View the file

Other files

File Type Posted
W912J6-12-R-0002_0004_BDE_RC.pdf PDF
W912J6-12-R-0002-0003_AMENDMENT 03_29TH_RC.pdf PDF
General_Decision_Number_.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
Addendum_004.pdf PDF
Running QUESTIONS AND ANSWERS.docx DOCX document
A-402 - ENLARGED FLOOR PLANS- RESTROOMS.pdf PDF
A-313-O - ENLARGED PARTIAL BUILDING SECTIONS- AUDITORIUM- OBI-1 CONDITION.pdf PDF
A-611 - DOOR SCHEDULE DOOR AND FRAME TYPES.pdf PDF
I-650 - INTERIOR ROOM FINISH SCHEDULE.pdf PDF
I-651 - INTERIOR FINISH LEGEND.pdf PDF
W912J6-12-R-0002-0002_ADDENDUM 02.pdf PDF
Addendum 002 02APR12.pdf PDF
Running QUESTIONS AND ANSWERS.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
Running QUESTIONS AND ANSWERS.docx DOCX document
W912J6-12-R-0002-0002_ADDENDUM 02.pdf PDF
W912J6-12-R-0002-0001_ADDENDUM 01.pdf PDF
Addendum 001 30MAR12.pdf PDF
Running QUESTIONS AND ANSWERS as of 5 April 2012.docx DOCX document
Addendum 002 02APR12.pdf PDF
PREPROP_SLIDES_29th_IBCT_Readines_Center 1 .pdf PDF
29th BDE Readiness Center Sign in Sheet.pdf PDF
PREPROP_SLIDES_29th_IBCT_Readines_Center.pptx PPTX presentation
Exhibit C New.docx DOCX document
Exhibit_C_RC.docx DOCX document
QUESTIONS AND ANSWERS.docx DOCX document
EXHIBIT_A_RC 1 .docx DOCX document
Exhibit_D_ _E_RC.docx DOCX document
Exhibit_B_RC.docx DOCX document
Exhibit I TEP Sample.docx DOCX document
EXHIBIT F for forward Pricing.docx DOCX document
W912J6-12-R-0002_BDE_RC_Phase 1.pdf PDF
Exhibit H TEP Calculation.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIARNG Kalaeloa Readiness Center (RC) W90FY-Q-09-D-0006-9N02

Kalaeloa, Hawaii PN 150043

Addendum 003

16 April 2012 Page 1

ADDENDUM 003

16 April 2012

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents, Amendment No. 1, Addendum 001 and Addendum 002 as noted below. Acknowledge receipt of this

Addendum in the space provided in the Bid Form. Failure to do so may subject Bidder to disqualification.

This Amendment consists of 11 pages including all attachments noted herein.

MODIFICATIONS TO DRAWINGS:

1) Sheet S-511 – FLOOR FRAMING SECTIONS AND DETAILS

a. Details 6/S-511 and 7/A-511: Revise “L2 x 2 x 3/16 CONT.” to L2 x 3 x 3/16 CONT. LLV”.

2) Sheet A-101A – FIRST FLOOR PLAN – SECTOR A

Sheet A-102A – SECOND FLOOR PLAN – SECTOR A

Sheet A-402 – ENLARGED FLOOR PLANS – RESTROOMS

a. Wall modified and door deleted and replaced by toilet partition and toilet partition door at entrance to HC Showers:

i. RM. 1181 – MEN’S HC SHOWER #1

ii. RM. 1191 – WOMEN’S HC SHOWER #1

iii. RM. 2161 – MEN’S HC SHOWER #2

iv. RM. 2171 – WOMEN’S HC SHOWER #2

3) Sheet A-111A – FIRST FLOOR REFLECTED CEILING PLAN – SECTOR A

Sheet A-111B – FIRST FLOOR REFLECTED CEILING PLAN – SECTOR B

Sheet A-112A – SECOND FLOOR REFLECTED CEILING PLAN – SECTOR A

Sheet A-112B – SECOND FLOOR REFLECTED CEILING PLAN – SECTOR B

Sheet A-421 – ENLARGED REFLECTED CEILING PLAN - AUDITORIUM, FIRST FLOOR -

BASE BID CONDITION

Sheet A-421.O – ENLARGED REFLECTED CEILING PLAN - AUDITORIUM, FIRST

FLOOR - OBI #1 CONDITION

Sheet A-422 – ENLARGED REFLECTED CEILING PLAN - AUDITORIUM, SECOND

FLOOR -BASE BID CONDITION

Sheet A-422.O – ENLARGED REFLECTED CEILING PLAN - AUDITORIUM, SECOND

FLOOR - OBI #1 CONDITION

Sheet A-423– ENLARGED REFLECTED CEILING PLANS – COMMAND SUITE

Sheet A-424– ENLARGED REFLECTED CEILING PLANS – COMMAND SUITE

Sheet A-425– ENLARGED REFLECTED CEILING PLANS – CLASSROOMS

Sheet A-426– ENLARGED REFLECTED CEILING PLANS – CLASSROOMS

16 April 2012 Page 2

Revise REFLECTED CEILING PLAN KEYNOTES Legend as follows:

a. Keynote 15, revise to read: “LINEAR WOOD CEILINGS, WDC1, @ 10’-0”AFF, WITH

3/8” REVEALS BETWEEN WDC1 PANELS & SOFFIT PERIMETER, UNLESS

NOTED OTHERWISE.”

b. Keynote 17, revise to read: “LINEAR WOOD CEILINGS, WDC1, @ 28’-4”AFF, WITH

3/8” REVEALS BETWEEN WDC1 PANELS & SOFFIT PERIMETER, UNLESS

NOTED OTHERWISE.”

c. Keynote 20, revise to read: “LINEAR WOOD CEILINGS, WDC1, @ 27’-4”AFF, WITH

3/8” REVEALS BETWEEN WDC1 PANELS & SOFFIT PERIMETER, UNLESS

NOTED OTHERWISE.”

d. Keynote 24, revise to read: “LINEAR WOOD CEILINGS, WDC1, @ 9’-4”AFF, WITH

3/8” REVEALS BETWEEN WDC1 PANELS & SOFFIT PERIMETER, UNLESS

NOTED OTHERWISE.”

e. Keynote 27, revise to read: “FABRIC WRAPPED CEILING PANEL FCP1, @ 27’-11”

AFF DIRECT MOUNTED TO PAINTED GYP. BD. CEILING, PT3, @ 28’-1 1/4" AFF.

4) Sheet A-313.O – ENLARGED BUILDING SECTIONS – AUDITORIUM – OBI#1

CONDITION

a. See attached Sheet A-313.O for modifications described below.

b. Detail 2/A-313.O: revise note “ACOUSTICAL WOOD PANEL, AWP1, OVER 3/4"

PLYWOOD ON 3-5/8” METAL STUD FRAMING – ALL EXPOSED EDGES TO BE

FACTORY FINISHED” to read “ACOUSTICAL WOOD PANEL, AWP2, OVER 3/4"

PLYWOOD ON 3-5/8” METAL STUD FRAMING – ALL EXPOSED EDGES TO BE

FACTORY FINISHED”.

c. Detail 5/A-313.O: revise note “STONE CAP SET IN CONTINUOUS BED OF

ADHESIVE” to read “3 CM STONE CAP, ST1, SET IN CONTINUOUS BED OF

ADHESIVE”. Revise note “ACOUSTICAL WOOD PANEL, AWP1, OVER 3/4"

PLYWOOD ON 3-5/8” METAL STUD FRAMING – ALL EXPOSED EDGES TO BE

FACTORY FINISHED” to read “ACOUSTICAL WOOD PANEL, AWP2, OVER 3/4"

PLYWOOD ON 3-5/8” METAL STUD FRAMING – ALL EXPOSED EDGES TO BE

FACTORY FINISHED”.

d. Detail 7/A-313.O: revise note “STONE CAP SET IN CONTINUOUS BED OF

ADHESIVE” to read “3 CM STONE CAP, ST1, SET IN CONTINUOUS BED OF

ADHESIVE”.

e. Detail 10/A-313.O: revise note “STONE CAP SET IN CONTINUOUS BED OF

ADHESIVE” to read “3 CM STONE CAP, ST1, SET IN CONTINUOUS BED OF

ADHESIVE”. Revise note “ACOUSTICAL WOOD PANEL, AWP1, OVER 3/4"

PLYWOOD ON 3-5/8” METAL STUD FRAMING – ALL EXPOSED EDGES TO BE

FACTORY FINISHED” to read “ACOUSTICAL WOOD PANEL, AWP2, OVER 3/4"

PLYWOOD ON 3-5/8” METAL STUD FRAMING – ALL EXPOSED EDGES TO BE

FACTORY FINISHED”.

5) Sheet A-314.O – ENLARGED PARTIAL BUILDING SECTIONS – AUDITORIUM – OBI #1

a. Detail 3/A-314.O: revise note “STONE WALL CAP – SEE INTERIOR DRAWINGS

FOR ADDITIONAL INFORMATION” to read “3 CM STONE WALL CAP, ST1.”

16 April 2012 Page 3

6) Sheet A-322 – WALL SECTIONS

a. Revise WALL SECTION 2/A322 detail note to read:

“HIGH IMPACT, ACOUSTICAL FABRIC-WRAPPED WALL PANEL (FWP3)”

7) Sheet A-401 – TYPICAL RESTROOM, SHOWER DETAILS AND ACCESSORY SCHEDULE

Sheet A-402 – ENLARGED FLOOR PLANS – RESTROOMS

a. TOILET ACCESSORY SCHEDULE, revise MARK 23, DESCRIPTION to read:

“TOILET STALL, FLOOR AND CEILING ANCHORED – ACCESSIBLE”.

b. TOILET ACCESSORY SCHEDULE, revise MARK 24, DESCRIPTION to read:

“TOILET STALL, FLOOR AND CEILING ANCHORED – STANDARD”.

c. TOILET ACCESSORY SCHEDULE, add MARK 28, DESCRIPTION to read:

“H/C SHOWER STALL PARTITION AND DOOR”.

8) Sheet A-401 – TYPICAL RESTROOM, SHOWER DETAILS AND ACCESSORY SCHEDULE

a. Detail 3/A-401, revise Detail reference 3/A-541 to 6/S-511.

9) Sheet A-402 – ENLARGED FLOOR PLANS – RESTROOMS

a. Details 4/A-402 and 8/A-402 revised to indicate modified wall and door deleted, replaced by toilet partition and partition door at entrance to HC Showers – see attached Sheet A-

402.

10) Sheet A-406 – ENLARGED FLOOR PLANS

a. Detail 1/A-406 PARTIAL ENLARGED FLOOR PLAN, remove NOTE: “SCHEDULED

CORNER GUARD”

11) Sheet A-411 – INTERIOR ELEVATIONS – LOBBY

Sheet A-412 – INTERIOR ELEVATIONS – LOBBY

Sheet A-413 – INTERIOR ELEVATIONS – AUDITORIUM - BASE BID CONDITION

Sheet A-413.O – INTERIOR ELEVATIONS – AUDITORIUM - OBI #1 CONDITION

Sheet A-414 – INTERIOR ELEVATIONS – ASSEMBLY HALL

Sheet A-415 – INTERIOR ELEVATIONS – ASSEMBLY HALL

Sheet A-416 – INTERIOR ELEVATIONS

Revise KEYNOTES Legend as follows:

a. Keynote 1, revise to read: “WOOD WALL PANEL (WDP1) SEE DETAIL 1/I-651.

b. Keynote 2, revise to read: “WOOD WALL PANEL (WDP2) SEE DETAIL 2/I-651.

c. Keynote 26, revise to read: “WOOD WALL PANEL (WDP3) SEE DETAIL 1/I-651.

12) Sheet A-413.O – INTERIOR ELEVATIONS – AUDITORIUM – OBI #1 CONDITION

a. Detail 3/A413.O: WD2 hatch at balcony to be adjusted to read as WD3 finish.

16 April 2012 Page 4

13) Sheet A-541 – CEILING DETAILS

a. Delete Detail 3/A-541

14) Sheet A-611 – DOOR SCHEDULE:

a. See attached Sheet A-611 – DOOR SCHEDULE for modifications described below.

b. Delete Door 1013I and Door 1013J from the Door Schedule. These doors are not in the project.

c. Delete Doors 1181A, 1191A, 2161A and 2171A. These doors are being revised to toilet par-titions.

d. Add Door EL1:

i. Name – ELEVATOR

ii. Width – 3’-6”

iii. Height – 7’-0”

iv. Door Type – STL

v. Door Type – L

vi. Fire Rating – 90 MIN.

e. Doors 1000A, 1000C: Add remark “4”.

f. Doors 1017A, 1100A, 1220A, 2180A: Delete “45 MIN.” Fire Rating.

g. Doors 1060A, 2030A, 2050A, 2060A, 2070A, 2130A, 2210A, 2220A:

Revise Door Type from “D” to “C”.

h. Doors 1021A, 1061A, 1062A, 1241A, 1242A, 2051A:

Revise Door Type from “C” to “G”; delete “45 MIN.” Fire Rating.

i. Door 1120A: Revise Room Name from “CORRIDOR” to “WOMEN #2.

j. Doors 1201A, 1202A: Revise Door Width from “4’-4”” to “3’-6””.

k. Door 1240A: Revise Door Type from “C” to “E”.

l. Door 1247A: Revise Room Name from “CORRIDOR” to JAN. CLOS.”

m. Doors 2000A, 2000B: Revise Door Type from “G” to “H”.

n. Doors 1250B, 1250C: Revise Door Type from “C” to “H”; delete “45 MIN.” Fire Rating.

o. Door 2041A: Add Door Type “C”.

p. Doors 2131A and 2132A, delete bubble and reference to OBI#1. These doors are not includ-ed in the scope of OBI#1.

q. Doors 2140A and 2140B Add bubble and reference to OBI#1. These doors are included in the scope of OBI#1.

r. Door 2150A: Revise Room Name from “CORRIDOR” to “JAN. CLOS.”; revise Door

Height from “7’-0”” to “8’-10””.

s. Door Schedule Remarks: Revise Remark 4 to read: “FIELD VERIFY OVERALL FRAME

DIMENSIONS – PROVIDE 3’-0” WIDE DOOR IF POSSIBLE”.

t. Door General Notes:

i. Renumber Door General Note “4” to “5”.

ii. Revise Door Note 3 to read: “GLASS IN DOOR PANEL AND SIDELIGHT TO BE

TEMPERED GLASS TYP.”

iii. Add new Door Note 4 to read: “GLAZING FOR LIGHTS IN FIRE RATED DOORS

TO BE FIRE RATED GLASS TYP. AS REQUIRED TO MEET DOOR RATING”.

u. Door Types: Delete “TYPE “D” – SINGLE FLUSH W/ GLASS. This Door Type is no long-er applicable to the project.

16 April 2012 Page 5

15) Sheet I-410 – AUDITORIUM SEATING DIAGRAMS

a. Revise Total Seat Count TABLE FIRST FLOOR to read as follows;

“TOTAL SEAT COUNT

FIRST FLOOR

- BASE BID 312

- OBI#1 – ADDITIONAL SEATS REQ’D 2

OBI# 1 CONDITION – TOTAL SEATS 314

NOTE OBI #1 CONDITION – TOTAL SEATS INCLUDES BASE BID SEATING PLUS 2

ADDITIONAL SEATS FOR OBI#1”

16) Sheet I-650 – INTERIOR ROOM FINISH SCHEDULE

a. Interior Finish Abbreviations Legend: Add “WDP WOOD WALL PANEL”.

b. Room Finish Schedule: Adjust wall finishes from WD2, WD3, WD4 to WDP1, WDP2, WDP3 according to revised drawings.

17) Sheet I-651 – INTERIOR ROOM FINISH LEGEND

a. Interior Finish Abbreviations Legend: Add “WDP WOOD WALL PANEL”.

b. Add “DETAIL GENERAL NOTE” to 1/I-651 to read:

“1. WOOD WALL PANEL, WDP1, TO USE WD2 VENEER FINISH.

2. WOOD WALL PANEL, WDP3, TO USE WD3 VENEER FINISH.”

c. Adjust NOTES in the middle panel on detail 2/I-651 “SOLID WOOD EDGE – WD3” to read

“SOLID WOOD EDGE – WD2”. “WOOD VENEER – WD3” to read “WOOD VENEER –

WD4”. Refer revised drawings for further details.

d. On INTERIOR FINISH LEGEND add #6 to “NOTE” column on STT4 finish item.

MODIFICATIONS TO SPECIFICATIONS:

1) Specification Section 033000 – CAST-IN-PLACE CONCRETE:

a. Revise the first sentence in 3.9.F.1 to read:

“Maintain concrete temperature below 95 deg F at time of placement.”

b. The rest of 3.9.F.1 remains intact and is unchanged.

2) Specification Section 045000 – TERRA COTTA PANEL AND BAGUETTE LOUVER

SYSTEM:

a. Revise 1.2.B.2 to read: “Extruded hollow terra cotta baguette/louvers – includes items indicated as terra cotta baguette sunshades on the Drawings.

3) Specification Section 10280 – TOILET, BATH AND LAUNDRY ACCESSORIES:

a. Revise “2.3.G – Liquid Soap Dispenser” to read “2.3.G – Wall Mounted Liquid Soap

Dispenser”.

16 April 2012 Page 6

b. Add “2.3.J – Lavatory Mounted Liquid Soap Dispenser” to read:

“J. Lavatory Mounted Liquid-Soap Dispenser:

1. Basis-of-Design Product: Bobrick #B-8226

2. Description: Designed for dispensing soap in liquid or lotion form.

3. Mounting: Deck mounted on lavatory.

4. Capacity: 34 oz.

5. Materials:

i. Piston, Spout and Top Cover: Type 304 stainless steel with bright polished finish.

ii. Container: Translucent shatter resistant polyethylene.”

c. Add “2.3.K – Soap Dish” to read:

“K. Soap Dish:

1. Basis-of-Design Product: Bobrick #B- 4390.

2. Description: With washcloth bar.

3. Mounting: Recessed

4. Material and Finish: Stainless steel, No. 4 finish (satin).”

4) Specification Section 321316 – CONCRETE PAVING:

a. Revise 2.3.A.1 to read:

“1. Portland Cement: ASTM C 150 Type 1.”

ATTACHMENTS:

1) Sheet A-313.O – ENLARGED BUILDING SECTIONS – AUDITORIUM – OBI#1

2) Sheet A-402 – ENLARGED FLOOR PLANS – RESTROOMS

3) Sheet A-611 – DOOR SCHEDULE

4) Sheet I-650 – INTERIOR ROOM FINISH SCHEDULE

5) Sheet I-651 – INTERIOR ROOM FINISH LEGEND

END OF ADDENDUM 003