SK-A3.pdf
PDF 177 KB Posted
- Attached to
- RECOVERY--Y--Replace Troop Training Quarters Federal contract opportunity
- Solicitation number
- W912KC-09-B-0009
About this file
A3 Revised Drawing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Troopcamp Addendum 3.doc | DOC document | |
| SK-A4.pdf | ||
| 08410 Metal Framed Storefronts.pdf | ||
| SK-A5.pdf | ||
| SK-P1.pdf | ||
| SK-C2.pdf | ||
| E102 ADD 2.pdf | ||
| 16711 - Telecommunications.pdf | ||
| E001 ADD 2.pdf | ||
| SK-A2.pdf | ||
| SK-A1.pdf | ||
| E602 ADD 2.pdf | ||
| SK-C3.pdf | ||
| E108 ADD 2.pdf | ||
| 02820 - Aluminum Louver Fencing.pdf | ||
| 04720 - Cast Stone.pdf | ||
| E604 ADD 2.pdf | ||
| SK-C1.pdf | ||
| E107 ADD 2.pdf | ||
| Troopcamp Addendum 2.doc | DOC document | |
| E601 ADD 2.pdf | ||
| 09900 Paints and Coatings.pdf | ||
| S102.pdf | ||
| S302.pdf | ||
| Troopcamp Addendum 1.pdf | ||
| 05520 Handrails and Railing.pdf | ||
| S101.pdf | ||
| 02225 Building Demolition.pdf | ||
| Replace Troop Training Quarters.pdf | ||
| Troop Training Spec Vol 2.pdf | ||
| Troop Training Spec Vol 1.pdf |
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST
FLOOR
0' - 0"
SECOND
FLOOR
12' - 8"
CONCRETE FOOTING
SEE STRUCTURAL
DRAWINGS
AGGREGATE - SEE
STRUCTURAL
DRAWINGS
VAPOR BARRIER
CONCRETE SLAB
SEE STRUCTURAL
DRAWINGS
DORM 2 BED
DAY ROOM
16mm [5/8"] GYPSUM
BOARD ATTACHED
TO ICF WALL
SUSPENDED
ACOUSTICAL
CEILING TILE
SYSTEM
GYPSUM BOARD OVER
METAL STUD BULKHEAD
PRECAST CONC DECK
W/ TOPPING -SEE
STRUCTURAL DRAWINGS
FLOOR COVERING - SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD ATTACHED
TO ICF WALL
GYPSUM BOARD ATTACHED
TO ICF WALL
FLASHING W/ TERM
BAR & SEALANT
CAVITY MORTAR
CONTROL
MATERIAL
METAL DECK
51mm [2"] RIGID INSUL
88mm [3 1/2"] VENTED
PLYWOOD & INSUL
SANDWICH PANEL
FLOOR COVERING
AND BASE - SEE
ROOM FINISH
SCHEDULE
FLOOR COVERING AND
BASE - SEE ROOM FINISH
SCHEDULE
T O T O P O F S H E L F A N G L E
D A T E
S K E T C H
M O D
IF
IC
A T
IO
N
T O D W G
A D D E N D U M N O
S K -A
R E P L A C E T R O O P T R A
IN
IN
G Q U A R T E R S
P E N N S Y L V A N
IA
A
IR
N A T
IO
N A L G U A R D
S E P T , 2 9 3
A
1 SCALE: 3/4" = 1'-0"
WALL SECTION
File details come from the government source that posted it. Updated .