AS-BUILTS (FIO)_APSI Fuel Yokota.pdf

PDF 41 MB Posted

Attached to
Asia Pacific Stability Initiative (APSI) – Fuel Receipt and Distribution Upgrades Yokota
Solicitation number
W912HV21R0001
Issued by

About this file

This solicitation seeks proposals for upgrades to the liquid fuel unloading and distribution facility at Yokota Air Base in Japan. The Asia Pacific Stability Initiative (APSI) - Fuel Receipt and Distribution Upgrades Yokota project aims to expand and upgrade the existing facility to accommodate rail cars and fuel delivery trucks, comply with current requirements, and ensure a complete and usable system. Specifically, the project includes replacing rail station headers and adding truck offload headers, installing two drop tanks in below-ground vaults with pumps and piping, upgrading the backup generator, adding secondary containment and a remote spill containment basin, constructing truck access roads and an offload parking area, and improving on-base roads. Nearby lighting, utilities, yard piping, rail lines and other components will also be replaced or improved. The solicitation was released by the Department of the Army Corps of Engineers Engineering District Japan.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIO (FOR INFORMATION ONLY)

j2ee9gsg Text Box "As-Built" drawings are provided for informational purposes only (FIO). These "As-built" drawings are not part of the solicitation (and will not become part of the contract) and do not amend the solicitation (specifications, drawings, etc.). "As-builts" drawings may not be complete or depict existing conditions. The contractor will be responsible for verifying actual conditions at the site.

ds0188 spill containment
ds04840 B4091 piping and pumps
00 COVER SHEET.tif
01 C1 GENERAL SITE PLAN.tif
02 C2 DETAIL SITE PLAN.tif
03 A1 FLOOR PLAN, ELEV & SECTION.tif
04 A2 WALL SECTION & MISC DETAIL.tif
05 S1 STRUCTURE PLAN.tif
06 M1 LAYOUT & KEY PLAN.tif
07 M2 PIPING PLAN 1.tif
08 M3 PIPING PLAN 2.tif
09 M4 PIPING PLAN 3.tif
10 M5 PIPING PROFILE.tif
11 M6 STAND-BY GENERATOR & DETAIL.tif
12 M7 MISC DETAIL.tif
13 E1 ELEC DISTRIBUTION PLAN.tif
14 E2 ELEC PLAN & DIAGRAM.tif
ds05336 B4091 transformers
E01(目次)
T01(表紙)
E02(B1390平面図)
E03(B1390姿図)
E04(B4070平面図)
E05B4070姿図)
E06(B4085平面図)
E07(B4091姿図)
E08(B4091平面図)
E09(B4091姿図)
ds05379 leak detection
01
02
03
04
05
06
07
08
09
10
ds05381 liquid fuel stands
01
02
03
04
05
06
07
ds06600 B4091 outside air
ds07135 B4091 lighting and electrical
UNLOADING ELEC

File details come from the government source that posted it. Updated .