W912HV-22-R-0003 KHS SPECS RTA Vol 2.pdf
PDF 14 MB Posted
- Attached to
- PA00109 DoDEA Replace Kinnick High School, Commander Fleet Activities (CFA), Yokosuka, Japan
- Solicitation number
- W912HV-22-R-0003
About this file
This document provides details for a federal contract solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Japan is seeking a contractor to construct a new four-story high school located at Commander Fleet Activities in Yokosuka, Japan, along with associated athletic fields and site improvements. The high school is anticipated to be approximately 14,700 square meters and include various instructional and support spaces. The project also includes demolition of existing facilities and remediation of contaminated soils. The solicitation will utilize lowest price technically acceptable procedures, with award going to the lowest priced responsible offeror receiving an acceptable rating. The period of performance is estimated at 47 months. Only firms authorized and licensed to perform construction work in Japan will be considered for award. The submission deadline for questions is listed along with instructions for registering for amendments and submitting proposals electronically.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS VOL 2 CODE 6 FINAL DESIGN RTA
Project No: PA00109
Administered By:
U.S. Army Engineering District, Japan
APO AP 96338-5010
For:
The Department of Defense Education Activity (DoDEA)
Arlington, VA 22203
Prepared By:
23 JULY 2021
REPLACE KINNICK HIGH SCHOOL
Commander Fleet Activities Yokosuka, Japan
W912HV-22-R-0003
Replace Kinnick High School
CFA Yokosuka, Japan
PA00109
Final Design RTA
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00-A ENG FORM 4025
01 33 00-B SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
01 33 29-A LEED PROJECT TRACKING CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26-A USACE ACCIDENT PREVENTION PLAN CHECKLIST
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 45 35-A STATEMENT OF SPECIAL INSPECTIONS
01 45 35-B SCHEDULE OF SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 00-A CONSTRUCTION PROJECT SIGNS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS - MASTER DRAFT - Reduced
Submittals
01 57 19-A ENVIRONMENTAL PROTECTION PLAN
01 57 19-B ENVIRONMENTAL BRIEF CHECKLIST
01 57 19-C DIRECT DISCHARGE EFFLUENT LIMITATIONS
01 57 19-D NOEP Review Request Form
01 57 19-E NOEP Requirements Form
01 57 19-F NOEP ROND Form
01 57 19-G BMP Biological Resources
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 00-A DD FORM 1354
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
01 91 00.15-A COMMISSIONING PLAN
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 61 13-A SITE INSPECTION
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 13.00 10-A REPORT OF FINDINGS HAZMAT TESTING
02 82 13.00 10-B AHERA ASBESTOS MANAGEMENT PLAN
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBS
AND MERCURY - MASTER DRAFT
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 33 00 CAST-IN-PLACE ARCHITECTURAL CONCRETE
PA00109
PROJECT TABLE OF CONTENTS Page 2
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 23 00 GLASS UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
06 61 17 HOMOGENEOUS QUARTZ (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 12 00 BUILT-UP BITUMINOUS WATERPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 32 13 ROOF TILES
07 41 63 FABRICATED ROOF PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 56 00 FLUID-APPLIED ROOFING
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
PA00109
PROJECT TABLE OF CONTENTS Page 3
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS, FRAMES, AND WINDOW WALL
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 32 13 ALUMINUM SLIDING/FOLDING GLASS DOORS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR AND WINDOW ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND WINDOW WALL
08 51 13 ALUMINUM WINDOWS
08 60 45 TRANSLUCENT PANELS
08 62 00 SKYLIGHTS
08 71 00 DOOR HARDWARE
08 71 00-A DOOR HARDWARE SCHEDULE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC AND QUARRY TILING
09 51 00 ACOUSTICAL CEILINGS
09 64 66 WOOD ATHLETIC FLOORING
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPETING
09 72 00 WALLCOVERINGS
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 PLAQUE SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 39 FOLDING PANEL PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 28 13-A TOILET ACCESSORY SCHEDULE
10 35 00 FLAGPOLES
10 44 16 FIRE EXTINGUISHER CABINETS
10 51 13 METAL LOCKERS
10 99 00 MISCELLANEOUS SPECIALTIES
PA00109
PROJECT TABLE OF CONTENTS Page 4
DIVISION 11 - EQUIPMENT
11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
11 06 40.13-A FOODSERVICE EQUIPMENT SCHEDULE
11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT
11 44 00 FOOD COOKING EQUIPMENT
11 48 00 CLEANING AND DISPOSAL EQUIPMENT
11 52 13 MOTORIZED PROJECTION SCREENS
11 53 00 LABORATORY EQUIPMENT AND FUMEHOODS
11 61 43 STAGE CURTAINS AND TRACK
11 84 00 ATHLETIC EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 35 53 MANUFACTURED WOOD LABORATORY CASEWORK
12 36 53 EPOXY COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS
12 61 13 UPHOLSTERED AUDIENCE SEATING
12 76 00 TELESCOPING GYM SEATS
12 86 00 BLEACHERS AND PRESS BOX
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATOR
14 42 00 WHEELCHAIR LIFT
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
PA00109
PROJECT TABLE OF CONTENTS Page 5
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM
HEAT EXCHANGERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED-HOT, WATER PIPING SYSTEMS
23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - HVAC
25 05 11.01-A DESIGNER CONTROLS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
(LIGHTING, PUBLIC ADDRESS, INTERCOMMUNICATION, PROGRAM
BELL/MASTER CLOCK)
25 05 11.02-A DESIGNER CONTROLS
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - FIRE
REPORTING AND PUMP CONTROLLER
25 05 11.03-A DESIGNER CONTROLS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00.00 10 ELECTRICAL LIGHTING CONTROL SYSTEMS COMMISSIONING
REQUIREMENTS
26 11 16.00 33 THREE-PHASE, CUBICLE-TYPE PAD-MOUNTED TRANSFORMER
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 41 00 AUDIO/VISUAL SYSTEMS
27 51 16 PUBLIC ADDRESS SYSTEMS
27 51 23.10 INTERCOMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
PA00109
PROJECT TABLE OF CONTENTS Page 6
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
31 23 01.00 20 EXCAVATION AND FILL UNDER BUILDINGS
31 31 16.13 CHEMICAL TERMITE CONTROL
31 62 13.24 CONCRETE CYLINDER PILES
31 62 13.24-A PILE AND DRIVING EQUIPMENT DATA FORM
31 62 13.24-B PILE DRIVING LOG
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE
SUBBASE COURSE FOR PAVING
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 16.16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 16 15 CONCRETE BLOCK PAVEMENTS
32 17 23 PAVEMENT MARKINGS
32 18 16.13 PLAYCOURT PROTECTIVE SURFACING
32 18 23 OUTDOOR ATHLETIC COURTS
32 31 13 CHAIN LINK FENCES AND GATES
32 84 24 IRRIGATION SPRINKLER SYSTEMS
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 12 33.00 30 WATER METERS
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.19 ACTIVE VEHICLE BARRIERS
-- End of Project Table of Contents --
Replace Kinnick High School PA00109 CFA Yokosuka, Japan Final Design RTA
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 12 00
BUILT-UP BITUMINOUS WATERPROOFING
02/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 ENVIRONMENTAL CONDITIONS
1.4 DELIVERY AND STORAGE
1.4.1 Packaged Materials
PART 2 PRODUCTS
2.1 ASPHALT WATERPROOFING SYSTEM
2.1.1 Asphalt Primer Coat
2.1.2 Asphalt Roofing Layer
2.1.3 Asphalt Stretch Roofing
2.1.4 Asphalt Compound
2.1.5 Asphalt Felt Roofing Layer
PART 3 EXECUTION
3.1 INSPECTION OF SURFACES
3.2 PREPARATION OF SURFACES
3.3 APPLICATION
3.3.1 Protection of Surrounding Areas
3.3.2 Waterproofing
3.3.3 Fabric Membrane Reinforcement
3.3.4 Flashing Flanges
3.3.5 Clamping Devices
3.3.6 Reglets
3.4 FIELD TEST
3.4.1 Sampling and Testing of Bulk Liquid Asphalt
3.4.2 Test of Membrane Waterproofing
3.5 PROTECTIVE COVERING
3.5.1 Horizontal Surfaces
3.6 CLEAN UP
-- End of Section Table of Contents --
SECTION 07 12 00 Page 1
SECTION 07 12 00
BUILT-UP BITUMINOUS WATERPROOFING
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS A 6022 (2005) Stretchy Asphalt Roofing Felts (Synthetic Fiber Base)
JIS K 2207 (1996) Petroleum Asphalts
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Asphalt primer coat
Asphalt roofing layer
Asphalt stretch roofing
Asphalt compound
SD-06 Test Reports
Asphalt waterproofing system
Submit certified laboratory reports on the results of tests performed on asphalt delivered to the construction site.
SD-08 Manufacturer's Instructions
Application
1.3 ENVIRONMENTAL CONDITIONS
Apply the primers and waterproofing specified herein when the ambient temperature is above 4 degrees C .
SECTION 07 12 00 Page 2
1.4 DELIVERY AND STORAGE
1.4.1 Packaged Materials
Deliver materials in bundles, rolls, and sealed containers bearing the manufacturer's original labels. Asphalt shall be protected from freezing in a weathertight enclosure. Store materials in an enclosed area free from contact with soil and weather, and maintain at not less than 10 degrees C for at least 24 hours before use. Reinforcement fabrics shall be protected from moisture damage and moisture absorption in a weathertight enclosure or shall be stored off the ground on pallets, and covered on top and all sides with breathable-type canvas tarpaulins.
Plastic sheets cause condensation buildup and therefore shall not be used to cover waterproofing materials. If material is dated for use or shelf life is indicated on the labels, remove outdated material from the jobsite. Damaged or deteriorated materials shall be removed from project site.
PART 2 PRODUCTS
2.1 ASPHALT WATERPROOFING SYSTEM
Use Japanese waterproofing methods of the following types. AI-1 method for main facility roofing and E-2 method for 2nd floor toilets and janitor room.
2.1.1 Asphalt Primer Coat
As recommended by the manufacturer.
2.1.2 Asphalt Roofing Layer
JIS K 2207 as recommended by the manufacturer.
2.1.3 Asphalt Stretch Roofing
JIS A 6022 . Provide layers and types as recommended by the waterproofing manufacturer.
2.1.4 Asphalt Compound
JIS K 2207 , as recommended by the manufacturer.
2.1.5 Asphalt Felt Roofing Layer
As recommended by the manufacturer.
PART 3 EXECUTION
3.1 INSPECTION OF SURFACES
Before starting the work, inspect all surfaces that to be waterproofed to determine if in satisfactory condition. Check the location and setting of all embedded items. Place backing and blocking and perimeter framing for recessed items as required by the various trades on the project. Complete conduit, piping, and other required rough-in. Notify the Contracting Officer of serious defects or conditions that will prevent satisfactory application. Start application after such defects and conditions have been corrected.
SECTION 07 12 00 Page 3
3.2 PREPARATION OF SURFACES
Surfaces to be treated shall be clean and dry, smooth and free from deleterious and excess materials and projections. Concrete surfaces shall be properly cured, free of release agents, oil, grease, dirt, laitance, loose material, frost, debris and other contaminants. Thoroughly wet holes, joints, cracks, and voids in concrete with water, and then carefully fill with portland cement mortar, strike flush, and permit to dry. Cut off or grind smooth high spots. Mortar joints in masonry walls shall be flush and free of extraneous. Give surfaces to receive asphalt membrane waterproofing a priming coat of asphalt primer. Apply priming coat as recommended by the manufacturer, covering the entire surface to be waterproofed. Allow primer to dry before applying waterproofing.
3.3 APPLICATION
Install waterproofing where indicated. Provide ventilation for enclosed spaces when using bituminous membrane waterproofing.
3.3.1 Protection of Surrounding Areas
Before starting waterproofing work, protect surrounding areas and surfaces shall be protected from spillage and migration of asphalt onto other work. D rains and conductors shall be protected from clogging with asphalt.
3.3.2 Waterproofing
Primer shall be applied at a rate of 0.2 liters per square meter. Primer shall not be left in puddles. Primer shall be dry to the touch before application of asphalt. At roof drains, and elsewhere as indicated, the fabric shall extend into a clamping device, set in a heavy coating of flashing cement, and securely clamped.
3.3.3 Fabric Membrane Reinforcement
Provide fabric membranes to reinforce felts at intersections. Provide reinforcement consisting of two plies of fabric membrane cemented in place and to each other with bituminous plastic cement not less than 2 mm thick for each coating.
3.3.4 Flashing Flanges
Prime flashing flanges of pipe sleeves of pipes and ducts penetrating the waterproofing membrane. Allow primer to dry. Strip flanges in with two fabric membrane collars cemented in place and to each other with bituminous plastic cement. Extend collars 100 and 150 mm , respectively, beyond the edge of the flanges, cover the flanges, and fit the flanges tight against the sleeve. Extend waterproofing connected to work exposed to weather to the back of the adjoining work, or counter flash to form a watertight connection.
3.3.5 Clamping Devices
At floor drains and elsewhere, as indicated, extend membrane into clamping device set in heavy coating of bituminous plastic cement, and clamp securely.
SECTION 07 12 00 Page 4
3.3.6 Reglets
Install continuous reglets as specified in Section 07 60 00 FLASHING AND SHEET METAL to receive the exposed edges of membrane waterproofing. After placement of waterproofing, completely fill reglets with bitumen.
3.4 FIELD TEST
3.4.1 Sampling and Testing of Bulk Liquid Asphalt
Notify the Contracting Officer one working day prior to the delivery date of asphalt. Take a minimum of one quart sample of each shipment of bulk liquid asphalt when the shipment arrives at the construction site. Obtain samples in the presence of the Contracting Officer using clean one quart, friction lid cans. Label samples to indicate project contract number, location where used on project, and date and time of arrival of shipment from which sample is taken. Give samples to the Contracting Officer for safekeeping until picked up by the testing laboratory. The Contractor shall pay for the testing of the bulk liquid asphalt. Samples tested which are found not to be in conformance with specification requirements will constitute grounds for rejection. Remove and replace with new materials all waterproofing installed with asphalt from which the nonconforming samples were taken.
3.4.2 Test of Membrane Waterproofing
Prior to concealment, plug the drain and cover membrane waterproofing on horizontal surfaces over finished spaces with 100 mm of ponded water for 24 hours to test watertightness. Make careful measurement of the water level at the beginning and end of the 24-hour period. If water level falls, drain the water, and thoroughly dry and inspect the waterproofing membrane. Make repairs or replacement, as directed, and repeat test.
Work which conceals membrane waterproofing shall not proceed before approval of test results.
3.5 PROTECTIVE COVERING
3.5.1 Horizontal Surfaces
Place protective covering over membrane immediately after application has thoroughly dried. Remove protective covering immediately before proceeding with work that will conceal the membrane waterproofing.
3.6 CLEAN UP
Surfaces of other work which are stained with waterproofing materials shall be cleaned with a cleaner recommended by waterproofing manufacturer.
-- End of Section --
SECTION 07 12 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 13 53
ELASTOMERIC SHEET WATERPROOFING
02/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 MANUFACTURER'S DETAILS
1.4 PRODUCT DATA
1.5 CODE REQUIREMENTS
1.6 DELIVERY, STORAGE, HANDLING, IDENTIFICATION
1.7 ENVIRONMENTAL CONDITIONS
1.8 SPECIAL WARRANTIES
1.8.1 Guarantee
1.8.2 Warranty
PART 2 PRODUCTS
2.1 SUSTAINABILITY CRITERIA
2.1.1 Reduced Volatile Organic Compound (VOC) Content
2.1.2 Recycled Content
2.2 MATERIALS
2.3 COMPOSITE, SELF-ADHERING MEMBRANE SHEETING
2.3.1 Composite, Self-Adhering Sheeting Performance Requirements
2.3.2 Primers
2.3.3 Mastics
2.4 Protection Board
PART 3 EXECUTION
3.1 VERIFICATION OF CONDITIONS
3.2 SURFACE PREPARATION
3.3 APPLICATION
3.3.1 Building Envelope Requirements
3.3.2 General Installation Requirements
3.3.2.1 Self-Adhering Membrane
3.4 COMPOSITE, SELF-ADHERING MEMBRANE
3.5 FLASHING
3.6 PROTECTIVE COVERING
-- End of Section Table of Contents --
SECTION 07 13 53 Page 1
SECTION 07 13 53
ELASTOMERIC SHEET WATERPROOFING
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1305 (2008) Standard Test Method for Crack Bridging Ability of Liquid-Applied Waterproofing Membrane
ASTM D146/D146M (2004; E 2012; R 2012) Sampling and Testing Bitumen-Saturated Felts and Woven Fabrics for Roofing and Waterproofing
ASTM D1876 (2008; R 2015; E 2015) Standard Test Method for Peel Resistance of Adhesives (T-Peel Test)
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D5385/D5385M (1993; R 2014; E 2014) Standard Test Method for Hydrostatic Pressure Resistance of Waterproofing Membranes
ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics
ASTM D903 (1998; R 2010) Peel or Stripping Strength of Adhesive Bonds
ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2015) International Building Code
SECTION 07 13 53 Page 2
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Manufacturer's Standard Details
Protection Board
Primers, Adhesives, and Mastics
SD-06 Test Reports
Protective Covering
SD-07 Certificates
Protective Coverings
Draft Special Warranties
Final Special Warranties
SD-08 Manufacturer's Instructions
Primers, Adhesives, and Mastics
1.3 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating transition and termination details, and installation details. Include verification of existing conditions.
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for protective coverings , and manufacturer's material safety data sheets (MSDS) for primers, adhesives, and mastics .
SECTION 07 13 53 Page 3
1.5 CODE REQUIREMENTS
Provide membrane waterproofing system in accordance with ICC IBC Section 1805 Dampproofing and Waterproofing.
1.6 DELIVERY, STORAGE, HANDLING, IDENTIFICATION
Deliver and store materials in accordance with manufacturer's printed instructions, out of the weather, in manufacturer's original packaging with brand name and product identification clearly marked. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Do not permit unidentified materials in the work area or in the project.
1.7 ENVIRONMENTAL CONDITIONS
Do not apply waterproofing during inclement weather or when there is ice, frost, surface moisture, or visible dampness on the surface to receive waterproofing for when ambient and surface temperatures are 4 degrees C or below. The restriction on the application of waterproofing materials when ambient and surface temperatures are below 4 degrees C will be waived if the Contractor devises a means, approved by the Contracting Officer in writing, of maintaining the surface and ambient temperatures above 4 degrees C .
1.8 SPECIAL WARRANTIES
1.8.1 Guarantee
Guarantee waterproofing membrane installation against failure due to leaks for a period of two years from the date of Beneficial Occupancy. Submit draft and final guarantees in accordance with Sections 01 78 00 CLOSEOUT
SUBMITTALS.
1.8.2 Warranty
Provide manufacturer's material warranty for all system components for a period of ten years from the date of Beneficial Occupancy. Submit draft and final warranties in accordance with Sections 01 78 00 CLOSEOUT
SUBMITTALS.
PART 2 PRODUCTS
2.1 SUSTAINABILITY CRITERIA
Where allowed by performance criteria:
2.1.1 Reduced Volatile Organic Compound (VOC) Content
Provide products with reduced VOC content in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC
COMPOUNDS.
2.1.2 Recycled Content
Provide products with recycled content in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.
SECTION 07 13 53 Page 4
2.2 MATERIALS
Provide elastomeric waterproofing sheet material and related primers, adhesives, and mastics as specified herein. Ensure compatibility of waterproofing materials with each other, and with materials on which they are applied. Provide materials that comply with applicable requirements cited below when tested in accordance with the referenced ASTM publications.
2.3 COMPOSITE, SELF-ADHERING MEMBRANE SHEETING
Cold applied composite sheet consisting of rubberized asphalt and cross laminated, high density polyethylene film. Not less than 1.5 mm minimum thickness is required.
2.3.1 Composite, Self-Adhering Sheeting Performance Requirements
a. Tensile Strength ASTM D412, Die C: 1.6 MPa minimum.
b. Ultimate Elongation, ASTM D412, Die C: 200 percent minimum.
c. Water Vapor Transmission, ASTM E96/E96M 26.7 degrees C Permeance, Procedure B: 5.72 by 10-7 g/Pa.s.m2 maximum.
d. Pliability degrees, ASTM D146/D146M: (180 degrees Bend Over 25 mm Mandrel): No cracks at minus 32 degrees C minus.
e. Provide test report data for crack bridging ability: Either in accordance with ASTM C1305 as modified for a dry film thickness specified by the manufacturer and conducted at low temperature; or in accordance with a cycling over crack test also conducted for the specified dry film thickness at low temperature. Using either test, verify crack bridging up to 6 mm without damage to the membrane system.
f. Puncture Resistance, ASTM E154/E154M REV A: 18 kg minimum.
g. Lap Adhesion at Minimum Application Temperature, ASTM D1876 Modified, 880 N/m .
h. Peel Strength, ASTM D903: Modified 1576 N/m
i. Resistance to Hydrostatic Head, ASTM D5385/D5385M : 70 m of water.
j. Water Absorption, ASTM D570; 0.1 percent maximum.
2.3.2 Primers
Asphalt composition, ASTM D41/D41M, or synthetic polymer in solvent as recommended by the membrane manufacturer.
2.3.3 Mastics
Polymer modified asphalt in suitable solvent of trowel grade consistency and as recommended by the membrane manufacturer.
2.4 Protection Board
Provide protection board that is compatible with the waterproofing membrane. Use a minimum 13 mm thick fir bitumen impregnated board 25 mm
SECTION 07 13 53 Page 5 for polystyrene 3 mm thick for vertical and 6 mm for horizontal premolded bituminous protection board as recommended by the manufacturer.
PART 3 EXECUTION
3.1 VERIFICATION OF CONDITIONS
Before starting the work, verify surfaces that must be waterproofed are in satisfactory condition. Notify the Contracting Officer of defects or conditions anticipated to prevent a satisfactory application. Do not start application until defects and conditions have been corrected.
3.2 SURFACE PREPARATION
Ensure surfaces to receive treatment are clean, dry, smooth, and free from deleterious materials and projections. Thoroughly wet holes, joints, cracks, and voids in concrete with water and fill with Portland cement mortar, strike flush, and permit to dry. Cut off high spots or grind smooth. Finish top surfaces of projecting masonry or concrete ledges below grade, except footings, to a steep bevel with Portland cement mortar. Sweep surfaces to receive covering before applying waterproofing to remove dust and foreign matter. Cure concrete by a method compatible with the waterproofing system.
3.3 APPLICATION
3.3.1 Building Envelope Requirements
Provide a continuous waterproofing system at all material and building transitions. Lap, wrap, fasten and seal products in accordance with manufacturer's printed instructions. Envelope assembly variations are not permitted without written approval from the Contracting Officer's Representative.
3.3.2 General Installation Requirements
Provide sheet waterproofing in accordance with manufacturer's printed installation instructions. Ensure the surface to receive membrane is clean, smooth and dry without surface irregularities; correct deficiencies prior to installation. When using solvent welding liquid, avoid prolonged contact with skin and breathing of vapor and provide adequate ventilation.
Carry waterproofing of horizontal surfaces up abutting vertical surfaces and adhere solid to the substrate. Avoid wrinkles and buckles in applying membrane and joint reinforcement.
3.3.2.1 Self-Adhering Membrane
Apply composite, self-adhering membrane on surfaces primed at a uniform coverage rate in accordance with membrane manufacturer's printed instructions. Remove release sheet and apply with tacky surface in contact with dried primer.
3.4 COMPOSITE, SELF-ADHERING MEMBRANE
Lap sheets at edges and ends a minimum of 65 mm over the preceding sheet.
Provide all side laps a minimum 65 mm and end laps 127 mm . Provide self-adhesive, mastic laps in accordance with manufacturer's recommendation. Roll or firmly press to adhere membrane to substrate.
Cover corners and joints with two layers of reinforcement by first
SECTION 07 13 53 Page 6 applying a 300 mm width of membrane centered along the axis. Flash projections with a second ply of membrane for a distance of 150 mm from the drain or projection. Finish exposed, terminated edges of membrane on horizontal or vertical surfaces with a toweled bead of mastic. Apply mastic around edges of membrane, and drains and projections. Apply mastic at end of each work day.
3.5 FLASHING
Flash penetrations through membrane. Seal all penetrations where reinforcing bars penetrate a waterproofing membrane with the appropriate sealant or mastic flashing component.
3.6 PROTECTIVE COVERING
After installation has been inspected and approved by the Contracting Officer, apply a protective covering to the membrane waterproofing prior to backfilling. Protect vertical membrane waterproofing with a 13 mm minimum thickness of asphalt plank; 13 mm minimum thickness of fiberboard;
or 3 mm minimum thickness of compatible water resistant bitumen type protection board with edges abutting adjacent edges and exposed surfaces covered by a taping system recommended by manufacturer of protection board.
-- End of Section --
SECTION 07 13 53 Page 7
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 21 13
BOARD INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 MANUFACTURER'S DETAILS
1.4 PRODUCT DATA
1.5 CERTIFICATIONS
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Delivery
1.6.2 Storage
1.7 SAFETY PRECAUTIONS
1.7.1 Other Safety Considerations
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Reduced Volatile Organic Compound (VOC) Content
2.1.2 Recycled Content
2.2 BOARD INSULATION
2.2.1 Thermal Resistance
2.2.2 Acoustical Performance (AP-3)
2.2.3 Fire Protection Requirements
2.2.4 Other Material Properties
2.2.5 Prohibited Materials
2.2.6 Below Slab Thickness
2.3 ACCESSORIES
2.3.1 Adhesive
2.3.2 Mechanical Fasteners
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
3.2 INSTALLATION
3.2.1 Installation and Handling
3.2.2 Electrical Wiring
3.2.3 Continuity of Insulation
3.2.4 Coordination
3.3 INSTALLATION ON WALLS
3.3.1 Installation on Walls
3.3.2 Adhesive Attachment to Concrete and Masonry Walls
3.4 INSTALLATION ON UNDERSIDE OF CONCRETE INFILL FLOOR SLAB
3.4.1 Mechanically Fastened Systems
3.4.2 Adhesively Bonded Systems
-- End of Section Table of Contents --
SECTION 07 21 13 Page 1
SECTION 07 21 13
BOARD INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C165 (2007; R 2012) Standard Test Method for Measuring Compressive Properties of Thermal Insulations
ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method
ASTM C578 (2016) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2015) International Building Code
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS A 1901 (2015) Determination of the Emission of Volatile Organic Compounds and Aldehydes by Building Products - Small Chamber Test Method
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS)Indoor Advantage
SECTION 07 21 13 Page 2
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Manufacturer's Standard Details
Board Insulation ;
Accessories
SD-07 Certificates
Board Insulation
SD-08 Manufacturer's Instructions
Board Insulation
Adhesive
1.3 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details. Include verification of existing conditions.
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life and precautions for flammability and toxicity.
1.5 CERTIFICATIONS
Provide products that are third party certified in accordance with ULE Greenguard Gold, SCS Scientific Certification Systems Indoor Advantage Gold , or F 4-Star and 4VOC per JIS A 1901 or approved equal. ( http://www.scsglobalservices.com/indoor-air-quality-certification )
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
SECTION 07 21 13 Page 3
1.6.2 Storage
Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before and during installation.
1.7 SAFETY PRECAUTIONS
1.7.1 Other Safety Considerations
Comply with the safety requirements of ASTM C930.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
Where allowed by performance criteria:
2.1.1 Reduced Volatile Organic Compound (VOC) Content
Provide products with reduced VOC content and F 4-star and 4 VOC rating.
2.1.2 Recycled Content
Provide products with recycled content.
2.2 BOARD INSULATION
Provide thermal and acoustical insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
b. Extruded Preformed Cellular Polystyrene: ASTM C578 REV A, thermal board insulation for concealed installation at external walls.
c. Mineral Fiber Board: ASTM C612, Type IVA compliant for acoustical surfacing.
2.2.1 Thermal Resistance
As indicated.
2.2.2 Acoustical Performance (AP-3)
Provide the following minimum acoustical performance as tested in conformance with ASTM C423:
a. 50 mm thickness: NRC 1.00
b. 75 mm thickness: NRC 1.05
c. 100 mm thickness: NRC 1.10
SECTION 07 21 13 Page 4
2.2.3 Fire Protection Requirements
a. Flame spread index of 25 or less when tested in accordance with
ASTM E84.
b. Smoke developed index of 50 or less when tested in accordance with
ASTM E84.
c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.
2.2.4 Other Material Properties
Provide insulating materials with the following properties:
a. Rigid cellular plastics for thermal: Compressive Resistance at Yield: Not less than 276 kilopascals (kPa) when measured according to
ASTM D1621.
b. Mineral fiber board for acoustic: Compressive strength: Minimum load required to produce a reduction in thickness of 10 percent 4.3 kPa when tested according to ASTM C165.
c. Acoustic Board Facing (AP-3): Black mat with non-woven fiberglass.
d. Below Slab Filler Insulation: 416 kg/m 3 density polyurethane foam sheet reinforced with continuous strand fiberglass and woven roving.
2.2.5 Prohibited Materials
Do not provide materials containing asbestos.
2.2.6 Below Slab Thickness
Provide minimum 25 mm thick boards to fill total thickness as indicated.
2.3 ACCESSORIES
2.3.1 Adhesive
As recommended by insulation manufacturer.
2.3.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Prior to installation, ensure all areas that are in contact with the insulation are dry and free of projections that could cause voids or compressed insulation. Do not proceed with installation if moisture or other conditions are present, and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.
SECTION 07 21 13 Page 5
3.2 INSTALLATION
3.2.1 Installation and Handling
Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.
3.2.2 Electrical Wiring
Do not install insulation in a manner that would enclose electrical wiring between two layers of insulation.
3.2.3 Continuity of Insulation
Butt tightly against adjoining boards, studs, and obstructions. Provide continuity and integrity of insulation. Provide and verify continuity of insulative throughout the building enclosure.
3.2.4 Coordination
Verify final installed insulation thicknesses comply with thicknesses indicated or R-values specified herein or indicated, and with the approved insulation submittal(s).
3.3 INSTALLATION ON WALLS
3.3.1 Installation on Walls
Apply board directly to walls with fasteners adhered to substrate as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Cut insulation to cover walls. Apply adhesive to wall and set clip or other mechanical fastener in adhesive as recommended by manufacturer. After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.
3.3.2 Adhesive Attachment to Concrete and Masonry Walls
Apply adhesive to wall and cover wall as indicated.
3.4 INSTALLATION ON UNDERSIDE OF CONCRETE INFILL FLOOR SLAB
3.4.1 Mechanically Fastened Systems
Size insulation to cover underside of slab. Apply adhesive to slab and set fasteners in adhesive as recommended by manufacturer. After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.
3.4.2 Adhesively Bonded Systems
Apply adhesive to below slab infill insulation to hold in place while topping slab is installed.
SECTION 07 21 13 Page 6
-- End of Section --
SECTION 07 21 13 Page 7
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SUSTAINABLE DESIGN CERTIFICATION
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
1.4.2 Storage
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
1.5.2 Other Safety Concerns
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Recycled Content for Insulation Materials
2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation
Materials
2.2 BLANKET INSULATION
2.2.1 Thermal Resistance Value (R-VALUE) and Acoustical Rating
2.2.2 Recycled Materials
2.2.3 Prohibited Materials
2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation
Materials
2.3 FIBERGLASS ENCAPSULATED ACOUSTICAL CEILING PADS
2.4 CURTAIN WALL INSULATION
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
3.2 INSTALLATION
3.2.1 Insulation
3.2.1.1 Electrical wiring
3.2.1.2 Continuity of Insulation
3.2.1.3 Cold Climate Requirement
3.2.1.4 Insulation without Affixed Vapor Retarder
3.2.1.5 Sizing of Blankets
3.2.1.6 Fiberglass Encapsulated Acoustical Ceiling Pads
3.2.1.7 Curtain Wall Insulation
-- End of Section Table of Contents --
SECTION 07 21 16 Page 1
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method
ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation
ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS A 1901 (2015) Determination of the Emission of Volatile Organic Compounds and Aldehydes by Building Products - Small Chamber Test Method
JIS A 9504 (1952; R2011) Man Made Mineral Fibre Thermal Insulation Materials
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office
SECTION 07 21 16 Page 2 that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Blanket Insulation ;
Curtain Wall Insulation SD-08 Manufacturer's Instructions
Insulation
1.3 SUSTAINABLE DESIGN CERTIFICATION
Product must be third party certified in accordance with ULE Greenguard Gold.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.4.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .
1.5.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:
SECTION 07 21 16 Page 3
2.1.1 Recycled Content for Insulation Materials
Provide insulation materials meeting the recycled content requirements as stated within this section .
2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation Materials
Provide insulation materials meeting the reduced VOC requirements as stated within this section.
2.2 BLANKET INSULATION
ASTM C665, Type I, blankets without membrane coverings except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.
2.2.1 Thermal Resistance Value (R-VALUE) and Acoustical Rating
The R-Value must be as indicated on drawings, minimum R-13 and acoustical insulation NRC of 1.15 and STC of 45, unless indicated otherwise.
2.2.2 Recycled Materials
Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:
Fiberglass: 20 to 25 percent glass cullet
2.2.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation Materials
ULE Greenguard Gold , or F 4-Star and 4VOC per JIS A 1901 .
2.3 FIBERGLASS ENCAPSULATED ACOUSTICAL CEILING PADS
Provide 50 mm thick, 304 mm by 304 mm or 304 mm by 608 mm , 0.102 mm thick black PVC encapsulated pads filled with 32 kg/cubic meter density fiberglass with a NRC of 1.00 when tested in mounting E-400 per ASTM C423.
2.4 CURTAIN WALL INSULATION
Provide UL Perimeter Fire-Containment Systems as indicated consisting of foil faced insulation minimum nominal density of 128 kg/cubic meter conforming with ASTM C612 or JIS A 9504 and unfaced safing insulation minimum nominal density of 64 kg/cubic meter conforming with ASTM C612.
Provide with accessory hangers, washers, T-bars, smoke seals, and anchors for complete tested system.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids or compressed insulation. If moisture or other conditions are found
SECTION 07 21 16 Page 4 that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.2 INSTALLATION
3.2.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.2.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.2.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs and any obstructions. Provide continuity and integrity of insulation. Avoid creating thermal bridges.
3.2.1.3 Cold Climate Requirement
Place insulation to the outside of pipes.
3.2.1.4 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between studs and other framing.
3.2.1.5 Sizing of Blankets
Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.
3.2.1.6 Fiberglass Encapsulated Acoustical Ceiling Pads
Coordinate installation with wood ceiling grilles and planks. Lay panels on top of grilles and planks for 100 percent coverage except for mechanical, electrical, and fire sprinkler penetrations. Where PVC facing is cut or torn, patch with black PVC tape as recommended by the manufacturer.
3.2.1.7 Curtain Wall Insulation
Install insulation to conform with manufacturer's recommendations, design number and requirements of Section 07 84 00 , FIRESTOPPING.
-- End of Section --
SECTION 07 21 16 Page 5
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 22 00
ROOF AND DECK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SHOP DRAWINGS
1.4 PRODUCT DATA
1.5 MANUFACTURER'S INSTRUCTIONS
1.6 QUALITY CONTROL
1.7 FM APPROVAL REQUIREMENTS
1.8 FIRE PERFORMANCE REQUIREMENTS
1.8.1 Insulation in Roof Systems
1.8.2 Fire Resistance Ratings for Roofs
1.9 CERTIFICATIONS
1.10 DELIVERY, STORAGE, AND HANDLING
1.10.1 Delivery
1.10.2 Storage and Handling
1.11 ENVIRONMENTAL CONDITIONS
1.12 PROTECTION
1.12.1 Special Protection
1.12.2 Completed Work
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Reduce Volatile Organic Compounds (VOC) Contents
2.1.2 Recycled Content
2.2 INSULATION
2.2.1 Insulation Type
2.2.2 Recycled Materials
2.2.3 Insulation Thickness
2.2.4 Cants
2.3 COVER BOARD
2.3.1 Glass Mat Gypsum Roof Board
2.4 BITUMENS
2.4.1 Asphalt Roof Cement
2.5 ADHESIVES
2.6 FASTENERS
2.6.1 Fasteners for Steel Decks
2.6.2 Fasteners for Poured Concrete Decks
2.7 WOOD NAILERS
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
3.1.1 Surface Inspection
3.1.2 Surface Preparation
SECTION 07 22 00 Page 1
3.2 INSULATION INSTALLATION
3.2.1 Installation Using Adhesive and Mechanical Fasteners
3.2.2 Special Precautions for Installation of Foam Insulation
3.2.2.1 Polyisocyanurate Insulation
3.2.3 Cant Strips
3.3 PROTECTION
3.3.1 Protection of Applied Insulation
3.3.2 Damaged Work and Materials
3.4 INSPECTION
-- End of Section Table of Contents --
SECTION 07 22 00 Page 2
SECTION 07 22 00
ROOF AND DECK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of…
This is the start of the file's text. The full file is on GovTribe.