W912HV-22-R-0003-am0003 Revised SPECS.pdf

PDF 2 MB Posted

Attached to
PA00109 DoDEA Replace Kinnick High School, Commander Fleet Activities (CFA), Yokosuka, Japan
Solicitation number
W912HV-22-R-0003
Issued by

About this file

This document provides details for a federal contract opportunity to construct a new high school in Yokosuka, Japan. The project involves building a four-story, 14,700 square meter high school building along with site work including athletic fields and infrastructure. Construction will be sequenced over multiple phases. The contract will be a firm-fixed-price awarded using lowest-priced technically acceptable procedures. Only local Japanese sources registered and licensed to perform construction in Japan will be considered. The period of performance is anticipated to be 47 months.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 106 PAGES

DoDEA Replace Kinnick High School

01 11 00.00 10 SD-01 Preconstruction Submittals

1.10Initial Site Conditions Photos

1.6 GKey Personnel Qualifications

1.9.2Conformed Drawings Submittal

1.9.3 GINDOOR AIR QUALITY (IAQ)

MANAGEMENT PLAN

SD-07 Certificates

1.10Monthly Progress Photos

SD-11 Closeout Submittals

1.10Construction Completion Photos

01 20 00 SD-07 Certificates

3.2 GBill Of Lading

3.2 GBill Of Lading

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

1.8.1 GSubmittal Register Monthly

Update

01 33 29 SD-01 Preconstruction Submittals

1.4 GQualifications for the

Sustainability Professional

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 106 PAGES

01 33 29 3.1.1 GSustainability Implementation

Plan

01 35 26 SD-01 Preconstruction Submittals

1.7.2.2 GStandard Lift Plan

1.7 GAccident Prevention Plan (APP)

1.7.2.3 GCritical Lift Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.3 GCrane Operators/Riggers

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 106 PAGES

01 45 35 3.1.1Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Certificate of Compliance

1.5.16 GSpecial Inspector of Record

1.5 GSpecial Inspector

SD-11 Closeout Submittals

3.1.1Interim Final Report

2.1 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

3.3.2 GTemporary Utility Connections

Plan

01 57 19 SD-01 Preconstruction Submittals

1.9 GEnvironmental Protection Plan

1.8.3 GEnvironmental Manager

Qualifications

3.11 GWritten Assessment Of Friable

Asbestos Disturbance

SD-06 Test Reports

3.8.2.1 GSolid Waste Management Report

3.7.2Nonhazardous Solid Waste

Diversion Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 106 PAGES

01 57 19 1.7.1 GAsbestos Certification

1.7.2 GLead Certification

SD-11 Closeout Submittals

3.8.3.4 GDisposal Documentation for

Hazardous and Regulated Waste

1.8.4 GAssembled Employee Training

Records

3.8.2.1 GSolid Waste Management Report

3.8.3.1 GHazardous Waste/Debris

Management

1.11Environmental Records Binder

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.7.1 GWarranty Management Plan

1.7.5Warranty Tags

3.8Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 106 PAGES

01 78 00 SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1 GAs-Built Record of Equipment

and Materials

3.6 GAs-Built Record of Equipment

and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

3.9 GInterim DD FORM 1354

3.9 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

1.7.1Lead Commissioning Specialist

1.7.2Technical Commissioning

Specialists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 106 PAGES

01 91 00.15 1.7Commissioning Firm's Contract

SD-06 Test Reports

3.1.3 GDesign Review Report

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.2 GFinal Construction Phase

Commissioning Plan

3.1.5.2 GPre-Functional Checklists

1.9Issues Log

3.2 GCommissioning Report

3.3.1 GPost-Construction Trend Log

Report

SD-07 Certificates

1.10 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 GTraining Plan

3.1.6Training Attendance Rosters

3.1.7 GSystems Manual

3.1.8Maintenance and Service Life

Plans

SD-11 Closeout Submittals

3.1.2.1 GConstruction Phase

Commissioning Plan

3.2 GFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 106 PAGES

02 41 00 1.2.1 GDemolition Plan

1.8Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.3Receipts

02 61 13 SD-03 Product Data

1.2 GWork Plan

3.6 GClosure Report

02 82 00 SD-03 Product Data

1.2.2Amended Water

1.3.9Safety Data Sheets (SDS) for All

Materials

2.1Encapsulants

3.1.2.1Respirators

3.1.7Local Exhaust Equipment

3.1.7Pressure Differential Automatic

Recording Instrument

3.1.8Vacuums

3.1.10Glovebags

SD-06 Test Reports

1.5.6Air Sampling Results

1.5.7Pressure Differential Recordings for Local Exhaust System

3.2.12.2Encapsulation Test Patches

3.2.14.5Clearance Sampling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 106 PAGES

02 82 00 3.3.3.2Asbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4Employee Training

1.3.5Notifications

1.3.7Respiratory Protection Program

1.3.10Asbestos Hazard Abatement Plan

1.3.11Testing Laboratory

1.3.12Landfill Approval

1.3.12Delivery Tickets

1.3.12Waste Shipment Records

1.3.13Transporter Certification

1.3.14Medical Certification

1.5.2Private Qualified Person

Documentation

1.5.3Competent Person

1.5.4Worker's License

1.5.5Contractor's License

2.1Encapsulants

3.1Equipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3Water Filtration Equipment

3.1.8Vacuums

3.1.8Ventilation Systems

SD-11 Closeout Submittals

1.3.5Permits[ and Licenses]

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 106 PAGES

02 82 00 1.3.5Notifications

1.3.7.1Respirator Program Records

1.5.9Protective Clothing

Decontamination Facility

Notification

1.7.1Rental Equipment

1.3.12.1Records

02 83 00 SD-01 Preconstruction Submittals

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.4Medical Examinations

1.5.2.8Lead, Cadmium, Chromium

Waste Management Plan

1.5.4Licenses, Permits and

Notifications

1.5.5Occupant Protection Plan

3.4.1.1Initial Sample Results

3.5.2.1Written Evidence of TSD

Approval

1.5.2.2Lead, Cadmium, Chromium

Compliance Plan

3.1.1.6Lead, Cadmium, Chromium

Compliance Plan

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 106 PAGES

02 83 00 1.6.7Negative Air Pressure System

2.1Materials and Equipment

2.1.1Expendable Supplies

3.1.1.5Local Exhaust Equipment

3.1.1.5Pressure Differential Automatic

Recording Instrument

3.1.1.6Pressure Differential Log

SD-06 Test Reports

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.3Sampling Results

1.5.3Pressure Differential Recordings

For Local Exhaust System

SD-07 Certificates

3.1.1.1Occupant Notification

3.1.1.1 GNotification of the

Commencement of [LBP] Hazard

Abatement

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

02 84 16 SD-01 Preconstruction Submittals

1.4.7Notification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 106 PAGES

02 84 16 1.4.1.1PCB and Lamp Management and

Disposal Plan

SD-11 Closeout Submittals

3.5.5Transporter certification

3.2.4Certification of Decontamination

3.5.3Copy E of the Japan Hazardous

Waste Manifest

3.5.6.2Disposal Request Form

3.3.1Signed Ballast Turn-in (at Bldg

3625) Sheet

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.9 GLaboratory Accreditation

SD-02 Shop Drawings

2.1Formwork

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.1Formwork Materials

2.6 SReinforcement

Part 2 SRecycled Content

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.6.2Mechanical Reinforcing Bar

Connectors

2.4.6Vapor Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 106 PAGES

03 30 00 2.2.2Water Stop Materials and Splices

1.6.3.2Pumping Concrete

1.6.3.3Finishing Plan

SD-04 Samples

1.6.5.1Slab Finish Samples

1.6.5.2Surface Finish Samples

1.6.5.3Sample Wall Panels

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.10.2.1Tolerance Report

3.13.2.3 GCompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete

3.13.2.6Chloride Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.3.2Water

3.15.2 GGas Pressure Welded Splice

SD-07 Certificates

2.6.1Reinforcing Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 106 PAGES

03 30 00 1.8Welder Qualifications

1.6.3.4VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

2.2.2Waterstops

3.4Waterstops

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5 SJoint Sealants

2.4.1Curing Compound

03 31 01.00 10 SD-03 Product Data

1.2 GConcrete Mix Designs

2.2 GBatch Plant

2.2.3Concrete Mixers

3.1.4 GConstruction Joint Treatment

3.2.1 GCold-Weather Requirements

3.2.2 GHot-Weather Requirements

1.4.1 GCementitious Materials, Admixtures, and Curing

Compound

2.1.6Nonshrink Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 106 PAGES

03 31 01.00 10 2.1.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

3.3Tests and Inspections

SD-07 Certificates

1.4Concrete Field Testing

Technicians

1.4Concrete Construction Inspector

(CCI)

2.1.1Cementitious Materials

SD-08 Manufacturer’s Instructions

1.4.1Curing Compound

03 33 00 SD-02 Shop Drawings

1.4.1Detail Drawings

SD-04 Samples

2.1Materials

1.4.2Panels

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1Hot Weather Procedures

1.5.2Cold Weather Procedures

2.2.2.2.1Cement

2.4.1.1Cementitious Materials

SD-05 Design Data

2.1.2Masonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 106 PAGES

04 20 00 SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.3Prism Tests

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.1Bar Positioners

2.6.2Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

04 23 00 SD-03 Product Data

2.1.1Glass Masonry Units

2.2.2Water Repellent Additive or

Admixture

SD-04 Samples

2.1.1Glass Masonry Units

SD-07 Certificates

2.1.1Glass Masonry Units

2.2.2Water Repellent Additive or

Admixture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 106 PAGES

04 23 00 2.2.1Mortar

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 106 PAGES

05 12 00 2.3.3Tension Control Bolts

2.1 SRecycled Content

SD-05 Design Data

1.4.2 GShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

1.3MLIT Structural Steel Fabricator

Quality Certification

1.3MLIT Structural Steel Erector

Quality Certification

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.3 GFabrication Drawings

SD-03 Product Data

Part 2 SRecycled Content

2.1 SRecycled Content

SD-04 Samples

2.1.1Metal Roof Deck Units

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 106 PAGES

05 30 00 2.1 GDeck Units

SD-07 Certificates

1.3.2Welder Qualifications

1.3.2Welding Procedures

1.3.1Manufacturer's Certificate

05 50 13 SD-02 Shop Drawings

2.3Cover Plates and Frames

2.4Separation Joint Covers

2.7Bollards/Pipe Guards

2.12Fall Protection Anchor System

2.9Gridiron Components

2.10Metal Plank Ceiling

2.13Aluminum Fence and Gates

3.14Aluminum Fence and Gates

SD-03 Product Data

2.3Cover Plates and Frames

2.4Separation Joint Covers

2.6Floor Gratings

2.8Angles and Plates

2.11Roof Hatches

2.5Separation Joint Compression

Seal

2.12Fall Protection Anchor System

2.9Gridiron Components

2.10Metal Plank Ceiling

2.13Aluminum Fence and Gates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 106 PAGES

05 50 13 3.14Aluminum Fence and Gates

SD-04 Samples

2.4Separation Joint Covers

2.5Separation Joint Compression

Seal

2.10Metal Plank Ceiling

2.13Aluminum Fence and Gates

3.14Aluminum Fence and Gates

05 51 00 SD-02 Shop Drawings

2.2.1Metal Stair System

SD-03 Product Data

2.4.1Structural-Steel Plates, Shapes, and Bars

2.4.2Structural-Steel Tubing

2.3.2Concrete Inserts

2.2.3Protective Coating

2.2.2Steel Pan Stairs

2.3.1Steel Stairs

Part 2 SRecycled Content

SD-07 Certificates

1.3.1Welding Procedures

1.3.1 GWelder Qualification

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00-B (AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 106 PAGES

05 51 33 2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1Fabrication Drawings

SD-03 Product Data

1.2.1Steel Railings and Handrails

2.2.1Aluminum Handrails with Resin

Finish

1.2.1Anchorage and Fastening

Systems

SD-07 Certificates

1.4.1Welding Procedures

1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-03 Product Data

2.2.1Recovered Lumber

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.8.1Certified Sustainably Harvested

Wood

1.7Preservative Treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 106 PAGES

06 10 00 SD-10 Operation and Maintenance

Data

3.3Take-back Program

06 20 00 SD-02 Shop Drawings

1.3Detail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

1.5FRP and Accessories

2.3FRP and Accessories

1.5Resin Panels

2.4Resin Panels

1.5Wood Ceiling Grilles

2.6Wood Ceiling Grilles

1.5Wood Plank Ceiling

2.5Wood Plank Ceiling

06 41 16.00 10 SD-02 Shop Drawings

1.5Shop Drawings

2.9Shop Drawings

1.5Installation

3.1Installation

SD-04 Samples

2.3 GPlastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.4.1Quality Assurance

06 61 16 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 106 PAGES

06 61 16 1.5.2Detail Drawings

3.1Installation

SD-03 Product Data

2.1Solid Polymer Material

SD-06 Test Reports

2.1Solid Polymer Material

SD-10 Operation and Maintenance

Data

3.2Clean-up

SD-11 Closeout Submittals

1.3LEED Documentation

06 61 17 SD-02 Shop Drawings

1.4.2Detail Drawings

3.1Installation

SD-03 Product Data

1.4.1Solid homogeneous quartz material

2.1Solid homogeneous quartz material

1.4.1Qualifications

2.3Fabrications

1.4.3Certification

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 106 PAGES

06 61 17 1.4.1Solid homogeneous quartz material

2.1Solid homogeneous quartz material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 12 00 SD-03 Product Data

2.1.1Asphalt primer coat

2.1.2Asphalt roofing layer

2.1.3Asphalt stretch roofing

2.1.4Asphalt compound

SD-06 Test Reports

2.1Asphalt waterproofing system

SD-08 Manufacturer’s Instructions

3.3Application

07 13 53 SD-03 Product Data

1.3Manufacturer's Standard Details

2.4Protection Board

1.4Primers, Adhesives, and Mastics

SD-06 Test Reports

3.6Protective Covering

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 106 PAGES

07 13 53 1.4Protective Coverings

1.8Special Warranties

1.8Special Warranties

SD-08 Manufacturer’s Instructions

1.4Primers, Adhesives, and Mastics

07 21 13 SD-03 Product Data

1.3Manufacturer's Standard Details

2.2Board Insulation

2.3Accessories

SD-07 Certificates

2.2Board Insulation

SD-08 Manufacturer’s Instructions

2.2Board Insulation

2.3.1Adhesive

07 21 16 SD-03 Product Data

2.2Blanket Insulation

2.4Curtain Wall Insulation

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 22 00 SD-02 Shop Drawings

1.3Insulation Board Layout

SD-03 Product Data

2.2Insulation

1.4Cover Board

2.6Fasteners

2.5Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 106 PAGES

07 22 00 2.4.1Asphalt

SD-06 Test Reports

1.8.1Flame Spread Rating

SD-07 Certificates

1.9Volatile Organic Compounds

(VOC) Content

1.6Installer Qualifications

1.6Certificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.5Adhesives

2.6Fasteners

2.2Insulation

07 27 26 SD-01 Preconstruction Submittals

1.7.1Qualifications of Manufacturer

1.7.2Qualifications of Installer

SD-02 Shop Drawings

1.3Fluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.3Fluid-Applied Membrane Air

Barrier

2.3Primers, Adhesives, and Mastics

2.7Reinforcement

1.3.2Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 106 PAGES

07 27 26 2.1Volatile Organic Compound

(VOC) Content

SD-04 Samples

1.3.3Mockup

SD-06 Test Reports

1.5Capillary Moisture Test

1.3.4Field Peel Adhesion Test

1.3.4Flame Propagation of Wall

Assemblies

1.3.4Flame Spread and Smoke

Developed Index Ratings

3.4.1Site Inspections

SD-07 Certificates

1.3Fluid-Applied Membrane Air

Barrier

2.4Transition Membrane

1.7.1Qualifications of Manufacturer

1.7.2Qualifications of Installer

SD-08 Manufacturer’s Instructions

1.3Fluid-Applied Membrane Air

Barrier

2.4Transition Membrane

2.3Primers, Adhesives, and Mastics

07 32 13 SD-02 Shop Drawings

1.5.2Clay tile roofing system

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 106 PAGES

07 32 13 2.1.1Clay tile

SD-04 Samples

2.1.1Clay tile

SD-07 Certificates

1.5.1Qualifications

07 41 63 SD-01 Preconstruction Submittals

1.4.1Qualification of Manufacturer

1.4.1Qualification of Installer

1.4.1Qualifications for Welding

1.4.1Work Plan

1.4.1On-Site Inspection and

Acceptance Procedure

SD-02 Shop Drawings

1.4.1Roofing Panels

1.4.1Flashing and Accessories

1.4.1Gutter/Downspout Assembly

SD-03 Product Data

1.4.1Coil Stock

1.4.1Factory Color Finish

1.4.1Closure Materials

1.4.1Sealants and Caulking

1.4.1Galvanizing Repair Paint

1.4.1Accessories

SD-04 Samples

1.4.1Coil Stock

1.4.1Roofing Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 106 PAGES

07 41 63 2.3.1.2Fasteners

2.5.1Metal Closure Strips

1.4.1Manufacturer's Color Charts and

Chips

SD-05 Design Data

1.4.1Wind Design Analysis

1.4.1Seismic Design Analysis

SD-06 Test Reports

3.4.1.2Leakage Tests

3.1Coatings and Base Metals of

Metal Roofing

1.4.1Factory Finish and Color

Performance Requirements

1.4.1Wind Uplift Test Report

1.4.1Seismic Test Report

SD-07 Certificates

1.4.1Coil Stock

2.3.1.2Fasteners

1.4.1Galvanizing Repair Paint

1.4.1Safety Data Sheets

SD-08 Manufacturer’s Instructions

1.4.1Installation of Roof Panel

Assemblies

SD-11 Closeout Submittals

1.7Warranty

3.3.5Information Form and Placard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 106 PAGES

07 41 63 3.4.2Manufacturer's Field Inspection

Reports

1.4.1Application Instructions

3.6.2Date of Installation Wall-Mounted

Placard

07 52 00 SD-02 Shop Drawings

1.4.6Roof plan

SD-03 Product Data

2.2Modified Bitumen Sheets

2.2Fiberglass Felt

2.5Primer

2.6Modified Bitumen Roof Cement

2.8Fasteners And Plates

1.9Warranty

SD-07 Certificates

1.4.4Fire Resistance

SD-11 Closeout Submittals

1.9Warranty

3.8Information Card

3.7Instructions To Government

Personnel

07 56 00 SD-03 Product Data

2.1Fluid-applied roof membrane

2.2.1Primer

2.2.3Top coat surfacing aggregate

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 106 PAGES

07 56 00 1.4.4Random tests

SD-07 Certificates

1.4.1Qualifications Of Manufacturer

1.4.2Qualifications Of Applicator

SD-09 Manufacturer’s Field

Reports

1.7Manufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.10Warranty

3.12Information Card

3.11Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

3.1.11Gutters

3.1.12Downspouts

3.1.16Expansion Joints

3.1.10Gravel Stops and fascia

3.1.13Flashing for Roof Drains

3.1.17Flashing at Roof Penetrations and Equipment Supports

3.1.14Scuppers

3.1.19Copings

3.1.15Conductor Heads

SD-08 Manufacturer’s Instructions

3.5Quality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 106 PAGES

07 81 00 SD-03 Product Data

3.3Fireproofing Material

SD-06 Test Reports

1.2.2Fire Resistance Rating

3.6Field Tests

1.2.3Evaluation Reports

07 84 00 SD-02 Shop Drawings

2.1Firestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3Inspection

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond Breakers

2.4Backstops

3.1Field Adhesion Test

SD-07 Certificates

1.4.1Indoor Air Quality

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.6 GFrames

2.6 GFrames

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 106 PAGES

08 11 13 2.1 GDoors

2.6 GFrames

2.4 GAccessories

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor, Frame and Window Wall

Assembly

SD-03 Product Data

1.5.1Door, Frame and Window Wall

Assembly

SD-05 Design Data

1.5.2 GDesign Data

1.2.1 GCalculations

SD-06 Test Reports

1.2.2Air Infiltration

1.2.3Water Penetration

SD-10 Operation and Maintenance

Data

1.5.3Adjustments, Cleaning, and

Maintenance

08 14 00 SD-02 Shop Drawings

2.1Doors

SD-03 Product Data

2.1 GDoors

2.2 GAccessories

2.3.7 GWater-resistant Sealer

1.5 GWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 106 PAGES

08 14 00 2.1.2 GSound Reduction Index (Rw)

Rating

2.1.3 GFire Resistance Rating

SD-04 Samples

2.1Doors

2.3.6.2Door Finish Colors

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.2.4 GAccessories

08 32 13 SD-02 Shop Drawings

2.1Aluminum sliding/folding glass doors

SD-03 Product Data

2.1Aluminum sliding/folding glass doors

2.1.1Hardware

2.1.2Glazing

2.1.3Weatherstripping

2.1.4Finish

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 106 PAGES

08 32 13 2.1Aluminum sliding/folding glass doors

08 33 13 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data

1.5 GWarranty

2.1 GRolling Counter Doors

3.1 GInstallation

3.3 GCleaning

SD-10 Operation and Maintenance

Data

2.1 GRolling Counter Doors

SD-11 Closeout Submittals

2.3 GRolling Counter Door

(Non-Rated)

08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

2.2.1.4Bottom Bars

2.1.1.1Guides

2.2.3.1Mounting Brackets

2.2.1.8Overhead Drum

3.3.2Hood

2.1.1.1 GInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 106 PAGES

08 33 23 2.2.1 GOverhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

SD-04 Samples

2.2.5 GSurface Finishing

SD-05 Design Data

2.2.1Overhead Coiling Doors

2.2.2Hardware

2.2.3Counterbalancing Mechanism

2.2.4Manual Door Operators

SD-10 Operation and Maintenance

Data

3.3.2Operation and Maintenance

Manuals

3.3.2Materials

3.3.2Devices

3.3.2Procedures

3.3.2Manufacture's Brochures

3.3.2Parts Lists

SD-11 Closeout Submittals

3.3.1Warranty

08 34 73 SD-02 Shop Drawings

2.1 GHollow Metal Sound Retardant

Doors

2.1 GDoor Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 106 PAGES

08 34 73 2.1 GAcoustical Windows

SD-03 Product Data

2.1 GHollow Metal Sound Retardant

Doors

2.1 GDoor Frames

2.1Door Hardware

2.1Vision Panels

2.1Thresholds

2.1 GAcoustical Windows

SD-06 Test Reports

2.4.3 GAcoustical Tests

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1List of Product Installations

SD-02 Shop Drawings

3.3 GInstallation Drawings

2.2Fabrication Drawings

SD-03 Product Data

1.2.1Manufacturer's Catalog Data

2.2.3Finish

SD-05 Design Data

1.8 GDesign Data

SD-06 Test Reports

1.2.1Certified Test Reports

3.4.3Deflection

3.4.1Air Infiltration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 106 PAGES

08 41 13 3.4.4Condensation Resistance and

Thermal Transmittance

3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.6Manufacturer's Product Warranty

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.4.1Hardware

1.7Window Performance

2.1.5Weatherstripping

2.2.4Accessories

SD-10 Operation and Maintenance

Data

2.1Windows

08 60 45 SD-02 Shop Drawings

3.2 GShop Drawings

SD-03 Product Data

2.2Translucent Panels

1.6Warranty

SD-06 Test Reports

2.2Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 106 PAGES

08 62 00 SD-02 Shop Drawings

3.2 GShop Drawings

SD-03 Product Data

2.1.1 GSkylight

1.6Warranty

1.7.1 G LMaterials

SD-07 Certificates

2.1.1Skylight

1.4Qualifications

08 71 00 SD-02 Shop Drawings

1.3Manufacturer's Detail Drawings

1.5 GHardware Schedule

2.3.7 GKeying System

SD-03 Product Data

2.3Hardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5Hardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.7.1 GInsulating Glass

2.3.1.1Sealants

2.3.2Joint Backer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 106 PAGES

08 81 00 SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

2.1.3One-Way Vision Glass

(Transparent Mirrors)

1.7.2Monolithic Opacified Spandrel

08 91 00 SD-02 Shop Drawings

1.4 GWall louvers

1.5 GWall louvers

SD-03 Product Data

2.2 GMetal Wall Louvers

SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

2.4.1bronze anodized

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

SD-03 Product Data

2.1Metal Support Systems

09 29 00 SD-03 Product Data

2.1.1Gypsum Board

2.1.5Cementitious Backer Units

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 106 PAGES

09 29 00 2.1.2Water-Resistant Gypsum Board

2.1.4Abuse Resistant Gypsum Board

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

09 30 10 SD-03 Product Data

2.1Tile

2.2Setting-Bed

2.4Mortar and Grout

SD-10 Operation and Maintenance

Data

3.3Installation

09 51 00 SD-02 Shop Drawings

2.1Detail Drawings

SD-03 Product Data

2.2Acoustical Units

09 64 66 SD-02 Shop Drawings

2.2Hardwood Strip Flooring

SD-03 Product Data

2.2Hardwood Strip Flooring

SD-04 Samples

2.3.1Strip Flooring

2.3.3Flexible Foam Underlayment

SD-07 Certificates

1.3.1Indoor Air Quality

SD-08 Manufacturer’s Instructions

2.2System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 106 PAGES

09 64 66 3.2.1Adhesive

SD-10 Operation and Maintenance

Data

2.3.1Strip Flooring

09 65 00 SD-03 Product Data

2.12Resilient Flooring and

Accessories

1.4.1.1Adhesives, Caulking and

Sealants

2.1Sheet Vinyl Flooring

2.2Luxury Vinyl Tile

2.3Rubber Tile

2.4Wall Base

2.6Stair Treads and Risers

SD-10 Operation and Maintenance

Data

2.12Resilient Flooring and

Accessories

09 65 66 SD-03 Product Data

3.3Installation

SD-04 Samples

1.3.7 GFlooring

SD-06 Test Reports

1.3.3Laboratory Test Results

1.6Warranty

09 68 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 106 PAGES

09 68 00 3.4Installation Drawings

SD-03 Product Data

2.1Carpet

2.4Moldings

2.1.2Physical Characteristics

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.6Warranty

09 72 00 SD-03 Product Data

2.1Wallcoverings and Accessories

2.9Primer and Adhesive

SD-04 Samples

2.1Wallcoverings and Accessories

SD-07 Certificates

2.1Wallcoverings and Accessories

SD-08 Manufacturer’s Instructions

2.1Wallcoverings and Accessories

SD-10 Operation and Maintenance

Data

2.1Wallcoverings and Accessories

SD-11 Closeout Submittals

1.2LEED Documentation

09 84 20 SD-02 Shop Drawings

2.5Approved Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 106 PAGES

09 84 20 SD-03 Product Data

3.2Installation

2.3Acoustical Wall Panels

2.5Acoustical Wall Panels

SD-04 Samples

2.3Acoustical Wall Panels

2.5Acoustical Wall Panels

SD-07 Certificates

2.3Acoustical Wall Panels

2.5Acoustical Wall Panels

SD-11 Closeout Submittals

1.5Warranty

09 90 00 SD-02 Shop Drawings

3.9Piping Identification

SD-03 Product Data

2.1Manufacturer's Technical Data

Sheets

SD-08 Manufacturer’s Instructions

3.5Application

3.5.2Mixing

SD-10 Operation and Maintenance

Data

1.3.1.1Coatings

10 11 00 SD-03 Product Data

1.2Visual Display Board

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 106 PAGES

10 11 00 2.1.3Aluminum

2.1.1Porcelain Enamel

2.1Materials

SD-07 Certificates

1.2Visual Display Board

10 14 00.10 SD-02 Shop Drawings

3.1Detail Drawings

SD-03 Product Data

3.1Installation

2.1Dimensional Building Letters

2.2Electronic LED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .