Package 1 - General.pdf

PDF 3 MB Posted

Attached to
NORTH COLORADO SPRINGS READINESS CENTER SOLICITATION
Solicitation number
W912LC-11-R-0006
Issued by

About this file

FINAL DESIGN-DRAWINGS 1 OF 4

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS 08102011 Addendum.docx DOCX document
Addendum 2 080911.pdf PDF
Addendum 1 080911.pdf PDF
QUESTIONS AND ANSWERS 08092011 Addendum.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
Addendum__2.docx DOCX document
NCSRC Development Fees 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED 1600.docx DOCX document
Soils Report NCSRC.pdf PDF
LEED 2009 NCSRC Scorecard 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED.docx DOCX document
760092813_dsc_0253.jpg JPG image
QUESTIONS AND ANSWERS 07292011 REVISED.doc DOC document
QUESTIONS AND ANSWERS 07272011.doc DOC document
QUESTIONS AND ANSWERS 07262011 revised.doc DOC document
QUESTIONS AND ANSWERS 07262011.doc DOC document
Preproposal conference 072211 —
ATTENDANCE PRE-PROPOSAL CONF JULY 22 2011.pdf PDF
QUESTIONS AND ANSWERS 07222011.doc DOC document
W912LC-11-R-0006 MOD 0001.pdf PDF
QUESTIONS AND ANSWERS 07082011.doc DOC document
Package 2 - Site.pdf PDF
SOLICITATION W912LC-11-R-0006.pdf PDF
080201 - Final Design - Specifications Vol 1.pdf PDF
Package 3 - Arch Int Kitchen.pdf PDF
Package 4 - Structural Mech Pumb Elec FP.pdf PDF
080201 - Final Design - Specifications Vol 2.pdf PDF
Exhibit C SSS NCOSPR Final.doc DOC document
Exhibit D and F NCOSPR Final.doc DOC document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SITE

B R

IA

R G A

TE PK

W Y.

V O Y A G

ER

P K W Y

I-2

SPRINGCREST RD

nu m be r

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:

M.I.O. & J.F.

A.U. & G.L.

B

ID

F

IN

A L

D O

C U

M E

N T

V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O

G-01

COVER SHEET

281-01

Prelim Design Submittal 27 SEPT 2010

Concept Design JUNE 2010

Intermediate Design Submittal 20 JAN 2011

Final Design Submittal 31 MAY 2011

N O R

TH

C O

LO

R A D O S P R

IN

G S

R

EA

D

IN

ES

S C

EN

TE

R

Bid Final Documents 5 JULY 2011

NORTH COLORADO SPRINGS READINESS CENTER

PROJECT TEAMVICINITY MAPS

OWNER:

COLORADO ARMY

NATIONAL GUARD

Richard Burtt, MAJ, EN MILCON Project Manager Ph: 720-250-1389 Fax: 720-250-1369

ARCHITECTURE:

HB&A, LLC

Gene Leavines, AIA Associate Principal 102 East Moreno Avenue Colorado Springs, CO 80903

Ph: 719-473-7063 Fax: 719-473-7092 www.hbaa.com

M.E.P. ENGINEERING:

LEO A DALY

8600 Indian Hills Drive Omaha, NE 68114-4039 Ph: 402-391-8111 Fax: 402-391-8564 www.leoadaly.com

Mike Brady, PE Mechanical Engineer

Chad Schock Plumbing Designer

Jergen Noetzel, PE Electrical Engineer

STRUCTURAL ENGINEERING:

LEO A DALY

Susan A. Jorgensen, PE, LEED AP Principal, Structural Engineer 2000 South Colorado Boulevard Annex Building, Suite 300 Denver, CO 80222-7940 Ph: 303.756.2100 Fax: 303.757.2350 www.leoadaly.com

CIVIL ENGINEERING:

FARNSWORTH GROUP, INC.

Ted Barela, PE Engineering Manager 3538 JFK Parkway, Suite 3 Fort Collins, CO 80525 Ph: 970-266-1066 Fax: 970-266-1075 www.f-w.com

LANDSCAPE ARCHITECTURE:

Thomas & Thomas Jim Houk, ASLA Land Planner 614 N. Tejon Colorado Springs, CO 80903 Ph: 719-578-8777 Fax: 719-578-8495

INTERIOR DESIGNER:

Senger Design Group Cindy Senger, ASID 523 S Cascade Ave #B Colorado Springs, CO 80903 Ph: 719-522-1520 Fax: 719-522-1584

COLORADO ARMY NATIONAL GUARD

OPTIONAL LINE ITEM LIST (OLI)

West section of loop access drive paving as indicated on Drawing AS-100. The Base Bid shall include all grading and base course required to install the indicated section of the loop access road. OLI # 1 shall upgrade the western section of the loop access road to include asphalt paving. Should OLI #2 be selected then OLI #1 shall be upgraded to provide concrete paving. Required paving sections are noted on Drawing C-102. Note that both the northeast and southwest access control gates are included in the Base Bid.

The Base Bid includes rigid concrete paving at the Military Vehicle Parking, North and South Access entry aprons at Voyager Parkway, and the apron adjacent to the trash enclosure. The remainder of the vehicle paving in the Base Bid is asphalt paving. OLI #2 upgrades all asphalt paving to concrete using the same cross section and sub-base specified for the Military Vehicle Parking Area. Required paving sections are noted on Drawing C-102.

Covered Military Vehicle Parking structures as described by Drawings A-1000 & A-1001. All underground infrastructure required to support the Covered Military Vehicle Parking structures shall be included in the Base Bid including all underground conduit for power (block heaters), underground conduit for lighting, underground conduit for security monitoring, and underground conduit for the photovoltaic arrays included in OLI #4. All rigid concrete paving beneath the covered parking structures shall be included in the Base Bid.

Roof-mounted photovoltaic arrays on the covered Military Vehicle Parking structures. As noted in OLI #3, all underground conduits for the photovoltaic arrays shall be installed with the Base Bid.

Roof-mounted photovoltaic arrays located on the west wing of the primary Readiness Center building. Note that all internal conduit runs serving the roofmounted photovoltaic arrays shall be included in the Base Bid.

Unit ERU-5A to be provided in lieu of ERU-5. ERU-5A shall be heating only and shall be factory piped without reversing valve for heating only application.

Provide cream paste polish at the Drill Hall concrete floor (Room 183) in lieu of the Base Bid concrete sealer.

Main entry sidewalk shall be amended to include bronze lettering and contrasting integral concrete tint to create the memorial sidewalk as defined on Drawing AS-103. Memorial Walk Anchor Area shall be amended to include integral colored concrete (Re: AS-103)

1.

2.

3.

4.

5.

6.

7.

8.

EARTH

ROCK

CONCRETE

BRICK

CEMENT, SAND, GROUT,

PLASTER

STONE

STEEL

FINISHED WOOD

ROUGH WOOD

SHIMS

PLYWOOD

GLASS

ALUMINUM

GYPSUM BOARD

(GYP. BD.)

CONCRETE BLOCK

BATT INSULATION

RIGID INSULATION

FIRESAFING

CERAMIC TILE

POROUS FILL

STRUCTURAL GLAZED TILE

G

ROOM NAME

A

B

MATCH LINE

PROPERTY, BOUNDARY

LINES

CENTERLINE, GRIDS

PARTITION TYPES

ENLARGED PLAN

OR ELEVATION

NEW OR REQ'D.

ELEVATION

EXISTING CONTOURS

NEW CONTOURS

LEVEL/ELEV. INDICATOR

16.58

WINDOW TYPE

GRID LINE

ROOM/SPACE NUMBER

DOOR NUMBER

DETAIL

WALL SECTIONS

ELEVATIONS

KEYNOTE (DEMOLITION)26

A1.1

A6.2

FRAME TYPE

A7.1

DETAIL NUMBER

SHEET WHERE DRAWN

BUILDING SECTIONS5

A6.1

A

1/A-100

FLOOR DRAINFD

R's

REFER, REFERENCE

MARKER BOARDMB

MECHANICAL CONTRACTORMC

ELECTRICAL CONTRACTOREC

RELOCATEDRELOC

CENTER POINTCP

FLOOR MATF.M.

AFF

AP

ACOUST

ADD

ADJ

ALT

ALUM/AL

AB

APPROX

ARCH

AD

ABOVE FINISHED FLOOR

ACCESS PANEL

ACOUSTICAL

ADDENDUM

ADJUSTABLE/ADJACENT

ALTERNATIVE, ALTERNATE

ALUMINUM

ANCHOR BOLTS

ANGLE

APPROXIMATE

ARCHITECTURAL/ARCHITECT

AREA DRAIN

BR

BM

B.M.

BLKG

BD

BOT

BLDG

BLK

BACKER ROD

BEAM

BENCH MARK

BLOCKING

BOARD

BOTTOM

BUILDING

BLOCK

CAB'T

CPT

CI

CB

CLG

CEM

CEM PLAS

C

CR

CT

CLR

COL

COMP

CONC

CMU

CONST

CONT

CONTR

CJ

CORR

CTSK

CABINET

CARPET

CAST IRON

CHALKBOARD

CEILING

CEMENT

CEMENT PLASTER

CENTER LINE

CLASSROOM

CERAMIC TILE

CLEAR

COLUMN

COMPOSITE

CONCRETE

CONCRETE MASONRY UNIT

CONSTRUCTION

CONTINUOUS

CONTRACTOR

CONTROL JOINT

CORRIDOR

COUNTERSINK

AUTO AUTOMATIC

DEG

DET/DTL

DIA

DIAG

DIM

DR

DO

DN

DS

DWG

DEGREE

DETAIL

DIAMETER

DIAGONAL

DIMENSION

DOOR

DOOR OPENING

DOWN

DOWNSPOUT

DRAWING

EA

EW

ELEC

EP

EWC

EL

ELEV

EMER

EQ

ETC

EF

EX, EXIST

EXP

EJ

EXT

EACH

EACH WAY

ELECTRIC

ELECTRIC PANEL

ELECTRIC WATER COOLER

ELEVATION

ELEVATION/ELEVATOR

EMERGENCY

EQUAL

ETCETERA

EXHAUST FAN

EXISTING

EXPANSION

EXPANSION JOINT

EXTERIOR

FT

FIN

FF

FEC

FR

F.R.

FLASH

FLR

FD

FS

FLUOR

FTG

FURR

FEET/FOOT

FINISH

FINISH FLOOR

FIRE EXTINGUISHER CABINET

FRAME

FIRE RESISTANT

FLASHING

FLOOR

FLOOR DRAIN

FLOOR SINK

FLUORESECENT

FOOTING

FURRING

GALV

GI

GA

GB/GYP BD

GYP PLAS

GALVANIZED

GALVANIZED IRON/STEEL

GUAGE/GAGE

GYPSUM BOARD

GYSPUM PLASTER

HC

HDWE

HR

HT

HDR

HM

HORIZ

HB

HANDICAPPED

HARDWARE

HOUR

HEIGHT

HEADER

HOLLOW METAL

HORIZONTAL

HOSE BIB

INCL

ID

INSUL

INT

INCLUSIVE

INSIDE DIAMETER

INSULATION

INTERIOR

JAN

JT

JANITOR

JOINT

KO KNOCK OUT

LD BRG

LAV

LT

LOUV

LOAD BEARING

LAVATORY

LIGHT

LOUVER

MAT'L

MANUF/MANF

MO

MAX

MAS

MECH

MTL/MET

MIN

MISC

MT/MNT

MATERIAL

MANUFACTOR

MASONRY OPENING

MAXIMUM

MASONRY

MECHANICAL

METAL

MINIMUM

MINUS

MISCELLANEOUS

MOUNT, MOUNTED

NOM

NIC

NTS

NO

NOMINAL

NOT IN CONTRACT

NOT TO SCALE

NUMBER

OC

OPNG

OPP

OD

ORIG

ON CENTER

OPENING

OPPOSITE

OUTSIDE DIA/OVERFLOW DRAIN

ORIGINAL

PNT

PR

PLAS LAM

PL

PAINTED

PAIR

PLASTIC LAMINATE

PLATE

PLUS

PLBG

PLYWD

PVC

PT

PTN

PRPT

PLUMBING

PLYWOOD

POLYVINYLCLORIDE

POINT

PARTITION

PARAPET

QT QUARRY TILE

RAD/R

RECPT

REFIN

REFL

REINF

REQ'D

RF

RTU

REV

R&R

RD

RM

RO

RE:

RADIUS

RECEPTACLE

REFINISH

REFLECTED

REINFORCEMENT/REINFORCING

REQUIRED

ROOF, ROOFING

ROOF TOP UNIT

REVISED/REVISION

REMOVE AND REPLACE

ROOF DRAIN

ROOM

ROUGH OPENING

RISERS

SCHED

SHT

SIM

SPEC

SQ

SQ FT/SF

SQ IN

SQ YD

SS

STD

STL

STRUC

SEP

ST

SCHEDULES

SHEET

SIMILAR

SPECIFICATIONS/SPECIFIED/

SQUARE

SQUARE FOOT/SQUARE FEET

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STANDARD

STEEL

STRUCTURAL

SEPERATE

STRAIGHT

TELE

TB

THK

T&B

T.O.

TS

T's

TOW

TRANSF

TYP

TELEPHONE

TACK BOARD

THICK

TOP AND BOTTOM

TOILET

TOP OF

TUBE STEEL

TREADS

TOP OF WALL

TRANSFORMER

TYPICAL

TLT / TOIL

UNF

UNO

UBC

UNFINISHED

UNLESS NOTED OTHERWISE

UNIFORM BUILDING CODE

VCT

VERT

VS

VINYL COMPOSITION TILE

VERTICAL

VENT STACK

WC

W

WDW/WIND

W/ W/O

WD

WATER CLOSET

WASHER

WINDOW

WITH

WITHOUT

WOOD

SAT SUSPENDED ACOUSTICAL TILE

BRG BEARING

DEMO DEMOLITION

DBL DOUBLE

DF DRINKING FOUNTAIN

E EAST

JST JOIST

PL PROPERTY LINE

SAG SUSPENDED ACOUSTICAL GRID

SALV SALVAGE

T&G TONGUE & GROOVE

VWC VINYL WALL COVERING

WK

WF WIDE FLANGE

WORK

@ AT

T.O.M. TOP OF MASONRY

STOR STORAGE

RDL ROOF DRAIN LEADER

PRIN PRINCIPAL

POLYISO POLYISOCYANURATE

FIELD VERIFYF.V.

F.O.M. FACE OF MASONRY

PLN PLAN

MIL / MM MILLIMETER

MTG MOUNTING / MEETING

LMC LIBRARY MEDIA CENTER

INST INSTRUMENT

ENCL ENCLOSURE

ENG ENGINEER/ENGINEERING

EDUCATIONED

ABV ABOVE

A.V. AUDIO VIDEO

CONF CONFERENCE

CL CLOSET

OF, OFD OVER FLOW DRAIN

CIP CAST IN PLACE

RE: REFER TO

R REINFORCEMENT

nu m be r

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:

M.I.O. & J.F.

A.U. & G.L.

B

ID

F

IN

A L

D O

C U

M E

N T

V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O

G-02

DRAWING

SHEETS &

ABBREVIATIONS

281-01

Prelim Design Submittal 27 SEPT 2010

Concept Design JUNE 2010

Intermediate Design Submittal 20 JAN 2011

Final Design Submittal 31 MAY 2011

N O R

TH

C O

LO

R A D O S P R

IN

G S

R

EA

D

IN

ES

S C

EN

TE

R

Bid Final Documents 5 JULY 2011

MATERIALS & SYMBOLS LEGEND

ARCHITECTURAL ABBREVIATIONSDRAWING SHEET INDEX

GENERAL

CIVIL

LANDSCAPE

ARCHITECTURAL

STRUCTURAL

ELECTRICAL

PLUMBING

FOOD SERVICE

MECHANICAL

A-500 BUILDING SECTIONS

A-501 BUILDING SECTIONS

A-502 BUILDING SECTIONS

A-510 WALL SECTIONS

A-511 WALL SECTIONS

A-512 WALL SECTIONS

A-513 WALL SECTIONS

A-514 WALL SECTIONS

A-515 WALL SECTIONS

A-516 WALL SECTIONS

A-517 WALL SECTIONS

A-518 WALL SECTIONS

A-519 WALL SECTIONS

A-520 WALL SECTIONS

A-600 ENLARGED RESTROOM PLANS

A-601 ENLARGED PLANS

A-602 ENLARGED STAIR PLANS & SECTIONS

A-610 INTERIOR ELEVATIONS

A-611 INTERIOR ELEVATIONS

A-612 INTERIOR ELEVATIONS

A-620 INTERIOR DETAILS

A-621 INTERIOR DETAILS

A-622 INTERIOR DETAILS

A-623 INTERIOR DETAILS

A-624 INTERIOR DETAILS

A-700 FOUNDATION DETAILS

A-710 PLAN DETAILS

A-711 PLAN DETAILS

A-712 PLAN DETAILS

A-720 ROOF DETAILS

A-721 ROOF DETAILS

A-722 ROOF DETAILS

A-723 ROOF DETAILS

A-730 DETAILS

A-731 DETAILS

A-740 CEILING DETAILS

A-741 CEILING DETAILS

A-800 DOOR SCHEDULE

A-810 WINDOW SCHEDULE

A-811 WINDOW SCHEDULE

A-820 DOOR DETAILS

A-821 DOOR DETAILS

A-830 WINDOW DETAILS

A-831 WINDOW DETAILS

A-832 WINDOW DETAILS

A-900 ROOM MATERIAL SCHEDULE

A-910 WALL TYPES

A-1000 COVERED PARKING O.L.I.

A-1001 COVERED PARKING O.L.I. DETAILS

A-100 COMPOSITE FLOOR PLAN

A-101 SECTOR 1 FIRST FLOOR PLAN

A-102 SECTOR 2 FIRST FLOOR PLAN

A-103 SECTOR 3 FIRST FLOOR PLAN

A-110 SECTOR 2 SECOND FLOOR PLAN

A-111 SECTOR 3 SECOND FLOOR PLAN

A-120 CONTROL JOINT LAYOUT

A-121 SECTOR 1 - METAL CAGE DETAILED FLOOR PLAN

A-122 TA-50 LOCKER LAYOUT AND DETAILS

A-200 COMPOSITE RELFLECTED CEILING PLANS

A-201 SECTOR 1 FIRST FLOOR RELFECTED CEILING PLAN

A-202 SECTOR 2 FIRST FLOOR RELFECTED CEILING PLAN

A-203 SECTOR 3 FIRST FLOOR RELFECTED CEILING PLAN

A-210 SECTOR 2 SECOND FLOOR REFLECTED CEILING PLAN

A-211 SECTOR 3 SECOND FLOOR RELFECTED CEILING PLAN

A-300 COMPOSITE ROOF PLAN

A-301 PARTIAL ROOF PLAN

A-302 PARTIAL ROOF PLAN

A-310 LIGHTNING PROTECTION PLAN AND DETAILS

A-400 BUILDING ELEVATIONS

A-401 BUILDING ELEVATIONS

G-01 COVER SHEET

G-02 DRAWING SHEETS & ABBREVIATIONS

G-03 CODE ANALYSIS

G-04 DEPARTMENT PLANS

G-05 DEPARTMENT SCHEDULES

F-001 SITE PLAN

F-100 GENERAL NOTES AND LEGEND

F-101 HAZARD CLASSIFICATION PLAN

F-102 HAZARD CLASSIFICATION PLAN

F-103 HAZARD CLASSIFICATION PLAN

F-110 HAZARD CLASSIFICATION PLAN

F-201 FIRST FLOOR FIRE ALARM PLAN -

AREA 1

F-202 FIRST FLOOR FIRE ALARM PLAN -

AREA 2

F-203 FIRST FLOOR FIRE ALARM PLAN -

AREA 3

F-210 SECOND FLOOR FIRE ALARM PLAN

F-220 FIRE ALARM & MASS NOTIFICATION

MATRIX

E-001 ELECTRICAL SYMBOLS

E-100 ELECTRICAL SITE PLAN

E-101 LIGHTIING FIRST FLOOR SECTOR 1

E-102 LIGHTING FIRST FLOOR SECTOR 2

E-103 LIGHTING FIRST FLOOR SECTOR 3

E-110 LIGHTING SECOND FLOOR SECTOR 1

E-111 LIGHTING SECOND FLOOR SECTOR 2

E-201 POWER FIRST FLOOR SECTOR 1

E-202 POWER FIRST FLOOR SECTOR 2

E-203 POWER FIRST FLOOR SECTOR 3

E-210 POWER SECOND FLOOR SECTOR 2

E-211 POWER SECOND FLOOR SECTOR 2

E-301 SYSTEMS FIRST FLOOR SECTOR 1

E-302 SYSTEMS FIRST FLOOR SECTOR 2

E-303 SYSTEMS FIRST FLOOR SECTOR 3

E-311 SYSTEMS SECOND FLOOR SECTOR 2

E-400 ONE LINE DIAGRAM

E-401 ELECTRICAL DETAILS

E-402 ELECTRICAL DETAILS

E-403 ENLARGED KITCHEN PLAN

E-500 SCHEDULES AND DIAGRAMS

E-501 PANEL SCHEDULES

E-502 PANEL SCHEDULES

E-503 PANEL SCHEDULES

P-001 PLUMBING ABBREVIATION SYMBOLS

P-011 PLUMBING FOUNDATION SECTOR 1

P-012 PLUMBING FOUNDATION SECTOR 2

P-013 PLUMBING FOUNDATION SECTOR 3

P-101 PLUMBING LEVEL 1 SECTOR 1

P-102 PLUMBING LEVEL 1 SECTOR 2

P-103 PLUMBING LEVEL 1 SECTOR 3

P-113 PLUMBING LEVEL 2 SECTOR 3

P-120 ROOF PLAN WEST PLUMBING

P-121 ROOF PLAN EAST PLUMBING

P-400 PLUMBING SCHEDULE

P-500 PLUMBING DETAILS

P-501 PLUMBING DETAILS

M-000 MECHANICAL UTILITY PLAN

M-001 MECHANICAL ABBREVIATION AND

SYMBOLS

M-101 HVAC LEVEL 1 SECTOR 1

M-102 HVAC LEVEL 1 SECTOR 2

M-103 HVAC LEVEL 1 SECTOR 3

M-110 HVAC LEVEL 2 SECTOR 2

M-111 HVAC LEVEL 2 SECTOR 3

M-201 HVAC PIPING LEVEL 1 SECTOR 1

M-202 HVAC PIPING LEVEL 1 SECTOR 2

M-203 HVAC PIPING LEVEL 1 SECTOR 3

M-211 HVAC PIPING LEVEL 2 SECTOR 3

M-301 HVAC ENLARGED PLANS

M-302 HVAC ENLARGED PLANS

M-401 TEMPERATURE CONTROL SEQUENCE

M-402 TEMPERATURE CONTROL POINTS LIST

M-403 TEMPERATURE CONTROL POINTS LIST

M-501 MECHANICAL DETAILS

M-601 HVAC SCHEDULES

M-602 HVAC SCHEDULES

S-532 FRAMING DETAILS

S-533 FRAMING DETAILS

S-534 FRAMING DETAILS

S-540 STEEL JOIST DIAGRAMS

S-541 STEEL TRUSS DIAGRAMS

S-550 WINDOW SUPPORT DETAILS

S-551 WINDOW SUPPORT DETAILS

S-552 WINDOW SUPPORT DETAILS

S-560 STAIR LAYOUT AND DETAILS

S-570 SITE STRUCTURES

S-580 COV. PARKING OLI

S-581 COV. PARKING OLI SECTIONS AND

DETAILS

S-601 STL. COL. AND BASE PLATED SCHED

S-602 BEAM CONNECTION SCHEDULES AND

DETAILS

S-001 STRUCTURAL GENERAL NOTES

S-002 STRUCTURAL GENERAL NOTES

S-003 STRUCTURAL GENERAL NOTES

S-101 FOUNDATION PLAN SECTOR 1

S-102 FOUNDATION PLAN SECTOR 2

S-103 FOUNDATION PLAN SECTOR 3

S-111 LOW ROOF FRAMING PLAN SECTOR 1

S-112 LOW ROOF FRAMING PLAN SECTOR 2

S-113 SECOND FLOOR FRAMING PLAN

SECTOR 3

S-122 HIGH ROOF FRAMING SECTOR 2

S-123 HIGH ROOF FRAMING SECTOR 3

S-501 FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 FOUNDATION DETAILS

S-510 CONCRETE VAULT DETAILS

S-520 MASONRY WALL DETAILS

S-530 FRAMING DETAILS

S-531 FRAMING DETAILS

FS1.1 FOODSERVICE EQUIPMENT PLAN

FS1.2 FOODSERVICE BUILD. COND & VENT.

PLAN

FS1.3 FOODSERVICE PLUMBING PLAN

FS1.4 FOODSERVICE ELECTRICAL PLAN

FS2.1 MANUFACTURER'S HOOD DRAWING

IN-101 FIRST FLOOR FINISH PLAN

IN-102 FIRST FLOOR FINISH PLAN

IN-103 FIRST FLOOR FINISH PLAN

IN-110 SECOND FLOOR FINISH PLAN

IN-201 FIRST FLOOR FURNITURE PLAN

IN-202 FIRST FLOOR FURNITURE PLAN

IN-203 FIRST FLOOR FURNITURE PLAN

IN-210 SECOND FLOOR FURNITURE PLAN

IN-300 INTERIOR FINISH SPECIFICATIONS

IN-301 INTERIOR FINISH SCHEDULE & TYP.

FINISH ELEVS.

IN-302 SECOND FLOOR INTERIOR FINISH

SCHEDULE

AS-100 ARCHITECTURE SITE & OLI PLAN

AS-101 ARCHITECTURAL SITE DETAILS

AS-102 MONUMENT SIGN

AS-103 MEMORIAL WALK

AS-104 MILITARY VEHICLE PARKING LAYOUT

AS-110 ATFP SITE PLAN

L-100 LANDSCAPE SITE PLAN

L-101 LANDSCAPE SITE PLAN

L-102 LANDSCAPE DETAILS

L-103 TREE TRANSPLANT PLAN

L-104 SITE DETAILS

L-105 LANDSCAPE DETAILS

IR-100 IRRIGATION PLANS

IR-101 IRRIGATION PLANS

IR-102 IRRIGATION PLANS

IR-103 IRRIGATION DETAILS

IR-104 IRRIGATION DETAILS

C-001 CIVIL GENERAL NOTES

C-002 SURVEY

C-003 DEMOLITION PLAN

C-004 DEMOLITION PLAN

C-100 OVERALL SITE PLAN

C-101 SITE PLAN

C-102 SITE PLAN

C-103 LINE AND CURVE TABLE

C-104 SIGNAGE AND STRIPING PLAN

C-105 SIGNAGE AND STRIPING PLAN

C-300 OVERALL UTILITY PLAN

C-301 OVERALL UTILITY PLAN

C-302 OVERALL UTILITY PLAN

C-400 GRADE, DRAIN & EROSION CONTRL PLN

C-401 GRADE, DRAIN & EROSION CONTRL PLN

C-402 GRADE, DRAIN & EROSION CONTRL PLN

C-403 GRADE, DRAIN & EROSION CONTRL PLN

C-404 GRADE, DRAIN & EROSION CONTRL PLN

C-405 DRIVEWAY PROFILE

C-406 DRIVEWAY PROFILE

C-500 SANITARY SEWER PROFILE

C-600 WATERLINE PROFILE

C-601 WATERLINE PROFILE

C-700 STORM SEWER PROFILE

C-701 STORM SEWER PROFILE

C-800 SITE DETAILS

C-801 SITE DETAILS

C-802 SITE DETAILS

C-803 SITE DETAILS

C-804 SITE DETAILS

C-804A SITE DETAILS

C-805 WATER DETAILS

C-806 WATER DETAILS

C-807 WATER DETAILS

C-808 WATER DETAILS

C-809 WATER DETAILS

C-810 WATER DETAILS

C-811 SANITARY SEWER DETAILS

C-812 SANITARY SEWER DETAILS

C-813 STORM SEWER DETAILS

C-814 STORM SEWER DETAILS

C-815 STORM SEWER DETAILS

C-816 STORM SEWER DETAILS

C-900 TRAFFIC SIGNAL PLAN

C-901 TRAFFIC SIGNAL PLAN

1. All dimensions are to face of stud or face of masonry unless noted otherwise.

2. Refer to enlarged plans for dimensions, detail references and interior elevation references within the bubbled areas.

3. Refer to A-910 for wall types.

4. Refer to finish plans and room finish schedule for location of wall finishes and proposed furniture layouts.

5. Where doors in metal stud partitions are not specifically dimensioned on the plan provide a hinge side dimension of 6” from door opening to the adjacent perpendicular wall.

6. Contractor shall verify installation requirements for all products to be incorporated in the work (including partition thickness for recessed products and blocking), and is responsible for accommodating any changes to other materials or products that are necessary to properly complete the installation.

7. Refer to A-900 and Specifications for information regarding sealant locations and types.

GENERAL NOTES

8. The drawings and specifications are complimentary. Items shown in one location in the drawings shall be considered to be a requirement of the contract for construction. In the event of an inconsistency between drawings and the specification, or within either set of documents, the contractor shall seek clarification or interpretation from the architect prior to bidding. Where inconsistencies are not clarified prior to bidding, the contractor shall provide the better quality or greater quantity of work.

9. Fire rated corridors, stair enclosures, doors, and partitions indicated in this set of documents are components of continuous system consisting of walls, floors, and ceilings.

Provide rated assemblies for indicated locations to maintain the continuity of the fire rating. Provide fire safing and fire rated sealants to maintain the continuity.

10. Provide rolling shades in all window openings and at all door frame types 5, except for the curtain walls in air lock 100, lobby 101, air lock 102 and the translucent wall panel in drill hall 183. Refer to Room Finish Schedule for more information.

11. Conceal ALL conduit in walls and in ceilings, including in CMU. Contractor to coordinate locations of conduit runs prior to wall construction. Except in mech, elec rooms and Maint. Bay.

INTERIORS

FIRE PROTECTION

ARCHITECTURAL (CONT.) STRUCTURAL (CONT.)

UP

UP

UP

DN

ASSEMBLY

CLASSROOM

EXERCISE

LOCKERS

KITCHEN

MECHANICAL

OFFICE

STORAGE

1 HOUR SEPARATION

LEGEND

FIRE EXTINGUISHER

CABINET

F.E.C.

B

A-3S-1 34' - 2 5/8"

28' - 1 1/2"

S-1

19' - 2 5/8"

/4

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

F.E.C.

A-3

B

6' - 8"

' - 4

42' - 4"

20' - 0"

' - 6

79'-6"

75'-4"

' - 0

"16' - 6"

1 0 ' - 6

F.E.C.

F.E.C.

F.E.C.

Applicable Building Code: 2009 International Building Code Reference Section

Building Square Footage:

Classification:

Allowable Height:

Allowable Building Area:

Automatic Sprinkler System is being provided.

Area Increase:

45,930 sf net 1st Floor 12,622 sf net 2nd Floor 58,552 sf net Total 49,095 sf gross 1st Floor 13,885 sf gross 2nd Floor 62,980 sf gross Total

A-3 Assembly (8,562 sf net) B, Business (29,982 sf net) S-1, Storage (19,740 sf net)

Type IIB, A-3 - 2 Stories Type IIB, B - 4 Stories Type IIB, S-1 - 3 Stories

Type IIB, A-3 - 9,500sf Type IIB, B - 23,000sf Type IIB, S-1 - 17,500sf

Sect. 302.1, 303.1 Sect. 304.1 Sect. 311.2

Table 503

Table 503

Area Increase per Frontage [1-.25]1 = .75 A-3 (9,500) 9,500 + [9,500 X .75] + 9,500 x 2 = 35,625sf 35,635sf x 2 = 71,250sf (2 stories)

B (23,000) 23,000 + [23,000 x .75] + 23,000 x 2 = 86,250sf 86,250sf x 2 = 172,500sf (2 stories)

S-1 (17,500) 17,500 + [17,500 x .75] + 17,500 x 2 = 65,625sf 65,625sf x 2 = 131,250sf (2 stories)

Ratios B - 17,360/86,250 = .20 (first floor) A-3 - 8,562/35,625 = .24 S-1 - 19,740/65,625 = .30 First Floor Total = .74

B - 12,622/86,250 = .15 (second floor) Second Floor Total = .15

Type IIB

Mixed Occupancy A-3 Assembly B Office S-1 Storage

1 Hour between B and A-3 1 Hour between A-3 and S (Classroom A-3 is being considered an accessory use and is not separated)

Assembly without fixed seats, 15 net Business areas, 100 gross Classrooms, 20 net Kitchens, 200 gross Library, 50 gross Locker room, 50 gross Exercise rooms, 50 gross Storage, 300 gross Mechanical rooms, 300 gross

Assembly 8,562 sf/15 570 Business areas 19,704 sf/100 197 Classrooms 4,227 sf/20 211 Kitchen 1,309 sf/200 7 Library 584 sf/50 12 Locker room 320 sf/50 6 Exercise room 836 sf/50 17 Storage 21,067 sf/300 70 Mechanical 1,943 sf/300 6 Total 1,096

Building Construction Type:

Building Occupancy Types:

Occupancy Separations:

Occupancy Load:

Sect. 508.3

Table 508.3.3

Table 1004.1.1

Minimum Egress Width:

Exit Travel Distance:

Corridor Construction:

Corridor Width:

Dead Ends:

Number of Exits:

Vertical Exit Enclosures:

Accessibility Parking:

Lockers:

Plumbing Fixtures:

0.2"/occupant Stairways 156" (13') 0.15"/occupant Other 117" (9.75') Occupant load 2nd floor = 60*.2" = 12" Occupant load A-3 = 570*.2" = 114" (9'-6")

A, S-1 = 250' B = 300'

A fire-resistance rating is not required for corridors in an occupancy in Group B which is a space requiring only a single means of egress.

A,B,S: When occupant load served by corridor is greater than 30 with a sprinkler system is 0 hours.

44" minimum

If more than one exit is required, 20' B Occupancies with a sprinkler, 50'

Occupant Load More than 1000 = 4

1 hour if less than 4 stories

If 301-400 spaces are provided, provide 8 accessible parking spaces, provide 2 van accessible space

5% of Lockers need to be accessible

Total Occupant Load = 1092

Table 1005.1

Table 1016.1

Sect. 1017.1

Table 1017.1

Sect. 1018.2

Sect. 1018.4

Table 1021.1

Table 1022.1

Table 1106.1

Sect. 1109.8.1

Table 2902.1

Reference SectionApplicable Building Code: 2009 International Building Code

Building Code Analysis

Reference SectionApplicable Building Code: 2009 International Building Code

OCCUPANT LOAD FOR PLUMBING

FIXTURES (CIRCULATION REMOVED)

Assembly without fixed seats, 15 net Business areas, 100 gross Classrooms, 20 net Kitchens, 200 gross Library, 50 gross Locker room, 50 gross Exercise rooms, 50 gross Storage, 300 gross Mechanical rooms, 300 gross

Assembly 8,551 sf/15 570 Business areas 14,871 sf/100 149 Classrooms 3,534 sf/20 177 Kitchen 1,342 sf/200 7 Library 601 sf/50 12 Locker room 236 sf/50 5 Exercise room 798 sf/50 16 Storage 17,131 sf/300 58 Mechanical 1,988 sf/300 7 Total 1,001

Total Occupant Load = 1001

Male 80% = 801, Female 20% = 200

Assembly: M = 1/125, F = 1/65, Lav = 1/200, DF = 1/500 Assembly load = 570 total = 285M & 285F M = 3, F = 5, MLav = 2 FLav = 2, DF = 1* *(Assembly is an ancillary use to the remainder of the occupancy)

Business: M&F = 1/25 for 50 then 1/50 thereafter, Lav = 1/100, DF = 1/100 Business load = 373, 298M & 75F M = 7, F = 3, Mlav = 3, Flav = 1, DF = 4

Storage: M&F = 1/100, Lav = 1/100, DF = 1/100 Storage load = 58 total M = 1, F = 1, Lav = 1 in each restroom, DF = 1

Total Male fixtures = 11 [ 13 provided ] Total Female fixtures = 9 [ 9 provided ] Total Unisex fixtures = 0 [ 1 provided ] Total Male lavs = 6 [ 8 provided ] Total Female lavs = 4 [ 7 provided ] Total Unisex lavs = 0 [ 1 provided ] Total Drinking Fountains = 6 [ 6 provided ] nu m be r

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:

M.I.O. & J.F.

A.U. & G.L.

B

ID

F

IN

A L

D O

C U

M E

N T

V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O

G-03

CODE ANALYSIS

281-01

Prelim Design Submittal 27 SEPT 2010

Concept Design JUNE 2010

Intermediate Design Submittal 20 JAN 2011

Final Design Submittal 31 MAY 2011

N O R

TH

C O

LO

R A D O S P R

IN

G S

R

EA

D

IN

ES

S C

EN

TE

R

Bid Final Documents 5 JULY 2011

3/64" = 1'-0"G-03

1 First Floor Plan

3/64" = 1'-0"G-03

2 Second Floor Plan

WALLS TO BE

DESIGNED FOR

SMOKE CONATINMENT

WITHIN ROOM

PER SECTION

508.2.5 OF THE

2009 IBC

WALLS TO BE DESIGNED

FOR SMOKE CONATINMENT

WITHIN ROOM

PER SECTION 508.2.5 OF

THE 2009 IBC

PER SECTION 3006.4

EXCEPTION 2 OF THE

2009 IBC

ACCESSORY USE NO FIRE

RATING PER SECTIONS 508.2.1

& 508.2.4 OF THE 2009 IBC

UP

DN

172 174

165 164

176 177

161 160

114 115

118 121

133143

108 110

137138

148150 149

144 146

Department Legend

CIRCULATION

CLASSROOMS

DRILL HALL

FAC. MAINT.

KITCHEN

MECH. / ELEC.

OFFICES

RESTROOMS & SHOWERS

SECTIONS

SUPPORT

UNIT LOCKERS

UNIT STORAGE

107 125

173 175171

166 117

208 210

225 224

214 215

240 236

239 238 237

234a241

207a

208a

210a

Department Legend

CIRCULATION

CLASSROOMS

FAC. MAINT.

OFFICES

RESTROOMS & SHOWERS

SECTIONS

SUPPORT

TRAINING AID STORAGE

nu m be r

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:

M.I.O. & J.F.

A.U. & G.L.

B

ID

F

IN

A L

D O

C U

M E

N T

V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O

G-04

DEPARTMENT

PLANS

281-01

Prelim Design Submittal 27 SEPT 2010

Concept Design JUNE 2010

Intermediate Design Submittal 20 JAN 2011

Final Design Submittal 31 MAY 2011

N O R

TH

C O

LO

R A D O S P R

IN

G S

R

EA

D

IN

ES

S C

EN

TE

R

Bid Final Documents 5 JULY 2011

3/64" = 1'-0"G-04

1 COMPOSITE - FIRST FLOOR DEPARTMENT PLAN

3/64" = 1'-0"G-04

2 COMPOSITE - SECOND FLOOR DEPARTMENT PLAN

0' 10' 20' 40' 80' 5°

N

0' 10' 20' 40' 80' 5°

N nu m be r

H B & A, L L C

ARCHITECTURE

PLANNING &

INFORMATION

TECHNOLOGY

102 EAST MORENO

AVENUE

COLORADO SPRINGS

COLORADO

80903-3392

719.473.7063 www.hbaa.com ch k d d ra w n jo b is su e r ev is io n d es cr ip ti o n se al as so ci at ed w it h pr o je ct ar c hi te ct issue / revision date:

M.I.O. & J.F.

A.U. & G.L.

B

ID

F

IN

A L

D O

C U

M E

N T

V o ya ge r P ar kw ay C o lo ra d o S pr in gs C O

G-05

DEPARTMENT

SCHEDULES

281-01

Prelim Design Submittal 27 SEPT 2010

Concept Design JUNE 2010

Intermediate Design Submittal 20 JAN 2011

Final Design Submittal 31 MAY 2011

N O R

TH

C O

LO

R A D O S P R

IN

G S

R

EA

D

IN

ES

S C

EN

TE

R

Bid Final Documents 5 JULY 2011

Area Room Schedule

Room Number Room Name Area

179 WOMENS RESTROOM 191 SF

180 MENS RESTROOM 185 SF

181 MECHANICAL 472 SF

182 ELECTRICAL 257 SF

183 DRILL HALL 6257 SF

184 MAINTENANCE BAY 1020 SF

185 KITCHEN 672 SF

186 DRY STORAGE 108 SF

187 FRIDGE & FREEZER 203 SF

188 KITCHEN OFFICE 92 SF

189 KITCHEN JANITOR 14 SF

190 KITCHEN HALL 27 SF

191 KITCHEN RESTROOM 51 SF

192 SCULLERY 143 SF

201 HALLWAY 1711 SF

202 HALLWAY 142 SF

203 FACILITY MAINT. 133 SF

204 NURSING 37 SF

205 WOMENS RESTROOM 228 SF

206 MENS RESTROOM 239 SF

207 CLASSROOM 687 SF

207a Training Aid Storage 48 SF

208 CLASSROOM 756 SF

208a Training Aid Storage 48 SF

209 A/V STORAGE 171 SF

210 CLASSROOM 480 SF

210a Training Aid Storage 26 SF

211 SECTION MDAY

SCOUTS/SNIPERS

346 SF

212 SECTION MDAY MORTARS 354 SF

213 SECTION S6

COMMUNITCATIONS

358 SF

214 OFFICE S4 SENIOR SUPPLY 135 SF

215 OFFICE S4 122 SF

216 SECTION S4 SUPPLY 436 SF

217 STAIRS 53 SF

218 HALLWAY 88 SF

219 OFFICES HQ 785 SF

220 OFFICE S6 131 SF

221 OFFICE BN CSM 118 SF

222 OFFICE BNCDR 191 SF

223 OFFICE S4 121 SF

224 OFFICE S3 120 SF

225 OFFICE S1 121 SF

226 OFFICE XO 120 SF

227 PRINTER 68 SF

228 OFFICE CHAPLAIN 119 SF

229 OFFICE S2 119 SF

230 LIBRARY / COMPUTER 254 SF

231 TELECOM 302 SF

232 SECTION MDAY FIRE 510 SF

233 HALLWAY 221 SF

234 SECTION S3 PLANS 487 SF

234a ASSISTANT OPS NCO 94 SF

235 OFFICE AS3 118 SF

236 OFFICE AS3 115 SF

237 OFFICE AS3 115 SF

238 OFFICE AS3 115 SF

239 OFFICE OPS NCOIC 118 SF

240 S1 PS NCO 123 SF

241 SECTION S1 PERSONNEL 620 SF

242 OFFICE MEDICAL 120 SF

243 EXAM ROOM 106 SF

244 EXAM ROOM 93 SF

245 SECTION MDAY MEDICAL 482 SF

58520 SF

Area Room Schedule

Room Number Room Name Area

100 AIR LOCK 239 SF

101 LOBBY 1410 SF

102 AIR LOCK 192 SF

103 GREAT HALL 2092 SF

104 ELEVATOR 64 SF

105 ELEVATOR SERVICE 48 SF

106 FAC. MAINT 46 SF

107 ELEC. 261 SF

108 WOMENS RESTROOM 160 SF

109 ALCOVE 53 SF

110 MENS RESTROOM 220 SF

111 MENS LOCKER HALL 115 SF

112 MENS SHOWER 130 SF

113 MENS SHOWER 141 SF

114 MENS LOCKER 205 SF

115 FITNESS 836 SF

116 WOMENS RESTROOM 128 SF

117 WOMENS SHOWER 67 SF

118 MECHANICAL 946 SF

119 OFFICE ADMIN NCO 137 SF

120 OFFICE XO 137 SF

121 OFFICES HHC 755 SF

122 OFFICE 1SG 134 SF

123 OFFICE CDR 139 SF

124 OFFICE READINESS NCO 148 SF

125 PRINTER 83 SF

126 AIR LOCK 60 SF

127 HALLWAY 788 SF

128 STAIRS 227 SF

129 CONFERENCE 309 SF

130 BREAK 678 SF

131 HALLWAY 170 SF

132 HALLWAY 212 SF

133 LIBRARY / COMPUTER 330 SF

134 FAC. MAINT. 204 SF

135 SECTION S2 INTELLIGENCE 335 SF

136 CLASSROOM 549 SF

137 CLASSROOM 581 SF

138 CLASSROOM 595 SF

139 CLASSROOM 581 SF

140 FAC. MAINT. 85 SF

141 ALCOVE 77 SF

142 OFFICE ALPHA 337 SF

143 OFFICES ALPHA 255 SF

144 SECTION 92 SF

145 SECTION 99 SF

146 SECTION 136 SF

147 OFFICE CO XO 115 SF

148 OFFICE RNCO 121 SF

149 OFFICE CDR 120 SF

150 OFFICE 1SG 121 SF

151 HALLWAY 335 SF

152 FAMILY 242 SF

153 RECRUITING 242 SF

154 TRAINING DEV / SIM. CENTER 1297 SF

155 SIM CENTER STORAGE 119 SF

156 TELECOM CLOSET 146 SF

157 FACILITY MAINT. 180 SF

158 TABLE / CHAIR 526 SF

159 HALLWAY 596 SF

160 DISTRIBUTION 218 SF

161 VAULT 285 SF

162 LOCKERS 641 SF

163 HALLWAY 271 SF

164 LOCKERS 3209 SF

165 LOCKERS 2309 SF

166 HALLWAY 1168 SF

167 FAC. MAINT 194 SF

168 FLAMMABLE MATERIALS 149 SF

169 CONTROLLED WASTE 299 SF

170 HALLWAY 361 SF

171 CAGES 1374 SF

172 CAGES 1369 SF

173 CAGES 1383 SF

174 CAGES 1356 SF

175 CAGES 1217 SF

176 VAULT 285 SF

177 DISTRIBUTION 337 SF

178 ALCOVE 54 SF

Area Room Schedule CLASSROOMS

Room Number Room Name Area

133 LIBRARY / COMPUTER 330 SF

136 CLASSROOM 549 SF

137 CLASSROOM 581 SF

138 CLASSROOM 595 SF

139 CLASSROOM 581 SF

154 TRAINING DEV / SIM.

CENTER

1297 SF

207 CLASSROOM 687 SF

208 CLASSROOM 756 SF

210 CLASSROOM 480 SF

230 LIBRARY / COMPUTER 254 SF

6108 SF

Area Room Schedule CIRCULATION

Room Number Room Name Area

100 AIR LOCK 239 SF

101 LOBBY 1410 SF

102 AIR LOCK 192 SF

103 GREAT HALL 2092 SF

104 ELEVATOR 64 SF

109 ALCOVE 53 SF

126 AIR LOCK 60 SF

127 HALLWAY 788 SF

128 STAIRS 227 SF

131 HALLWAY 170 SF

132 HALLWAY 212 SF

141 ALCOVE 77 SF

151 HALLWAY 335 SF

159 HALLWAY 596 SF

163 HALLWAY 271 SF

166 HALLWAY 1168 SF

170 HALLWAY 361 SF

201 HALLWAY 1711 SF

202 HALLWAY 142 SF

217 STAIRS 53 SF

218 HALLWAY 88 SF

233 HALLWAY 221 SF

10529 SF

Area Room Schedule DRILL HALL

Room Number Room Name Area

183 DRILL HALL 6257 SF

184 MAINTENANCE BAY 1020 SF

7277 SF

Area Room Schedule SECTIONS

Room Number Room Name Area

129 CONFERENCE 309 SF

135 SECTION S2

INTELLIGENCE

335 SF

211 SECTION MDAY

SCOUTS/SNIPERS

346 SF

212 SECTION MDAY

MORTARS

354 SF

213 SECTION S6

COMMUNITCATIONS

358 SF

214 OFFICE S4 SENIOR

SUPPLY

135 SF

215 OFFICE S4 122 SF

216 SECTION S4 SUPPLY 436 SF

232 SECTION MDAY FIRE 510 SF

234 SECTION S3 PLANS 487 SF

234a ASSISTANT OPS NCO 94 SF

237 OFFICE AS3 115 SF

238 OFFICE AS3 115 SF

239 OFFICE OPS NCOIC 118 SF

240 S1 PS NCO 123 SF

241 SECTION S1

PERSONNEL

620 SF

242 OFFICE MEDICAL 120 SF

243 EXAM ROOM 106 SF

244 EXAM ROOM 93 SF

245 SECTION MDAY

MEDICAL

482 SF

5380 SF

Area Room Schedule OFFICES

Room Number Room Name Area

119 OFFICE ADMIN NCO 137 SF

120 OFFICE XO 137 SF

121 OFFICES HHC 755 SF

122 OFFICE 1SG 134 SF

123 OFFICE CDR 139 SF

124 OFFICE READINESS NCO 148 SF

125 PRINTER 83 SF

142 OFFICE ALPHA 337 SF

143 OFFICES ALPHA 255 SF

144 SECTION 92 SF

145 SECTION 99 SF

146 SECTION 136 SF

147 OFFICE CO XO 115 SF

148 OFFICE RNCO 121 SF

149 OFFICE CDR 120 SF

150 OFFICE 1SG 121 SF

152 FAMILY 242 SF

153 RECRUITING 242 SF

160 DISTRIBUTION 218 SF

177 DISTRIBUTION 337 SF

219 OFFICES HQ 785 SF

220 OFFICE S6 131 SF

221 OFFICE BN CSM 118 SF

222 OFFICE BNCDR 191 SF

223 OFFICE S4 121 SF

224 OFFICE S3 120 SF

225 OFFICE S1 121 SF

226 OFFICE XO 120 SF

227 PRINTER 68 SF

228 OFFICE CHAPLAIN 119 SF

229 OFFICE S2 119 SF

235 OFFICE AS3 118 SF

236 OFFICE AS3 115 SF

6217 SF

Area Room Schedule SUPPORT

Room Number Room Name Area

115 FITNESS 836 SF

130 BREAK 678 SF

156 TELECOM CLOSET 146 SF

168 FLAMMABLE

MATERIALS

149 SF

169 CONTROLLED WASTE 299 SF

209 A/V STORAGE 171 SF

231 TELECOM 302 SF

2581 SF

Area Room Schedule UNIT STORAGE

Room Number Room Name Area

161 VAULT 285 SF

171 CAGES 1374 SF

172 CAGES 1369 SF

173 CAGES 1383 SF

174 CAGES 1356 SF

175 CAGES 1217 SF

176 VAULT 285 SF

7269 SF

Area Room Schedule RESTROOMS &

SHOWERS

Room Number Room Name Area

108 WOMENS RESTROOM 160 SF

110 MENS RESTROOM 220 SF

111 MENS LOCKER HALL 115 SF

112 MENS SHOWER 130 SF

113 MENS SHOWER 141 SF

114 MENS LOCKER 205 SF

116 WOMENS RESTROOM 128 SF

117 WOMENS SHOWER 67 SF

178 ALCOVE 54 SF

179 WOMENS RESTROOM 191 SF

180 MENS RESTROOM 185 SF

204 NURSING 37 SF

205 WOMENS RESTROOM 228 SF

206 MENS RESTROOM 239 SF

2099 SF

Area Room Schedule UNIT LOCKER

Room Number Room Name Area

162 LOCKERS 641 SF

164 LOCKERS 3209 SF

165 LOCKERS 2309 SF

6159 SF

Area Room Schedule MECH. / ELEC.

Room Number Room Name Area

107 ELEC. 261 SF

118 MECHANICAL 946 SF

181 MECHANICAL 472 SF

182 ELECTRICAL 257 SF

1935 SF

Area Room Schedule FAC MAINT.

Room Number Room Name Area

105 ELEVATOR SERVICE 48 SF

106 FAC. MAINT 46 SF

134 FAC. MAINT. 204 SF

140 FAC. MAINT. 85 SF

155 SIM CENTER STORAGE 119 SF

157 FACILITY MAINT. 180 SF

167 FAC. MAINT 194 SF

203 FACILITY MAINT. 133 SF

1008 SF

Area Room Schedule TABLE CHAIR

Room Number Room Name Area

158 TABLE / CHAIR 526 SF

526 SF

Area Schedule (Gross Building)

Name Area

FIRST FLOOR AREA 49095 SF

SECOND FLOOR AREA 13878 SF

62972 SF

(10761)

(2459)

(7400)

(6392)

(6765)

(300)

(1225)

(300)

(10500)TOTAL OFFICES & SECTIONS

(6300)

(1024)

(1347)

(550)

(2244)

(800)

(640)

(300)

(150)

(64402)

(250)

(250)

Area Room Training Aid Storage

Room Number Room Name Area

207a Training Aid Storage 48 SF

208a Training Aid Storage 48 SF

210a Training Aid Storage 26 SF

122 SF

Area Room Schedule KITCHEN

Room Number Room Name Area

185 KITCHEN 672 SF

186 DRY STORAGE 108 SF

187 FRIDGE & FREEZER 203 SF

188 KITCHEN OFFICE 92 SF

189 KITCHEN JANITOR 14 SF

190 KITCHEN HALL 27 SF

191 KITCHEN RESTROOM 51 SF

192 SCULLERY 143 SF

1309 SF

01.1 - Cover Sheet
01.2 - General Drawings

File details come from the government source that posted it. Updated .