This document provides details of a solicitation posted for the Reception Complex Phase 1 project at Fort Jackson, South Carolina. The solicitation seeks proposals for construction of an overall reception complex including a clothing initial issue point warehouse, two lawn equipment buildings, dining facilities, landscaping, and parking. Supporting documents include five volumes of specifications and four volumes of drawings. A site visit is scheduled for August 20, 2019, and proposals are due by September 6, 2019. The opportunity is available to all qualified contractors via the Federal Business Opportunities website.
Spec Vol1
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reception Complex JA76149 Ft. Jackson, SC
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 74 19.37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 *1 DEMOLITION
02 82 00 *1 ASBESTOS REMEDIATION
02 83 13 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1 (revised by Amendment 0001)
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10 BUILDING AIR BARRIER SYSTEM
07 41 00 METAL SOFFIT PANELS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 56 13 STEEL SHELVING
DIVISION 11 - EQUIPMENT
11 13 19.13 LOADING DOCK LEVELERS
11 21 73 VERTICAL CAROUSELS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00 FURNITURE AND FURNITURE INSTALLATION
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
PROJECT TABLE OF CONTENTS Page 2 (revised by Amendment 0001)
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 57 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM
HEAT EXCHANGERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46 ELECTRIC UNIT HEATERS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 05 12 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
(SPECIAL SYSTEMS)
25 05 13 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
(FA/MNS)
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 SOUND REINFORCEMENT SYSTEMS
PROJECT TABLE OF CONTENTS Page 3 (revised by Amendment 0001)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 BASE COURSE FOR RIGID PAVING
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
33 63 13.19 CONCRETE TRENCH HYDRONIC AND STEAM ENERGY DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDICES
Appendix A ACM AND HAZMAT REPORTS Appendix B COMMISSIONING PLAN Appendix C SPECIAL INSPECTIONS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4 (revised by Amendment 0001)
Recept i on Compl ex JA76149 Ft . Jackson, SC
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
1. 1. 2 Locat i on
1. 1. 3 Dr awi ng and Speci f i cat i on Appl i cabi l i t y
1. 2 EXI STI NG WORK
1. 3 PHASI NG
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1 ( Revi sed by Amendment 0001)
SECTI ON 01 11 00
SUMMARY OF WORK
08/15
AMENDED PER AMENDMENT 01
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on *1
Thi s pr oj ect i s t he const r uct i on of Phase I of t he Recept i on Compl ex ( PN 76149). The wor k i ncl udes const r uct i on of an over al l Recept i on compl ex and i nci dent al r el at ed wor k f or one CI I P Hi gh- Bay War ehouse, t wo l awn equi pment bui l di ngs ( LEB) , one Gener al Pur pose War ehouse r enovat i on, one per manent Di ni ng Faci l i t y ( DFAC) , one t empor ar y Di ni ng Faci l i t y ( DFAC) , s i t e wor k, and par ki ng. The wor k i ncl udes const r uct i on of an over al l Recept i on Compl ex: a Cl ot hi ng I ni t i al I ssue Poi nt ( CI I P) Hi gh- Bay War ehouse, t wo l awn equi pment bui l di ngs ( LEB) , a per manent Di ni ng Faci l i t y ( DFAC) , a t empor ar y DFAC, l andscapi ng, and par ki ng.
1. 1. 2 Location
The wor k i s l ocat ed at For t Jackson, Col umbi a, SC, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
*1
1. 1. 3 Dr awi ng and Speci f i cat i on Appl i cabi l i t y
The f ol l owi ng i s pr ovi ded f or i nf or mat i onal pur poses onl y:
Specifications:
Vol umes 1- 3: Speci f i cat i ons f or t he CI I P, LEB, and si t e wor k Vol ume 4: Appendi ces Vol ume 5: DFAC and l andscapi ng speci f i cat i ons and geot echni cal r epor t f or ent i r e s i t e
Drawings:
Vol ume 1: Demol i t i on, s i t e l ayout , gr adi ng, pavi ng, ut i l t y and er osi on cont r ol dr awi ngs f or t he ent i r e s i t e Vol ume 2: CI I P and LEB dr awi ngs Vol ume 3: DFAC dr awi ngs and l andscapi ng dr awi ngs f or t he ent i r e s i t e Vol ume 4: Tempor ar y DFAC dr awi ngs
1. 2 EXI STI NG WORK
I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
*1
SECTI ON 01 11 00 Page 2 ( Revi sed by Amendment 0001)
1. 3 PHASING
*1
Building 1745 1875 shal l r emai n occupi ed and i n oper at i on unt i l t he Tempor ar y DFAC i s compl et e and accept ed by t he Cont r act i ng Of f i cer . Al l communi cat i on duct banks i n t he v i c i ni t y of t he 1875 and 1687 shal l r emai n unt i l t he new communi cat i on connect i on i s made t o 1867 and t he t empor ar y di ni ng f aci l i t y . Ref er t o Vol ume 1 of t he dr awi ngs f or addi t onal el ect r i cal and communi cat i on i nf or mat i on. Ref er t o Vol ume 3 of t he dr awi ngs f or addi t i onal i nf or mat i on on t hi s phasi ng.
Bui l di ngs 1720, 1730, 1740, 1705 and 1706 shal l r emai n occupi ed and i n oper at i on unt i l 1 Apr 2020, unl ess r el eased by t he Cont r act i ng Of f i cer at an ear l i er dat e. Saf e and secur e access t o t hese f aci l i t i es, i ncl udi ng access by emer gency ser vi ces, shal l be mai nt ai ned. No const r uct i on act i v i t i es ar e t o i mpact t he occupant s of t hese f aci l i t i es unt i l t hey have been vacat ed and r el eased by t he Gover nment , except f or appr oved Ut i l i t y and Road Out age r equest s.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 3 ( Revi sed by Amendment 0001)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 95 PAGES
Reception Complex
01 30 00 SD-01 Preconstruction Submittals
1.3.1.3 GList of Contact Personnel
1.4.1 GUtility Outage Requests
1.4.1 GUtility Connection Requests
1.4.2 GRoad Outage Request
1.4.3 GExcavation Permits
1.7Antiterrorism Operations Security
Requirements
1.8 GProgress and Completion
Pictures
1.10.2 GSuperintendent Qualifications
1.13Survey Verification
01 32 01 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G RO SPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G RO SSustainability Action Plan
1.5.3.1 G RO SPreliminary Sustainability
eNotebook SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Revised by Amendment 0001
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 95 PAGES
01 33 29 1.5.3.1 G RO Final High Performance and Sustainable Building Checklist
1.5.3.1 G RO Final Sustainability eNotebook
1.5.3.1 G RO SAmended Final Sustainability
eNotebook
1.5.3.1 G RO Amended Final High
Performance and Sustainable Building Checklist
3.2 G RO Third Party Certification
Certificates or Validation
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 95 PAGES
01 35 26 1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet 01 45 00 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports 3.9.2Verification Statement 3.4.3.1CQC specialized personnel daily reports 3.4.3.1CQC specialized personnel
Biweekly Reports 3.4.4.7Building Code Inspectors'
Inspection Reports 3.4.4.7Building Code Inspectors'
Biweekly Report 3.4.4.7Building Code Inspectors'
Comprehensive Final Report SD-07 Certificates
3.4.4.3Building Code Inspector Qualifications
01 45 35 SD-01 Preconstruction Submittals 3.1.2Written Practices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 95 PAGES
01 45 35 3.1.2NDT Procedures and Equipment Calibration Records
SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Certificate of Compliance
1.5 G ROSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals 3.1.2Interim Final Report
2.1 G ROComprehensive Final Report
3.1.2 G ROComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.3.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-02 Shop Drawings
2.1.2 GSign Legend Orders;
01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey
1.10 G ROSolid Waste Management Permit
1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
3.2.1.2 G ROStormwater Notice of Intent
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 95 PAGES
01 57 19 1.6.9.1 G RODirt and Dust Control Plan
1.5.5 G ROEmployee Training Records
1.5.4 G ROEnvironmental Manager
Qualifications SD-06 Test Reports
3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates
1.5.5 G ROEmployee Training Records
1.5.5.1Certificate of Competency 1.5.5Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.5.5 G ROAssembled Employee Training
Records
1.10 G ROSolid Waste Management Permit
3.7.2.1 G ROSolid Waste Management Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 95 PAGES
01 57 19 3.7.3.1 G ROHazardous Waste/Debris Management
1.5.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
3.7.2.1Contractor Certification
01 57 19.37 SD-01 Preconstruction Submittals
1.3 G ROIndoor Air Quality (IAQ)
Management Plan SD-06 Test Reports
1.3.2Air contamination testing SD-11 Closeout Submittals
1.3.2LEED
01 74 19.37 SD-11 Closeout Submittals
1.5Records 01 78 00 SD-03 Product Data
1.3.2 GAs-Built Record of Equipment
and Materials
1.6.1 GWarranty Management Plan
1.6.5 GWarranty Tags
1.4 GSpare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1 GInstructions
SD-10 Operation and Maintenance Data
1.8 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 95 PAGES
01 78 00 SD-11 Closeout Submittals
1.3.1 GAs-Built Record Drawings
1.5 GCertification of EPA Designated
Items
1.3.5 GEquipment-In-Place List
1.9 GRed Zone Meeting Checklist
1.10 GFinal Cleaning
1.11 GInterim Form DD1354
1.11 GChecklist for Form DD1354
01 78 23 SD-10 Operation and Maintenance Data
1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 91 00 SD-01 Preconstruction Submittals
1.9 G RODraft Cx Plan and Schedule
1.9 G ROFinal Cx Plan and Schedule
SD-02 Shop Drawings 1.11.2Control Drawings
SD-06 Test Reports
3.7 G ROFilled out functional test
readiness forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 95 PAGES
01 91 00 3.1.3 G ROCompleted PFT checklists
3.1.4.1 G ROCompleted startup checklists
3.7.4Completed FPT forms 3.1.5Nonconformance and Approval in
PFT checklists and Startup 3.8Progress reports and test results
SD-07 Certificates 3.2Calibration documentation 3.2Calibration certification
SD-08 Manufacturer’s Instructions 1.10Startup and Checkout Plan 1.10Checkout Forms 1.10Test Procedures
SD-10 Operation and Maintenance Data
3.10.1 G ROTraining Plan
3.10.3Training Documentation 3.10.4Training Verification
SD-11 Closeout Submittals
1.11.1 G ROFinal Cx Report
3.8.1Deficiency Report and Resolution
Record 3.8.4Deficiency Report and Resolution
Record 02 41 00 SD-01 Preconstruction Submittals
1.9 G ROExisting Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 95 PAGES
02 41 00 SD-07 Certificates
1.2.1 G RODemolition Plan
1.6 G RONotification
02 82 00 SD-03 Product Data
1.2.2 G ROAmended Water
1.3.9 G ROSafety Data Sheets (SDS) for All
Materials
2.1 G ROEncapsulants
3.1.2.1 G RORespirators
3.1.7 G ROLocal Exhaust Equipment
3.1.7 G ROPressure Differential Automatic
Recording Instrument
3.1.8 G ROVacuums
3.1.10 G ROGlovebags
SD-06 Test Reports
1.5.5 G ROAir Sampling Results
1.5.6 G ROPressure Differential Recordings
for Local Exhaust System
3.2.12.2 G ROEncapsulation Test Patches
3.2.14.5 G ROClearance Sampling
3.3.3.2 G ROAsbestos Disposal Quantity
Report SD-07 Certificates
1.3.4 G ROEmployee Training
1.3.5 G RONotifications
1.3.7 G RORespiratory Protection Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 95 PAGES
02 82 00 1.3.10 G ROAsbestos Hazard Abatement Plan
1.3.11 G ROTesting Laboratory
1.3.12 G ROLandfill Approval
1.3.12 G RODelivery Tickets
1.3.12 G ROWaste Shipment Records
1.3.13 G ROTransporter Certification
1.3.14 G ROMedical Certification
1.5.1 G ROPrivate Qualified Person
1.5.2 G ROCompetent Person
1.5.3 G ROWorker's License
1.5.4 G ROContractor's License
1.5.8 G ROFederal, State or Local Citations
on Previous Projects
2.1 G ROEncapsulants
3.1 G ROEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 G ROWater Filtration Equipment
3.1.8 G ROVacuums
3.1.8 G ROVentilation Systems
SD-11 Closeout Submittals
1.3.5 G ROPermits and Licenses
1.3.5 G RONotifications
1.3.7.1 G RORespirator Program Records
1.5.7 G ROProtective Clothing
Decontamination Facility Notification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 95 PAGES
02 82 00 1.7.1 G RORental Equipment 02 83 13 SD-01 Preconstruction Submittals
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report
1.5.2.2 G ROLead Compliance Plan
1.5.1.1 G ROCompetent Person
1.5.1.2 G ROTraining Certification
1.5.2.8 G ROLead Waste Management Plan
3.5.2.1 G ROWritten Evidence
1.5.2.4 G ROMedical Examinations
SD-06 Test Reports
1.5.2.3 G ROSampling Results
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.3 G ROTesting Laboratory
1.5.1.4 G ROThird Party Consultant
Qualifications
3.5.1.1 G ROClearance Certification
SD-11 Closeout Submittals
3.5.2.1 G ROhazardous waste manifest
3.5.2.1 G ROturn-in documents or weight
tickets 03 11 13 SD-02 Shop Drawings
2.2.1Formwork 3.1.1Formwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 95 PAGES
03 11 13 2.2.1 GForm Removal Schedule SD-03 Product Data
2.2Form Materials SD-04 Samples
1.3 GSample Panels
SD-05 Design Data
2.1Calculations SD-06 Test Reports
3.2Inspection 03 15 00 SD-03 Product Data
2.2Preformed Expansion Joint Filler 2.3Sealant
SD-04 Samples 2.3.2Field-Molded Type
SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant
03 20 00 SD-01 Preconstruction Submittals
2.3.1 G ROMechanical Butt-Splices
SD-02 Shop Drawings
3.1 G ROReinforcement
SD-07 Certificates 2.3Reinforcing Steel
03 30 00 SD-01 Preconstruction Submittals
1.5.2 G ROQuality Control Plan
1.5.1Laboratory Accreditation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 95 PAGES
03 30 00 3.8.5.6 G ROSampling Plan SD-03 Product Data
Part 2Recycled Content Products 2.2Cementitious Materials 2.10Vapor Retarder 2.1.5Floor Finish 2.4Chemical Admixtures
SD-04 Samples 2.4.5Surface Retarder
SD-05 Design Data
2.1.1 G ROMixture Proportions
SD-06 Test Reports
2.1.1 G ROMixture Proportions
3.8 G ROTesting and Inspection for CQC
2.2.2Fly Ash 2.2.5Ground Granulated Blast-Furnace
(GGBF) Slag 2.3Aggregates 3.8.5.1Air Content 3.8.5.3Slump 3.8.5.6Compressive Strength 2.5Water
SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 95 PAGES
03 35 00 SD-03 Product Data Part 2Recycled Content Products
SD-04 Samples 1.3.1Field Test Panels 1.3.1.1Sample Wall Panels 1.3.1.2Slab Panels
03 39 00 SD-03 Product Data 2.1Curing Materials
SD-06 Test Reports 3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions 2.1Curing Compound
04 20 00 SD-02 Shop Drawings
1.4.5 G RODetail Drawings
SD-03 Product Data 2.2Clay or Shale Brick 2.7.3Cement
1.6.2 G ROCold Weather Installation
2.8Water-Repellant Admixture
1.2.1LEED
SD-04 Samples
2.4 G ROConcrete Masonry Units (CMU)
2.2 G ROClay or Shale Brick
2.5 G ROArchitectural Cast Stone Items
2.10Anchors, Ties, and Bar
Positioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 95 PAGES
04 20 00 2.14Expansion-Joint Materials 2.11Joint Reinforcement 1.4.3Portable Panel
SD-06 Test Reports 3.20.3Efflorescence Test 3.20.1Field Testing of Mortar 3.20.2Field Testing of Grout 2.7.3Masonry Cement 1.4.4Masonry Inspector Qualifications 2.4.4Fire-Rated CMU
SD-07 Certificates 2.2Clay or Shale Brick 2.3Concrete Brick 2.4Concrete Masonry Units (CMU) 2.10Anchors, Ties, and Bar
Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 2.7.3Masonry Cement 2.7.1Admixtures for Masonry Mortar 2.9.1Admixtures for Grout 1.4.2Contamination
SD-08 Manufacturer’s Instructions 2.7.3Masonry Cement
05 12 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 95 PAGES
05 12 00 1.5.1 G DOErection and Erection Bracing Drawings
SD-02 Shop Drawings
1.5.2 G DOFabrication Drawings
SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer
Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 95 PAGES
05 12 00 2.5Galvanizing 1.3AISC Structural Steel Fabricator
Quality Certification 1.5.3Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods 3.7.1.1Certified Welding Inspector 3.7.1.2NDT Technician 3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 G ROFabrication Drawings
SD-03 Product Data
2.2Accessories 2.1Deck Units 2.1.3Galvanizing Repair Paint 2.2.12Mechanical Fasteners 2.1.3Touch-Up Paint
SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 G RODeck Units
SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3.1Fire Safety
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 95 PAGES
05 30 00 1.3.3.2Wind Storm Resistance 1.3.1Manufacturer's Certificate
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.6.1 G DOFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products SD-05 Design Data
1.6.2 G DOMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.2.1Welds 05 50 13 SD-02 Shop Drawings
2.10 G ROStructural Steel Door Frames
2.3Access Doors And Panels 2.6Expansion Joint Covers
2.9 G ROAngles And Plates
SD-03 Product Data 2.3Access doors and panels 2.4Control-joint covers 2.6Expansion joint covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 95 PAGES
05 50 13 2.10Structural steel door frames SD-04 Samples
2.6Expansion joint covers 2.4Control-joint covers
05 51 33 SD-02 Shop Drawings 2.3Ladders
SD-03 Product Data 2.3Ladders 2.3.1Ladder Safety Devices
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 1.3Fabricator Certification for Ships
Ladder Assembly 05 52 00 SD-02 Shop Drawings
1.2 G ROFabrication Drawings
3.2 G ROIron and Steel Hardware
3.2 G ROSteel Shapes, Plates, Bars and
Strips SD-03 Product Data
1.2 G ROStructural-Steel Plates, Shapes, and Bars
2.2.2 G ROConcrete Inserts
2.1.2 G ROProtective Coating
2.2.4 G ROSteel Railings and Handrails
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 95 PAGES
05 52 00 1.2 G ROAnchorage and Fastening Systems
SD-07 Certificates
1.4.1 G ROWelding Procedures
1.4.2 G ROWelder Qualification
SD-08 Manufacturer’s Instructions 3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.1 G RONailing Strips
SD-03 Product Data
1.9LEED
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.8Certificates of grade 1.7Preservative treatment
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings
SD-03 Product Data
1.7LEED
SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance
06 41 16 SD-02 Shop Drawings 1.5.2Shop Drawings 2.11Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 95 PAGES
06 41 16 Part 3Installation SD-03 Product Data
2.1Wood Materials 2.9Wood Finishes 2.11.4.3Finish Schedule
1.3LEED
SD-04 Samples 2.3Plastic Laminates 2.6Cabinet Hardware
SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework Part 3Laminate Clad Casework
06 61 16 SD-02 Shop Drawings 1.5.2Detail Drawings 3.1Installation
SD-03 Product Data 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications
1.3LEED
SD-04 Samples
2.1 G ROMaterial
2.3.6 G ROCounter Tops
SD-06 Test Reports 2.1Solid polymer material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 95 PAGES
06 61 16 SD-07 Certificates 2.3Fabrications 1.5.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.4 G ROWork Plan
SD-03 Product Data
2.2 G ROThermal Imaging Camera
SD-07 Certificates
1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 G ROPressure Test Procedures
3.5.5 G ROAir Leakage Test Report
3.6.5 G RODiagnostic Test Report
07 21 13 SD-03 Product Data 2.1Block or board insulation 2.2Vapor retarder 2.3Pressure sensitive tape 2.4Accessories
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 95 PAGES
07 21 13 2.4.1Adhesive 07 21 16 SD-03 Product Data
2.1Blanket Insulation 2.3Accessories
1.5LEED
SD-08 Manufacturer’s Instructions 3.3Insulation
07 22 00 SD-02 Shop Drawings 2.1.4Tapered Roof Insulation
SD-03 Product Data 2.3Fasteners 2.1Insulation
1.4.3LEED
SD-06 Test Reports 1.4.1Flame spread and smoke developed ratings SD-07 Certificates
1.3Qualifications SD-08 Manufacturer’s Instructions
2.3Fasteners 2.1Insulation
07 27 10 SD-02 Shop Drawings
1.3.2 G CAAir Barrier Assembly
SD-03 Product Data
2.1 G ROFluid-Applied Air Barrier/Moisture
Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 95 PAGES
07 27 10 2.2 G ROAir Barrier Component Materials SD-04 Samples
3.1.2 G ROMock-up
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.3 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 41 00 SD-02 Shop Drawings
2.1 G ROSoffit Panels
2.1 G ROSoffit Panels
SD-03 Product Data
2.1 G ROSoffit panels
2.1 G ROSoffit panels
2.2Attachment clips 2.3Accessories 2.3.1Fasteners 2.3.2Sealants
SD-04 Samples 2.1Soffit panels 2.1Soffit panels 2.3Accessories 2.3.2Sealants
SD-06 Test Reports 3.5Field Inspection 1.4.2Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 95 PAGES
07 41 00 SD-08 Manufacturer’s Instructions 3.3Installation
07 41 13 SD-02 Shop Drawings
1.4.5 G DORoofing Panels
1.4.5Flashing And Accessories
SD-03 Product Data 2.1Roof panels 1.4.5Factory-Applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Pressure Sensitive Tape 2.6Underlayment 2.7Gaskets and Sealing/Insulating
Compounds 1.4.5Coil Stock
1.10LEED
SD-04 Samples
2.1 G RORoof Panels
1.4.5 G ROFactory-applied Color Finish
2.4Accessories 1.4.5Fasteners 1.4.5Flashing And Accessories 1.4.5Gutter/Downspout Assembly 1.4.5Gaskets and Sealant/Insulating
Compounds SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 95 PAGES
07 41 13 1.2.2Wind Uplift Resistance SD-06 Test Reports
1.2.1 G CALeakage Test Report
1.2.2Wind Uplift Test Report 2.2Factory Finish and Color
Performance Requirements SD-07 Certificates
2.1Roof Panels 1.4.5Coil stock compatibility 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator
SD-08 Manufacturer’s Instructions 1.4.5Installation Manual
SD-11 Closeout Submittals
1.8 G ROWarranties
3.9 G ROInformation Card
07 42 13 SD-01 Preconstruction Submittals
1.5.3 G ROQualification of Manufacturer
1.5.4 G ROQualification of Installation
Contractor
1.5.4 G ROQualification of Welders
1.8 G ROWarranty
SD-02 Shop Drawings
1.5.1.1 G ROInstallation Drawings
SD-03 Product Data 2.1LEED Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 95 PAGES
07 42 13 2.2.1 G ROWall Panels 1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3Galvanizing Repair Paint 1.5.3Enamel Repair Paint 1.5.5Accessories 2.5Accessories
SD-04 Samples
2.2.1 G ROWall Panels
1.5.3 G ROFasteners
2.5.3 G ROMetal Closure Strips
2.2.3 G ROFactory Finish
SD-05 Design Data
1.5.1.2 G ROWind Load Design Analysis
SD-06 Test Reports
3.7.2 G ROLeakage Tests
1.3.2 G ROWind Load Tests
2.2.3.3 G ROCoating
2.2.3.3 G ROChalking
1.3.2 G ROSeismic Tests
SD-07 Certificates
1.5.3 G ROCoil Stock
1.5.3 G ROFasteners
1.5.3 G ROGalvanizing Repair Paint
1.5.3 G ROEnamel Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 95 PAGES
07 42 13 SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
SD-09 Manufacturer’s Field Reports
3.8 G ROManufacturer's Field Reports
SD-10 Operation and Maintenance Data
1.5.6 G ROMaintenance Instructions
SD-11 Closeout Submittals
1.8 G ROWarranty
07 60 00 SD-02 Shop Drawings
3.1.22Covering on flat, sloped, or curved surfaces
3.1.15Gutters 3.1.16Downspouts 3.1.23Expansion joints 3.1.19Splash pans 3.1.17Flashing for Roof Drains 3.1.10Base flashing 3.1.11Counterflashing 3.1.24Flashing at roof penetrations 3.1.12Reglets 3.1.18Scuppers 3.1.14Drip edge 3.1.20Open valley flashing 3.1.21Eave flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 95 PAGES
07 60 00 3.1.26Soffit and Fascia SD-03 Product Data
1.5LEED
07 61 14 SD-02 Shop Drawings
1.2.5 G RORoofing
SD-03 Product Data
2.2 G RORoofing Panels
2.4Attachment Clips 2.5.1Closures 2.5Accessories 2.5.2Fasteners 2.5.3Sealants 2.6Insulation
1.7 G ROWarranty
SD-04 Samples 2.2Panel 2.5Accessories 2.5.3Sealants 2.3Intermediate Support
SD-05 Design Data 1.5Design Calculations
SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 95 PAGES
07 61 14 1.6.3Manufacturer's Technical Representative
1.6.4Installer's Qualifications
2.2 G ROCoil Stock
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
SD-11 Closeout Submittals 3.8Information Card
2.2 SEnergy Star Label for Steel
Roofing Product
2.2.1 SRecycled Content for Steel
Roofing Product
2.2 SHeat Island Reduction
1.7Warranty
07 84 00 SD-02 Shop Drawings 1.2.3Firestopping Materials, with related assemblies SD-03 Product Data
1.6LEED
SD-07 Certificates
1.4.2Manufacturer's Technical Representative
Part 2Firestopping Materials 1.4.1Installer 3.3Inspection
07 92 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 95 PAGES
07 92 00 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-03 Product Data
2.1 G RODoors
2.7 G ROFrames
2.5Moldings
1.5LEED
08 11 16 SD-02 Shop Drawings
1.5.1 G RODoors, windows and frames
SD-03 Product Data
1.6LEED
SD-04 Samples 1.5.2Finish sample
SD-05 Design Data 1.2.1Calculations
1.5.3 G RODesign Analysis
SD-06 Test Reports 1.5.4Minimum Condensation
Resistance Factor
1.2.5.3 G ROStandard Airblast Test
SD-08 Manufacturer’s Instructions 2.1Doors and frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 95 PAGES
08 14 00 SD-02 Shop Drawings
2.1 G RODoors
SD-03 Product Data 2.1Doors 2.2Accessories 2.3.6Water-resistant sealer 1.5warranty
2.1.2 G ROFire resistance rating
1.3LEED
SD-04 Samples 2.1Doors
2.3.5.2 G RODoor finish colors
SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance
08 34 73 SD-02 Shop Drawings 2.1Wood Sound Retardant Doors 2.1Door Frames
SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Intumescent Seals and Gasketing
SD-06 Test Reports 1.3.3Acoustical Tests 1.3.3Air Infiltration Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 95 PAGES
08 34 73 1.3.3Positive Pressure Tests SD-07 Certificates
2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
08 51 13 SD-02 Shop Drawings
2.1 G ROWindows
1.10Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.2Fasteners
1.11 G ROWindow performance
2.3Mullions 2.2.4Accessories 1.11.5Thermal performance
1.7LEED
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-05 Design Data
2.1 G DOStructural Calculations For
Deflection
1.4.3 G DODesign Analysis
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 95 PAGES
08 51 13 1.4.4Minimum Condensation Resistance Factor
1.11.2.3 G DOStandard Airblast Test
SD-10 Operation and Maintenance Data
2.1 G ROWindows
08 71 00 SD-02 Shop…