W912JB24B0001 Amend 4.pdf
PDF 3 MB Posted
- Attached to
- Construct Readiness Center Federal contract opportunity
- Solicitation number
- W912JB-24-B-0001
About this file
This solicitation is for the construction of a new National Guard Readiness Center in Michigan. The project includes designing and building a 46,831 square foot facility to support training, administration, and logistical needs of the MIARNG. The new readiness center must be designed to meet industry standards as well as all applicable building codes. It must comply with DoD antiterrorism standards and achieve a minimum 50-year design life. The project also includes demolition of an existing 52,153 square foot building. The solicitation does not specify pricing terms, response dates, or which federal agency will make the award.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USPFO-MI - KELLI KELLEY
3423 N. MLK BLVD
LANSING MI 48906-2934
260247
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate Attachement 11, Addendum 2, dated 30 Jan 2024, into the terms and conditions of thisnvitation for Bids.There are no other changes, and all other terms and conditions shall remain the same
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jan-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB24B0001
X 9B. DATED (SEE ITEM 11)
27-Dec-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jan-2024
CODE
USPFO FOR MICHIGAN - CONTRACTING OFFICE
3423 N. MARTIN LUTHER KING JR. BLVD.
NG.MI.MIARNG.MBX.USPFO-PC@MAIL.MIL
LANSING MI 48906-2934
W912JB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912JB
FACILITY CODECODE
EMAIL:TEL:
W912JB24B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
NOTES
Table of Contents
SECTION 00 10 00 - BID SCHEDULE NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 – COMPLETE SET DRAWINGS Project #260247 Dated 29 June 2023
ATTACHMENT 2- B3 CONSTRUCT Readiness Center 4 SUBMITTAL BOOK- Dated 22 Aug 2023
ATTACHMENT 3- MI ARNG GAAF RC Vol 2 Type B 100 DRAWING- Dated 29 June 2023
ATTACHMENT 4- MI ARNG GAAF RC Vol 2 Type B 90 DRAWING- Dated N/A
ATTACHMENT 5- MI ARNG GAAF RC Vol 2 Type B 100 SPECIFICATIONS - Dated 12 May 2023
ATTACHMENT 6- MI ARNG GAAF RC Vol 3 Type B 90 SPECIFICATIONS- Dated 30 June 2023
ATTACHMENT 7- STATEMENT OF WORK- CONSTRUCT READINESS CENTER 4- Dated 1 Aug 2023
ATTACHMENT 8- BRAND NAME JUSTIFICATION- LonWorks LNS network software tool
ATTACHMENT 9- CAMP GRAYLING VISITOR VETTING FORM 2022 (Excel Spread Sheet)
ATTACHMENT 10-ADDENDUM 1 DATED 23 JAN 2024
ATTACHMENT 11-ADDENDUM 2 DATED 30 JAN 2024
1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov.
2. Facsimile transmission of bid is not authorized. Electronic submission of bids will NOT be accepted.
3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award
Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.
4. A complete bid package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00 10 00 Line Items- all items must be priced
(c) A Bid Bond and Power of Attorney is required along with the bid on th due date. In accordance with DoD Deviation 2020-00016, electronic http://www.sam.gov/
W912JB24B0001
signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. The bid bond must be on a
SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4
Noncompliance with bid guarantee requirements.
(d) Section 00 45 00 Representations and Certifications, completed and return only additional certifications found in this section in addition, the offeror must have entered current and complete data within the past year in
Online Representations and Certifications at www.sam.gov.
(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged
(g) Mark the front of the envelope with the following: BID No. W912JB-24-B-0001, Construct
Readiness Center”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
5. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting
Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A
Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (
IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small
Business Administration (SBA) and not the Contracting Officer.
A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of
FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and
Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program
Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories:
(A) Small business
(B) Service-disabled veteran-owned small business
(C) Women-owned small business (WOSB) under the WOSB Program
(D) Economically disadvantaged women-owned small business under the WOSB Program; or
(E) Historical underutilized business small business
Section 00 10 00
(End of Summary of Changes) http://www.sam.gov/
MICHIGAN Army National Guard
GAAF Readiness Center
MIARNG Project Number: 86608-260247
Atkins Project Number: 100078934
Rev. Date 01/30/24 Page 1 of 1
ADDENDUM 02
ADDENDUM NO. 02
Date: January 30, 2024
This Addendum forms a part of the Contract and corrects or modifies original Bid Documents, issued on June 6, 2023.
A. Bidder RFI Response
Responses to bidder’s questions received on January 24, 2024, are provided for general information. Responses that amend the contract documents are qualified as such with the following revised documents attached.
B. Project Manual Revisions (Each section replaced in its entirety) – 35 pages bookmarked.
PROJECT TABLE OF CONTENTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
C. Drawing Revisions (All changes clouded and tagged ADDENDUM 02) – 2 Sheets, bookmarked.
S-631 – MISC. DETAILS
- Revised notes on canopy details.
A-402 – ENLARGED KITCHEN PLANS
- Revised equipment list.
- Revised kitchen equipment layout plan.
END
# DATE
RFI DETAIL
Primary Discipline Response
Response Date
001 1/9/2024 The solicitation states that the price shall be good for 60 days, while the Site Visit slides state 90 days. Please clarify.
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
002 1/9/2024 Please advise what the time frame is for award of the option(s) and any resulting project schedule extensions if they are not all awarded at the same time
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
003 1/9/2024
Spec 01 35 26 (para. 1.6.1.1.1) states that the SSHO may also serve as the QC Manager duties but may not serve as the
Superintendent. However, Spec 01 45 00.00 10 (para. 3.4.2) states that the QC Manager is assigned as the CQC
Manager but has duties as project superintendent in addition to quality control. In addition, Spec 01 00 00 (para.
1.38.1, Key Personnel Description, states: “An individual Key Team Member may not hold more than one key role.”
This is followed by the minimum qualifications for Project Manager, Site Superintendent, Quality Control Manager, and
Safety Manager. Please clarify the project requirements for the QC Manager, SSHO and Superintendent).
MIARNG
It appears that the note in section 01 00 00 – “An individual Key Team Member may not hold more than one key role” contradicts language in spec 01 35 26.
Atkins understanding is that per 01 35 26 – The Quality Control Manager and Site
Safety and Health Office can be the same person, but there needs to be a separate
Project Superintendent.
Section 01 45 00.00 10 does not specifically mention “Quality Control Manager”, it states that the Contractor Quality Control manager also has superintendent duties.
Meaning observation and inspection of site work, production of reports and is on site at all times during construction. Atkins understanding is that there is no difference between a Quality Control Manager and a Contractor Quality Control
Manager.
Final response and decision to be confirmed by MIARNG.
1/12/2024
004 1/9/2024 Drawing CS503 shows chain link fence details but no chain link fence is found on the drawings. Please advise. CIVIL
Please refer to sheet OLI705 & OLI706. Optional line item drawings for the project are located at the back of the drawing set starting from OLI700 - OLI786. 1/12/2024
005 1/9/2024 Please confirm that the project is tax exempt per Spec 01 00 00. MIARNG Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG. 1/12/2024
006 1/9/2024 Please consider allowing submittal of the Bid via email. Typically, trades do not provide their bids until late in the process, making it difficult to copy, bind, and deliver the Bid documents.
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
007 1/10/2024 DMI Metals - I recently viewed the Readiness Center project in Grayling, MI and am interested in quoting the standing seam roof. Your name was listed as a contact, and I was wondering if Substitution Requests are acceptable.
MIARNG
Per FAR requirements, the specs do not name specific manufacturers or products.
The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.
1/12/2024
008 1/12/2024
Should coatings on concrete be polyurea on the interior and bituminous coating on the exterior? These are preferred practices in many communities in Michigan due to constant expansion-contraction of concrete tanks susceptible to toxins including phosphates, sulfuric acids, cleaning agents, and petroleum products. Epoxy coatings have been defined as too hard-brittle to survive in extreme temperature conditions. Cracking can occur and lead to premature failures on concrete designs (see recommended Concrete GI Spec).
PLUMBING
Per FAR requirements, the drawings & specifications do not name specific manufacturers or products. The drawings and specifications include salient characteristics of products and materials crucial to the performance of the product. If a submitted product meets or exceeds the performance of the product provided as the Basis of Design, it can be evaluated through the submittal process.
1/16/2024
009 1/12/2024 Are HDPE solutions acceptable as alternatives for the grease interceptor and oil separators? Fully welded designs using dual-wall construction are better for long-term structural durability, leak-free performance, and chemical resistance.
PLUMBING
Per FAR requirements, the specs do not name specific manufacturers or products.
The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.
1/15/2024
010 1/12/2024 Per S-201 and A-123 a prefabricated canopy on the south elevation is by others. If the Contractor installs framing with metal deck for this canopy, please provide details
ARCHITECTURE / STRUCTURE /
PLUMBING
Atkins will provide drawings and specs as needed in an addendum.
1/12/2024
011 1/12/2024 Per details on A-451 all shower cabins are wall fiberglass commercial showers. No spec found neither in architectural nor plumbing sections. Please clarify
SPECS
Atkins will provide revised specs in an addendum. / Shower walls can match shower pan material 1/15/2024
012 1/12/2024 What is the thickness of stone beneath slab-on-grade? Drawing S-111 refers to Geotechnical Report, but no Geotech
Report included in RFP
MIARNG
Geotechnical report which is in the design report can be made available by
MIARNG.
1/15/2024
013 1/12/2024 Please provide Food Service drawings. Spec 1106 40.13, 1.2.3 classified responsibilities of all parties, but section
2.1.2Food Service Equipment Schedule does not show this classification. Please advise.
SPECS
Please refer to sheet A-402 for kitchen equipment layout and equipment list. All food service equipment is contractor furnished and contractor installed unless otherwise noted as NOT IN CONTRACT on the kitchen equipment list. Atkins will update specs to remove Food Service Equipment Schedule.
1/16/2024
014 1/18/2024
Base Bid Fire Alarm Mass Notification: The design documents indicate clear and amber strobes; clear for fire alarm and amber for mass notification. This is an antiquated approach to mass notification design and no long supported by the
DoD, i.e., USACE, USAF, NAVFAC, etc. Refer to Engineering and Construction Bulletin ECB-2022-05 rev 2 Mass
Notification Requirements. Please confirm amber strobes are required. Note that LED MNS text signs at each exit door should be provided in lieu of amber strobes.
FIRE ALARM
As per Engineering and Construction Bulletin ECB-2018-17 Rev 3, Amber strobes must no longer be used in new mass notification systems. In lieu of amber strobes, clear or white strobes marked with the word “ALERT” must be used for new mass notification systems. Clear or white strobes must be provided for shared use by the facility’s combination mass notification and fire alarm system. The clear or white strobes are activated in conjunction with voice messages over the mass notification or fire alarm system. Drawings will be updated accordingly to include this modification.
1/19/2024
015 1/18/2024
Base Bid Fire Alarm Mass Notification: The proposed layout for notification appliances (i.e., speaker/strobes) does not appear to follow general guidelines and industry standards for a system required to achieve prescriptive audibility and voice intelligibility requirements. For example, there are occupiable spaces within the facility that do not have notification appliances. With the doors closed, it is unlikely these spaces will pass acceptance testing. Per NFPA 72, the ownness is on the Designer of Record to establish the acoustically distinguishable spaces. Please confirm the spaces without notification appliances are except from audibility and voice intelligibility requirements.
FIRE ALARM
The Fire Alarm drawings are scheduled for revision to include a speaker/strobe in
Offices. However, it's important to note that not all small spaces or offices will require a visible notification appliance, as outlined in UFC 3-600-01 9-18-6.3 (I).
Additionally, while the provided Fire Alarm drawings encompass the design intent, the contractor is required to furnish shop drawings that specify the final quantity, location, and calculations.
1/19/2024
016 1/18/2024
Base Bid Fire Alarm Mass Notification: The design documents do not show addressable input modules to monitoring the fire pump system as required by NFPA 20. Please clarify if the fire pump is required to be monitored by the fire alarm system. FIRE ALARM
Yes, FACP needs to monitor the Fire Pump. Control modules need to be included in drawings for the Running/Lost of Phase, Phase Reversal, test Header. Refer to the revised drawings. 1/19/2024
017 1/18/2024
Base Bid Fire Service Entrance: The fire service backflow preventer is downstream of the fire pump. Please clarify if the fire pump must be dual listed for both fire protection and domestic service.
FIRE PROTECTION / PLUMBING
The fire pump selected as the basis of design is NSF 61 certified, so it is safe to use with a potable water service. The pump selected for installation must be NSF 61 certified. UFC 03-600-01 requires the backflow preventer to be installed after the fire pump.
1/19/2024
018 1/18/2024
Base Bid Fire Protection: Wafer style check valves are annotated on Detail 2 on sheet F-401. Please confirm wafer style check valves are permitted; swing type check valves with removal face plate for internal inspection are more commonly used in the fire protection industry.
FIRE PROTECTION
The wafer-style check valve indicated on the riser is commonly used on the FDC inlet in our experience. A swing-type check valve is also acceptable at this location if there is sufficient space in the piping assembly for it.
1/19/2024
019 1/18/2024
Option 3: Please clarify if the HVLS fans must shut down upon the detection of fire sprinkler waterflow as required by
NFPA 13. FIRE PROTECTION
Yes, control monitors must be added to shut down the HVLS fans upon a waterflow alarm. 1/19/2024
020 1/18/2024
Option 3: Please confirm carbon monoxide detection is required in the Training Workbays per NFPA 72.
FIRE ALARM
An existing CO Detection system is specified in the Mechanical plans OLI730. The purpose of this system is to ensure low levels of CO in the training bay. This system will operate independently. 1/19/2024
021 1/18/2024
Option 4: Please clarify if the emergency generator controller must be monitored by the fire alarm system as required by NFPA 101; 9.1.3.2.
FIRE ALARM
Yes, the FACP needs to monitor the new generator. Please refer to Key Note #9 on sheet OLI785, where we specify the installation of conduits and control wiring between the generator and FACP.
1/19/2024
022 1/18/2024 Where are mesh partitions needed? ARCHITECTURE Please refer to sheet OLI740 1/19/2024
023 1/18/2024 Please provide door and shutter specs.
SPECS
Atkins will provide spec section for window counter doors in an addendum
1/19/2024
024 1/18/2024
For the alternate on the training bay fire protection, is that entire area getting sprinkled or just the north half?
FIRE PROTECTION
The entire area receives fire suppression. The entire building receives fire suppression. Apply coverage based on Hazard Classifications indicated under Fire
Protection Data on sheet F-001. AtkinsRéalis only presented the most remote area that was used to prepare hydraulic calculations.
1/22/2024
025 1/18/2024
Is detail 7 on S5-11 for the trench drains is a mistake as it refers to the architectural pages to verify location, but I do not see any annotations for a trench drain location within the architectural pages. ARCHITECTURE
Revised annotations for trench drain location will be provided in an addendum
1/23/2024
026 1/18/2024
Will not be able to meet the specs attached, please see below for some of the items not available.
CHI Springs are only warrantied for 1 year.
Max Cycles Available - 100k
Insulated Slats Not Available for Counter Shutters
Vision Lites Not Available in Shutters
6" Barrel Not Available for Shutters
SPECS
Atkins will provide spec section for window counter doors in an addendum
1/19/2024
027 1/18/2024
We would like to provide you a full package for you on this. We are specified on all the types except A2, A2E, A4, A4E, C-
H, CE-H, X & X1. Please let me know your thoughts.
ELECTRICAL / SPECS
Question is unclear. Per FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process. Any necessary substitution can be review during the submittal process.
1/22/2024
028 1/19/2024
Substitution request for metal lockers.
ARCHITECTURE
Per FAR requirements, the specs do not name specific manufacturers or products.
The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.
1/19/2024
MIARNG Readiness Center - BIDDER RFI LOG 2024
029 1/19/2024
Section 01 91 00.15 10 Total Building Commissioning
- Will there be a third-party Commissioning Agent on this project?
- If not, what will the Commissioning process be?
SPECS
Per the spec section listed the GC to employ the Services of and independent firm for commissioning. Follow specification for the process
030 1/19/2024
Section 23 09 00 Instrumentation and Control
- 2.1.2 Programming Control Unit and Programming Software “By Owner” – please confirm there is no work being performed by the owner.
- 2.1.4 Control Devices – please confirm all control devices are to be as listed on M-502 and that devices listed on M-
502 supersede the specifications.
MECHANICAL
2.1.2 - No work to be done by owner. Software and version to be confirmed by owner.
2.1.4 - Sheet M-502 shall supersede this section information where in conflict.
1/22/2024
031 1/19/2024
Section 23 09 23.01 Lonworks Direct Digital Control
- 3.1.2.1 Specified Circon DDC controllers on M-502 are not available with
H-O-A switches or AO potentiometers. Please advise.
- 3.1.2.2 Specified Circon DDC controllers on M-502 are not available with local displays. Please advise.
- 3.1.5 Specified Circon VAV controllers on M-502 are not available with network jacks. Are these to be furnished and wired to the communication buss at the room temperature sensors
MECHANICAL / MIARNG
Owner to confirm these devices on M-502 are preferred over listed functions in spec.
1/22/2024
032 1/19/2024
Division 25 Integrated Automation and all associated controls Specifications o Please confirm that any reference to
Tridium should be ignored and that this project is to be performed with a LonWorks LNS database and a CatNet Web
Server User Interface.
MECHANICAL
Correct. Controls are to be Lon system.
1/22/2024
033 1/19/2024 There are many different customer training requirements for the controls listed throughout the Specifications. What are the training requirements?
SPECS
Refer to 01 78 23 part 3
034 1/19/2024
Drawing M-601, Packaged Rooftop Units, Note #4
- Please confirm the intent of this note is; Provide “DDC Ready” units with damper, fan and cooling controls wired to a terminal strip in the controls compartment. DDC controls and components to be field installed.
MECHANICAL
Yes, RTUs and factory components provided are to be capable of DDC controls
1/22/2024
035 1/19/2024
Option #2 Build-out EOD Supply & PES Room
- Please confirm all work should on Drawing M-111 in the EOD Supply area should be included in the base bid
MECHANICAL
Correct. All work on sheet M-111 should be on the base bid.
1/22/2024
036 1/19/2024 Drawing – A653 does not include the material details for GL-4 Glazing which is specified in A611 Drawing notes for interior glazing. Please specify the details of GL4 Material.
ARCHITECTURE
Atkins will revise glazing information and issue revised sheet in an addendum 1/22/2024
037 1/19/2024 Drawing – A202 north elevation shows W8 which seems like a window or a louver but there is no detail shown either in window details or louver details please provide the details for W8.
ARCHITECTURE
Please refer to sheet A-621 for louver elevation and sheet A-623 for louver details.
1/22/2024
038 1/19/2024
Option 3: Fence spec calls for gate operators in para 2.1.6 and for electro-mechanical locks in para 2.1.7. However, they are not found neither on the site plans nor on the electrical plans. Are these gate operators and electro- mechanical locks required for this project? And if so, who will be responsible for the installation of these products?
CIVIL / SPECS
All sliding gate should be manually operated. Electro mechanical locks are not required. Atkins will revise spec sections and issue updated specs in an addendum.
1/22/2024
039 1/19/2024
Option 2: Please clarify the height of acoustical ceiling and mesh partitions height in PES Room
ARCHITECTURE
Ceiling height in PES room is at 10' per ceiling type legend. Wire mesh partitions in
Supply Rooms will go to the underside of the structure/roof above. No Ceiling.
Atkins will add note to Supply Room floor plan issue revised sheet in an addendum.
1/22/2024
040 1/19/2024
The specs call for all 24 volt and lon wiring to be in conduit regardless of building codes but the drawings saw that they can be in j hooks or bridal rings above suspended ceilings. Which route should i bid as the cost is very different. on all of our recent work for the state j hooks and bridal rings have been acceptable in suspended ceiling areas.
ELECTRICAL / SPECS
All fire alarm cables, data cables, and security cables shall be routed within conduits unless specified otherwise on the drawings. Cable trays shall be installed as specified on the drawings.
1/22/2024
041 1/19/2024
The specs call out a lot of performance testing that is very costly that is not normally done on state projects. what testing is actually required? These small but important items can drastically change cost of install
ELECTRICAL / SPECS
Our MIARNG project's specifications are based on the UFC criteria and
Government requirements. Could you specify which tests fall under these criteria?
The project expectation is that a certified contractor performs the required testing for a complete and fully functionally system.
1/22/2024
042 1/19/2024
Base Bid: Please provide grout selection for tile installation.
ARCHITECTURE
Please submit grout product that is compliant with the specifications. Grout color to be selected and coordinated with tile submittals during the submittal process by architect or government. For ceramic tile refer to paragraph 2.4.4, for all other tile refer to paragraph 2.4.5.
1/19/2024
043 1/24/2024 Kitchen Hood –Are there any specs available on the hood. What about fire suppression for underneath that hood?
SPECS
Refer to section 11 44 00 comply with standards shown
1/25/2024
044 1/24/2024
Dishwasher (item #8): No real specs on this piece. Is it a low temp unit or high temp? There is only one on the drawing but a quantity of 2 are shown on the schedule SPECS
Refer to section 11 48 00 comply with standards shown. Only one dishwasher is to be provided. Revised schedule will be issued as an addendum. 1/25/2024
045 1/24/2024 Prep Sink (item #4): On the schedule but not on the drawing
ARCHITECTURE
Prep sink will be tagged on the drawing and issued as an addendum.
1/25/2024
046 1/24/2024 Disposer (item #3): Any specs on these? Need to know what mounting style, voltage/phase, etc. SPECS Refer to section 11 48 00 comply with standards shown 1/25/2024
047 1/24/2024 Drawers (item #5): Are these being retrofitted to existing worktables? SPECS This is a new project with new equipment. Nothing is existing. 1/25/2024
048 1/24/2024
This document is not the new spec pages for the 2 counter shutters. Without these new specs from Atkins we cannot provide a bid on the 2 counter coiling doors. Please acquire these new specs so the coiling doors can be quoted. SPECS
Section 08 33 13 issued as part of Addendum 01 is the spec for the coiling counter doors and what needs to be bid 1/25/2024
049 1/24/2024
Could you verify whether any of the landscaping materials (stone, mulch, plants) are to be included with Options 3 through 5? The site plans for these options still show a rectangle where the plant bed from the Base Bid landscape plan would go, but there is no material or plant schedules besides turf associated with these options. CIVIL / LANDSCAPE
The planting bed with shrubs and mulch shown on the base bid is to be included in all bid options. The screened rock, crushed fines, and cobble rock shown on the base bid is to be inlcuded in the bid options, except in areas along the west side of the building where crushed aggregate or concrete pavement is to be included.
1/26/2024
050 1/24/2024
All the specs reference ASTM E 1996 and Table 2, but that only refers to the type and speed of the missile tested. All the PSF ratings I’ve found are for wind loads. There is a Minimum Design Load in the Aluminum Window specification referring to 50 PSF, but again that is under wind loads. There should be a minimum design pressure to make sure we exceed when laying out the frames. Please advise what the intended or minimum design pressure is in regard to large missile impact.
SPECS
It's unclear whether the question is in regards to impact loads, the loads on the window units as a whole, or the connections of the windows to the walls. Please clarify.
1/29/2024
051 1/24/2024
Please provide information on how prices will be evaluated. Is only the base bid being evaluated? Base plus total options? MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
052 1/24/2024
Will the Options be awarded at the same time as the Base Bid? If after, please provide the number of days for how long after award of the Base Bid that the Government has to award the Options. I.e., Options shall be awarded up to 90 days after award of Base Bid.
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
053 1/24/2024
Reference RFI #12. The geotechnical report for the thickness of the stone beneath the slab-on-grade only references
ACI standards. Please provide the thickness of the stone beneath the slab-on-grade. STRUCTURE / GEOTECH
6" thick base course.
1/26/2024
054 1/24/2024 Reference RFI #12. Is the stone beneath the slab-on-grade a design scope of work after award? If so, please provide the thickness of the stone beneath the slab-on-grade for bidding purposes.
STRUCTURE / GEOTECH
6" thick base course.
1/26/2024
055 1/24/2024 When do you expect construction to begin?
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
056 1/24/2024 Will the bid due date be extended?
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
057 1/25/2024 Please provide missing spec documents
SPECS
RFI is not clear. Spec Section 08 33 13 for the coiling counter doors has been included as part of Addendum 01.
1/25/2024
| ����� | �& |
| �� |
| ��� | � |
| �� |
| � | �� |
| ������ | �� |
�b �b
Mi chi gan Ar my Nat i onal Guar d Readi ness Cent er Type B 100% Submi ssi on Gr ayl i ng AAF, Mi chi gan
SECTI ON 08 44 00
CURTAI N WALL AND GLAZED ASSEMBLI ES
05/ 19
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ALUMI NUM ASSOCI ATI ON ( AA)
AA ADM ( 2020) Al umi num Desi gn Manual
AA ASD1 ( 2017; Er r at a 2017) Al umi num St andar ds and Dat a
AA DAF45 ( 2003; Reaf f i r med 2009) Desi gnat i on Syst em f or Al umi num Fi ni shes
AMERI CAN ARCHI TECTURAL MANUFACTURERS ASSOCI ATI ON ( AAMA)
AAMA 501. 1 ( 2017) St andar d Test Met hod f or Wat er Penet r at i on of Wi ndows, Cur t ai n Wal l s and Door s Usi ng Dynami c Pr essur e
AAMA 501. 2 ( 2015) Qual i t y Assur ance and Di agnost i c Wat er Leakage Fi el d Check of I nst al l ed St or ef r ont s, Cur t ai n Wal l s and Sl oped Gl azi ng Syst ems
AAMA 501. 4 ( 2018) Recommended St at i c Test Met hod f or Eval uat i ng Wi ndow Wal l , Cur t ai n Wal l and St or ef r ont Syst ems Subj ect ed t o Sei smi c and Wi nd- I nduced I nt er - St or y Dr i f t
AAMA 501. 5 ( 2007) Test Met hod f or Ther mal Cycl i ng of Ext er i or Wal l s
AAMA 501. 6 ( 2018) Recommended Dynami c Test Met hod f or Det er mi ni ng t he Sei smi c Dr i f t Causi ng Gl ass Fal l out f r om Wi ndow Wal l , Cur t ai n Wal l and St or ef r ont Syst ems
AAMA 501. 7 ( 2017) Recommended St at i c Test Met hod f or Eval uat i ng Wi ndows, Wi ndow Wal l , Cur t ai n Wal l and St or ef r ont Syst ems Subj ect ed t o Ver t i cal I nt er - St or y Movement s
AAMA 609 & 610 ( 2015) Cl eani ng and Mai nt enance Gui de f or Ar chi t ect ur al l y Fi ni shed Al umi num
AAMA 800 ( 2016) Vol unt ar y Speci f i cat i ons and Test Met hods f or Seal ant s
SECTI ON 08 44 00 Page 1 Januar y 30, 2024
AAMA 2603 ( 2020) Vol unt ar y Speci f i cat i on, Per f or mance Requi r ement s and Test Pr ocedur es f or Pi gment ed Or gani c Coat i ngs on Al umi num Ext r usi ons and Panel s
AAMA 2604 ( 2017a) Vol unt ar y Speci f i cat i on, Per f or mance Requi r ement s and Test Pr ocedur es f or Hi gh Per f or mance Or gani c Coat i ngs on Al umi num Ext r usi ons and Panel s
AAMA 2605 ( 2020) Vol unt ar y Speci f i cat i on, Per f or mance Requi r ement s and Test Pr ocedur es f or Super i or Per f or mi ng Or gani c Coat i ngs on Al umi num Ext r usi ons and Panel s
AAMA CW- 10 ( 2015) Car e and Handl i ng of Ar chi t ect ur al Al umi num f r om Shop t o Si t e
AAMA MCWM- 1 ( 1989) Met al Cur t ai n Wal l Manual
AAMA/ WDMA/ CSA 101/ I . S. 2/ A440 ( 2017) Nor t h Amer i can Fenest r at i on St andar d/ Speci f i cat i on f or Wi ndows, Door s, and Skyl i ght s
AMERI CAN HARDBOARD ASSOCI ATI ON ( AHA)
AHA A135. 4 ( 1995; R 2004) Basi c Har dboar d
AMERI CAN I RON AND STEEL I NSTI TUTE ( AI SI )
AI SC/ AI SI 121 ( 2007) St andar d Def i ni t i ons f or Use i n t he Desi gn of St eel St r uct ur es
AI SI SG03- 3 ( 2002; Suppl 2001- 2004; R 2008) Col d- For med St eel Desi gn Manual Set
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 7- 16 ( 2017; Er r at a 2018; Supp 1 2018) Mi ni mum Desi gn Loads and Associ at ed Cr i t er i a f or Bui l di ngs and Ot her St r uct ur es
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS A5. 1/ A5. 1M ( 2012) Speci f i cat i on f or Car bon St eel El ect r odes f or Shi el ded Met al Ar c Wel di ng
AWS A5. 10/ A5. 10M ( 2021) Wel di ng Consumabl es - Wi r e El ect r odes, Wi r es and Rods f or Wel di ng of Al umi num and Al umi num- Al l oys - Cl assi f i cat i on
AWS D1. 1/ D1. 1M ( 2020; Er r at a 1 2021) St r uct ur al Wel di ng Code - St eel
ASTM I NTERNATI ONAL ( ASTM)
ASTM A27/ A27M ( 2020) St andar d Speci f i cat i on f or St eel Cast i ngs, Car bon, f or Gener al Appl i cat i on
SECTI ON 08 44 00 Page 2 Januar y 30, 2024
ASTM A36/ A36M ( 2019) St andar d Speci f i cat i on f or Car bon St r uct ur al St eel
ASTM A47/ A47M ( 1999; R 2018; E 2018) St andar d Speci f i cat i on f or Fer r i t i c Mal l eabl e I r on Cast i ngs
ASTM A123/ A123M ( 2017) St andar d Speci f i cat i on f or Zi nc ( Hot - Di p Gal vani zed) Coat i ngs on I r on and St eel Pr oduct s
ASTM A153/ A153M ( 2016a) St andar d Speci f i cat i on f or Zi nc Coat i ng ( Hot - Di p) on I r on and St eel Har dwar e
ASTM A240/ A240M ( 2020a) St andar d Speci f i cat i on f or Chr omi um and Chr omi um- Ni ckel St ai nl ess St eel Pl at e, Sheet , and St r i p f or Pr essur e Vessel s and f or Gener al Appl i cat i ons
ASTM A242/ A242M ( 2013; R 2018) St andar d Speci f i cat i on f or Hi gh- St r engt h Low- Al l oy St r uct ur al St eel
ASTM A283/ A283M ( 2013) St andar d Speci f i cat i on f or Low and I nt er medi at e Tensi l e St r engt h Car bon St eel Pl at es
ASTM A424/ A424M ( 2009a; R 2016) St andar d Speci f i cat i on f or St eel Sheet f or Por cel ai n Enamel i ng
ASTM A501/ A501M ( 2021) St andar d Speci f i cat i on f or Hot - For med Wel ded and Seaml ess Car bon St eel St r uct ur al Tubi ng
ASTM A572/ A572M ( 2021; E 2021) St andar d Speci f i cat i on f or Hi gh- St r engt h Low- Al l oy Col umbi um- Vanadi um St r uct ur al St eel
ASTM A588/ A588M ( 2019) St andar d Speci f i cat i on f or Hi gh- St r engt h Low- Al l oy St r uct ur al St eel , up t o 50 ksi Mi ni mum Yi el d Poi nt , wi t h At mospher i c Cor r osi on Resi st ance
ASTM A606/ A606M ( 2018) St andar d Speci f i cat i on f or St eel Sheet and St r i p, Hi gh- St r engt h, Low- Al l oy, Hot - Rol l ed and Col d- Rol l ed, wi t h I mpr oved At mospher i c Cor r osi on Resi st ance
ASTM A653/ A653M ( 2020) St andar d Speci f i cat i on f or St eel Sheet , Zi nc- Coat ed ( Gal vani zed) or Zi nc- I r on Al l oy- Coat ed ( Gal vanneal ed) by t he Hot - Di p Pr ocess
ASTM A1008/ A1008M ( 2021a) St andar d Speci f i cat i on f or St eel , Sheet , Col d- Rol l ed, Car bon, St r uct ur al , Hi gh- St r engt h Low- Al l oy, Hi gh- St r engt h Low- Al l oy wi t h I mpr oved For mabi l i t y , Sol ut i on Har dened, and Bake Har denabl e
SECTI ON 08 44 00 Page 3 Januar y 30, 2024
ASTM A1011/ A1011M ( 2018a) St andar d Speci f i cat i on f or St eel Sheet and St r i p, Hot - Rol l ed, Car bon, St r uct ur al , Hi gh- St r engt h Low- Al l oy, Hi gh- St r engt h Low- Al l oy wi t h I mpr oved For mabi l i t y , and Ul t r a- Hi gh St r engt h
ASTM B26/ B26M ( 2018; E 2018) St andar d Speci f i cat i on f or Al umi num- Al l oy Sand Cast i ngs
ASTM B85/ B85M ( 2018) St andar d Speci f i cat i on f or Al umi num- Al l oy Di e Cast i ngs
ASTM B108/ B108M ( 2019) St andar d Speci f i cat i on f or Al umi num- Al l oy Per manent Mol d Cast i ngs
ASTM B136 ( 1984; R 2013) St andar d Met hod f or Measur ement of St ai n Resi st ance of Anodi c Coat i ngs on Al umi num
ASTM B137 ( 1995; R 2021) St andar d Test Met hod f or Measur ement of Coat i ng Mass Per Uni t Ar ea on Anodi cal l y Coat ed Al umi num
ASTM B152/ B152M ( 2019) St andar d Speci f i cat i on f or Copper Sheet , St r i p, Pl at e, and Rol l ed Bar
ASTM B209 ( 2014) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Sheet and Pl at e
ASTM B209M ( 2014) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Sheet and Pl at e ( Met r i c)
ASTM B211/ B211M ( 2019) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Rol l ed or Col d Fi ni shed Bar , Rod, and Wi r e
ASTM B221 ( 2021) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Ext r uded Bar s, Rods, Wi r e, Pr of i l es, and Tubes
ASTM B221M ( 2021) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Ext r uded Bar s, Rods, Wi r e, Pr of i l es, and Tubes ( Met r i c)
ASTM B244 ( 2009; R 2021) St andar d Met hod f or Measur ement of Thi ckness of Anodi c Coat i ngs on Al umi num and of Ot her Nonconduct i ve Coat i ngs on Nonmagnet i c Basi s Met al s wi t h Eddy- Cur r ent I nst r ument s
ASTM B308/ B308M ( 2010; R 2020) St andar d Speci f i cat i on f or Al umi num- Al l oy 6061- T6 St andar d St r uct ur al Pr of i l es
ASTM B316/ B316M ( 2020) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Ri vet and Col d- Headi ng Wi r e and Rods
SECTI ON 08 44 00 Page 4 Januar y 30, 2024
ASTM B429/ B429M ( 2010; E 2012) St andar d Speci f i cat i on f or Al umi num- Al l oy Ext r uded St r uct ur al Pi pe and Tube
ASTM C220 ( 1991; R 2015) St andar d Speci f i cat i on f or Fl at Asbest os- Cement Sheet s
ASTM C481 ( 1999; R 2011) St andar d Test Met hod Labor at or y Agi ng of Sandwi ch Const r uct i ons
ASTM C542 ( 2005; R 2017) St andar d Speci f i cat i on f or Lock- St r i p Gasket s
ASTM C547 ( 2019) St andar d Speci f i cat i on f or Mi ner al Fi ber Pi pe I nsul at i on
ASTM C552 ( 2021a) St andar d Speci f i cat i on f or Cel l ul ar Gl ass Ther mal I nsul at i on
ASTM C553 ( 2013; R 2019) St andar d Speci f i cat i on f or Mi ner al Fi ber Bl anket Ther mal I nsul at i on f or Commer ci al and I ndust r i al Appl i cat i ons
ASTM C578 ( 2019) St andar d Speci f i cat i on f or Ri gi d, Cel l ul ar Pol yst yr ene Ther mal I nsul at i on
ASTM C591 ( 2021) St andar d Speci f i cat i on f or Unf aced Pr ef or med Ri gi d Cel l ul ar Pol y i socyanur at e Ther mal I nsul at i on
ASTM C592 ( 2016) St andar d Speci f i cat i on f or Mi ner al Fi ber Bl anket I nsul at i on and Bl anket - Type Pi pe I nsul at i on ( Met al - Mesh Cover ed) ( I ndust r i al Type)
ASTM C610 ( 2015) St andar d Speci f i cat i on f or Mol ded Expanded Per l i t e Bl ock and Pi pe Ther mal I nsul at i on
ASTM C612 ( 2014; R 2019) St andar d Speci f i cat i on f or Mi ner al Fi ber Bl ock and Boar d Ther mal I nsul at i on
ASTM C665 ( 2017) St andar d Speci f i cat i on f or Mi ner al - Fi ber Bl anket Ther mal I nsul at i on f or Li ght Fr ame Const r uct i on and Manuf act ur ed Housi ng
ASTM C864 ( 2005; R 2015) Dense El ast omer i c Compr essi on Seal Gasket s, Set t i ng Bl ocks, and Spacer s
ASTM C920 ( 2018) St andar d Speci f i cat i on f or El ast omer i c Joi nt Seal ant s
ASTM C1048 ( 2018) St andar d Speci f i cat i on f or Heat - St r engt hened and Ful l y Temper ed Fl at Gl ass
SECTI ON 08 44 00 Page 5 Januar y 30, 2024
ASTM C1087 ( 2016) St andar d Test Met hod f or Det er mi ni ng Compat i bi l i t y of Li qui d- Appl i ed Seal ant s wi t h Accessor i es Used i n St r uct ur al Gl azi ng Syst ems
ASTM C1135 ( 2015) St andar d Test Met hod f or Det er mi ni ng Tensi l e Adhesi on Pr oper t i es of St r uct ur al Seal ant s
ASTM C1184 ( 2014) St andar d Speci f i cat i on f or St r uct ur al Si l i cone Seal ant s
ASTM C1363 ( 2019) St andar d Test Met hod f or Ther mal Per f or mance of Bui l di ng Mat er i al s and Envel ope Assembl i es by Means of a Hot Box Appar at us
ASTM C1401 ( 2014) St andar d Gui de f or St r uct ur al Seal ant Gl azi ng
ASTM D1037 ( 2012) Eval uat i ng Pr oper t i es of Wood- Base Fi ber and Par t i c l e Panel Mat er i al s
ASTM D1730 ( 2009; R 2020) St andar d Pr act i ces f or Pr epar at i on of Al umi num and Al umi num- Al l oy Sur f aces f or Pai nt i ng
ASTM D2244 ( 2016) St andar d Pr act i ce f or Cal cul at i on of Col or Tol er ances and Col or Di f f er ences f r om I nst r ument al l y Measur ed Col or Coor di nat es
ASTM D3656/ D3656M ( 2013) St andar d Speci f i cat i on f or I nsect Scr eeni ng and Louver Cl ot h Woven f r om Vi nyl - Coat ed Gl ass Yar ns
ASTM D4214 ( 2007; R 2015) St andar d Test Met hod f or Eval uat i ng t he Degr ee of Chal k i ng of Ext er i or Pai nt Fi l ms
ASTM E84 ( 2020) St andar d Test Met hod f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Mat er i al s
ASTM E90 ( 2009; R2016) St andar d Test Met hod f or Labor at or y Measur ement of Ai r bor ne Sound Tr ansmi ssi on Loss of Bui l di ng Par t i t i ons and El ement s
ASTM E119 ( 2020) St andar d Test Met hods f or Fi r e Test s of Bui l di ng Const r uct i on and Mat er i al s
ASTM E136 ( 2019a) St andar d Test Met hod f or Assessi ng Combust i bi l i t y of Mat er i al s Usi ng a Ver t i cal Tube Fur nace at 750 Degr ees C
ASTM E283 ( 2019) St andar d Test Met hod f or Det er mi ni ng t he Rat e of Ai r Leakage
SECTI ON 08 44 00 Page 6 Januar y 30, 2024
Thr ough Ext er i or Wi ndows, Cur t ai n Wal l s, and Door s Under Speci f i ed Pr essur e Di f f er ences Acr oss t he Speci men
ASTM E330/ E330M ( 2014; R 2021) St andar d Test Met hod f or St r uct ur al Per f or mance of Ext er i or Wi ndows, Door s, Skyl i ght s and Cur t ai n Wal l s by Uni f or m St at i c Ai r Pr essur e Di f f er ence
ASTM E331 ( 2000; R 2016) St andar d Test Met hod f or Wat er Penet r at i on of Ext er i or Wi ndows, Skyl i ght s, Door s, and Cur t ai n Wal l s by Uni f or m St at i c Ai r Pr essur e Di f f er ence
ASTM E546 ( 2014; R 2020) St andar d Test Met hod f or Fr ost Poi nt of Seal ed I nsul at i ng Gl ass Uni t s
ASTM E576 ( 2014; R 2020) St andar d Test Met hod f or Fr ost Poi nt of Seal ed I nsul at i ng Gl ass Uni t s i n t he Ver t i cal Posi t i on
ASTM E783 ( 2002; R 2018) St andar d Test Met hod f or Fi el d Measur ement of Ai r Leakage Thr ough I nst al l ed Ext er i or Wi ndows and Door s
ASTM E1105 ( 2015) St andar d Test Met hod f or Fi el d Det er mi nat i on of Wat er Penet r at i on of I nst al l ed Ext er i or Wi ndows, Skyl i ght s, Door s, and Cur t ai n Wal l s, by Uni f or m or Cycl i c St at i c Ai r Pr essur e Di f f er ence
ASTM E1300 ( 2016) St andar d Pr act i ce f or Det er mi ni ng Load Resi st ance of Gl ass i n Bui l di ngs
ASTM E1332 ( 2016) St andar d Cl assi f i cat i on f or Rat i ng Out door - I ndoor Sound At t enuat i on
ASTM E1886 ( 2019) St andar d Test Met hod f or Per f or mance of Ext er i or Wi ndows, Cur t ai n Wal l s, Door s, and I mpact Pr ot ect i ve Syst ems I mpact ed by Mi ssi l e( s) and Exposed t o Cycl i c Pr essur e Di f f er ent i al s
ASTM E1996 ( 2017) St andar d Speci f i cat i on f or Per f or mance of Ext er i or Wi ndows, Cur t ai n Wal l s, Door s, and I mpact Pr ot ect i ve Syst ems I mpact ed by Wi ndbor ne Debr i s i n Hur r i canes
ASTM E3061 ( 2017) St andar d Test Met hod f or Anal ysi s of Al umi num and Al umi num Al l oys by I nduct i vel y Coupl ed Pl asma At omi c Emi ssi on Spect r omet r y ( Per f or mance- Based Met hod)
ASTM F1642/ F1642M ( 2017) St andar d Test Met hod f or Gl azi ng and Gl azi ng Syst ems Subj ect t o Ai r bl ast Loadi ngs
SECTI ON 08 44 00 Page 7 Januar y 30, 2024
ASTM F2248 ( 2012) St andar d Pr act i ce f or Speci f y i ng an Equi val ent 3- Second Dur at i on Desi gn Loadi ng f or Bl ast Resi st ant Gl azi ng Fabr i cat ed wi t h Lami nat ed Gl ass
ASTM F2912 ( 2017) St andar d Speci f i cat i on f or Gl azi ng and Gl azi ng Syst ems Subj ect t o Ai r bl ast Loadi ngs
NATI ONAL ASSOCI ATI ON OF ARCHI TECTURAL METAL MANUFACTURERS ( NAAMM)
NAAMM AMP 500 ( 2006) Met al Fi ni shes Manual
NATI ONAL FENESTRATI ON RATI NG COUNCI L ( NFRC)
NFRC 100 ( 2020) Pr ocedur e f or Det er mi ni ng Fenest r at i on Pr oduct U- Fact or s
NFRC 200 ( 2020) Pr ocedur e f or Det er mi ni ng Fenest r at i on Pr oduct Sol ar Heat Gai n Coef f i c i ent and Vi s i bl e Tr ansmi t t ance at Nor mal I nci dence
NFRC 500 ( 2010) Pr ocedur e f or Det er mi ni ng Fenest r at i on Pr oduct Condensat i on Resi st ance Val ves
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 285 ( 2012) St andar d Fi r e Test Met hod f or Eval uat i on of Fi r e Pr opagat i on Char act er i st i cs of Ext er i or Non- Load- Bear i ng Wal l Assembl i es Cont ai ni ng Combust i bl e Component s
PORCELAI N ENAMEL I NSTI TUTE ( PEI )
PEI 1001 ( 1996) Speci f i cat i on f or Ar chi t ect ur al Por cel ai n Enamel ( ALS- 100)
PEI CG- 3 ( 2005) Col or Gui de f or Ar chi t ect ur al Por cel ai n Enamel
SOCI ETY FOR PROTECTI VE COATI NGS ( SSPC)
SSPC 7/ NACE No. 4 ( 2007) Br ush- Of f Bl ast Cl eani ng
SSPC SP 1 ( 2015) Sol vent Cl eani ng
SSPC SP 3 ( 2018) Power Tool Cl eani ng
SSPC SP 12/ NACE No. 5 ( 2002) Sur f ace Pr epar at i on and Cl eani ng of Met al s by Wat er j et t i ng Pr i or t o Recoat i ng
STEEL WI NDOW I NSTI TUTE ( SWI )
SWI AGSW ( 2002) Ar chi t ect ' s Gui de t o St eel Wi ndows
SECTI ON 08 44 00 Page 8 Januar y 30, 2024
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 4- 010- 01 ( 2018; wi t h Change 1, 2020) DoD Mi ni mum Ant i t er r or i sm St andar ds f or Bui l di ngs
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on
01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Gl azed Cur t ai n Wal l Syst em; G
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .