AM-0003 APSI Fuels Specifications.pdf

PDF 981 KB Posted

Attached to
Asia Pacific Stability Initiative (APSI) – Fuel Receipt and Distribution Upgrades Yokota
Solicitation number
W912HV21R0001
Issued by

About this file

This solicitation seeks proposals for the Asia Pacific Stability Initiative (APSI) Fuel Receipt and Distribution Upgrades project at Yokota Air Base in Japan. The scope of work includes expanding and upgrading the existing liquid fuel unloading facility to accommodate both rail cars and fuel delivery trucks. Key aspects of the work are replacing rail station headers, adding truck offload headers, constructing new drop tanks in below-ground vaults with pumps and piping, upgrading the backup generator, adding secondary containment and a remote spill containment basin, constructing truck access roads and a parking area, and performing other infrastructure upgrades and improvements. The closing date for proposals is listed as well as details on a pre-proposal site visit. The solicitation also includes the specifications and drawings for the project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 43 PAGES

W912HV-21-R-0001

APSI Fuel Distribution & Upgrade

01 11 00.00 10 SD-01 Preconstruction Submittals

1.11Initial Site Conditions Photos

1.7 GKey Personnel Qualifications

SD-07 Certificates

1.11Monthly Progress Photos

SD-11 Closeout Submittals

1.11Construction Completion Photos

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

1.8.1 GSubmittal Register Monthly

Update

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.7.2.3 GCritical Lift Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

1.12Notifications And Reports

SD-07 Certificates

1.6.1.4 GCrane Operators/Riggers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 43 PAGES

APSI Fuel Distribution & Upgrade

01 35 26 1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.7.2.2 GStandard Lift Plan

1.12.4Certificate Of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written Practices

3.1.3Written Practices

3.1.1NDT Procedures and Equipment

Calibration Records

3.1.3NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 43 PAGES

APSI Fuel Distribution & Upgrade

01 45 35 2.1Certificate of Compliance

1.5.10 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

3.3.2 GTemporary Utility Connections

Plan

01 57 19.01 SD-01 Preconstruction Submittals

1.8.1Preconstruction Survey

1.9.10.1 GSolid Waste Management Permit

1.8.2Regulatory Notifications

1.9 GEnvironmental Protection Plan

1.9.6.2 GDirt and Dust Control Plan

1.8.5 GEmployee Training Records

1.8.4 GEnvironmental Manager

Qualifications

3.15.3 GTemporary Fuel Storage Tank

Approval Request

3.15.5 GUnderground Fuel Storage Tank

Approval Request

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 43 PAGES

APSI Fuel Distribution & Upgrade

01 57 19.01 3.8.1 GWaste Determination

Documentation

1.8.3 GLicenses/Permits/Notifications

1.9.7.1 GStormwater Pollution Prevention

Plan

1.9.7.1 GStormwater Pollution Prevention

Plan

SD-06 Test Reports

3.8.1.1.2Laboratory Analysis

3.2.1Inspection Reports

3.8.2.1 GSolid Waste Management Report

3.7.2Nonhazardous Solid Waste

Diversion Report

1.9.9.2Hazardous Waste Analysis

Report

SD-07 Certificates

1.8.5 GEmployee Training Records

1.9.10.1Solid Waste Management

License

1.7.1Asbestos Certification

1.7.2Lead Certification

3.11 GWritten Assessment Of Friable

Asbestos Disturbance

SD-11 Closeout Submittals

3.8.1 GWaste Determination

Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 43 PAGES

APSI Fuel Distribution & Upgrade

01 57 19.01 3.8.3.4 GDisposal Documentation for

Hazardous and Regulated Waste

1.8.5 GAssembled Employee Training

Records

1.9.10.1 GSolid Waste Management Permit

3.8.2.1 GSolid Waste Management Report

3.8.3.1 GHazardous Waste/Debris

Management

1.9.11.2 GFuel Storage Tank

Installation/Removal Report

1.8.2 GRegulatory Notifications

3.8.2.1Sales Documentation

1.11Environmental Records Binder

3.8.2.1Contractor Certification

3.8.2.1Contractor Certification

1.10General Use Permitted

Equipment

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.7.1 GWarranty Management Plan

1.7.5Warranty Tags

3.8Final Cleaning

1.5Spare Parts Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 43 PAGES

APSI Fuel Distribution & Upgrade

01 78 00 SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1 GAs-Built Record of Equipment

and Materials

3.6 GAs-Built Record of Equipment

and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

3.9 GInterim DD FORM 1354

3.9 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 43 PAGES

APSI Fuel Distribution & Upgrade

01 78 23 3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

02 65 00 SD-01 Preconstruction Submittals

1.4.4 GWork Plan

1.4.4.1 GSite Safety and Health Plan

1.4.4.2 GExcavation and Material Handling

Plan

1.4.4.3 GField Sampling and Laboratory

Testing Plan

1.4.4.4 GTank and Piping Removal And

Disposal Plan

1.4.4.5 GSpill and Discharge Control Plan

1.4.1 GQualifications

1.4.2 GLaboratory Services

3.12.3State Licensed Waste

Transporter

SD-06 Test Reports

3.15Laboratory and Field Testing

Reports

3.2Tank Contents Verification

3.5.2Contaminated Water Disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 43 PAGES

APSI Fuel Distribution & Upgrade

02 65 00 3.10Soil Examination, Testing, and

Analysis

3.11 GBackfilling

SD-11 Closeout Submittals

3.12.4 GSalvage Rights

3.15Tank Closure Report

02 82 13.00 10 SD-01 Preconstruction Submittals

1.7.1 GAsbestos Hazard Abatement Plan

SD-02 Shop Drawings

1.4 GDetailed Drawings

SD-03 Product Data

3.11.3.1 GAsbestos Waste Shipment

Records

1.1Weight Bills and Delivery Tickets

2.1 GEncapsulants

1.9.1 GRespiratory Protection Program

3.11 GCleanup and Disposal

1.6.1 GQualifications

1.11Training Program

1.8.1Licenses, Permits and

Notifications

3.11.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.9Exposure Assessment and Air

Monitoring

1.7.3Local Exhaust System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 43 PAGES

APSI Fuel Distribution & Upgrade

02 82 13.00 10 SD-07 Certificates

1.7.3Local Exhaust System

2.1 GEncapsulants

1.9Medical Surveillance

Requirements

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.2 GLead Work Plan

1.5.1.1 GIH/PQP

1.5.1.2 GTraining Certification

1.5.2.8 Glead waste management plan

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 Gsampling results

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3 GTesting laboratory

3.5.2.1Hazardous waste treatment, storage, or disposal facility (TSD)

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.8 GLaboratory Accreditation

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 43 PAGES

APSI Fuel Distribution & Upgrade

03 30 00 2.1Formwork

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.1Formwork Materials

2.6Reinforcement

2.6.2Mechanical Reinforcing Bar

Connectors

1.6.3.2Pumping Concrete

1.6.3.3Finishing Plan

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Aggregates

3.13.2.3 GCompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete

3.13.2.6Chloride Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 43 PAGES

APSI Fuel Distribution & Upgrade

03 30 00 1.6.3.4VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

03 45 33 SD-05 Design Data

1.4.3 GConcrete Mix Design

SD-06 Test Reports

1.4.3 GConcrete Mix Design

2.2.1.1Fly Ash

2.2.3Aggregates

2.2.2Water

SD-07 Certificates

2.3Quality Control Procedures

3.10 GConstruction Records

1.4.1.3Erector's Post Audit Declaration

SD-11 Closeout Submittals

1.4.4Batch Ticket

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 43 PAGES

APSI Fuel Distribution & Upgrade

05 12 00 SD-03 Product Data

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

SD-06 Test Reports

3.6.1.2Weld Inspection Reports

3.6.2.1Bolt Testing Reports

SD-07 Certificates

1.3MLIT Structural Steel Fabricator

Quality Certification

1.3MLIT Structural Steel Erector

Quality Certification

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.4 GFabrication Drawings

SD-03 Product Data

2.2Accessories

1.3.1Deck Units

2.1.4Galvanizing Repair Paint

1.3.2Welding Equipment

1.3.2Welding Rods and Accessories

SD-05 Design Data

1.3.1 GDeck Units

SD-07 Certificates

1.3.2Welder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 43 PAGES

APSI Fuel Distribution & Upgrade

05 30 00 1.3.2Welding Procedures

1.3.3.1Wind Storm Resistance

1.3.1Manufacturer's Certificate

09 97 13.15 SD-05 Design Data

1.4.4.1Environmental Control System

SD-06 Test Reports

1.4.5.1Coatings Qualification Inspection

Reports

1.4.5.4 GNon-metallic Abrasive

Qualification Test Reports

1.4.5.2Metallic Abrasive Qualification

Test Reports

3.1.3Coating Sample Test Reports

3.1.4Abrasive Sample Test Reports

3.9.2.2Inspection Report Forms

3.9.2.3Daily Inspection Reports

1.4.5.3Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly)

SD-07 Certificates

1.4.1Contract Errors, Omissions, and

Other Discrepancies

1.4.2.1Corrective Action Procedures

1.4.2.2Implement Corrective Action

1.4.3Coating Work Plan

1.4.6.11Coating Materials

1.4.6.12Non-metallic Abrasive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 43 PAGES

APSI Fuel Distribution & Upgrade

09 97 13.15 1.4.6.13Metallic Abrasive

1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH)

1.4.6.5Qualifications of Individuals

Performing Abrasive Blasting

1.4.6.6Qualifications of Individuals

Applying Coatings

1.4.6.7Qualifications of Individuals

Operating Plural Component

Equipment

1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating

Inspection Company

1.4.6.4Qualifications of QC Specialist

Coating Inspector

1.4.6.8Qualifications of Testing

Laboratory for Coatings

1.4.6.9Qualifications of Testing

Laboratory for Abrasive

1.4.6.10Qualifications of Coating

Contractors

1.4.7Protective Coating Specialist

(PCS)

1.4.8Pre-Application Meeting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 43 PAGES

APSI Fuel Distribution & Upgrade

09 97 13.15 SD-08 Manufacturer’s Instructions

1.5.1Coating System Instructions

SD-11 Closeout Submittals

3.6.6 GDisposal of Used Abrasive

3.9.2.4 GInspection Logbook

09 97 13.27 SD-06 Test Reports

1.4.4.1Coatings Qualification Test

Reports

1.4.4.2Metallic Abrasive Qualification

Test Reports

3.1.3Coating Sample Test Reports

3.1.4Abrasive Sample Test Reports

3.8.2.2Inspection Report Forms

3.8.2.3Daily Inspection Reports

1.4.4.3Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly)

SD-07 Certificates

1.4.1Contract Errors, Omissions, and

Other Discrepancies

1.4.2.1Corrective Action Procedures

1.4.3Coating Work Plan

1.4.5.1Qualifications of Certified

Industrial Hygienist (CIH)

1.4.5.5Qualifications Of Individuals

Performing Abrasive Blasting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 43 PAGES

APSI Fuel Distribution & Upgrade

09 97 13.27 1.4.5.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.5.3Qualifications of Coating

Inspection Company

1.4.5.4Qualifications of QC Specialist

Coating Inspector

1.4.5.6Qualifications of Testing

Laboratory for Coatings

1.4.5.7Qualifications of Testing

Laboratory for Abrasive

1.4.5.8Qualifications of Coating

Contractors

1.4.5.9Coating Materials

1.4.5.10Coating System Component

Compatibility

1.4.5.11Non-metallic Abrasive

1.4.5.12Metallic Abrasive

SD-08 Manufacturer’s Instructions

1.5.1Coating System Instructions

SD-11 Closeout Submittals

3.5.6Disposal of Used Abrasive

3.8.2.4 GInspection Logbook

10 44 16 SD-02 Shop Drawings

GFire Extinguishers

Part 2 GAccessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 43 PAGES

APSI Fuel Distribution & Upgrade

10 44 16 GCabinets

2.2.1 GWall Brackets

GSchedule

SD-03 Product Data

GFire Extinguishers

Part 2 GAccessories

GCabinets

2.2.1 GWall Brackets

3.2.1Replacement Parts List

SD-04 Samples

Equipment Samples

SD-07 Certificates

GFire Extinguishers Certifications

Manufacturer's Warranty with

Inspection Tag

22 00 00 SD-02 Shop Drawings

3.3.1 GPlumbing System

SD-03 Product Data

2.4.1Emergency Eyewash and Shower

SD-06 Test Reports

3.3Tests, Flushing and Disinfection

SD-10 Operation and Maintenance

Data

3.3.1Plumbing System

23 00 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 43 PAGES

APSI Fuel Distribution & Upgrade

23 00 00 SD-03 Product Data

2.8.1.1Duct Connectors

2.10Electric Convectors

2.8.2Manual Balancing Dampers

2.8.5.1Registers and Grilles

2.9.1.1Centrifugal Type Power Roof

Ventilators

1.4.4Test Procedures

1.2.1.2 GDiagrams

2.10.4Unit Thermostat

2.8.6Air Vents, Penthouses, And

Goosenecks

SD-10 Operation and Maintenance

Data

3.11.1Operation and Maintenance

Manuals

2.8.2Manual Balancing Dampers

2.9.1.1Centrifugal Type Power Roof

Ventilators

23 07 00 SD-02 Shop Drawings

2.3Pipe Insulation Systems

3.3Equipment Insulation Systems

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 05 48.00 10 3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections

SD-07 Certificates

1.4.1Qualifications

1.4.3Acceptance test and inspections procedure

26 11 16.00 33 SD-02 Shop Drawings

2.3Cubicle Type Unit Substation

2.6Distribution

2.5Switchgear

SD-03 Product Data

2.4 GTransformers

3.7.3.4 GTransformers

2.5.1.1 GVacuum Circuit Breaker (VCB)

2.6.4.1 GInstruments

2.6.4.2 GInstrument Control Switches

2.6.4.3Buzzer

2.6.4.4Test Terminal

2.6.4.6 GLightning Arrester

SD-06 Test Reports

3.7.2Acceptance Checks and Tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 11 16.00 33 1.5.1 GData Package 5

26 20 00 SD-02 Shop Drawings

2.11 GPanelboards

2.14 GTransformers

2.18 GMotor control centers

2.25 GWireways

3.1.7.1 GMarking strips

SD-03 Product Data

2.10Receptacles

2.11.3 GCircuit breakers

2.8 GSwitches

2.14 GTransformers

2.12 GEnclosed circuit breakers

2.16 GMotor controllers

2.18.2 GCombination motor controllers

2.17 GManual motor starters

2.26 GSurge protective devices

SD-06 Test Reports

3.5.2600-volt wiring test

3.5.5Grounding system test

3.5.3Transformer tests

3.5.4Ground-fault receptacle test

26 24 13 SD-02 Shop Drawings

1.5.2 GSwitchboard Drawings

SD-03 Product Data

2.2 GSwitchboard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 24 13 SD-06 Test Reports

2.5.2Switchboard Design Tests

SD-11 Closeout Submittals

2.5.1Equipment Test Schedule

3.4Required Settings

2.8Service Entrance Available Fault

Current Label

26 29 23 SD-02 Shop Drawings

1.5.1 GSchematic Diagrams

1.5.2 GInterconnecting Diagrams

1.5.3 GInstallation Drawings

SD-03 Product Data

2.1 GVariable Frequency Drives

2.3Wires and Cables

1.5.4Equipment Schedule

SD-06 Test Reports

3.2.1VFD Test

3.2.2Performance Verification Tests

3.2.3Endurance Test

SD-08 Manufacturer’s Instructions

1.5.5Installation instructions

SD-09 Manufacturer’s Field

Reports

2.5.1 GVFD Factory Test Plan

1.5.6Factory test results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 29 23 SD-10 Operation and Maintenance

Data

2.1Variable Frequency Drives

26 32 15.00 10 SD-02 Shop Drawings

1.3.6 GDetailed Drawings

3.10 GAcceptance

2.26 GDual Purpose Generator Docking

Station

SD-03 Product Data

2.1.1Engine-Generator Parameter

Schedule

2.8.2Heat Exchanger

2.14Generator

2.5Manufacturer's Catalog

1.3.2Site Welding

1.5Spare Parts

3.7Onsite Training

2.1.7Vibration-Isolation

3.9Posted Data and Instructions

3.6.4.1Instructions

1.3.4Experience

1.3.5Field Engineer

3.2General Installation

2.26 GDual Purpose Generator Docking

Station

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(AM-0003)

j2ee9gsg Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 32 15.00 10 2.14Performance Criteria

2.9Sound Limitations

2.6.4Day Tank

3.6.1.2Power Factor

2.18.5Time-Delay on Alarms

2.12.3.2Battery Charger

SD-06 Test Reports

2.25Factory Inspection and Tests

2.25.2Factory Tests

3.6Onsite Inspection and Tests

SD-07 Certificates

2.8Cooling System

2.8Cooling System

2.1.7Vibration Isolation

2.25.2Prototype Test

2.1.5Reliability and Durability

2.9Sound Limitations

3.1Site Visit

2.14.1Current Balance

2.4Materials and Equipment

3.6.3Inspections

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

3.7 GMaintenance Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 32 15.00 10 2.7.2Filters

26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2 GEach major component

SD-06 Test Reports

1.4.3Lightning Protection and

Grounding System Test Plan

3.5.1Lightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3Lightning Protection System

Installers Documentation

1.4.2Component UL Listed and

Labeled

1.4.4Lightning protection system inspection certificate

3.1.1Roof manufacturer's warranty

26 42 19.00 20 SD-02 Shop Drawings

2.3Rectifiers

2.5Insulating flange sets

3.1Anode installation

3.2.1.1Test stations

3.2.1.1Anode junction boxes

SD-03 Product Data

2.3 GRectifiers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(AM-0003)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 42 19.00 20 2.4.2 GCable and wire

2.5 GInsulating flange sets

2.1 GAnodes

3.2.1.1 GTest stations

3.2.1.1Anode junction boxes

2.2 GAnode vent pipe

2.3.9Shunt resistors

2.1.4 GAnode backfill

SD-07 Certificates

1.3 GQualifications of Corrosion

Engineer

SD-10 Operation and Maintenance

Data

3.2 GCathodic protection system

SD-11 Closeout Submittals

3.2.1.2 GInitial Cathodic Protection System

Field Test Report

3.2.1.4 GFinal Cathodic Protection System

Field Test Report

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.7.1LED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1Luminaire Drawings

1.5.1.2Poles

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 43 PAGES

APSI Fuel Distribution & Upgrade

26 56 00 2.2 GLED, Luminaires

2.2.2 GLuminaire Light Sources

2.2.3 GLuminaire Power Supply Units

(Drivers)

2.3.1 GConcrete Poles

SD-06 Test Reports

3.2Operating Test

31 00 00 SD-01 Preconstruction Submittals

3.5 GShoring

1.4.2 GDewatering Work Plan

SD-06 Test Reports

3.16Testing

2.1Borrow Site Testing

32 11 20 SD-03 Product Data

1.4Plant, Equipment, and Tools

SD-06 Test Reports

2.2.1 GInitial Tests

3.12.1 GIn-Place Tests

32 11 23 SD-03 Product Data

1.4Plant, Equipment, and Tools

SD-06 Test Reports

2.3.1 GInitial Tests

3.11.1 GIn-Place Tests

32 12 16 SD-03 Product Data

2.4 GMix Design

3.10 GQuality Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 43 PAGES

APSI Fuel Distribution & Upgrade

32 12 16 3.11 GMaterial Acceptance

SD-06 Test Reports

2.2 GAggregates

3.10.3.2QC Monitoring

32 13 13.06 SD-03 Product Data

2.1.6 GCuring Materials

2.1.4 GAdmixtures

2.1.5.1 GDowel

2.1.5.4 GReinforcement

SD-05 Design Data

2.3 GMix Design

SD-06 Test Reports

2.1.3 GAggregate

3.7.2 GConcrete Slump Tests

3.7.4 GAir Content Tests

3.7.3 GFlexural Strength Tests

SD-07 Certificates

1.6.1 GReady-mixed Concrete Plant

1.6.4 GBatch Tickets

2.1.1 GCementitious Materials

32 17 23 SD-03 Product Data

2.1.1.1 GSurface Preparation Equipment

List

2.1.2 GApplication Equipment List

3.2Exterior Surface Preparation

1.3.1 GSafety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 43 PAGES

APSI Fuel Distribution & Upgrade

32 17 23 2.2.2.1 GReflective media for roads

2.2.1 GThermoplastic compound

3.3.2 GThermoplastic compound

SD-06 Test Reports

2.2.2.1 GReflective Media for Roads

2.2.1 GThermoplastic Compound

3.3.2 GThermoplastic Compound

3.4.1Test Reports

SD-07 Certificates

1.3.2 GQualifications

2.2.2.1Reflective Media for Roads

1.3.1 GVolatile Organic Compound

2.2.1Thermoplastic Compound

3.3.2Thermoplastic Compound

SD-08 Manufacturer’s Instructions

2.2.1 GThermoplastic Compound

3.3.2 GThermoplastic Compound

32 31 13.53 SD-02 Shop Drawings

1.3.2Fence Installation

3.1Fence Installation

1.3.2Installation Drawings

1.3.2Location of gate, corner, end, and pull posts

1.3.2Gate Assembly

2.5.1Gate Assembly

2.5.1Gate Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 43 PAGES

APSI Fuel Distribution & Upgrade

32 31 13.53 1.3.2Turnstiles

1.3.2Gate Hardware and Accessories

2.5.3Gate Hardware and Accessories

SD-03 Product Data

1.3.2Fence Installation

3.1Fence Installation

1.3.2Gate Assembly

2.5.1Gate Assembly

2.5.1Gate Assembly

1.3.2Gate Hardware and Accessories

2.5.3Gate Hardware and Accessories

SD-04 Samples

2.1.1Fabric

2.2Posts

2.2.1Post Caps

2.3.2Barbed Wire

2.2.1Barbed Wire Supporting Arms

2.1.1Stretcher Bars

2.1.1Gate Posts

1.3.2Gate Hardware and Accessories

2.5.3Gate Hardware and Accessories

1.3.2Turnstiles

2.6Padlocks

2.3.1Wire Ties

SD-06 Test Reports

1.3.1zinc coating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 43 PAGES

APSI Fuel Distribution & Upgrade

32 31 13.53 1.3.1Aluminum Alloy Coating

SD-07 Certificates

1.3.1Reports

1.3.1Zinc Coating

1.3.1aluminum alloy coating

2.1.1Fabric

2.3.2Barbed Wire

2.1.1Stretcher Bars

1.3.2Gate Hardware and Accessories

2.5.3Gate Hardware and Accessories

2.4Concrete

SD-08 Manufacturer’s Instructions

1.3.2Fence Installation

3.1Fence Installation

1.3.2Gate Assembly

2.5.1Gate Assembly

2.5.1Gate Assembly

3.6Hardware Assembly

1.3.1Accessories

SD-10 Operation and Maintenance

Data

3.6operating and maintenance instructions

32 92 19 SD-03 Product Data

2.4.3Wood Cellulose Fiber Mulch

2.3Fertilizer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 43 PAGES

APSI Fuel Distribution & Upgrade

32 92 19 SD-06 Test Reports

2.2.3Topsoil Composition Tests

SD-07 Certificates

2.1Seed

SD-08 Manufacturer’s Instructions

2.6Erosion Control Materials

32 92 23 SD-03 Product Data

2.3Fertilizer

SD-06 Test Reports

2.2.3Topsoil composition tests

SD-07 Certificates

2.1sods

33 08 55 SD-01 Preconstruction Submittals

1.3.2 GExisting System Cleanliness

Confirmation Plan

1.3.3 GTemporary Header

Commissioning Plan

1.3.4 GFinal System Start-Up Plan

1.3.1 GFinal Performance Testing Plan

1.3.5 GFinal Performance Testing Plan

3.8.3 GFinal Performance Testing Plan

1.3.1 GTemporary Header Fuel

Provisioning Plan

1.3.6 GTemporary Header Fuel

Provisioning Plan

1.3.1 GFinal Fuel Provisioning Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 08 55 1.3.7 GFinal Fuel Provisioning Plan

SD-06 Test Reports

1.5.1 GFinal Reports

3.2.5 GCathodic Protection Reports

3.7 GEquipment Tests

3.5.3 GPiping Flushing and Cleaning

Checklist

SD-07 Certificates

1.3.8 GCertification (Ready for Start-Up

and Performance Testing)

2.2.1 GCertificate of Calibration

1.8Disposal Of Waste Materials

SD-11 Closeout Submittals

1.6.1Certification of Entire System

33 09 52 SD-02 Shop Drawings

3.3.1 GShop Drawing

SD-03 Product Data

1.4Tools and Spare Parts

2.1.1 GPump Control Panel (PCP) and

Components

3.1 GPump Control Panel (PCP) and

Components

2.2 GProgrammable Logical Controller

(PLC) Hardware and Software

3.2 GProgrammable Logical Controller

(PLC) Hardware and Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 09 52 3.1.2 GControl Wiring Data Lists

SD-06 Test Reports

3.1.3Certified Pump Control Panel

(PCP) Shop Test Report

3.3.2Record of Test

SD-07 Certificates

1.5 GExperience and Qualifications

3.3.2 GTesting Plan

3.3.3 GTraining Plan for Instructing

Personnel

SD-10 Operation and Maintenance

Data

1.2 GOperation and Maintenance

Manuals

33 11 00 SD-06 Test Reports

3.3.1.2 GLeakage Test

3.3.1.1 GHydrostatic Test

SD-08 Manufacturer’s Instructions

2.1.1.1.1.1PVC Piping

2.1.1.1.2PVC Piping For Service Lines

33 40 00 SD-03 Product Data

2.7Containment Valve

2.8Sleeve Seals

SD-07 Certificates

3.9.1.1 GLeakage Test

3.9.1.2Determination of Density

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 40 00 3.9.2.1.3 GPost-Installation Inspection

Report

3.3Placing Pipe

33 52 23.15 SD-01 Preconstruction Submittals

1.6 GWelding Procedure Specifications

(WPS)

1.6 GWelder Performance Qualification

(WPQ)

1.6 GProcedure Qualification Record

(PQR)

3.1 GWelding Operations

SD-02 Shop Drawings

1.6.2 GPOL Service Piping

SD-06 Test Reports

3.2Examinations, Inspections and

Tests

SD-07 Certificates

1.6 GQualifications

33 52 40 SD-01 Preconstruction Submittals

1.5.3 GWork Plan

1.5.4 GHydrotesting Plan

2.2.3 GQuality Assurance Plan

SD-02 Shop Drawings

2.1.2Grounding and Bonding

2.5.6 GPipe Supports

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 52 40 2.2.2 GCarbon Steel Piping

2.2.3 GStainless Steel Piping

2.2.5 GExternal Protective Coatings For

Buried Steel Piping

2.2.6 GFittings

2.2.6.2 GCarbon Steel Fittings

2.2.7 GInsulating Flange Kits

2.2.7 GLightning Surge Arrester

2.2.8 GBolts, Nuts And Washers

2.2.9 GGaskets

2.2.10 GFlange Protectors

2.3.1 GBall Valves

2.3.2 GPlug (Double Block and Bleed)

Valves

2.3.2.4Electric Valve Actuator

2.3.3Swing Check Valves

2.3.4Wafer Check Valves

2.4 GPressure Relief Valve

2.4.2 GPressure Relief Valve

2.4.3 GPressure Relief Valve

2.5.1 GFlanged Swivel Joints

2.5.2 GMechanically Adjustable

Segmented Elastomeric Seal

2.5.3 GPipe Sleeves

2.5.4 GStrainers

2.5.7 GSample Connections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 52 40 2.6 GFlexible Hose Connectors

2.7 GAutomatic Air Vent

2.8.5 GBuried Utility Tape

2.8.6 GPipeline Markers

SD-06 Test Reports

3.12.1.1Exterior Coating Holiday Test

3.12.2Pneumatic Test

3.12.3Hydrostatic Test

SD-07 Certificates

1.5.1 GContractor Qualifications

1.5.2 GSystem Supplier

1.5.5.1 GPipeline Inventory

2.2.3 GQualifications of Owner's

Inspector

3.5.7 GSurvey Final Elevations

SD-10 Operation and Maintenance

Data

2.2.7 GInsulating Flange Kits

2.2.7 GLightning Surge Arrester

2.3.1 GBall Valves

2.3.2 GPlug (Double Block and Bleed)

Valves

2.3.2.4 GElectric Valve Actuator

2.3.3 GSwing Check Valves

2.4 GPressure Relief Valve

2.4.2 GPressure Relief Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 52 40 2.4.3 GPressure Relief Valve

2.5.1 GFlanged Swivel Joints

2.5.4 GStrainers

2.5.7 GSample Connections

2.7 GAutomatic Air Vent

33 52 43.14 SD-02 Shop Drawings

2.2 GControl Valves

SD-03 Product Data

2.2 GControl Valves

SD-06 Test Reports

2.2Control Valves

SD-07 Certificates

1.4.1 GPrevious Air Force/Military

Projects

1.4.1 GQualified Engineers

1.4.1 GField Assistance

SD-10 Operation and Maintenance

Data

1.4.2 GOperation and Maintenance

Manuals

33 52 43.23 SD-02 Shop Drawings

2.1 GFuel Transfer Pumps (Vertical

Turbine) (P-2001 through P-2006)

SD-03 Product Data

2.1 GFuel Transfer Pumps (Vertical

Turbine) (P-2001 through P-2006)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 52 43.23 SD-06 Test Reports

1.2Certified Test Curves

SD-07 Certificates

2.1 GFuel Transfer Pumps (Vertical

Turbine) (P-2001 through P-2006)

SD-10 Operation and Maintenance

Data

1.2 GOperation and Maintenance

Manuals

33 56 10 SD-01 Preconstruction Submittals

1.3.1Ul 2245 Test Procedures Plan

SD-02 Shop Drawings

2.1.1Grounding and Bonding

SD-03 Product Data

2.4.1 GAboveground Storage Tank

(Single Wall Steel)

2.5 GTank Protective Coatings

2.6.4.1 GPressure/Vacuum Vent

2.6.4.2 GEmergency Vent

2.7 GTank Gauges

SD-06 Test Reports

3.2.1 GUL 2245 Test Results

3.2.2 GAboveground Storage Tank

Tightness Tests

3.2.3Tank Manufacturer's Tests

3.4Tank Fill Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 56 10 3.2.5 GTank Inspection Reports

SD-07 Certificates

1.5.1 GContractor Qualifications

1.5.1 GManufacturer

1.5.2.1Permitting

1.5.2.2Registration

1.5.2.3Licensed Personnel

3.3Demonstrations

3.2.5 GSTI SP001 Inspector's

Certification

SD-08 Manufacturer’s Instructions

2.4Aboveground Storage Tank

2.7Tank Gauges

SD-10 Operation and Maintenance

Data

2.4 GAboveground Storage Tank

2.7 GTank Gauges

33 57 55 SD-02 Shop Drawings

2.3.1 GGrounding and Bonding

2.8 GMeters

2.10 GRailcar and Truck Offload

Equipment

SD-03 Product Data

2.4 GPressure Indicators

2.5 GDifferential Pressure Gauge

2.6 GAutomatic Pump Controls

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 57 55 2.6.4 GFlow Switches

2.7 GExplosive Vapor Sensor

2.8 GMeters

2.9.1 GStripping Pump (P-2007)

2.10.3 GSight Flow Indicator

2.10 GRailcar and Truck Offload

Equipment

2.12 GDrop Tank Level Switches

SD-07 Certificates

1.5 GSystem Supplier

SD-10 Operation and Maintenance

Data

2.6 GAutomatic Pump Controls

2.7 GExplosive Vapor Sensor

2.8 GMeters

2.9.1 GStripping Pump (P-2007)

33 58 00 SD-02 Shop Drawings

2.4Electronic Monitoring/Alarm

Panel

SD-03 Product Data

2.3 GLeak Detection System

2.4Electronic Monitoring/Alarm

Panel

SD-07 Certificates

3.3Demonstrations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 43 PAGES

APSI Fuel Distribution & Upgrade

33 58 00 SD-10 Operation and Maintenance

Data

2.4 GElectronic Monitoring/Alarm

Panel

33 71 02 SD-02 Shop Drawings

1.5.1 GPrecast underground structures

SD-03 Product Data

2.5 GHigh voltage cable

2.6 GHigh voltage cable terminations

2.10.2.1 GPrecast concrete structures

2.10.2.4Sealing Material

3.5.3Pulling-In Irons

2.10.3 GManhole frames and covers

2.10.4 GHandhole frames and covers

2.10.6 GComposite/fiberglass handholes

2.11 GCable supports

SD-06 Test Reports

3.16.1Field Acceptance Checks and

Tests

33 82 00 SD-02 Shop Drawings

1.5.1.1 GTelecommunications Outside

Plant

SD-03 Product Data

2.8 GWire and cable

2.5 GCable splices, and connectors

2.3 GClosures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A…