Troopcamp Addendum 3.doc

DOC document 42 KB Posted

Attached to
RECOVERY--Y--Replace Troop Training Quarters Federal contract opportunity
Solicitation number
W912KC-09-B-0009
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Revised Specifications Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--Y--Replace Troop Training Quarters, newest first.
File Type Posted
SK-A4.pdf PDF
SK-A3.pdf PDF
08410 Metal Framed Storefronts.pdf PDF
SK-A5.pdf PDF
SK-P1.pdf PDF
SK-C2.pdf PDF
E102 ADD 2.pdf PDF
16711 - Telecommunications.pdf PDF
E001 ADD 2.pdf PDF
SK-A2.pdf PDF
SK-A1.pdf PDF
E602 ADD 2.pdf PDF
SK-C3.pdf PDF
E108 ADD 2.pdf PDF
02820 - Aluminum Louver Fencing.pdf PDF
04720 - Cast Stone.pdf PDF
E604 ADD 2.pdf PDF
SK-C1.pdf PDF
E107 ADD 2.pdf PDF
Troopcamp Addendum 2.doc DOC document
E601 ADD 2.pdf PDF
09900 Paints and Coatings.pdf PDF
S102.pdf PDF
S302.pdf PDF
Troopcamp Addendum 1.pdf PDF
05520 Handrails and Railing.pdf PDF
S101.pdf PDF
02225 Building Demolition.pdf PDF
Replace Troop Training Quarters.pdf PDF
Troop Training Spec Vol 2.pdf PDF
Troop Training Spec Vol 1.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE TROOP TRAINING QUARTERS

193d Regional Support Group Pennsylvania Air National Guard

Ft. Indiantown Gap, Annville, Pennsylvania

Project No. LKLW959714

ADDENDUM #3

REVISIONS TO SPECIFICATIONS

· 08410 – METAL-FRAMED STOREFRONT

1) REPLACE Section 08410 with the attached Section 08410 in its entirety.

· 16711 – TELECOMMUNICATIONS

1) REVISE Paragraph 2.01 to read: TELEPHONE BACKBOARD (all communication roomS 104 and 202 walls)

· 13900 – FIRE SUPPRESSION

1) Delete Paragraphs 4. and 7. under Article 1.01 Paragraph A.

2) Delete Article 2.05 CLEAN AGENT FIRE EXTINGUISHING SYSTEM and the associated sub-paragraphs

3) Delete Article 2.06 CLEAN AGENT SYSTEM CONTROLS AND ASSOCIATED DEVISES and the associated sub-paragraphs

4) Delete Article 2.07 PREACTION – SINGLE INTERLOCK SYSTEM and the associated sub-paragraphs

· 15150 – SANITARY WASTE AND VENT PIPING

1) Add Paragraph D. under Article 2.05 FLOOR DRAINS “D. Floor Drain (FD-3): Outlet size 80 mm (3-inch); Cast iron, two piece body with 150 mm (6-inch) diameter adjustable stainless steel strainer, medium duty, invertible membrane flashing clamp and adjustable collar with seepage holes, trap primer tap; ZS-415-P.”

REVISIONS TO DRAWINGS

· A301 – BUILDING AND WALL SECTIONS

1) REVISE Wall Section 2 with revised partial Wall Section 2 as shown on SK-A3.

· A401 – ENLARGED STAIR AND ELEVATOR PLANS AND DETAILS

1) REPLACE Section 8 with Section 8 as shown on SK-A4.

· A602 – DOOR AND WINDOW DETAILS

1) REPLACE Detail 28 with Detail 28 as shown on SK-A5.

· P601 – PLUMBING SCHEDULES

1) REPLACE Drain and Shower Base Schedule with Drain and Shower Base Schedule shown on SK-P1

2) REVISE Plumbing Fixture Schedule to indicate DELETED for fixture SYMBOL P-4.

File details come from the government source that posted it. Updated .