Running QUESTIONS AND ANSWERS.docx

DOCX document 22 KB Posted

Attached to
Notice of Award- W912J6-12-C-0004 for W912J6-12-R-0002 29th Infantry Brigade Combat Team (IBCT) Readiness Center (Project No. PN150043
Solicitation number
W912J6-12-R-0002
Issued by

About this file

Q A as of 11 April 2012

View the file

Other files

File Type Posted
W912J6-12-R-0002_0004_BDE_RC.pdf PDF
W912J6-12-R-0002-0003_AMENDMENT 03_29TH_RC.pdf PDF
General_Decision_Number_.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
Addendum_004.pdf PDF
Running QUESTIONS AND ANSWERS.docx DOCX document
Addendum_003.pdf PDF
A-402 - ENLARGED FLOOR PLANS- RESTROOMS.pdf PDF
A-313-O - ENLARGED PARTIAL BUILDING SECTIONS- AUDITORIUM- OBI-1 CONDITION.pdf PDF
A-611 - DOOR SCHEDULE DOOR AND FRAME TYPES.pdf PDF
I-650 - INTERIOR ROOM FINISH SCHEDULE.pdf PDF
I-651 - INTERIOR FINISH LEGEND.pdf PDF
W912J6-12-R-0002-0002_ADDENDUM 02.pdf PDF
Addendum 002 02APR12.pdf PDF
Running QUESTIONS AND ANSWERS.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
W912J6-12-R-0002-0002_ADDENDUM 02.pdf PDF
W912J6-12-R-0002-0001_ADDENDUM 01.pdf PDF
Addendum 001 30MAR12.pdf PDF
Running QUESTIONS AND ANSWERS as of 5 April 2012.docx DOCX document
Addendum 002 02APR12.pdf PDF
PREPROP_SLIDES_29th_IBCT_Readines_Center 1 .pdf PDF
29th BDE Readiness Center Sign in Sheet.pdf PDF
PREPROP_SLIDES_29th_IBCT_Readines_Center.pptx PPTX presentation
Exhibit C New.docx DOCX document
Exhibit_C_RC.docx DOCX document
QUESTIONS AND ANSWERS.docx DOCX document
EXHIBIT_A_RC 1 .docx DOCX document
Exhibit_D_ _E_RC.docx DOCX document
Exhibit_B_RC.docx DOCX document
Exhibit I TEP Sample.docx DOCX document
EXHIBIT F for forward Pricing.docx DOCX document
W912J6-12-R-0002_BDE_RC_Phase 1.pdf PDF
Exhibit H TEP Calculation.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO:

SOLICITATION W912J6-12-R-0002

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload” Dated 28 Feb 2012

1. Q. How do I access the files/documents for the Project?

A. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation. Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, Defense Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084; or telephone (616) 961-4358, toll free (800) 352-3572; or email jcp-admin@dlis.dla.mil.

2. Q. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2015.

A. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (3 to 5 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.

Dated 05 April 2012

3. Q. On sheet C-124 a 2 foot by 3 foot CONCRETE BOX DRAIN is shown on OPTIONAL BID ITEMS 7, 8, and 9. Is this BOX DRAIN to be part of the Base Bid? If it is not part of the base bid should it be included with its respective OPTIONAL BID ITEM?

A. The box drain is not a portion of the Base Bid. The box drain is to be included in the respective versions of the Optional Bid Items 7, 8, and 9.

4. Q. 2. Final Specifications document - section 013520-(page 11) para

1.6. C.3.d states “The Commissioning Authority (CxA) for this project is provided by the A/E.".

The solicitation document W912J6-12-R-0002_BDE_RC_Phase#1.pdf states:

2.2.1.3.2. Proposal adequately discusses approach and timeline for commissioning. Use of an independent, qualified commissioning agent/firm may receive additional consideration Above two statements contradict each other. Please clarify if the commissioning authority is to be provided by the contractor or government A/E.

A. Government A/e.

Dated 10 April 2012

5. Q. Looking at Drawing A-411 and A-412 : Keynote 1 is for Wood Wall Panel (WD-1). However, WD1 on Interior finish abbreviation on sheet I-651 says that WD-1 is for wood doors.

A. This will be clarified in a forthcoming Addendum.

6.Q. Please provide spec for architectural terra cotta baguette sunshades.

A. Specification Section 045000 – Terra Cotta Panel and Baguette Louver System covers the architectural terra cotta baguette sunshades. This section is included in the Issued for Bid documents.

7.Q. Detail 6/S-511 and 3/A-541 gives conflicting size on shower partition support members. Please clarify.

A. Detail 3/A-541 will be deleted in a forthcoming Addendum.

7.Q. Section 012300 – Optional Bid Items OBI #1 – Price for providing all work in connection with the Auditorium Balcony… Plan Page I-410 shows that there are (2) fixed seats on the first floor that are labeled OBI #1 and in the Tabulation Box, it says that OBI #1 seats for the first floor is 314.

Please verify if there is OBI #1 work on the first floor and, if so, is this work for two seats only?

A. Per Sheet I-410:

- Total Seat Count First Floor Base Bid Condition is 312 seats

- Total Seat Count First Floor OBI#1 Condition is 314 seats.

The following Note will be added in a forthcoming Addendum under the Total Seat Count tabulation:

“OBI #1 – PROVIDE 2 ADDITIONAL SEATS”

The 2 additional seats required for OBI #1 are a result of the different wall elevations that results from the addition of the Balcony.

Dated 11 April 2012

8.Q. Regarding the IBCT Readiness Center Door Schedule:

Doors # 1013I & 1013J appear on the door schedule, but do not appear on the floor plans. I believe these openings are at doors # 1241A & 1242A. Please clarify.

A.

Doors 1013I and 1013J are not in the project. These are Doors 1241A and 1242A respectively.

This will be clarified in a forthcoming Addendum indicating the deletion of doors 1013I and 1013J from the Door Schedule.

9.Q. Please verify the locations for door numbers 1013J and 1012I. Also, verify that doors 1061A, 1062A, 1021A, 1241A, 1242A, 1250C, 1250B, 2051A will be pair doors and type "G". On door schedule they are shown to be single doors with type "C" and on floor plan they are pair doors. Please confirm.

A.

Doors 1013J and 1012I (1013I? – see above) are not in the project.

Doors 1061A, 1062A, 1021A, 1241A, 1242A, 1250C, 1250B, 2051A will be pair doors and type "G‖.

This will be further clarified in a forthcoming Addendum.

10.Q.Regarding Existing Pavements :

Please clarify the thickness of the existing pavements (AC & Concrete) that are to be demolished. Would you provide a specification for Sheet # C-010.

A.

Existing pavement thicknesses can be determined in the review of the Geotechnical Report located in Section 311001 ―Project Soils Report and Logs‖ of the specifications.

General specifications for Sheet C-010 can be found in Section 311000 ―Site Clearing‖, Section 15240 ―Construction Waste Management‖, and Section 17310 ―Cutting and Patching‖.

11.Q. Regarding Section 03300 Cast In Place Concrete, subsection 2.4, A, 2.

The specifications for section 321316 Concrete Paving, allows the use of flyash class “C” or “F” per ASTM C618 but does not indicate if the use of blended cements are allowed per ASTM C595. Will the design team accept ASTM C595 “Standard Specification for Blended Hydraulic Cements”, Type IP for concrete paving as well?

A.

Type IP cement is acceptable for concrete paving.

Section 321316 ―Concrete Paving‖ shall be modified as follows: Per Subsection 2.3 Concrete Materials A.1, Type III cement will not be utilized for this project.

12.Q. Need clarification on Section 102800 – Toilet, Bath & Laundry Accessories; 12.Q. Specs call for one type of mirror Bobrick Model #B-290, which is a framed mirror. The plans are also calling for a “frameless” mirror. Is this mirror a part of this section? If so, what model does the end user require?

A.

Framed mirrors are specified in Section 102800 – TOILET, BATH AND LAUNDRY ACCESSORIES. Framed mirror information is also included in Section 088300 – MIRRORS.

“Frameless” mirrors are specified in Section 088300 – MIRRORS. The “frameless” mirrors are not part of Section 102800 – TOILET AND BATH ACCESSORIES.

13.Q. The plans mention a Soap Dish. There is no spec for this. Please advice.

A.

A recessed soap dish will be added to Specification Section 102800 in a forthcoming Addendum.

14.Q. Plans mention a wall mounted soap dispenser and a lavatory mounted soap dispenser. The specs only mention the wall mounted soap dispenser. What model should I use for the lavatory mounted soap dispenser? Please advice.

A lavatory mounted soap dispenser will be added to Specification Section 102800 in a forthcoming Addendum.

Need Clarification on Section 102113 – Toilet Compartments:

15.Q. Specs call for “Floor-to-Ceiling” style. The plans are asking for “Overhead Braced”. Which style is required?

The specifications are correct. Toilet Compartments are “Floor and Ceiling Anchored”.

16.Q. As you can see, even with numerous guides and specifications, there are no precise guidelines regarding concrete temperatures or discharge times, it is left to the discretion of the purchaser. We are already doing the typical concrete temperature control procedure. The greatest concern on high concrete temperatures is lower strength due to water demand and hydration rates.

We respectful request waiver of the maximum concrete temperature specified. Instead we suggest maximum concrete temperature of 95oF provided the concrete is still workable.

The maximum temperature of concrete shall be increased to 95° F, provided the concrete is workable.

Dated 12 April 2012

17. Q, Reference: Underground Gas Tank

• First of all, we would like to know if an above ground tank is not an option. Underground tanks are difficult to maintain and would still require the same necessary set back requirements that an above ground tank requires. Also Oahu Gas Service (OGS) could rent the LP Gas Tank for the above ground tank. Please confirm.

A.

It is our understanding that an above ground LP Gas Tank presents a greater potential risk to the security and safety of the soldiers utilizing the facility and the building. For example, if an explosive device were detonated in the vicinity of an above ground tank, the explosion would be amplified. We do not recommend installing an above ground LP Gas Tank near this facility. Please bid the below grade LP Gas Tank as specified on the plans.

18. Q. When is the last day to receive questions?

The last day for questions will be 18 April 2012 by COB.