LEED 2009 NCSRC Scorecard 080411.pdf

PDF 37 KB Posted

Attached to
NORTH COLORADO SPRINGS READINESS CENTER SOLICITATION
Solicitation number
W912LC-11-R-0006
Issued by

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS 08102011 Addendum.docx DOCX document
Addendum 2 080911.pdf PDF
Addendum 1 080911.pdf PDF
QUESTIONS AND ANSWERS 08092011 Addendum.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
QUESTIONS AND ANSWERS 08092011.docx DOCX document
Addendum__2.docx DOCX document
NCSRC Development Fees 080411.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED 1600.docx DOCX document
Soils Report NCSRC.pdf PDF
QUESTIONS AND ANSWERS 08042011 REVISED.docx DOCX document
760092813_dsc_0253.jpg JPG image
QUESTIONS AND ANSWERS 07292011 REVISED.doc DOC document
QUESTIONS AND ANSWERS 07272011.doc DOC document
QUESTIONS AND ANSWERS 07262011 revised.doc DOC document
QUESTIONS AND ANSWERS 07262011.doc DOC document
Preproposal conference 072211 —
ATTENDANCE PRE-PROPOSAL CONF JULY 22 2011.pdf PDF
QUESTIONS AND ANSWERS 07222011.doc DOC document
W912LC-11-R-0006 MOD 0001.pdf PDF
QUESTIONS AND ANSWERS 07082011.doc DOC document
Package 2 - Site.pdf PDF
SOLICITATION W912LC-11-R-0006.pdf PDF
080201 - Final Design - Specifications Vol 1.pdf PDF
Package 3 - Arch Int Kitchen.pdf PDF
Package 4 - Structural Mech Pumb Elec FP.pdf PDF
080201 - Final Design - Specifications Vol 2.pdf PDF
Exhibit C SSS NCOSPR Final.doc DOC document
Exhibit D and F NCOSPR Final.doc DOC document
Package 1 - General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED 2009 for New Construction and Major Renovations North Colorado Springs Readiness Center

Project Checklist May 18, 2011

12 13 1 Possible Points: 26 Y N ? Y N ?

Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2

5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1 6 Credit 4.1 6

1 Credit 4.2 1 10 2 3 Possible Points: 15 3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1

1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2

1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1

1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1 1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1

1 Credit 7.2 1 1 Credit 4.1 1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1

1 Credit 4.3 1 6 4 Possible Points: 10 1 Credit 4.4 1

1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 2 2 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1

2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 4 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1

1 Credit 8.1 1 17 15 3 Possible Points: 35 1 Credit 8.2 1

Y Prereq 1 6 Possible Points: 6 Y Prereq 2

Y Prereq 3 1 Credit 1.1 1 10 9 Credit 1 1 to 19 1 Credit 1.2 1

4 3 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1 2 Credit 4 2 1 Credit 1.5 1 3 Credit 5 3 1 Credit 2 1

2 Credit 6 2 3 Possible Points: 4

6 6 2 Possible Points: 14 1 Credit 1.1 1

Y Prereq 1 1 Credit 1.2 1 3 Credit 1.1 1 to 3 Credit 1.3 1 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1

2 Credit 2 1 to 2 2 Credit 3 1 to 2 60 36 13 Possible Points: 110

Regional Priority: SSc1 Regional Priority: SSc5.1 Regional Priority: WEc1, Opt 2 Regional Priority: WEc3 (40%)

Measurement and Verification

Innovation in Design: Preservation & Relocation of Trees Innovation in Design: Exemplary Performance, Maximize Open Space Innovation in Design: Public Outreach Program Innovation in Design: Exemplary Performance, WEc2 45% Innovation in Design: Specific Title

Materials Reuse

Storage and Collection of Recyclables

Materials and Resources

Fundamental Commissioning of Building Energy Systems

Total Construction Waste Management

Enhanced Commissioning On-Site Renewable Energy

Enhanced Refrigerant Management

Construction IAQ Management Plan—Before Occupancy

Materials and Resources, Continued

Water Efficiency

Building Reuse—Maintain Existing Walls, Floors, and Roof

Alternative Transportation—Parking Capacity

Heat Island Effect—Roof

Recycled Content Regional Materials

Certified Wood

Alternative Transportation—Bicycle Storage and Changing Rooms

Sustainable Sites

Alternative Transportation—Public Transportation Access

Site Selection Development Density and Community Connectivity

Construction Activity Pollution Prevention

Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings

Optimize Energy Performance

Energy and Atmosphere

Water Use Reduction—20% Reduction

Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems

Indoor Chemical and Pollutant Source Control

Thermal Comfort—Design Controllability of Systems—Thermal Comfort

Green Power

Water Use Reduction

Minimum Energy Performance Fundamental Refrigerant Management

Daylight and Views—Views

LEED Accredited Professional

Daylight and Views—Daylight

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Construction IAQ Management Plan—During Construction

Outdoor Air Delivery Monitoring

Indoor Environmental Quality

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control

Increased Ventilation

Regional Priority Credits

Innovation and Design Process

One Page

File details come from the government source that posted it. Updated .