Troopcamp Addendum 2.doc

DOC document 45 KB Posted

Attached to
RECOVERY--Y--Replace Troop Training Quarters Federal contract opportunity
Solicitation number
W912KC-09-B-0009
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Narrative Changes to Specifications Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--Y--Replace Troop Training Quarters, newest first.
File Type Posted
Troopcamp Addendum 3.doc DOC document
SK-A4.pdf PDF
SK-A3.pdf PDF
08410 Metal Framed Storefronts.pdf PDF
SK-A5.pdf PDF
SK-P1.pdf PDF
SK-C2.pdf PDF
E102 ADD 2.pdf PDF
16711 - Telecommunications.pdf PDF
E001 ADD 2.pdf PDF
SK-A2.pdf PDF
SK-A1.pdf PDF
E602 ADD 2.pdf PDF
SK-C3.pdf PDF
E108 ADD 2.pdf PDF
02820 - Aluminum Louver Fencing.pdf PDF
04720 - Cast Stone.pdf PDF
E604 ADD 2.pdf PDF
SK-C1.pdf PDF
E107 ADD 2.pdf PDF
E601 ADD 2.pdf PDF
09900 Paints and Coatings.pdf PDF
S102.pdf PDF
S302.pdf PDF
Troopcamp Addendum 1.pdf PDF
05520 Handrails and Railing.pdf PDF
S101.pdf PDF
02225 Building Demolition.pdf PDF
Replace Troop Training Quarters.pdf PDF
Troop Training Spec Vol 2.pdf PDF
Troop Training Spec Vol 1.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE TROOP TRAINING QUARTERS

193d Regional Support Group Pennsylvania Air National Guard

Ft. Indiantown Gap, Annville, Pennsylvania

Project No. LKLW959714

ADDENDUM #2

REVISIONS TO SPECIFICATIONS

· Section 02820 – ALUMINUM LOUVER FENCING

1) ADD attached section 02820 in its entirety.

· Section 04720 – CAST STONE

1) ADD attached section 04720 in its entirety.

· Section 08410 – METAL-FRAMED STOREFRONTS

1) REVISE paragraph 2.02.C.1 as follows:

1. Thickness 45 mm (1-3/4 inches)

· Section 08800 – GLAZING

1) REVISE paragraph 2.01.A.5 as follows:

5. Thickness 33 mm (1-5/16 inches)

· Section 09212 – SPRAY-ON ACOUSTIC FINISH

1) REVISE paragraph 2.01.A as follows:

A. International Cellulose Corporation, SonaSpray “fc”

· Section 13100 – LIGHTNING PROTECTION

1) REVISE paragraph 2.01.A.6 as follows:

6. National Lightning Protection Corporation

2) ADD paragraph 2.01.A.7 as follows:

7. Or Approved Equal

· Section 16140 – WIRING DEVICES

1) REVISE article 2.01.E as follows:

E. Colors of wiring devices to be selected from the Manufacturer’s standard color range by the Government during shop drawing review. The Manufacturer’s standard color ranges shall include, at minimum: white, black, ivory, and gray.

2) ADD article 2.01.F as follows:

F.

Acceptable Manufacturers:

1. Hubbell Inc.

2. Pass & Seymour

3. Leviton Manufacturing Co.

· Section 16711 – TELECOMMUNICATIONS

1) REPLACE Section 16711 with the attached Section 16711 in its entirety.

REVISIONS TO DRAWINGS

· C001 – GENERAL SITE INFORMATION PLAN

1) ADD information on SK-C1 related to the existing communications ductbank to Area 1 Project Location Plan.

· C102 – LAYOUT PLAN

1) REVISE 3.04M [10’] R curb at parking lot entry island (southwest corner near centerline coordinate 4) to 3.96M [13’] R.

2) ADD Dumpster Enclosure and Pad information as shown on SK-C2.

· C103 – GRADING AND DRAINAGE PLAN

1) REVISE elevation of Propane Tank Pad to 447.75’.

2) ADD Dumpster Enclosure Pad information as shown on SK-C2.

· C505 - DETAILS

1) ADD details related to Dumpster Pad and Site Work as shown on SK-C3.

· A101 – FIRST FLOOR PLANS AND DETAILS

1) REVISE ceiling type F to read as follows:

TYPE F 600x600 [24”x24”] ACOUSTIC CEILING TILE WITH 24mm [15/16”] EXPOSED TEE GRID.

· A102 – SECOND FLOOR PLANS AND DETAILS

1) REVISE ceiling type A to read as follows:

TYPE A 600x600 [24”x24”] BEVELED TEGULAR ACOUSTIC CEILING TILE WITH 16mm [9/16”] EXPOSED TEE GRID. PROVIDE 16mm [5/8”] FIRE RATED GYPSUM BOARD AT UNDERSIDE OF TRUSSES AT STAIR A AND STAIR B.

2) REVISE ceiling type F to read as follows:

TYPE F 600x600 [24”x24”] ACOUSTIC CEILING TILE WITH 24mm [15/16”] EXPOSED TEE GRID.

· A103 – ROOF PLANS AND DETAILS

1) ADD plan, elevations, detail, and section as shown on SK-A1 and SK-A2.

· E001 – SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

1) REPLACE drawing E001 with attached drawing E001 in its entirety.

· E102 – LIGHTING SECOND FLOOR PLAN

1) REPLACE drawing E102 with attached drawing E102 in its entirety.

· E107 – TELECOMMUNICATION FIRST FLOOR PLAN

1) REPLACE drawing E107 with attached drawing E107 in its entirety.

· E108 – TELECOMMUNICATION SECOND FLOOR PLAN

1) REPLACE drawing E108 with attached drawing E108 in its entirety.

· E601 – SCHEDULES

1) REPLACE drawing E601 with attached drawing E601 in its entirety.

· E602 – DIAGRAMS AND DETAILS

1) REPLACE drawing E602 with attached drawing E602 in its entirety.

· E604 – SCHEDULES

1) REPLACE drawing E604 with attached drawing E604 in its entirety.