North Colorado Springs Readiness Center – Colorado Army National Guard
Proj. No. 080201 PROFESSIONAL SEALS 31 May 2011
00 0002 - 1
PROFESSIONAL SEALS
awjohnson Susie Stamp awjohnson Kelly Stamp awjohnson Todd Stamp awjohnson Jeremy Stamp
Jeff Finn Stamp
Jeff Finn Stamp
Proj. No. 080201 PROFESSIONAL SEALS 31 May 2011
00 0002 - 2
END OF SECTION
Proj. No. 080201 TABLE OF CONTENTS 05 July 2011
TOC - 1
TABLE OF CONTENTS
LEGEND
First Column: date of latest section Second Column: shaded 'X' indicates section is included in current printing Third Column: revision number (“0” indicates original, revisions are numbered consecutively) Fourth Column: specification section number Fifth Column: specification section title
The pages in each section are numbered. The last page of each Section contains the words END OF SECTION. Notify Architect if any page is missing in a Section of the Project Manual.
ISSUES OF SPECIFICATION SECTIONS
25 June 10 – Concept Design Submittal (Spec Outline) 27 Sept 2010 -- Preliminary Design (60%) Submittal 04 Jan 2011 -- Intermediate Design (75%) Submittal 31 Mar 2011 -- Final Design (90%) Submittal 31 May 2011 -- Final Design Submittal 05 July 2011 -- Final Design Submittal Revised
-- VOLUME 1 --
DIVISION 01 - GENERAL REQUIREMENTS
05 July 2011 1 01 0000 General Requirements 31 May 2011 0 01 0001 Affirmative Procurement 31 May 2011 0 01 1000 Summary of Work 05 July 2011 1 01 2300 Optional Line Items (OLI’s) 31 May 2011 0 01 2500 Substitution Procedures 31 May 2011 0 01 3100 Project Management and Coordination 31 May 2011 0 01 3200 Construction Progress Documentation 31 May 2011 0 01 3233 Photographic Documentation 31 May 2011 0 01 3300 Submittal Procedures & Attchmnts 31 May 2011 0 01 4000 Quality Requirements & Attchmnts 31 May 2011 0 01 5000 Temporary Facilities and Controls 31 May 2011 0 01 6000 Product Requiremnts 31 May 2011 0 01 7329 Cutting and Patching 31 May 2011 0 01 7419 Construction Waste Management and Disposal 31 May 2011 0 01 7700 Closeout Procedures & Attchmnts 31 May 2011 0 01 7823 Operation and Maintenance Manuals 31 May 2011 0 01 7839 Project Record Documents 31 May 2011 0 01 7900 Operation and Maintenance Training 31 May 2011 0 01 8113 Sustainable Design Requirements & Attchmnts 31 May 2011 0 01 9113 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
Not Req’d.
DIVISION 03 – CONCRETE
05 July 2011 1 03 3000 Cast-In-Place Concrete 31 May 2011 0 03 3600 Non-Shrink Grout
TOC - 2
05 July 2011 1 03 3650 Concrete Flooring Polish/Stain 05 July 2011 1 03 3660 Paste Polished Concrete Floor 05 July 2011 1 03 3680 Sandscape Textured Concrete Pavement 31 May 2011 0 03 4500 Plant Precast Architectural Concrete
DIVISION 04 - MASONRY
31 May 2011 0 04 2000 Unit Masonry
DIVISION 05 - METALS
05 July 2011 1 05 1200 Structural Steel Framing 05 July 2011 1 05 2100 Steel Joist Framing 05 July 2011 1 05 3100 Steel Decking 05 July 2011 1 05 3110 Long Span Steel Decking 05 July 2011 1 05 4000 Cold-Formed Metal Framing 05 July 2011 1 05 5000 Metal Fabrications 05 July 2011 1 05 5100 Metal Stairs 31 May 2011 0 05 5213 Pipe and Tube Railings 31 May 2011 0 05 7300 Ornamental Railings 31 May 2011 0 05 7500 Decorative Formed Metal
DIVISION 06 - WOOD AND PLASTICS
31 May 2011 0 06 1053 Rough Carpentry 31 May 2011 0 06 1601 Sheathing
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
31 May 2011 0 07 1113 Bituminous Dampproofing 31 May 2011 0 07 1900 Water Repellent Coating 31 May 2011 0 07 2100 Thermal Insulation 31 May 2011 0 07 2616 Below Slab-on-Grade Vapor Retarder 05 July 2011 1 07 2720 Air-Water Barriers 31 May 2011 0 07 4213 Metal Wall Panels 31 May 2011 0 07 4215 Solar Heating Wall Panels 31 May 2011 0 07 4263 Terra Cotta Wall Panel Assembly 31 May 2011 0 07 5423 Thermoplastic (TPO) Membrane Roofing 31 May 2011 0 07 6200 Flashing and Sheet Metal 31 May 2011 0 07 7200 Roof Accessories 31 May 2011 0 07 8413 Penetration Firestopping & Fire Resistive Joint Systems 31 May 2011 0 07 9200 Joint Sealants 31 May 2011 0 07 9513 Expansion Joint Covers
DIVISION 08 - OPENINGS
31 May 2011 0 08 1113 Hollow Metal Doors and Frames 31 May 2011 0 08 1416 Prefinished Flush Wood Doors 31 May 2011 0 08 3113 Access Doors and Frames 31 May 2011 0 08 3323 Overhead Coiling Doors 31 May 2011 0 08 3459 Vault Doors 31 May 2011 0 08 3613 Overhead Sectional Doors 31 May 2011 0 08 4113 Aluminum Entrance Doors and Storefront 31 May 2011 0 08 4413 Glazed Aluminum Curtain-Wall 31 May 2011 0 08 4500 Translucent Wall and Roof Assemblies 31 May 2011 0 08 5113 Aluminum Windows
TOC - 3
31 May 2011 0 08 6250 Tubular Daylighting Device 0 08 7100 Door Hardware 31 May 2011 0 08 8000 Glazing 31 May 2011 0 08 8300 Mirrors 31 May 2011 0 08 9000 Wall Louvers
DIVISION 09 – FINISHES
31 May 2011 0 09 2116 Gypsum Board Assemblies 31 May 2011 0 09 2120 Finishing of Gypsum Board 31 May 2011 0 09 3000 Tiling 31 May 2011 0 09 5113 Acoustical Panel Ceilings 31 May 2011 0 09 5424 Metal Plank Ceilings 31 May 2011 0 09 6513 Resilient Base and Accessories 31 May 2011 0 09 6519 Resilient Flooring 31 May 2011 0 09 6723 Seamless Urethane Flooring 31 May 2011 0 09 6813 Tile Carpeting 31 May 2011 0 09 6900 Access Flooring 31 May 2011 0 09 9100 Painting
DIVISION 10 – SPECIALTIES
31 May 2011 0 10 1100 Visual Display Surfaces 31 May 2011 0 10 1400 Signage 31 May 2011 0 10 2113 Toilet Compartments 31 May 2011 0 10 2213 Wire Mesh Partitions 31 May 2011 0 10 2226 Operable Partitions 31 May 2011 0 10 2400 Equipment Screens 31 May 2011 0 10 2600 Wall and Door Protection 31 May 2011 0 10 2813 Toilet Accessories 31 May 2011 0 10 4400 Fire Protection Specialties 31 May 2011 0 10 5113 Metal Lockers 31 May 2011 0 10 7500 Flagpoles
DIVISION 11 – EQUIPMENT
31 May 2011 0 11 1201 Access/Barrier Gates 31 May 2011 0 11 1300 Dock Equipment 31 May 2011 0 11 4000 Foodservice Equipment 31 May 2011 0 11 9400 Special Equipment
DIVISION 12 – FURNISHINGS
31 May 2011 0 12 2413 Roller Window Shades 31 May 2011 0 12 3216 Institutional Casework 31 May 2011 0 12 4816 Entrance Floor Grilles and Frames 05 July 2011 1 12 9300 Site Furnishings
DIVISION 13 - SPECIAL CONSTRUCTION
Not Req’d
DIVISION 14 - CONVEYING EQUIPMENT
31 May 2011 0 14 2400 Hydraulic Elevators
TOC - 4
- VOLUME 2 -
DIVISION 21 – FIRE SUPPRESSION
21 0800 21 1313
Fire Suppression Commission Wet-Pipe Sprinkler System, Fire Suppresion
DIVISION 22 – PLUMBING
05 July 2011 1 22 0500 Common Work Results for Plumbing 05 July 2011 1 22 0513 Common Motor Requirements for Plumbing Equipment 05 July 2011 1 22 0519 Meters and Gages for Plumbing Piping 05 July 2011 1 22 0523 General Duty Valves for Plumbing Piping 05 July 2011 1 22 0529 Hangers & Supports for Plumbing Piping & Equipment
22 0548
22 0553
Vibration And Seismic Controls For Plumbing Piping And Equipment Identification for Plumbing Piping and Equipment
22 0700 22 0800
Plumbing Insulation Plumbing Commissioning
05 July 2011 1 22 1116 Domestic Water Piping 05 July 2011 1 22 1119 Domestic Water Piping Specialties 05 July 2011 1 22 1123 Domestic Water Pumps 05 July 2011 1 22 1223 Facility Indoor Potable-Water Storage Tanks 05 July 2011 1 22 1316 Building Sanitary Waste and Vent Piping 05 July 2011 1 22 1319 Sanitary Waste Piping Specialties 05 July 2011 1 22 1413 Building Storm Drainage Piping 05 July 2011 1 22 1423 Storm Drainage Piping Specialties 05 July 2011 1 22 3300 Electric, Domestic-Water Heaters 05 July 2011 1 22 3400 Fuel Fired Domestic Water Heaters 05 July 2011 1 22 4000 Plumbing Fixtures 05 July 2011 1 22 4700 Drinking Fountains and Water Coolers
DIVISION 23 – HEATING VENTILATING AND AIR
CONDITIONING
05 July 2011 1 23 0500 Common Work Results for HVAC 05 July 2011 1 23 0513 Common Motor Requirements for HVAC Equipment 05 July 2011 1 23 0519 Meters and Gages for HVAC Piping 05 July 2011 1 23 0523 General Duty Valves for HVAC Piping
23 0529 23 0548
Hangers and Supports for HVAC Piping and Equipment Vibration And Seismic Controls For Hvac Piping And Equip
05 July 2011 1 23 0553 Identification for HVAC Piping and Equipment 05 July 2011 1 23 0593 Testing Adjusting and Balancing for HVAC 05 July 2011 1 23 0700 HVAC Insulation 05 July 2011 1 23 0800 HVAC Commissioning 05 July 2011 1 23 0900 Instrumentation and Control for HVAC 05 July 2011 1 23 1123 Facility Natural Gas Piping 05 July 2011 1 23 2113 Hydronic Piping 05 July 2011 1 23 2113.33 Ground-Loop Heat-Pump Piping 05 July 2011 1 23 2123 Hydronic Pumps 05 July 2011 1 23 3113 Metal Ducts 05 July 2011 1 23 3300 Air Duct Accessories 05 July 2011 1 23 3310 Louvers and Vents
TOC - 5
05 July 2011 1 23 3423 HVAC Power Ventilators 05 July 2011 1 23 3713 Diffusers, Registers, and Grilles 05 July 2011 1 23 3723 HVAC Gravity Ventilators 05 July 2011 1 23 5100 Breechings, Chimneys And Stacks 05 July 2011 1 23 5523 Gas-Fired Radiant Heaters 05 July 2011 1 23 5533 Fuel Fired Unit Heaters 05 July 2011 1 23 7200 Air-To-Air Energy Recovery Equipment 05 July 2011 1 23 7333 Indoor Indirect Fuel Fired Heating and Ventilating Units 05 July 2011 1 23 8126 Split-System Air-Conditioners 05 July 2011 1 23 8146 Water-Source Unitary Heat Pumps 05 July 2011 1 23 8239 Unit Heaters
DIVISION 26 – ELECTRICAL
05 July 2011 1 26 0500 Common Work Results For Electrical 05 July 2011 1 26 0519 Low Voltage Electrical Power Conductors and Cables 05 July 2011 1 26 0526 Grounding and Bonding for Electrical Systems 05 July 2011 1 26 0529 Hangers and Supports for Electrical Systems 05 July 2011 1 26 0533 Raceway and Boxes for Electrical Systems 05 July 2011 1 26 0536 Cable Trays for Electrical Systems
26 0543 26 0548
Underground Ducts and Raceways for Electrical Systems Vibration And Seismic Controls For Electrical Systems
05 July 2011 1 26 0553 Identification for Electrical Systems 05 July 2011 1 26 0800 Electrical Commissioning 05 July 2011 1 26 0923 Lighting Control Devices 05 July 2011 1 26 2200 Low-Voltage Transformers 05 July 2011 1 26 2413 Switchboards 05 July 2011 1 26 2416 Panelboards 05 July 2011 1 26 2713 Electricity Metering 05 July 2011 1 26 2726 Wiring Devices 05 July 2011 1 26 2816 Enclosed Switches and Circuit Breakers 05 July 2011 1 26 2913 Enclosed Controllers 05 July 2011 1 26 2923 Variable-Frequency Motor Controllers 05 July 2011 1 26 3213 Engine Generators 05 July 2011 1 26 3600 Transfer Switches 05 July 2011 1 26 4113 Lightning Protection for Structures 05 July 2011 1 26 4313 Transient-Voltage Suppression for Low-Voltage Electrical
Power Circuits 05 July 2011 1 26 5100 Interior Lighting 05 July 2011 1 26 5600 Exterior Lighting
DIVISION 27 – COMMUNICATIONS
27 0500 27 0800
Common Work Results for Communications Communications Commissioning
05 July 2011 1 27 1100 Communications Equipment Room Fittings 05 July 2011 1 27 1500 Communications Horizontal Cabling
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 0800 28 3176
Electronic Safety and Security Commissioning Interior Fire Alarm & Mass Notification System
DIVISION 31 - EARTHWORK
05 July 2011 1 31 1000 Site Clearing
TOC - 6
05 July 2011 1 31 2000 Earth Moving
DIVISION 32 - EXTERIOR IMPROVEMENTS
05 July 2011 1 32 1216 Asphalt Paving 05 July 2011 1 32 1313 Concrete Paving 05 July 2011 1 32 1373 Concrete Paving Joint Sealants 05 July 2011 1 32 3113 Chain Link Fences and Gates 05 July 2011 1 32 3223 Segmental Retaining Walls 05 July 2011 1 32 8400 Irrigation 05 July 2011 1 32 9000 Plantings 05 July 2011 1 32 9200 Turf and Grasses
DIVISION 33 - UTILITIES
05 July 2011 1 33 1100 Water Utilities Distribution Piping 05 July 2011 1 33 3100 Sanitary Sewerage Utilities 05 July 2011 1 33 4100 Storm Drainage Utilities
END OF TABLE OF CONTENTS
Proj. No. 080201 21 0800 - 1 FIRE SUPPRESSION COMMISSIONING 5 July 2011
SECTION 21 0800 - FIRE SUPPRESSION COMMISSIONING
1.0 GENERAL
1.01 SUMMARY:
The contractor shall participate fully in commissioning as specified in Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS. See Section 01 91 13 for the commissioning process.
Proj. No. 080201 21 0800 - 2 FIRE SUPPRESSION COMMISSIONING 5 July 2011
(this page intentionally left blank)
North Colorado Springs Readiness Center – Colorado National Guard
Proj. No. 080201 5 July 2011 211313 - 1
WET PIPE SPRINKLER SYSTEM
SECTION 21 13 13.00 10 - WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
PART 1 - GENERAL
1.1 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
1. AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
a. ASSE 1015(2009) Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies
2. AMERICAN WATER WORKS ASSOCIATION (AWWA)
a. AWWA B300(2004) Hypochlorites
b. AWWA B301(2004) Liquid Chlorine
c. AWWA C104/A21.4(2008) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
d. AWWA C110/A21.10(2008) Ductile-Iron and Gray-Iron Fittings for Water
e. AWWA C111/A21.11(2000) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
f. AWWA C151/A21.51(2009) Ductile-Iron Pipe, Centrifugally Cast, for Water
g. AWWA C203(2008) Coal-Tar Protective Coatings and Linings for Steel Water
Pipelines - Enamel and Tape - Hot-Applied
h. AWWA C606(2006) Grooved and Shouldered Joints
i. AWWA C651(2005; Errata 2005) Standard for Disinfecting Water Mains
j. AWWA C652(2002) Disinfection of Water-Storage Facilities
3. ASME INTERNATIONAL (ASME)
a. ASME B16.1(2005) Standard for Gray Iron Threaded Fittings; Classes 125 and
b. ASME B16.11(2009) Forged Fittings, Socket-Welding and Threaded
c. ASME B16.18(2001; R 2005) Cast Copper Alloy Solder Joint Pressure Fittings
d. ASME B16.21(2005) Nonmetallic Flat Gaskets for Pipe Flanges
e. ASME B16.22(2001; R 2005) Standard for Wrought Copper and Copper Alloy
Solder Joint Pressure Fittings
f. ASME B16.26(2006) Standard for Cast Copper Alloy Fittings for Flared Copper
Tubes
g. ASME B16.3(2006) Malleable Iron Threaded Fittings, Classes 150 and 300
h. ASME B16.4(2006) Standard for Gray Iron Threaded Fittings; Classes 125 and
i. ASME B16.9(2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings
j. ASME B18.2.2(1987; R 2005) Standard for Square and Hex Nuts
4. ASTM INTERNATIONAL (ASTM)
a. ASTM A 135/A 135M(2009) Standard Specification for Electric-Resistance-Welded
Steel Pipe
b. ASTM A 183(2003; R 2009) Standard Specification for Carbon Steel Track Bolts and Nuts
c. ASTM A 193/A 193M(2009) Standard Specification for Alloy-Steel and Stainless
Steel Bolting Materials for High-Temperature Service
d. ASTM A 449(2007b) Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use
5 July 2011 211313 - 2
WET PIPE SPRINKLER SYSTEM
e. ASTM A 47/A 47M(1999; R 2009) Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
f. ASTM A 53/A 53M(2007) Standard Specification for Pipe, Steel, Black and Hot- Dipped, Zinc-Coated, Welded and Seamless
g. ASTM A 536(1984; R 2009) Standard Specification for Ductile Iron Castings
h. ASTM A 563(2007a) Standard Specification for Carbon and Alloy Steel Nuts
i. ASTM A 563M(2007) Standard Specification for Carbon and Alloy Steel Nuts
(Metric)
j. ASTM A 795/A 795M(2008) Standard Specification for Black and Hot-Dipped Zinc-
Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use
k. ASTM B 62(2009) Standard Specification for Composition Bronze or Ounce Metal
Castings
l. ASTM B 75(2002) Standard Specification for Seamless Copper Tube
m. ASTM B 75M(1999; R 2005) Standard Specification for Seamless Copper Tube
(Metric)
n. ASTM B 88(2009) Standard Specification for Seamless Copper Water Tube
o. ASTM B 88M(2005) Standard Specification for Seamless Copper Water Tube
(Metric)
p. ASTM D 2000(2008) Standard Classification System for Rubber Products in
Automotive Applications
q. ASTM F 436(2009) Hardened Steel Washers
r. ASTM F 436M(2009) Hardened Steel Washers (Metric)
s. ASTM F 442/F 442M(2009) Standard Specification for Chlorinated Poly(Vinyl
Chloride) (CPVC) Plastic Pipe (SDR-PR)
5. FM GLOBAL (FM)
a. FM P7825a(2005) Approval Guide Fire Protection
b. FM P7825b(2005) Approval Guide Electrical Equipment
6. MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
a. MSS SP-71(2005) Standard for Gray Iron Swing Check Valves, Flanged and
Threaded Ends
7. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
a. NFPA 101(2009; Amd 1 & 2 2009) Life Safety Code
b. NFPA 13(2010) Installation of Sprinkler Systems
c. NFPA 1963(2009) Standard for Fire Hose Connections
d. NFPA 24(2010) Standard for the Installation of Private Fire Service Mains and
Their Appurtenances
8. NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
a. NICET 1014-7(2003) Program Detail Manual for Certification in the Field of Fire
Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
9. UNDERWRITERS LABORATORIES (UL)
a. UL 668(2004; Rev thru Aug 2008) Hose Valves for Fire Protection Service
b. UL Bld Mat Dir(2009) Building Materials Directory
c. UL Fire Prot Dir(2009) Fire Protection Equipment Directory
10. UNIFIED FACILITIES CRITERIA (UFC)
a. UFC 3-600-01, (Change 1, 14 July 2009) Fire Protection Engineering for
Facilities,
1.2 SYSTEM DESCRIPTION
A. Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively affect or disrupt the
5 July 2011 211313 - 3
WET PIPE SPRINKLER SYSTEM
sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in areas indicated on the drawings F-001, F-101, -102, -103, and -110.
B. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13 and UFC 3-600-01. Pipe sizes shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.
1.3 PERFORMANCE REQUIREMENTS
A. Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13 as modified by UFC 3-600-01.
1. Water velocity in the piping shall not exceed 20 ft/s.
2. Margin of Safety for Available Water Flow and Pressure: 10 percent, including losses through water-service piping, valves, and backflow preventers.
3. Sprinkler Occupancy Hazard Classifications:
a. Building Service Areas: Ordinary Hazard, Group 1.
b. Electrical Equipment Rooms: Ordinary Hazard, Group 1.
c. General Storage Areas: Ordinary Hazard, Group 1.
d. Mechanical Equipment Rooms: Ordinary Hazard, Group 1.
e. Office and Public Areas: Light Hazard.
f. Repair Garages: Ordinary Hazard, Group 2.
g. Flammable Storage: Ordinary Hazard, Group 2.
4. Minimum Density for Automatic-Sprinkler Piping Design:
a. Light-Hazard Occupancy: 0.10 gpm over 3000-sq. ft. (4.1 mm/min. over 280-
sq. m) area.
b. Ordinary-Hazard, Group 1 Occupancy: 0.15 gpm over 3000-sq. ft. (6.1 mm/min.
over 280-sq. m) area.
c. Ordinary-Hazard, Group 2 Occupancy: 0.20 gpm over 3000-sq. ft. (8.1 mm/min.
over 280-sq. m)] area.
5. Maximum Protection Area per Sprinkler:
a. Office Spaces: 225 sq. ft. (20.9 sq. m).
b. Storage Areas: 130 sq. ft. (12.1 sq. m).
c. Mechanical Equipment Rooms: 130 sq. ft. (12.1 sq. m).
d. Electrical Equipment Rooms: 130 sq. ft. (12.1 sq. m).
e. Other Areas: According to NFPA 13 recommendations unless otherwise indicated.
6. Total Combined Hose-Stream Demand Requirement: According to NFPA 13 unless otherwise indicated:
a. Light-Hazard Occupancies: 250 gpm (950 L/min) for 60 minutes.
b. Ordinary-Hazard Occupancies: 500 gpm (1900 L/min) for 60 minutes.
B. Seismic Performance: Sprinkler piping shall withstand the effects of earthquake motions determined according to NFPA 13 and ASCE/SEI 7.
C. Delegated Design: Design sprinkler system(s), including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated. A flow test witnessed by a Fire Protection Engineer (FPE) is required and must be conducted in accordance with NFPA 291.
D. Hydraulic Calculations: Prepare hydraulic calculations as outlined in NFPA 13, except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable.
5 July 2011 211313 - 4
WET PIPE SPRINKLER SYSTEM
1. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically.
2. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation.
3. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows.
4. Elevations of hydraulic reference points (nodes) shall be indicated.
5. Documentation shall identify each pipe individually and the nodes connected thereto.
Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.
6. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included.
7. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included and shall be independent of shop drawings.
1.4 SUBMITTALS
A. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
B. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G
Six (6) copies of the Sprinkler System Shop Drawings, prior to the start of sprinkler sys-tem installation.
As-Built Drawings
As-built shop drawings, updated to reflect as-built conditions after all related work is completed. Provide as-built drawings no later than one (1) day prior to commencing final acceptance testing.
SD-03 Product Data
Fire Protection Related Submittals
A list of the Fire Protection Related Submittals, after the approval of the Fire Protection Specialist.
Materials and Equipment; G
Manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity. Submit concurrently with Shop Drawings, Sway Bracing, and Hydraulic Calculations.
5 July 2011 211313 - 5
WET PIPE SPRINKLER SYSTEM
Spare Parts
Spare parts data for each different item of material and equipment specified.
Preliminary Tests; G
Proposed procedures for Preliminary Tests, no later than 14 days prior to the proposed start of the tests. Proposed date and time to begin the preliminary tests.
Final Acceptance Test; G
Proposed procedures for Final Acceptance Test, no later than 14 days prior to the pro-posed start of the tests. Proposed date and time to begin Final Acceptance Test, submit-ted with the Final Acceptance Test Procedures. Notification shall be provided at least 14 days prior to the proposed start of the test. Notification shall include a copy of the Con-tractor's Material & Test Certificates.
Onsite Training; G
Proposed Onsite Training schedule, at least 14 days prior to the start of related training.
Fire Protection Specialist; G
The name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprink-ler system drawings and hydraulic calculations.
Sprinkler System Installer; G
The name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.
SD-05 Design Data
Sway Bracing; G
Load calculations for sizing of sway bracing, for systems that are required to be protected against damage from earthquakes, concurrent with Shop Drawings and Hydraulic Calcu-lations.
Hydraulic Calculations; G
Hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments, concurrent with Shop Drawings and Sway Bracing.
SD-06 Test Reports
Preliminary Test Report; G
Three copies of the completed Preliminary Test Report, no later than 7 days after the completion of the Preliminary Tests. The Preliminary Tests Report shall include both the Contractor's Material and Test Certificate for Underground Piping and the Contractor's Material and Test Certificate for Aboveground Piping. All items in the Preliminary Tests Report shall be signed by the Fire Protection Specialist.
5 July 2011 211313 - 6
WET PIPE SPRINKLER SYSTEM
Final Acceptance Test Report; G
Three copies of the completed Final Acceptance Tests Reports, no later than 7 days after the completion of the Final Acceptance Tests. All items in the Final Acceptance Report shall be signed by the Fire Protection Specialist.
SD-07 Certificates
Inspection by Fire Protection Specialist; G
SD-10 Operation and Maintenance Data
Operating and Maintenance Instructions
Six manuals listing step-by-step procedures required for system startup, operation, shut-down, and routine maintenance, at least 14 days prior to field training. The manuals shall include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance including the name of a lo-cal supplier, simplified wiring and controls diagrams, troubleshooting guide, and recom-mended service organization (including address and telephone number) for each item of equipment. Each service organization submitted shall be capable of providing 4 hour on-site response to a service call on an emergency basis.
1.5 QUALITY ASSURANCE
A. Compliance with referenced NFPA standards is mandatory. This includes advisory provisions listed in the appendices of such standards, as though the word "shall" had been substituted for the word "should" wherever it appears. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification shall govern. Reference to "authority having jurisdiction" shall be interpreted to mean the Contracting Officer.
B. Fire Protection Specialist
1. Perform work specified in this section under the supervision of and certified by the Fire
Protection Specialist who is registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES). The Fire Protection Specialist shall prepare a list of the fire protection related submittals from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
C. Sprinkler System Installer
1. Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
D. Shop Drawings
1. Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. Drawings shall include plan and elevation views demonstrating
5 July 2011 211313 - 7
WET PIPE SPRINKLER SYSTEM
that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:
a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.
b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.
e. Details of each type of riser assembly; pipe hanger; sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring.
1.6 DELIVERY, STORAGE, AND HANDLING
A. All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.
1.7 EXTRA MATERIALS
A. Submit spare parts data for each different item of material and equipment specified.
B. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service.
C. A list of special tools and test equipment required for maintenance and testing of the products supplied by the Contractor shall be included.
PART 2 - PRODUCTS
2.1 STANDARD PRODUCTS
A. Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
5 July 2011 211313 - 8
WET PIPE SPRINKLER SYSTEM
2.2 NAMEPLATES
A. All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.
2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE
A. Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM P7825a and FM P7825b.
B. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM P7825a and FM P7825b
2.4 UNDERGROUND PIPING COMPONENTS
A. Pipe
1. Piping from a point 6 inches above the floor to a point 5 feet outside the building wall shall be ductile iron with a rated working pressure of 175 psi conforming to AWWA C151/A21.51, with cement mortar lining conforming to AWWA C104/A21.4.
2. Piping more than 5 feet outside the building walls shall comply with Section 33 11 00
WATER UTILITY DISTRIBUTION PIPING.
B. Fittings and Gaskets
1. Fittings shall be ductile iron conforming to AWWA C110/A21.10. Gaskets shall be suitable in design and size for the pipe with which such gaskets are to be used.
2. Gaskets for ductile iron pipe joints shall conform to AWWA C111/A21.11.
C. Gate Valve and Indicator Posts
1. Gate valves for underground installation shall be of the inside screw type with counter-clockwise rotation to open.
2. Where indicating type valves are shown or required, indicating valves shall be gate valves with an approved indicator post of a length to permit the top of the post to be located 3 feet above finished grade.
3. Gate valves and indicator posts shall be listed in UL Fire Prot Dir or FM P7825a and FM P7825b.
2.5 ABOVEGROUND PIPING COMPONENTS
A. Aboveground piping shall be steel.
B. Steel Piping Components
1. Steel Pipe
a. Except as modified herein, steel pipe shall be black as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A 795/A 795M, ASTM A 53/A 53M, or ASTM A 135/A 135M.
b. Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of 1.0 or greater after threads or grooves are cut or rolled formed.
c. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.
5 July 2011 211313 - 9
WET PIPE SPRINKLER SYSTEM
2. Fittings for Non-Grooved Steel Pipe
a. Fittings shall be cast iron conforming to ASME B16.4, steel conforming to ASME
B16.9 or ASME B16.11, or malleable iron conforming to ASME B16.3. Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type.
b. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.
C. Grooved Mechanical Joints and Fittings
1. Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer;segmented welded fittings shall not be used.
2. Fitting and coupling houses shall be malleable iron conforming to ASTM A 47/A 47M, Grade 32510; ductile iron conforming to ASTM A 536, Grade 65-45-12.
3. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe.
Nuts and bolts shall be heat-treated steel conforming to ASTM A 183 and shall be cadmium plated or zinc electroplated.
D. Flanges
1. Flanges shall conform to NFPA 13 and ASME B16.1. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16 inch thick, and full face or self-centering flat ring type.
E. Bolts, Nut, and Washers
1. Bolts shall be conform to ASTM A 449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque.
2. Nuts shall be hexagon type conforming to ASME B18.2.2, ASTM A 193/A 193M, Grade
5, or ASTM A 563, Grade C3or DH3.
3. Washers shall meet the requirements of ASTM F 436. Flat circular washers shall be provided under all bolt heads and nuts.
F. Pipe Hangers
1. Hangers shall be listed in UL Fire Prot Dir or FM P7825a and FM P7825b and of the type suitable for the application, construction, and pipe type and sized to be supported.
G. Valves
1. Control Valve and Gate Valve
a. Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or FM P7825a and FM P7825b.
H. Check Valve
1. Check valve 2 inches and larger shall be listed in UL Bld Mat Dir or FM P7825a and FM
P7825b.
2. Check valves 4 inches and larger shall be of the swing type with flanged cast iron body and flanged inspection plate, shall have a clear waterway and shall meet the requirements of MSS SP-71, for Type 3 or 4.
2.6 WATERFLOW ALARM
A. Electrically operated, exterior-mounted, waterflow alarm bell shall be provided and installed in accordance with NFPA 13.
5 July 2011 211313 - 10
WET PIPE SPRINKLER SYSTEM
B. Waterflow alarm bell shall be rated 24 VDC and shall be connected to the Fire Alarm Control Panel(FACP) in accordance with Section 28 31 00 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM.
2.7 ALARM INITIATING AND SUPERVISORY DEVICES
A. Sprinkler Waterflow Indicator Switch, Vane Type
1. Switch shall be vane type with a pipe saddle and cast aluminum housing. The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe.
2. The device shall sense water movements and be capable of detecting a sustained flow of 10 gpm or greater.
3. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges.
4. The switch shall be tamper resistant and contain two SPDT (Form C) contacts arranged to transfer upon removal of the housing cover, and shall be equipped with a silicone rubber gasket to assure positive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.
B. Sprinkler Pressure (Waterflow) Alarm Switch
1. Pressure switch shall include a metal housing with a neoprene diaphragm, SPDT snap action switches and a 1/2 inch NPT male pipe thread.
2. The switch shall have a maximum service pressure rating of 175 psi.
3. There shall be two SPDT (Form C) contacts factory adjusted to operate at 4 to 8 psi.
4. The switch shall be capable of being mounted in any position in the alarm line trim piping of the alarm check valve.
C. Valve Supervisory (Tamper) Switch
1. Switch shall be suitable for mounting to the type of control valve to be supervised open.
2. The switch shall be tamper resistant and contain one set of SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.
D. FIRE DEPARTMENT CONNECTION
1. Fire department connection shall be projecting type with cast brass body, matching wall escutcheon lettered "Auto Spkr" with a polished brass finish.
2. The connection shall have two inlets with individual self-closing clappers, caps with drip drains and chains.
3. Female inlets shall have 2-1/2 inch diameter American National Fire Hose Connection
Screw Threads (NH) per NFPA 1963.
E. SPRINKLERS
1. Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations.
2. Sprinklers in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13.
3. Extended coverage sprinklers shall not be used.
4. Concealed Sprinkler: Concealed sprinkler shall be white polyester and brushed aluminum (as indicated on the attendant drawings), quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.
5. Recessed Sprinkler: Recessed sprinkler shall be white polyester, quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.
6. Flush Sprinkler: Flush sprinkler shall be white polyester quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.
5 July 2011 211313 - 11
WET PIPE SPRINKLER SYSTEM
7. Pendent Sprinkler: Pendent sprinkler shall be of the fusible strut or glass bulb type, recessed, quick-response type with nominal 1/2 inch orifice. Pendent sprinklers shall have a white polyester finish.
8. Upright Sprinkler: Upright sprinkler shall be brass, quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.
9. Sidewall Sprinkler: Sidewall sprinkler shall have a nominal 1/2 inch orifice. Sidewall sprinkler shall have a white polyester finish. Sidewall sprinkler shall be the quick-response type.
F. DISINFECTING MATERIALS
1. Liquid Chlorine
a. Liquid chlorine shall conform to AWWA B301.
2. Hypochlorites
a. Calcium hypochlorite and sodium hypochlorite shall conform to AWWA B300.
G. ACCESSORIES
1. Sprinkler Cabinet
a. Spare sprinklers shall be provided in accordance with NFPA 13 and shall be packed in a suitable metal or plastic cabinet.
b. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed.
c. At least one wrench of each type required shall be provided.
2. Pendent Sprinkler Escutcheon
a. Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinklers.
b. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.
3. Pipe Escutcheon
a. Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy.
b. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.
4. Sprinkler Guard
a. Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage.
b. Guards shall be provided on sprinklers located in the Repair Bay and Cages.
5. Identification Sign
a. Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background.
b. Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "alarm test," "alarm line," and similar wording as required to identify operational components.
H. FIRE HOSE REEL ASSEMBLY
1. Assembly shall include nozzle, fire hose, reel, 1-1/2 inch valve, and bracket suitable for wall mounting.
2. The assembly shall be semi-automatic type complete with Underwriters clip which permits controlled one-man operation whereby control valve can be opened, hose unreeled and clip released by pulling on hose.
3. Valve shall be non-rising stem, all bronze, angle type with 1-1/2 inch American National Standard Fire Hose Screw Thread (NH) male outlet in accordance with NFPA 1963.
Reel shall be of steel construction with red enamel finish and shall be equipped with100 feet of 1-1/2 inch rubber lined fire hose.
4. Nozzle shall be of the industrial combination fog-straight stream type with shutoff.
5. Components of the assembly shall be listed in UL Fire Prot Dir.
5 July 2011 211313 - 12
WET PIPE SPRINKLER SYSTEM
I. DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY
1. Double-check backflow prevention assembly shall comply with ASSE 1015.
2. The assembly shall have a bronze, cast-iron or stainless steel body with flanged ends.
The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-positive-seating check valve for continuous pressure application, and four test cocks.
3. Assemblies shall be rated for working pressure of 175 psi.
4. The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly.
5. A test port for a pressure gauge shall be provided both upstream and downstream of the double check backflow prevention assembly valves.
PART 3 - EXECUTION
3.1 FIELD MEASUREMENTS
A. After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION REQUIREMENTS
A. The installation shall be in accordance with the applicable provisions of NFPA 13, NFPA 24 and publications referenced therein. Installation of in-rack sprinklers shall comply with applicable provisions of NFPA 13.
3.3 INSPECTION BY FIRE PROTECTION SPECIALIST
A. Prior to ceiling installation and concurrent with the Final Acceptance Test Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports.
B. The Fire Protection Specialist shall:
1. Inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements,
2. Witness the preliminary and final tests, and sign the test results,
3. After completion of the system inspections and a successful final test, certify in writing that the system has been installed in accordance with the contract requirements.
4. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
3.4 ABOVEGROUND PIPING INSTALLATION
A. Protection of Piping Against Earthquake Damage
1. Seismically protect the system piping against damage from earthquakes.
2. This requirement is not subject to determination under NFPA 13.
3. Install the seismic protection of the system piping in accordance with UFC 3-310-04, NFPA 13 and Annex A.
4. Include the required features identified therein that are applicable to the specific piping system.
5 July 2011 211313 - 13
WET PIPE SPRINKLER SYSTEM
B. Piping in Exposed Areas
1. Install exposed piping without diminishing exit access widths, corridors or equipment access.
2. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.
C. Piping in Finished Areas
1. In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings.
2. Piping shall be inspected, tested and approved before being concealed.
3. Risers and similar vertical runs of piping in finished areas shall be concealed.
D. Pendent Sprinklers
1. Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler shall be threaded.
2. Hangers shall be provided on arm-overs to drop nipples supplying pendent sprinklers when the arm-over exceeds 12 inches for steel pipe or 6 inches for copper tubing.
3. Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space.
4. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling.
5. On pendent sprinklers installed below suspended or dropped ceilings, the distance from the sprinkler deflector to the underside of the ceiling shall not exceed 4 inches.
6. Recessed pendent sprinklers shall be installed such that the distance from the sprinkler deflector to the underside of the ceiling shall not exceed the manufacturer's listed range and shall be of uniform depth throughout the finished area.
7. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grid.
E. Upright Sprinklers
1. Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.
2. Riser nipples exceeding 30 inches in length shall be individually supported.
F. Pipe Joints
1. Pipe joints shall conform to NFPA 13, except as modified herein. Not more than four threads shall show after joint is made up.
2. Welded joints will be permitted, only if welding operations are performed as required by
NFPA 13 at the Contractor's fabrication shop, not at the project construction site.
Flanged joints shall be provided where indicated or required by NFPA 13.
3. Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size.
4. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer throughout the facility.
5. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application.
6. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances.
7. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.
5 July 2011 211313 - 14
WET PIPE SPRINKLER SYSTEM
G. Reducers
1. Reductions in pipe sizes shall be made with one-piece tapered reducing fittings.
2. The use of grooved-end or rubber-gasketed reducing couplings will not be permitted.
When standard fittings of the required size are not manufactured, single bushings of the face type will be permitted.
3. Where used, face bushings shall be installed with the outer face flush with the face of the fitting opening being reduced.
4. Bushings shall not be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2 inch.
H. Pipe Penetrations
1. Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted.
2. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves.
3. Each sleeve shall be Schedule 40 galvanized steel, ductile iron or cast iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface.
4. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13.
5. The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation.
6. Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 13 FIRESTOPPING.
7. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.
I. Escutcheons
1. Escutcheons shall be provided for pipe penetration of ceilings and walls.
2. Escutcheons shall be securely fastened to the pipe at surfaces through which piping passes.
J. Inspector's Test Connection
1. Unless…