2024-01-29 MARNG RFI LOG (1).xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Construct Readiness Center Federal contract opportunity
Solicitation number
W912JB-24-B-0001
Issued by
Department of the Army Michigan Army National Guard

About this file

This document contains a request for information (RFI) log and related questions and answers about a solicitation to construct a new Michigan Army National Guard Readiness Center. The RFI log includes 58 questions submitted by potential bidders between January 9th and 25th, along with responses from Atkins, the project's design firm. Common questions relate to specifications, drawings, and clarification of requirements for items like controls, fire protection, structural elements, and site work. The responses provide additional details, specifications, or notes that updated drawings and specifications will be issued in addendums. The related opportunity describes that the $46.8 million project will design and construct a new 46,831 square foot readiness center for training, administration and logistics for the Michigan ARNG. The facility must meet all local, state and federal building codes as well as energy efficiency and accessibility standards.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Readiness Center, newest first.
File Type Posted
Abstract Pg 2.pdf PDF
Abstract Pg 1.pdf PDF
w912JB24B00001 Updated.pdf PDF
w912JB24B00001 AMEND 5.pdf PDF
2024-01-31 MARNG RFI LOG (1).xlsx XLSX spreadsheet
W912JB24B0001 Amend 4.pdf PDF
Amendment 3.pdf PDF
W912JB24B0001 Amend 2.pdf PDF
RFI Log as of 29.xlsx XLSX spreadsheet
W912JB24B0001 Amendment.pdf PDF
RFI LOG as of 23 Jan 24.xlsx XLSX spreadsheet
Geotech Report MI ARNG GAAF RC.pdf PDF
RFI Log as of 18 Jan.xlsx XLSX spreadsheet
Readiness Center Pre-Bid Conference_Site Visit.pptx PPTX presentation
Pre-Bid Site Visit Sign-in sheet.pdf PDF
RFI Log.docx DOCX document
GAAF Vetting Access Roster.xlsx XLSX spreadsheet
W912JB24B0001 1229.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3.pdf__Part4.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3.pdf__Part3.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3.pdf__Part2.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3.pdf__Part5.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3.pdf__Part1.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3.pdf Part 2.pdf PDF
MI ARNG GAAF RC Volume 2 TYPE B 100 Drawings FULL_R3 Part 1.pdf PDF
W912JB24B0001 Signed.pdf PDF
MI ARNG GAFF RC Volume 3 TYPE B 100 Specifications_R1.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER RFI 2024

MIARNG Readiness Center - BIDDER RFI LOG 2024
#DATERFI DETAILPrimary DisciplineResponseResponse Date
0011/9/24The solicitation states that the price shall be good for 60 days, while the Site Visit slides state 90 days. Please clarify.
MIARNGQuestions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.1/12/24
0021/9/24Please advise what the time frame is for award of the option(s) and any resulting project schedule extensions if they are not all awarded at the same timeMIARNGQuestions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.1/12/24
0031/9/24Spec 01 35 26 (para. 1.6.1.1.1) states that the SSHO may also serve as the QC Manager duties but may not serve as the Superintendent. However, Spec 01 45 00.00 10 (para. 3.4.2) states that the QC Manager is assigned as the CQC Manager but has duties as project superintendent in addition to quality control. In addition, Spec 01 00 00 (para. 1.38.1, Key Personnel Description, states: “An individual Key Team Member may not hold more than one key role.” This is followed by the minimum qualifications for Project Manager, Site Superintendent, Quality Control Manager, and Safety Manager. Please clarify the project requirements for the QC Manager, SSHO and Superintendent).MIARNGIt appears that the note in section 01 00 00 – “An individual Key Team Member may not hold more than one key role” contradicts language in spec 01 35 26.

Atkins understanding is that per 01 35 26 – The Quality Control Manager and Site Safety and Health Office can be the same person, but there needs to be a separate Project Superintendent.

Section 01 45 00.00 10 does not specifically mention “Quality Control Manager”, it states that the Contractor Quality Control manager also has superintendent duties. Meaning observation and inspection of site work, production of reports and is on site at all times during construction. Atkins understanding is that there is no difference between a Quality Control Manager and a Contractor Quality Control Manager.

Final response and decision to be confirmed by MIARNG.1/12/24
0041/9/24Drawing CS503 shows chain link fence details but no chain link fence is found on the drawings. Please advise.CIVILPlease refer to sheet OLI705 & OLI706. Optional line item drawings for the project are located at the back of the drawing set starting from OLI700 - OLI786.1/12/24
0051/9/24Please confirm that the project is tax exempt per Spec 01 00 00.MIARNGQuestions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.1/12/24
0061/9/24Please consider allowing submittal of the Bid via email. Typically, trades do not provide their bids until late in the process, making it difficult to copy, bind, and deliver the Bid documents.MIARNGQuestions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.1/12/24
0071/10/24DMI Metals - I recently viewed the Readiness Center project in Grayling, MI and am interested in quoting the standing seam roof. Your name was listed as a contact, and I was wondering if Substitution Requests are acceptable.MIARNGPer FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.1/12/24
0081/12/24Should coatings on concrete be polyurea on the interior and bituminous coating on the exterior? These are preferred practices in many communities in Michigan due to constant expansion-contraction of concrete tanks susceptible to toxins including phosphates, sulfuric acids, cleaning agents, and petroleum products. Epoxy coatings have been defined as too hard-brittle to survive in extreme temperature conditions. Cracking can occur and lead to premature failures on concrete designs (see recommended Concrete GI Spec).PLUMBINGPer FAR requirements, the drawings & specifications do not name specific manufacturers or products. The drawings and specifications include salient characteristics of products and materials crucial to the performance of the product. If a submitted product meets or exceeds the performance of the product provided as the Basis of Design, it can be evaluated through the submittal process.1/16/24
0091/12/24Are HDPE solutions acceptable as alternatives for the grease interceptor and oil separators? Fully welded designs using dual-wall construction are better for long-term structural durability, leak-free performance, and chemical resistance.PLUMBINGPer FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.1/15/24
0101/12/24Per S-201 and A-123 a prefabricated canopy on the south elevation is by others. If the Contractor installs framing with metal deck for this canopy, please provide detailsARCHITECTURE / STRUCTURE / PLUMBINGAtkins will provide drawings and specs as needed in an addendum.1/12/24
0111/12/24Per details on A-451 all shower cabins are wall fiberglass commercial showers. No spec found neither in architectural nor plumbing sections. Please clarifySPECSAtkins will provide revised specs in an addendum. / Shower walls can match shower pan material1/15/24
0121/12/24What is the thickness of stone beneath slab-on-grade? Drawing S-111 refers to Geotechnical Report, but no Geotech Report included in RFPMIARNGGeotechnical report which is in the design report can be made available by MIARNG.1/15/24
0131/12/24Please provide Food Service drawings. Spec 1106 40.13, 1.2.3 classified responsibilities of all parties, but section 2.1.2Food Service Equipment Schedule does not show this classification. Please advise.SPECSPlease refer to sheet A-402 for kitchen equipment layout and equipment list. All food service equipment is contractor furnished and contractor installed unless otherwise noted as NOT IN CONTRACT on the kitchen equipment list. Atkins will update specs to remove Food Service Equipment Schedule.1/16/24
0141/18/24Base Bid Fire Alarm Mass Notification: The design documents indicate clear and amber strobes; clear for fire alarm and amber for mass notification. This is an antiquated approach to mass notification design and no long supported by the DoD, i.e., USACE, USAF, NAVFAC, etc. Refer to Engineering and Construction Bulletin ECB-2022-05 rev 2 Mass Notification Requirements. Please confirm amber strobes are required. Note that LED MNS text signs at each exit door should be provided in lieu of amber strobes.FIRE ALARMAs per Engineering and Construction Bulletin ECB-2018-17 Rev 3, Amber strobes must no longer be used in new mass notification systems. In lieu of amber strobes, clear or white strobes marked with the word “ALERT” must be used for new mass notification systems. Clear or white strobes must be provided for shared use by the facility’s combination mass notification and fire alarm system. The clear or white strobes are activated in conjunction with voice messages over the mass notification or fire alarm system. Drawings will be updated accordingly to include this modification.1/19/24
0151/18/24Base Bid Fire Alarm Mass Notification: The proposed layout for notification appliances (i.e., speaker/strobes) does not appear to follow general guidelines and industry standards for a system required to achieve prescriptive audibility and voice intelligibility requirements. For example, there are occupiable spaces within the facility that do not have notification appliances. With the doors closed, it is unlikely these spaces will pass acceptance testing. Per NFPA 72, the ownness is on the Designer of Record to establish the acoustically distinguishable spaces. Please confirm the spaces without notification appliances are except from audibility and voice intelligibility requirements.FIRE ALARMThe Fire Alarm drawings are scheduled for revision to include a speaker/strobe in Offices. However, it's important to note that not all small spaces or offices will require a visible notification appliance, as outlined in UFC 3-600-01 9-18-6.3 (I). Additionally, while the provided Fire Alarm drawings encompass the design intent, the contractor is required to furnish shop drawings that specify the final quantity, location, and calculations.1/19/24
0161/18/24Base Bid Fire Alarm Mass Notification: The design documents do not show addressable input modules to monitoring the fire pump system as required by NFPA 20. Please clarify if the fire pump is required to be monitored by the fire alarm system.FIRE ALARMYes, FACP needs to monitor the Fire Pump. Control modules need to be included in drawings for the Running/Lost of Phase, Phase Reversal, test Header. Refer to the revised drawings.1/19/24
0171/18/24Base Bid Fire Service Entrance: The fire service backflow preventer is downstream of the fire pump. Please clarify if the fire pump must be dual listed for both fire protection and domestic service.FIRE PROTECTION / PLUMBINGThe fire pump selected as the basis of design is NSF 61 certified, so it is safe to use with a potable water service. The pump selected for installation must be NSF 61 certified. UFC 03-600-01 requires the backflow preventer to be installed after the fire pump.1/19/24
0181/18/24Base Bid Fire Protection: Wafer style check valves are annotated on Detail 2 on sheet F-401. Please confirm wafer style check valves are permitted; swing type check valves with removal face plate for internal inspection are more commonly used in the fire protection industry.FIRE PROTECTIONThe wafer-style check valve indicated on the riser is commonly used on the FDC inlet in our experience. A swing-type check valve is also acceptable at this location if there is sufficient space in the piping assembly for it.1/19/24
0191/18/24Option 3: Please clarify if the HVLS fans must shut down upon the detection of fire sprinkler waterflow as required by NFPA 13.FIRE PROTECTIONYes, control monitors must be added to shut down the HVLS fans upon a waterflow alarm.1/19/24
0201/18/24Option 3: Please confirm carbon monoxide detection is required in the Training Workbays per NFPA 72.FIRE ALARMAn existing CO Detection system is specified in the Mechanical plans OLI730. The purpose of this system is to ensure low levels of CO in the training bay. This system will operate independently.1/19/24
0211/18/24Option 4: Please clarify if the emergency generator controller must be monitored by the fire alarm system as required by NFPA 101; 9.1.3.2.FIRE ALARMYes, the FACP needs to monitor the new generator. Please refer to Key Note #9 on sheet OLI785, where we specify the installation of conduits and control wiring between the generator and FACP.1/19/24
0221/18/24Where are mesh partitions needed?ARCHITECTUREPlease refer to sheet OLI7401/19/24
0231/18/24Please provide door and shutter specs.SPECSAtkins will provide spec section for window counter doors in an addendum1/19/24
0241/18/24For the alternate on the training bay fire protection, is that entire area getting sprinkled or just the north half?FIRE PROTECTIONThe entire area receives fire suppression. The entire building receives fire suppression. Apply coverage based on Hazard Classifications indicated under Fire Protection Data on sheet F-001. AtkinsRéalis only presented the most remote area that was used to prepare hydraulic calculations.1/22/24
0251/18/24Is detail 7 on S5-11 for the trench drains is a mistake as it refers to the architectural pages to verify location, but I do not see any annotations for a trench drain location within the architectural pages.ARCHITECTURERevised annotations for trench drain location will be provided in an addendum1/23/24
0261/18/24Will not be able to meet the specs attached, please see below for some of the items not available.

CHI Springs are only warrantied for 1 year.

Max Cycles Available - 100k Insulated Slats Not Available for Counter Shutters Vision Lites Not Available in Shutters

6" Barrel Not Available for ShuttersSPECSAtkins will provide spec section for window counter doors in an addendum1/19/24
0271/18/24We would like to provide you a full package for you on this. We are specified on all the types except A2, A2E, A4, A4E, C-H, CE-H, X & X1. Please let me know your thoughts.ELECTRICAL / SPECSQuestion is unclear. Per FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process. Any necessary substitution can be review during the submittal process.1/22/24
0281/19/24Substitution request for metal lockers.ARCHITECTUREPer FAR requirements, the specs do not name specific manufacturers or products. The specs include salient characteristics of products and materials. If a specific product meets the listed characteristics, then a it can be evaluated during the submittal process.1/19/24
0291/19/24Section 01 91 00.15 10 Total Building Commissioning

- Will there be a third-party Commissioning Agent on this project?

- If not, what will the Commissioning process be?SPECSPer the spec section listed the GC to employ the Services of and independent firm for commissioning. Follow specification for the process
0301/19/24Section 23 09 00 Instrumentation and Control

- 2.1.2 Programming Control Unit and Programming Software “By Owner” – please confirm there is no work being performed by the owner.

- 2.1.4 Control Devices – please confirm all control devices are to be as listed on M-502 and that devices listed on M-502 supersede the specifications. MECHANICAL 2.1.2 - No work to be done by owner. Software and version to be confirmed by owner.

2.1.4 - Sheet M-502 shall supersede this section information where in conflict.1/22/24
0311/19/24Section 23 09 23.01 Lonworks Direct Digital Control

- 3.1.2.1 Specified Circon DDC controllers on M-502 are not available with H-O-A switches or AO potentiometers. Please advise.

- 3.1.2.2 Specified Circon DDC controllers on M-502 are not available with local displays. Please advise.

- 3.1.5 Specified Circon VAV controllers on M-502 are not available with network jacks. Are these to be furnished and wired to the communication

buss at the room temperature sensorsMECHANICAL / MIARNGOwner to confirm these devices on M-502 are preferred over listed functions in spec.1/22/24
0321/19/24Division 25 Integrated Automation and all associated controls Specifications o Please confirm that any reference to Tridium should be ignored and that this project is to be performed with a LonWorks LNS database and a CatNet Web Server User Interface.MECHANICALCorrect. Controls are to be Lon system.1/22/24
0331/19/24There are many different customer training requirements for the controls listed
throughout the Specifications. What are the training requirements?SPECSRefer to 01 78 23 part 3
0341/19/24Drawing M-601, Packaged Rooftop Units, Note #4

- Please confirm the intent of this note is; Provide “DDC Ready” units with damper, fan and cooling controls wired to a terminal strip in the controls

compartment. DDC controls and components to be field installed.MECHANICALYes, RTUs and factory components provided are to be capable of DDC controls1/22/24
0351/19/24Option #2 Build-out EOD Supply & PES Room

- Please confirm all work should on Drawing M-111 in the EOD Supply

area should be included in the base bidMECHANICALCorrect. All work on sheet M-111 should be on the base bid.1/22/24
0361/19/24Drawing – A653 does not include the material details for GL-4 Glazing which is specified in A611 Drawing notes for interior glazing. Please specify the details of GL4 Material.ARCHITECTUREAtkins will revise glazing information and issue revised sheet in an addendum1/22/24
0371/19/24Drawing – A202 north elevation shows W8 which seems like a window or a louver but there is no detail shown either in window details or louver details please provide the details for W8.ARCHITECTUREPlease refer to sheet A-621 for louver elevation and sheet A-623 for louver details.1/22/24
0381/19/24Option 3: Fence spec calls for gate operators in para 2.1.6 and for electro-mechanical locks in para 2.1.7. However, they are not found neither on the site plans nor on the electrical plans. Are these gate operators and electro- mechanical locks required for this project? And if so, who will be responsible for the installation of these products?CIVIL / SPECSAll sliding gate should be manually operated. Electro mechanical locks are not required. Atkins will revise spec sections and issue updated specs in an addendum.1/22/24
0391/19/24Option 2: Please clarify the height of acoustical ceiling and mesh partitions height in PES RoomARCHITECTURECeiling height in PES room is at 10' per ceiling type legend. Wire mesh partitions in Supply Rooms will go to the underside of the structure/roof above. No Ceiling. Atkins will add note to Supply Room floor plan issue revised sheet in an addendum.1/22/24
0401/19/24The specs call for all 24 volt and lon wiring to be in conduit regardless of building codes but the drawings saw that they can be in j hooks or bridal rings above suspended ceilings. Which route should i bid as the cost is very different. on all of our recent work for the state j hooks and bridal rings have been acceptable in suspended ceiling areas.ELECTRICAL / SPECSAll fire alarm cables, data cables, and security cables shall be routed within conduits unless specified otherwise on the drawings. Cable trays shall be installed as specified on the drawings.1/22/24
0411/19/24The specs call out a lot of performance testing that is very costly that is not normally done on state projects. what testing is actually required? These small but important items can drastically change cost of installELECTRICAL / SPECSOur MIARNG project's specifications are based on the UFC criteria and Government requirements. Could you specify which tests fall under these criteria? The project expectation is that a certified contractor performs the required testing for a complete and fully functionally system.1/22/24
0421/19/24Base Bid: Please provide grout selection for tile installation.ARCHITECTUREPlease submit grout product that is compliant with the specifications. Grout color to be selected and coordinated with tile submittals during the submittal process by architect or government. For ceramic tile refer to paragraph 2.4.4, for all other tile refer to paragraph 2.4.5.1/19/24
0431/24/24Kitchen Hood –Are there any specs available on the hood. What about fire suppression for underneath that hood?SPECSRefer to section 11 44 00 comply with standards shown1/25/24
0441/24/24Dishwasher (item #8): No real specs on this piece. Is it a low temp unit or high temp? There is only one on the drawing but a quantity of 2 are shown on the scheduleSPECSRefer to section 11 48 00 comply with standards shown. Only one dishwasher is to be provided. Revised schedule will be issued as an addendum.1/25/24
0451/24/24Prep Sink (item #4): On the schedule but not on the drawingARCHITECTUREPrep sink will be tagged on the drawing and issued as an addendum.1/25/24
0461/24/24Disposer (item #3): Any specs on these? Need to know what mounting style, voltage/phase, etc.SPECSRefer to section 11 48 00 comply with standards shown1/25/24
0471/24/24Drawers (item #5): Are these being retrofitted to existing worktables?SPECSThis is a new project with new equipment. Nothing is existing.1/25/24
0481/24/24This document is not the new spec pages for the 2 counter shutters. Without these new specs from Atkins we cannot provide a bid on the 2 counter coiling doors. Please acquire these new specs so the coiling doors can be quoted.SPECSSection 08 33 13 issued as part of Addendum 01 is the spec for the coiling counter doors and what needs to be bid1/25/24
0491/24/24Could you verify whether any of the landscaping materials (stone, mulch, plants) are to be included with Options 3 through 5? The site plans for these options still show a rectangle where the plant bed from the Base Bid landscape plan would go, but there is no material or plant schedules besides turf associated with these options.CIVIL / LANDSCAPEThe planting bed with shrubs and mulch shown on the base bid is to be included in all bid options. The screened rock, crushed fines, and cobble rock shown on the base bid is to be inlcuded in the bid options, except in areas along the west side of the building where crushed aggregate or concrete pavement is to be included.1/26/24
0501/24/24All the specs reference ASTM E 1996 and Table 2, but that only refers to the type and speed of the missile tested. All the PSF ratings I’ve found are for wind loads. There is a Minimum Design Load in the Aluminum Window specification referring to 50 PSF, but again that is under wind loads. There should be a minimum design pressure to make sure we exceed when laying out the frames. Please advise what the intended or minimum design pressure is in regard to large missile impact.SPECS
0511/24/24Please provide information on how prices will be evaluated. Is only the base bid being evaluated? Base plus total options?
MIARNGQuestions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.

The total bid price will be evaluated as bid plus all options.

052 1/24/24 Will the Options be awarded at the same time as the Base Bid? If after, please provide the number of days for how long after award of the Base Bid that the Government has to award the Options. I.e., Options shall be awarded up to 90 days after award of Base Bid. MIARNG Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.

Options will be evaluated and exercised at the time of award.

0531/24/24Reference RFI #12. The geotechnical report for the thickness of the stone beneath the slab-on-grade only references ACI standards. Please provide the thickness of the stone beneath the slab-on-grade.STRUCTURE / GEOTECH6" thick base course.
0541/24/24Reference RFI #12. Is the stone beneath the slab-on-grade a design scope of work after award? If so, please provide the thickness of the stone beneath the slab-on-grade for bidding purposes.STRUCTURE / GEOTECH6" thick base course.
0551/24/24When do you expect construction to begin?MIARNGQuestions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.

APRIL / MAY 2024

056 1/24/24 Will the bid due date be extended? MIARNG Questions regarding the solicitation process or schedule and other contractual items will need to be responded to by MIARNG.

Yes, February 6, 2024 057 1/25/24 Please provide missing spec documents SPECS RFI is not clear. Spec Section 08 33 13 for the coiling counter doors has been included as part of Addendum 01. 1/25/24

File details come from the government source that posted it. Updated .