This document outlines a federal contract opportunity for fuel receipt and distribution upgrades at Yokota Air Base in Japan. The U.S. Army Corps of Engineers Engineering District Japan is seeking proposals to expand and upgrade the existing liquid fuel unloading facility to accommodate both rail cars and fuel delivery trucks. The project includes replacing rail station headers and adding truck offload headers, installing two drop tanks in below-ground vaults with pumps and piping, upgrading the backup generator, and adding secondary containment and a remote spill containment basin. Additional requirements are to construct truck access roads and an offload parking area, improve nearby on-base roads, and replace or improve lighting, utilities, yard piping, rail lines, and other components to provide a complete and upgraded fuel facility. Demolition of some existing components is also required. The solicitation number for this opportunity is W912HV21R0001.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X
X
X
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
C T
O
S O
L I C
I T
A T
I O
N
N
O
U S
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
READY TO ADVERTISE
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
V E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
P r o j
C
H I
A
Z N
R E
A P
S I
F
U E
L
R
E C
E I P
T
A
D
I S
T R
I B
U T
I O
N
U
P G
R A
D E
S
Y O
K O
B
S
E
J A
P A
N
M A
K
S
C R
I P
T I O
N D
A T
E
A U
G
US Army Corps of Engineers ®
P-100
K E
Y
P
L A
N
D S
E B
A S
T I A
N
D S
E B
A S
T I A
N
J R
U T
L E
D G
E
L R
O B
E R
T S
Z N
R E
P
D
W G
SEE
P-101
SEE
P-102
SCALE: 1:500
KEY PLAN
P-100
Meters
0 25 50
AAV AUTOMATIC AIR VENT
AFF ABOVE FINISHED FLOOR
AG ABOVE GRADE
AI ADDITIVE INJECTOR
API AMERICAN PETROLEUM INSTITUTE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ATG AUTOMATIC TANK GAUGING
BBL BARREL
BF BLIND FLANGE
BG BELOW GRADE
BLDG BUILDING
BOP BOTTOM OF PIPE
°C DEGREES CELSIUS
CENTERLINE
CS CARBON STEEL
DB&B DOUBLE BLOCK AND BLEED
DIA OR Ø DIAMETER
DIV DIVISION
DN DIAMETER NOMINAL
EFSO EMERGENCY FUEL SHUT-OFF
ECC ECCENTRIC
EL ELEVATION
EV EMERGENCY VENT
FNPT FEMALE NATIONAL PIPE THREAD
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FQT FLOW RATE TOTALIZE TRANSMITTER
FQI FLOW RATE TOTALIZE INDICATOR
FQIT FLOW RATE TOTALIZE INDICATING TRANSMITTER
FSII FUEL SYSTEM ICING INHIBITOR
GAL GALLONS
GPM GALLONS PER MINUTE
HA HAND-AUTO
HG MERCURY
HLV HIGH-LEVEL VALVE
HOA HAND-OFF-AUTO
HP HORSE POWER
HPV HIGH POINT VENT
HR HOUR
HS HAND SWITCH
HZ HERTZ
I INTERLOCK
IF ISOLATION FLANGE
IN INCH
ISA INTERNATIONAL SOCIETY OF AUTOMATION
JP-8 MILITARY GRADE AVIATION TURBINE FUEL
kL KILOLITERS kPa KILOPASCALS kW KILOWATTS
L LITERS
LAL LEVEL ALARM LOW
LAH LEVEL ALARM HIGH
LAHH LEVEL ALARM HIGH-HIGH
LB POUND
LC LEVEL CONTROL
LI LEVEL INDICATOR
LT LEVEL TRANSMITTER
LO LOCK OPEN
LPM LITERS PER MINUTE
LPD LOW POINT DRAIN
LR/DTR LINE RELIEVING/ DIFFERENTIAL THERMAL RELIEF
LS LEVEL SWITCH
LSH LEVEL SWITCH HIGH
LSHH LEVEL SWITCH HIGH-HIGH
LSL LEVEL SWITCH LOW
LSLL LEVEL SWITCH LOW-LOW
m
METER (DIMENSION)
m
CUBIC METER
mA MILLIAMP mm MILLIMETER
M
MOTOR OR METER (EQUIPMENT)
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MFR MANUFACTURER
MIL MILITARY
MIN MINIMUM
MNPT MALE NATIONAL PIPE THREAD
MOV MOTOR-OPERATED VALVE
MPa MEGAPASCAL
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NDE NON-DESTRUCTIVE EXAMINATION
NO NORMALLY OPEN
NPSHa NET POSITIVE SUCTION HEAD AVAILABLE
NPT NATIONAL PIPE THREAD
NSCV NON-SURGE CHECK VALVE
NTS NOT TO SCALE
OZ OUNCES
P PUMP
PC PRESSURE CONTROL
PCP PUMP CONTROL PANEL
PCV PRESSURE CONTROL VALVE
PDM POSITIVE DISPLACEMENT METER
PH OR Ø PHASE
PDI PRESSURE DIFFERENTIAL INDICATOR
PI PRESSURE INDICATOR
PIT PRESSURE INDICATING TRANSMITTER
PLC PROGRAMMABLE LOGIC CONTROLLER
POL
PETROLEUM, OIL, AND LUBRICANTS
PRT PRODUCT RECOVERY TANK
PRV PRESSURE RELIEF VALVE
PS-X PIPE SUPPORT NUMBER "X"
PSI POUNDS PER SQUARE INCH
PSID POUNDS PER SQUARE INCH DIFFERENTIAL
PVV PRESSURE VACUUM VENT
RED REDUCER OR REDUCING
RFSO RAISED FACED SLIP-ON
RFSW RAISED FACE SOCKET WELDED
RFWN RAISED FACE WELD NECK
RTD RESISTANCE TEMPERATURE DETECTOR
S STRAINER OR SOLENOID
SC SAMPLE CONNECTION
SCFH STANDARD CUBIC FEET PER HOUR
SG SPECIFIC GRAVITY
SP STRIPPING PUMP
SPCV SURGE PRESSURE CONTROL VALVE
SQ SQUARE
SS STAINLESS STEEL
STI STEEL TANK INSTITUTE
SUB SUBMERGENCE
SW SOCKET WELDED
T TANK
THD THREADED
THK THICK
TM TURBINE METER
TSH TEMPERATURE SWITCH HIGH
TT TEMPERATURE TRANSMITTER
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UST UNDERGROUND STORAGE TANK
VAC VOLTS ALTERNATING CURRENT
VDC VOLTS DIRECT CURRENT
VP VALVE PIT
W/ WITH
ZI POSITION INDICATOR
# NUMBER OR POUND
C
L
FIRST LETTER SUCCEEDING LETTERS
MEASURED OR
INITIATING VARIABLE
MODIFIER
READOUT OF PASSIVE
FUNCTION
OUTPUT FUNCTION MODIFIER
A ANALYSIS ALARM
B
BURNER, COMBUSTION
C CONTROL
D SPECIFIC GRAVITY DIFFERENTIAL
E VOLTAGE
SENSOR (PRIMARY
ELEMENT)
F FLOW RATE
RATIO (FRACTION)
G GLASS
H HAND HIGH
I
CURRENT
(ELECTRICAL)
INDICATE
J POWER
K TIME
L LEVEL
LIGHT (PILOT)
LOW
M MOMENTARY
MIDDLE (INTERMEDIATE)
N
O
ORIFICE (RESTRICTION)
P PRESURE
POINT (TEST
CONNECTION)
Q QUANTITY
INTEGRATE OR
TOTALIZE
R RADIATION RECORD OR PRINT
S SPEED OR FREQUENCY SAFETY SWITCH
T TEMPERATURE TRANSMIT
U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION
V VIBRATION
VALVE, DAMPER OR
LOUVER
W WEIGHT OR FORCE WELL
X UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED
Y
RELAY, COMPUTER OR SOLENOID
Z POSITION
DRIVE, ACTUATE OR UNCLASSIFIED FINAL
CONTROL ELEMENT
LIMITS OF REMOVAL (REMOVE ON SHADED
SIDE)
CONNECT TO EXISTING
ANGLE PATTERN BALL CHECK SHUTOFF
VALVE
BALL VALVE
CHECK VALVE - SWING TYPE
CHECK VALVE - WAFER OR DUAL-PLATE
TYPE
DOUBLE BLOCK AND BLEED (PLUG) VALVE
DIAPHRAGM CONTROL VALVE - GLOBE
PATTERN
PRESSURE RELIEF VALVE
SLIDING-VANE POSITIVE DISPLACEMENT
PUMP (SIDE INLET, TOP DISCHRAGE)
MOTOR (ELECTRIC)
VERTICAL TURBINE PUMP
BASKET STRAINER
BLIND FLANGE
BRAIDED FLEXIBLE CONNECTOR
CAM AND GROOVE TYPE COUPLING
DB&B VALVE LR/DTR (ARROW INDICATES
DIRECTION OF RELIEF)
EMERGENCY VENT
FLANGE CONNECTION
FLOW ARROW (INDICATES DIRECTION OF
FLOW)
FLOW STRAIGHTENING VANE
FREE VENT WITH WEATHER HOOD
HOSE (WITH CAM AND GROOVE FITTINGS)
METER - POSITIVE DISPLACEMENT
METER - TURBINE
ORIFICE PLATE
OVERFILL PREVENTION VALVE (FLOAT-TYPE)
PIPE CAP (THREADED OR SOCKET WELDED)
PIPE CAP (BUTT-WELDED)
PIPE PLUG (THREADED)
PRESSURE RESERVOIR
PRESSURE INDICATOR
PRESSURE/VACUUM VENT
REDUCER (CONCENTRIC)
REDUCER (ECCENTRIC)
SAMPLE CONNECTION (QUICK
DISCONNECT-TYPE)
SIGHT FLOW INDICATOR
SWIVEL JOINT (NON-LUBRICATED)
TEE STRAINER
WELD DOT
WYE STRAINER
INSTRUMENT IDENTIFICATION
LEGEND
LOCAL, FIELD MOUNTED INSTRUMENT
MAIN, CENTRAL PANEL MOUNTED
INSTRUMENT
LOCAL, FIELD MOUNTED DISPLAY
MAIN, CENTRAL PANEL MOUNTED DISPLAY
CONTROL/INTERLOCK SCHEME
PROGRAMMABLE LOGIC CONTROLLER
INPUT/OUTPUT
AUTOMATIC TANK GAUGING INPUT/OUTPUT
EMERGENCY SHUT-OFF SAFETY CIRCUIT
INPUT/OUTPUT
M
M
S
M
PI
XXX
XXX
XXX
XXX
I
PLC
ATG
EFSO
MINOR (SMALL BORE) PIPING
EXISTING MINOR
(SMALL BORE) PIPING
FLOW DIAGRAM LINE DESIGNATIONS
MAJOR PIPING
EXISTING MAJOR PIPING
ELECTRICAL SIGNAL
HYDRAULIC SIGNAL
M-0XX-YYZZ
M-0XX-YYZZ
BOUNDARY OR LIMITS
PIPE IS CONTINUED ON SHEET
M-0XX WITH LINE NUMBER YYZZ,
FLOW IS FROM THAT DRAWING
ABBREVIATIONS
PIPE IS CONTINUED ON SHEET
M-0XX WITH LINE NUMBER YYZZ,
FLOW IS TO THAT DRAWING
EXISTING HYDRAULIC SIGNAL
M-0XX-YYZZ
PIPE IS CONTINUED ON SHEET
M-0XX WITH LINE NUMBER YYZZ,
FLOW IS BIDIRECTIONAL
PIPE LINE IDENTIFICATION
DNXX-AABBB-YYZZ
INSTRUMENT IDENTIFICATION KEY FLOW DIAGRAM SYMBOLS
PIPE SIZE (DIAMETER NOMINAL)
PIPE MATERIAL (CS OR SS)
M-001
A B
B R
E V
I A
T I O
N S
L E
G E
N D
S
A
Y M
B O
L S
M
F
R I T
Z
M
F
R I T
Z
J
F
R E
D E
R I C
K
K
W
A R
I N
G
EXISTING PIPING REMOVAL
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
READY TO ADVERTISE
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
Z N
R E
A P
S I
F
U E
L
R
E C
E I P
T
A
S
T R
I B
U T
I O
N
U
P G
R A
D E
S
Y O
K O
S
E
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
A U
G
US Army Corps of Engineers ®
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
Z N
R E
M
D
W G
UNIT AREA NUMBER
LINE NUMBER
ASME CLASS (150 OR 300)
AutoCAD SHX Text
ENGINEERING, INC.
M-002
G E
N E
R A
L
M
E C
H A
N I C
A L
P
O L
N
O T
E S
M
F
R I T
Z
M
F
R I T
Z
J
F
R E
D E
R I C
K
K
W
A R
I N
G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
READY TO ADVERTISE
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
Z N
R E
A P
S I
F
U E
L
R
E C
E I P
T
A
S
T R
I B
U T
I O
N
U
P G
R A
D E
S
Y O
K O
S
E
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
A U
G
US Army Corps of Engineers ®
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
Z N
R E
M
D
W G
GENERAL MECHANICAL NOTES
1. MECHANICAL POL PIPING FABRICATION, WELDING, AND NON-DESTRUCTIVE EXAMINATION AND
PNEUMATIC/ HYDROSTATIC TESTING MUST BE IN ACCORDANCE WITH ASME B31.3 UNLESS
OTHERWISE INDICATED.
2. FIELD VERIFY DIMENSIONS AND ELEVATIONS OF EXISTING PIPING PRIOR TO FABRICATION OF
CONNECTING PIPING.
3. PROTECT EXISTING PIPING TO REMAIN FROM DAMAGE DURING DEMOLITION AND PIPE REMOVAL.
DAMAGE TO EXISTING PIPE, PIPE SUPPORT AND/OR TANK COATINGS RESULTING FROM
DEMOLITION AND CONSTRUCTION MUST BE REPAIRED.
4. THE GOVERNMENT IS RESPONSIBLE FOR INITIAL DRAIN-DOWN OF THE PIPING SYSTEM. THE
CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF RESIDUAL FUEL FROM THE PIPING SYSTEM
AND DISPOSAL OF OFF-SPEC FUEL AND SLUDGE OFF SITE. FOR BIDDING PURPOSES, ASSUME 100
GALLONS OF OFF-SPEC FUEL AND SLUDGE MUST BE DISPOSED OF.
5. DEFINITIONS:
A. PURGING: THE COMPLETE REMOVAL OF FUEL FROM PIPING BY USING VACUUM EQUIPMENT
TO REMOVE FUEL AT LOW POINTS, AND/OR COLD CUTTING PIPING AT LOW POINTS TO DRAIN
FUEL.
B. INERTING: THE REMOVAL OR NEUTRALIZATION OF EXPLOSIVE VAPORS IN PIPE OR PORTIONS
OF PIPE WHICH PREVIOUSLY CONTAINED FUEL AS REQUIRED TO PERFORM HOT WORK.
C. DEMOLISH: REMOVE AND DISPOSE OF OFF-SITE.
5. AFTER DEFUELING, COLD CUT THE PIPING USING A MULTI-WHEEL PIPE CUTTER AND
NON-FLAMMABLE LUBRICATION.
6. THE PIPING MUST BE PURGED AND INERTED AS REQUIRED TO MAKE TIE-IN WELDS AND PERFORM
HOT WORK SAFELY.
7. HOT-WORK, PIPE END PREPARATION, AND WELDING MUST BE ACCOMPLISHED BY:
A. COMPLETE HEADER DEFUELING AND INERTING BETWEEN ISOLATION POINTS, OR
B. USING GAS BARRIER PLUGS AND INTERTING IN ACCORDANCE WITH API BULLETING 2209.
7. PROVIDE BLOCKING AS REQUIRED WHEN REMOVING COMPONENTS TO MAINTAIN PIPE AND
FLANGE BOLT ALIGNMENT.
8. THE FOLLOWING WELD CLEARANCES MUST BE MAINTAINED DURING PIPING CONSTRUCTION :
A. PROVIDE A MINIMUM OF 75 mm BETWEEN ADJACENT PIPE GIRTH WELDS
B. PROVIDE A MINIMUM OF 50 mm BETWEEN A PIPE GIRTH WELD AND ADJACENT WELD FOR
BRANCH FITTINGS
C. PROVIDE A MINIMUM OF 25 mm BETWEEN A PIPE GIRTH WELD AND ADJACENT PIPE SUPPORT
ATTACHMENT WELD.
9. REFER TO PRODUCT FLOW SYMBOL MARKING DETAIL 9/M-501 FOR PIPELINE PRODUCT
IDENTIFICATION REQUIREMENTS. PRODUCT IDENTIFICATION MARKINGS MUST BE APPLIED AT THE
FOLLOWING LOCATIONS:
A. WHERE THE PIPELINE ENTERS/ EXITS THE GROUND
B. IN VALVE PITS
C. AT INTERSECTIONS OF ABOVEGROUND PIPING
D. ON ABOVEGROUND PIPING AT APPROXIMATELY 60 METER INTERVALS
E. ALL RECEIVING CONNECTIONS
F. WHERE LINE CONNECTIONS ARE MADE TO MANIFOLDS
G. ANY OTHER LOCATION NECESSARY TO ASSURE READY IDENTIFICATION OF THE PRODUCT IN
THE SYSTEM.
10.PIPING SEGMENTS WITH TIE-IN WELDS IDENTIFIED AS "HYDROSTATIC TEST EXEMPT WELD" ARE
INTENDED TO BE PNEUMATICALLY AND HYDROSTATICALLY TESTED PRIOR TO CONNECTION TO
THE EXISTING PIPING SYSTEM. TO FACILITATE PNEUMATIC AND HYDROSTATIC TESTING OF THE
PIPING SEGMENT, PROVIDE A MINIMUM OF 300 mm OF ADDITIONAL PIPE LENGTH ON EACH END OF
THE PIPE SEGMENT TO WELD TEMPORARY FLANGE CONNECTIONS. PROVIDE A BLIND FLANGE
WITH TEST AND DRAIN CONNECTIONS ON THE TEMPORARY FLANGES. UPON COMPLETION OF THE
HYDROSTATIC TEST, DRAIN THE PIPING SEGMENT, REMOVE THE TEMPORARY FLANGE
CONNECTIONS, AND CUT PIPE TO THE REQUIRED FINAL LENGTH TO COMPLETE TIE-IN WELDS.
HYDROSTATIC TEST EXEMPT WELD NOTES
1. IN ADDITION TO FINAL RADIOGRAPHIC EXAMINATION, TIE-IN WELDS IDENTIFIED AS "HYDROSTATIC
TEST EXEMPT WELD" MUST RECEIVE AN ENHANCED IN-PROCESS EXAMINATION IN ACCORDANCE
WITH ASME B31.3, SECTION 344.7.
2. IN-PROCESS EXAMINATION MUST BE PERFORMED BY A CERTIFIED WELDING INSPECTOR AND
INCLUDES VISUAL EXAMINATION OF:
A. JOINT PREPARATION AND CLEANLINESS
B. PREHEATING
C. FIT-UP, JOINT CLEARANCE, AND INTERNAL ALIGNMENT PRIOR TO JOINING
D. VARIABLES SPECIFIED BY THE JOINING PROCEDURE, INCLUDING FILLER MATERIAL,
POSITION, AND ELECTRODE
E. EXTERNAL CONDITION OF THE ROOT PASS AFTER CLEANING AIDED BY LIQUID PENETRANT
OR MAGNETIC PARTICLE EXAMINATION
F. SLAG REMOVAL REMOVAL AND WELD CONDITION BETWEEN PASSES
G. APPEARANCE OF FINISHED JOINT
3. UPON COMPLETION OF TIE-IN WELDS AND FINAL RADIOGRAPHIC EXAMINATION, THE PIPING MUST
RECEIVE A SOAK TEST IN ACCORDANCE WITH API 1595, AND THEN FLUSHED AND CLEANED WITH
FUEL.
M-003
E
Q U
E N
O
P E
R A
T I O
M
F
R I T
Z
M
F
R I T
Z
J
F
R E
D E
R I C
K
K
W
A R
I N
G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
READY TO ADVERTISE
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
Z N
R E
A P
S I
F
U E
L
R
E C
E I P
T
A
S
T R
I B
U T
I O
N
U
P G
R A
D E
S
Y O
K O
S
E
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
A U
G
US Army Corps of Engineers ®
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
Z N
R E
M
D
W G
GENERAL - PLC PROGRAMMING REQUIREMENTS
THE SEQUENCE OF OPERATIONS PROVIDED HEREIN ARE A GENERAL OVERVIEW OF THE STEPS REQUIRED TO
OPERATE THE SYSTEM AND DO NOT PROVIDE A COMPREHENSIVE LIST OF ALL PLC PROGRAMMING
REQUIREMENTS, INCLUDING INSTRUMENT SET POINTS, TIME DELAYS, ETC. THE CONTRACTOR MUST UTILIZE
THE SEQUENCE OF OPERATIONS PROVIDED HEREIN, FLOW DIAGRAMS, ELECTRICAL INSTRUMENTATION
DRAWINGS, AND FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM SPECIFICATION TO PROGRAM THE PLC TO
PROVIDE THE REQUIRED SYSTEM FUNCTIONALITY.
GENERAL - FUEL RECEIPT VIA RAIL OR TRUCK OFFLOAD
THE RAIL AND TRUCK OFFLOAD FACILITY IS CAPABLE OF RECEIVING FUEL INTO ONE OR BOTH DROP TANKS
(TANK 1 OR TANK 2) AND TRANSFERRING THE OFFLOADED FUEL TO THE FOLLOWING FACILITIES - MAIN BULK
STORAGE, EAST SIDE STORAGE, OR HYDRANT SYSTEMS. FOR NORMAL OFFLOADING OPERATIONS, THE FUEL
TRANSFER PUMPS (P-2001 THROUGH P-2006) ARE INTENDED TO OPERATE AUTOMATICALLY AND ARE
CONTROLLED BY THE LEVEL OF FUEL WITHIN THE DROP TANKS.
NOTE: NORMAL FUEL RECEIPT FOR YOKOTA AIR BASE IS VIA RAIL CAR AND IS INTENDED TO BE OFFLOADED
INTO ONE DESIGNATED RECEIPT DROP TANK AND TRANSFERRED TO EITHER MAIN BULK STORAGE OR EAST
SIDE STORAGE. TO ENSURE SYSTEM COMPONENT LONGEVITY AND EQUAL PUMP WEAR, THE DESIGNATED
RECEIPT DROP TANK SHOULD BE ALTERNATED BETWEEN TANK 1 AND TANK 2 FOR EVERY RECEIPT. TRUCK
ONLY RECEIPTS, SIMULTANEOUS RECEIPTS FROM RAIL CARS AND TRUCKS, AND RECEIPT TRANSFERS TO THE
HYDRANT SYSTEMS ARE CONSIDERED CONTINGENCY OPERATIONS.
NOTE: RECEIPT FUEL TRANSFERS TO THE EAST SIDE STORAGE FACILITY AND HYDRANT SYSTEMS WILL BE
POSSIBLE UPON COMPLETION OF DESC2103 CONSTRUCT JET FUEL JP8 BULK STORAGE TANKS PROJECT WHEN
A FUTURE DN300 (12-INCH) PIPELINE IS CONSTRUCTED BETWEEN BUILDING 4091 AND VALVE PIT B-1 (TO BE
COMPLETED BY OTHERS). UNTIL THEN, FUEL TRANSFERS TO THE EAST SIDE STORAGE FACILITY AND HYDRANT
SYSTEM MUST CONTINUE USING THE FUEL PUMPS AT MAIN BULK STORAGE FACILITY AND TRANSFER PIPELINES
BETWEEN MAIN BULK STORAGE AND VALVE PIT B-1.
FUEL TRANSFER TO MAIN BULK STORAGE FACILITY
FOR FUEL RECEIPT AND TRANSFER TO MAIN BULK STORAGE BY EITHER RAIL CAR OR TRUCK OFFLOAD, THE
FOLLOWING PROCEDURES SHOULD BE FOLLOWED. NOTE, OPERATING PUMP SELECTIONS AND VALVE
ALIGNMENTS SHOULD NOT BE CHANGED WHILE ACTIVELY OFFLOADING. THIS RECEIPT/TRANSFER OPERATION
ALLOWS FOR OFFLOADING OF UP TO 12 RAIL CARS SIMULTANEOUSLY (NORMAL OPERATION) OR 8 TRUCKS
SIMULTANEOUSLY (CONTINGENCY OPERATION). FOR SIMULTANEOUS OFFLOAD OF BOTH RAIL CARS AND
TRUCKS, SEE THE SECTION TITLED CONTINGENCY OPERATION - FUEL TRANSFER TO TWO FACILITY LOCATIONS.
1. THE HAND-OFF-AUTO SWITCHES (LOCATED ON THE PCP) FOR THE SIX FUEL TRANSFER PUMPS (P-2001
THROUGH P-2006) SHOULD BE IN THE “AUTO” POSITION. NOTE: IF ANY PUMP IS TO BE OUT OF SERVICE FOR
MAINTENANCE, THE HAND SWITCH FOR THAT PUMP SHOULD REMAIN IN THE “OFF” POSITION.
A. THE PCP WILL ALLOW ONLY TWO PUMPS (PER DROP TANK) TO OPERATE AT ANY ONE TIME DURING
AUTOMATED FUEL TRANSFER OPERATIONS TO A SINGLE FACILITY. THE THIRD PUMP IS PROVIDED AS A
BACKUP IN THE EVENT THAT ONE PUMP IS OFFLINE.
B. THE PCP WILL AUTOMATICALLY SELECT THE LEAD AND LAG PUMPS BASED ON THE TOTAL ACCUMULATED
RUN TIME OF THE PUMPS SET TO RUN IN THE “AUTO” POSITION.
C. THE LEAD PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE LOWEST ACCUMULATED RUN TIME.
D. THE LAG PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE SECOND LOWEST ACCUMULATED RUN
TIME.
E. IN THE EVENT THAT EITHER THE LEAD OR LAG PUMP FAILS TO START WHEN CALLED, THE PCP WILL
AUTOMATICALLY SELECT THE THIRD PUMP TO START.
F. THE LEAD/LAG PUMP SELECTION BY THE PCP WILL AUTOMATICALLY CYCLE AS EACH PUMP IS STARTED
AND STOPPED TO ENSURE ALL PUMPS ARE RUN SIMILAR AMOUNTS OF TIME.
2. SELECT THE DESIGNATED DROP TANK FOR FUEL RECEIPT (TANK 1 OR TANK 2) BY SETTING THE “TANK
TRANSFER OPERATION SELECTOR” HAND SWITCHES (LOCATED ON THE PCP) TO “ENABLE” AND “MAIN BULK
STORAGE.” THE “TANK TRANSFER OPERATION SELECTOR” HAND SWITCH FOR THE NON-RECEIPT DROP
TANK SHOULD BE SET TO “OFF.”
A. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “ENABLE”, THE PCP WILL OPEN
THE MOTORIZED DROP TANK INLET VALVE.
B. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “OFF”, THE PCP WILL CLOSE THE
MOTORIZED DROP TANK INLET VALVE. THE PCP WILL DISPLAY THE OPEN/CLOSE POSITION FOR THE TANK
INLET VALVES.
C. IN THE EVENT BOTH DROP TANK SELECTOR SWITCHES ARE IN THE “ENABLE” POSITION, AND BOTH DROP
TANK SELECTOR SWITCHES ARE SET FOR TRANSFERS TO THE SAME FACILITY, THE PCP WILL ALLOW
ONLY ONE PUMP IN EACH TANK TO OPERATE IN A LEAD/LAG CONFIGURATION.
D. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “MAIN BULK STORAGE”, THE PCP
WILL UTILIZE THE VARIABLE FREQUENCY DRIVES (VFD) TO REDUCE THE PUMP SPEED TO 75 PERCENT OF
THE NORMAL OPERATING SPEED (SPEED REDUCTION TO BE FIELD ADJUSTED DURING COMMISSIONING).
3. VERIFY THE “RECEIPT CROSS-OVER VALVE” SWITCH IS SET TO THE “OPEN” POSITION. THE MOTORIZED
VALVE OPERATOR WILL ALIGN THE VALVE TO THE SELECTED POSITION. THE PCP WILL DISPLAY THE
OPEN/CLOSE POSITION FOR THE CROSS-OVER VALVE.
4. VERIFY ALL MANUAL DOUBLE-BLOCK AND BLEED VALVES AT THE RAIL OR TRUCK OFFLOAD POSITIONS ARE
OPEN.
5. CONNECT THE GROUND REEL CLAMP TO EACH RAIL CAR OR TRUCK, AND THEN CONNECT THE OFFLOADING
HOSE(S) TO EACH HOSE CONNECTION.
6. FOR TRUCK OFFLOAD, OPEN THE DN80 (3-INCH) BALL VALVES ON THE OFFLOAD HEADER FOR EACH HOSE
CONNECTION USED.
7. OPEN THE RAIL OR TRUCK VALVE(S) FOR EACH HOSE CONNECTION USED. EACH COMPARTMENT ON THE
TRAIN OR TRUCK SHOULD BE OFFLOADED SIMULTANEOUSLY.
8. CONFIRM THAT FUEL IS FLOWING USING THE SIGHT FLOW INDICATORS AT EACH HOSE CONNECTION.
9. THE PCP WILL AUTOMATICALLY START AND STOP THE LEAD/LAG PUMPS WHEN THE LIQUID LEVEL REACHES
THE PUMP CONTROL LEVEL SENSORS IN THAT TANK.
10.FOR OVERFILL PREVENTION AND ALARM CONDITIONS, REFER TO THE SECTION TITLED OVERFILL
PREVENTION AND ALARM CONDITIONS.
11.UPON COMPLETION OF THE OFFLOAD, CLOSE THE RAIL OR TRUCK VALVE(S). DISCONNECT AND STORE THE
OFFLOAD HOSES, THEN DISCONNECT AND RETRACT THE GROUNDING CLAMPS.
12.IN THE EVENT THE FUEL WITHIN THE DROP TANK IS ABOVE THE LEAD PUMP STOP ELEVATION, BUT BELOW
THE LEAD PUMP START ELEVATION, DEPRESS THE “LEAD PUMP MANUAL START” PUSHBUTTON (LOCATED ON
THE PCP).
A. THE PCP WILL DESIGNATE ONE PUMP AS THE LEAD PUMP AND WILL RUN THE PUMP UNTIL THE LIQUID
LEVEL DROPS TO THE LEAD PUMP STOP ELEVATION.
B. IF THE LIQUID LEVEL WITHIN THE TANK IS BELOW THE LEAD PUMP STOP ELEVATION, THE PCP WILL NOT
START THE PUMP WHEN THE “LEAD PUMP MANUAL START” PUSHBUTTON IS DEPRESSED.
13.WHEN ALL OFFLOADING ACTIVITIES ARE COMPLETE, TURN THE “TANK TRANSFER OPERATION SELECTOR”
HAND SWITCH FOR THE RECEIPT TANK TO THE “OFF” POSITION AND RETURN ALL MANUAL VALVES TO THEIR
NORMALLY OPEN/CLOSED POSITIONS.
SEQUENCE OF OPERATIONS .
FUEL TRANSFER TO EAST SIDE STORAGE FACILITY
FOR FUEL RECEIPT AND TRANSFER TO EAST SIDE STORAGE FACILITY, BY EITHER RAIL CAR OR TRUCK OFFLOAD, THE
FOLLOWING PROCEDURES SHOULD BE FOLLOWED. NOTE, OPERATING PUMP SELECTIONS AND VALVE ALIGNMENTS
SHOULD NOT BE CHANGED WHILE ACTIVELY OFFLOADING. THIS RECEIPT/TRANSFER OPERATION ALLOWS FOR
OFFLOADING OF UP TO 12 RAIL CARS SIMULTANEOUSLY (NORMAL OPERATION) OR 8 TRUCKS SIMULTANEOUSLY
(CONTINGENCY OPERATION). FOR SIMULTANEOUS OFFLOAD OF BOTH RAIL CARS AND TRUCKS, SEE THE SECTION
TITLED CONTINGENCY OPERATION - FUEL TRANSFER TO TWO FACILITY LOCATIONS.
1. THE HAND-OFF-AUTO SWITCHES (LOCATED ON THE PCP) FOR THE SIX FUEL TRANSFER PUMPS (P-2001 THROUGH
P-2006) SHOULD BE IN THE “AUTO” POSITION. NOTE: IF ANY PUMP IS TO BE OUT OF SERVICE FOR MAINTENANCE, THE HAND SWITCH FOR THAT PUMP SHOULD REMAIN IN THE “OFF” POSITION.
A. THE PCP WILL ALLOW ONLY TWO PUMPS (PER DROP TANK) TO OPERATE AT ANY ONE TIME DURING
AUTOMATED FUEL TRANSFER OPERATIONS TO A SINGLE FACILITY. THE THIRD PUMP IS PROVIDED AS A
BACKUP IN THE EVENT THAT ONE PUMP IS OFFLINE.
B. THE PCP WILL AUTOMATICALLY SELECT THE LEAD AND LAG PUMPS BASED ON THE TOTAL ACCUMULATED RUN
TIME OF THE PUMPS SET TO RUN IN THE “AUTO” POSITION.
C. THE LEAD PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE LOWEST ACCUMULATED RUN TIME.
D. THE LAG PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE SECOND LOWEST ACCUMULATED RUN TIME.
E. IN THE EVENT THAT EITHER THE LEAD OR LAG PUMP FAILS TO START WHEN CALLED, THE PCP WILL
AUTOMATICALLY SELECT THE THIRD PUMP TO START.
F. THE LEAD/LAG PUMP SELECTION BY THE PCP WILL AUTOMATICALLY CYCLE AS EACH PUMP IS STARTED AND
STOPPED TO ENSURE ALL PUMPS ARE RUN SIMILAR AMOUNTS OF TIME.
2. SELECT THE DESIGNATED RECEIPT DROP TANK (TANK 1 OR TANK 2) BY SETTING THE “TANK TRANSFER
OPERATION SELECTOR” HAND SWITCHES (LOCATED ON THE PCP) TO “ENABLE” AND “EAST SIDE STORAGE.” THE
“TANK TRANSFER OPERATION SELECTOR” HAND SWITCH FOR THE NON-RECEIPT DROP TANK SHOULD BE SET TO
“OFF.”
A. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “ENABLE”, THE PCP WILL OPEN THE
MOTORIZED DROP TANK INLET VALVE.
B. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “OFF”, THE PCP WILL CLOSE THE
MOTORIZED DROP TANK INLET VALVE. THE PCP WILL DISPLAY THE OPEN/CLOSE POSITION FOR THE TANK
INLET VALVES.
C. IN THE EVENT BOTH TANK SELECTOR SWITCHES ARE IN THE “ENABLE” POSITION, AND BOTH TANK
SELECTOR SWITCHES ARE SET FOR TRANSFERS TO THE SAME FACILITY, THE PCP WILL ALLOW ONLY
ONE PUMP IN EACH TANK TO OPERATE IN A LEAD/LAG CONFIGURATION.
D. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “EAST SIDE STORAGE”, THE
PCP WILL ALLOW THE VARIABLE FREQUENCY DRIVES (VFD) TO OPERATE AT 100 PERCENT OF THE
NORMAL OPERATING SPEED (NO REDUCTION IN PUMP SPEED).
3. VERIFY THE “RECEIPT CROSS-OVER VALVE” SWITCH IS SET TO THE “OPEN” POSITION. THE MOTORIZED
VALVE OPERATOR WILL ALIGN THE VALVE TO THE SELECTED POSITION. THE PCP WILL DISPLAY THE
OPEN/CLOSE POSITION FOR THE CROSS-OVER VALVE.
4. VERIFY ALL MANUAL DOUBLE-BLOCK AND BLEED VALVES AT THE RAIL OR TRUCK OFFLOAD POSITIONS ARE OPEN.
5. CONNECT THE GROUND REEL CLAMP TO EACH RAIL CAR OR TRUCK, AND THEN CONNECT THE OFFLOADING
HOSE(S) TO EACH HOSE CONNECTION.
6. FOR TRUCK OFFLOAD, OPEN THE DN80 (3-INCH) BALL VALVES ON THE OFFLOAD HEADER FOR EACH HOSE
CONNECTION USED.
7. OPEN THE RAIL OR TRUCK VALVE(S) FOR EACH HOSE CONNECTION USED. EACH COMPARTMENT ON THE TRAIN
OR TRUCK SHOULD BE OFFLOADED SIMULTANEOUSLY.
8. CONFIRM THAT FUEL IS FLOWING USING THE SIGHT FLOW INDICATORS AT EACH HOSE CONNECTION.
9. THE PCP WILL AUTOMATICALLY START AND STOP THE LEAD/LAG PUMPS WHEN THE LIQUID LEVEL REACHES THE
PUMP CONTROL LEVEL SENSORS IN THAT TANK.
10. FOR OVERFILL PREVENTION AND ALARM CONDITIONS, REFER TO THE SECTION TITLED OVERFILL PREVENTION
AND ALARM CONDITIONS.
11. UPON COMPLETION OF THE OFFLOAD, CLOSE THE RAIL OR TRUCK VALVE(S). DISCONNECT AND STORE THE
OFFLOAD HOSES, THEN DISCONNECT AND RETRACT THE GROUNDING CLAMPS.
12. IN THE EVENT THE FUEL WITHIN THE DROP TANK IS ABOVE THE LEAD PUMP STOP ELEVATION, BUT BELOW THE
LEAD PUMP START ELEVATION, DEPRESS THE “LEAD PUMP MANUAL START” PUSHBUTTON (LOCATED ON THE PCP).
A. THE PCP WILL DESIGNATE ONE PUMP AS THE LEAD PUMP AND WILL RUN THE PUMP UNTIL THE LIQUID LEVEL
DROPS TO THE LEAD PUMP STOP ELEVATION.
B. IF THE LIQUID LEVEL WITHIN THE TANK IS BELOW THE LEAD PUMP STOP ELEVATION, THE PCP WILL NOT START
THE PUMP WHEN THE “LEAD PUMP MANUAL START” PUSHBUTTON IS DEPRESSED.
13. WHEN ALL OFFLOADING ACTIVITIES ARE COMPLETE, TURN THE “TANK TRANSFER OPERATION SELECTOR” HAND
SWITCH FOR THE RECEIPT TANK TO THE “OFF” POSITION AND RETURN ALL MANUAL VALVES TO THEIR NORMALLY
OPEN/CLOSED POSITIONS.
CONTINGENCY OPERATION - FUEL TRANSFER TO HYDRANT SYSTEMS
FOR FUEL RECEIPT AND TRANSFER TO THE “OLD” OR “NEW” HYDRANT SYSTEMS, BY EITHER RAIL CAR OR
TRUCK OFFLOAD, THE FOLLOWING PROCEDURES SHOULD BE FOLLOWED. NOTE, OPERATING PUMP
SELECTIONS AND VALVE ALIGNMENTS SHOULD NOT BE CHANGED WHILE ACTIVELY OFFLOADING. THIS
RECEIPT/TRANSFER OPERATION OCCURS AT A REDUCED FLOW RATE DUE TO THE RECEIPT FILTRATION
CAPABILITIES AT THE HYDRANT SYSTEM. THIS RECEIPT/TRANSFER OPERATION ALLOWS FOR OFFLOADING
OF UP TO 12 RAIL CARS SIMULTANEOUSLY (NORMAL OPERATION) OR 8 TRUCKS SIMULTANEOUSLY
(CONTINGENCY OPERATION). FOR SIMULTANEOUS OFFLOAD OF BOTH RAIL CARS AND TRUCKS, SEE THE
SECTION TITLED CONTINGENCY OPERATION - FUEL TRANSFER TO TWO FACILITY LOCATIONS.
1. THE HAND-OFF-AUTO SWITCHES (LOCATED ON THE PCP) FOR THE SIX FUEL TRANSFER PUMPS (P-2001
THROUGH P-2006) SHOULD BE IN THE “AUTO” POSITION. NOTE: IF ANY PUMP IS TO BE OUT OF SERVICE
FOR MAINTENANCE, THE HAND SWITCH FOR THAT PUMP SHOULD REMAIN IN THE “OFF” POSITION.
A. THE PCP WILL ALLOW ONLY ONE PUMP TO OPERATE AT ANY ONE TIME DURING AUTOMATED FUEL
TRANSFER OPERATIONS TO THE HYDRANT SYSTEMS DUE TO THE REDUCED FLOW RATE ALLOWED BY
THE RECEIPT FILTRATION. THE SECOND AND THIRD PUMPS ARE PROVIDED AS A BACKUP IN THE
EVENT THAT ONE PUMP IS OFFLINE.
B. THE PCP WILL AUTOMATICALLY SELECT THE LEAD PUMP BASED ON THE TOTAL ACCUMULATED RUN
TIME OF THE PUMPS SET TO RUN IN THE “AUTO” POSITION.
C. THE LEAD PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE LOWEST ACCUMULATED RUN TIME.
D. IN THE EVENT THAT THE LEAD PUMP FAILS TO START WHEN CALLED, THE PCP WILL AUTOMATICALLY
SELECT THE SECOND OR THIRD PUMP TO START.
E. THE LEAD PUMP SELECTION BY THE PCP WILL AUTOMATICALLY CYCLE AS EACH PUMP IS STARTED
AND STOPPED TO ENSURE ALL PUMPS ARE RUN SIMILAR AMOUNTS OF TIME.
2. SELECT THE DESIGNATED RECEIPT TANK (TANK 1 OR TANK 2) BY SETTING THE “TANK TRANSFER
OPERATION SELECTOR” HAND SWITCHES (LOCATED ON THE PCP) TO “ENABLE” AND “HYDRANT
SYSTEMS.” THE “TANK TRANSFER OPERATION SELECTOR” HAND SWITCH FOR THE NON-RECEIPT DROP
TANK SHOULD BE SET TO “OFF.”
A. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “ENABLE”, THE PCP WILL
OPEN THE MOTORIZED DROP TANK INLET VALVE.
B. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “OFF”, THE PCP WILL CLOSE
THE MOTORIZED DROP TANK INLET VALVE. THE PCP WILL DISPLAY THE OPEN/CLOSE POSITION FOR
THE TANK INLET VALVES.
C. IN THE EVENT BOTH TANK SELECTOR SWITCHES ARE IN THE “ENABLE” POSITION, AND BOTH TANK
SELECTOR SWITCHES ARE SET FOR TRANSFERS TO THE SAME FACILITY, THE PCP WILL ALLOW ONLY
ONE PUMP IN EACH TANK TO OPERATE IN A LEAD/LAG CONFIGURATION.
D. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “HYDRANT SYSTEMS”, THE
PCP WILL ALLOW THE VARIABLE FREQUENCY DRIVES (VFD) TO OPERATE AT 100 PERCENT OF THE
NORMAL OPERATING SPEED (NO REDUCTION IN PUMP SPEED).
3. VERIFY THE “RECEIPT CROSS-OVER VALVE” SWITCH IS SET TO THE “OPEN” POSITION. THE MOTORIZED
VALVE OPERATOR WILL ALIGN THE VALVE TO THE SELECTED POSITION. THE PCP WILL DISPLAY THE
OPEN/CLOSE POSITION FOR THE CROSS-OVER VALVE.
4. VERIFY ALL MANUAL DOUBLE-BLOCK AND BLEED VALVES AT THE RAIL OR TRUCK OFFLOAD POSITIONS
ARE OPEN.
5. CONNECT THE GROUND REEL CLAMP TO EACH RAIL CAR OR TRUCK, AND THEN CONNECT THE
OFFLOADING HOSE(S) TO EACH HOSE CONNECTION.
6. FOR TRUCK OFFLOAD, OPEN THE DN80 (3-INCH) BALL VALVES ON THE OFFLOAD HEADER FOR EACH
HOSE CONNECTION USED.
7. OPEN THE RAIL OR TRUCK VALVE(S) FOR EACH HOSE CONNECTION USED. EACH COMPARTMENT ON THE
TRAIN OR TRUCK SHOULD BE OFFLOADED SIMULTANEOUSLY.
8. CONFIRM THAT FUEL IS FLOWING USING THE SIGHT FLOW INDICATORS AT EACH HOSE CONNECTION.
9. THE PCP WILL AUTOMATICALLY START AND STOP THE LEAD PUMP WHEN THE LIQUID LEVEL REACHES
THE PUMP CONTROL LEVEL SENSORS IN THAT TANK.
10.FOR OVERFILL PREVENTION AND ALARM CONDITIONS, REFER TO THE SECTION TITLED OVERFILL
PREVENTION AND ALARM CONDITIONS.
11.UPON COMPLETION OF THE OFFLOAD, CLOSE THE RAIL OR TRUCK VALVE(S). DISCONNECT AND STORE
THE OFFLOAD HOSES, THEN DISCONNECT AND RETRACT THE GROUNDING CLAMPS.
12.IN THE EVENT THE FUEL WITHIN THE DROP TANK IS ABOVE THE LEAD PUMP STOP ELEVATION, BUT
BELOW THE LEAD PUMP START ELEVATION, DEPRESS THE “LEAD PUMP MANUAL START” PUSHBUTTON
(LOCATED ON THE PCP).
A. THE PCP WILL DESIGNATE ONE PUMP AS THE LEAD PUMP AND WILL RUN THE PUMP UNTIL THE LIQUID
LEVEL DROPS TO THE LEAD PUMP STOP ELEVATION.
B. IF THE LIQUID LEVEL WITHIN THE TANK IS BELOW THE LEAD PUMP STOP ELEVATION, THE PCP WILL
NOT START THE PUMP WHEN THE “LEAD PUMP MANUAL START” PUSHBUTTON IS DEPRESSED.
13. WHEN ALL OFFLOADING ACTIVITIES ARE COMPLETE, TURN THE “TANK TRANSFER OPERATION
SELECTOR” HAND SWITCH FOR THE RECEIPT TANK TO THE “OFF” POSITION AND RETURN ALL MANUAL
VALVES TO THEIR NORMALLY OPEN/CLOSED POSITIONS.
M-004
E
Q U
E N
O
P E
R A
T I O
F
R I T
Z
M
F
R I T
Z
J
F
R E
D E
R I C
K
K
W
A R
I N
G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
READY TO ADVERTISE
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
Z N
R E
A P
S I
F
U E
L
R
E C
E I P
T
A
S
T R
I B
U T
I O
N
U
P G
R A
D E
S
Y O
K O
S
E
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
A U
G
US Army Corps of Engineers ®
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
Z N
R E
M
D
W G
DROP TANK OVERFILL PREVENTION AND ALARM CONDITIONS
THE HIGH LEVEL SHUTOFF VALVE, INDEPENDENT TANK LEVEL SWITCHES, FLOW SWITCHES, AND PUMP
MOTOR WINDING THERMOSTATS ARE PROVIDED AS A SYSTEM SAFEGUARD TO PREVENT POTENTIAL
OVERFILLS AND/OR TO PROTECT THE PUMPS AND EQUIPMENT FROM DAMAGE. FOR OPERATIONAL
REQUIREMENTS OF EFSO STATIONS, REFER TO THE SECTION TITLED EMERGENCY STOP AND RESET. ALL
TIMER DELAYS AND SWITCH SET POINTS MUST BE FIELD ADJUSTED DURING START AND COMMISSIONING.
THE FOLLOWING OPERATIONS WILL RESULT IN ALARM CONDITIONS:
1. IF THE FUEL LEVEL IN A DROP TANK RISES TO 85% VOLUME, THE HIGH LEVEL VALVE FLOAT WILL CAUSE
THE TANK HIGH LEVEL VALVE TO CLOSE. THE HIGH LEVEL VALVE MUST BE ADJUSTED TO FULLY CLOSE
BEFORE THE LEVEL REACHES THE HIGH LEVEL ALARM. WHEN THE FUEL LEVEL DROPS BELOW THE HIGH
LEVEL VALVE FLOAT PILOT ACTUATION LEVEL, THE HIGH LEVEL VALVE WILL BEGIN TO OPEN.
2. IF THE FUEL LEVEL IN A DROP TANK RISES TO 90% VOLUME, THE HIGH LEVEL SWITCH WILL ACTIVATE
THE HIGH LEVEL ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE ALARM
ANNUNCIATOR PANEL AND AN EXTERIOR STROBE AND AUDIBLE ALARM, AND WILL ENERGIZE THE
SOLENOID ON THE HIGH LEVEL VALVE, CAUSING THE HIGH LEVEL VALVE TO CLOSE. THE HIGH LEVEL
ALARM CAN BE SILENCED BY DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE HIGH LEVEL VALVE
SOLENOID WILL REMAIN ENERGIZED, AND THE HIGH LEVEL INDICATOR LIGHT AND STROBE WILL
CONTINUE TO ILLUMINATE UNTIL THE ALARM CONDITION IS CORRECTED.
3. IF THE FUEL LEVEL IN A DROP TANK RISES TO 95% VOLUME, THE HIGH-HIGH LEVEL SWITCH WILL
ACTIVATE THE HIGH-HIGH LEVEL ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE
ALARM ANNUNCIATOR PANEL AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE SOLENOID ON THE
HIGH LEVEL CONTROL VALVE ASSOCIATED WITH THE DROP TANK WILL ENERGIZE, FORCING THE VALVE
TO CLOSE. THE HIGH-HIGH LEVEL ALARM CAN BE SILENCED BY DEPRESSING THE ACKNOWLEDGE
SWITCH. NOTE, THE HIGH-HIGH LEVEL INDICATOR LIGHT AND STROBE WILL CONTINUE TO ILLUMINATE, AND THE HIGH LEVEL VALVE SOLENOID WILL REMAIN ENERGIZED, UNTIL THE ALARM CONDITION IS
CORRECTED.
4. IF A FLOW SWITCH FOR THE FUEL TRANSFER PUMPS (P-2001 THROUGH P-2006) SENSES LOW/NO FLOW, THE SWITCH WILL ACTIVATE A LOW FLOW ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON
THE ALARM ANNUNCIATOR PANEL, AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE PCP WILL SHUT
DOWN THE RESPECTIVE FUEL TRANSFER PUMP. THE PCP WILL START ANOTHER PUMP TO OPERATE IN
PLACE OF THE PUMP THAT IS SHUT-DOWN DUE TO LOW/NO FLOW IF THE LEVEL WITHIN THE DROP TANK
IS ABOVE THE LEAD OR LAG PUMP START ELEVATION. THE LOW FLOW ALARM WILL CONTINUE UNTIL THE
ALARM ACKNOWLEDGE SWITCH IS DEPRESSED.
5. IF THE FUEL TRANSFER PUMP MOTOR WINDING TEMPERATURE RISES ABOVE THE THERMOSTAT
SETTING, THE SWITCH WILL ACTIVATE A HIGH TEMPERATURE ALARM CONSISTING OF AN INDICATOR
LIGHT AND BUZZER ON THE ALARM ANNUNCIATOR PANEL AND SHUT DOWN THE AFFECTED FUEL
TRANSFER PUMP. THE PCP WILL START ANOTHER PUMP TO OPERATE IN PLACE OF THE PUMP THAT IS
SHUT-DOWN DUE TO HIGH WINDING TEMPERATURE IF THE LEVEL WITHIN THE DROP TANK IS ABOVE THE
LEAD OR LAG PUMP START ELEVATION. HE HIGH TEMPERATURE ALARM CAN BE SILENCED BY
DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE HIGH TEMPERATURE ALARM WILL
AUTOMATICALLY RESET WHEN THE MOTOR WINDING TEMPERATURE DROPS BELOW THE THERMOSTAT
SETTING.
6. IF A DROP TANK VAULT SUMP SENSOR DETECTS WATER OR HYDROCARBON LIQUIDS, THE LEAK DETECTION
SENSOR WILL ACTIVATE THE DROP TANK LEAK ALARM CONSISTING OF AN INDICATOR LIGHT AND
BUZZER ON THE ALARM ANNUNCIATOR PANEL AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE
DROP TANK LEAK ALARM CAN BE SILENCED BY DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE
DROP TANK LEAK ALARM INDICATOR LIGHT AND STROBE WILL CONTINUE TO ILLUMINATE UNTIL THE
ALARM CONDITION IS CORRECTED.
7. IF A DROP TANK VAULT EXPLOSIVE VAPOR SENSOR DETECTS 25 PERCENT OF THE LOWER EXPLOSIVE LIMIT
OF JET FUEL VAPORS, THE EXPLOSIVE VAPOR SENSOR WILL ACTIVATE THE DROP TANK EXPLOSIVE
VAPOR ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE ALARM ANNUNCIATOR PANEL
AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE DROP TANK EXPLOSIVE VAPOR ALARM CAN BE
SILENCED BY DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE DROP TANK EXPLOSIVE VAPOR
ALARM INDICATOR LIGHT AND STROBE WILL CONTINUE TO ILLUMINATE UNTIL THE ALARM CONDITION IS
CORRECTED.
DROP TANK DRAW-DOWN SEQUENCE
FOR MANUAL DRAW-DOWN OF THE DROP TANKS, USING THE STRIPPING PUMP (P-2007), THE FOLLOWING
PROCEDURES SHOULD BE FOLLOWED. DROP TANK DRAW-DOWN FUEL CAN BE TRANSFERRED TO “MAIN
BULK STORAGE”, “EAST SIDE STORAGE”, OR “HYDRANT SYSTEMS.”
1. SELECT THE DESIGNATED DRAW-DOWN TANK (TANK 1 OR TANK 2) BY SETTING THE RESPECTIVE “TANK
DRAIN VALVE” HAND SWITCH (LOCATED ON THE PCP) TO “OPEN.” THE MOTORIZED VALVE OPERATOR
WILL ALIGN THE VALVES TO THE SELECTED POSITION. THE PCP WILL DISPLAY THE OPEN/CLOSE
POSITION FOR THE TANK DRAIN VALVE.
2. RESET THE MECHANICAL REGISTER ON THE POSITIVE DISPLACEMENT METER TO RECONCILE THE
VOLUME OF FUEL TRANSFERRED OUT OF THE TANK.
3. SET THE METER PRE-SET SHUTOFF VOLUME FOR THE INTENDED TRANSFER VOLUME (TO THE NEAREST
WHOLE GALLON) AND OPEN THE SET-STOP VALVE. AT THE PUMP MINIMUM SUBMERGENCE LEVEL, EACH
DROP TANK WILL HAVE APPROXIMATELY 20,400 L (5,390 GALLONS) OF HEEL REMAINING.
4. TO START THE STRIPPING PUMP, DEPRESS THE LOCAL “START” PUSHBUTTON (LOCATED ON THE
CONTROL STATION NEAR BLDG 4091). CONFIRM FUEL IS FLOWING THROUGH THE METER.
5. WHEN THE PRE-SET VOLUME OF FUEL IS TRANSFERRED, THE METER SET-STOP VALVE WILL CLOSE, STOPPING FLOW THROUGH THE METER. THE LOW FLOW SWITCH WILL SHUT DOWN THE STRIPPING
PUMP DUE TO LOW/NO FLOW.
A. IF THE TRANSFER MUST BE STOPPED PRIOR TO REACHING THE PRE-SET VOLUME, DEPRESS THE
STRIPPING PUMP “STOP” PUSHBUTTON (LOCATED ON THE CONTROL STATION NEAR BLDG 4091).
B. IF THE PRE-SET VOLUME IS GREATER THAN THE ACTUAL VOLUME REMAINING IN THE TANK, THE LOW
FLOW SWITCH WILL SENSE LOW/NO FLOW AND WILL SHUT THE PUMP DOWN PRIOR TO CLOSURE OF
THE METER SET-STOP VALVE.
6. TURN THE “TANK DRAIN VALVE” HAND SWITCHES TO THE “CLOSE” POSITION AND RETURN ALL MANUAL
VALVES TO THEIR NORMALLY OPEN/CLOSED POSITIONS.
FUEL TRANSFER TO GENERATOR DAY TANK
FOR FUEL TRANSFER TO THE GENERATOR BELLY (DAY) TANK, THE FOLLOWING PROCEDURES SHOULD BE
FOLLOWED. THIS TRANSFER OPERATION OCCURS WITH THE STRIPPING PUMP (P-2007).
1. ALIGN THE PROPER VALVES TO TRANSFER FUEL FROM THE DESIGNATED DROP TANK TO THE
GENERATOR BELLY (DAY) TANK.
2. SELECT THE DESIGNATED TRANSFER TANK (TANK 1 OR TANK 2) BY SETTING THE “TANK DRAIN VALVE”
HAND SWITCH (LOCATED ON THE PCP) TO “OPEN.” THE MOTORIZED VALVE OPERATOR WILL ALIGN THE
VALVES TO THE SELECTED POSITION. THE PCP WILL DISPLAY THE OPEN/CLOSE POSITION FOR THE TANK
DRAIN VALVE.
3. RESET THE MECHANICAL REGISTER ON THE POSITIVE DISPLACEMENT METER TO RECONCILE THE
VOLUME OF FUEL TRANSFERRED OUT OF THE DROP TANK.
4. SET THE METER PRE-SET SHUTOFF VOLUME FOR THE INTENDED TRANSFER VOLUME (TO THE NEAREST
WHOLE GALLON) AND OPEN THE SET-STOP VALVE.
5. TO START THE STRIPPING PUMP, DEPRESS THE LOCAL “START” PUSHBUTTON (LOCATED ON THE
CONTROL STATION NEAR BLDG 4091). CONFIRM FUEL IS FLOWING THROUGH THE METER.
6. WHEN THE PRE-SET VOLUME OF FUEL IS TRANSFERRED, THE METER SET-STOP VALVE WILL CLOSE, STOPPING FLOW THROUGH THE METER. THE LOW FLOW SWITCH WILL SHUT DOWN THE PUMP DUE TO
LOW/NO FLOW.
A. IF THE TRANSFER MUST BE STOPPED PRIOR TO REACHING THE PRE-SET VOLUME, DEPRESS THE
STRIPPING PUMP “STOP” PUSHBUTTON (LOCATED ON THE CONTROL STATION NEAR BLDG 4091).
B. IF THE GENERATOR TANK HIGH LEVEL SHUTOFF VALVE CLOSES, THE LOW FLOW SWITCH WILL SENSE
LOW/NO FLOW AND WILL SHUT THE PUMP DOWN PRIOR TO CLOSURE OF THE METER SET-STOP
VALVE.
7. UPON COMPLETION OF FUEL TRANSFER, DEPRESS THE STRIPPING PUMP “STOP” PUSHBUTTON.
8. TURN THE “TANK DRAIN VALVE” HAND SWITCHES TO THE “CLOSE” POSITION AND RETURN ALL MANUAL
VALVES TO THEIR NORMALLY OPEN/CLOSED POSITIONS.
GENERATOR TANK OVERFILL PREVENTION AND ALARM CONDITIONS
THE OVERFILL PREVENTION VALVE, INDEPENDENT TANK LEVEL SWITCHES AND FLOW SWITCHES ARE
PROVIDED AS A SYSTEM SAFEGUARD TO PREVENT POTENTIAL OVERFILLS AND/OR TO PROTECT THE
PUMPS AND EQUIPMENT FROM DAMAGE. FOR OPERATIONAL REQUIREMENTS OF EFSO STATIONS, REFER
TO THE SECTION TITLED EMERGENCY STOP AND RESET. ALL TIMER DELAYS AND SWITCH SET POINTS MUST
BE FIELD ADJUSTED DURING START AND COMMISSIONING. THE FOLLOWING OPERATIONS WILL RESULT IN
ALARM CONDITIONS:
1. IF THE FUEL LEVEL IN THE GENERATOR TANK RISES TO 85% VOLUME, THE HIGH LEVEL SWITCH WILL
ACTIVATE THE HIGH LEVEL ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE ALARM
ANNUNCIATOR PANEL AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE HIGH LEVEL ALARM CAN BE
SILENCED BY DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE HIGH LEVEL INDICATOR LIGHT AND
STROBE WILL CONTINUE TO ILLUMINATE UNTIL THE ALARM CONDITION IS CORRECTED.
2. IF THE FUEL LEVEL IN THE GENERATOR TANK RISES TO 90% VOLUME, THE OVERFILL PREVENTION VALVE
FLOAT WILL CAUSE THE VALVE TO CLOSE. WHEN THE FUEL LEVEL DROPS BELOW THE OVERFILL
PREVENTION VALVE FLOAT ACTUATION LEVEL, THE OVERFILL PREVENTION VALVE WILL BEGIN TO OPEN.
3. IF THE FUEL LEVEL IN THE GENERATOR TANK RISES TO 95% VOLUME, THE HIGH-HIGH LEVEL SWITCH
WILL ACTIVATE THE HIGH-HIGH LEVEL ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE
ALARM ANNUNCIATOR PANEL AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE HIGH-HIGH LEVEL
ALARM CAN BE SILENCED BY DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE HIGH-HIGH LEVEL
INDICATOR LIGHT AND STROBE WILL CONTINUE TO ILLUMINATE UNTIL THE ALARM CONDITION IS
CORRECTED.
4. IF THE FUEL LEVEL IN THE GENERATOR TANK FALLS TO 15% VOLUME, THE LOW LEVEL SWITCH WILL
ACTIVATE THE LOW LEVEL ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE ALARM
ANNUNCIATOR PANEL AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE LOW LEVEL ALARM CAN BE
SILENCED BY DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE LOW LEVEL INDICATOR LIGHT AND
STROBE WILL CONTINUE TO ILLUMINATE UNTIL THE ALARM CONDITION IS CORRECTED.
5. IF THE LEAK DETECTION SENSOR IN THE GENERATOR TANK DETECTS WATER OR HYDROCARBON
LIQUIDS, THE LEAK DETECTION SENSOR WILL ACTIVATE THE GENERATOR TANK LEAK ALARM
CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE ALARM ANNUNCIATOR PANEL AND AN
EXTERIOR STROBE AND AUDIBLE ALARM. THE GENERATOR TANK LEAK ALARM CAN BE SILENCED BY
DEPRESSING THE ACKNOWLEDGE SWITCH. NOTE, THE GENERATOR TANK LEAK ALARM INDICATOR LIGHT
AND STROBE WILL CONTINUE TO ILLUMINATE UNTIL THE ALARM CONDITION IS CORRECTED.
6. IF THE STRIPPING PUMP (P-2007) FLOW SWITCH SENSES LOW/NO FLOW, THE SWITCH WILL ACTIVATE A
LOW FLOW ALARM CONSISTING OF AN INDICATOR LIGHT AND BUZZER ON THE ALARM ANNUNCIATOR
PANEL, AND AN EXTERIOR STROBE AND AUDIBLE ALARM. THE PCP WILL SHUT DOWN THE STRIPPING
PUMP. THE LOW FLOW ALARM WILL CONTINUE UNTIL THE ALARM ACKNOWLEDGE SWITCH IS
DEPRESSED.
EMERGENCY STOP AND RESET
1. DEPRESSING ANY OF THE EMERGENCY STOP (EFSO) PUSHBUTTONS AT THE FACILITY WILL STOP ALL
FUEL TRANSFER PUMPS, THE STRIPPING PUMP, AND ENERGIZE THE SOLENOIDS ON THE HIGH LEVEL
VALVES, CAUSING THE VALVES TO CLOSE. THIS ACTION IS EXECUTED WITHOUT REGARD FOR WHETHER
THE PUMPS WERE AUTOMATICALLY STARTED OR MANUALLY STARTED. ACTIVATION OF AN EFSO
PUSHBUTTON WILL ALSO ILLUMINATE AN INDICATOR LIGHT AND BUZZER ON THE PCP AND AN EXTERIOR
STROBE AND AUDIBLE ALARM. ALL AUDIBLE AND VISUAL ALARMS WILL CONTINUE UNTIL THE ALARM IS
RESET.
2. IN ORDER TO RESET THE SYSTEM AFTER AN ALARM, DEPRESS THE “RESET” PUSHBUTTON LOCATED AT
THE PCP AFTER RESETTING THE INITIAL ACTIVE EMERGENCY STOP PUSHBUTTON STATION.
SEQUENCE OF OPERATIONS (CONTINUED) .
CONTINGENCY OPERATION - FUEL TRANSFER TO TWO FACILITY LOCATIONS
FOR SIMULTANEOUS FUEL RECEIPT BY BOTH RAIL CAR AND TRUCK, THE FOLLOWING PROCEDURES
SHOULD BE FOLLOWED. THE SYSTEM IS DESIGNED TO ALLOW SIMULTANEOUS OFFLOADING OF UP TO 12
RAIL CARS AND 8 TRUCKS. NOTE, THE OPERATING PUMP SELECTIONS AND VALVE ALIGNMENTS SHOULD
NOT BE CHANGED WHILE ACTIVELY OFFLOADING.
1. THE HAND-OFF-AUTO SWITCHES (LOCATED ON THE PCP) FOR THE SIX FUEL TRANSFER PUMPS (P-2001
THROUGH P-2006) SHOULD BE IN THE “AUTO” POSITION. NOTE: IF ANY PUMP IS TO BE OUT OF SERVICE
FOR MAINTENANCE, THE HAND SWITCH FOR THAT PUMP SHOULD REMAIN IN THE “OFF” POSITION.
A. THE PCP WILL ALLOW UP TO FOUR PUMPS TO OPERATE AT ANY ONE TIME DURING AUTOMATED FUEL
TRANSFER OPERATIONS TO TWO SEPARATE FACILITIES (TWO PUMPS PER DROP TANK). THE THIRD
PUMP IN EACH DROP TANK IS PROVIDED AS A BACKUP IN THE EVENT THAT ONE PUMP IS OFFLINE.
NOTE: IF FUEL IS SIMULTANEOUSLY TRANSFERRED TO MAIN BULK STORAGE AND THE HYDRANT
SYSTEMS, THE PCP WILL ALLOW TWO PUMPS TO OPERATE IN THE TANK SET FOR TRANSFERS TO
MAIN BULK STORAGE, AND ONLY ONE PUMP TO OPERATE IN THE TANK SET FOR TRANSFERS TO THE
HYDRANT SYSTEMS.
B. THE PCP WILL AUTOMATICALLY SELECT THE LEAD AND LAG PUMPS BASED ON THE TOTAL
ACCUMULATED RUN TIME OF THE PUMPS SET TO RUN IN THE “AUTO” POSITION.
C. THE LEAD PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE LOWEST ACCUMULATED RUN TIME.
D. THE LAG PUMP SELECTED TO RUN BY THE PCP WILL HAVE THE SECOND LOWEST ACCUMULATED RUN
TIME.
E. IN THE EVENT THAT EITHER THE LEAD OR LAG PUMP FAILS TO START WHEN CALLED, THE PCP WILL
AUTOMATICALLY SELECT THE THIRD PUMP TO START.
F. THE LEAD/LAG PUMP SELECTION BY THE PCP WILL AUTOMATICALLY CYCLE AS EACH PUMP IS
STARTED AND STOPPED TO ENSURE ALL PUMPS ARE RUN SIMILAR AMOUNTS OF TIME.
2. SELECT TANK 1 AS THE DESIGNATED RAIL CAR RECEIPT DROP TANK BY SETTING THE “TANK 1 TRANSFER
OPERATION SELECTOR” HAND SWITCH (LOCATED ON THE PCP) TO “ENABLE.” SELECT THE INTENDED
FACILITY WHERE THE FUEL WILL BE TRANSFERRED BY SETTING THE HAND SWITCH TO “MAIN BULK
STORAGE”, “EAST SIDE STORAGE”, OR “HYDRANT SYSTEMS”. SELECT TANK 2 AS THE DESIGNATED
TRUCK RECEIPT DROP TANK BY SETTING THE “TANK 2 TRANSFER OPERATION SELECTOR” HAND SWITCH
TO “ENABLE.” SELECT THE INTENDED FACILITY WHERE THE FUEL WILL BE TRANSFERRED BY SETTING
THE HAND SWITCH TO “MAIN BULK STORAGE”, “EAST SIDE STORAGE”, OR “HYDRANT SYSTEMS”.
A. IMPORTANT: ONE DROP TANK MUST BE SET TO TRANSFER FUEL TO MAIN BULK STORAGE, AND THE
SECOND DROP TANK MUST BE SET TO TRANSFER FUEL TO EITHER EAST SIDE STORAGE OR THE
HYDRANT SYSTEMS. FUEL CANNOT BE DELIVERED SIMULTANEOUSLY TO EAST SIDE STORAGE AND
THE HYDRANT SYSTEMS.
B. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “ENABLE”, THE PCP WILL
OPEN THE MOTORIZED DROP TANK INLET VALVE.
C. WHEN THE “TANK TRANSFER OPERATION SELECTOR” SWITCH IS SET TO “OFF”, THE PCP WILL CLOSE
THE MOTORIZED DROP TANK INLET VALVE. THE PCP WILL DISPLAY THE OPEN/CLOSE POSITION FOR
THE TANK INLET VALVES.
D. FOR THE DROP TANK SET TO “MAIN BULK STORAGE”, THE PCP WILL UTILIZE THE VARIABLE
FREQUENCY DRIVES (VFD) TO REDUCE THE PUMP SPEED (OF THE PUMPS ASSOCIATED WITH THAT
DROP TANK) TO 75 PERCENT OF THE NORMAL OPERATING SPEED (SPEED REDUCTION TO BE FIELD
ADJUSTED DURING COMMISSIONING).
E. FOR THE DROP TANK SET TO “EAST SIDE STORAGE” OR "HYDRANT SYSTEMS", THE PCP WILL ALLOW
THE VARIABLE FREQUENCY DRIVES (OF THE PUMPS ASSOCIATED WITH THAT DROP TANK) TO
OPERATE AT 100 PERCENT OF THE NORMAL OPERATING SPEED (NO REDUCTION IN PUMP SPEED).
3. SET THE “RECEIPT CROSS-OVER VALVE” SWITCH TO THE “CLOSED” POSITION. THE MOTORIZED VALVE
OPERATOR WILL ALIGN THE VALVE TO THE SELECTED POSITION. THE PCP WILL DISPLAY THE
OPEN/CLOSE POSITION FOR THE CROSS-OVER VALVE.
4. VERIFY ALL MANUAL DOUBLE-BLOCK AND BLEED VALVES AT THE RAIL OR TRUCK OFFLOAD POSITIONS
ARE OPEN.
5. CONNECT THE GROUND REEL CLAMP TO EACH RAIL CAR OR TRUCK, AND THEN CONNECT THE
OFFLOADING HOSE(S) TO EACH HOSE CONNECTION.
6. FOR TRUCK OFFLOAD, OPEN THE DN80 (3-INCH) BALL VALVES ON THE OFFLOAD HEADER FOR EACH
HOSE CONNECTION USED.
7. OPEN THE RAIL OR TRUCK VALVE(S) FOR EACH HOSE CONNECTION USED. EACH COMPARTMENT ON THE
TRAIN OR TRUCK SHOULD BE OFFLOADED SIMULTANEOUSLY.
8. CONFIRM THAT FUEL IS FLOWING USING THE SIGHT FLOW INDICATORS AT EACH HOSE CONNECTION.
9. THE PCP WILL AUTOMATICALLY START AND STOP THE LEAD/LAG PUMPS WHEN THE LIQUID LEVEL
REACHES THE PUMP CONTROL LEVEL SENSORS IN THAT TANK.
10.FOR OVERFILL PREVENTION AND ALARM CONDITIONS, REFER TO THE SECTION TITLED OVERFILL
PREVENTION AND ALARM CONDITIONS.
11.UPON COMPLETION OF THE OFFLOAD, CLOSE THE RAIL OR TRUCK VALVE(S). DISCONNECT AND STORE
THE OFFLOAD HOSES, THEN DISCONNECT AND RETRACT THE GROUNDING CLAMPS.
12.IN THE EVENT THE FUEL WITHIN THE DROP TANK(S) IS ABOVE THE LEAD PUMP STOP ELEVATION, BUT
BELOW THE LEAD PUMP START ELEVATION, DEPRESS THE “LEAD PUMP MANUAL START” PUSHBUTTON
(LOCATED ON THE PCP).
A. THE PCP WILL DESIGNATE ONE PUMP AS THE LEAD PUMP AND WILL RUN THE PUMP UNTIL THE LIQUID
LEVEL DROPS TO THE LEAD PUMP STOP ELEVATION.
B. IF THE LIQUID LEVEL WITHIN THE TANK IS BELOW THE LEAD PUMP STOP ELEVATION, THE PCP WILL
NOT START THE PUMP WHEN THE “LEAD PUMP MANUAL START” PUSHBUTTON IS DEPRESSED.
13.WHEN ALL OFFLOADING ACTIVITIES ARE COMPLETE, TURN THE “TANK TRANSFER OPERATION
SELECTOR” HAND SWITCHES TO THE “OFF” POSITION AND RETURN ALL MANUAL VALVES TO THEIR
NORMALLY OPEN/CLOSED POSITIONS AND RETURN THE "RECEIPT CROSS-OVER VALVE" SWITCH TO THE
"OPEN" POSITION.
MANUAL PUMP OPERATION
THE FUEL TRANSFER PUMPS (P-2001 THROUGH P-2006) CAN BE MANUALLY OPERATED AS REQUIRED FOR
TESTING AND MAINTENANCE. NOTE: DURING MANUAL FUEL TRANSFER OPERATIONS, THE PUMPS WILL
OPERATE INDEPENDENT OF THE LEVEL SWITCHES USED FOR LEAD/LAG FUEL PUMP SHUTDOWN AND
INDEPENDENT OF THE FLOW SWITCHES.
1. TURN THE DESIRED PUMP HAND-OFF-AUTO SWITCH (LOCATED ON THE PCP) TO THE “HAND” POSITION.
2. TO START THE PUMP, TURN AND HOLD THE LOCAL HAND-AUTO SWITCH (LOCATED NEAR THE PUMP) IN
THE “HAND” POSITION. THE SWITCH HAS A SPRING RETURN AND WILL STOP THE PUMP AND RETURN TO
THE “AUTO” POSITION WHEN RELEASED.
M-011
A
I L C
F
L O
M
O V
A L S
F L O
W
D
I A
G R
A M
M
F
R I T
Z
M
F
R I T
Z
K
W
A R
I N
G
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
M-015-X102
DN150-CS150 (INACTIVE)
TO BLDG 4091
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
R A
I L C
F
L O
A D
P O
S I T
I O
N
B
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
D N
N C
R A
I L C
F
L O
A D
P O
S I T
I O
N
A
A G
B G
A G
B G
A G
B G
A G
B G
B G
A G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
B G
A G
M-015-X101
DN300-CS150 TO
BLDG 4091
DN250-CS150 DN250-CS
DN300-CS150
DN150-CS150 (INACTIVE)
DEMOLITION NOTES:
1. PHASE WORK TO PROVIDE CONTINUOUS RAILCAR OFFLOADING DURING DEMOLITION AND CONSTRUCTION, REFER TO SHEETS MD101 THROUGH MD103.
2. PROVIDE A DN300 TEMPORARY OFFLOAD HEADER WITH 11 RAILCAR OFFLOAD POSITIONS ON THE NORTH
SIDE OF TRACK #8 TO ALLOW FOR FUEL RECEIPT WHEN THE EXISTING "A" AND "B" RAILCAR OFFLOAD
POSITIONS ARE DEMOLISHED. CONNECT THE TEMPORARY OFFLOAD HEADER TO THE DN300 SUCTION
PIPING INSIDE OF BUILDING 4091. REFER TO SHEET MD102 FOR TEMPORARY OFFLOAD HEADER
CONSTRUCTION.
3. DEMOLISH ABOVEGROUND PIPING COMPONENTS AT THE 32 RAIL OFFLOAD STATIONS (TYP OF 16 "A" SIDE
STATIONS AND 16 "B" SIDE STATIONS) INCLUDING THE DN100 DB&B VALVE, SIGHT FLOW INDICATOR, SWIVEL JOINT, HOSE AND HOSE TRAY AT EACH OFFLOAD STATION. RETAIN AND REUSE THE EXISTING
DN100 DB&B VALVES, SIGHT FLOW INDICATORS, AND FLANGED CAM-AND-GROOVE HOSE COUPLINGS FROM
11 OF THE "A" OFFLOAD POSITIONS FOR REUSE ON THE TEMPORARY OFFLOAD HEADER (SELECT
COMPONENTS THAT ARE IN THE BEST CONDITION FOR REUSE).
4. PROVIDE TEMPORARY DN100 BLIND FLANGES AT THE "A" SIDE STATIONS TO ALLOW "B" SIDE STATIONS TO
REMAIN IN SERVICE UNTIL THE TEMPORARY OFFLOAD HEADER IS CONSTRUCTED.
RAIL #8
RAIL #7
Ø100 OFFLOAD
HOSE (TYP)
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
READY TO ADVERTISE
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
Z N
R E
A P
S I
F
U E
L
R
E C
E I P
T
A
S
T R
I B
U T
I O
N
U
P G
R A
D E
S
Y O
K O
S
E
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
A U
G
US Army Corps of Engineers ®
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
U
S
R
O U
O
R T
H
S
U I T
E
B
F A
L M
O U
T H
M
E
G
A M
B E
L L
S
T R
E E
T
S U
I T
E
A N
C H
O R
A G
E
A
K
Z N
R E
M
D
W G
SEE NOTE 3
(TYP OF 11)
M-012
A
I L C
U
F
L O
D
I F
I C
A T
I O
O
W
D
I A
G R
A M
M
F
R I T
Z
M
F
R I T
Z
J
F
R E
D E
R I C
K
K
W
A R
I N
G
S
DN150
NO
SC
TRUCK OFFLOAD
POSITION 1
DN80 FULL-PORT
BALL VALVE (TYP)
DN80 FLANGED x
CAM-AND-GROOVE
COUPLER (TYP)
DN150-SS150-2001
DN25 LPD
40 MESH (TYP)
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
B
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P O
S I T
I O
N
A
R A
I L C
A R
O F
F L O
A D
P…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .