About this file
Narrative Changes to Specifications Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Troopcamp Addendum 3.doc | DOC document | |
| SK-A4.pdf | ||
| SK-A3.pdf | ||
| 08410 Metal Framed Storefronts.pdf | ||
| SK-A5.pdf | ||
| SK-P1.pdf | ||
| SK-C2.pdf | ||
| E102 ADD 2.pdf | ||
| 16711 - Telecommunications.pdf | ||
| E001 ADD 2.pdf | ||
| SK-A2.pdf | ||
| SK-A1.pdf | ||
| E602 ADD 2.pdf | ||
| SK-C3.pdf | ||
| E108 ADD 2.pdf | ||
| 02820 - Aluminum Louver Fencing.pdf | ||
| 04720 - Cast Stone.pdf | ||
| E604 ADD 2.pdf | ||
| SK-C1.pdf | ||
| E107 ADD 2.pdf | ||
| E601 ADD 2.pdf | ||
| 09900 Paints and Coatings.pdf | ||
| S102.pdf | ||
| S302.pdf | ||
| Troopcamp Addendum 1.pdf | ||
| 05520 Handrails and Railing.pdf | ||
| S101.pdf | ||
| 02225 Building Demolition.pdf | ||
| Replace Troop Training Quarters.pdf | ||
| Troop Training Spec Vol 2.pdf | ||
| Troop Training Spec Vol 1.pdf |
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE TROOP TRAINING QUARTERS
193d Regional Support Group Pennsylvania Air National Guard
Ft. Indiantown Gap, Annville, Pennsylvania
Project No. LKLW959714
ADDENDUM #2
REVISIONS TO SPECIFICATIONS
· Section 02820 – ALUMINUM LOUVER FENCING
1) ADD attached section 02820 in its entirety.
· Section 04720 – CAST STONE
1) ADD attached section 04720 in its entirety.
· Section 08410 – METAL-FRAMED STOREFRONTS
1) REVISE paragraph 2.02.C.1 as follows:
1. Thickness 45 mm (1-3/4 inches)
· Section 08800 – GLAZING
1) REVISE paragraph 2.01.A.5 as follows:
5. Thickness 33 mm (1-5/16 inches)
· Section 09212 – SPRAY-ON ACOUSTIC FINISH
1) REVISE paragraph 2.01.A as follows:
A. International Cellulose Corporation, SonaSpray “fc”
· Section 13100 – LIGHTNING PROTECTION
1) REVISE paragraph 2.01.A.6 as follows:
6. National Lightning Protection Corporation
2) ADD paragraph 2.01.A.7 as follows:
7. Or Approved Equal
· Section 16140 – WIRING DEVICES
1) REVISE article 2.01.E as follows:
E. Colors of wiring devices to be selected from the Manufacturer’s standard color range by the Government during shop drawing review. The Manufacturer’s standard color ranges shall include, at minimum: white, black, ivory, and gray.
2) ADD article 2.01.F as follows:
F.
Acceptable Manufacturers:
1. Hubbell Inc.
2. Pass & Seymour
3. Leviton Manufacturing Co.
· Section 16711 – TELECOMMUNICATIONS
1) REPLACE Section 16711 with the attached Section 16711 in its entirety.
REVISIONS TO DRAWINGS
· C001 – GENERAL SITE INFORMATION PLAN
1) ADD information on SK-C1 related to the existing communications ductbank to Area 1 Project Location Plan.
· C102 – LAYOUT PLAN
1) REVISE 3.04M [10’] R curb at parking lot entry island (southwest corner near centerline coordinate 4) to 3.96M [13’] R.
2) ADD Dumpster Enclosure and Pad information as shown on SK-C2.
· C103 – GRADING AND DRAINAGE PLAN
1) REVISE elevation of Propane Tank Pad to 447.75’.
2) ADD Dumpster Enclosure Pad information as shown on SK-C2.
· C505 - DETAILS
1) ADD details related to Dumpster Pad and Site Work as shown on SK-C3.
· A101 – FIRST FLOOR PLANS AND DETAILS
1) REVISE ceiling type F to read as follows:
TYPE F 600x600 [24”x24”] ACOUSTIC CEILING TILE WITH 24mm [15/16”] EXPOSED TEE GRID.
· A102 – SECOND FLOOR PLANS AND DETAILS
1) REVISE ceiling type A to read as follows:
TYPE A 600x600 [24”x24”] BEVELED TEGULAR ACOUSTIC CEILING TILE WITH 16mm [9/16”] EXPOSED TEE GRID. PROVIDE 16mm [5/8”] FIRE RATED GYPSUM BOARD AT UNDERSIDE OF TRUSSES AT STAIR A AND STAIR B.
2) REVISE ceiling type F to read as follows:
TYPE F 600x600 [24”x24”] ACOUSTIC CEILING TILE WITH 24mm [15/16”] EXPOSED TEE GRID.
· A103 – ROOF PLANS AND DETAILS
1) ADD plan, elevations, detail, and section as shown on SK-A1 and SK-A2.
· E001 – SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
1) REPLACE drawing E001 with attached drawing E001 in its entirety.
· E102 – LIGHTING SECOND FLOOR PLAN
1) REPLACE drawing E102 with attached drawing E102 in its entirety.
· E107 – TELECOMMUNICATION FIRST FLOOR PLAN
1) REPLACE drawing E107 with attached drawing E107 in its entirety.
· E108 – TELECOMMUNICATION SECOND FLOOR PLAN
1) REPLACE drawing E108 with attached drawing E108 in its entirety.
· E601 – SCHEDULES
1) REPLACE drawing E601 with attached drawing E601 in its entirety.
· E602 – DIAGRAMS AND DETAILS
1) REPLACE drawing E602 with attached drawing E602 in its entirety.
· E604 – SCHEDULES
1) REPLACE drawing E604 with attached drawing E604 in its entirety.