This document provides specifications for warranty submittals on a federal construction contract. The contract is for repair and maintenance work at Kingsley Field Air National Guard Base in Oregon, solicited by the Department of the Army Oregon Army National Guard. The specifications require the contractor to compile all warranties and service contracts from subcontractors and manufacturers in duplicate binders. The binders must include the contract and product information, warranty durations, procedures for claims, and responsible contractor contacts. Warranties must be dated as of substantial completion or final acceptance of individual work items. The contractor must submit the warranty binders within 10 days of those dates.
Warranties
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FINAL_RFI's_as_of_7_June_19.pdf | ||
| Attachment_2-_Fuel_Tank.pdf | ||
| Attachment_4_-_Exhibit_7460.PDF | ||
| Attachment_3-_Fuel_Tank_Trench.pdf | ||
| FINAL_RFI's_as_of_7_June_19.pdf | ||
| 01_72_00_Record_Documents.pdf | ||
| 01_40_00_General_Projects_and_Quality.pdf | ||
| 01_78_23_O_and_M_Data.pdf | ||
| RFI's_as_of_1_June_19.pdf | ||
| 01_78_00_Contract_Closeout.pdf | ||
| 01_33_00_Submittals.pdf | ||
| 01_14_00_Security_Requirements.pdf | ||
| 01_39_00_Request_for_Information.pdf | ||
| RFI's_as_of_30_May.pdf | ||
| RFI's.pdf | ||
| Revised_Specs.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf | ||
| W912JV19B7001.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 77 00 Page 1
ORANG Repair Maint. Ramp KJAQ162682
Kingsley Field ANGB Type B-2 Submittal
01 77 00
WARRANTIES
PART 1 - GENERAL
1.1 DESCRIPTION
A. Compile specified warranties.
B. Compile specified service and maintenance contracts.
C. Co-execute submittals when so specified.
D. Review submittals to verify compliance with Contract Documents.
E. Submit to Contracting Officer for review and transmittal to Government.
1.2 SUBMITTAL REQUIREMENTS
A. Assemble warranties, and service and maintenance contracts, executed by each of the respective manufacturers, suppliers, and subcontractors.
B. Number of original signed hardcopies required: Two each.
C. Table of Contents: Neatly typed, in orderly sequence. Provide complete information for each item.
1. Specifications Section Number and Title.
2. Product or work item.
3. Firm, with name of principal, address and telephone number.
4. Date of beginning of warranty, or service and maintenance contract.
5. Duration of warranty, or service maintenance contract.
6. Provide information for Government personnel:
a. Proper procedure in case of failure.
b. Instances which might affect the validity of warranty.
7. Contractor, name of responsible principal, address and telephone number.
1.3 FORM OF SUBMITTALS
A. Prepare in duplicate packets.
B. Format
1. Size 8-1/2 in. x 11 in., punch sheets for 3-ring binder.
Fold larger sheets to fit into binders.
2. Cover: Identify each packet with typed or printed title
"WARRANTIES". List:
a. Title of Project
b. Name of Contractor
01 77 00 Page 2
ORANG Repair Maint. Ramp KJAQ162682
Kingsley Field ANGB Type B-2 Submittal
c. Binders: Commercial quality, three-ring, with durable and cleanable plastic covers.
1.4 TIME OF SUBMITTALS
A. All warranties shall be dated as of the date of beneficial occupancy substantial completion) or as determined by the Contracting Officer.
B. For items of work, where acceptance is delayed materially beyond the Date of Substantial Completion, provide updated submittal within ten days after acceptance, listing the date of acceptance as the start of the warranty period.
1.5 SUBMITTALS REQUIRED
A. Submit warranties, service and maintenance contracts as specified in the respective sections of Specifications.
PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION
3.1 SCHEDULE OF WARRANTIES
A. See individual sections for required warranty periods.
-- END OF SECTION --