Complete_Specifications_Part_4.pdf

PDF 9 MB Posted

Attached to
Repair NW Gravity Sewer Line Federal contract opportunity
Solicitation number
W912JB-19-B-5001
Issued by
Department of the Army Michigan Army National Guard

About this file

Part 4

View the file

Other files for this federal contract opportunity

Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SELFRIDGE ANGB, MICHIGAN

Section 32 12 10 Page 1

SECTION 32 12 10

BITUMINOUS TACK AND PRIME COATS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 102 (2009) Standard Method of Test for Spot Test of Asphaltic Materials

AASHTO T 40 (2002; R 2006) Sampling Bituminous Materials

ASTM INTERNATIONAL (ASTM)

ASTM D140/D140M (2009) Standard Practice for Sampling Bituminous Materials

ASTM D2995 (1999; R 2009) Determining Application Rate of Bituminous Distributors

1.2 SYSTEM DESCRIPTION

1.2.1 General Requirements

Plant, equipment, machines and tools used in the work are subject to approval and shall be maintained in a satisfactory working condition at all times. Calibrated equipment such as asphalt distributors, scales, batching equipment, spreaders and similar equipment, should have been recalibrated by a calibration laboratory within 12 months prior to commencing work .

1.2.2 Bituminous Distributor

Provide a distributor with pneumatic tires of such size and number that the load produced on the base surface does not exceed 650 psi of tire width to prevent rutting, shoving or otherwise damaging the base surface or other layers in the pavement structure. Design and equip the distributor to spray the bituminous material in a uniform coverage at the specified temperature, at readily determined and controlled rates from 0.05 to 2.0 gallons per square yard, with a pressure range of 25 to 75 psi and with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Include with the distributor equipment a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the

Section 32 12 10 Page 2 distributor. Equip the distributor to circulate and agitate the bituminous material during the heating process.

1.2.3 Heating Equipment for Storage Tanks

The equipment for heating the bituminous material shall be steam, electric, or hot oil heaters. Provide steam heaters consisting of steam coils and equipment for producing steam, so designed that the steam cannot get into the material. Fix an armored thermometer to the tank with a temperature range from 40 to 400 degrees F so that the temperature of the bituminous material may be determined at all times.

1.2.4 Power Brooms and Power Blowers

Use power brooms and power blowers suitable for cleaning the surfaces to which the bituminous coat is to be applied.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Waybills and Delivery Tickets

SD-06 Test Reports

Sampling and Testing

1.4 DELIVERY, STORAGE, AND HANDLING

Inspect the materials delivered to the site for contamination and damage.

Unload and store the materials with a minimum of handling. Provide Waybills and Delivery Tickets for materials delivered to the site.

1.5 ENVIRONMENTAL REQUIREMENTS

Apply bituminous coat only when the surface to receive the bituminous coat is dry. Apply bituminous coat only when the atmospheric temperature in the shade is 50 degrees F or above and when the temperature has not been below 35 degrees F for the 12 hours prior to application, unless otherwise directed.

PART 2 PRODUCTS

2.1 PRIME COAT

Provide asphalt conforming to AASHTO M 81 or AASHTO M 82 and specified in the following two subparagraphs.

2.1.1 Cutback Asphalt

Provide cutback asphalt conforming to ASTM D2027, Grade MC-30 or MC-70, ASTM D2028/D2028M, Grade RC-250.

Section 32 12 10 Page 3

2.1.2 Emulsified Asphalt

Provide emulsified asphalt conforming to ASTM D977, Type RS-1m, RS-2a, HFRS- 2, MS-0p, MS-2h, MS-2s, or SS1h, ASTM D2397, Type CRS-1, CRs-2, CMS-2, or CSS-1h.

2.2 TACK COAT

Provide asphalt conforming to ASTM D977, Type SS-1h or ASTM D2397, Type CSS- 1h.

2.2.1 Cutback Asphalt

Provide cutback asphalt conforming to ASTM D2027, Grade MC-30 or MC-70, ASTM D2028/D2028M, Grade RC-250.

2.2.2 Emulsified Asphalt

Provide emulsified asphalt conforming to ASTM D977, Type RS-1m, RS-2a, HFRS- 2, MS-0p, MS-2h, MS-2s, or SS1h, ASTM D2397, Type CRS-1, CRs-2, CMS-2, or CSS-1h. Dilute the emulsified asphalt with equal parts of water. The base asphalt used to manufacture the emulsion shall show a negative spot when tested in accordance with AASHTO T 102 using standard naphtha.

PART 3 EXECUTION

3.1 PREPARATION OF SURFACE

Immediately before applying the bituminous coat, remove all loose material, dirt, clay, or other objectionable material from the surface to be treated by means of a power broom or blower supplemented with hand brooms. The surface shall be dry and clean at the time of treatment.

3.2 APPLICATION RATE

The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contracting Officer.

3.2.1 Tack Coat

Apply bituminous material for the tack coat in quantities of not less than

0.05 gallon nor more than 0.15 gallon per square yard of pavement surface.

3.2.2 Prime Coat

Apply bituminous material for the prime coat in quantities of not less than

0.18 gallon nor more than 0.35 gallon per square yard of pavement surface.

3.3 APPLICATION TEMPERATURE

3.3.1 Viscosity Relationship

Asphalt application temperature shall provide an application viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 centistokes, kinematic. Furnish the temperature viscosity relation to the Contracting Officer.

Section 32 12 10 Page 4

3.3.2 Temperature Ranges

The viscosity requirements determine the application temperature to be used.

The following is a normal range of application temperatures:

Liquid Asphalts

MC-30 70-140 degrees F MC-70 105-180 degrees F RC-250 145-220 degrees F*

Paving Grade Asphalts

Emulsions RS-1m 85-135 degrees F RS2a 125-175 degrees F HFRS-2 125-175 degrees F MS-0p 125-175 degrees F MS-2h 125-175 degrees F MS-2S 125-175 degrees F SS-1h 85-135 degrees F CRS-1 85-135 degrees F CRS-2 125-175 degrees F CMS-2 125-175 degrees F CSS-1h 85-135 degrees F

* These temperature ranges exceed the flash point of the material and care should be taken in their heating.

3.4 APPLICATION

3.4.1 General

Following preparation and subsequent inspection of the surface, apply the bituminous prime or tack coat with the Bituminous Distributor at the specified rate with uniform distribution over the surface to be treated.

Properly treat all areas and spots missed by the distributor with the hand spray. Until the succeeding layer of pavement is placed, maintain the surface by protecting the surface against damage and by repairing deficient areas at no additional cost to the Government. If required, spread clean dry sand to effectively blot up any excess bituminous material. No smoking, fires, or flames other than those from the heaters that are a part of the equipment are permitted within 25 feet of heating, distributing, and transferring operations of bituminous material other than bituminous emulsions. Prevent all traffic, except for paving equipment used in constructing the surfacing, from using the underlying material, whether primed or not, until the surfacing is completed. The bituminous coat shall conform to all requirements as described herein.

3.4.2 Prime Coat

The prime coat is required if it will be at least 7 days before the surfacing (Asphalt cement hot mix concrete) layer is constructed on the

Section 32 12 10 Page 5 underlying (base course, etc.) compacted material. The type of liquid asphalt and application rate will be as specified herein. Protect the underlying from any damage (water, traffic, etc.) until the surfacing is placed. If the Contractor places the surfacing within seven days, the choice of protection measures or actions to be taken is at the Contractor's option. Repair (recompact or replace) damage to the underlying material caused by lack of, or inadequate, protection by approved methods at no additional cost to the Government. If the Contractor opts to use the prime coat, apply as soon as possible after consolidation of the underlying material. Apply the bituminous material uniformly over the surface to be treated at a pressure range of 25 to 75 psi; the rate shall be as specified above in paragraph APPLICATION RATE. To obtain uniform application of the prime coat on the surface treated at the junction of previous and subsequent applications, spread building paper on the surface for a sufficient distance back from the ends of each application to start and stop the prime coat on the paper and to ensure that all sprayers will operate at full force on the surface to be treated. Immediately after application remove and destroy the building paper.

3.4.3 Tack Coat

Apply tack coat on each successive layer of pavement. Apply the tack coat when the surface to be treated is dry. Immediately following the preparation of the surface for treatment, apply the bituminous material by means of the bituminous distributor, within the limits of temperature specified herein and at a rate as specified above in paragraph APPLICATION RATE. Apply the bituminous material so that uniform distribution is obtained over the entire surface to be treated. Treat lightly coated areas and spots missed by the distributor with the bituminous material. Following the application of bituminous material, allow the surface to cure without being disturbed for period of time necessary to permit setting of the tack coat. Apply the bituminous tack coat only as far in advance of the placing of the overlying layer as required for that day's operation. Maintain and protect the treated surface from damage until the succeeding course of pavement is placed.

3.5 CURING PERIOD

Following application of the bituminous material and prior to application of the succeeding layer of pavement, allow the bituminous coat to cure and to obtain evaporation of any volatiles or moisture. Maintain the coated surface until the succeeding layer of pavement is placed, by protecting the surface against damage and by repairing and recoating deficient areas.

Allow the prime coat to cure without being disturbed for a period of at least 48 hours or longer, as may be necessary to attain penetration into the treated course. Furnish and spread enough sand to effectively blot up and cure excess bituminous material.

3.6 FIELD QUALITY CONTROL

Samples of the bituminous material used shall be obtained by the Contractor as directed, under the supervision of the Contracting Officer. The sample may be retained and tested by the Government at no cost to the Contractor.

3.7 SAMPLING AND TESTING

Section 32 12 10 Page 6

Perform sampling and testing by an approved commercial testing laboratory or by facilities furnished by the Contractor. No work requiring testing will be permitted until the facilities have been inspected and approved.

3.7.1 Sampling

The samples of bituminous material, unless otherwise specified, shall be in accordance with ASTM D140/D140M or AASHTO T 40. Sources from which bituminous materials are to be obtained shall be selected and notification furnished the Contracting Officer within 15 days after the award of the contract.

3.7.2 Calibration Test

Furnish all equipment, materials, and labor necessary to calibrate the bituminous distributor. Calibration shall be made with the approved job material and prior to applying the bituminous coat material to the prepared surface. Calibrate the bituminous distributor in accordance with ASTM D2995.

3.7.3 Trial Applications

Before providing the complete bituminous coat, apply three lengths of at least 100 feet for the full width of the distributor bar to evaluate the amount of bituminous material that can be satisfactorily applied.

3.7.3.1 Tack Coat Trial Application Rate

Unless otherwise authorized, apply the trial application rate of bituminous tack coat materials in the amount of 0.05 gallons per square yard. Other trial applications shall be made using various amounts of material as may be deemed necessary.

3.7.3.2 Prime Coat Trial Application Rate

Unless otherwise authorized, apply the trial application rate of bituminous materials in the amount of 0.25 gallon per square yard. Other trial applications shall be made using various amounts of material as may be deemed necessary.

3.7.4 Sampling and Testing During Construction

Perform quality control sampling and testing as required in paragraph FIELD

QUALITY CONTROL.

3.8 TRAFFIC CONTROLS

Keep traffic off surfaces freshly treated with bituminous material.

-- End of Section --

32 12 16 1 ASPHALT PAVING

SECTION 32 12 16 - ASPHALT PAVING – Non Airfield Pavement

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 STANDARD SPECIFICATION

A. Michigan Department of Transportation, Standard Specifications for Construction, 2003.

1.3 SUMMARY

A. Section Includes:

1. Hot-mix asphalt patching.

2. Hot-mix asphalt paving.

3. Asphalt surface treatments.

4. Pavement-marking paint.

B. Related Sections:

1. Section 02 41 19, Selective Structure Demolition, for demolition, removal, and recycling of existing asphalt pavements, and for geotextiles that are not embedded within courses of asphalt paving.

2. Section 31 20 00, Earthwork, for aggregate subbase and base courses and for aggregate pavement shoulders.

3. Division 32 Sections for other paving installed as part of crosswalks in asphalt pavement areas.

4. Section 32 13 73, Concrete Paving Joint Sealants, for joint sealants and fillers at paving terminations.

1.4 DEFINITION

A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms.

32 12 16 2 ASPHALT PAVING

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.

1. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.

2. Job-Mix Designs: For each job mix proposed for the Work.

3. Asphalt Concrete Mix Formula:

a. Submit minimum of 15 days prior to start of production.

b. Submittal to include the following information:

1) Gradation and portion for each aggregate constituent used in mixture to produce a single gradation of aggregate within specified limits.

2) Bulk specific gravity for each aggregate constituent.

3) Measured maximum specific gravity of mix at optimum asphalt content determined in accordance with ASTM D2041.

4) Properties as stated in this section for at least four different asphalt contents other than optimum, two below optimum, and two above optimum.

5) Percent of asphalt lost due to absorption by aggregate.

6) Index of Retained Strength (TSR) at optimum asphalt contents as determined by AASHTO T283.

7) Percentage of asphalt cement, to nearest 0.1 percent, to be added to mixture.

8) Optimum mixing temperature.

9) Optimum compaction temperature.

10) Temperature-viscosity curve of asphalt cement to be used.

11) Brand name of any additive to be used and percentage added to mixture.

4. Test Report for Asphalt Cement:

a. Submit minimum 10 days prior to start of production.

b. Show appropriate test method(s) for each material and the test results.

5. Manufacturer’s Certificate of Compliance for the following materials:

a. Aggregate: Gradation, source test results as defined in Section 302 of the Standard Specifications.

b. Asphalt for Binder: Type, grade, and viscosity-temperature curve.

c. Tack Coat: Type and grade of asphalt.

d. Additives.

e. Mix: Conforms to job-mix formula.

6. Statement of qualification for independent testing laboratory.

B. Shop Drawings: Indicate pavement markings, lane separations, and defined parking spaces.

Indicate, with international symbol of accessibility, spaces allocated for people with disabilities.

32 12 16 3 ASPHALT PAVING

C. LEED Submittals:

1. Refer to Section 01 81 13, Sustainable Design Requirements, for information regarding LEED® submission requirements.

2. The Contractor and/or Subcontractor shall submit the following information under a separate tab for LEED information.

a. A complete list materials.

b. Material costs for each material listed. Material costs shall not include installation or shipping costs.

c. Location of material manufacturer.

d. Location of material extraction/harvest.

e. Post-consumer and pre-consumer recycled content of each material.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified manufacturer and Installer.

B. Material Certificates: For each paving material, from manufacturer.

C. Material Test Reports: For each paving material.

1.7 QUALITY ASSURANCE

A. Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by the Michigan DOT.

B. Installer Qualifications: Imprinted-asphalt manufacturer's authorized installer who is trained and approved for installation of imprinted asphalt required for this Project.

C. Testing Agency Qualifications: Qualified according to ASTM D 3666 for testing indicated.

D. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of Michigan DOT for asphalt paving work.

1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section.

E. Preinstallation Conference: Conduct conference at Project site.

1. Review methods and procedures related to hot-mix asphalt paving including, but not limited to, the following:

a. Review proposed sources of paving materials, including capabilities and location of plant that will manufacture hot-mix asphalt.

b. Review condition of subgrade and preparatory work.

c. Review requirements for protecting paving work, including restriction of traffic during installation period and for remainder of construction period.

32 12 16 4 ASPHALT PAVING

d. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver pavement-marking materials to Project site in original packages with seals unbroken and bearing manufacturer's labels containing brand name and type of material, date of manufacture, and directions for storage.

B. Store pavement-marking materials in a clean, dry, protected location within temperature range required by manufacturer. Protect stored materials from direct sunlight.

1.9 PROJECT CONDITIONS

A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:

1. Tack Coat: Minimum surface temperature of 60 deg F (15.6 deg C).

2. Slurry Coat: Comply with weather limitations in ASTM D 3910.

3. Asphalt Base Course: Minimum surface temperature of 40 deg F (4.4 deg C) and rising at time of placement.

4. Asphalt Surface Course: Minimum surface temperature of 60 deg F (15.6 deg C) at time of placement.

B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F (4.4 deg C) for oil-based materials and 55 deg F (12.8 deg C) for water-based materials, and not exceeding 95 deg F (35 deg C).

PART 2 - PRODUCTS

2.1 ASPHALT MATERIALS

A. Asphalt Binder: PG 58-22 as specified in Section 904 of the Standard Specifications.

B. Tack Coat: Emulsified asphalt Grade SS-1 or SS-1h conforming to Section 904 of the Standard Specifications.

C. Water: Potable.

D. Undersealing Asphalt: ASTM D 3141, pumping consistency.

2.2 AUXILIARY MATERIALS

32 12 16 5 ASPHALT PAVING

A. Herbicide: Commercial chemical for weed control, registered by the EPA. Provide in granular, liquid, or wettable powder form.

B. Sand: ASTM D 1073, Grade Nos. 2 or 3.

C. Joint Sealant: ASTM D 6690, Type II or III, hot-applied, single-component, polymer-modified bituminous sealant.

D. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with AASHTO M 248, Type S; colors complying with FS TT-P-1952.

1. Color: As indicated.

2.3 MIXES

A. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mixes approved by Michigan DOT designed according to procedures in AI SP-2 Superpave Mix Design.

1. Provide mixes with a history of satisfactory performance in geographical area where Project is located.

2. Provide mixes complying with composition, grading, and tolerance requirements in ASTM D 3515 for the following nominal, maximum aggregate sizes:

a. 1/2 inch (13 mm).

3. Superpave Mix Design Requirements:

a. Pavement Design ESALs: 3 million.

b. Design Gyrations, NDES: 96.

c. Coarse Aggregate Angularity, ASTM D5821: One or more fractured faces

75 percent minimum.

d. Fine Aggregate Angularity, AASHTO T304: 40 percent, minimum.

e. Flat and Elongated Particles, ASTM D4791: 10 percent, maximum.

f. Clay Content, AASHTO T176: Minimum sand equivalent of 40 percent.

g. Voids in Mineral Aggregate: See Table 1.

h. Voids Filled with Asphalt: 65-78 percent.

i. Mixture Density as a Percentage of Theoretical Maximum Density at Initial

Gyration Level: 89 percent, maximum.

j. Mix Density at Maximum Number of Gyrations: Less than 98 percent of theoretical maximum density.

k. Dust Proportion: 0.8 to 1.6.

l. Air Voids: 4 percent.

32 12 16 6 ASPHALT PAVING

m. Tensile Strength Ratio, AASHTO T283: 80 percent, minimum.

Table 1 Voids in Mineral Aggregate (VMA) Criteria

Nominal Maximum Aggregate Size (mm)

Minimum VMA, Percent

9.5 (3/8”) 15

12.5 (1/2”) 14

19.0 (3/4”) 13

25.0 (1”) 12

37.5 (1-1/2”) 11

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that subgrade is dry and in suitable condition to begin paving.

B. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph (5 km/h).

2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons (13.6 tonnes).

3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Contracting Officer, and replace with compacted backfill or fill as directed.

C. Proceed with paving only after unsatisfactory conditions have been corrected.

D. Verify that utilities, traffic loop detectors, and other items requiring a cut and installation beneath the asphalt surface have been completed and that asphalt surface has been repaired flush with adjacent asphalt prior to beginning installation of imprinted asphalt.

3.2 PATCHING

A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement section to sound base. Excavate rectangular or trapezoidal patches, extending 12 inches (300 mm) into adjacent sound pavement, unless otherwise indicated. Cut excavation faces

32 12 16 7 ASPHALT PAVING

vertically. Remove excavated material. Recompact existing unbound-aggregate base course to form new subgrade.

B. Portland Cement Concrete Pavement: Break cracked slabs and roll as required to reseat concrete pieces firmly.

1. Pump hot undersealing asphalt under rocking slab until slab is stabilized or, if necessary, crack slab into pieces and roll to reseat pieces firmly.

2. Remove disintegrated or badly cracked pavement. Excavate rectangular or trapezoidal patches, extending into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Recompact existing unbound-aggregate base course to form new subgrade.

C. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd. (0.2 to 0.7 L/sq. m).

1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.

Remove spillages and clean affected surfaces.

D. Patching: Fill excavated pavements with hot-mix asphalt base mix for full thickness of patch and, while still hot, compact flush with adjacent surface.

E. Patching: Partially fill excavated pavements with hot-mix asphalt base mix and, while still hot, compact. Cover asphalt base course with compacted, hot-mix surface layer finished flush with adjacent surfaces.

3.3 REPAIRS

A. Leveling Course: Install and compact leveling course consisting of hot-mix asphalt surface course to level sags and fill depressions deeper than 1 inch (25 mm) in existing pavements.

1. Install leveling wedges in compacted lifts not exceeding 3 inches (75 mm) thick.

B. Crack and Joint Filling: Remove existing joint filler material from cracks or joints to a depth of 1/4 inch (6 mm).

1. Clean cracks and joints in existing hot-mix asphalt pavement.

2. Use hot-applied joint sealant to seal cracks and joints more than 1/4 inch (6 mm) wide.

Fill flush with surface of existing pavement and remove excess.

3.4 SURFACE PREPARATION

A. General: Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.

32 12 16 8 ASPHALT PAVING

B. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq.

yd. (0.2 to 0.7 L/sq. m).

1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.

Remove spillages and clean affected surfaces.

3.5 HOT-MIX ASPHALT PLACING

A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.

1. Place hot-mix asphalt courses in number of lifts and thicknesses indicated.

2. Spread mix at minimum temperature of 250 deg F (121 deg C).

3. Begin applying mix along centerline of crown for crowned sections and on high side of one-way slopes unless otherwise indicated.

4. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.

B. Place paving in consecutive strips not less than 10 feet (3 m) wide unless infill edge strips of a lesser width are required.

1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete a section of asphalt base course before placing asphalt surface course.

C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.

3.6 JOINTS

A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct joints free of depressions, with same texture and smoothness as other sections of hot-mix asphalt course.

1. Clean contact surfaces and apply tack coat to joints.

2. Offset longitudinal joints, in successive courses, a minimum of 6 inches (150 mm).

3. Offset transverse joints, in successive courses, a minimum of 24 inches (600 mm).

4. Construct transverse joints at each point where paver ends a day's work and resumes work at a subsequent time. Construct these joints using either "bulkhead" or "papered" method according to AI MS-22, for both "Ending a Lane" and "Resumption of Paving Operations."

5. Compact joints as soon as hot-mix asphalt will bear roller weight without excessive displacement.

6. Compact asphalt at joints to a density within 2 percent of specified course density.

32 12 16 9 ASPHALT PAVING

3.7 COMPACTION

A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or with vibratory-plate compactors in areas inaccessible to rollers.

1. Complete compaction before mix temperature cools to 185 deg F (85 deg C).

B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.

C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:

1. Average Density: 96 percent of reference laboratory density according to ASTM D 6927, but not less than 94 percent nor greater than 100 percent.

2. Average Density: 92 percent of reference maximum theoretical density according to ASTM D 2041, but not less than 90 percent nor greater than 96 percent.

D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.

E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment. Bevel edges while asphalt is still hot; compact thoroughly.

F. Repairs: Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness.

G. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.

H. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.

3.8 INSTALLATION TOLERANCES

A. Pavement Thickness: Compact each course to produce the thickness indicated within the following tolerances:

1. Base Course: Plus or minus 1/2 inch (13 mm).

2. Surface Course: Plus 1/4 inch (6 mm), no minus.

32 12 16 10 ASPHALT PAVING

B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot (3-m) straightedge applied transversely or longitudinally to paved areas:

1. Base Course: 1/4 inch (6 mm).

2. Surface Course: 1/8 inch (3 mm).

3. Crowned Surfaces: Test with crowned template centered and at right angle to crown.

Maximum allowable variance from template is 1/4 inch (6 mm).

3.9 PAVEMENT MARKING

A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Contracting Officer.

B. Allow paving to age for 30 days before starting pavement marking.

C. Sweep and clean surface to eliminate loose material and dust.

D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils (0.4 mm).

3.10 FIELD QUALITY CONTROL

A. Testing Agency: Contractor will engage a qualified, independent testing agency to perform tests and inspections.

B. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to ASTM D 3549.

C. Surface Smoothness: Finished surface of each hot-mix asphalt course will be tested for compliance with smoothness tolerances.

D. In-Place Density: Testing agency will take samples of uncompacted paving mixtures and compacted pavement according to ASTM D 979 or AASHTO T 168.

1. Reference maximum theoretical density will be determined by averaging results from four samples of hot-mix asphalt-paving mixture delivered daily to site, prepared according to ASTM D 2041, and compacted according to job-mix specifications.

2. In-place density of compacted pavement will be determined by testing core samples according to ASTM D 1188 or ASTM D 2726.

a. One core sample will be taken for every 1000 sq. yd. (836 sq. m) or less of installed pavement, with no fewer than 3 cores taken.

b. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correlated with ASTM D 1188 or

ASTM D 2726.

32 12 16 11 ASPHALT PAVING

E. Replace and compact hot-mix asphalt where core tests were taken.

F. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.

END OF SECTION 32 12 16

32 13 13 1 CONCRETE PAVING

SECTION 32 13 13 - CONCRETE PAVING – Non Airfield Pavement

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 STANDARD SPECIFICATION

A. Michigan Department of Transportation, Standard Specifications for Construction, 2003.

1.3 SUMMARY

A. Section Includes:

1. Driveways.

2. Roadways.

3. Parking lots.

4. Curbs and gutters.

5. Walks.

B. Related Sections:

1. Section 03 30 00, Cast-in-Place Concrete, for general building applications of concrete.

2. Section 32 13 73, Concrete Paving Joint Sealants, for joint sealants in expansion and contraction joints within concrete paving and in joints between concrete paving and asphalt paving or adjacent construction.

1.4 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, fly ash and other pozzolans, and ground granulated blast-furnace slag.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. LEED Submittals:

1. Refer to Section 01 81 13, Sustainable Design Requirements, for information regarding LEED® submission requirements.

2. The Contractor and/or Subcontractor shall submit the following information under a separate tab for LEED information.

32 13 13 2 CONCRETE PAVING

a. A complete list materials.

b. Material costs for each material listed. Material costs shall not include installation or shipping costs.

c. Location of material manufacturer.

d. Location of material extraction/harvest.

e. Post-consumer and pre-consumer recycled content of each material.

f. Documentation on readymix plants letterhead confirm % of fly-ash used in concrete mix.

C. Shop Drawings: Indicate pavement markings, lane separations, and defined parking spaces.

Indicate, with international symbol of accessibility, spaces allocated for people with disabilities.

D. Samples for Initial Selection: For each type of product, ingredient, or admixture requiring color selection.

E. Other Action Submittals:

1. Design Mixtures: For each concrete paving mixture. Include alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer of detectable warnings, ready-mix concrete manufacturer, and testing agency.

B. Material Certificates: For the following, from manufacturer:

1. Cementitious materials.

2. Steel reinforcement and reinforcement accessories.

3. Fiber reinforcement.

4. Admixtures.

5. Curing compounds.

6. Applied finish materials.

7. Bonding agent or epoxy adhesive.

8. Joint fillers.

C. Material Test Reports: For each of the following:

1. Aggregates. Include service-record data indicating absence of deleterious expansion of concrete due to alkali-aggregate reactivity.

D. Field quality-control reports.

1.7 QUALITY ASSURANCE

A. Detectable Warning Installer Qualifications: An employer of workers trained and approved by manufacturer of stamped concrete paving systems.

32 13 13 3 CONCRETE PAVING

B. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities" (Quality Control Manual - Section 3, "Plant Certification Checklist").

C. Testing Agency Qualifications: Qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.

D. Concrete Testing Service: Engage a qualified testing agency to perform material evaluation tests and to design concrete mixtures.

E. ACI Publications: Comply with ACI 301 (ACI 301M) unless otherwise indicated.

F. Mockups: Build mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Build mockups of full-thickness sections of concrete paving to demonstrate typical joints;

surface finish, texture, and color; curing; and standard of workmanship.

2. Build mockups of concrete paving in the location and of the size indicated or, if not indicated, build mockups where directed by Contracting Officer and not less than 96 inches (2400 mm) by 96 inches (2400 mm).

3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Contracting Officer specifically approves such deviations in writing.

4. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

G. Preinstallation Conference: Conduct conference at Project site.

1. Review methods and procedures related to concrete paving, including but not limited to, the following:

a. Concrete mixture design.

b. Quality control of concrete materials and concrete paving construction practices.

2. Require representatives of each entity directly concerned with concrete paving to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Ready-mix concrete manufacturer.

d. Concrete paving subcontractor.

e. Manufacturer's representative of stamped concrete paving system used for detectable warnings.

32 13 13 4 CONCRETE PAVING

1.8 PROJECT CONDITIONS

A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.

B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F (4.4 deg C) for oil-based materials and 55 deg F (12.8 deg C) for water-based materials, and not exceeding 95 deg F (35 deg C).

PART 2 - PRODUCTS

2.1 FORMS

A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces.

1. Use flexible or uniformly curved forms for curves with a radius of 100 feet (30.5 m) or less. Do not use notched and bent forms.

B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces.

2.2 STEEL REINFORCEMENT

A. Recycled Content: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.

B. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, fabricated from galvanized-steel wire into flat sheets.

C. Epoxy-Coated Welded Wire Reinforcement: ASTM A 884/A 884M, Class A, plain steel.

D. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420); deformed.

E. Epoxy-Coated Reinforcing Bars: ASTM A 775/A 775M or ASTM A 934/A 934M; with ASTM A 615/A 615M, Grade 60 (Grade 420) deformed bars.

F. Steel Bar Mats: ASTM A 184/A 184M; with ASTM A 615/A 615M, Grade 60 (Grade 420), deformed bars; assembled with clips.

G. Epoxy-Coated-Steel Wire: ASTM A 884/A 884M, Class A coated, plain.

H. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60 (Grade 420) plain-steel bars; zinc coated (galvanized) after fabrication according to ASTM A 767/A 767M, Class I coating. Cut bars true to length with ends square and free of burrs.

32 13 13 5 CONCRETE PAVING

I. Epoxy-Coated, Joint Dowel Bars: ASTM A 775/A 775M; with ASTM A 615/A 615M, Grade 60 (Grade 420), plain-steel bars.

J. Tie Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

K. Hook Bolts: ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6), internally and externally threaded. Design hook-bolt joint assembly to hold coupling against paving form and in position during concreting operations, and to permit removal without damage to concrete or hook bolt.

L. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars, welded wire reinforcement, and dowels in place. Manufacture bar supports according to CRSI's "Manual of Standard Practice" from steel wire, plastic, or precast concrete of greater compressive strength than concrete specified, and as follows:

1. Equip wire bar supports with sand plates or horizontal runners where base material will not support chair legs.

2. For epoxy-coated reinforcement, use epoxy-coated or other dielectric-polymer-coated wire bar supports.

M. Epoxy Repair Coating: Liquid, two-part, epoxy repair coating, compatible with epoxy coating on reinforcement.

N. Zinc Repair Material: ASTM A 780.

2.3 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of same type, brand, and source throughout Project:

1. Portland Cement: ASTM C 150, gray portland cement Type II:

a. Fly Ash: ASTM C 618, Class C.

b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.

B. Normal-Weight Aggregates: ASTM C 33, Class 4S, uniformly graded. Provide aggregates from a single source with documented service-record data of at least 10 years' satisfactory service in similar paving applications and service conditions using similar aggregates and cementitious materials.

1. Coarse-Aggregate: Class 6A as specified in Section 902 of the Standard Specifications.

2. Fine Aggregate: Class 2NS as specified in Section 902 of the Standard Specifications.

C. Water: Potable and complying with ASTM C 94/C 94M.

D. Air-Entraining Admixture: ASTM C 260.

E. Chemical Admixtures: Admixtures certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material.

32 13 13 6 CONCRETE PAVING

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Retarding Admixture: ASTM C 494/C 494M, Type B.

3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.

5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.

6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.

2.4 CURING MATERIALS

A. Absorptive Cover: AASHTO M 182, Class 3, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) dry.

B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

C. Water: Potable.

D. Evaporation Retarder: Waterborne, monomolecular, film forming, manufactured for application to fresh concrete.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Axim Italcementi Group, Inc.; Caltexol CIMFILM.

b. BASF Construction Chemicals, LLC; Confilm.

c. ChemMasters; Spray-Film.

d. Conspec by Dayton Superior; Aquafilm.

e. Dayton Superior Corporation; Sure Film (J-74).

f. Edoco by Dayton Superior; BurkeFilm.

g. Euclid Chemical Company (The), an RPM company; Eucobar.

h. Kaufman Products, Inc.; VaporAid.

i. Lambert Corporation; LAMBCO Skin.

j. L&M Construction Chemicals, Inc.; E-CON.

k. Meadows, W. R., Inc.; EVAPRE.

l. Metalcrete Industries; Waterhold.

m. Nox-Crete Products Group; MONOFILM.

n. Sika Corporation, Inc.; SikaFilm.

o. SpecChem, LLC; Spec Film.

p. Symons by Dayton Superior; Finishing Aid.

q. TK Products, Division of Sierra Corporation; TK-2120 TRI-FILM.

r. Unitex; PRO-FILM.

s. Vexcon Chemicals Inc.; Certi-Vex EnvioAssist.

E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Anti-Hydro International, Inc.; A-H Curing Compound #2 DR WB.

b. ChemMasters; Safe-Cure Clear.

32 13 13 7 CONCRETE PAVING

c. Dayton Superior Corporation; Day-Chem Rez Cure (J-11-W).

d. Euclid Chemical Company (The), an RPM company; Kurez W VOX.

e. Kaufman Products, Inc.; Thinfilm 420.

f. Lambert Corporation; AQUA KURE - CLEAR.

g. L&M Construction Chemicals, Inc.; L&M CURE R.

h. Meadows, W. R., Inc.; 1100-CLEAR SERIES.

i. Nox-Crete Products Group; Resin Cure E.

j. SpecChem, LLC; PaveCure Rez.

k. Symons by Dayton Superior; Resi-Chem Clear.

l. Tamms Industries, Inc., Euclid Chemical Company (The); TAMMSCURE

WB 30C.

m. Vexcon Chemicals Inc.; Certi-Vex Enviocure 100.

2.5 RELATED MATERIALS

A. Joint Fillers: ASTM D 1751, asphalt-saturated cellulosic fiber in preformed strips.

B. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.

C. Epoxy Bonding Adhesive: ASTM C 881/C 881M, two-component epoxy resin capable of humid curing and bonding to damp surfaces; of class suitable for application temperature, of grade complying with requirements, and of the following types:

1. Types IV and V, load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.

D. Chemical Surface Retarder: Water-soluble, liquid, set retarder with color dye, for horizontal concrete surface application, capable of temporarily delaying final hardening of concrete to a depth of 1/8 to 1/4 inch (3 to 6 mm).

1. Products: Subject to compliance with requirements, provide one of the following:

a. ChemMasters; Exposee.

b. Conspec by Dayton Superior; Delay S.

c. Dayton Superior Corporation; Sure Etch (J-73).

d. Edoco by Dayton Superior; True Etch Surface Retarder.

e. Euclid Chemical Company (The), an RPM company; Surface Retarder Formula S.

f. Kaufman Products, Inc.; Expose.

g. Meadows, W. R., Inc.; TOP-STOP.

h. Metalcrete Industries; Surftard.

i. Nox-Crete Products Group; CRETE-NOX TA.

j. Scofield, L. M. Company; LITHOTEX Top Surface Retarder.

k. Sika Corporation, Inc.; Rugasol-S.

l. SpecChem, LLC; Spec Etch.

m. TK Products, Division of Sierra Corporation; TK-6000 Concrete Surface Retarder.

n. Unitex; TOP-ETCH Surface Retarder.

o. Vexcon Chemicals Inc.; Certi-Vex Envioset.

32 13 13 8 CONCRETE PAVING

2.6 DETECTABLE WARNING MATERIALS

A. Detectable Warning Stamp: Semirigid polyurethane mats with formed underside capable of imprinting detectable warning pattern on plastic concrete; perforated with a vent hole at each dome.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Advanced Surfaces Inc.

b. Matcrete Precision Stamped Concrete Tools.

c. Southern Color N.A., Inc.

d. Stampcrete International Ltd.

e. Superior Decorative by Dayton Superior.

2. Size of Stamp: One piece 24 by 36 inches (610 by 914 mm).

B. Liquid Release Agent: Manufacturer's standard, clear, evaporating formulation designed to facilitate release of stamp mats.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Advanced Surfaces Inc.; Liquid Release.

b. Matcrete Precision Stamped Concrete Tools; Liquid Release Agent.

c. Southern Color N.A., Inc.; SCC Clear Liquid Release.

d. Stampcrete International Ltd.; Stampcrete Liquid Release.

e. Superior Decorative by Dayton Superior; Pro Liquid Release.

2.7 PAVEMENT MARKINGS

A. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with AASHTO M 248, Type S; colors complying with FS TT-P-1952.

1. Color: As indicated.

2.8 CONCRETE MIXTURES

A. Prepare design mixtures, proportioned according to ACI 301 (ACI 301M), for each type and strength of normal-weight concrete, and as determined by either laboratory trial mixtures or field experience.

1. Use a qualified independent testing agency for preparing and reporting proposed concrete design mixtures for the trial batch method.

2. When automatic machine placement is used, determine design mixtures and obtain laboratory test results that meet or exceed requirements.

B. Proportion mixtures to provide normal-weight concrete with the following properties:

1. Compressive Strength (28 Days): 4000 psi (27.6 MPa).

32 13 13 9 CONCRETE PAVING

2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.45.

3. Slump Limit: 4 inches (100 mm), plus or minus 1 inch (25 mm).

C. Add air-entraining admixture at manufacturer's prescribed rate to result in normal-weight concrete at point of placement having an air content as follows:

1. Air Content: 4-1/2 percent plus or minus 1.5 percent for 1-1/2-inch (38-mm) nominal maximum aggregate size.

2. Air Content: 4-1/2 percent plus or minus 1.5 percent for 1-inch (25-mm) nominal maximum aggregate size.

3. Air Content: 5 percent plus or minus 1.5 percent for 3/4-inch (19-mm) nominal maximum aggregate size.

D. Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.

E. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.

1. Use water-reducing admixture in concrete as required for placement and workability.

2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

F. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. Fly Ash or Pozzolan: 25 percent.

2. Ground Granulated Blast-Furnace Slag: 40 percent.

3. Combined Fly Ash or Pozzolan, and Ground Granulated Blast-Furnace Slag: 40 percent, with fly ash or pozzolan not exceeding 25 percent.

2.9 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M and ASTM C 1116/C 1116M. Furnish batch certificates for each batch discharged and used in the Work.

1. When air temperature is between 85 and 90 deg F (30 and 32 deg C), reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above…