This document summarizes a federal contract solicitation to construct a new National Guard Readiness Center. The solicitation was issued by the Department of the Army Michigan Army National Guard seeking proposals to design and build a 46,831 square foot facility to support training, administrative, and logistical needs. The new readiness center must be designed to meet industry standards and building codes, with consideration for backup power generation, vehicle parking, and accessibility for individuals with disabilities. Antiterrorism measures and Army real property disposal policies will also be followed. The project involves replacing an existing 52,153 square foot facility.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USPFO-MI - KELLI KELLEY
3423 N. MLK BLVD
LANSING MI 48906-2934
260247
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate Attachment 10- Addendum 1, dated 23 Jan 2024, into the terms and conditions of this Invitation for Bids.
There are no other changes, and all other terms and conditions shall remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jan-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB24B0001
X 9B. DATED (SEE ITEM 11)
27-Dec-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jan-2024
CODE
USPFO MI PURCHASING & CONTRACTING
JOINT FORCES READINESS CENTER-BUILDING 30
3423 NORTH MARTIN LUTHER KING JR. BLVD
LANSING MI 48906-2934
W912JB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912JB
FACILITY CODECODE
EMAIL:TEL:
W912JB24B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
NOTES
Table of Contents
SECTION 00 10 00 - BID SCHEDULE NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 – COMPLETE SET DRAWINGS Project #260247 Dated 29 June 2023 ATTACHMENT 2- B3 CONSTRUCT Readiness Center 4 SUBMITTAL BOOK- Dated 22 Aug 2023 ATTACHMENT 3- MI ARNG GAAF RC Vol 2 Type B 100 DRAWING- Dated 29 June 2023 ATTACHMENT 4- MI ARNG GAAF RC Vol 2 Type B 90 DRAWING- Dated N/A ATTACHMENT 5- MI ARNG GAAF RC Vol 2 Type B 100 SPECIFICATIONS - Dated 12 May 2023 ATTACHMENT 6- MI ARNG GAAF RC Vol 3 Type B 90 SPECIFICATIONS- Dated 30 June 2023 ATTACHMENT 7- STATEMENT OF WORK- CONSTRUCT READINESS CENTER 4- Dated 1 Aug 2023 ATTACHMENT 8- BRAND NAME JUSTIFICATION- LonWorks LNS network software tool ATTACHMENT 9- CAMP GRAYLING VISITOR VETTING FORM 2022 (Excel Spread Sheet)
ATTACHMENT 10-ADDENDUM 1 DATED 23 JAN 2024
1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov.
2. Facsimile transmission of bid is not authorized. Electronic submission of bids will NOT be accepted.
3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.
4. A complete bid package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00 10 00 Line Items- all items must be priced
(c) A Bid Bond and Power of Attorney is required along with the bid on th due date. In accordance with DoD Deviation 2020-00016, electronic http://www.sam.gov/
W912JB24B0001
signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.
(d) Section 00 45 00 Representations and Certifications, completed and return only additional certifications found in this section in addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.
(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged
(g) Mark the front of the envelope with the following: BID No. W912JB-24-B-0001, Construct Readiness Center”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
5. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories:
(A) Small business
(B) Service-disabled veteran-owned small business
(C) Women-owned small business (WOSB) under the WOSB Program
(D) Economically disadvantaged women-owned small business under the WOSB Program; or
(E) Historical underutilized business small business
Section 00 10 00
(End of Summary of Changes) http://www.sam.gov/
MICHIGAN Army National Guard
GAAF Readiness Center
MIARNG Project Number: 86608-260247
Atkins Project Number: 100078934
Rev. Date 01/23/24 Page 1 of 3
ADDENDUM 01
ADDENDUM NO. 01
Date: January 23, 2024
This Addendum forms a part of the Contract and corrects or modifies original Bid Documents, issued on June 6, 2023.
A. Bidder RFI Response
Responses to bidder’s questions received between January 09 and January 19, 2024, are provided for general information. Responses that amend the contract documents are qualified as such with the following revised documents attached.
B. Project Manual Revisions (Each section replaced in its entirety) – 185 pages bookmarked
PROJECT TABLE OF CONTENTS
01 33 00 SUBMITTAL REGISTER
08 33 13 COILING COUNTER DOORS
22 00 00 PLUMBING GENERAL PURPOSE
32 31 13 53 - HIGH-SECURITY FENCES AND GATES
C. Drawing Revisions (All changes clouded and tagged ADDENDUM 01) – 36 Sheets, bookmarked
G-002 – DRAWING INDEX
- Revised index to add new sheet FA-211.
CU201 – UTILITY PROFILES – SHEET 1 OF 3
- The vertical scales were corrected to be shown as 1”=5’.
- The proposed grade line was extended to the existing grade on the waterline W-2 profile
CU202 - UTILITY PROFILES - SHEET 2 OF 3
- The sanitary sewer pipe between SS-01 and CO-1 on the profile was lowered to provide a minimum 3.5’ of cover over the pipe.
- The proposed grade line was extended to meet the existing grade on the sanitary sewer profile ES-SS
2000 to CO-1
CU203 - UTILITY PROFILES - SHEET 3 OF 3
- The sanitary sewer pipe from CO-5 to SS-02 was lowered to provide a minimum 3.5’ of cover over the pipe.
- Invert elevations on the Pipe and Structure Schedule were revised.
CU501 - UTILITY DETAILS
- The fire hydrant detail was revised to show a minimum depth over the waterline to be 6’-0”.
S-001 - GENERAL NOTES, ABBREVIATIONS & SYMBOLS
-Revised seismic load table.
S-002 - GENERAL NOTES
- Revised general notes.
S-121 - LOW ROOF FRAMING PLAN
- Revised south elevation canopy.
Rev. Date 01/23/24 Page 2 of 3
S-201 - STRUCTURAL ELEVATIONS
- Revised south elevation canopy.
S-302 - BUILDING SECTIONS
- Added canopy section.
S-511 - TYPICAL CONCRETE DETAILS
- Revised slab edge at door opening detail.
S-612 - LIGHT GUAGE TYPICAL DETAILS
- Revised bracing detail.
S-631 - MISC DETAILS
- Added details for canopy.
A-151 – ROOF PLAN
- Revised canopy on south elevation.
- Located snow guard and provided a note.
A-201 – BUILDING ELEVATION
- Revised canopy drawing on south elevation.
A-202 – BUILDING ELEVATION
- Revised note for canopy on south elevation.
A-310 – WALL SECTIONS
- Revised location of foundation rigid board insulation.
- Revised canopy detail.
A-111 - WALL SECTIONS
A-561 - EXTERIOR BUILDING ENVELOPE DETAILS
- Revised location foundation rigid board insulation.
- Added canopy detail.
A-562 - EXTERIOR BUILDING ENVELOPE DETAILS
- Located snow guard and provided annotation.
- Added details for canopy gutter and downspout.
A-621 - WINDOW & STOREFRONT ELEVATIONS
- Added notes for GL 4 glazing type.
FA-001 - FIRE ALARM SYSMBOL LEGEND, ABBREVIATIONS, AND GENERAL NOTES
- Updated MASS notification speaker/strobe description
- Added LED text sign to the legend.
FA-111 – FIRE ALRAM PLAN – AREA A
- Added LED test sign at the North Egress door.
- Updated the location of one combination MASS notification speaker and strobe in the EOD
Supply.
Rev. Date 01/23/24 Page 3 of 3
FA-112 – FIRE ALARM PLAN – AREA B
- Added LED test sign at the East and South Egress doors.
- Added MASS notification speaker and strobe in specific locations (Lactation Area and offices 141, 149, 150, 152, 153, 160, 161, 159, 158, 155, and 156).
- Added monitor modules for the fire pump in the Fire Pump Room.
FA 211 - FIRE ALARM ROOF PLAN
- Introduced a new sheet to incorporate Monitor Modules and control Relays in all the RTU.
FA-501 - FIRE ALARM RISER DIAGRAM
- Added new Key notes 11 and 12.
P-100.1 - UNDERGROUND PLUMBING PLAN - PART A
- The finished floor elevation was revised to match the civil plan floor elevation of 1153.00
- Pipe invert elevations were adjusted based on the revised finished floor elevation.
P-100.2 - UNDERGROUND PLUMBING PLAN - PART B
- The finished floor elevation was revised to match the civil plan floor elevation of 1153.00
M-503 - HVAC CONTROLS
- Revised fire alarm notes.
OLI715 - OPTION 3 FLOOR PLAN & REFLECTED CEILING PLAN
- Revised location of trench drain.
OLI718 - OPTION 3 WALL SECTIONS
- Revised location of foundation rigid board insulation.
- Revised location of trench drain.
OLI719 - OPTION 3 TRAINING BAY DETAILS
- Revised location of trench drain.
OLI726 - OPTION 3 TRAINING BAY PLUMBING PLAN
- The finished floor elevation was revised to match the civil plan floor elevation of 1153.00
- Pipe invert elevations were adjusted based on the revised finished floor elevation.
OLI735 - OPTION 3 - TRAINING BAY POWER AND LIGHTING
- Added electrical circuit for a second CO and GAS Detection alarm panel.
OLI737 - OPTION 3 - FIRE ALARM – WORKBAYS
- Added Monitor Modules and Control Relays to initiate the shutdown of HVLS fans immediately after a waterflow alarm is activated.
OLI740 - OPTION 2- SUPPLY & PES ROOM PLANS
- Added notes for wire mesh partitions.
END
# DATE
RFI DETAIL
Primary Discipline Response Response Date
001 1/9/2024 The solicitation states that the price shall be good for 60 days, while the Site Visit slides state 90 days. Please clarify.
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
002 1/9/2024 Please advise what the time frame is for award of the option(s) and any resulting project schedule extensions if they are not all awarded at the same time
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
003 1/9/2024
Spec 01 35 26 (para. 1.6.1.1.1) states that the SSHO may also serve as the QC Manager duties but may not serve as the Superintendent. However, Spec 01 45 00.00 10 (para. 3.4.2) states that the QC Manager is assigned as the CQC
Manager but has duties as project superintendent in addition to quality control. In addition, Spec 01 00 00 (para.
1.38.1, Key Personnel Description, states: “An individual Key Team Member may not hold more than one key role.”
This is followed by the minimum qualifications for Project Manager, Site Superintendent, Quality Control Manager, and Safety Manager. Please clarify the project requirements for the QC Manager, SSHO and Superintendent).
MIARNG
It appears that the note in section 01 00 00 – “An individual Key Team Member may not hold more than one key role” contradicts language in spec 01 35 26.
Atkins understanding is that per 01 35 26 – The Quality Control Manager and Site
Safety and Health Office can be the same person, but there needs to be a separate Project Superintendent.
Section 01 45 00.00 10 does not specifically mention “Quality Control Manager”, it states that the Contractor Quality Control manager also has superintendent duties. Meaning observation and inspection of site work, production of reports and is on site at all times during construction. Atkins understanding is that there is no difference between a Quality Control Manager and a Contractor Quality
Control Manager.
Final response and decision to be confirmed by MIARNG.
1/12/2024
004 1/9/2024 Drawing CS503 shows chain link fence details but no chain link fence is found on the drawings. Please advise. CIVIL Please refer to sheet OLI705 & OLI706. Optional line item drawings for the project are located at the back of the drawing set starting from OLI700 - OLI786.
1/12/2024
005 1/9/2024 Please confirm that the project is tax exempt per Spec 01 00 00. MIARNG Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
006 1/9/2024 Please consider allowing submittal of the Bid via email. Typically, trades do not provide their bids until late in the process, making it difficult to copy, bind, and deliver the Bid documents.
MIARNG
Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.
1/12/2024
007 1/10/2024 DMI Metals - I recently viewed the Readiness Center project in Grayling, MI and am interested in quoting the standing seam roof. Your name was listed as a contact, and I was wondering if Substitution Requests are acceptable.
MIARNG
Per FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.
1/12/2024
008 1/12/2024
Should coatings on concrete be polyurea on the interior and bituminous coating on the exterior? These are preferred practices in many communities in Michigan due to constant expansion-contraction of concrete tanks susceptible to toxins including phosphates, sulfuric acids, cleaning agents, and petroleum products. Epoxy coatings have been defined as too hard-brittle to survive in extreme temperature conditions. Cracking can occur and lead to premature failures on concrete designs (see recommended Concrete GI Spec).
PLUMBING
Per FAR requirements, the drawings & specifications do not name specific manufacturers or products. The drawings and specifications include salient characteristics of products and materials crucial to the performance of the product. If a submitted product meets or exceeds the performance of the product provided as the Basis of Design, it can be evaluated through the submittal process.
1/16/2024
009 1/12/2024
Are HDPE solutions acceptable as alternatives for the grease interceptor and oil separators? Fully welded designs using dual-wall construction are better for long-term structural durability, leak-free performance, and chemical resistance.
PLUMBING
Per FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.
1/15/2024
010 1/12/2024 Per S-201 and A-123 a prefabricated canopy on the south elevation is by others. If the Contractor installs framing with metal deck for this canopy, please provide details
ARCHITECTURE / STRUCTURE /
PLUMBING
Atkins will provide drawings and specs as needed in an addendum. 1/12/2024
011 1/12/2024 Per details on A-451 all shower cabins are wall fiberglass commercial showers. No spec found neither in architectural nor plumbing sections. Please clarify
SPECS
Atkins will provide revised specs in an addendum. / Shower walls can match shower pan material 1/15/2024
012 1/12/2024 What is the thickness of stone beneath slab-on-grade? Drawing S-111 refers to Geotechnical Report, but no Geotech
Report included in RFP
MIARNG
Geotechnical report which is in the design report can be made available by
MIARNG.
1/15/2024
013 1/12/2024 Please provide Food Service drawings. Spec 1106 40.13, 1.2.3 classified responsibilities of all parties, but section
2.1.2Food Service Equipment Schedule does not show this classification. Please advise.
SPECS
Please refer to sheet A-402 for kitchen equipment layout and equipment list. All food service equipment is contractor furnished and contractor installed unless otherwise noted as NOT IN CONTRACT on the kitchen equipment list. Atkins will update specs to remove Food Service Equipment Schedule.
1/16/2024
014 1/18/2024
Base Bid Fire Alarm Mass Notification: The design documents indicate clear and amber strobes; clear for fire alarm and amber for mass notification. This is an antiquated approach to mass notification design and no long supported by the DoD, i.e., USACE, USAF, NAVFAC, etc. Refer to Engineering and Construction Bulletin ECB-2022-05 rev 2 Mass
Notification Requirements. Please confirm amber strobes are required. Note that LED MNS text signs at each exit door should be provided in lieu of amber strobes.
FIRE ALARM
As per Engineering and Construction Bulletin ECB-2018-17 Rev 3, Amber strobes must no longer be used in new mass notification systems. In lieu of amber strobes, clear or white strobes marked with the word “ALERT” must be used for new mass notification systems. Clear or white strobes must be provided for shared use by the facility’s combination mass notification and fire alarm system.
The clear or white strobes are activated in conjunction with voice messages over the mass notification or fire alarm system. Drawings will be updated accordingly to include this modification.
1/19/2024
015 1/18/2024
Base Bid Fire Alarm Mass Notification: The proposed layout for notification appliances (i.e., speaker/strobes) does not appear to follow general guidelines and industry standards for a system required to achieve prescriptive audibility and voice intelligibility requirements. For example, there are occupiable spaces within the facility that do not have notification appliances. With the doors closed, it is unlikely these spaces will pass acceptance testing. Per NFPA 72, the ownness is on the Designer of Record to establish the acoustically distinguishable spaces. Please confirm the spaces without notification appliances are except from audibility and voice intelligibility requirements.
FIRE ALARM
The Fire Alarm drawings are scheduled for revision to include a speaker/strobe in
Offices. However, it's important to note that not all small spaces or offices will require a visible notification appliance, as outlined in UFC 3-600-01 9-18-6.3 (I).
Additionally, while the provided Fire Alarm drawings encompass the design intent, the contractor is required to furnish shop drawings that specify the final quantity, location, and calculations.
1/19/2024
016 1/18/2024
Base Bid Fire Alarm Mass Notification: The design documents do not show addressable input modules to monitoring the fire pump system as required by NFPA 20. Please clarify if the fire pump is required to be monitored by the fire alarm system. FIRE ALARM
Yes, FACP needs to monitor the Fire Pump. Control modules need to be included in drawings for the Running/Lost of Phase, Phase Reversal, test Header. Refer to the revised drawings.
1/19/2024
017 1/18/2024
Base Bid Fire Service Entrance: The fire service backflow preventer is downstream of the fire pump. Please clarify if the fire pump must be dual listed for both fire protection and domestic service.
FIRE PROTECTION /
PLUMBING
The fire pump selected as the basis of design is NSF 61 certified, so it is safe to use with a potable water service. The pump selected for installation must be NSF
61 certified. UFC 03-600-01 requires the backflow preventer to be installed after the fire pump.
1/19/2024
018 1/18/2024
Base Bid Fire Protection: Wafer style check valves are annotated on Detail 2 on sheet F-401. Please confirm wafer style check valves are permitted; swing type check valves with removal face plate for internal inspection are more commonly used in the fire protection industry.
FIRE PROTECTION
The wafer-style check valve indicated on the riser is commonly used on the FDC inlet in our experience. A swing-type check valve is also acceptable at this location if there is sufficient space in the piping assembly for it.
1/19/2024
019 1/18/2024
Option 3: Please clarify if the HVLS fans must shut down upon the detection of fire sprinkler waterflow as required by
NFPA 13. FIRE PROTECTION
Yes, control monitors must be added to shut down the HVLS fans upon a waterflow alarm.
1/19/2024
020 1/18/2024
Option 3: Please confirm carbon monoxide detection is required in the Training Workbays per NFPA 72.
FIRE ALARM
An existing CO Detection system is specified in the Mechanical plans OLI730. The purpose of this system is to ensure low levels of CO in the training bay. This system will operate independently.
1/19/2024
021 1/18/2024
Option 4: Please clarify if the emergency generator controller must be monitored by the fire alarm system as required by NFPA 101; 9.1.3.2.
FIRE ALARM
Yes, the FACP needs to monitor the new generator. Please refer to Key Note #9 on sheet OLI785, where we specify the installation of conduits and control wiring between the generator and FACP.
1/19/2024
022 1/18/2024 Where are mesh partitions needed? ARCHITECTURE Please refer to sheet OLI740 1/19/2024
023 1/18/2024 Please provide door and shutter specs.
SPECS Atkins will provide spec section for window counter doors in an addendum 1/19/2024
024 1/18/2024
For the alternate on the training bay fire protection, is that entire area getting sprinkled or just the north half?
FIRE PROTECTION
The entire area receives fire suppression. The entire building receives fire suppression. Apply coverage based on Hazard Classifications indicated under Fire
Protection Data on sheet F-001. AtkinsRéalis only presented the most remote area that was used to prepare hydraulic calculations.
1/22/2024
025 1/18/2024
Is detail 7 on S5-11 for the trench drains is a mistake as it refers to the architectural pages to verify location, but I do not see any annotations for a trench drain location within the architectural pages. ARCHITECTURE Revised annotations for trench drain location will be provided in an addendum 1/23/2024
026 1/18/2024
Will not be able to meet the specs attached, please see below for some of the items not available.
CHI Springs are only warrantied for 1 year.
Max Cycles Available - 100k
Insulated Slats Not Available for Counter Shutters
Vision Lites Not Available in Shutters
6" Barrel Not Available for Shutters
SPECS Atkins will provide spec section for window counter doors in an addendum 1/19/2024
027 1/18/2024
We would like to provide you a full package for you on this. We are specified on all the types except A2, A2E, A4, A4E, C-H, CE-H, X & X1. Please let me know your thoughts.
ELECTRICAL / SPECS
Question is unclear. Per FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process. Any necessary substitution can be review during the submittal process.
1/22/2024
028 1/19/2024
Substitution request for metal lockers.
ARCHITECTURE
Per FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.
1/19/2024
MIARNG Readiness Center - BIDDER RFI LOG 2024
029 1/19/2024
Section 01 91 00.15 10 Total Building Commissioning
- Will there be a third-party Commissioning Agent on this project?
- If not, what will the Commissioning process be?
SPECS
Per the spec section listed the GC to employ the Services of and independent firm for commissioning. Follow specification for the process
030 1/19/2024
Section 23 09 00 Instrumentation and Control
- 2.1.2 Programming Control Unit and Programming Software “By Owner” – please confirm there is no work being performed by the owner.
- 2.1.4 Control Devices – please confirm all control devices are to be as listed on M-502 and that devices listed on M-
502 supersede the specifications.
MECHANICAL
2.1.2 - No work to be done by owner. Software and version to be confirmed by owner.
2.1.4 - Sheet M-502 shall supersede this section information where in conflict.
1/22/2024
031 1/19/2024
Section 23 09 23.01 Lonworks Direct Digital Control
- 3.1.2.1 Specified Circon DDC controllers on M-502 are not available with
H-O-A switches or AO potentiometers. Please advise.
- 3.1.2.2 Specified Circon DDC controllers on M-502 are not available with local displays. Please advise.
- 3.1.5 Specified Circon VAV controllers on M-502 are not available with network jacks. Are these to be furnished and wired to the communication buss at the room temperature sensors
MECHANICAL / MIARNG
Owner to confirm these devices on M-502 are preferred over listed functions in spec.
1/22/2024
032 1/19/2024
Division 25 Integrated Automation and all associated controls Specifications o Please confirm that any reference to
Tridium should be ignored and that this project is to be performed with a LonWorks LNS database and a CatNet Web
Server User Interface.
MECHANICAL Correct. Controls are to be Lon system. 1/22/2024
033 1/19/2024 There are many different customer training requirements for the controls listed throughout the Specifications. What are the training requirements?
SPECS Refer to 01 78 23 part 3
034 1/19/2024
Drawing M-601, Packaged Rooftop Units, Note #4
- Please confirm the intent of this note is; Provide “DDC Ready” units with damper, fan and cooling controls wired to a terminal strip in the controls compartment. DDC controls and components to be field installed.
MECHANICAL Yes, RTUs and factory components provided are to be capable of DDC controls 1/22/2024
035 1/19/2024
Option #2 Build-out EOD Supply & PES Room
- Please confirm all work should on Drawing M-111 in the EOD Supply area should be included in the base bid
MECHANICAL Correct. All work on sheet M-111 should be on the base bid. 1/22/2024
036 1/19/2024 Drawing – A653 does not include the material details for GL-4 Glazing which is specified in A611 Drawing notes for interior glazing. Please specify the details of GL4 Material.
ARCHITECTURE Atkins will revise glazing information and issue revised sheet in an addendum 1/22/2024
037 1/19/2024 Drawing – A202 north elevation shows W8 which seems like a window or a louver but there is no detail shown either in window details or louver details please provide the details for W8.
ARCHITECTURE
Please refer to sheet A-621 for louver elevation and sheet A-623 for louver details.
1/22/2024
038 1/19/2024
Option 3: Fence spec calls for gate operators in para 2.1.6 and for electro-mechanical locks in para 2.1.7. However, they are not found neither on the site plans nor on the electrical plans. Are these gate operators and electro-mechanical locks required for this project? And if so, who will be responsible for the installation of these products?
CIVIL / SPECS
All sliding gate should be manually operated. Electro mechanical locks are not required. Atkins will revise spec sections and issue updated specs in an addendum.
1/22/2024
039 1/19/2024
Option 2: Please clarify the height of acoustical ceiling and mesh partitions height in PES Room
ARCHITECTURE
Ceiling height in PES room is at 10' per ceiling type legend. Wire mesh partitions in Supply Rooms will go to the underside of the structure/roof above. No Ceiling.
Atkins will add note to Supply Room floor plan issue revised sheet in an addendum.
1/22/2024
040 1/19/2024
The specs call for all 24 volt and lon wiring to be in conduit regardless of building codes but the drawings saw that they can be in j hooks or bridal rings above suspended ceilings. Which route should i bid as the cost is very different.
on all of our recent work for the state j hooks and bridal rings have been acceptable in suspended ceiling areas.
ELECTRICAL / SPECS
All fire alarm cables, data cables, and security cables shall be routed within conduits unless specified otherwise on the drawings. Cable trays shall be installed as specified on the drawings.
1/22/2024
041 1/19/2024
The specs call out a lot of performance testing that is very costly that is not normally done on state projects. what testing is actually required? These small but important items can drastically change cost of install
ELECTRICAL / SPECS
Our MIARNG project's specifications are based on the UFC criteria and
Government requirements. Could you specify which tests fall under these criteria? The project expectation is that a certified contractor performs the required testing for a complete and fully functionally system.
1/22/2024
042 1/19/2024
Base Bid: Please provide grout selection for tile installation.
ARCHITECTURE
Please submit grout product that is compliant with the specifications. Grout color to be selected and coordinated with tile submittals during the submittal process by architect or government. For ceramic tile refer to paragraph 2.4.4, for all other tile refer to paragraph 2.4.5.
1/19/2024
Mi chi gan Ar my Nat i onal Guar d Readi ness Cent er Type B 100% Submi ssi on Gr ayl i ng AAF, Mi chi gan
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 12/ 20 GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 33 29 02/ 21 SUSTAI NABI LI TY REQUI REMENTS AND
REPORTI NG
01 35 26 11/ 20, CHG 3: 02/ 22 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 11/ 16, CHG 2: 11/ 21 QUALI TY CONTROL
01 50 00 11/ 20, CHG 1: 08/ 21 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 11/ 15, CHG 5: 08/ 21 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 08/ 19, CHG 3: 11/ 21 PROJECT I DENTI FI CATI ON
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
01 78 23 08/ 15, CHG 2: 08/ 21 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 15 10 05/ 19, CHG 3: 05/ 22 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 03 - CONCRETE
03 30 00 02/ 19, CHG 3: 11/ 21 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 11/ 15, CHG 2: 05/ 19 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 08/ 18, CHG 2: 05/ 21 STRUCTURAL STEEL
05 21 00 05/ 15, CHG 1: 08/ 18 STEEL JOI ST FRAMI NG
05 30 00 05/ 15, CHG 2: 08/ 18 STEEL DECKS
05 40 00 05/ 15, CHG 1: 08/ 18 COLD- FORMED METAL FRAMI NG
05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 33 02/ 16, CHG 2: 02/ 18 METAL LADDERS
05 52 00 02/ 18, CHG 1: 02/ 20 METAL RAI LI NGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY
06 20 00 08/ 16, CHG 2: 11/ 18 FI NI SH CARPENTRY
06 41 16. 00 10 08/ 10, CHG 1: 11/ 18 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL
CABI NETS
06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/ 19 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM
FOR AI R TI GHTNESS
07 21 13 02/ 16, CHG 2: 08/ 20 BOARD I NSULATI ON
07 21 16 11/ 11, CHG 4: 08/ 18 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 02/ 16, CHG 3: 11/ 18 ROOF AND DECK I NSULATI ON
07 27 10. 00 10 08/ 19, CHG 1: 02/ 20 BUI LDI NG AI R BARRI ER SYSTEM
07 27 26 05/ 17, CHG 2: 08/ 20 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 42 13 05/ 11, CHG 2: 02/ 18 METAL WALL PANELS
07 53 23 05/ 12, CHG 2: 08/ 18 ETHYLENE- PROPYLENE- DI ENE- MONOMER
PROJECT TABLE OF CONTENTS Page 1
ROOFI NG
07 60 00 05/ 17, CHG 2: 11/ 18 FLASHI NG AND SHEET METAL
07 61 14. 00 20 08/ 16, CHG 1: 08/ 18 STEEL STANDI NG SEAM ROOFI NG
07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG
07 92 00 08/ 16, CHG 3: 11/ 18 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/ 20 STEEL DOORS AND FRAMES
08 11 16 05/ 17, CHG 2: 11/ 18 ALUMI NUM DOORS AND FRAMES
08 14 00 08/ 16, CHG 1: 08/ 18 WOOD DOORS
08 31 00 05/ 17, CHG 1: 08/ 18 ACCESS DOORS AND PANELS
08 33 13 05/ 09, CHG 2: 11/ 12 COI LI NG COUNTER DOORS
08 33 23 08/ 20, CHG 1: 02/ 22 OVERHEAD COI LI NG DOORS
08 34 59 08/ 08, CHG 1: 11/ 12 VAULT DOORS
08 44 00 05/ 19 CURTAI N WALL AND GLAZED ASSEMBLI ES
08 51 13 05/ 19 ALUMI NUM WI NDOWS
08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE
08 81 00 05/ 19 GLAZI NG
08 91 00 08/ 20 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR GYPSUM BOARD
09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD
09 30 10 08/ 20 CERAMI C AND PORCELAI N TI LI NG
09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS
09 62 38 08/ 17, CHG 1: 08/ 18 STATI C- CONTROL FLOORI NG
09 65 00 08/ 10, CHG 3: 08/ 18 RESI LI ENT FLOORI NG
09 68 00 11/ 17, CHG 2: 08/ 20 CARPETI NG
09 84 20 08/ 16, CHG 1: 08/ 18 ACOUSTI CAL WALL PANELS
09 90 00 02/ 21 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 10 08/ 17, CHG 1: 11/ 18 EXTERI OR SI GNAGE
10 14 00. 20 08/ 20 I NTERI OR SI GNAGE
10 21 13 08/ 20 TOI LET COMPARTMENTS
10 22 13 08/ 16, CHG 1: 08/ 18 WI RE MESH PARTI TI ONS
10 22 39 08/ 20 FOLDI NG PANEL PARTI TI ONS
10 26 00 08/ 20 WALL AND DOOR PROTECTI ON
10 28 13 08/ 20 TOI LET ACCESSORI ES
10 44 16 11/ 19 FI RE EXTI NGUI SHER ACCESSORI ES
10 51 13 05/ 11 METAL LOCKERS
10 56 13 04/ 06 STEEL SHELVI NG
DI VI SI ON 11 - EQUI PMENT
11 05 40 08/ 17, CHG 1: 02/ 18 COMMON WORK RESULTS FOR FOODSERVI CE
EQUI PMENT
11 06 40. 13 08/ 17 FOODSERVI CE EQUI PMENT SCHEDULE
11 31 13 08/ 17, CHG 1: 08/ 18 ELECTRI C KI TCHEN EQUI PMENT
11 41 11 08/ 17 REFRI GERATED AND FROZEN FOOD STORAGE
EQUI PMENT
11 42 00 08/ 17 FOOD PREPARATI ON EQUI PMENT
11 44 00 08/ 17, CHG 1: 08/ 18 FOOD COOKI NG EQUI PMENT
11 46 00 01/ 08 FOOD DI SPENSI NG EQUI PMENT
11 47 00 08/ 17, CHG 1: 08/ 18 I CE MACHI NES
11 48 00 08/ 17, CHG 1: 08/ 18 CLEANI NG AND DI SPOSAL EQUI PMENT
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 08/ 20 ROLLER WI NDOW SHADES
12 36 00 08/ 16, CHG 2: 08/ 18 COUNTERTOPS
12 48 13 08/ 17 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 08/ 17, CHG 1: 08/ 18 SI TE FURNI SHI NGS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13. 00 10 05/ 09 WET PI PE SPRI NKLER SYSTEM, FI RE
PROTECTI ON
21 30 00 04/ 08 FI RE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/ 15 PLUMBI NG, GENERAL PURPOSE
22 07 19 08/ 16 PLUMBI NG PI PI NG I NSULATI ON
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 15 02/ 14 COMMON PI PI NG FOR HVAC
23 05 48. 00 40 08/ 15 VI BRATI ON AND SEI SMI C CONTROLS FOR
HVAC PI PI NG AND EQUI PMENT
23 05 93 11/ 15 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR
HVAC
23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL
SYSTEMS
23 09 00 02/ 19, CHG 3: 05/ 21 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 11/ 15, CHG 2: 05/ 21 I NSTRUMENTATI ON AND CONTROL DEVI CES
FOR HVAC
23 09 23. 01 02/ 19, CHG 1: 02/ 20 LONWORKS DI RECT DI GI TAL CONTROL FOR
HVAC AND OTHER BUI LDI NG CONTROL SYSTEMS
23 09 53. 00 20 02/ 10, CHG 2: 08/ 17 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 20 11/ 08 FACI LI TY GAS PI PI NG
23 21 13. 00 20 04/ 06, CHG 2: 11/ 19 LOW TEMPERATURE WATER ( LTW) HEATI NG
SYSTEM
23 21 23 08/ 17 HYDRONI C PUMPS
23 25 00 05/ 21 CHEMI CAL TREATMENT OF WATER FOR
MECHANI CAL SYSTEMS
23 30 00 05/ 20, CHG 1: 02/ 22 HVAC AI R DI STRI BUTI ON
23 52 46. 00 20 05/ 15, CHG 3: 08/ 18 LOW PRESSURE WATER HEATI NG BOI LERS
( OVER 800, 000 BTU/ HR OUTPUT)
23 80 20. 00 10 05/ 20 GAS- FI RED HEATI NG EQUI PMENT
23 81 00 05/ 18, CHG 1: 02/ 21 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
23 82 00. 00 20 02/ 16, CHG 1: 08/ 18 TERMI NAL HEATI NG UNI TS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 05/ 21 CYBERSECURI TY FOR FACI LI TY- RELATED
CONTROL SYSTEMS
25 08 10 05/ 21 UTI LI TY MONI TORI NG AND CONTROL SYSTEM
TESTI NG
25 10 10 02/ 19, CHG 1: 05/ 21 UTI LI TY MONI TORI NG AND CONTROL SYSTEM
( UMCS) FRONT END AND I NTEGRATI ON
DI VI SI ON 26 - ELECTRI CAL
PROJECT TABLE OF CONTENTS Page 3
26 05 00. 00 40 11/ 20 COMMON WORK RESULTS FOR ELECTRI CAL
26 05 13. 00 40 05/ 20 MEDI UM- VOLTAGE CABLES
26 05 19. 10 10 05/ 16 I NSULATED WI RE AND CABLE
26 05 26. 00 40 08/ 19 GROUNDI NG AND BONDI NG FOR ELECTRI CAL
SYSTEMS
26 05 71. 00 40 02/ 17 LOW VOLTAGE OVERCURRENT PROTECTI VE
DEVI CES
26 08 00 11/ 21 APPARATUS I NSPECTI ON AND TESTI NG
26 09 23. 00 40 08/ 19 LI GHTI NG CONTROL DEVI CES
26 12 19. 10 05/ 19, CHG 1: 11/ 19 THREE- PHASE, LI QUI D- FI LLED PAD- MOUNTED
TRANSFORMERS
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 08/ 21 SWI TCHBOARDS
26 24 16. 00 40 08/ 19 PANELBOARDS
26 27 13. 10 30 10/ 07, CHG 2: 08/ 18 ELECTRI C METERS
26 28 01. 00 10 08/ 21 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 02/ 20, CHG 1: 05/ 21 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS
UNDER 600 VOLTS
26 41 00 11/ 13 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG
26 56 00 08/ 21 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 28. 36 40 05/ 17 CABLE TRAYS FOR COMMUNI CATI ONS SYSTEMS
27 10 00 08/ 11 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/ 16 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE
TESTI NG
28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS
NOTI FI CATI ON SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 08/ 08, CHG 2: 02/ 21 EARTHWORK
31 11 00 11/ 18 CLEARI NG AND GRUBBI NG
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 08/ 17 LANDSCAPE ESTABLI SHMENT
32 11 23 05/ 22 AGGREGATE BASE COURSE FOR FLEXI BLE
PAVI NG
32 12 13 05/ 17 BI TUMI NOUS TACK AND PRI ME COATS
32 12 16. 16 11/ 20 ROAD- MI X ASPHALT PAVI NG
32 13 13. 06 05/ 20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SI TE FACI LI TI ES
32 15 00 05/ 17 AGGREGATE SURFACI NG
32 16 19 05/ 18 CONCRETE CURBS, GUTTERS AND SI DEWALKS
32 31 13. 53 11/ 21 HI GH- SECURI TY FENCES ( CHAI N LI NK AND
ORNAMENTAL) AND GATES
32 92 19 08/ 17, CHG 1: 08/ 21 SEEDI NG
32 93 00 08/ 17, CHG 1: 08/ 21 EXTERI OR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/ 18, CHG 1: 02/ 22 WATER UTI LI TY DI STRI BUTI ON PI PI NG
PROJECT TABLE OF CONTENTS Page 4
33 30 00 05/ 18 SANI TARY SEWERAGE
33 40 00 11/ 21 STORMWATER UTI LI TI ES
33 82 00 04/ 06 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 112 PAGES
W9133L16D0008
Grayling ARNG GAAF Readiness Center
01 11 00 SD-01 Preconstruction Submittals
1.5 GSalvage Plan
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-06 Test Reports
1.5.3.2 GThird Party Certification Design
Compliance Report
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
1.5.3.2 GAmended Final Sustainability
eNotebook
1.5.3.2 GAmended Final High
Performance and Sustainable
Building Checklist
3.2 GThird Party Certification
Certificate, Assessment, or
Validation and Compliance Report
01 35 26 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 112 PAGES
Grayling ARNG GAAF Readiness Center
01 35 26 1.7 GAccident Prevention Plan (APP)
1.7 GAccident Prevention Plan (APP)
1.7.1 GAPP - Construction
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.3.2 GStandard Lift Plan
1.7.3.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.10.2Verification Statement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 112 PAGES
Grayling ARNG GAAF Readiness Center
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2 GStormwater Notice of Intent
1.6.9.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 112 PAGES
Grayling ARNG GAAF Readiness Center
01 57 19 3.7.1.1.2Laboratory Analysis
3.2.1.3Inspection Reports
1.10.1 GMonthly Solid Waste Disposal
Report
SD-07 Certificates
1.5.5 GEmployee Training Records
1.5.5.1Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
3.7.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 112 PAGES
Grayling ARNG GAAF Readiness Center
01 57 19 3.7.2.1Contractor Certification
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
3.4 GFinal Approved Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 112 PAGES
Grayling ARNG GAAF Readiness Center
01 78 00 3.5 GConstruction Contract
Specifications
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
1.7.1 GLead Commissioning Specialist
1.7.2 GTechnical Commissioning
Specialists
1.7 GCommissioning Firm's Contract
SD-06 Test Reports
3.1.2.1 GInterim Construction Phase
Commissioning Plan
3.1.2.2 GFinal Construction Phase
Commissioning Plan
3.1.2.1.2 GTemplate Building Envelope
Inspection Checklists
3.1.4.2 GBuilding Envelope Inspection
Checklists
3.1.4.3 GPre-Functional Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 112 PAGES
Grayling ARNG GAAF Readiness Center
01 91 00.15 10 1.9Issues Log
3.2 GCommissioning Report
SD-07 Certificates
1.10 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.5 GSystems Manual
3.1.5 GSystems Manual
SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
3.1.2.2 SFinal Construction Phase
Commissioning Plan
03 30 00 SD-01 Preconstruction Submittals
1.6.5 GQuality Control Plan
1.6.6…