W912HV-22-R-0003 KHS SPECS RTA Vol 2.pdf

PDF 14 MB Posted

Attached to
PA00109 DoDEA Replace Kinnick High School, Commander Fleet Activities (CFA), Yokosuka, Japan
Solicitation number
W912HV-22-R-0003
Issued by

About this file

This document provides details for a federal contract solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Japan is seeking a contractor to construct a new four-story high school located at Commander Fleet Activities in Yokosuka, Japan, along with associated athletic fields and site improvements. The high school is anticipated to be approximately 14,700 square meters and include various instructional and support spaces. The project also includes demolition of existing facilities and remediation of contaminated soils. The solicitation will utilize lowest price technically acceptable procedures, with award going to the lowest priced responsible offeror receiving an acceptable rating. The period of performance is estimated at 47 months. Only firms authorized and licensed to perform construction work in Japan will be considered for award. The submission deadline for questions is listed along with instructions for registering for amendments and submitting proposals electronically.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS VOL 2 CODE 6 FINAL DESIGN RTA

Project No: PA00109

Administered By:

U.S. Army Engineering District, Japan

APO AP 96338-5010

For:

The Department of Defense Education Activity (DoDEA)

Arlington, VA 22203

Prepared By:

23 JULY 2021

REPLACE KINNICK HIGH SCHOOL

Commander Fleet Activities Yokosuka, Japan

W912HV-22-R-0003

Replace Kinnick High School

CFA Yokosuka, Japan

PA00109

Final Design RTA

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 00-A ENG FORM 4025

01 33 00-B SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REPORTING

01 33 29-A LEED PROJECT TRACKING CHECKLIST

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 26-A USACE ACCIDENT PREVENTION PLAN CHECKLIST

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 45 35-A STATEMENT OF SPECIAL INSPECTIONS

01 45 35-B SCHEDULE OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 50 00-A CONSTRUCTION PROJECT SIGNS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS - MASTER DRAFT - Reduced

Submittals

01 57 19-A ENVIRONMENTAL PROTECTION PLAN

01 57 19-B ENVIRONMENTAL BRIEF CHECKLIST

01 57 19-C DIRECT DISCHARGE EFFLUENT LIMITATIONS

01 57 19-D NOEP Review Request Form

01 57 19-E NOEP Requirements Form

01 57 19-F NOEP ROND Form

01 57 19-G BMP Biological Resources

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 00-A DD FORM 1354

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

01 91 00.15-A COMMISSIONING PLAN

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 61 13-A SITE INSPECTION

02 82 13.00 10 ASBESTOS ABATEMENT

02 82 13.00 10-A REPORT OF FINDINGS HAZMAT TESTING

02 82 13.00 10-B AHERA ASBESTOS MANAGEMENT PLAN

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBS

AND MERCURY - MASTER DRAFT

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

03 33 00 CAST-IN-PLACE ARCHITECTURAL CONCRETE

PA00109

PROJECT TABLE OF CONTENTS Page 2

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

04 23 00 GLASS UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

06 61 17 HOMOGENEOUS QUARTZ (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 12 00 BUILT-UP BITUMINOUS WATERPROOFING

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 32 13 ROOF TILES

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 56 00 FLUID-APPLIED ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

PA00109

PROJECT TABLE OF CONTENTS Page 3

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS, FRAMES, AND WINDOW WALL

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 32 13 ALUMINUM SLIDING/FOLDING GLASS DOORS

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 73 SOUND CONTROL DOOR AND WINDOW ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND WINDOW WALL

08 51 13 ALUMINUM WINDOWS

08 60 45 TRANSLUCENT PANELS

08 62 00 SKYLIGHTS

08 71 00 DOOR HARDWARE

08 71 00-A DOOR HARDWARE SCHEDULE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC AND QUARRY TILING

09 51 00 ACOUSTICAL CEILINGS

09 64 66 WOOD ATHLETIC FLOORING

09 65 00 RESILIENT FLOORING

09 65 66 RESILIENT ATHLETIC FLOORING

09 68 00 CARPETING

09 72 00 WALLCOVERINGS

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 PLAQUE SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 21 23.16 CUBICLE TRACK AND HARDWARE

10 22 39 FOLDING PANEL PARTITIONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 28 13-A TOILET ACCESSORY SCHEDULE

10 35 00 FLAGPOLES

10 44 16 FIRE EXTINGUISHER CABINETS

10 51 13 METAL LOCKERS

10 99 00 MISCELLANEOUS SPECIALTIES

PA00109

PROJECT TABLE OF CONTENTS Page 4

DIVISION 11 - EQUIPMENT

11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT

11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE

11 06 40.13-A FOODSERVICE EQUIPMENT SCHEDULE

11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT

11 44 00 FOOD COOKING EQUIPMENT

11 48 00 CLEANING AND DISPOSAL EQUIPMENT

11 52 13 MOTORIZED PROJECTION SCREENS

11 53 00 LABORATORY EQUIPMENT AND FUMEHOODS

11 61 43 STAGE CURTAINS AND TRACK

11 84 00 ATHLETIC EQUIPMENT

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 35 53 MANUFACTURED WOOD LABORATORY CASEWORK

12 36 53 EPOXY COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS

12 61 13 UPHOLSTERED AUDIENCE SEATING

12 76 00 TELESCOPING GYM SEATS

12 86 00 BLEACHERS AND PRESS BOX

12 93 00 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 14 - CONVEYING EQUIPMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATOR

14 42 00 WHEELCHAIR LIFT

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

PA00109

PROJECT TABLE OF CONTENTS Page 5

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 30 00 HVAC AIR DISTRIBUTION

23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM

HEAT EXCHANGERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED-HOT, WATER PIPING SYSTEMS

23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - HVAC

25 05 11.01-A DESIGNER CONTROLS

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -

(LIGHTING, PUBLIC ADDRESS, INTERCOMMUNICATION, PROGRAM

BELL/MASTER CLOCK)

25 05 11.02-A DESIGNER CONTROLS

25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - FIRE

REPORTING AND PUMP CONTROLLER

25 05 11.03-A DESIGNER CONTROLS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00.00 10 ELECTRICAL LIGHTING CONTROL SYSTEMS COMMISSIONING

REQUIREMENTS

26 11 16.00 33 THREE-PHASE, CUBICLE-TYPE PAD-MOUNTED TRANSFORMER

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 41 00 AUDIO/VISUAL SYSTEMS

27 51 16 PUBLIC ADDRESS SYSTEMS

27 51 23.10 INTERCOMMUNICATION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

PA00109

PROJECT TABLE OF CONTENTS Page 6

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 23 01.00 20 EXCAVATION AND FILL UNDER BUILDINGS

31 31 16.13 CHEMICAL TERMITE CONTROL

31 62 13.24 CONCRETE CYLINDER PILES

31 62 13.24-A PILE AND DRIVING EQUIPMENT DATA FORM

31 62 13.24-B PILE DRIVING LOG

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE

SUBBASE COURSE FOR PAVING

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 12 16.16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 16 15 CONCRETE BLOCK PAVEMENTS

32 17 23 PAVEMENT MARKINGS

32 18 16.13 PLAYCOURT PROTECTIVE SURFACING

32 18 23 OUTDOOR ATHLETIC COURTS

32 31 13 CHAIN LINK FENCES AND GATES

32 84 24 IRRIGATION SPRINKLER SYSTEMS

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 12 33.00 30 WATER METERS

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 34 - TRANSPORTATION

34 71 13.19 ACTIVE VEHICLE BARRIERS

-- End of Project Table of Contents --

Replace Kinnick High School PA00109 CFA Yokosuka, Japan Final Design RTA

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 12 00

BUILT-UP BITUMINOUS WATERPROOFING

02/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 ENVIRONMENTAL CONDITIONS

1.4 DELIVERY AND STORAGE

1.4.1 Packaged Materials

PART 2 PRODUCTS

2.1 ASPHALT WATERPROOFING SYSTEM

2.1.1 Asphalt Primer Coat

2.1.2 Asphalt Roofing Layer

2.1.3 Asphalt Stretch Roofing

2.1.4 Asphalt Compound

2.1.5 Asphalt Felt Roofing Layer

PART 3 EXECUTION

3.1 INSPECTION OF SURFACES

3.2 PREPARATION OF SURFACES

3.3 APPLICATION

3.3.1 Protection of Surrounding Areas

3.3.2 Waterproofing

3.3.3 Fabric Membrane Reinforcement

3.3.4 Flashing Flanges

3.3.5 Clamping Devices

3.3.6 Reglets

3.4 FIELD TEST

3.4.1 Sampling and Testing of Bulk Liquid Asphalt

3.4.2 Test of Membrane Waterproofing

3.5 PROTECTIVE COVERING

3.5.1 Horizontal Surfaces

3.6 CLEAN UP

-- End of Section Table of Contents --

SECTION 07 12 00 Page 1

SECTION 07 12 00

BUILT-UP BITUMINOUS WATERPROOFING

02/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

JAPANESE INDUSTRIAL STANDARDS (JIS)

JIS A 6022 (2005) Stretchy Asphalt Roofing Felts (Synthetic Fiber Base)

JIS K 2207 (1996) Petroleum Asphalts

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Asphalt primer coat

Asphalt roofing layer

Asphalt stretch roofing

Asphalt compound

SD-06 Test Reports

Asphalt waterproofing system

Submit certified laboratory reports on the results of tests performed on asphalt delivered to the construction site.

SD-08 Manufacturer's Instructions

Application

1.3 ENVIRONMENTAL CONDITIONS

Apply the primers and waterproofing specified herein when the ambient temperature is above 4 degrees C .

SECTION 07 12 00 Page 2

1.4 DELIVERY AND STORAGE

1.4.1 Packaged Materials

Deliver materials in bundles, rolls, and sealed containers bearing the manufacturer's original labels. Asphalt shall be protected from freezing in a weathertight enclosure. Store materials in an enclosed area free from contact with soil and weather, and maintain at not less than 10 degrees C for at least 24 hours before use. Reinforcement fabrics shall be protected from moisture damage and moisture absorption in a weathertight enclosure or shall be stored off the ground on pallets, and covered on top and all sides with breathable-type canvas tarpaulins.

Plastic sheets cause condensation buildup and therefore shall not be used to cover waterproofing materials. If material is dated for use or shelf life is indicated on the labels, remove outdated material from the jobsite. Damaged or deteriorated materials shall be removed from project site.

PART 2 PRODUCTS

2.1 ASPHALT WATERPROOFING SYSTEM

Use Japanese waterproofing methods of the following types. AI-1 method for main facility roofing and E-2 method for 2nd floor toilets and janitor room.

2.1.1 Asphalt Primer Coat

As recommended by the manufacturer.

2.1.2 Asphalt Roofing Layer

JIS K 2207 as recommended by the manufacturer.

2.1.3 Asphalt Stretch Roofing

JIS A 6022 . Provide layers and types as recommended by the waterproofing manufacturer.

2.1.4 Asphalt Compound

JIS K 2207 , as recommended by the manufacturer.

2.1.5 Asphalt Felt Roofing Layer

As recommended by the manufacturer.

PART 3 EXECUTION

3.1 INSPECTION OF SURFACES

Before starting the work, inspect all surfaces that to be waterproofed to determine if in satisfactory condition. Check the location and setting of all embedded items. Place backing and blocking and perimeter framing for recessed items as required by the various trades on the project. Complete conduit, piping, and other required rough-in. Notify the Contracting Officer of serious defects or conditions that will prevent satisfactory application. Start application after such defects and conditions have been corrected.

SECTION 07 12 00 Page 3

3.2 PREPARATION OF SURFACES

Surfaces to be treated shall be clean and dry, smooth and free from deleterious and excess materials and projections. Concrete surfaces shall be properly cured, free of release agents, oil, grease, dirt, laitance, loose material, frost, debris and other contaminants. Thoroughly wet holes, joints, cracks, and voids in concrete with water, and then carefully fill with portland cement mortar, strike flush, and permit to dry. Cut off or grind smooth high spots. Mortar joints in masonry walls shall be flush and free of extraneous. Give surfaces to receive asphalt membrane waterproofing a priming coat of asphalt primer. Apply priming coat as recommended by the manufacturer, covering the entire surface to be waterproofed. Allow primer to dry before applying waterproofing.

3.3 APPLICATION

Install waterproofing where indicated. Provide ventilation for enclosed spaces when using bituminous membrane waterproofing.

3.3.1 Protection of Surrounding Areas

Before starting waterproofing work, protect surrounding areas and surfaces shall be protected from spillage and migration of asphalt onto other work. D rains and conductors shall be protected from clogging with asphalt.

3.3.2 Waterproofing

Primer shall be applied at a rate of 0.2 liters per square meter. Primer shall not be left in puddles. Primer shall be dry to the touch before application of asphalt. At roof drains, and elsewhere as indicated, the fabric shall extend into a clamping device, set in a heavy coating of flashing cement, and securely clamped.

3.3.3 Fabric Membrane Reinforcement

Provide fabric membranes to reinforce felts at intersections. Provide reinforcement consisting of two plies of fabric membrane cemented in place and to each other with bituminous plastic cement not less than 2 mm thick for each coating.

3.3.4 Flashing Flanges

Prime flashing flanges of pipe sleeves of pipes and ducts penetrating the waterproofing membrane. Allow primer to dry. Strip flanges in with two fabric membrane collars cemented in place and to each other with bituminous plastic cement. Extend collars 100 and 150 mm , respectively, beyond the edge of the flanges, cover the flanges, and fit the flanges tight against the sleeve. Extend waterproofing connected to work exposed to weather to the back of the adjoining work, or counter flash to form a watertight connection.

3.3.5 Clamping Devices

At floor drains and elsewhere, as indicated, extend membrane into clamping device set in heavy coating of bituminous plastic cement, and clamp securely.

SECTION 07 12 00 Page 4

3.3.6 Reglets

Install continuous reglets as specified in Section 07 60 00 FLASHING AND SHEET METAL to receive the exposed edges of membrane waterproofing. After placement of waterproofing, completely fill reglets with bitumen.

3.4 FIELD TEST

3.4.1 Sampling and Testing of Bulk Liquid Asphalt

Notify the Contracting Officer one working day prior to the delivery date of asphalt. Take a minimum of one quart sample of each shipment of bulk liquid asphalt when the shipment arrives at the construction site. Obtain samples in the presence of the Contracting Officer using clean one quart, friction lid cans. Label samples to indicate project contract number, location where used on project, and date and time of arrival of shipment from which sample is taken. Give samples to the Contracting Officer for safekeeping until picked up by the testing laboratory. The Contractor shall pay for the testing of the bulk liquid asphalt. Samples tested which are found not to be in conformance with specification requirements will constitute grounds for rejection. Remove and replace with new materials all waterproofing installed with asphalt from which the nonconforming samples were taken.

3.4.2 Test of Membrane Waterproofing

Prior to concealment, plug the drain and cover membrane waterproofing on horizontal surfaces over finished spaces with 100 mm of ponded water for 24 hours to test watertightness. Make careful measurement of the water level at the beginning and end of the 24-hour period. If water level falls, drain the water, and thoroughly dry and inspect the waterproofing membrane. Make repairs or replacement, as directed, and repeat test.

Work which conceals membrane waterproofing shall not proceed before approval of test results.

3.5 PROTECTIVE COVERING

3.5.1 Horizontal Surfaces

Place protective covering over membrane immediately after application has thoroughly dried. Remove protective covering immediately before proceeding with work that will conceal the membrane waterproofing.

3.6 CLEAN UP

Surfaces of other work which are stained with waterproofing materials shall be cleaned with a cleaner recommended by waterproofing manufacturer.

-- End of Section --

SECTION 07 12 00 Page 5

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 13 53

ELASTOMERIC SHEET WATERPROOFING

02/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 MANUFACTURER'S DETAILS

1.4 PRODUCT DATA

1.5 CODE REQUIREMENTS

1.6 DELIVERY, STORAGE, HANDLING, IDENTIFICATION

1.7 ENVIRONMENTAL CONDITIONS

1.8 SPECIAL WARRANTIES

1.8.1 Guarantee

1.8.2 Warranty

PART 2 PRODUCTS

2.1 SUSTAINABILITY CRITERIA

2.1.1 Reduced Volatile Organic Compound (VOC) Content

2.1.2 Recycled Content

2.2 MATERIALS

2.3 COMPOSITE, SELF-ADHERING MEMBRANE SHEETING

2.3.1 Composite, Self-Adhering Sheeting Performance Requirements

2.3.2 Primers

2.3.3 Mastics

2.4 Protection Board

PART 3 EXECUTION

3.1 VERIFICATION OF CONDITIONS

3.2 SURFACE PREPARATION

3.3 APPLICATION

3.3.1 Building Envelope Requirements

3.3.2 General Installation Requirements

3.3.2.1 Self-Adhering Membrane

3.4 COMPOSITE, SELF-ADHERING MEMBRANE

3.5 FLASHING

3.6 PROTECTIVE COVERING

-- End of Section Table of Contents --

SECTION 07 13 53 Page 1

SECTION 07 13 53

ELASTOMERIC SHEET WATERPROOFING

02/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1305 (2008) Standard Test Method for Crack Bridging Ability of Liquid-Applied Waterproofing Membrane

ASTM D146/D146M (2004; E 2012; R 2012) Sampling and Testing Bitumen-Saturated Felts and Woven Fabrics for Roofing and Waterproofing

ASTM D1876 (2008; R 2015; E 2015) Standard Test Method for Peel Resistance of Adhesives (T-Peel Test)

ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing

ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D5385/D5385M (1993; R 2014; E 2014) Standard Test Method for Hydrostatic Pressure Resistance of Waterproofing Membranes

ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics

ASTM D903 (1998; R 2010) Peel or Stripping Strength of Adhesive Bonds

ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

SECTION 07 13 53 Page 2

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Manufacturer's Standard Details

Protection Board

Primers, Adhesives, and Mastics

SD-06 Test Reports

Protective Covering

SD-07 Certificates

Protective Coverings

Draft Special Warranties

Final Special Warranties

SD-08 Manufacturer's Instructions

Primers, Adhesives, and Mastics

1.3 MANUFACTURER'S DETAILS

Submit manufacturer's standard details indicating transition and termination details, and installation details. Include verification of existing conditions.

1.4 PRODUCT DATA

Include data for material descriptions, recommendations for product shelf life, requirements for protective coverings , and manufacturer's material safety data sheets (MSDS) for primers, adhesives, and mastics .

SECTION 07 13 53 Page 3

1.5 CODE REQUIREMENTS

Provide membrane waterproofing system in accordance with ICC IBC Section 1805 Dampproofing and Waterproofing.

1.6 DELIVERY, STORAGE, HANDLING, IDENTIFICATION

Deliver and store materials in accordance with manufacturer's printed instructions, out of the weather, in manufacturer's original packaging with brand name and product identification clearly marked. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Do not permit unidentified materials in the work area or in the project.

1.7 ENVIRONMENTAL CONDITIONS

Do not apply waterproofing during inclement weather or when there is ice, frost, surface moisture, or visible dampness on the surface to receive waterproofing for when ambient and surface temperatures are 4 degrees C or below. The restriction on the application of waterproofing materials when ambient and surface temperatures are below 4 degrees C will be waived if the Contractor devises a means, approved by the Contracting Officer in writing, of maintaining the surface and ambient temperatures above 4 degrees C .

1.8 SPECIAL WARRANTIES

1.8.1 Guarantee

Guarantee waterproofing membrane installation against failure due to leaks for a period of two years from the date of Beneficial Occupancy. Submit draft and final guarantees in accordance with Sections 01 78 00 CLOSEOUT

SUBMITTALS.

1.8.2 Warranty

Provide manufacturer's material warranty for all system components for a period of ten years from the date of Beneficial Occupancy. Submit draft and final warranties in accordance with Sections 01 78 00 CLOSEOUT

SUBMITTALS.

PART 2 PRODUCTS

2.1 SUSTAINABILITY CRITERIA

Where allowed by performance criteria:

2.1.1 Reduced Volatile Organic Compound (VOC) Content

Provide products with reduced VOC content in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC

COMPOUNDS.

2.1.2 Recycled Content

Provide products with recycled content in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.

SECTION 07 13 53 Page 4

2.2 MATERIALS

Provide elastomeric waterproofing sheet material and related primers, adhesives, and mastics as specified herein. Ensure compatibility of waterproofing materials with each other, and with materials on which they are applied. Provide materials that comply with applicable requirements cited below when tested in accordance with the referenced ASTM publications.

2.3 COMPOSITE, SELF-ADHERING MEMBRANE SHEETING

Cold applied composite sheet consisting of rubberized asphalt and cross laminated, high density polyethylene film. Not less than 1.5 mm minimum thickness is required.

2.3.1 Composite, Self-Adhering Sheeting Performance Requirements

a. Tensile Strength ASTM D412, Die C: 1.6 MPa minimum.

b. Ultimate Elongation, ASTM D412, Die C: 200 percent minimum.

c. Water Vapor Transmission, ASTM E96/E96M 26.7 degrees C Permeance, Procedure B: 5.72 by 10-7 g/Pa.s.m2 maximum.

d. Pliability degrees, ASTM D146/D146M: (180 degrees Bend Over 25 mm Mandrel): No cracks at minus 32 degrees C minus.

e. Provide test report data for crack bridging ability: Either in accordance with ASTM C1305 as modified for a dry film thickness specified by the manufacturer and conducted at low temperature; or in accordance with a cycling over crack test also conducted for the specified dry film thickness at low temperature. Using either test, verify crack bridging up to 6 mm without damage to the membrane system.

f. Puncture Resistance, ASTM E154/E154M REV A: 18 kg minimum.

g. Lap Adhesion at Minimum Application Temperature, ASTM D1876 Modified, 880 N/m .

h. Peel Strength, ASTM D903: Modified 1576 N/m

i. Resistance to Hydrostatic Head, ASTM D5385/D5385M : 70 m of water.

j. Water Absorption, ASTM D570; 0.1 percent maximum.

2.3.2 Primers

Asphalt composition, ASTM D41/D41M, or synthetic polymer in solvent as recommended by the membrane manufacturer.

2.3.3 Mastics

Polymer modified asphalt in suitable solvent of trowel grade consistency and as recommended by the membrane manufacturer.

2.4 Protection Board

Provide protection board that is compatible with the waterproofing membrane. Use a minimum 13 mm thick fir bitumen impregnated board 25 mm

SECTION 07 13 53 Page 5 for polystyrene 3 mm thick for vertical and 6 mm for horizontal premolded bituminous protection board as recommended by the manufacturer.

PART 3 EXECUTION

3.1 VERIFICATION OF CONDITIONS

Before starting the work, verify surfaces that must be waterproofed are in satisfactory condition. Notify the Contracting Officer of defects or conditions anticipated to prevent a satisfactory application. Do not start application until defects and conditions have been corrected.

3.2 SURFACE PREPARATION

Ensure surfaces to receive treatment are clean, dry, smooth, and free from deleterious materials and projections. Thoroughly wet holes, joints, cracks, and voids in concrete with water and fill with Portland cement mortar, strike flush, and permit to dry. Cut off high spots or grind smooth. Finish top surfaces of projecting masonry or concrete ledges below grade, except footings, to a steep bevel with Portland cement mortar. Sweep surfaces to receive covering before applying waterproofing to remove dust and foreign matter. Cure concrete by a method compatible with the waterproofing system.

3.3 APPLICATION

3.3.1 Building Envelope Requirements

Provide a continuous waterproofing system at all material and building transitions. Lap, wrap, fasten and seal products in accordance with manufacturer's printed instructions. Envelope assembly variations are not permitted without written approval from the Contracting Officer's Representative.

3.3.2 General Installation Requirements

Provide sheet waterproofing in accordance with manufacturer's printed installation instructions. Ensure the surface to receive membrane is clean, smooth and dry without surface irregularities; correct deficiencies prior to installation. When using solvent welding liquid, avoid prolonged contact with skin and breathing of vapor and provide adequate ventilation.

Carry waterproofing of horizontal surfaces up abutting vertical surfaces and adhere solid to the substrate. Avoid wrinkles and buckles in applying membrane and joint reinforcement.

3.3.2.1 Self-Adhering Membrane

Apply composite, self-adhering membrane on surfaces primed at a uniform coverage rate in accordance with membrane manufacturer's printed instructions. Remove release sheet and apply with tacky surface in contact with dried primer.

3.4 COMPOSITE, SELF-ADHERING MEMBRANE

Lap sheets at edges and ends a minimum of 65 mm over the preceding sheet.

Provide all side laps a minimum 65 mm and end laps 127 mm . Provide self-adhesive, mastic laps in accordance with manufacturer's recommendation. Roll or firmly press to adhere membrane to substrate.

Cover corners and joints with two layers of reinforcement by first

SECTION 07 13 53 Page 6 applying a 300 mm width of membrane centered along the axis. Flash projections with a second ply of membrane for a distance of 150 mm from the drain or projection. Finish exposed, terminated edges of membrane on horizontal or vertical surfaces with a toweled bead of mastic. Apply mastic around edges of membrane, and drains and projections. Apply mastic at end of each work day.

3.5 FLASHING

Flash penetrations through membrane. Seal all penetrations where reinforcing bars penetrate a waterproofing membrane with the appropriate sealant or mastic flashing component.

3.6 PROTECTIVE COVERING

After installation has been inspected and approved by the Contracting Officer, apply a protective covering to the membrane waterproofing prior to backfilling. Protect vertical membrane waterproofing with a 13 mm minimum thickness of asphalt plank; 13 mm minimum thickness of fiberboard;

or 3 mm minimum thickness of compatible water resistant bitumen type protection board with edges abutting adjacent edges and exposed surfaces covered by a taping system recommended by manufacturer of protection board.

-- End of Section --

SECTION 07 13 53 Page 7

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 21 13

BOARD INSULATION

02/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 MANUFACTURER'S DETAILS

1.4 PRODUCT DATA

1.5 CERTIFICATIONS

1.6 DELIVERY, STORAGE, AND HANDLING

1.6.1 Delivery

1.6.2 Storage

1.7 SAFETY PRECAUTIONS

1.7.1 Other Safety Considerations

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Reduced Volatile Organic Compound (VOC) Content

2.1.2 Recycled Content

2.2 BOARD INSULATION

2.2.1 Thermal Resistance

2.2.2 Acoustical Performance (AP-3)

2.2.3 Fire Protection Requirements

2.2.4 Other Material Properties

2.2.5 Prohibited Materials

2.2.6 Below Slab Thickness

2.3 ACCESSORIES

2.3.1 Adhesive

2.3.2 Mechanical Fasteners

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

3.2 INSTALLATION

3.2.1 Installation and Handling

3.2.2 Electrical Wiring

3.2.3 Continuity of Insulation

3.2.4 Coordination

3.3 INSTALLATION ON WALLS

3.3.1 Installation on Walls

3.3.2 Adhesive Attachment to Concrete and Masonry Walls

3.4 INSTALLATION ON UNDERSIDE OF CONCRETE INFILL FLOOR SLAB

3.4.1 Mechanically Fastened Systems

3.4.2 Adhesively Bonded Systems

-- End of Section Table of Contents --

SECTION 07 21 13 Page 1

SECTION 07 21 13

BOARD INSULATION

02/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C165 (2007; R 2012) Standard Test Method for Measuring Compressive Properties of Thermal Insulations

ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method

ASTM C578 (2016) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation

ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories

ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics

ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

JAPANESE INDUSTRIAL STANDARDS (JIS)

JIS A 1901 (2015) Determination of the Emission of Volatile Organic Compounds and Aldehydes by Building Products - Small Chamber Test Method

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS)Indoor Advantage

SECTION 07 21 13 Page 2

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Manufacturer's Standard Details

Board Insulation ;

Accessories

SD-07 Certificates

Board Insulation

SD-08 Manufacturer's Instructions

Board Insulation

Adhesive

1.3 MANUFACTURER'S DETAILS

Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details. Include verification of existing conditions.

1.4 PRODUCT DATA

Include data for material descriptions, recommendations for product shelf life and precautions for flammability and toxicity.

1.5 CERTIFICATIONS

Provide products that are third party certified in accordance with ULE Greenguard Gold, SCS Scientific Certification Systems Indoor Advantage Gold , or F 4-Star and 4VOC per JIS A 1901 or approved equal. ( http://www.scsglobalservices.com/indoor-air-quality-certification )

1.6 DELIVERY, STORAGE, AND HANDLING

1.6.1 Delivery

Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.

SECTION 07 21 13 Page 3

1.6.2 Storage

Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before and during installation.

1.7 SAFETY PRECAUTIONS

1.7.1 Other Safety Considerations

Comply with the safety requirements of ASTM C930.

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

Where allowed by performance criteria:

2.1.1 Reduced Volatile Organic Compound (VOC) Content

Provide products with reduced VOC content and F 4-star and 4 VOC rating.

2.1.2 Recycled Content

Provide products with recycled content.

2.2 BOARD INSULATION

Provide thermal and acoustical insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:

b. Extruded Preformed Cellular Polystyrene: ASTM C578 REV A, thermal board insulation for concealed installation at external walls.

c. Mineral Fiber Board: ASTM C612, Type IVA compliant for acoustical surfacing.

2.2.1 Thermal Resistance

As indicated.

2.2.2 Acoustical Performance (AP-3)

Provide the following minimum acoustical performance as tested in conformance with ASTM C423:

a. 50 mm thickness: NRC 1.00

b. 75 mm thickness: NRC 1.05

c. 100 mm thickness: NRC 1.10

SECTION 07 21 13 Page 4

2.2.3 Fire Protection Requirements

a. Flame spread index of 25 or less when tested in accordance with

ASTM E84.

b. Smoke developed index of 50 or less when tested in accordance with

ASTM E84.

c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.

2.2.4 Other Material Properties

Provide insulating materials with the following properties:

a. Rigid cellular plastics for thermal: Compressive Resistance at Yield: Not less than 276 kilopascals (kPa) when measured according to

ASTM D1621.

b. Mineral fiber board for acoustic: Compressive strength: Minimum load required to produce a reduction in thickness of 10 percent 4.3 kPa when tested according to ASTM C165.

c. Acoustic Board Facing (AP-3): Black mat with non-woven fiberglass.

d. Below Slab Filler Insulation: 416 kg/m 3 density polyurethane foam sheet reinforced with continuous strand fiberglass and woven roving.

2.2.5 Prohibited Materials

Do not provide materials containing asbestos.

2.2.6 Below Slab Thickness

Provide minimum 25 mm thick boards to fill total thickness as indicated.

2.3 ACCESSORIES

2.3.1 Adhesive

As recommended by insulation manufacturer.

2.3.2 Mechanical Fasteners

Corrosion resistant fasteners as recommended by the insulation manufacturer.

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

Prior to installation, ensure all areas that are in contact with the insulation are dry and free of projections that could cause voids or compressed insulation. Do not proceed with installation if moisture or other conditions are present, and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.

SECTION 07 21 13 Page 5

3.2 INSTALLATION

3.2.1 Installation and Handling

Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.

3.2.2 Electrical Wiring

Do not install insulation in a manner that would enclose electrical wiring between two layers of insulation.

3.2.3 Continuity of Insulation

Butt tightly against adjoining boards, studs, and obstructions. Provide continuity and integrity of insulation. Provide and verify continuity of insulative throughout the building enclosure.

3.2.4 Coordination

Verify final installed insulation thicknesses comply with thicknesses indicated or R-values specified herein or indicated, and with the approved insulation submittal(s).

3.3 INSTALLATION ON WALLS

3.3.1 Installation on Walls

Apply board directly to walls with fasteners adhered to substrate as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Cut insulation to cover walls. Apply adhesive to wall and set clip or other mechanical fastener in adhesive as recommended by manufacturer. After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.

3.3.2 Adhesive Attachment to Concrete and Masonry Walls

Apply adhesive to wall and cover wall as indicated.

3.4 INSTALLATION ON UNDERSIDE OF CONCRETE INFILL FLOOR SLAB

3.4.1 Mechanically Fastened Systems

Size insulation to cover underside of slab. Apply adhesive to slab and set fasteners in adhesive as recommended by manufacturer. After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.

3.4.2 Adhesively Bonded Systems

Apply adhesive to below slab infill insulation to hold in place while topping slab is installed.

SECTION 07 21 13 Page 6

-- End of Section --

SECTION 07 21 13 Page 7

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 21 16

MINERAL FIBER BLANKET INSULATION

11/11

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 SUSTAINABLE DESIGN CERTIFICATION

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery

1.4.2 Storage

1.5 SAFETY PRECAUTIONS

1.5.1 Respirators

1.5.2 Other Safety Concerns

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Recycled Content for Insulation Materials

2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation

Materials

2.2 BLANKET INSULATION

2.2.1 Thermal Resistance Value (R-VALUE) and Acoustical Rating

2.2.2 Recycled Materials

2.2.3 Prohibited Materials

2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation

Materials

2.3 FIBERGLASS ENCAPSULATED ACOUSTICAL CEILING PADS

2.4 CURTAIN WALL INSULATION

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

3.2 INSTALLATION

3.2.1 Insulation

3.2.1.1 Electrical wiring

3.2.1.2 Continuity of Insulation

3.2.1.3 Cold Climate Requirement

3.2.1.4 Insulation without Affixed Vapor Retarder

3.2.1.5 Sizing of Blankets

3.2.1.6 Fiberglass Encapsulated Acoustical Ceiling Pads

3.2.1.7 Curtain Wall Insulation

-- End of Section Table of Contents --

SECTION 07 21 16 Page 1

SECTION 07 21 16

MINERAL FIBER BLANKET INSULATION

11/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method

ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation

ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing

ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories

ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials

JAPANESE INDUSTRIAL STANDARDS (JIS)

JIS A 1901 (2015) Determination of the Emission of Volatile Organic Compounds and Aldehydes by Building Products - Small Chamber Test Method

JIS A 9504 (1952; R2011) Man Made Mineral Fibre Thermal Insulation Materials

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.134 Respiratory Protection

UL ENVIRONMENT (ULE)

ULE Greenguard UL Greenguard Certification Program

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office

SECTION 07 21 16 Page 2 that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Blanket Insulation ;

Curtain Wall Insulation SD-08 Manufacturer's Instructions

Insulation

1.3 SUSTAINABLE DESIGN CERTIFICATION

Product must be third party certified in accordance with ULE Greenguard Gold.

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery

Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.

1.4.2 Storage

Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.

1.5 SAFETY PRECAUTIONS

1.5.1 Respirators

Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .

1.5.2 Other Safety Concerns

Consider other safety concerns and measures as outlined in ASTM C930.

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:

SECTION 07 21 16 Page 3

2.1.1 Recycled Content for Insulation Materials

Provide insulation materials meeting the recycled content requirements as stated within this section .

2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation Materials

Provide insulation materials meeting the reduced VOC requirements as stated within this section.

2.2 BLANKET INSULATION

ASTM C665, Type I, blankets without membrane coverings except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.

2.2.1 Thermal Resistance Value (R-VALUE) and Acoustical Rating

The R-Value must be as indicated on drawings, minimum R-13 and acoustical insulation NRC of 1.15 and STC of 45, unless indicated otherwise.

2.2.2 Recycled Materials

Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:

Fiberglass: 20 to 25 percent glass cullet

2.2.3 Prohibited Materials

Do not provide asbestos-containing materials.

2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation Materials

ULE Greenguard Gold , or F 4-Star and 4VOC per JIS A 1901 .

2.3 FIBERGLASS ENCAPSULATED ACOUSTICAL CEILING PADS

Provide 50 mm thick, 304 mm by 304 mm or 304 mm by 608 mm , 0.102 mm thick black PVC encapsulated pads filled with 32 kg/cubic meter density fiberglass with a NRC of 1.00 when tested in mounting E-400 per ASTM C423.

2.4 CURTAIN WALL INSULATION

Provide UL Perimeter Fire-Containment Systems as indicated consisting of foil faced insulation minimum nominal density of 128 kg/cubic meter conforming with ASTM C612 or JIS A 9504 and unfaced safing insulation minimum nominal density of 64 kg/cubic meter conforming with ASTM C612.

Provide with accessory hangers, washers, T-bars, smoke seals, and anchors for complete tested system.

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids or compressed insulation. If moisture or other conditions are found

SECTION 07 21 16 Page 4 that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.

3.2 INSTALLATION

3.2.1 Insulation

Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.

3.2.1.1 Electrical wiring

Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.

3.2.1.2 Continuity of Insulation

Install blanket insulation to butt tightly against adjoining blankets and to studs and any obstructions. Provide continuity and integrity of insulation. Avoid creating thermal bridges.

3.2.1.3 Cold Climate Requirement

Place insulation to the outside of pipes.

3.2.1.4 Insulation without Affixed Vapor Retarder

Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between studs and other framing.

3.2.1.5 Sizing of Blankets

Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.

3.2.1.6 Fiberglass Encapsulated Acoustical Ceiling Pads

Coordinate installation with wood ceiling grilles and planks. Lay panels on top of grilles and planks for 100 percent coverage except for mechanical, electrical, and fire sprinkler penetrations. Where PVC facing is cut or torn, patch with black PVC tape as recommended by the manufacturer.

3.2.1.7 Curtain Wall Insulation

Install insulation to conform with manufacturer's recommendations, design number and requirements of Section 07 84 00 , FIRESTOPPING.

-- End of Section --

SECTION 07 21 16 Page 5

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 22 00

ROOF AND DECK INSULATION

02/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 SHOP DRAWINGS

1.4 PRODUCT DATA

1.5 MANUFACTURER'S INSTRUCTIONS

1.6 QUALITY CONTROL

1.7 FM APPROVAL REQUIREMENTS

1.8 FIRE PERFORMANCE REQUIREMENTS

1.8.1 Insulation in Roof Systems

1.8.2 Fire Resistance Ratings for Roofs

1.9 CERTIFICATIONS

1.10 DELIVERY, STORAGE, AND HANDLING

1.10.1 Delivery

1.10.2 Storage and Handling

1.11 ENVIRONMENTAL CONDITIONS

1.12 PROTECTION

1.12.1 Special Protection

1.12.2 Completed Work

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Reduce Volatile Organic Compounds (VOC) Contents

2.1.2 Recycled Content

2.2 INSULATION

2.2.1 Insulation Type

2.2.2 Recycled Materials

2.2.3 Insulation Thickness

2.2.4 Cants

2.3 COVER BOARD

2.3.1 Glass Mat Gypsum Roof Board

2.4 BITUMENS

2.4.1 Asphalt Roof Cement

2.5 ADHESIVES

2.6 FASTENERS

2.6.1 Fasteners for Steel Decks

2.6.2 Fasteners for Poured Concrete Decks

2.7 WOOD NAILERS

PART 3 EXECUTION

3.1 EXAMINATION AND PREPARATION

3.1.1 Surface Inspection

3.1.2 Surface Preparation

SECTION 07 22 00 Page 1

3.2 INSULATION INSTALLATION

3.2.1 Installation Using Adhesive and Mechanical Fasteners

3.2.2 Special Precautions for Installation of Foam Insulation

3.2.2.1 Polyisocyanurate Insulation

3.2.3 Cant Strips

3.3 PROTECTION

3.3.1 Protection of Applied Insulation

3.3.2 Damaged Work and Materials

3.4 INSPECTION

-- End of Section Table of Contents --

SECTION 07 22 00 Page 2

SECTION 07 22 00

ROOF AND DECK INSULATION

02/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .