About this file
This document provides details for a federal contract solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Japan is seeking a contractor to construct a new four-story high school located at Commander Fleet Activities in Yokosuka, Japan, along with associated site work including athletic fields, parking, and infrastructure. The high school is anticipated to be approximately 14,700 square meters and include classrooms, labs, administrative offices, and other required facilities. The contract will be awarded on a firm-fixed-price basis to the lowest priced technically acceptable offeror in accordance with the solicitation's evaluation criteria. Proposals are due on the date specified in the solicitation, which is available on SAM.gov. Offerors must be authorized to conduct business and perform construction work in Japan and comply with all relevant Japanese laws and regulations.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL:
A. WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE BUILDING CODE AS STATED BELOW. HOWEVER, WHERE
REFERENCE IS MADE TO PERFORMANCE CONFORMING TO OTHER STANDARDS THE MORE STRINGENT SHALL APPLY.
1. INTERNATIONAL BUILDING CODE, 2015 EDITION.
2. UNIFIED FACILITIES CRITERIA 3-301-01 STRUCTURAL ENGINEERING DATED 12 SEPTEMBER 2016 WITH CHANGE 3
3. UNIFIED FACILITIES CRITERIA 3-310-04 SEISMIC DESIGN OF BUILDINGS DATED 20 JUNE 2016 WITH CHANGE 1
B. THE CONTRACTOR SHALL COMPARE ALL THE CONTRACT DOCUMENTS WITH EACH OTHER AND REPORT IN WRITING
TO THE CONTRACTING OFFICER ALL INCONSISTENCIES AND OMISSIONS.
C. COORDINATE WORK WITH ARCHITECTURAL DRAWINGS AND ALL OTHER CONTRACT DOCUMENTS PRIOR TO
CONSTRUCTION OF STRUCTURAL ELEMENTS.
D. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD CONDITIONS AND SHALL COMPARE SUCH
FIELD MEASUREMENTS AND CONDITIONS WITH THE DRAWINGS BEFORE COMMENCING WORK. REPORT IN WRITING
TO THE CONTRACTING OFFICER ALL INCONSISTENCIES AND OMISSIONS.
E. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR METHODS OF CONSTRUCTION, WORKMANSHIP AND JOB SAFETY.
THE CONTRACTOR SHALL PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED FOR STABILITY OF
STRUCTURAL MEMBERS AND SYSTEMS.
G. CONSTRUCTION LOADING SHALL NOT EXCEED DESIGN LIVE LOAD UNLESS SPECIAL SHORING IS PROVIDED.
ALLOWABLE LOADS SHALL BE REDUCED IN AREAS WHERE THE STRUCTURE HAS NOT ATTAINED FULL DESIGN
STRENGTH.
H. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF THE ADJACENT PROPERTIES, STRUCTURES, STREETS AND UTILITIES DURING THE CONSTRUCTION PERIOD.
I. DETAILS NOTED AS TYPICAL ON THE STRUCTURAL DRAWINGS SHALL APPLY IN ALL CONDITIONS UNLESS
SPECIFICALLY SHOWN OR NOTED.
DESIGN CRITERIA:
A. DESIGN LOAD CRITERIA BASED ON THE FOLLOWING
1. UNIFIED FACILITIES CRITERIA 3-301-01 STRUCTURAL ENGINEERING DATED 12 SEPTEMBER 2016 WITH CHANGE 3
2. UNIFIED FACILITIES CRITERIA 3-310-04 SEISMIC DESIGN OF BUILDINGS DATED 20 JUNE 2016 WITH CHANGE 1
3. INTERNATIONAL BUILDING CODE , 2015 EDITION
4. ASCE 7-10
B. DEAD LOADS:
1. DEAD LOADS INCLUDE THE WEIGHT OF MATERIALS INTO CONSTRUCTION OF THE BUILDING INCLUDING ROOFS, CEILINGS, PARTITIONS, AND FIXED SERVICE EQUIPMENT.
2. PARTITIONS (SEISMIC): 0.5 KPA (10 PSF)
C. LIVE LOADS (FOR LOCATIONS SEE SHEETS S-003 THRU S-008):
1. ROOF: 1.0 KPA (20 PSF) (REDUCIBLE WHERE PERMITTED BY CODE)
2. CLASSROOMS: 1.9 KPA (40 PSF) (REDUCIBLE WHERE PERMITTED BY CODE)
3. OFFICES: 2.4 KPA (50 PSF) (REDUCIBLE WHERE PERMITTED BY CODE)
4. LIBRARIES
a. STACK ROOMS: 7.2 KPA (150 PSF)
b. READING ROOMS: 2.9 KPA (60 PSF)
5. GYMNASIUMS AND BLEACHERS: 4.8 KPA (100 PSF)
6. STAIRS AND BALCONIES: 4.8 KPA (100 PSF)
7. CORRIDORS
a. CORRIDORS (ABOVE FIRST FLOOR): 3.8 KPA (80 PSF)
b. CORRIDORS (AT FIRST FLOOR): 4.8 KPA (100 PSF)
8. TOILET ROOMS: 3.6 KPA (75 PSF)
9. ASSEMBLY AREAS: 4.8 KPA (100 PSF)
10. DINING ROOMS: 4.8 KPA (100 PSF)
11. MECHANICAL / ELECTRICAL ROOMS
a. GENERAL: 4.8 KPA (100 PSF)
b. HVAC: 6.0 KPA (125 PSF)
12. STORAGE ROOM: 6.0 KPA (125 PSF)
13. PARTITION LOAD: 0.7 KPA (15 PSF)
D. ROOF SNOW LOADS
1. HIGH SCHOOL BUILDING
a. GROUND SNOW: P g = 0.57 KPA (12 PSF)
b. SNOW EXPOSURE FACTOR: C e = 1.0
c. ICE FACTOR: I i = 1.25
d. SNOW LOAD IMPORTANCE FACTOR: I s = 1.10
e. THERMAL FACTOR: C t = 1.0
f. FROST PENETRATION FACTOR 152 MM (6 INCHES)
2. CENTRAL PLANT
a. GROUND SNOW: P g = 0.57 KPA (12 PSF)
b. SNOW EXPOSURE FACTOR: C e = 1.0
c. ICE FACTOR: I i = 1.0
d. SNOW LOAD IMPORTANCE FACTOR: I s = 1.0
e. THERMAL FACTOR: C t = 1.0
f. FROST PENETRATION FACTOR 152 MM (6 INCHES)
3. BRIGG'S BAY ATHLETIC FIELD - FIELD HOUSE, DUGOUTS AND STORAGE STRUCTURE
a. GROUND SNOW: P g = 0.57 KPA (12 PSF)
b. SNOW EXPOSURE FACTOR: C e = 1.0
c. ICE FACTOR: I i = 1.0
d. SNOW LOAD IMPORTANCE FACTOR: I s = 1.0
e. THERMAL FACTOR: C t = 1.0
f. FROST PENETRATION FACTOR 152 MM (6 INCHES)
E. WIND DESIGN DATA
1. HIGH SCHOOL BUILDING
a. RISK CATEGORY: III
b. ULTIMATE DESIGN WIND SPEED: V ult = 218 KM/H (135 MPH)
c. NOMINAL DESIGN WIND SPEED: V asd = 168 KM/H (105 MPH)
d. EXPOSURE CATEGORY: D
e. BUILDING ENCLOSURE CLASSIFICATION: ENCLOSED
f. INTERNAL PRESSURE COEFF: GC pi = +/-0.18
g. COMPONENTS AND CLADDING DESIGN WIND PRESSURE: VARIES
2. CENTRAL PLANT
a. RISK CATEGORY: II
b. ULTIMATE DESIGN WIND SPEED: V ult = 203 KM/H (126 MPH)
c. NOMINAL DESIGN WIND SPEED: V asd = 157 KM/H (98 MPH)
d. EXPOSURE CATEGORY: D
e. BUILDING ENCLOSURE CLASSIFICATION: ENCLOSED
f. INTERNAL PRESSURE COEFF: GC pi = +/-0.18
g. COMPONENTS AND CLADDING DESIGN WIND PRESSURE: VARIES
3. BRIGG'S BAY ATHLETIC FIELD - FIELD HOUSE, DUGOUTS, AND STORAGE STRUCTURE
a. RISK CATEGORY: II
b. ULTIMATE DESIGN WIND SPEED: V ult = 203 KM/H (126 MPH)
c. NOMINAL DESIGN WIND SPEED: V asd = 157 KM/H (98 MPH)
d. EXPOSURE CATEGORY: D
e. BUILDING ENCLOSURE CLASSIFICATION: ENCLOSED
f. INTERNAL PRESSURE COEFF: GC pi = +/-0.18
g. COMPONENTS AND CLADDING DESIGN WIND PRESSURE: VARIES
F. EARTHQUAKE DESIGN DATA
1. HIGH SCHOOL BUILDING - CLASSROOM WING
a. RISK CATEGORY: III
b. IMPORTANCE FACTOR: I e = 1.25
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS
i. SHORT PERIOD: S s = 1.96g
ii. 1-SEC PERIOD: S 1 = 0.93g
d. SPECTRAL RESPONSE COEFFICIENTS
i. SHORT PERIOD: S DS = 1.18g
ii. 1-SEC PERIOD: S D1 = 1.49g
e. SEISMIC DESIGN CATEGORY: E
f. BASIC SEISMIC-FORCE-RESISTING SYSTEM: BUILDING FRAME SYSTEM - SPECIAL REINFORCED CONCRETE
SHEAR WALLS (NON-BEARING)
g. DESIGN BASE SHEAR: V = C s x W
h. SEISMIC RESPONSE COEFFICIENT: C s = 0.25
i. RESPONSE MODIFICATION FACTOR: R = 6
j. ANALYSIS PROCEDURE: MODAL RESPONSE SPECTRUM ANALYSIS
k. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS
i. COMPONENT IMPORTANCE FACTOR:
1) EGRESS STAIRS AND FIRE SPRINKLERS: Ip = 1.5
2) ALL OTHER ITEMS: Ip = 1.0
2. HIGH SCHOOL BUILDING - MUSIC/GYM WING
a. RISK CATEGORY: III
b. IMPORTANCE FACTOR: I e = 1.25
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS
i. SHORT PERIOD: S s = 1.96g
ii. 1-SEC PERIOD: S 1 = 0.93g
d. SPECTRAL RESPONSE COEFFICIENTS
i. SHORT PERIOD: S DS = 1.18g
ii. 1-SEC PERIOD: S D1 = 1.49g
e. SEISMIC DESIGN CATEGORY: E
f. BASIC SEISMIC-FORCE-RESISTING SYSTEM: BUILDING FRAME SYSTEM - SPECIAL REINFORCED CONCRETE
SHEAR WALLS
g. DESIGN BASE SHEAR: V = C s x W
h. SEISMIC RESPONSE COEFFICIENT: C s = 0.29
i. RESPONSE MODIFICATION FACTOR: R = 5
j. ANALYSIS PROCEDURE: MODAL RESPONSE SPECTRUM ANALYSIS
k. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS
I. COMPONENT IMPORTANCE FACTOR:
1) EGRESS STAIRS AND FIRE SPRINKLERS: Ip = 1.5
2) ALL OTHER ITEMS: Ip = 1.0
3. CENTRAL PLANT
a. RISK CATEGORY: II
b. IMPORTANCE FACTOR: I e = 1.00
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS
i. SHORT PERIOD: S s = 1.96g
ii. 1-SEC PERIOD: S 1 = 0.93g
d. SPECTRAL RESPONSE COEFFICIENTS
i. SHORT PERIOD: S DS = 1.18g
ii. 1-SEC PERIOD: S D1 = 1.49g
e. SEISMIC DESIGN CATEGORY: E
f. BASIC SEISMIC-FORCE-RESISTING SYSTEM: BUILDING FRAME SYSTEM - SPECIAL REINFORCED CONCRETE
SHEAR WALLS (NON-BEARING)
g. DESIGN BASE SHEAR: V = C s x W
h. SEISMIC RESPONSE COEFFICIENT: C s = 0.20
i. RESPONSE MODIFICATION FACTOR: R = 6
j. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
k. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS
i. COMPONENT IMPORTANCE FACTOR: Ip = 1.0
4. BRIGGS BAY ATHLETIC FIELD - FIELD HOUSE AND DUGOUTS
a. RISK CATEGORY: II
b. IMPORTANCE FACTOR: I e = 1.00
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS
i. SHORT PERIOD: S s = 1.96g
ii. 1-SEC PERIOD: S 1 = 0.93g
d. SPECTRAL RESPONSE COEFFICIENTS
i. SHORT PERIOD: S DS = 1.18g
ii. 1-SEC PERIOD: S D1 = 1.49g
e. SEISMIC DESIGN CATEGORY: E
f. BASIC SEISMIC-FORCE-RESISTING SYSTEM: BUILDING FRAME SYSTEM - SPECIAL REINFORCED CONCRETE
SHEAR WALLS (NON-BEARING)
g. DESIGN BASE SHEAR: V = C s x W
h. SEISMIC RESPONSE COEFFICIENT: C s = 0.20
i. RESPONSE MODIFICATION FACTOR: R = 6
j. ANALYSIS PROCEDURE: EQUIVALENT LATER FORCE PROCEDURE
k. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS
i. COMPONENT IMPORTANCE FACTOR: Ip = 1.0
5. BRIGGS BAY ATHLETIC FIELD - STORAGE STRUCTURE
a. RISK CATEGORY: II
b. IMPORTANCE FACTOR: I e = 1.00
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS
i. SHORT PERIOD: S s = 1.96g
ii. 1-SEC PERIOD: S 1 = 0.93g
d. SPECTRAL RESPONSE COEFFICIENTS
i. SHORT PERIOD: S DS = 1.18g
ii. 1-SEC PERIOD: S D1 = 1.49g
e. SEISMIC DESIGN CATEGORY: E
f. BASIC SEISMIC-FORCE-RESISTING SYSTEM: BUILDING FRAME SYSTEM - SPECIAL REINFORCED CONCRETE
SHEAR WALLS (BEARING)
g. DESIGN BASE SHEAR: V = C s x W
h. SEISMIC RESPONSE COEFFICIENT: C s = 0.24
i. RESPONSE MODIFICATION FACTOR: R = 5
j. ANALYSIS PROCEDURE: EQUIVALENT LATER FORCE PROCEDURE
k. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS
i. COMPONENT IMPORTANCE FACTOR: Ip = 1.0
G. SOILS DATA
1. HIGH SCHOOL BUILDING
a. SITE CLASS: E
b. PHC PILES (IMPACT DRIVEN)
i. 400MM DIA.: 75 METRIC TONS [735 kN] (165 KIPS)
ii. 500MM DIA.: 115 METRIC TONS [1125 kN] (253 KIPS)
iii. 600MM DIA.: 169 METRIC TONS [1655 kN] (372 KIPS)
c. EARTH PRESSURES (LEVEL BACKFILL)
i. PASSIVE: 5600 KG/M³ (350 PCF) ON PILE CAPS
2. CENTRAL PLANT
a. SITE CLASS: E
b. ALLOWABLE BEARING: 48 KN/M² (1000 PSF)
c. SUBGRADE MODULUS: 31,400 KN/M3 (200 KCF)
d. EARTH PRESSURES
i. PASSIVE: 5600 KG/M³ (350 PCF)
e. COEFFICIENT OF FRICTION: V = 0.35
3. BRIGGS BAY ATHLETIC FIELD - FIELD HOUSE, BLEACHERS / PRESS BOX, DUGOUTS, AND STORAGE STRUCTURE
a. SITE CLASS: E
b. ALLOWABLE BEARING: 48 KN/M² (1000 PSF)
c. SUBGRADE MODULUS: 31,400 KN/M3 (200 KCF)
d. EARTH PRESSURES
i. PASSIVE: 5600 KG/M³ (350 PCF)
e. COEFFICIENT OF FRICTION: V = 0.35
4. RETAINING WALLS AT WALKWAY BETWEEN HIGH SCHOOL SITE AND BRIGGS BAY SITE
a. SITE CLASS: E
b. ALLOWABLE BEARING: 48 KN/M² (1000 PSF)
c. EARTH PRESSURES (LEVEL BACKFILL)
i. ACTIVE (UNRESTRAINED): 480 KG/M³ (30 PCF)
ii. PASSIVE: 4800 KG/M³ (300 PCF)
iii. SEISMIC: N/A, ALL WALLS ARE LESS THAN 6'-0"
d. COEFFICIENT OF FRICTION: V = 0.30
5. LIGHT POLES AT BRIGGS BAY ATHLETIC FIELD
a SHEAR STRENGTH (COHESION)
i. UPPER 3.5M (11.5 FT): C = 3660 KN/M2 (750 PSF)
ii. BELOW 3.5M (11.5 FT): C = 1220 KN/M2 (250 PSF)
b. WET UNIT WEIGHT OF SOIL: 1600 KN/M3 (100 PCF)
H. ANTI-TERRORISM (AT) DESIGN, UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS WITH
CHANGE 1, DATED 19 AUGUST 2020
1. HIGH SCHOOL BUILDING - CLASSROOM WING
a. BUILDING CATEGORY: PRIMARY GATHERING / LOW OCCUPANCY AT MECHANICAL ROOMS
b. UNOBSTRUCTED SPACE: 16M UNLESS NOTED OTHERWISE, SEE SHEET GI132
2. HIGH SCHOOL BUILDING - MUSIC / GYM WING
a. BUILDING CATEGORY: PRIMARY GATHERING
b. UNOBSTRUCTED SPACE: 16M UNLESS NOTED OTHERWISE, SEE SHEET GI132
3. CENTRAL PLANT
a. BUILDING CATEGORY: LOW OCCUPANCY
b. ANTI-TERRORISM NOT REQUIRED PER UFC 4-010-01 SECTION 1-6
4. BRIGGS BAY ATHLETIC FIELD - FIELD HOUSE
a. BUILDING CATEGORY: INHABITED
b. UNOBSTRUCTED SPACE: 16M UNLESS NOTED OTHERWISE, SEE SHEET GI132
5. BRIGGS BAY ATHLETIC FIELD - DUGOUTS AND STORAGE STRUCTURE
a. BUILDING CATEGORY: LOW OCCUPANCY
b. ANTI-TERRORISM NOT REQUIRED PER UFC 4-010-01 SECTION 1-6
I. PROGRESSIVE COLLAPSE DESIGN DATA
1. HIGH SCHOOL BUILDING - CLASSROOM WING
a. NUMBER OF STORIES: 2 AND 4 STORIES (PROGRESSIVE COLLAPSE FOR 4-STORY AREA ONLY). DESIGN OF
THE 4-STORY AREA IS IN ACCORDANCE WITH UFC 4-023-03, 1603.1.9 DATED 01 NOVEMBER 2016 WITH
CHANGE 3. FUTURE ADDITIONS OR ALTERATIONS SHALL NOT JEOPARDIZE THE REQUIREMENTS FOR
PROGRESSIVE COLLAPSE.
b. RISK (OCCUPANCY) CATEGORY: III
c. ANALYSIS METHOD: ALTERNATE PATH METHOD AND ENHANCED LOCAL RESISTANCE (ELR)
d. ANALYSIS PROCEDURE: LINEAR STATIC PROCEDURE
e. PERFORMANCE LEVEL: LIFE SAFETY
f. BUILDING TYPE: CONCRETE SHEAR WALLS WITH STIFF DIAPHRAGMS
g. PUBLIC ACCESS: CONTROLLED ACCESS
2. HIGH SCHOOL BUILDING - MUSIC / GYM WING
a. NUMBER OF STORIES: 1 STORY
b. PROGRESSIVE COLLAPSE NOT REQUIRED PER UFC 4-010-01 SECTION 3.7
3. CENTRAL PLANT
a. PROGRESSIVE COLLAPSE NOT REQUIRED FOR LOW OCCUPANCY PER UFC 4-010-01 SECTION 1-9
4. BRIGGS BAY ATHLETIC FIELD - FIELD HOUSE, DUGOUTS, AND STORAGE STRUCTURE
a. NUMBER OF STORIES: 1 STORY
b. PROGRESSIVE COLLAPSE NOT REQUIRED PER UFC 4-010-01 SECTION 3.7
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
7/ /2 :1 7:
A M
/2
/2
:1
:0
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-001
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
G E N E R A L N O T E S
B M
J T
J M
J U L Y
P A -B N E W S -0
S -0
CONCRETE:
A. CONCRETE CONSTRUCTION SHALL CONFORM TO AMERICAN CONCRETE INSTITUTE ACI 318/318M AND JIS A-5308
READY-MIXED CONCRETE.
B. CONCRETE SHALL BE REGULAR WEIGHT HARD ROCK CONCRETE AND SHALL HAVE THE FOLLOWING MINIMUM 28
DAY COMPRESSIVE STRENGTHS:
1. PILES: 85 MPA
2. PILE CAPS: 27 MPA
3. PILE CAP BUILD UPS: 36 MPA (SEE DETAIL B5/S-602)
4. WALLS, BEAMS, COLUMNS AND SUSPENDED SLABS (CLASSROOM WING ONLY): 36 MPA
5. WALLS, BEAMS, COLUMNS AND SUSPENDED SLABS (ALL OTHER BUILDINGS): 27 MPA
6. SPREAD FOOTINGS , WALL FOOTINGS, GRADE BEAMS, TIE BEAMS AND MAT SLABS: 27 MPA
7. SLAB-ON-GRADE: 27 MPA
8. ALL OTHER CONCRETE: 27 MPA
C. CONCRETE DELIVERY TICKETS SHALL RECORD ALL FREE WATER IN THE MIX: AT BATCHING BY PLANT, FOR
CONSISTENCY BY DRIVER, AND ANY ADDITIONAL REQUEST BY CONTRACTOR IF PERMITTED BY THE MIX DESIGN.
D. WATER USED IN MIXING CONCRETE SHALL BE CLEAN AND FREE FROM INJURIOUS AMOUNTS OF OILS, ACIDS, ALKALIS, SALTS, ORGANIC MATERIALS OR OTHER SUBSTANCES THAT ARE DELETERIOUS TO CONCRETE OR STEEL
REINFORCEMENT.
E. FREQUENCY OF CONDUCTING STRENGTH TESTS SHALL BE AS FOLLOWS:
1. SAMPLES FOR STRENGTH OF EACH CLASS OF CONCRETE PLACED EACH DAY SHALL BE TAKEN NOT LESS
THAN ONCE A DAY, NOR LESS THAN ONCE FOR EACH 115 CUBIC METERS OF CONCRETE, NOR LESS THAN
ONCE FOR EACH 465 SQUARE METERS OF SURFACE AREA FOR SLABS OR WALLS.
2. IF THE TOTAL VOLUME OF CONCRETE IS SUCH THAT THE FREQUENCY OF TESTING WOULD PROVIDE LESS
THAN FIVE STRENGTH TESTS FOR A GIVEN CLASS OF CONCRETE, TESTS SHALL BE MADE FROM AT LEAST
FIVE RANDOMLY SELECTED BATCHES OR FROM EACH BATCH IF FEWER THAN FIVE BATCHES ARE USED.
F. ALL INSERTS, ANCHOR BOLTS, PLATES, AND OTHER ITEMS TO BE CAST IN THE CONCRETE SHALL BE HOT-DIPPED
GALVANIZED ACCORDING TO JIS H8641 UNLESS OTHERWISE NOTED.
G. REINFORCING BARS, ANCHOR BOLTS, INSERTS, AND OTHER ITEMS TO BE CAST IN THE CONCRETE SHALL BE
SECURED IN POSITION PRIOR TO PLACEMENT OF CONCRETE.
H. CONDUITS, PIPES, AND SLEEVES PASSING THROUGH A SLAB OR FOOTING AND NOT CONFORMING TO TYPICAL
DETAILS SHALL BE LOCATED AND SUBMITTED TO THE ARCHITECT FOR APPROVAL.
I. CONDUITS, PIPES, AND SLEEVES EMBEDDED WITHIN A SLAB OR WALL (OTHER THAN THOSE MERELY PASSING
THROUGH) SHALL SATISFY THE FOLLOWING:
1. NO LARGER IN OUTSIDE DIMENSIONS THAN 1/3 THE OVERALL THICKNESS OF BEAM, SLAB, OR WALL IN WHICH
THEY ARE EMBEDDED.
2. CONDUITS, PIPES, AND SLEEVES SHALL NOT BE PLACED THROUGH OR EMBEDDED IN A BEAM UNLESS
SPECIFICALLY DETAILED.
3. SPACED NO CLOSER THAN 3 DIAMETERS OR WIDTHS ON CENTER.
4. PLACED IN THE MIDDLE 1/3 OF SLAB OR WALL THICKNESS.
J. THE CONTRACTOR SHALL LOCATE CONSTRUCTION JOINTS SO AS NOT TO IMPAIR THE STRENGTH OF THE
STRUCTURE AND TO MINIMIZE SHRINKAGE STRESSES. SUBMIT LOCATION OF CONSTRUCTION JOINTS TO THE
CONTRACTING OFFICER FOR APPROVAL, UNLESS OTHERWISE NOTED.
K. SEE ARCHITECTURAL DRAWINGS FOR CHAMFERS, EDGE RADII, DRIP EDGES, REGLETS, FINISHES AND OTHER
NON-STRUCTURAL ITEMS NOT SHOWN OR SPECIFIED ON THE STRUCTURAL DRAWINGS.
L. NON-SHRINK GROUT SHALL BE A PREMIXED NON-METALLIC FORMULA, CAPABLE OF DEVELOPING A MINIMUM
COMPRESSIVE STRENGTH OF 21 MPA (3,046 PSI) IN 1 DAY AND 36 MPA (5,221 PSI) IN 28 DAYS.
M. CONSTRUCTION JOINTS IN FLOOR SHALL BE LOCATED WITHIN THE MIDDLE THIRD OF SPANS OF SLABS, BEAMS AND
GIRDERS. JOINTS IN GIRDERS SHALL BE OFFSET A MINIMUM DISTANCE OF TWO TIMES THE WIDTH OF AN
INTERSECTING BEAM.
N. LEAVE FORMWORK FOR OTHER STRUCTURAL ELEMENTS THAT SUPPORT WEIGHT OF CONCRETE IN PLACE UNTIL
CONCRETE HAS ACHIEVED ITS 28 DAY DESIGN COMPRESSIVE STRENGTH.
O. MEASURE FLOOR AND SLAB FLATNESS AND LEVELNESS ACCORDING TO ASTM E1155/E1155M WITHIN 48 HOURS OF
FINISHING.
REINFORCING STEEL:
A. REINFORCING STEEL GRADES AND YIELD STRENGTH SHALL CONFORM TO JIS G3112 AS FOLLOWS, UNLESS NOTED
OTHERWISE:
1. D10, D13, D16 (#3, #4, #5): JIS G3112 SD295A, FS = 295 MPa
2. D19, D22, D25 (#6, #7, #8): JIS G3112 SD345, FS = 345 MPa
3. D29 (#9 AND LARGER): JIS G3112 SD390, FS = 390 MPa
B. WELDED WIRE REINFORCEMENT SHALL BE GALVANIZED CONFORMING TO JIS G3551.
C. CLEAR CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS, UNLESS OTHERWISE NOTED:
1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: ---- 80 MM (3")
2. CONCRETE FORMED AND EXPOSED TO EARTH OR WEATHER:
a. D19 (#6) THROUGH D35 (#11): -------------------------------------------------------- 50 MM (2")
b. D16 (#5) BAR, W31 OR D31 WIRE, AND SMALLER: ---------------------------- 40 MM (1.5")
3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
a. SLABS, WALLS:
i. D38, D41 AND D51: ------------------------------------------------------------------ 40 MM (1.5")
ii. D35 (#11) AND SMALLER: --------------------------------------------------------- 20 MM (0.75")
b. BEAMS, COLUMNS:
i. PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS: ------------------ 40 MM (1.5")
D. REINFORCING STEEL SHALL BE SPLICED WHERE INDICATED ON PLANS. PROVIDE LAP SPLICE LENGTH PER TYPICAL
DETAILS AND SCHEDULE, UNLESS OTHERWISE NOTED. REINFORCING STEEL BARS D19 (#6) AND LARGER ARE
PERMITTED TO BE GAS PRESSURE WELDED SPLICE IN LIEU OF LAP SPLICE. GAS PRESSURE WELDING SHALL
COMPLY WITH JASS 5, JRJI GAS PRESSURE, AND JIS Z3881. STAGGER LAP BARS AS INDICATED.
E. LAP EDGES AND ENDS OF ADJOINING SHEETS OF WELDED WIRE REINFORCEMENT AT LEAST ONE MESH SPACING.
OFFSET LAPS OF ADJOINING SHEET WIDTHS TO PREVENT CONTINUOUS LAPS IN EITHER DIRECTION.
F. STANDARD HOOKS ON REINFORCING BARS USED SHALL COMPLY WITH ACI 318/318M, SECTION 7.1 OR SEE DETAIL
C1/S-604.
G. MINIMUM REINFORCEMENT BEND DIAMETERS SHALL COMPLY WITH ACI 318/318M, SECTION 7.2 OR SEE DETAIL
C1/S-604.
STRUCTURAL STEEL:
A. FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE AMERICAN INSTITUTE OF STEEL
CONSTRUCTION MANUAL OF STEEL CONSTRUCTION, FOURTEENTH EDITION.
B. STRUCTURAL STEEL PLATES SHALL CONFORM TO JIS G3136 SN400B 235 MPa OR SN490B 325 MPa UNLESS
OTHERWISE NOTED.
C. STEEL WIDE FLANGE SECTIONS SHALL CONFORM TO JIS G3136 SN490B.
D. CHANNELS AND ANGLES SHALL CONFORM TO JIS G3106 SM400 235 MPa.
E. STEEL PIPES SHALL CONFORM TO JIS G3444 STK400 235 MPa.
F. STEEL TUBES SHALL CONFORM TO JIS G3466 STKR400 245 MPa.
G. BOLTS M12 OR SMALLER SHALL CONFORM TO JIS B1180.
H. BOLTS M16 OR LARGER SHALL CONFORM TO JIS B1186 TYPE F10T. ALL CONTACT SURFACES FOR SLIP-CRITICAL
(SC) BOLTS SHALL BE APPLIED WITH CLASS B COATINGS WITH BLAST-CLEANED STEEL IN ACCORDANCE WITH AISC
325 OR JIS EQUIVALENT.
I. ANCHOR BOLTS SHALL CONFORM TO JIS B1220 ABR400 (GRADE 400MPa) HOT DIPPED GALVANIZED OR JIS B1120
ABR520SUS WHERE EXPOSED WITH TYPE 5J DOUBLE NUT AND TYPE 200J WASHER.
J. STEEL HEADED SHEAR STUDS SHALL BE JIS B1198.
K. WELDS AND WELDING PROCEDURES SHALL CONFORM TO THE STRUCTURAL WELDING CODE AWS D1.1 OF THE
AMERICAN WELDING SOCIETY OR JASS 6.
L. WELDING SHALL BE PERFORMED BY WELDERS PREQUALIFIED FOR WELDING PROCEDURES TO BE USED.
M. WELDING ELECTRODES SHALL BE JIS Z3212 .
N. ALL STEEL SHALL BE PRIME PAINTED IN THE SHOP.
O. EXPOSED STEEL SHALL BE HOT-DIPPED GALVANIZED ACCORDING TO JIS H8641.
P. ALL ANCHOR BOLTS, PLATES, AND OTHER ITEMS TO BE CAST IN CONCRETE SHALL BE HOT-DIPPED GALVANIZED
ACCORDING TO JIS H8641 UNLESS OTHERWISE NOTED.
SPECIAL INSPECTIONS:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT SPECIAL INSPECTION OF PORTIONS OF THE WORK
AS REQUIRED BY THE BUILDING CODE IS MADE AT THE APPROPRIATE TIME. THE CONTRACTOR SHALL GIVE TIMELY
NOTICE OF WHEN AND WHERE INSPECTIONS ARE TO BE MADE AND PROVIDE ACCESS FOR THE INSPECTOR. THE
CONTRACTOR SHALL CORRECT DEFECTIVE WORK AT NO ADDITIONAL COST TO THE GOVERNMENT AND PAY FOR
RE-INSPECTION.
B. THE SPECIAL INSPECTOR OF RECORD (SIOR) SHALL KEEP RECORDS OF SPECIAL INSPECTIONS AND FURNISH
SPECIAL INSPECTION REPORTS TO THE CONTRACTING OFFICER. REPORTS SHALL INDICATE THAT WORK WAS
INSPECTED WAS DONE IN CONFORMANCE TO THE CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION.
C. REFER TO SPECIFICATION SECTION 01 45 35 SPECIAL INSPECTIONS AND ATTACHMENT A AND ATTACHMENT B FOR
THE FOLLOWING
1. SEE SPECIFICATION SECTION 01 45 35 FOR SPECIAL INSPECTION REQUIREMENTS, SUBMITTALS, QUALIFICATIONS, RESPONSIBILITIES OF THE SPECIAL INSPECTOR OF RECORD (SIOR) THE QUALITY CONTROL
MANAGER AND THE SPECIAL INSPECTORS
2. SEE ATTACHMENT A FOR THE STATEMENT OF SPECIAL INSPECTIONS. THIS IDENTIFIES ELEMENTS THAT ARE
PART OF THE DESIGNATED SEISMIC SYSTEMS (DSS). ELEMENTS OF THE DSS REQUIRE ADDITIONAL
CERTIFICATIONS OF COMPLIANCE AND INCLUDE CERTAIN ELECTRICAL, MECHANICAL, PLUMBING AND
ARCHITECTURAL ELEMENTS.
3. SEE ATTACHMENT B FOR THE SCHEDULE OF SPECIAL INSPECTIONS. THIS IDENTIFIES WHICH SPECIAL
INSPECTIONS NEED TO BE PERFORMED, OBSERVED, DOCUMENTED AND ITEMS THAT NEED PERIODIC OR
CONTINUOUS SPECIAL INSPECTION. THIS IS ALSO DESCRIBED IN ITEM D BELOW.
C. THE FOLLOWING TYPE OF WORK LISTED UNDER THE INTERNATIONAL BUILDING CODE SECTION 1704 REQUIRES
SPECIAL INSPECTION:
1. INSPECTION OF FABRICATORS UNLESS DONE IN AN APPROVED FABRICATOR’S SHOP (SECTION 1704.2)
a. STRUCTURAL STEEL
b. PRECAST CONCRETE
2. STEEL CONSTRUCTION (SECTION 1704.3 AND TABLE 1704.3)
a. WELDING
3. CONCRETE CONSTRUCTION (SECTION 1704.4 AND TABLE 1704.4)
a. PLACEMENT OF REINFORCING STEEL INCLUDING PRESTRESSING TENDONS
b. REINFORCING STEEL WELDING
c. BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING PLACEMENT OF CONCRETE
d. POST INSTALLED ANCHORS IN CONCRETE
e. CONCRETE PLACEMENT
f. MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES
g. EXCEPTIONS FOR INSPECTION DURING CONCRETE PLACEMENT:
i. NONSTRUCTURAL SLABS SUPPORTED DIRECTLY ON GROUND - EXTERIOR SLABS ONLY
4. SOILS (SECTION 1704.7)
5. SEISMIC RESISTANCE OF MECHANICAL AND ELECTRICAL COMPONENTS
6. SEE DRAWING FROM OTHER DISCIPLINES FOR NON-STRUCTURAL SPECIAL INSPECTION REQUIREMENTS
FOUNDATION:
A. FOUNDATION DESIGN IS BASED ON THE FOLLOWING GEOTECHNICAL INVESTIGATION REPORT.
1. GEOTECHNICAL ENGINEERING REPORT TITLED "GEOTECHNICAL ENGINEERING REPORT - REVISION 2, FY18
DODEA MILCON PROJECT, REPLACE KINNICK HIGH SCHOOL, COMMANDER FLEET ACTIVITIES YOKOSUKA, JAPAN
CONTRACT NO. W912HV-17-D-0005" PREPARED BY MASA FUJIOKA & ASSOCIATES DATED NOVEMBER 29, 2017.
2. ESC LETTER MEMO TITLED "NEW KINNICK HIGH SCHOOL - ADDITIONAL PROBES CFA YOKOSUKA, JAPAN," DATED
AUGUST 30, 2018.
B. CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATION FROM SURFACE WATER, GROUND WATER OR
SEEPAGE.
C. EXCAVATIONS FOR ANY PURPOSE SHALL NOT REMOVE LATERAL SUPPORT FROM ANY FOOTING OR FOUNDATION
WITHOUT FIRST UNDERPINNING OR PROTECTING THE FOOTING OR FOUNDATION AGAINST SETTLEMENT OR LATERAL
TRANSLATION.
D. SOIL SUBGRADE SHALL BE PROOFROLLED WITH A MINIMUM 10-TON VIBRATORY COMPACTOR UNDER OBSERVATION
OF A GEOTECHNICAL ENGINEER TO CHECK FOR SOFT OR WEAK AREAS. ANY SOFT OR WEAK AREAS SHALL BE
EXCAVATED AND REPLACED WITH COMPACTED STRUCTURAL FILL. SOIL SUBGRADE SHALL BE COMPACTED TO 95%
OF MAXIMUM DRY DENSITY.
E. ONSITE AND IMPORTED GRANULAR STRUCTURAL FILL SHALL CONSIST OF NON-EXPANSIVE GRANULAR MATERIALS, FREE OF ORGANIC MATERIALS AND PARTICLES LARGER THAN 7.50 CENTIMETERS (3 INCHES) WITH A MAXIMUM CBR
EXPANSION OF 1% AND A MINIMUM CBR VALUE OF 15%. GRANULAR STRUCTURAL FILL SHALL BE COMPACTED TO
95% MAXIMUM DRY DENSITY IN ACCORDANCE TO ASTM D1557 OR JIS A 1210.
F. ONSITE AND IMPORTED STRUCTURAL FILL SHALL CONSIST OF NON-EXPANSIVE GRANULAR MATERIALS, FREE OF
ORGANIC MATERIALS AND PARTICLES LARGER THAN 7.50 CENTIMETERS (3 INCHES) WITH A MAXIMUM CBR
EXPANSION OF 2% AND A MINIMUM CBR VALUE OF 5%. STRUCTURAL FILL SHALL BE COMPACTED TO 90% MAXIMUM
DRY DENSITY IN ACCORDANCE TO ASTM D1557 OR JIS A 1210.
G. A GEOTECHNICAL ENGINEER SHALL BE RETAINED TO OBSERVE ACTUAL FIELD CONDITIONS TO CONFIRM
FOUNDATION BEARING CONDITIONS AND REQUIRED EMBEDMENT DEPTHS. GEOTECHNICAL ENGINEER SHALL
SUBMIT LETTER OF COMPLIANCE TO THE CONTRACTING OFFICER.
H. ALL CONSTRUCTION AREAS SHALL BE CLEARED OF VEGETATION, DEBRIS, EXISTING PAVEMENT STRUCTURES AND
FOUNDATIONS.
I. JOINTS IN WALLS AND FLOOR, JOINTS BETWEEN THE WALL AND FLOOR AND PENETRATIONS IN THE WALL AND
FLOOR SHALL BE MADE WATERTIGHT UTILIZING APPROVED METHODS AND MATERIALS.
J. PILES
1. PHC PILES SHALL BE DRIVEN TO A MINIMUM OF 1M (3.3 FT) INTO THE ROCK.
2. INSTALL PILES IN PRE DRILLED HOLES.
STRUCTURAL ABBREVIATIONS :
AB
ALT
ARCH
BLKG
BM
BOC
BOT
BTWN
CG
CJP
CL
CLR
CMU
COL
CONC
CONT
Cx OR
DBL
DIA
DWG
EA
EF
EL
ELEC
ELEV
EQ
EW
EW
EXIST OR (E)
EXT
FIN
FLR
FP
FT
FTG
GA
GALV
HORIZ
HSB
HSS OR
Hx OR nX
ID
INFO
JST
LLH
LLV
LLx
Lx
AT
ANCHOR BOLT
ALTERNATE
ARCHITECTURAL
BLOCKING
BEAM
BOTTOM OF CONCRETE
BOTTOM
BETWEEN
CENTER OF GRAVITY
COMPLETE JOINT PENETRATION
CENTER LINE
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONTINUOUS
STRUCTURAL STEEL CHANNEL
DOUBLE
DIAMETER
DRAWING
EACH
EACH FACE
ELEVATION
ELECTRICAL
ELEVATOR
EQUAL
EACH WAY
EARTHQUAKE WALL, CONCRETE SHEAR WALL
EXISTING
EXTERIOR
FINISH
FLOOR
FIRE PROTECTION
FOOT OR FEET
FOOTING
GAUGE
GALVANIZED
HORIZONTAL
HIGH STRENGTH BOLTS
HOLLOW STRUCTURAL RECTANGULAR
OR SQUARE SECTION (STEEL TUBE)
STRUCTURAL WIDE FLANGE STEEL
INSIDE DIAMETER
INFORMATION
JOIST
LONG LEG HORIZONTAL
LONG LEG VERTICAL
DOUBLE STRUCTURAL STEEL ANGLE
STRUCTURAL STEEL ANGLE
MAX
MB
MECH
MEP
MIN
MISC
NO OR #
NTS
OC
OD
OPNG
OPP
PL
PP
PREFAB
QTY
REF
REINF
REQD
SAE
SCHED
SHT
SIM
SPECS
STIFF
SQ
SS
SYM
TEMP
THK
THRU
TOC
TOS
TOW
TYP
T&B
UNO / UON
VERT
VIF
W
W/
W/O
WP
MAXIMUM
MACHINE BOLT
MECHANICAL
MECHANICAL, ELECTRICAL, AND PLUMBING
MINIMUM
MISCELLANEOUS
NUMBER
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OPENING
OPPOSITE
PLATE
PARTIAL PENETRATION
PREFABRICATED
QUANTITY
REFERENCE
REINFORCED OR REINFORCING
REQUIRED
SOCIETY OF AUTOMOTIVE ENGINEERS
SCHEDULE
SHEET
SIMILAR
SPECIFICATIONS
STIFFENER
SQUARE
STAINLESS STEEL
SYMMETRICAL
TEMPERATURE
THICK
THROUGH
TOP OF CONCRETE
TOP OF STEEL
TOP OF WALL
TYPICAL
TOP AND BOTTOM
UNLESS OTHERWISE NOTED
VERTICAL
VERIFY IN FIELD
CONCRETE WALL
WITH
WITHOUT
WORK POINT
COLD-FORMED STEEL FRAMING:
A. COLD-FORMED METAL FRAMING SHALL COMPLY WITH AISI'S "NORTH AMERICAN SPECIFICATIONS FOR THE DESIGN
OF COLD-FORMED STEEL STRUCTURAL MEMBERS" AND ITS "STANDARD FOR COLD FORMED STEEL FRAMING -
GENERAL PROVISIONS"
B. COLD-FORMED STEEL MEMBERS AND ACCESSORIES SHALL BE OF THE TYPE AND THICKNESS CALLED FOR ON THE
DRAWINGS. MEMBER DESIGNATIONS ARE PER STEEL STUD MANUFACTURER'S ASSOCIATION.
C. ALL MEMBERS EQUAL TO OR GREATER THAN 1.36 MILLIMETERS (54 MILS) THICK SHALL MEET THE REQUIREMENTS
OF JIS G3350 SSC400 235 MPa. ALL OTHER MEMBERS SHALL MEET THE REQUIREMENTS OF JIS 3350 SSC400 235
MPa.
D. CUT FRAMING MEMBERS BY SAWING OR SHEARING. DO NOT TORCH CUT.
E. HOLES IN WALL STUDS AND OTHER STRUCTURAL MEMBERS SHALL NOT EXCEED 38 MILLIMETERS (1.5 INCHES) IN
WIDTH OR 101 MILLIMETERS (4 INCHES) IN LENGTH. HOLES SHALL BE PERMITTED ONLY ALONG THE CENTERLINE
OF THE WEB OF THE FRAMING MEMBER. HOLES SHALL NOT BE LESS THAN 610 MILLIMETERS (24 INCHES) CENTER
TO CENTER AND SHALL NOT BE LOCATED MORE THAN 254 MILLIMETERS (10 INCHES) FROM EDGE OF HOLE TO END
OF MEMBER.
F. SCREWS SHALL BE INSTALLED WITH A MINIMUM EDGE DISTANCE AND CENTER-TO-CENTER SPACING OF 13
MILLIMETERS (1/2 INCH), SHALL BE SELF TAPPING AND SHALL CONFORM TO SAE J 78. SCREWS SHALL EXTEND
THROUGH THE STEEL A MINIMUM OF THREE EXPOSED THREADS. ALL SELF-DRILLING TAPPING SCREWS
CONFORMING TO SAE J 78 SHALL HAVE A TYPE II COATING IN ACCORDANCE WITH ASTM B 633.
G. STUD WEB HOLES CLOSER THAN 254 MILLIMETERS (10 INCHES) FROM THE EDGE OF THE HOLE TO THE EDGE OF
THE MEMBER SHALL BE PATCHED WITH A SOLID PLATE, C-SECTION OR TRACK SECTION. THE PATCH SHALL BE OF
A MINIMUM THICKNESS AS THE STUD MEMBER AND SHALL EXTEND AT LEAST 26 MILLIMETERS (1 INCH) BEYOND ALL
EDGES OF THE HOLE. THE PATCH SHALL BE FASTENED TO THE WEB WITH NO. 8 SCREWS SPACED NO GREATER
THAN 26 MILLIMETERS (1 INCH) CENTER TO CENTER ALONG THE EDGES OF THE PATCH, WITH A MINIMUM EDGE
DISTANCE OF 13 MILLIMETERS (1/2 INCH).
H. STEEL STUDS AND OTHER STRUCTURAL MEMBERS SHALL NOT BE SPLICED.
ELEVATOR:
A. ELEVATOR MACHINE BEAMS, HOIST BEAMS, RAILS, SILLS, BRACKETS, DOOR SUPPORTS AND CONNECTIONS TO THE
PRIMARY STRUCTURE ARE PERFORMANCE-SPECIFIED COMPONENTS TO BE DESIGNED BY THE ELEVATOR
MANUFACTURER.
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
7/ /2 :1 7:
A M
/2
/2
:1
:0
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-002
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
G E N E R A L N O T E S
B M
J T
J M
J U L Y
P A -B N E W S -0
S -0
A
C
C E J
9.1
K
Z
Q
T
H
G
B
B
FD
6.5
W
S R
U
V
Y X
P N
M L
12.6
14.6
7.6
K.4
E.8 J.5
12.4
G.2
9.5
6.2
AA
AA
12.2
12.7
A.4
A.4
LOADING LEGEND
LL = 1.0 KPa (20 PSF)
• ROOF (REDUCIBLE WHERE
PERMITTED BY CODE)
LL = 2.6 KPa (55 PSF)
• CLASSROOM (40 PSF - REDUCIBLE
WHERE PERMITTED BY CODE)
• PARTITION (15 PSF)
LL = 2.9 KPa (60 PSF)
• ASSEMBLY AREAS WITH FIXED SEATS
LL = 3.1 KPa (65 PSF)
• OFFICE (50 PSF - REDUCIBLE WHERE
PERMITTED BY CODE)
• PARTITION (15 PSF)
LL= 3.6 KPa (75 PSF)
• TOILETS/WASHROOM
• LOCKER ROOMS AT GYM
• READING ROOMS (60 PSF)
• PARTITIONS (15 PSF)
LL = 3.8 KPa (80 PSF)
• CORRIDORS ABOVE FIRST FLOOR
• LOCKER ROOMS IN CORRIDORS
LL = 4.8KPa (100PSF)
• FIRST FLOOR CORRIDOORS
• DINING ROOMS
• MECHANICAL/ELECTRICAL ROOMS
• STAIRS
• GYMNASIUM/BLEACHERS
• ASSEMBLY AREAS
• LOBBY
LL = 6.0 KPa (125 PSF)
• LIGHT STORAGE
LL = 7.2 KPa (150 PSF)
• STACK ROOMS
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
7/ /2 :1 7:
A M
/2
/2
:1
:1
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-003
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G P L A N F
IR
S T F L O O R
B M
E A D
J M
J U L Y
P A -B N E W S -0
S -0
1 : 200A1 LOADING PLAN - FIRST FLOOR 0 10 20 m
SCALE: 1:200
PLAN NORTH
C
C E J
9.1
K
Z
Q
T
H
G
B
B
FD
6.5
W
S R
U
V
Y X
P N
M L
12.6
14.6
7.6
K.4
E.8 J.5
12.4
G.2
9.5
6.2
AA
AA
12.2
12.7
A.4
A.4
LOADING LEGEND
LL = 1.0 KPa (20 PSF)
• ROOF (REDUCIBLE WHERE
PERMITTED BY CODE)
LL = 2.6 KPa (55 PSF)
• CLASSROOM (40 PSF - REDUCIBLE
WHERE PERMITTED BY CODE)
• PARTITION (15 PSF)
LL = 2.9 KPa (60 PSF)
• ASSEMBLY AREAS WITH FIXED SEATS
LL = 3.1 KPa (65 PSF)
• OFFICE (50 PSF - REDUCIBLE WHERE
PERMITTED BY CODE)
• PARTITION (15 PSF)
LL= 3.6 KPa (75 PSF)
• TOILETS/WASHROOM
• LOCKER ROOMS AT GYM
• READING ROOMS (60 PSF)
• PARTITIONS (15 PSF)
LL = 3.8 KPa (80 PSF)
• CORRIDORS ABOVE FIRST FLOOR
• LOCKER ROOMS IN CORRIDORS
LL = 4.8KPa (100PSF)
• FIRST FLOOR CORRIDOORS
• DINING ROOMS
• MECHANICAL/ELECTRICAL ROOMS
• STAIRS
• GYMNASIUM/BLEACHERS
• ASSEMBLY AREAS
• LOBBY
LL = 6.0 KPa (125 PSF)
• LIGHT STORAGE
LL = 7.2 KPa (150 PSF)
• STACK ROOMS
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
7/ /2 :1 7:
A M
/2
/2
:1
:1
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-004
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G P L A N S E C O N D F L O O R
B M
E A D
J M
J U L Y
P A -B N E W S -0
S -0
1 : 200A1 LOADING PLAN - SECOND FLOOR 0 10 20 m
C E J
9.1
K
Z
Q
T
H
G
B
FD
6.5
W
S R
U
V
Y X
P N
M L
12.6
14.6
7.6
K.4
E.8 J.5
12.4
G.2
9.5
6.2
AA
12.2
12.7
A.4
LOADING LEGEND
LL = 1.0 KPa (20 PSF)
• ROOF (REDUCIBLE WHERE
PERMITTED BY CODE)
LL = 2.6 KPa (55 PSF)
• CLASSROOM (40 PSF - REDUCIBLE
WHERE PERMITTED BY CODE)
• PARTITION (15 PSF)
LL = 2.9 KPa (60 PSF)
• ASSEMBLY AREAS WITH FIXED SEATS
LL = 3.1 KPa (65 PSF)
• OFFICE (50 PSF - REDUCIBLE WHERE
PERMITTED BY CODE)
• PARTITION (15 PSF)
LL= 3.6 KPa (75 PSF)
• TOILETS/WASHROOM
• LOCKER ROOMS AT GYM
• READING ROOMS (60 PSF)
• PARTITIONS (15 PSF)
LL = 3.8 KPa (80 PSF)
• CORRIDORS ABOVE FIRST FLOOR
• LOCKER ROOMS IN CORRIDORS
LL = 4.8KPa (100PSF)
• FIRST FLOOR CORRIDOORS
• DINING ROOMS
• MECHANICAL/ELECTRICAL ROOMS
• STAIRS
• GYMNASIUM/BLEACHERS
• ASSEMBLY AREAS
• LOBBY
LL = 6.0 KPa (125 PSF)
• LIGHT STORAGE
LL = 7.2 KPa (150 PSF)
• STACK ROOMS
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
7/ /2 :1 7:
A M
/2
/2
:1
:2
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-005
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G P L A N T H
IR
D F L O O R
B M
E A D
J M
J U L Y
P A -B N E W S -0
S -0
1 : 200A1 LOADING PLAN - THIRD FLOOR 0 10 20 m
C
C E J
9.1
K
Z
Q
T
H
G
B
B
FD
6.5
W
S R
U
V
Y X
P N
M L
12.6
14.6
7.6
K.4
E.8 J.5
12.4
G.2
9.5
6.2
AA
AA
12.2
12.7
A.4
A.4
LOADING LEGEND
LL = 1.0 KPa (20 PSF)
• ROOF (REDUCIBLE WHERE
PERMITTED BY CODE)
LL = 2.6 KPa (55 PSF)
• CLASSROOM (40 PSF - REDUCIBLE
WHERE PERMITTED BY CODE)
• PARTITION (15 PSF)
LL = 2.9 KPa (60 PSF)
• ASSEMBLY AREAS WITH FIXED SEATS
LL = 3.1 KPa (65 PSF)
• OFFICE (50 PSF - REDUCIBLE WHERE
PERMITTED BY CODE)
• PARTITION (15 PSF)
LL= 3.6 KPa (75 PSF)
• TOILETS/WASHROOM
• LOCKER ROOMS AT GYM
• READING ROOMS (60 PSF)
• PARTITIONS (15 PSF)
LL = 3.8 KPa (80 PSF)
• CORRIDORS ABOVE FIRST FLOOR
• LOCKER ROOMS IN CORRIDORS
LL = 4.8KPa (100PSF)
• FIRST FLOOR CORRIDOORS
• DINING ROOMS
• MECHANICAL/ELECTRICAL ROOMS
• STAIRS
• GYMNASIUM/BLEACHERS
• ASSEMBLY AREAS
• LOBBY
LL = 6.0 KPa (125 PSF)
• LIGHT STORAGE
LL = 7.2 KPa (150 PSF)
• STACK ROOMS
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
7/ /2 :1 7:
A M
/2
/2
:1
:2
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-006
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G P L A N F O U R T H F L O O R
B M
E A D
J M
J U L Y
P A -B N E W S -0
S -0
1 : 200A1 LOADING PLAN - FOURTH FLOOR 0 10 20 m
C
C E J
9.1
H
G
B
B
FD
6.5
7.6
E.8 J.5
G.2
9.5
6.2
AA
AA
A.4
A.4
LOADING LEGEND
LL = 1.0 KPa (20 PSF)
• ROOF (REDUCIBLE WHERE
PERMITTED BY CODE)
LL = 2.6 KPa (55 PSF)
• CLASSROOM (40 PSF - REDUCIBLE
WHERE PERMITTED BY CODE)
• PARTITION (15 PSF)
LL = 2.9 KPa (60 PSF)
• ASSEMBLY AREAS WITH FIXED SEATS
LL = 3.1 KPa (65 PSF)
• OFFICE (50 PSF - REDUCIBLE WHERE
PERMITTED BY CODE)
• PARTITION (15 PSF)
LL= 3.6 KPa (75 PSF)
• TOILETS/WASHROOM
• LOCKER ROOMS AT GYM
• READING ROOMS (60 PSF)
• PARTITIONS (15 PSF)
LL = 3.8 KPa (80 PSF)
• CORRIDORS ABOVE FIRST FLOOR
• LOCKER ROOMS IN CORRIDORS
LL = 4.8KPa (100PSF)
• FIRST FLOOR CORRIDOORS
• DINING ROOMS
• MECHANICAL/ELECTRICAL ROOMS
• STAIRS
• GYMNASIUM/BLEACHERS
• ASSEMBLY AREAS
• LOBBY
LL = 6.0 KPa (125 PSF)
• LIGHT STORAGE
LL = 7.2 KPa (150 PSF)
• STACK ROOMS
C E
H
GFD
6.5
7.6
E.8
G.2
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
7/ /2 :1 7:
A M
/2
/2
:1
:3
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-007
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G P L A N R O O F A N D H
IG
H R O O F
B M
E A D
J M
J U L Y
P A -B N E W S -0
S -0
1 : 200A1
LOADING PLAN - ROOF
1 : 200C3
LOADING PLAN - HIGH ROOF
0 10 20 m
CBA
2.3
2.4
2.9
B.4
A B C D E
F
CBA
2.3
2.4
2.9
B.4
A B C D E
F
LL = 1.0 KPa (20 PSF)
• ROOF (REDUCIBLE WHERE
PERMITTED BY CODE)
LL = 3.1 KPa (65 PSF)
• OFFICE (50 PSF)
• PARTITION (15 PSF)
LL= 3.6 KPa (75 PSF)
• TOILETS/WASHROOM
• PARTITIONS (15 PSF)
LL = 4.8KPa (100PSF)
• FIRST FLOOR CORRIDORS
• DINING ROOMS
• MECHANICAL/ELECTRICAL ROOMS
• STORES
LL = 6.0 KPa (125 PSF)
• LIGHT STORAGE
LOADING LEGEND
A B
A B
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
9/ /2 9:
:4 A M
/1
/2
:1 :4
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\R e v it
U s e r
F ile s \k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-008
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G P L A N C E N T R A L P L A N T F
IE
L D H O U S E
D U G O U T A N D S T O R A G E S T R U C T U R E
B M
E A D
J M
J U L Y
P A -B N E W S -0
S -0
1 : 200A1
LOADING PLAN - CENTRAL PLANT - FLOOR
1 : 200A3 LOADING PLAN - FIELD HOUSE - FLOOR 0 10 20 m
SCALE: 1:200
1 : 200C1
LOADING PLAN - CENTRAL PLANT - ROOF
1 : 200C3
LOADING PLAN - FIELD HOUSE - ROOF
PLAN NORTH
PLAN NORTH 1 : 200C4
LOADING PLAN - DUGOUT - FLOOR
1 : 200D4
LOADING PLAN - DUGOUT - ROOF
PLAN NORTH
PLAN NORTH
1 : 200A4
LOADING PLAN -
STORAGE STRUCTURE - FLOOR
1 : 200B4
LOADING PLAN -
STORAGE STRUCTURE - ROOF
PLAN NORTH
PLAN NORTH
jonathanl Rectangle
NOTES:
1. WIND LOADS ARE CALCULATED PER ASCE 7-10 COMPONENTS
AND CLADDING PER ASCE 7-10 CHAPTER 30 PART 1.
2. END DISTANCE (a) = 7500, (a1) = 1230, AND (a2) = 970 MEASURED
FROM OUTSIDE EDGE OF WALL.
3. POSITIVE PRESSURE VALUES REFER TO FORCES ACTING
TOWARD THE BUILDING. NEGATIVE PRESSURE VALUES REFER
TO FORCES ACTING AWAY FROM THE BUILDING.
4. EACH COMPONENT MUST BE DESIGNED FOR MAXIMUM POSITIVE
AND NEGATIVE FORCES.
5. FOR COMPONENTS HAVING EFFECTIVE AREAS IN BETWEEN
TABULATED VALUES, LINEAR INTERPOLATION IS ALLOWED.
6. EFFECTIVE WIND AREA IS DEFINED IN ASCE 7-10.
A. THE SPAN LENGTH MULTIPLIED BY AN EFFECTIVE WIDTH THAT
NEED NOT BE LESS THAN 1/3 THE SPAN LENGTH.
B. FOR CLADDING FASTENERS, THE EFFECTIVE WIND AREA
SHALL NOT BE GREATER THAN THE AREA THAT IS
TRIBURTARY TO AN INDIVIDUAL FASTENER.
aa a
BUILDING SURFACE
DESIGNATION, TYP
COMPONENTS AND CLADDING
WIND PRESSURE (PSF)
WALL WALL ENDS4 5
+409 kPa -409 kPa
+409 kPa -749 kPa
+296 kPa -334 kPa
+296 kPa -447 kPa
≤1.9
>46.5
EFFECTIVE
WIND AREA(M2)
a
A C E J
K
Z
T
P M
14.6
J.5
6.2
AA
FOR BALANCE OF
INFORMATION,
SEE
A1
S-009
T Y
P a
LEGEND:
INDICATES END
PRESSURE
A C E J
K
Z
W
M
J.5
FOR BALANCE OF
INFORMATION,
SEE
A1
S-009
T Y
P a
LEGEND:
INDICATES END
PRESSURE
A C E J
9.1
Q
HF
L
J.5
12.4
9.5
FOR BALANCE OF
INFORMATION,
SEE
A1
S-009
LEGEND:
INDICATES END
PRESSURE
T Y
P a
A C E J
9.1
FOR BALANCE OF
INFORMATION,
SEE
A1
S-009
LEGEND:
INDICATES END
PRESSURE
T Y
P a
C E
G
6.5
FOR BALANCE OF
INFORMATION,
SEE
A1
S-009
LEGEND:
INDICATES END
PRESSURE
CBA
a2, TYP A
F a1 , T
Y P
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
A S N O T E D
7/ /2 :1 7:
A M
/2
/2
:1
:4
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
S-009
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
L O A D
IN
G D
IA
G R A M S C O M P O N E N T S A N D C L A D D
IN
G
D e s ig n e r
A u th o r
C h e c k e r
J U L Y
P A -B N E W S -0
S -0
NTSA1
COMPONENTS AND CLADDING WIND
PRESSURE - EXTERIOR WALLS
1 : 750C1
LOAD DIAGRAM - FIRST FLOOR
1 : 750C2
LOAD DIAGRAM - SECOND FLOOR
1 : 750C4
LOAD DIAGRAM - THIRD FLOOR
1 : 750B2
LOAD DIAGRAM - FOURTH FLOOR
1 : 750B4
LOAD DIAGRAM - ROOF
0 30 65 m
SCALE: 1:750
1 : 750A2
LOAD DIAGRAM - CENTRAL PLANT
1 : 750A4
LOAD DIAGRAM - FIELD HOUSE
C
C E J
9.1
K
Z
Q
T
H
G
B
B
FD
6.5
W
S R
U
V
Y X
P N
M L
12.6
14.6
7.6
K.4
E.8 J.5
12.4
1S-111
A1
1S-112
A1
1S-113
A1
1S-114
A1
1S-115
A1
1S-116
A1
G.2
9.5
6.2
37.4m ESTIMATED
PILE LENGTH
41.8m ESTIMATED
PILE LENGTH
37.4m ESTIMATED
PILE LENGTH
41.8m ESTIMATED
PILE LENGTH
(E) BOX CULVERT, V.I.F.
C
LE
A R
A N
C E
R E
Q U
IR
E
M E
N T
S E
E A
S -103 F
O R
(E ) B
O X
C U
LV
E
R T
AA
AA
12.2
12.7
TEST PILE, TYP
MFA-3
P-7 P-6
MFA-5
MFA-4
MFA-2
MFA-6
MFA-9
MFA-7
MFA-8
P-5
P-4
P-3
P-2
MFA-10
MFA-11
MFA-12
P-1
A.4
A.4
CONSTRUCTION JOINT,
TYP PER
B5
S-612
SIM
CONSTRUCTION JOINT,
TYP PER
B5
S-612
SIM
CONSTRUCTION JOINT,
TYP PER
B5
S-612
SIM
NOTES:
1. MFA-1 INDICATES APPROXIMATE BORING LOCATION.
FOR MORE INFORMATION, SEE SHEET 1B-101.
2. P-1 INDICATES APPROXIMATE PROBE LOCATION.
FOR MORE INFORMATION, SEE SHEET 1B-101.
3. FOR TEST PILE INFORMATION, SEE SPECIFICATION
31 62 13.24.
4. FOR WALL ELEVATION AND BUILDING SECTION
CALLOUTS, SEE SHEET .1S-102
LEGEND:
INDICATES PILE
INDICATES TEST PILE
INDICATES APPROXIMATE LOCATION
OF BORING OR PROBE, SEE CIVIL
DWGS FOR MORE INFORMATION
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
7/ /2 :0 3:
A M
/2
/2
:0
:0
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
1S-101
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
O V E R A L L F O U N D A T
IO
N P L A N
B M
L J C
J M
J U L Y
P A -B N E W S -1
S
-1
0 10 20 m
SCALE: 1:200
PLAN NORTH
1 : 200A1
OVERALL FOUNDATION PLAN
PILE QUANTITIES
PILE DIAMETER
ESTIMATED
PILE LENGTH QTY
400ø PILE 37.4 m 20
400ø PILE 41.8 m 8
500ø PILE 37.4 m 119
500ø PILE 41.8 m 25
600ø PILE 41.8 m 186
TOTAL (INCLUDING TEST) PILES: 358
PILE DIAMETER
ESTIMATED
TOTAL PILE
LENGTH
400 1082 m
500 5496 m
600 7775 m
TOTAL: 14353 m
TOTAL PILE SPLICES: 1074
TEST PILE QUANTITIES
PILE DIAMETER QTY
400ø PILE 1
500ø PILE 5
600ø PILE 9
TOTAL TEST PILES: 15 (OF 358)
C
C E J
9.1
K
Z
Q
T
H
G
B
B
FD
6.5
W
1S-121
A1
1S-122
A1
1S-123
A1
1S-124
A1
1S-125
A1
1S-126
A1
B3
1S-301
BLDG
SECT
S
R
U
V
Y X
P N
M L
12.6
14.6
7.6
C4
1S-201
WALL
ELEV
C1
1S-201
WALL
ELEV
C2
1S-201
WALL
ELEV
B3
1S-201
WALL
ELEV
B1
1S-201
WALL
ELEV
A1
1S-201
WALL
ELEV
A3
1S-201
WALL
ELEV
C1
1S-202
WALL
ELEV
C3
1S-202
WALL
ELEV
K.4
B1
1S-202
WALL
ELEV
B4
1S-203
WALL
ELEV
C1
1S-204
WALL
ELEV
C2
1S-204
WALL
ELEV
C4
1S-204
WALL
ELEV
A1
1S-204
WALL
ELEV
B4
1S-204
WALL
ELEV
B1
1S-204
WALL
ELEV
C1
1S-203
WALL
ELEV
C4
1S-203
WALL
ELEV
B1
1S-203
WALL
ELEV
B4
1S-202
WALL
ELEV
C1
1S-301
BLDG
SECT
C2
1S-301
BLDG
SECT
B1
1S-301
BLDG
SECT
A1
1S-301
BLDG
SECT
E.8
C1
1S-302
BLDG
SECT
C2
1S-302
BLDG
SECT
C4
1S-302
BLDG
SECT
B1
1S-302
BLDG
SECT
A1
1S-302
BLDG
SECT
B3
1S-302
BLDG
SECT
A4
1S-302
BLDG
SECT
A1
1S-202
WALL
ELEV
J.5
12.4
B5
1S-202
WALL
ELEV
A4
1S-202
WALL
ELEV
A3
1S-202
WALL
ELEV
A1
1S-205
WALL
ELEV
A2
1S-205
WALL
ELEV
A3
1S-205
WALL
ELEV
A4
1S-205
WALL
ELEV
B1
1S-205
WALL
ELEV
B2
1S-205
WALL
ELEV
B3
1S-205
WALL
ELEV
B5
1S-205
WALL
ELEV
B4
1S-205
WALL
ELEV
C1
1S-205
WALL
ELEV
C2
1S-205
WALL
ELEV
C3
1S-205
WALL
ELEV
C4
1S-205
WALL
ELEV
C5
1S-205
WALL
ELEV
A1
1S-206
WALL
ELEV
A2
1S-206
WALL
ELEV
A3
1S-206
WALL
ELEV
C4
1S-207
WALL
ELEV
B1
1S-206
WALL
ELEV
B2
1S-206
WALL
ELEV
B3
1S-206
WALL
ELEV
B4
1S-206
WALL
ELEV
B5
1S-206
WALL
ELEV
C1
1S-206
WALL
ELEV
C2
1S-206
WALL
ELEV
C4
1S-206
WALL
ELEV
C5
1S-206
WALL
ELEV
G.2
9.5
6.2
A1
1S-203
WALL
ELEV
AA
AA
B4
1S-207
WALL
ELEV
B2
1S-204
WALL
ELEV
C1
1S-207
WALL
ELEV
C2
1S-207
WALL
ELEV
A4
1S-206
WALL
ELEV
B1
1S-207
WALL
ELEV
B2
1S-207
WALL
ELEV
A1
1S-207
WALL
ELEV
A2
1S-207
WALL
ELEV
A4
1S-207
WALL
ELEV
A3
1S-207
WALL
ELEV
12.2
12.7
CONSTRUCTION JOINT
PER AND
A4
S-605
B5
S-612
SIM
CONSTRUCTION JOINT
PER AND
A4
S-605
B5
S-612
SIM
WALL CONSTRUCTION JOINT
WCJ-1, TYP PER
A4
S-608
CONSTRUCTION JOINT
PER AND
A4
S-605
B5
S-612
SIM
A.4
A.4
WALL CONSTRUCTION JOINT
WCJ-1, TYP PER
A4
S-608
A4
1S-203
WALL
ELEV
NOTE:
SEE SHEET 1S-124 FOR NOTES AND LEGEND
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
7/ /2 :0 3:
A M
/2
/2
:0
:1
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
1S-102
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
O V E R A L L F
IR
S T F L O O R F R A M
IN
G P L A N
B M
L J C
J M
J U L Y
P A -B N E W S -1
S
-1
0 10 20 m
SCALE: 1:200
PLAN NORTH
1 : 200A1
OVERALL FIRST FLOOR FRAMING PLAN
C
C
E J
9.1
K
Z
Q
T
H
G
B
B
F
D
6.5
W
B3
1S-301
BLDG
SECT
S
R
U
V
Y X
P N
M L
12.6
14.6
7.6
C4
1S-201
WALL
ELEV
C1
1S-201
WALL
ELEV
C2
1S-201
WALL
ELEV
B3
1S-201
WALL
ELEV
B1
1S-201
WALL
ELEV
A1
1S-201
WALL
ELEV
A3
1S-201
WALL
ELEV
C1
1S-202
WALL
ELEV
C3
1S-202
WALL
ELEV
K.4
B1
1S-202
WALL
ELEV
B4
1S-203
WALL
ELEV
C1
1S-204
WALL
ELEV
C2
1S-204
WALL
ELEV
C4
1S-204
WALL
ELEV
A1
1S-204
WALL
ELEV
B4
1S-204
WALL
ELEVB1
1S-204
WALL
ELEV
C1
1S-203
WALL
ELEV
C4
1S-203
WALL
ELEV
B1
1S-203
WALL
ELEV
B4
1S-202
WALL
ELEV
C1
1S-301
BLDG
SECT
C2
1S-301
BLDG
SECT
B1
1S-301
BLDG
SECT
A1
1S-301
BLDG
SECT
E.8
C1
1S-302
BLDG
SECT
C2
1S-302
BLDG
SECT
C4
1S-302
BLDG
SECT
B1
1S-302
BLDG
SECT
A1
1S-302
BLDG
SECT
B3
1S-302
BLDG
SECT
A4
1S-302
BLDG
SECT
A1
1S-202
WALL
ELEV
J.5
12.4
B5
1S-202
WALL
ELEV
A4
1S-202
WALL
ELEV
A3
1S-202
WALL
ELEV
A1
1S-205
WALL
ELEV
A2
1S-205
WALL
ELEV
A3
1S-205
WALL
ELEV
A4
1S-205
WALL
ELEV
B1
1S-205
WALL
ELEV
B2
1S-205
WALL
ELEV
B3
1S-205
WALL
ELEV
B5
1S-205
WALL
ELEV
B4
1S-205
WALL
ELEV
C1
1S-205
WALL
ELEV
C2
1S-205
WALL
ELEV
C3
1S-205
WALL
ELEV
C4
1S-205
WALL
ELEV
C5
1S-205
WALL
ELEV
A1
1S-206
WALL
ELEV
A2
1S-206
WALL
ELEV
A3
1S-206
WALL
ELEV
C4
1S-207
WALL
ELEV
B1
1S-206
WALL
ELEV
B2
1S-206
WALL
ELEV
B3
1S-206
WALL
ELEV
B4
1S-206
WALL
ELEV
B5
1S-206
WALL
ELEV
C1
1S-206
WALL
ELEV
C2
1S-206
WALL
ELEV
C4
1S-206
WALL
ELEV
C5
1S-206
WALL
ELEV
1S-134
A1
1S-132
A1 1S-131
A1
1S-133
A1
1S-135
A1
1S-136
A1
G.2
9.5
6.2
A1
1S-203
WALL
ELEV
AA
AA
B4
1S-207
WALL
ELEV
B2
1S-204
WALL
ELEV
C1
1S-207
WALL
ELEV
C2
1S-207
WALL
ELEV
A4
1S-206
WALL
ELEV
B1
1S-207
WALL
ELEV
B2
1S-207
WALL
ELEV
A1
1S-207
WALL
ELEV
A2
1S-207
WALL
ELEV
A4
1S-207
WALL
ELEV
A3
1S-207
WALL
ELEV
12.2
12.7
1S-403
C3
CONSTRUCTION JOINT
PER AND
B4
S-609
B5
S-612
CONSTRUCTION JOINT
PER AND
B4
S-609
B5
S-612
CONSTRUCTION JOINT
PER AND
B4
S-609
B5
S-612
WALL CONSTRUCTION JOINT
WCJ-1, TYP PER
A4
S-608
A.4
A.4
A4
1S-203
WALL
ELEV
WALL CONSTRUCTION JOINT
WCJ-1, TYP PER
A4
S-608
WALL CONSTRUCTION JOINT
WCJ-1, TYP PER
A4
S-608
WALL CONSTRUCTION JOINT
WCJ-1, TYP PER
A4
S-608
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers
Japan District
SHEET
IDENTIFICATION
SHEET OF
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T J A P A N
C O R P S O F E N G
IN
E E R
A P O A P -5
K A I H A W A
II
I N C
S B E R E T A N
IA
S T R E E T C -1 C
H O N O L U L U H I
D E
S
IG
N E
D B
Y
D W
N B
Y
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
S
IZ
E
F
IL
E N
A M
E
D R
A W
IN
G
C O
D E
P
L O
T D
A T
E
C K
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
S U
B M
IT
T
A L
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SIGNED
G R O U P I N T E R N A T
IO
N A L
IS
O A
W H V -1 -D -0
C O M M A N D E R F L E E T A C T
IV
IT
IE
S Y O K O S U K A C F A Y J A P A N
X F -7 -4 -0
7/ /2 :0 3:
A M
/2
/2
:0
:2
A
M C
U s e rs
\l io n e l.
K
A I-
H A
W A
II
\D o c u m e n ts
\k h s -K in n ic k H
S -S c h o o l- S
K A
I .0 lio n e l.
k a i.
rv t
1S-103
R E P L A C E K
IN
N
IC
K H
IG
H S C H O O L
F Y P R O J E C T N O P A
O V E R A L L S E C O N D F L O O R A N D L O W R O O F F R A M
IN
G
P L A N
B M
L J C
J M
J U L Y
P A -B N E W S -1
S
-1
0 10 20 m
SCALE: 1:200
PLAN NORTH
OVERALL SECOND FLOOR AND LOW ROOF FRAMING PLAN
A C
E J
9.1
K
Z
Q
T
H
G
B
FD
6.5
W
B3
1S-301
BLDG
SECT
S R
U
V
Y X
P N
M L
12.6
14.6
7.6
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .