This solicitation seeks proposals for the Asia Pacific Stability Initiative (APSI) Fuel Receipt and Distribution Upgrades project at Yokota Air Base in Japan. The scope of work includes expanding and upgrading the existing liquid fuel unloading facility to accommodate both rail cars and fuel delivery trucks. Key aspects of the work are replacing rail station headers, adding truck offload headers, constructing new drop tanks in below-ground vaults with pumps and piping, upgrading the backup generator, adding secondary containment and a remote spill containment basin, constructing truck access roads and a parking area, and performing other infrastructure upgrades and improvements. The closing date for proposals is listed as well as details on a pre-proposal site visit. The solicitation also includes the specifications and drawings for the project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 43 PAGES
W912HV-21-R-0001
APSI Fuel Distribution & Upgrade
01 11 00.00 10 SD-01 Preconstruction Submittals
1.11Initial Site Conditions Photos
1.7 GKey Personnel Qualifications
SD-07 Certificates
1.11Monthly Progress Photos
SD-11 Closeout Submittals
1.11Construction Completion Photos
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
1.8.1 GSubmittal Register Monthly
Update
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
1.7.2.3 GCritical Lift Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
1.12Notifications And Reports
SD-07 Certificates
1.6.1.4 GCrane Operators/Riggers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 43 PAGES
APSI Fuel Distribution & Upgrade
01 35 26 1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.7.2.2 GStandard Lift Plan
1.12.4Certificate Of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written Practices
3.1.3Written Practices
3.1.1NDT Procedures and Equipment
Calibration Records
3.1.3NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 43 PAGES
APSI Fuel Distribution & Upgrade
01 45 35 2.1Certificate of Compliance
1.5.10 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
3.3.2 GTemporary Utility Connections
Plan
01 57 19.01 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.9.10.1 GSolid Waste Management Permit
1.8.2Regulatory Notifications
1.9 GEnvironmental Protection Plan
1.9.6.2 GDirt and Dust Control Plan
1.8.5 GEmployee Training Records
1.8.4 GEnvironmental Manager
Qualifications
3.15.3 GTemporary Fuel Storage Tank
Approval Request
3.15.5 GUnderground Fuel Storage Tank
Approval Request
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 43 PAGES
APSI Fuel Distribution & Upgrade
01 57 19.01 3.8.1 GWaste Determination
Documentation
1.8.3 GLicenses/Permits/Notifications
1.9.7.1 GStormwater Pollution Prevention
Plan
1.9.7.1 GStormwater Pollution Prevention
Plan
SD-06 Test Reports
3.8.1.1.2Laboratory Analysis
3.2.1Inspection Reports
3.8.2.1 GSolid Waste Management Report
3.7.2Nonhazardous Solid Waste
Diversion Report
1.9.9.2Hazardous Waste Analysis
Report
SD-07 Certificates
1.8.5 GEmployee Training Records
1.9.10.1Solid Waste Management
License
1.7.1Asbestos Certification
1.7.2Lead Certification
3.11 GWritten Assessment Of Friable
Asbestos Disturbance
SD-11 Closeout Submittals
3.8.1 GWaste Determination
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 43 PAGES
APSI Fuel Distribution & Upgrade
01 57 19.01 3.8.3.4 GDisposal Documentation for
Hazardous and Regulated Waste
1.8.5 GAssembled Employee Training
Records
1.9.10.1 GSolid Waste Management Permit
3.8.2.1 GSolid Waste Management Report
3.8.3.1 GHazardous Waste/Debris
Management
1.9.11.2 GFuel Storage Tank
Installation/Removal Report
1.8.2 GRegulatory Notifications
3.8.2.1Sales Documentation
1.11Environmental Records Binder
3.8.2.1Contractor Certification
3.8.2.1Contractor Certification
1.10General Use Permitted
Equipment
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1 GWarranty Management Plan
1.7.5Warranty Tags
3.8Final Cleaning
1.5Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 43 PAGES
APSI Fuel Distribution & Upgrade
01 78 00 SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1 GAs-Built Record of Equipment
and Materials
3.6 GAs-Built Record of Equipment
and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 43 PAGES
APSI Fuel Distribution & Upgrade
01 78 23 3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
02 65 00 SD-01 Preconstruction Submittals
1.4.4 GWork Plan
1.4.4.1 GSite Safety and Health Plan
1.4.4.2 GExcavation and Material Handling
Plan
1.4.4.3 GField Sampling and Laboratory
Testing Plan
1.4.4.4 GTank and Piping Removal And
Disposal Plan
1.4.4.5 GSpill and Discharge Control Plan
1.4.1 GQualifications
1.4.2 GLaboratory Services
3.12.3State Licensed Waste
Transporter
SD-06 Test Reports
3.15Laboratory and Field Testing
Reports
3.2Tank Contents Verification
3.5.2Contaminated Water Disposal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 43 PAGES
APSI Fuel Distribution & Upgrade
02 65 00 3.10Soil Examination, Testing, and
Analysis
3.11 GBackfilling
SD-11 Closeout Submittals
3.12.4 GSalvage Rights
3.15Tank Closure Report
02 82 13.00 10 SD-01 Preconstruction Submittals
1.7.1 GAsbestos Hazard Abatement Plan
SD-02 Shop Drawings
1.4 GDetailed Drawings
SD-03 Product Data
3.11.3.1 GAsbestos Waste Shipment
Records
1.1Weight Bills and Delivery Tickets
2.1 GEncapsulants
1.9.1 GRespiratory Protection Program
3.11 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program
1.8.1Licenses, Permits and
Notifications
3.11.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.9Exposure Assessment and Air
Monitoring
1.7.3Local Exhaust System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 43 PAGES
APSI Fuel Distribution & Upgrade
02 82 13.00 10 SD-07 Certificates
1.7.3Local Exhaust System
2.1 GEncapsulants
1.9Medical Surveillance
Requirements
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.2 GLead Work Plan
1.5.1.1 GIH/PQP
1.5.1.2 GTraining Certification
1.5.2.8 Glead waste management plan
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 Gsampling results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3 GTesting laboratory
3.5.2.1Hazardous waste treatment, storage, or disposal facility (TSD)
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.8 GLaboratory Accreditation
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 43 PAGES
APSI Fuel Distribution & Upgrade
03 30 00 2.1Formwork
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.6Reinforcement
2.6.2Mechanical Reinforcing Bar
Connectors
1.6.3.2Pumping Concrete
1.6.3.3Finishing Plan
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete
3.13.2.6Chloride Ion Concentration
3.13.2.4Air Content
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 43 PAGES
APSI Fuel Distribution & Upgrade
03 30 00 1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.1Curing Compound
03 45 33 SD-05 Design Data
1.4.3 GConcrete Mix Design
SD-06 Test Reports
1.4.3 GConcrete Mix Design
2.2.1.1Fly Ash
2.2.3Aggregates
2.2.2Water
SD-07 Certificates
2.3Quality Control Procedures
3.10 GConstruction Records
1.4.1.3Erector's Post Audit Declaration
SD-11 Closeout Submittals
1.4.4Batch Ticket
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 43 PAGES
APSI Fuel Distribution & Upgrade
05 12 00 SD-03 Product Data
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
SD-06 Test Reports
3.6.1.2Weld Inspection Reports
3.6.2.1Bolt Testing Reports
SD-07 Certificates
1.3MLIT Structural Steel Fabricator
Quality Certification
1.3MLIT Structural Steel Erector
Quality Certification
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
1.3.1Deck Units
2.1.4Galvanizing Repair Paint
1.3.2Welding Equipment
1.3.2Welding Rods and Accessories
SD-05 Design Data
1.3.1 GDeck Units
SD-07 Certificates
1.3.2Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 43 PAGES
APSI Fuel Distribution & Upgrade
05 30 00 1.3.2Welding Procedures
1.3.3.1Wind Storm Resistance
1.3.1Manufacturer's Certificate
09 97 13.15 SD-05 Design Data
1.4.4.1Environmental Control System
SD-06 Test Reports
1.4.5.1Coatings Qualification Inspection
Reports
1.4.5.4 GNon-metallic Abrasive
Qualification Test Reports
1.4.5.2Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.9.2.2Inspection Report Forms
3.9.2.3Daily Inspection Reports
1.4.5.3Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.2.2Implement Corrective Action
1.4.3Coating Work Plan
1.4.6.11Coating Materials
1.4.6.12Non-metallic Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 43 PAGES
APSI Fuel Distribution & Upgrade
09 97 13.15 1.4.6.13Metallic Abrasive
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
1.4.6.5Qualifications of Individuals
Performing Abrasive Blasting
1.4.6.6Qualifications of Individuals
Applying Coatings
1.4.6.7Qualifications of Individuals
Operating Plural Component
Equipment
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.8Qualifications of Testing
Laboratory for Coatings
1.4.6.9Qualifications of Testing
Laboratory for Abrasive
1.4.6.10Qualifications of Coating
Contractors
1.4.7Protective Coating Specialist
(PCS)
1.4.8Pre-Application Meeting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 43 PAGES
APSI Fuel Distribution & Upgrade
09 97 13.15 SD-08 Manufacturer’s Instructions
1.5.1Coating System Instructions
SD-11 Closeout Submittals
3.6.6 GDisposal of Used Abrasive
3.9.2.4 GInspection Logbook
09 97 13.27 SD-06 Test Reports
1.4.4.1Coatings Qualification Test
Reports
1.4.4.2Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.8.2.2Inspection Report Forms
3.8.2.3Daily Inspection Reports
1.4.4.3Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.3Coating Work Plan
1.4.5.1Qualifications of Certified
Industrial Hygienist (CIH)
1.4.5.5Qualifications Of Individuals
Performing Abrasive Blasting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 43 PAGES
APSI Fuel Distribution & Upgrade
09 97 13.27 1.4.5.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.5.3Qualifications of Coating
Inspection Company
1.4.5.4Qualifications of QC Specialist
Coating Inspector
1.4.5.6Qualifications of Testing
Laboratory for Coatings
1.4.5.7Qualifications of Testing
Laboratory for Abrasive
1.4.5.8Qualifications of Coating
Contractors
1.4.5.9Coating Materials
1.4.5.10Coating System Component
Compatibility
1.4.5.11Non-metallic Abrasive
1.4.5.12Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Coating System Instructions
SD-11 Closeout Submittals
3.5.6Disposal of Used Abrasive
3.8.2.4 GInspection Logbook
10 44 16 SD-02 Shop Drawings
GFire Extinguishers
Part 2 GAccessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 43 PAGES
APSI Fuel Distribution & Upgrade
10 44 16 GCabinets
2.2.1 GWall Brackets
GSchedule
SD-03 Product Data
GFire Extinguishers
Part 2 GAccessories
GCabinets
2.2.1 GWall Brackets
3.2.1Replacement Parts List
SD-04 Samples
Equipment Samples
SD-07 Certificates
GFire Extinguishers Certifications
Manufacturer's Warranty with
Inspection Tag
22 00 00 SD-02 Shop Drawings
3.3.1 GPlumbing System
SD-03 Product Data
2.4.1Emergency Eyewash and Shower
SD-06 Test Reports
3.3Tests, Flushing and Disinfection
SD-10 Operation and Maintenance
Data
3.3.1Plumbing System
23 00 00 SD-02 Shop Drawings
1.4.3 GDetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 43 PAGES
APSI Fuel Distribution & Upgrade
23 00 00 SD-03 Product Data
2.8.1.1Duct Connectors
2.10Electric Convectors
2.8.2Manual Balancing Dampers
2.8.5.1Registers and Grilles
2.9.1.1Centrifugal Type Power Roof
Ventilators
1.4.4Test Procedures
1.2.1.2 GDiagrams
2.10.4Unit Thermostat
2.8.6Air Vents, Penthouses, And
Goosenecks
SD-10 Operation and Maintenance
Data
3.11.1Operation and Maintenance
Manuals
2.8.2Manual Balancing Dampers
2.9.1.1Centrifugal Type Power Roof
Ventilators
23 07 00 SD-02 Shop Drawings
2.3Pipe Insulation Systems
3.3Equipment Insulation Systems
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 05 48.00 10 3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections
SD-07 Certificates
1.4.1Qualifications
1.4.3Acceptance test and inspections procedure
26 11 16.00 33 SD-02 Shop Drawings
2.3Cubicle Type Unit Substation
2.6Distribution
2.5Switchgear
SD-03 Product Data
2.4 GTransformers
3.7.3.4 GTransformers
2.5.1.1 GVacuum Circuit Breaker (VCB)
2.6.4.1 GInstruments
2.6.4.2 GInstrument Control Switches
2.6.4.3Buzzer
2.6.4.4Test Terminal
2.6.4.6 GLightning Arrester
SD-06 Test Reports
3.7.2Acceptance Checks and Tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 11 16.00 33 1.5.1 GData Package 5
26 20 00 SD-02 Shop Drawings
2.11 GPanelboards
2.14 GTransformers
2.18 GMotor control centers
2.25 GWireways
3.1.7.1 GMarking strips
SD-03 Product Data
2.10Receptacles
2.11.3 GCircuit breakers
2.8 GSwitches
2.14 GTransformers
2.12 GEnclosed circuit breakers
2.16 GMotor controllers
2.18.2 GCombination motor controllers
2.17 GManual motor starters
2.26 GSurge protective devices
SD-06 Test Reports
3.5.2600-volt wiring test
3.5.5Grounding system test
3.5.3Transformer tests
3.5.4Ground-fault receptacle test
26 24 13 SD-02 Shop Drawings
1.5.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 24 13 SD-06 Test Reports
2.5.2Switchboard Design Tests
SD-11 Closeout Submittals
2.5.1Equipment Test Schedule
3.4Required Settings
2.8Service Entrance Available Fault
Current Label
26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic Diagrams
1.5.2 GInterconnecting Diagrams
1.5.3 GInstallation Drawings
SD-03 Product Data
2.1 GVariable Frequency Drives
2.3Wires and Cables
1.5.4Equipment Schedule
SD-06 Test Reports
3.2.1VFD Test
3.2.2Performance Verification Tests
3.2.3Endurance Test
SD-08 Manufacturer’s Instructions
1.5.5Installation instructions
SD-09 Manufacturer’s Field
Reports
2.5.1 GVFD Factory Test Plan
1.5.6Factory test results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 29 23 SD-10 Operation and Maintenance
Data
2.1Variable Frequency Drives
26 32 15.00 10 SD-02 Shop Drawings
1.3.6 GDetailed Drawings
3.10 GAcceptance
2.26 GDual Purpose Generator Docking
Station
SD-03 Product Data
2.1.1Engine-Generator Parameter
Schedule
2.8.2Heat Exchanger
2.14Generator
2.5Manufacturer's Catalog
1.3.2Site Welding
1.5Spare Parts
3.7Onsite Training
2.1.7Vibration-Isolation
3.9Posted Data and Instructions
3.6.4.1Instructions
1.3.4Experience
1.3.5Field Engineer
3.2General Installation
2.26 GDual Purpose Generator Docking
Station
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0003)
j2ee9gsg Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 32 15.00 10 2.14Performance Criteria
2.9Sound Limitations
2.6.4Day Tank
3.6.1.2Power Factor
2.18.5Time-Delay on Alarms
2.12.3.2Battery Charger
SD-06 Test Reports
2.25Factory Inspection and Tests
2.25.2Factory Tests
3.6Onsite Inspection and Tests
SD-07 Certificates
2.8Cooling System
2.8Cooling System
2.1.7Vibration Isolation
2.25.2Prototype Test
2.1.5Reliability and Durability
2.9Sound Limitations
3.1Site Visit
2.14.1Current Balance
2.4Materials and Equipment
3.6.3Inspections
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
3.7 GMaintenance Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 32 15.00 10 2.7.2Filters
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2 GEach major component
SD-06 Test Reports
1.4.3Lightning Protection and
Grounding System Test Plan
3.5.1Lightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3Lightning Protection System
Installers Documentation
1.4.2Component UL Listed and
Labeled
1.4.4Lightning protection system inspection certificate
3.1.1Roof manufacturer's warranty
26 42 19.00 20 SD-02 Shop Drawings
2.3Rectifiers
2.5Insulating flange sets
3.1Anode installation
3.2.1.1Test stations
3.2.1.1Anode junction boxes
SD-03 Product Data
2.3 GRectifiers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
(AM-0003)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 42 19.00 20 2.4.2 GCable and wire
2.5 GInsulating flange sets
2.1 GAnodes
3.2.1.1 GTest stations
3.2.1.1Anode junction boxes
2.2 GAnode vent pipe
2.3.9Shunt resistors
2.1.4 GAnode backfill
SD-07 Certificates
1.3 GQualifications of Corrosion
Engineer
SD-10 Operation and Maintenance
Data
3.2 GCathodic protection system
SD-11 Closeout Submittals
3.2.1.2 GInitial Cathodic Protection System
Field Test Report
3.2.1.4 GFinal Cathodic Protection System
Field Test Report
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.7.1LED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1Luminaire Drawings
1.5.1.2Poles
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 43 PAGES
APSI Fuel Distribution & Upgrade
26 56 00 2.2 GLED, Luminaires
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Power Supply Units
(Drivers)
2.3.1 GConcrete Poles
SD-06 Test Reports
3.2Operating Test
31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
1.4.2 GDewatering Work Plan
SD-06 Test Reports
3.16Testing
2.1Borrow Site Testing
32 11 20 SD-03 Product Data
1.4Plant, Equipment, and Tools
SD-06 Test Reports
2.2.1 GInitial Tests
3.12.1 GIn-Place Tests
32 11 23 SD-03 Product Data
1.4Plant, Equipment, and Tools
SD-06 Test Reports
2.3.1 GInitial Tests
3.11.1 GIn-Place Tests
32 12 16 SD-03 Product Data
2.4 GMix Design
3.10 GQuality Control
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 43 PAGES
APSI Fuel Distribution & Upgrade
32 12 16 3.11 GMaterial Acceptance
SD-06 Test Reports
2.2 GAggregates
3.10.3.2QC Monitoring
32 13 13.06 SD-03 Product Data
2.1.6 GCuring Materials
2.1.4 GAdmixtures
2.1.5.1 GDowel
2.1.5.4 GReinforcement
SD-05 Design Data
2.3 GMix Design
SD-06 Test Reports
2.1.3 GAggregate
3.7.2 GConcrete Slump Tests
3.7.4 GAir Content Tests
3.7.3 GFlexural Strength Tests
SD-07 Certificates
1.6.1 GReady-mixed Concrete Plant
1.6.4 GBatch Tickets
2.1.1 GCementitious Materials
32 17 23 SD-03 Product Data
2.1.1.1 GSurface Preparation Equipment
List
2.1.2 GApplication Equipment List
3.2Exterior Surface Preparation
1.3.1 GSafety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 43 PAGES
APSI Fuel Distribution & Upgrade
32 17 23 2.2.2.1 GReflective media for roads
2.2.1 GThermoplastic compound
3.3.2 GThermoplastic compound
SD-06 Test Reports
2.2.2.1 GReflective Media for Roads
2.2.1 GThermoplastic Compound
3.3.2 GThermoplastic Compound
3.4.1Test Reports
SD-07 Certificates
1.3.2 GQualifications
2.2.2.1Reflective Media for Roads
1.3.1 GVolatile Organic Compound
2.2.1Thermoplastic Compound
3.3.2Thermoplastic Compound
SD-08 Manufacturer’s Instructions
2.2.1 GThermoplastic Compound
3.3.2 GThermoplastic Compound
32 31 13.53 SD-02 Shop Drawings
1.3.2Fence Installation
3.1Fence Installation
1.3.2Installation Drawings
1.3.2Location of gate, corner, end, and pull posts
1.3.2Gate Assembly
2.5.1Gate Assembly
2.5.1Gate Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 43 PAGES
APSI Fuel Distribution & Upgrade
32 31 13.53 1.3.2Turnstiles
1.3.2Gate Hardware and Accessories
2.5.3Gate Hardware and Accessories
SD-03 Product Data
1.3.2Fence Installation
3.1Fence Installation
1.3.2Gate Assembly
2.5.1Gate Assembly
2.5.1Gate Assembly
1.3.2Gate Hardware and Accessories
2.5.3Gate Hardware and Accessories
SD-04 Samples
2.1.1Fabric
2.2Posts
2.2.1Post Caps
2.3.2Barbed Wire
2.2.1Barbed Wire Supporting Arms
2.1.1Stretcher Bars
2.1.1Gate Posts
1.3.2Gate Hardware and Accessories
2.5.3Gate Hardware and Accessories
1.3.2Turnstiles
2.6Padlocks
2.3.1Wire Ties
SD-06 Test Reports
1.3.1zinc coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 43 PAGES
APSI Fuel Distribution & Upgrade
32 31 13.53 1.3.1Aluminum Alloy Coating
SD-07 Certificates
1.3.1Reports
1.3.1Zinc Coating
1.3.1aluminum alloy coating
2.1.1Fabric
2.3.2Barbed Wire
2.1.1Stretcher Bars
1.3.2Gate Hardware and Accessories
2.5.3Gate Hardware and Accessories
2.4Concrete
SD-08 Manufacturer’s Instructions
1.3.2Fence Installation
3.1Fence Installation
1.3.2Gate Assembly
2.5.1Gate Assembly
2.5.1Gate Assembly
3.6Hardware Assembly
1.3.1Accessories
SD-10 Operation and Maintenance
Data
3.6operating and maintenance instructions
32 92 19 SD-03 Product Data
2.4.3Wood Cellulose Fiber Mulch
2.3Fertilizer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 43 PAGES
APSI Fuel Distribution & Upgrade
32 92 19 SD-06 Test Reports
2.2.3Topsoil Composition Tests
SD-07 Certificates
2.1Seed
SD-08 Manufacturer’s Instructions
2.6Erosion Control Materials
32 92 23 SD-03 Product Data
2.3Fertilizer
SD-06 Test Reports
2.2.3Topsoil composition tests
SD-07 Certificates
2.1sods
33 08 55 SD-01 Preconstruction Submittals
1.3.2 GExisting System Cleanliness
Confirmation Plan
1.3.3 GTemporary Header
Commissioning Plan
1.3.4 GFinal System Start-Up Plan
1.3.1 GFinal Performance Testing Plan
1.3.5 GFinal Performance Testing Plan
3.8.3 GFinal Performance Testing Plan
1.3.1 GTemporary Header Fuel
Provisioning Plan
1.3.6 GTemporary Header Fuel
Provisioning Plan
1.3.1 GFinal Fuel Provisioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 08 55 1.3.7 GFinal Fuel Provisioning Plan
SD-06 Test Reports
1.5.1 GFinal Reports
3.2.5 GCathodic Protection Reports
3.7 GEquipment Tests
3.5.3 GPiping Flushing and Cleaning
Checklist
SD-07 Certificates
1.3.8 GCertification (Ready for Start-Up
and Performance Testing)
2.2.1 GCertificate of Calibration
1.8Disposal Of Waste Materials
SD-11 Closeout Submittals
1.6.1Certification of Entire System
33 09 52 SD-02 Shop Drawings
3.3.1 GShop Drawing
SD-03 Product Data
1.4Tools and Spare Parts
2.1.1 GPump Control Panel (PCP) and
Components
3.1 GPump Control Panel (PCP) and
Components
2.2 GProgrammable Logical Controller
(PLC) Hardware and Software
3.2 GProgrammable Logical Controller
(PLC) Hardware and Software
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 09 52 3.1.2 GControl Wiring Data Lists
SD-06 Test Reports
3.1.3Certified Pump Control Panel
(PCP) Shop Test Report
3.3.2Record of Test
SD-07 Certificates
1.5 GExperience and Qualifications
3.3.2 GTesting Plan
3.3.3 GTraining Plan for Instructing
Personnel
SD-10 Operation and Maintenance
Data
1.2 GOperation and Maintenance
Manuals
33 11 00 SD-06 Test Reports
3.3.1.2 GLeakage Test
3.3.1.1 GHydrostatic Test
SD-08 Manufacturer’s Instructions
2.1.1.1.1.1PVC Piping
2.1.1.1.2PVC Piping For Service Lines
33 40 00 SD-03 Product Data
2.7Containment Valve
2.8Sleeve Seals
SD-07 Certificates
3.9.1.1 GLeakage Test
3.9.1.2Determination of Density
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 40 00 3.9.2.1.3 GPost-Installation Inspection
Report
3.3Placing Pipe
33 52 23.15 SD-01 Preconstruction Submittals
1.6 GWelding Procedure Specifications
(WPS)
1.6 GWelder Performance Qualification
(WPQ)
1.6 GProcedure Qualification Record
(PQR)
3.1 GWelding Operations
SD-02 Shop Drawings
1.6.2 GPOL Service Piping
SD-06 Test Reports
3.2Examinations, Inspections and
Tests
SD-07 Certificates
1.6 GQualifications
33 52 40 SD-01 Preconstruction Submittals
1.5.3 GWork Plan
1.5.4 GHydrotesting Plan
2.2.3 GQuality Assurance Plan
SD-02 Shop Drawings
2.1.2Grounding and Bonding
2.5.6 GPipe Supports
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 52 40 2.2.2 GCarbon Steel Piping
2.2.3 GStainless Steel Piping
2.2.5 GExternal Protective Coatings For
Buried Steel Piping
2.2.6 GFittings
2.2.6.2 GCarbon Steel Fittings
2.2.7 GInsulating Flange Kits
2.2.7 GLightning Surge Arrester
2.2.8 GBolts, Nuts And Washers
2.2.9 GGaskets
2.2.10 GFlange Protectors
2.3.1 GBall Valves
2.3.2 GPlug (Double Block and Bleed)
Valves
2.3.2.4Electric Valve Actuator
2.3.3Swing Check Valves
2.3.4Wafer Check Valves
2.4 GPressure Relief Valve
2.4.2 GPressure Relief Valve
2.4.3 GPressure Relief Valve
2.5.1 GFlanged Swivel Joints
2.5.2 GMechanically Adjustable
Segmented Elastomeric Seal
2.5.3 GPipe Sleeves
2.5.4 GStrainers
2.5.7 GSample Connections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 52 40 2.6 GFlexible Hose Connectors
2.7 GAutomatic Air Vent
2.8.5 GBuried Utility Tape
2.8.6 GPipeline Markers
SD-06 Test Reports
3.12.1.1Exterior Coating Holiday Test
3.12.2Pneumatic Test
3.12.3Hydrostatic Test
SD-07 Certificates
1.5.1 GContractor Qualifications
1.5.2 GSystem Supplier
1.5.5.1 GPipeline Inventory
2.2.3 GQualifications of Owner's
Inspector
3.5.7 GSurvey Final Elevations
SD-10 Operation and Maintenance
Data
2.2.7 GInsulating Flange Kits
2.2.7 GLightning Surge Arrester
2.3.1 GBall Valves
2.3.2 GPlug (Double Block and Bleed)
Valves
2.3.2.4 GElectric Valve Actuator
2.3.3 GSwing Check Valves
2.4 GPressure Relief Valve
2.4.2 GPressure Relief Valve
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 52 40 2.4.3 GPressure Relief Valve
2.5.1 GFlanged Swivel Joints
2.5.4 GStrainers
2.5.7 GSample Connections
2.7 GAutomatic Air Vent
33 52 43.14 SD-02 Shop Drawings
2.2 GControl Valves
SD-03 Product Data
2.2 GControl Valves
SD-06 Test Reports
2.2Control Valves
SD-07 Certificates
1.4.1 GPrevious Air Force/Military
Projects
1.4.1 GQualified Engineers
1.4.1 GField Assistance
SD-10 Operation and Maintenance
Data
1.4.2 GOperation and Maintenance
Manuals
33 52 43.23 SD-02 Shop Drawings
2.1 GFuel Transfer Pumps (Vertical
Turbine) (P-2001 through P-2006)
SD-03 Product Data
2.1 GFuel Transfer Pumps (Vertical
Turbine) (P-2001 through P-2006)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 52 43.23 SD-06 Test Reports
1.2Certified Test Curves
SD-07 Certificates
2.1 GFuel Transfer Pumps (Vertical
Turbine) (P-2001 through P-2006)
SD-10 Operation and Maintenance
Data
1.2 GOperation and Maintenance
Manuals
33 56 10 SD-01 Preconstruction Submittals
1.3.1Ul 2245 Test Procedures Plan
SD-02 Shop Drawings
2.1.1Grounding and Bonding
SD-03 Product Data
2.4.1 GAboveground Storage Tank
(Single Wall Steel)
2.5 GTank Protective Coatings
2.6.4.1 GPressure/Vacuum Vent
2.6.4.2 GEmergency Vent
2.7 GTank Gauges
SD-06 Test Reports
3.2.1 GUL 2245 Test Results
3.2.2 GAboveground Storage Tank
Tightness Tests
3.2.3Tank Manufacturer's Tests
3.4Tank Fill Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 56 10 3.2.5 GTank Inspection Reports
SD-07 Certificates
1.5.1 GContractor Qualifications
1.5.1 GManufacturer
1.5.2.1Permitting
1.5.2.2Registration
1.5.2.3Licensed Personnel
3.3Demonstrations
3.2.5 GSTI SP001 Inspector's
Certification
SD-08 Manufacturer’s Instructions
2.4Aboveground Storage Tank
2.7Tank Gauges
SD-10 Operation and Maintenance
Data
2.4 GAboveground Storage Tank
2.7 GTank Gauges
33 57 55 SD-02 Shop Drawings
2.3.1 GGrounding and Bonding
2.8 GMeters
2.10 GRailcar and Truck Offload
Equipment
SD-03 Product Data
2.4 GPressure Indicators
2.5 GDifferential Pressure Gauge
2.6 GAutomatic Pump Controls
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 57 55 2.6.4 GFlow Switches
2.7 GExplosive Vapor Sensor
2.8 GMeters
2.9.1 GStripping Pump (P-2007)
2.10.3 GSight Flow Indicator
2.10 GRailcar and Truck Offload
Equipment
2.12 GDrop Tank Level Switches
SD-07 Certificates
1.5 GSystem Supplier
SD-10 Operation and Maintenance
Data
2.6 GAutomatic Pump Controls
2.7 GExplosive Vapor Sensor
2.8 GMeters
2.9.1 GStripping Pump (P-2007)
33 58 00 SD-02 Shop Drawings
2.4Electronic Monitoring/Alarm
Panel
SD-03 Product Data
2.3 GLeak Detection System
2.4Electronic Monitoring/Alarm
Panel
SD-07 Certificates
3.3Demonstrations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 43 PAGES
APSI Fuel Distribution & Upgrade
33 58 00 SD-10 Operation and Maintenance
Data
2.4 GElectronic Monitoring/Alarm
Panel
33 71 02 SD-02 Shop Drawings
1.5.1 GPrecast underground structures
SD-03 Product Data
2.5 GHigh voltage cable
2.6 GHigh voltage cable terminations
2.10.2.1 GPrecast concrete structures
2.10.2.4Sealing Material
3.5.3Pulling-In Irons
2.10.3 GManhole frames and covers
2.10.4 GHandhole frames and covers
2.10.6 GComposite/fiberglass handholes
2.11 GCable supports
SD-06 Test Reports
3.16.1Field Acceptance Checks and
Tests
33 82 00 SD-02 Shop Drawings
1.5.1.1 GTelecommunications Outside
Plant
SD-03 Product Data
2.8 GWire and cable
2.5 GCable splices, and connectors
2.3 GClosures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .