SK-A4.pdf

PDF 125 KB Posted

Attached to
RECOVERY--Y--Replace Troop Training Quarters Federal contract opportunity
Solicitation number
W912KC-09-B-0009
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

A4 Revised Drawing

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--Y--Replace Troop Training Quarters, newest first.
File Type Posted
Troopcamp Addendum 3.doc DOC document
SK-A3.pdf PDF
08410 Metal Framed Storefronts.pdf PDF
SK-A5.pdf PDF
SK-P1.pdf PDF
SK-C2.pdf PDF
E102 ADD 2.pdf PDF
16711 - Telecommunications.pdf PDF
E001 ADD 2.pdf PDF
SK-A2.pdf PDF
SK-A1.pdf PDF
E602 ADD 2.pdf PDF
SK-C3.pdf PDF
E108 ADD 2.pdf PDF
02820 - Aluminum Louver Fencing.pdf PDF
04720 - Cast Stone.pdf PDF
E604 ADD 2.pdf PDF
SK-C1.pdf PDF
E107 ADD 2.pdf PDF
Troopcamp Addendum 2.doc DOC document
E601 ADD 2.pdf PDF
09900 Paints and Coatings.pdf PDF
S102.pdf PDF
S302.pdf PDF
Troopcamp Addendum 1.pdf PDF
05520 Handrails and Railing.pdf PDF
S101.pdf PDF
02225 Building Demolition.pdf PDF
Replace Troop Training Quarters.pdf PDF
Troop Training Spec Vol 2.pdf PDF
Troop Training Spec Vol 1.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST

FLOOR

0' - 0"

SECOND

FLOOR

12' - 8"

T/ FOOTING

-2' - 0"

T/ CONC AT

STAIRS

22' - 8"

STAIR

A

CORRIDOR #2

VESTIBULE #2

/3

/3

E Q U A L R

IS

E R S

E Q U A L R

IS

E R S

STEEL PLATE

STRINGER

1067 [42"] HIGH

GUARDRAIL

CONTINUOUS

HANDRAIL

WALL MOUNTED

HANDRAIL

19 [3/4"] FIRE

RETARDANT

TREATED PLYWOOD

DATE:

SKETCH:

MODIFICATION

TO DWG:

ADDENDUM NO: SK-A4

REPLACE TROOP TRAINING QUARTERS

PENNSYLVANIA AIR NATIONAL GUARD

SCALE: 1/4" = 1'-0"

SECTION

SEPT 18, 2009

A401

File details come from the government source that posted it. Updated .