CAST IN PLACE
RE: REFER TO
R REINFORCEMENT
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O
G-02
DRAWING
SHEETS &
ABBREVIATIONS
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
MATERIALS & SYMBOLS LEGEND
ARCHITECTURAL ABBREVIATIONSDRAWING SHEET INDEX
GENERAL
CIVIL
LANDSCAPE
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
PLUMBING
FOOD SERVICE
MECHANICAL
A-500 BUILDING SECTIONS
A-501 BUILDING SECTIONS
A-502 BUILDING SECTIONS
A-510 WALL SECTIONS
A-511 WALL SECTIONS
A-512 WALL SECTIONS
A-513 WALL SECTIONS
A-514 WALL SECTIONS
A-515 WALL SECTIONS
A-516 WALL SECTIONS
A-517 WALL SECTIONS
A-518 WALL SECTIONS
A-519 WALL SECTIONS
A-520 WALL SECTIONS
A-600 ENLARGED RESTROOM PLANS
A-601 ENLARGED PLANS
A-602 ENLARGED STAIR PLANS & SECTIONS
A-610 INTERIOR ELEVATIONS
A-611 INTERIOR ELEVATIONS
A-612 INTERIOR ELEVATIONS
A-620 INTERIOR DETAILS
A-621 INTERIOR DETAILS
A-622 INTERIOR DETAILS
A-623 INTERIOR DETAILS
A-624 INTERIOR DETAILS
A-700 FOUNDATION DETAILS
A-710 PLAN DETAILS
A-711 PLAN DETAILS
A-712 PLAN DETAILS
A-720 ROOF DETAILS
A-721 ROOF DETAILS
A-722 ROOF DETAILS
A-723 ROOF DETAILS
A-730 DETAILS
A-731 DETAILS
A-740 CEILING DETAILS
A-741 CEILING DETAILS
A-800 DOOR SCHEDULE
A-810 WINDOW SCHEDULE
A-811 WINDOW SCHEDULE
A-820 DOOR DETAILS
A-821 DOOR DETAILS
A-830 WINDOW DETAILS
A-831 WINDOW DETAILS
A-832 WINDOW DETAILS
A-900 ROOM MATERIAL SCHEDULE
A-910 WALL TYPES
A-1000 COVERED PARKING O.L.I.
A-1001 COVERED PARKING O.L.I. DETAILS
A-100 COMPOSITE FLOOR PLAN
A-101 SECTOR 1 FIRST FLOOR PLAN
A-102 SECTOR 2 FIRST FLOOR PLAN
A-103 SECTOR 3 FIRST FLOOR PLAN
A-110 SECTOR 2 SECOND FLOOR PLAN
A-111 SECTOR 3 SECOND FLOOR PLAN
A-120 CONTROL JOINT LAYOUT
A-121 SECTOR 1 - METAL CAGE DETAILED FLOOR PLAN
A-122 TA-50 LOCKER LAYOUT AND DETAILS
A-200 COMPOSITE RELFLECTED CEILING PLANS
A-201 SECTOR 1 FIRST FLOOR RELFECTED CEILING PLAN
A-202 SECTOR 2 FIRST FLOOR RELFECTED CEILING PLAN
A-203 SECTOR 3 FIRST FLOOR RELFECTED CEILING PLAN
A-210 SECTOR 2 SECOND FLOOR REFLECTED CEILING PLAN
A-211 SECTOR 3 SECOND FLOOR RELFECTED CEILING PLAN
A-300 COMPOSITE ROOF PLAN
A-301 PARTIAL ROOF PLAN
A-302 PARTIAL ROOF PLAN
A-310 LIGHTNING PROTECTION PLAN AND DETAILS
A-400 BUILDING ELEVATIONS
A-401 BUILDING ELEVATIONS
G-01 COVER SHEET
G-02 DRAWING SHEETS & ABBREVIATIONS
G-03 CODE ANALYSIS
G-04 DEPARTMENT PLANS
G-05 DEPARTMENT SCHEDULES
F-001 SITE PLAN
F-100 GENERAL NOTES AND LEGEND
F-101 HAZARD CLASSIFICATION PLAN
F-102 HAZARD CLASSIFICATION PLAN
F-103 HAZARD CLASSIFICATION PLAN
F-110 HAZARD CLASSIFICATION PLAN
F-201 FIRST FLOOR FIRE ALARM PLAN -
AREA 1
F-202 FIRST FLOOR FIRE ALARM PLAN -
AREA 2
F-203 FIRST FLOOR FIRE ALARM PLAN -
AREA 3
F-210 SECOND FLOOR FIRE ALARM PLAN
F-220 FIRE ALARM & MASS NOTIFICATION
MATRIX
E-001 ELECTRICAL SYMBOLS
E-100 ELECTRICAL SITE PLAN
E-101 LIGHTIING FIRST FLOOR SECTOR 1
E-102 LIGHTING FIRST FLOOR SECTOR 2
E-103 LIGHTING FIRST FLOOR SECTOR 3
E-110 LIGHTING SECOND FLOOR SECTOR 1
E-111 LIGHTING SECOND FLOOR SECTOR 2
E-201 POWER FIRST FLOOR SECTOR 1
E-202 POWER FIRST FLOOR SECTOR 2
E-203 POWER FIRST FLOOR SECTOR 3
E-210 POWER SECOND FLOOR SECTOR 2
E-211 POWER SECOND FLOOR SECTOR 2
E-301 SYSTEMS FIRST FLOOR SECTOR 1
E-302 SYSTEMS FIRST FLOOR SECTOR 2
E-303 SYSTEMS FIRST FLOOR SECTOR 3
E-311 SYSTEMS SECOND FLOOR SECTOR 2
E-400 ONE LINE DIAGRAM
E-401 ELECTRICAL DETAILS
E-402 ELECTRICAL DETAILS
E-403 ENLARGED KITCHEN PLAN
E-500 SCHEDULES AND DIAGRAMS
E-501 PANEL SCHEDULES
E-502 PANEL SCHEDULES
E-503 PANEL SCHEDULES
P-001 PLUMBING ABBREVIATION SYMBOLS
P-011 PLUMBING FOUNDATION SECTOR 1
P-012 PLUMBING FOUNDATION SECTOR 2
P-013 PLUMBING FOUNDATION SECTOR 3
P-101 PLUMBING LEVEL 1 SECTOR 1
P-102 PLUMBING LEVEL 1 SECTOR 2
P-103 PLUMBING LEVEL 1 SECTOR 3
P-113 PLUMBING LEVEL 2 SECTOR 3
P-120 ROOF PLAN WEST PLUMBING
P-121 ROOF PLAN EAST PLUMBING
P-400 PLUMBING SCHEDULE
P-500 PLUMBING DETAILS
P-501 PLUMBING DETAILS
M-000 MECHANICAL UTILITY PLAN
M-001 MECHANICAL ABBREVIATION AND
SYMBOLS
M-101 HVAC LEVEL 1 SECTOR 1
M-102 HVAC LEVEL 1 SECTOR 2
M-103 HVAC LEVEL 1 SECTOR 3
M-110 HVAC LEVEL 2 SECTOR 2
M-111 HVAC LEVEL 2 SECTOR 3
M-201 HVAC PIPING LEVEL 1 SECTOR 1
M-202 HVAC PIPING LEVEL 1 SECTOR 2
M-203 HVAC PIPING LEVEL 1 SECTOR 3
M-211 HVAC PIPING LEVEL 2 SECTOR 3
M-301 HVAC ENLARGED PLANS
M-302 HVAC ENLARGED PLANS
M-401 TEMPERATURE CONTROL SEQUENCE
M-402 TEMPERATURE CONTROL POINTS LIST
M-403 TEMPERATURE CONTROL POINTS LIST
M-501 MECHANICAL DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
S-532 FRAMING DETAILS
S-533 FRAMING DETAILS
S-534 FRAMING DETAILS
S-540 STEEL JOIST DIAGRAMS
S-541 STEEL TRUSS DIAGRAMS
S-550 WINDOW SUPPORT DETAILS
S-551 WINDOW SUPPORT DETAILS
S-552 WINDOW SUPPORT DETAILS
S-560 STAIR LAYOUT AND DETAILS
S-570 SITE STRUCTURES
S-580 COV. PARKING OLI
S-581 COV. PARKING OLI SECTIONS AND
DETAILS
S-601 STL. COL. AND BASE PLATED SCHED
S-602 BEAM CONNECTION SCHEDULES AND
DETAILS
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL GENERAL NOTES
S-003 STRUCTURAL GENERAL NOTES
S-101 FOUNDATION PLAN SECTOR 1
S-102 FOUNDATION PLAN SECTOR 2
S-103 FOUNDATION PLAN SECTOR 3
S-111 LOW ROOF FRAMING PLAN SECTOR 1
S-112 LOW ROOF FRAMING PLAN SECTOR 2
S-113 SECOND FLOOR FRAMING PLAN
SECTOR 3
S-122 HIGH ROOF FRAMING SECTOR 2
S-123 HIGH ROOF FRAMING SECTOR 3
S-501 FOUNDATION DETAILS
S-502 FOUNDATION DETAILS
S-503 FOUNDATION DETAILS
S-510 CONCRETE VAULT DETAILS
S-520 MASONRY WALL DETAILS
S-530 FRAMING DETAILS
S-531 FRAMING DETAILS
FS1.1 FOODSERVICE EQUIPMENT PLAN
FS1.2 FOODSERVICE BUILD. COND & VENT.
PLAN
FS1.3 FOODSERVICE PLUMBING PLAN
FS1.4 FOODSERVICE ELECTRICAL PLAN
FS2.1 MANUFACTURER'S HOOD DRAWING
IN-101 FIRST FLOOR FINISH PLAN
IN-102 FIRST FLOOR FINISH PLAN
IN-103 FIRST FLOOR FINISH PLAN
IN-110 SECOND FLOOR FINISH PLAN
IN-201 FIRST FLOOR FURNITURE PLAN
IN-202 FIRST FLOOR FURNITURE PLAN
IN-203 FIRST FLOOR FURNITURE PLAN
IN-210 SECOND FLOOR FURNITURE PLAN
IN-300 INTERIOR FINISH SPECIFICATIONS
IN-301 INTERIOR FINISH SCHEDULE & TYP.
FINISH ELEVS.
IN-302 SECOND FLOOR INTERIOR FINISH
SCHEDULE
AS-100 ARCHITECTURE SITE & OLI PLAN
AS-101 ARCHITECTURAL SITE DETAILS
AS-102 MONUMENT SIGN
AS-103 MEMORIAL WALK
AS-104 MILITARY VEHICLE PARKING LAYOUT
AS-110 ATFP SITE PLAN
L-100 LANDSCAPE SITE PLAN
L-101 LANDSCAPE SITE PLAN
L-102 LANDSCAPE DETAILS
L-103 TREE TRANSPLANT PLAN
L-104 SITE DETAILS
L-105 LANDSCAPE DETAILS
IR-100 IRRIGATION PLANS
IR-101 IRRIGATION PLANS
IR-102 IRRIGATION PLANS
IR-103 IRRIGATION DETAILS
IR-104 IRRIGATION DETAILS
C-001 CIVIL GENERAL NOTES
C-002 SURVEY
C-003 DEMOLITION PLAN
C-004 DEMOLITION PLAN
C-100 OVERALL SITE PLAN
C-101 SITE PLAN
C-102 SITE PLAN
C-103 LINE AND CURVE TABLE
C-104 SIGNAGE AND STRIPING PLAN
C-105 SIGNAGE AND STRIPING PLAN
C-300 OVERALL UTILITY PLAN
C-301 OVERALL UTILITY PLAN
C-302 OVERALL UTILITY PLAN
C-400 GRADE, DRAIN & EROSION CONTRL PLN
C-401 GRADE, DRAIN & EROSION CONTRL PLN
C-402 GRADE, DRAIN & EROSION CONTRL PLN
C-403 GRADE, DRAIN & EROSION CONTRL PLN
C-404 GRADE, DRAIN & EROSION CONTRL PLN
C-405 DRIVEWAY PROFILE
C-406 DRIVEWAY PROFILE
C-500 SANITARY SEWER PROFILE
C-600 WATERLINE PROFILE
C-601 WATERLINE PROFILE
C-700 STORM SEWER PROFILE
C-701 STORM SEWER PROFILE
C-800 SITE DETAILS
C-801 SITE DETAILS
C-802 SITE DETAILS
C-803 SITE DETAILS
C-804 SITE DETAILS
C-804A SITE DETAILS
C-805 WATER DETAILS
C-806 WATER DETAILS
C-807 WATER DETAILS
C-808 WATER DETAILS
C-809 WATER DETAILS
C-810 WATER DETAILS
C-811 SANITARY SEWER DETAILS
C-812 SANITARY SEWER DETAILS
C-813 STORM SEWER DETAILS
C-814 STORM SEWER DETAILS
C-815 STORM SEWER DETAILS
C-816 STORM SEWER DETAILS
C-900 TRAFFIC SIGNAL PLAN
C-901 TRAFFIC SIGNAL PLAN
1. All dimensions are to face of stud or face of masonry unless noted otherwise.
2. Refer to enlarged plans for dimensions, detail references and interior elevation references within the bubbled areas.
3. Refer to A-910 for wall types.
4. Refer to finish plans and room finish schedule for location of wall finishes and proposed furniture layouts.
5. Where doors in metal stud partitions are not specifically dimensioned on the plan provide a hinge side dimension of 6” from door opening to the adjacent perpendicular wall.
6. Contractor shall verify installation requirements for all products to be incorporated in the work (including partition thickness for recessed products and blocking), and is responsible for accommodating any changes to other materials or products that are necessary to properly complete the installation.
7. Refer to A-900 and Specifications for information regarding sealant locations and types.
GENERAL NOTES
8. The drawings and specifications are complimentary. Items shown in one location in the drawings shall be considered to be a requirement of the contract for construction. In the event of an inconsistency between drawings and the specification, or within either set of documents, the contractor shall seek clarification or interpretation from the architect prior to bidding. Where inconsistencies are not clarified prior to bidding, the contractor shall provide the better quality or greater quantity of work.
9. Fire rated corridors, stair enclosures, doors, and partitions indicated in this set of documents are components of continuous system consisting of walls, floors, and ceilings.
Provide rated assemblies for indicated locations to maintain the continuity of the fire rating. Provide fire safing and fire rated sealants to maintain the continuity.
10. Provide rolling shades in all window openings and at all door frame types 5, except for the curtain walls in air lock 100, lobby 101, air lock 102 and the translucent wall panel in drill hall 183. Refer to Room Finish Schedule for more information.
11. Conceal ALL conduit in walls and in ceilings, including in CMU. Contractor to coordinate locations of conduit runs prior to wall construction. Except in mech, elec rooms and Maint. Bay.
INTERIORS
FIRE PROTECTION
ARCHITECTURAL (CONT.) STRUCTURAL (CONT.)
UP
UP
UP
DN
ASSEMBLY
CLASSROOM
EXERCISE
LOCKERS
KITCHEN
MECHANICAL
OFFICE
STORAGE
1 HOUR SEPARATION
LEGEND
FIRE EXTINGUISHER
CABINET
F.E.C.
B
A-3S-1 34' - 2 5/8"
28' - 1 1/2"
S-1
19' - 2 5/8"
/4
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
A-3
B
6' - 8"
' - 4
42' - 4"
20' - 0"
' - 6
79'-6"
75'-4"
' - 0
"16' - 6"
1 0 ' - 6
F.E.C.
F.E.C.
F.E.C.
Applicable Building Code: 2009 International Building Code Reference Section
Building Square Footage:
Classification:
Allowable Height:
Allowable Building Area:
Automatic Sprinkler System is being provided.
Area Increase:
45,930 sf net 1st Floor 12,622 sf net 2nd Floor 58,552 sf net Total 49,095 sf gross 1st Floor 13,885 sf gross 2nd Floor 62,980 sf gross Total
A-3 Assembly (8,562 sf net) B, Business (29,982 sf net) S-1, Storage (19,740 sf net)
Type IIB, A-3 - 2 Stories Type IIB, B - 4 Stories Type IIB, S-1 - 3 Stories
Type IIB, A-3 - 9,500sf Type IIB, B - 23,000sf Type IIB, S-1 - 17,500sf
Sect. 302.1, 303.1 Sect. 304.1 Sect. 311.2
Table 503
Table 503
Area Increase per Frontage [1-.25]1 = .75 A-3 (9,500) 9,500 + [9,500 X .75] + 9,500 x 2 = 35,625sf 35,635sf x 2 = 71,250sf (2 stories)
B (23,000) 23,000 + [23,000 x .75] + 23,000 x 2 = 86,250sf 86,250sf x 2 = 172,500sf (2 stories)
S-1 (17,500) 17,500 + [17,500 x .75] + 17,500 x 2 = 65,625sf 65,625sf x 2 = 131,250sf (2 stories)
Ratios B - 17,360/86,250 = .20 (first floor) A-3 - 8,562/35,625 = .24 S-1 - 19,740/65,625 = .30 First Floor Total = .74
B - 12,622/86,250 = .15 (second floor) Second Floor Total = .15
Type IIB
Mixed Occupancy A-3 Assembly B Office S-1 Storage
1 Hour between B and A-3 1 Hour between A-3 and S (Classroom A-3 is being considered an accessory use and is not separated)
Assembly without fixed seats, 15 net Business areas, 100 gross Classrooms, 20 net Kitchens, 200 gross Library, 50 gross Locker room, 50 gross Exercise rooms, 50 gross Storage, 300 gross Mechanical rooms, 300 gross
Assembly 8,562 sf/15 570 Business areas 19,704 sf/100 197 Classrooms 4,227 sf/20 211 Kitchen 1,309 sf/200 7 Library 584 sf/50 12 Locker room 320 sf/50 6 Exercise room 836 sf/50 17 Storage 21,067 sf/300 70 Mechanical 1,943 sf/300 6 Total 1,096
Building Construction Type:
Building Occupancy Types:
Occupancy Separations:
Occupancy Load:
Sect. 508.3
Table 508.3.3
Table 1004.1.1
Minimum Egress Width:
Exit Travel Distance:
Corridor Construction:
Corridor Width:
Dead Ends:
Number of Exits:
Vertical Exit Enclosures:
Accessibility Parking:
Lockers:
Plumbing Fixtures:
0.2"/occupant Stairways 156" (13') 0.15"/occupant Other 117" (9.75') Occupant load 2nd floor = 60*.2" = 12" Occupant load A-3 = 570*.2" = 114" (9'-6")
A, S-1 = 250' B = 300'
A fire-resistance rating is not required for corridors in an occupancy in Group B which is a space requiring only a single means of egress.
A,B,S: When occupant load served by corridor is greater than 30 with a sprinkler system is 0 hours.
44" minimum
If more than one exit is required, 20' B Occupancies with a sprinkler, 50'
Occupant Load More than 1000 = 4
1 hour if less than 4 stories
If 301-400 spaces are provided, provide 8 accessible parking spaces, provide 2 van accessible space
5% of Lockers need to be accessible
Total Occupant Load = 1092
Table 1005.1
Table 1016.1
Sect. 1017.1
Table 1017.1
Sect. 1018.2
Sect. 1018.4
Table 1021.1
Table 1022.1
Table 1106.1
Sect. 1109.8.1
Table 2902.1
Reference SectionApplicable Building Code: 2009 International Building Code
Building Code Analysis
Reference SectionApplicable Building Code: 2009 International Building Code
OCCUPANT LOAD FOR PLUMBING
FIXTURES (CIRCULATION REMOVED)
Assembly without fixed seats, 15 net Business areas, 100 gross Classrooms, 20 net Kitchens, 200 gross Library, 50 gross Locker room, 50 gross Exercise rooms, 50 gross Storage, 300 gross Mechanical rooms, 300 gross
Assembly 8,551 sf/15 570 Business areas 14,871 sf/100 149 Classrooms 3,534 sf/20 177 Kitchen 1,342 sf/200 7 Library 601 sf/50 12 Locker room 236 sf/50 5 Exercise room 798 sf/50 16 Storage 17,131 sf/300 58 Mechanical 1,988 sf/300 7 Total 1,001
Total Occupant Load = 1001
Male 80% = 801, Female 20% = 200
Assembly: M = 1/125, F = 1/65, Lav = 1/200, DF = 1/500 Assembly load = 570 total = 285M & 285F M = 3, F = 5, MLav = 2 FLav = 2, DF = 1* *(Assembly is an ancillary use to the remainder of the occupancy)
Business: M&F = 1/25 for 50 then 1/50 thereafter, Lav = 1/100, DF = 1/100 Business load = 373, 298M & 75F M = 7, F = 3, Mlav = 3, Flav = 1, DF = 4
Storage: M&F = 1/100, Lav = 1/100, DF = 1/100 Storage load = 58 total M = 1, F = 1, Lav = 1 in each restroom, DF = 1
Total Male fixtures = 11 [ 13 provided ] Total Female fixtures = 9 [ 9 provided ] Total Unisex fixtures = 0 [ 1 provided ] Total Male lavs = 6 [ 8 provided ] Total Female lavs = 4 [ 7 provided ] Total Unisex lavs = 0 [ 1 provided ] Total Drinking Fountains = 6 [ 6 provided ] nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O
G-03
CODE ANALYSIS
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/64" = 1'-0"G-03
1 First Floor Plan
3/64" = 1'-0"G-03
2 Second Floor Plan
WALLS TO BE
DESIGNED FOR
SMOKE CONATINMENT
WITHIN ROOM
PER SECTION
508.2.5 OF THE
2009 IBC
WALLS TO BE DESIGNED
FOR SMOKE CONATINMENT
WITHIN ROOM
PER SECTION 508.2.5 OF
THE 2009 IBC
PER SECTION 3006.4
EXCEPTION 2 OF THE
2009 IBC
ACCESSORY USE NO FIRE
RATING PER SECTIONS 508.2.1
& 508.2.4 OF THE 2009 IBC
UP
DN
172 174
165 164
176 177
161 160
114 115
118 121
133143
108 110
137138
148150 149
144 146
Department Legend
CIRCULATION
CLASSROOMS
DRILL HALL
FAC. MAINT.
KITCHEN
MECH. / ELEC.
OFFICES
RESTROOMS & SHOWERS
SECTIONS
SUPPORT
UNIT LOCKERS
UNIT STORAGE
107 125
173 175171
166 117
208 210
225 224
214 215
240 236
239 238 237
234a241
207a
208a
210a
Department Legend
CIRCULATION
CLASSROOMS
FAC. MAINT.
OFFICES
RESTROOMS & SHOWERS
SECTIONS
SUPPORT
TRAINING AID STORAGE
nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O
G-04
DEPARTMENT
PLANS
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
3/64" = 1'-0"G-04
1 COMPOSITE - FIRST FLOOR DEPARTMENT PLAN
3/64" = 1'-0"G-04
2 COMPOSITE - SECOND FLOOR DEPARTMENT PLAN
0' 10' 20' 40' 80' 5°
N
0' 10' 20' 40' 80' 5°
N nu m be r
H B & A, L L C
ARCHITECTURE
PLANNING &
INFORMATION
TECHNOLOGY
102 EAST MORENO
AVENUE
COLORADO SPRINGS
COLORADO
80903-3392
719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:
M.I.O. & J.F.
A.U. & G.L.
B
ID
F
IN
A L
D O
C U
M E
N T
V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O
G-05
DEPARTMENT
SCHEDULES
281-01
Prelim Design Submittal 27 SEPT 2010
Concept Design JUNE 2010
Intermediate Design Submittal 20 JAN 2011
Final Design Submittal 31 MAY 2011
N O R
TH
C O
LO
R A D O S P R
IN
G S
R
EA
D
IN
ES
S C
EN
TE
R
Bid Final Documents 5 JULY 2011
Area Room Schedule
Room Number Room Name Area
179 WOMENS RESTROOM 191 SF
180 MENS RESTROOM 185 SF
181 MECHANICAL 472 SF
182 ELECTRICAL 257 SF
183 DRILL HALL 6257 SF
184 MAINTENANCE BAY 1020 SF
185 KITCHEN 672 SF
186 DRY STORAGE 108 SF
187 FRIDGE & FREEZER 203 SF
188 KITCHEN OFFICE 92 SF
189 KITCHEN JANITOR 14 SF
190 KITCHEN HALL 27 SF
191 KITCHEN RESTROOM 51 SF
192 SCULLERY 143 SF
201 HALLWAY 1711 SF
202 HALLWAY 142 SF
203 FACILITY MAINT. 133 SF
204 NURSING 37 SF
205 WOMENS RESTROOM 228 SF
206 MENS RESTROOM 239 SF
207 CLASSROOM 687 SF
207a Training Aid Storage 48 SF
208 CLASSROOM 756 SF
208a Training Aid Storage 48 SF
209 A/V STORAGE 171 SF
210 CLASSROOM 480 SF
210a Training Aid Storage 26 SF
211 SECTION MDAY
SCOUTS/SNIPERS
346 SF
212 SECTION MDAY MORTARS 354 SF
213 SECTION S6
COMMUNITCATIONS
358 SF
214 OFFICE S4 SENIOR SUPPLY 135 SF
215 OFFICE S4 122 SF
216 SECTION S4 SUPPLY 436 SF
217 STAIRS 53 SF
218 HALLWAY 88 SF
219 OFFICES HQ 785 SF
220 OFFICE S6 131 SF
221 OFFICE BN CSM 118 SF
222 OFFICE BNCDR 191 SF
223 OFFICE S4 121 SF
224 OFFICE S3 120 SF
225 OFFICE S1 121 SF
226 OFFICE XO 120 SF
227 PRINTER 68 SF
228 OFFICE CHAPLAIN 119 SF
229 OFFICE S2 119 SF
230 LIBRARY / COMPUTER 254 SF
231 TELECOM 302 SF
232 SECTION MDAY FIRE 510 SF
233 HALLWAY 221 SF
234 SECTION S3 PLANS 487 SF
234a ASSISTANT OPS NCO 94 SF
235 OFFICE AS3 118 SF
236 OFFICE AS3 115 SF
237 OFFICE AS3 115 SF
238 OFFICE AS3 115 SF
239 OFFICE OPS NCOIC 118 SF
240 S1 PS NCO 123 SF
241 SECTION S1 PERSONNEL 620 SF
242 OFFICE MEDICAL 120 SF
243 EXAM ROOM 106 SF
244 EXAM ROOM 93 SF
245 SECTION MDAY MEDICAL 482 SF
58520 SF
Area Room Schedule
Room Number Room Name Area
100 AIR LOCK 239 SF
101 LOBBY 1410 SF
102 AIR LOCK 192 SF
103 GREAT HALL 2092 SF
104 ELEVATOR 64 SF
105 ELEVATOR SERVICE 48 SF
106 FAC. MAINT 46 SF
107 ELEC. 261 SF
108 WOMENS RESTROOM 160 SF
109 ALCOVE 53 SF
110 MENS RESTROOM 220 SF
111 MENS LOCKER HALL 115 SF
112 MENS SHOWER 130 SF
113 MENS SHOWER 141 SF
114 MENS LOCKER 205 SF
115 FITNESS 836 SF
116 WOMENS RESTROOM 128 SF
117 WOMENS SHOWER 67 SF
118 MECHANICAL 946 SF
119 OFFICE ADMIN NCO 137 SF
120 OFFICE XO 137 SF
121 OFFICES HHC 755 SF
122 OFFICE 1SG 134 SF
123 OFFICE CDR 139 SF
124 OFFICE READINESS NCO 148 SF
125 PRINTER 83 SF
126 AIR LOCK 60 SF
127 HALLWAY 788 SF
128 STAIRS 227 SF
129 CONFERENCE 309 SF
130 BREAK 678 SF
131 HALLWAY 170 SF
132 HALLWAY 212 SF
133 LIBRARY / COMPUTER 330 SF
134 FAC. MAINT. 204 SF
135 SECTION S2 INTELLIGENCE 335 SF
136 CLASSROOM 549 SF
137 CLASSROOM 581 SF
138 CLASSROOM 595 SF
139 CLASSROOM 581 SF
140 FAC. MAINT. 85 SF
141 ALCOVE 77 SF
142 OFFICE ALPHA 337 SF
143 OFFICES ALPHA 255 SF
144 SECTION 92 SF
145 SECTION 99 SF
146 SECTION 136 SF
147 OFFICE CO XO 115 SF
148 OFFICE RNCO 121 SF
149 OFFICE CDR 120 SF
150 OFFICE 1SG 121 SF
151 HALLWAY 335 SF
152 FAMILY 242 SF
153 RECRUITING 242 SF
154 TRAINING DEV / SIM. CENTER 1297 SF
155 SIM CENTER STORAGE 119 SF
156 TELECOM CLOSET 146 SF
157 FACILITY MAINT. 180 SF
158 TABLE / CHAIR 526 SF
159 HALLWAY 596 SF
160 DISTRIBUTION 218 SF
161 VAULT 285 SF
162 LOCKERS 641 SF
163 HALLWAY 271 SF
164 LOCKERS 3209 SF
165 LOCKERS 2309 SF
166 HALLWAY 1168 SF
167 FAC. MAINT 194 SF
168 FLAMMABLE MATERIALS 149 SF
169 CONTROLLED WASTE 299 SF
170 HALLWAY 361 SF
171 CAGES 1374 SF
172 CAGES 1369 SF
173 CAGES 1383 SF
174 CAGES 1356 SF
175 CAGES 1217 SF
176 VAULT 285 SF
177 DISTRIBUTION 337 SF
178 ALCOVE 54 SF
Area Room Schedule CLASSROOMS
Room Number Room Name Area
133 LIBRARY / COMPUTER 330 SF
136 CLASSROOM 549 SF
137 CLASSROOM 581 SF
138 CLASSROOM 595 SF
139 CLASSROOM 581 SF
154 TRAINING DEV / SIM.
CENTER
1297 SF
207 CLASSROOM 687 SF
208 CLASSROOM 756 SF
210 CLASSROOM 480 SF
230 LIBRARY / COMPUTER 254 SF
6108 SF
Area Room Schedule CIRCULATION
Room Number Room Name Area
100 AIR LOCK 239 SF
101 LOBBY 1410 SF
102 AIR LOCK 192 SF
103 GREAT HALL 2092 SF
104 ELEVATOR 64 SF
109 ALCOVE 53 SF
126 AIR LOCK 60 SF
127 HALLWAY 788 SF
128 STAIRS 227 SF
131 HALLWAY 170 SF
132 HALLWAY 212 SF
141 ALCOVE 77 SF
151 HALLWAY 335 SF
159 HALLWAY 596 SF
163 HALLWAY 271 SF
166 HALLWAY 1168 SF
170 HALLWAY 361 SF
201 HALLWAY 1711 SF
202 HALLWAY 142 SF
217 STAIRS 53 SF
218 HALLWAY 88 SF
233 HALLWAY 221 SF
10529 SF
Area Room Schedule DRILL HALL
Room Number Room Name Area
183 DRILL HALL 6257 SF
184 MAINTENANCE BAY 1020 SF
7277 SF
Area Room Schedule SECTIONS
Room Number Room Name Area
129 CONFERENCE 309 SF
135 SECTION S2
INTELLIGENCE
335 SF
211 SECTION MDAY
SCOUTS/SNIPERS
346 SF
212 SECTION MDAY
MORTARS
354 SF
213 SECTION S6
COMMUNITCATIONS
358 SF
214 OFFICE S4 SENIOR
SUPPLY
135 SF
215 OFFICE S4 122 SF
216 SECTION S4 SUPPLY 436 SF
232 SECTION MDAY FIRE 510 SF
234 SECTION S3 PLANS 487 SF
234a ASSISTANT OPS NCO 94 SF
237 OFFICE AS3 115 SF
238 OFFICE AS3 115 SF
239 OFFICE OPS NCOIC 118 SF
240 S1 PS NCO 123 SF
241 SECTION S1
PERSONNEL
620 SF
242 OFFICE MEDICAL 120 SF
243 EXAM ROOM 106 SF
244 EXAM ROOM 93 SF
245 SECTION MDAY
MEDICAL
482 SF
5380 SF
Area Room Schedule OFFICES
Room Number Room Name Area
119 OFFICE ADMIN NCO 137 SF
120 OFFICE XO 137 SF
121 OFFICES HHC 755 SF
122 OFFICE 1SG 134 SF
123 OFFICE CDR 139 SF
124 OFFICE READINESS NCO 148 SF
125 PRINTER 83 SF
142 OFFICE ALPHA 337 SF
143 OFFICES ALPHA 255 SF
144 SECTION 92 SF
145 SECTION 99 SF
146 SECTION 136 SF
147 OFFICE CO XO 115 SF
148 OFFICE RNCO 121 SF
149 OFFICE CDR 120 SF
150 OFFICE 1SG 121 SF
152 FAMILY 242 SF
153 RECRUITING 242 SF
160 DISTRIBUTION 218 SF
177 DISTRIBUTION 337 SF
219 OFFICES HQ 785 SF
220 OFFICE S6 131 SF
221 OFFICE BN CSM 118 SF
222 OFFICE BNCDR 191 SF
223 OFFICE S4 121 SF
224 OFFICE S3 120 SF
225 OFFICE S1 121 SF
226 OFFICE XO 120 SF
227 PRINTER 68 SF
228 OFFICE CHAPLAIN 119 SF
229 OFFICE S2 119 SF
235 OFFICE AS3 118 SF
236 OFFICE AS3 115 SF
6217 SF
Area Room Schedule SUPPORT
Room Number Room Name Area
115 FITNESS 836 SF
130 BREAK 678 SF
156 TELECOM CLOSET 146 SF
168 FLAMMABLE
MATERIALS
149 SF
169 CONTROLLED WASTE 299 SF
209 A/V STORAGE 171 SF
231 TELECOM 302 SF
2581 SF
Area Room Schedule UNIT STORAGE
Room Number Room Name Area
161 VAULT 285 SF
171 CAGES 1374 SF
172 CAGES 1369 SF
173 CAGES 1383 SF
174 CAGES 1356 SF
175 CAGES 1217 SF
176 VAULT 285 SF
7269 SF
Area Room Schedule RESTROOMS &
SHOWERS
Room Number Room Name Area
108 WOMENS RESTROOM 160 SF
110 MENS RESTROOM 220 SF
111 MENS LOCKER HALL 115 SF
112 MENS SHOWER 130 SF
113 MENS SHOWER 141 SF
114 MENS LOCKER 205 SF
116 WOMENS RESTROOM 128 SF
117 WOMENS SHOWER 67 SF
178 ALCOVE 54 SF
179 WOMENS RESTROOM 191 SF
180 MENS RESTROOM 185 SF
204 NURSING 37 SF
205 WOMENS RESTROOM 228 SF
206 MENS RESTROOM 239 SF
2099 SF
Area Room Schedule UNIT LOCKER
Room Number Room Name Area
162 LOCKERS 641 SF
164 LOCKERS 3209 SF
165 LOCKERS 2309 SF
6159 SF
Area Room Schedule MECH. / ELEC.
Room Number Room Name Area
107 ELEC. 261 SF
118 MECHANICAL 946 SF
181 MECHANICAL 472 SF
182 ELECTRICAL 257 SF
1935 SF
Area Room Schedule FAC MAINT.
Room Number Room Name Area
105 ELEVATOR SERVICE 48 SF
106 FAC. MAINT 46 SF
134 FAC. MAINT. 204 SF
140 FAC. MAINT. 85 SF
155 SIM CENTER STORAGE 119 SF
157 FACILITY MAINT. 180 SF
167 FAC. MAINT 194 SF
203 FACILITY MAINT. 133 SF
1008 SF
Area Room Schedule TABLE CHAIR
Room Number Room Name Area
158 TABLE / CHAIR 526 SF
526 SF
Area Schedule (Gross Building)
Name Area
FIRST FLOOR AREA 49095 SF
SECOND FLOOR AREA 13878 SF
62972 SF
(10761)
(2459)
(7400)
(6392)
(6765)
(300)
(1225)
(300)
(10500)TOTAL OFFICES & SECTIONS
(6300)
(1024)
(1347)
(550)
(2244)
(800)
(640)
(300)
(150)
(64402)
(250)
(250)
Area Room Training Aid Storage
Room Number Room Name Area
207a Training Aid Storage 48 SF
208a Training Aid Storage 48 SF
210a Training Aid Storage 26 SF
122 SF
Area Room Schedule KITCHEN
Room Number Room Name Area
185 KITCHEN 672 SF
186 DRY STORAGE 108 SF
187 FRIDGE & FREEZER 203 SF
188 KITCHEN OFFICE 92 SF
189 KITCHEN JANITOR 14 SF
190 KITCHEN HALL 27 SF
191 KITCHEN RESTROOM 51 SF
192 SCULLERY 143 SF
1309 SF
| 01.1 - Cover Sheet |
| 01.2 - General Drawings |