This document provides details of a solicitation posted for the Reception Complex Phase 1 project at Fort Jackson, South Carolina. The solicitation seeks proposals for construction of an overall reception complex including a clothing initial issue point warehouse, two lawn equipment buildings, dining facilities, landscaping, and parking. Supporting documents include five volumes of specifications and four volumes of drawings. A site visit is scheduled for August 20, 2019, and proposals are due by September 6, 2019. The opportunity is available to all qualified contractors via the Federal Business Opportunities website.

Spec Vol1

View the file

Other files for this federal contract opportunity

Other files attached to Reception Complex Phase 1, newest first.
File Type Posted
B._AMD_0006_Solicitation_W912HP19R2000_Reception_Complex.pdf PDF
B._AMD0006_Solicitation_W912HP19R2001_BTC4.pdf PDF
B._AMD_0005_Solicitation_19R2000_Reception_Complex_Phase_1.pdf PDF
B._AMD_0004_Solicitation_W912HP19R20000_Reception_Complex.pdf PDF
Specifications_Volume_5_-_IFC_Reception_Phase_1_AMD4.pdf PDF
B._AMD_0003_Solicitation_W912HP19R2000_Reception_Complex.pdf PDF
Drawings_Volume_2_-_IFC_Reception_Phase_1_AMD3.pdf PDF
Specifications_Volume_5_-_IFC_Reception_Phase_1_AMD2.pdf PDF
Specifications_Volume_1_-_IFC_Reception_Phase_1_AMD2.PDF PDF
B._AMD_0002_Solicitation_W912HP19R2000_Reception_Complex.pdf PDF
Drawings_Volume_1_-_IFC_Reception_Phase_1_AMD2.pdf PDF
Drawings_Volume_3_-_IFC_Reception_Phase_1_AMD2.pdf PDF
Drawings_Volume_2_-_IFC_Reception_Phase_1_AMD2.pdf PDF
Specifications_Volume_2_-_IFC_Reception_Phase_1_AMD2.PDF PDF
A._Site_Visit_Sign-In_Sheet.pdf PDF
Specifications_Volume_2_-_IFC_Reception_Phase_I_AMD1.pdf PDF
Drawings_Volume_1_-_IFC_Reception_Phase_1_AMD1.pdf PDF
Drawings_Volume_3_-_IFC_Reception_Phase_I_AMD1.pdf PDF
Specifications_Volume_5_-_IFC_Reception_Phase_AMD1.pdf PDF
Drawings_Volume_2_-_IFC_Recepton_Phase_1_AMD1.pdf PDF
Specifications_Volume_3_-_IFC_Reception_Phase_I_AMD1.pdf PDF
B._AMD_0001_Solicitation_W912HP19R2000_Reception_Complex.pdf PDF
junc-up.dgn —
junc-sp1.dgn —
junc-gp1.dgn —
junc-gp.dgn —
junc-dp.dgn —
junv-tp.dgn —
junc-sp.dgn —
junv-rp.dgn —
Drawings_Volume_2_-_IFC_Reception_Phase_I.pdf PDF
B._Attachment_3_-_Past_Performance_Questionnaire.pdf PDF
Specifications_Volume_3_-_IFC_Reception_Phase_I.PDF PDF
Specifications_Volume_5_-_IFC_Reception_Phase_I.pdf PDF
B._Attachment_4_-_Small_Business_Participation_Plan.pdf PDF
Drawings_Volume_3_-_IFC_Reception_Phase_I.pdf PDF
B._Solicitation_W912HP19R2000_Reception_Complex_Phase_1,_Ft._Jax.pdf PDF
Drawings_Volume_4_-_IFC_Reception_Phase_I.pdf PDF
B._Attachment_1_-_Proposal_Data_Sheet.pdf PDF
B._Attachment_2_-_Descriptive_Summary_Sheet.pdf PDF
Specifications_Volume_2_-_IFC_Reception_Phase_I.PDF PDF
Specifications_Volume_1_-_IFC_Reception_Phase_I.PDF PDF
Drawings_Volume_1_-_IFC_Reception_Phase_I.pdf PDF
Specifications_Volume_4_-_IFC_Reception_Phase_I.PDF PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reception Complex JA76149 Ft. Jackson, SC

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 74 19.37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 *1 DEMOLITION

02 82 00 *1 ASBESTOS REMEDIATION

02 83 13 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

PROJECT TABLE OF CONTENTS Page 1 (revised by Amendment 0001)

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10 BUILDING AIR BARRIER SYSTEM

07 41 00 METAL SOFFIT PANELS

07 41 13 METAL ROOF PANELS

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 61 14 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 56 13 STEEL SHELVING

DIVISION 11 - EQUIPMENT

11 13 19.13 LOADING DOCK LEVELERS

11 21 73 VERTICAL CAROUSELS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00 FURNITURE AND FURNITURE INSTALLATION

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

PROJECT TABLE OF CONTENTS Page 2 (revised by Amendment 0001)

13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 57 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM

HEAT EXCHANGERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 46 ELECTRIC UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 05 12 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(SPECIAL SYSTEMS)

25 05 13 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(FA/MNS)

DIVISION 26 - ELECTRICAL

26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS

26 28 01 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 SOUND REINFORCEMENT SYSTEMS

PROJECT TABLE OF CONTENTS Page 3 (revised by Amendment 0001)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 BASE COURSE FOR RIGID PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION

33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES

33 63 13.19 CONCRETE TRENCH HYDRONIC AND STEAM ENERGY DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDICES

Appendix A ACM AND HAZMAT REPORTS Appendix B COMMISSIONING PLAN Appendix C SPECIAL INSPECTIONS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4 (revised by Amendment 0001)

Recept i on Compl ex JA76149 Ft . Jackson, SC

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 1. 1 Pr oj ect Descr i pt i on

1. 1. 2 Locat i on

1. 1. 3 Dr awi ng and Speci f i cat i on Appl i cabi l i t y

1. 2 EXI STI NG WORK

1. 3 PHASI NG

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 1 ( Revi sed by Amendment 0001)

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

AMENDED PER AMENDMENT 01

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 1. 1 Pr oj ect Descr i pt i on *1

Thi s pr oj ect i s t he const r uct i on of Phase I of t he Recept i on Compl ex ( PN 76149). The wor k i ncl udes const r uct i on of an over al l Recept i on compl ex and i nci dent al r el at ed wor k f or one CI I P Hi gh- Bay War ehouse, t wo l awn equi pment bui l di ngs ( LEB) , one Gener al Pur pose War ehouse r enovat i on, one per manent Di ni ng Faci l i t y ( DFAC) , one t empor ar y Di ni ng Faci l i t y ( DFAC) , s i t e wor k, and par ki ng. The wor k i ncl udes const r uct i on of an over al l Recept i on Compl ex: a Cl ot hi ng I ni t i al I ssue Poi nt ( CI I P) Hi gh- Bay War ehouse, t wo l awn equi pment bui l di ngs ( LEB) , a per manent Di ni ng Faci l i t y ( DFAC) , a t empor ar y DFAC, l andscapi ng, and par ki ng.

1. 1. 2 Location

The wor k i s l ocat ed at For t Jackson, Col umbi a, SC, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

*1

1. 1. 3 Dr awi ng and Speci f i cat i on Appl i cabi l i t y

The f ol l owi ng i s pr ovi ded f or i nf or mat i onal pur poses onl y:

Specifications:

Vol umes 1- 3: Speci f i cat i ons f or t he CI I P, LEB, and si t e wor k Vol ume 4: Appendi ces Vol ume 5: DFAC and l andscapi ng speci f i cat i ons and geot echni cal r epor t f or ent i r e s i t e

Drawings:

Vol ume 1: Demol i t i on, s i t e l ayout , gr adi ng, pavi ng, ut i l t y and er osi on cont r ol dr awi ngs f or t he ent i r e s i t e Vol ume 2: CI I P and LEB dr awi ngs Vol ume 3: DFAC dr awi ngs and l andscapi ng dr awi ngs f or t he ent i r e s i t e Vol ume 4: Tempor ar y DFAC dr awi ngs

1. 2 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

*1

SECTI ON 01 11 00 Page 2 ( Revi sed by Amendment 0001)

1. 3 PHASING

*1

Building 1745 1875 shal l r emai n occupi ed and i n oper at i on unt i l t he Tempor ar y DFAC i s compl et e and accept ed by t he Cont r act i ng Of f i cer . Al l communi cat i on duct banks i n t he v i c i ni t y of t he 1875 and 1687 shal l r emai n unt i l t he new communi cat i on connect i on i s made t o 1867 and t he t empor ar y di ni ng f aci l i t y . Ref er t o Vol ume 1 of t he dr awi ngs f or addi t onal el ect r i cal and communi cat i on i nf or mat i on. Ref er t o Vol ume 3 of t he dr awi ngs f or addi t i onal i nf or mat i on on t hi s phasi ng.

Bui l di ngs 1720, 1730, 1740, 1705 and 1706 shal l r emai n occupi ed and i n oper at i on unt i l 1 Apr 2020, unl ess r el eased by t he Cont r act i ng Of f i cer at an ear l i er dat e. Saf e and secur e access t o t hese f aci l i t i es, i ncl udi ng access by emer gency ser vi ces, shal l be mai nt ai ned. No const r uct i on act i v i t i es ar e t o i mpact t he occupant s of t hese f aci l i t i es unt i l t hey have been vacat ed and r el eased by t he Gover nment , except f or appr oved Ut i l i t y and Road Out age r equest s.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3 ( Revi sed by Amendment 0001)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 95 PAGES

Reception Complex

01 30 00 SD-01 Preconstruction Submittals

1.3.1.3 GList of Contact Personnel

1.4.1 GUtility Outage Requests

1.4.1 GUtility Connection Requests

1.4.2 GRoad Outage Request

1.4.3 GExcavation Permits

1.7Antiterrorism Operations Security

Requirements

1.8 GProgress and Completion

Pictures

1.10.2 GSuperintendent Qualifications

1.13Survey Verification

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G RO SPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G RO SSustainability Action Plan

1.5.3.1 G RO SPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Revised by Amendment 0001

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 95 PAGES

01 33 29 1.5.3.1 G RO Final High Performance and Sustainable Building Checklist

1.5.3.1 G RO Final Sustainability eNotebook

1.5.3.1 G RO SAmended Final Sustainability

eNotebook

1.5.3.1 G RO Amended Final High

Performance and Sustainable Building Checklist

3.2 G RO Third Party Certification

Certificates or Validation

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.7.2.4 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 95 PAGES

01 35 26 1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet 01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports 3.9.2Verification Statement 3.4.3.1CQC specialized personnel daily reports 3.4.3.1CQC specialized personnel

Biweekly Reports 3.4.4.7Building Code Inspectors'

Inspection Reports 3.4.4.7Building Code Inspectors'

Biweekly Report 3.4.4.7Building Code Inspectors'

Comprehensive Final Report SD-07 Certificates

3.4.4.3Building Code Inspector Qualifications

01 45 35 SD-01 Preconstruction Submittals 3.1.2Written Practices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 95 PAGES

01 45 35 3.1.2NDT Procedures and Equipment Calibration Records

SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Certificate of Compliance

1.5 G ROSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals 3.1.2Interim Final Report

2.1 G ROComprehensive Final Report

3.1.2 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-02 Shop Drawings

2.1.2 GSign Legend Orders;

01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey

1.10 G ROSolid Waste Management Permit

1.5.2 G RORegulatory Notifications

1.6 G ROEnvironmental Protection Plan

3.2.1.2 G ROStormwater Notice of Intent

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 95 PAGES

01 57 19 1.6.9.1 G RODirt and Dust Control Plan

1.5.5 G ROEmployee Training Records

1.5.4 G ROEnvironmental Manager

Qualifications SD-06 Test Reports

3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports

3.7.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.5.5 G ROEmployee Training Records

1.5.5.1Certificate of Competency 1.5.5Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.7.1 G ROWaste Determination

Documentation

3.7.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.5.5 G ROAssembled Employee Training

Records

1.10 G ROSolid Waste Management Permit

3.7.2.1 G ROSolid Waste Management Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 95 PAGES

01 57 19 3.7.3.1 G ROHazardous Waste/Debris Management

1.5.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

3.7.2.1Contractor Certification

01 57 19.37 SD-01 Preconstruction Submittals

1.3 G ROIndoor Air Quality (IAQ)

Management Plan SD-06 Test Reports

1.3.2Air contamination testing SD-11 Closeout Submittals

1.3.2LEED

01 74 19.37 SD-11 Closeout Submittals

1.5Records 01 78 00 SD-03 Product Data

1.3.2 GAs-Built Record of Equipment

and Materials

1.6.1 GWarranty Management Plan

1.6.5 GWarranty Tags

1.4 GSpare Parts Data

SD-08 Manufacturer’s Instructions

1.6.1 GInstructions

SD-10 Operation and Maintenance Data

1.8 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 95 PAGES

01 78 00 SD-11 Closeout Submittals

1.3.1 GAs-Built Record Drawings

1.5 GCertification of EPA Designated

Items

1.3.5 GEquipment-In-Place List

1.9 GRed Zone Meeting Checklist

1.10 GFinal Cleaning

1.11 GInterim Form DD1354

1.11 GChecklist for Form DD1354

01 78 23 SD-10 Operation and Maintenance Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 91 00 SD-01 Preconstruction Submittals

1.9 G RODraft Cx Plan and Schedule

1.9 G ROFinal Cx Plan and Schedule

SD-02 Shop Drawings 1.11.2Control Drawings

SD-06 Test Reports

3.7 G ROFilled out functional test

readiness forms

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 95 PAGES

01 91 00 3.1.3 G ROCompleted PFT checklists

3.1.4.1 G ROCompleted startup checklists

3.7.4Completed FPT forms 3.1.5Nonconformance and Approval in

PFT checklists and Startup 3.8Progress reports and test results

SD-07 Certificates 3.2Calibration documentation 3.2Calibration certification

SD-08 Manufacturer’s Instructions 1.10Startup and Checkout Plan 1.10Checkout Forms 1.10Test Procedures

SD-10 Operation and Maintenance Data

3.10.1 G ROTraining Plan

3.10.3Training Documentation 3.10.4Training Verification

SD-11 Closeout Submittals

1.11.1 G ROFinal Cx Report

3.8.1Deficiency Report and Resolution

Record 3.8.4Deficiency Report and Resolution

Record 02 41 00 SD-01 Preconstruction Submittals

1.9 G ROExisting Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 95 PAGES

02 41 00 SD-07 Certificates

1.2.1 G RODemolition Plan

1.6 G RONotification

02 82 00 SD-03 Product Data

1.2.2 G ROAmended Water

1.3.9 G ROSafety Data Sheets (SDS) for All

Materials

2.1 G ROEncapsulants

3.1.2.1 G RORespirators

3.1.7 G ROLocal Exhaust Equipment

3.1.7 G ROPressure Differential Automatic

Recording Instrument

3.1.8 G ROVacuums

3.1.10 G ROGlovebags

SD-06 Test Reports

1.5.5 G ROAir Sampling Results

1.5.6 G ROPressure Differential Recordings

for Local Exhaust System

3.2.12.2 G ROEncapsulation Test Patches

3.2.14.5 G ROClearance Sampling

3.3.3.2 G ROAsbestos Disposal Quantity

Report SD-07 Certificates

1.3.4 G ROEmployee Training

1.3.5 G RONotifications

1.3.7 G RORespiratory Protection Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 95 PAGES

02 82 00 1.3.10 G ROAsbestos Hazard Abatement Plan

1.3.11 G ROTesting Laboratory

1.3.12 G ROLandfill Approval

1.3.12 G RODelivery Tickets

1.3.12 G ROWaste Shipment Records

1.3.13 G ROTransporter Certification

1.3.14 G ROMedical Certification

1.5.1 G ROPrivate Qualified Person

1.5.2 G ROCompetent Person

1.5.3 G ROWorker's License

1.5.4 G ROContractor's License

1.5.8 G ROFederal, State or Local Citations

on Previous Projects

2.1 G ROEncapsulants

3.1 G ROEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 G ROWater Filtration Equipment

3.1.8 G ROVacuums

3.1.8 G ROVentilation Systems

SD-11 Closeout Submittals

1.3.5 G ROPermits and Licenses

1.3.5 G RONotifications

1.3.7.1 G RORespirator Program Records

1.5.7 G ROProtective Clothing

Decontamination Facility Notification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 95 PAGES

02 82 00 1.7.1 G RORental Equipment 02 83 13 SD-01 Preconstruction Submittals

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report

1.5.2.2 G ROLead Compliance Plan

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.8 G ROLead Waste Management Plan

3.5.2.1 G ROWritten Evidence

1.5.2.4 G ROMedical Examinations

SD-06 Test Reports

1.5.2.3 G ROSampling Results

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.3 G ROTesting Laboratory

1.5.1.4 G ROThird Party Consultant

Qualifications

3.5.1.1 G ROClearance Certification

SD-11 Closeout Submittals

3.5.2.1 G ROhazardous waste manifest

3.5.2.1 G ROturn-in documents or weight

tickets 03 11 13 SD-02 Shop Drawings

2.2.1Formwork 3.1.1Formwork

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 95 PAGES

03 11 13 2.2.1 GForm Removal Schedule SD-03 Product Data

2.2Form Materials SD-04 Samples

1.3 GSample Panels

SD-05 Design Data

2.1Calculations SD-06 Test Reports

3.2Inspection 03 15 00 SD-03 Product Data

2.2Preformed Expansion Joint Filler 2.3Sealant

SD-04 Samples 2.3.2Field-Molded Type

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00 SD-01 Preconstruction Submittals

2.3.1 G ROMechanical Butt-Splices

SD-02 Shop Drawings

3.1 G ROReinforcement

SD-07 Certificates 2.3Reinforcing Steel

03 30 00 SD-01 Preconstruction Submittals

1.5.2 G ROQuality Control Plan

1.5.1Laboratory Accreditation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 95 PAGES

03 30 00 3.8.5.6 G ROSampling Plan SD-03 Product Data

Part 2Recycled Content Products 2.2Cementitious Materials 2.10Vapor Retarder 2.1.5Floor Finish 2.4Chemical Admixtures

SD-04 Samples 2.4.5Surface Retarder

SD-05 Design Data

2.1.1 G ROMixture Proportions

SD-06 Test Reports

2.1.1 G ROMixture Proportions

3.8 G ROTesting and Inspection for CQC

2.2.2Fly Ash 2.2.5Ground Granulated Blast-Furnace

(GGBF) Slag 2.3Aggregates 3.8.5.1Air Content 3.8.5.3Slump 3.8.5.6Compressive Strength 2.5Water

SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 95 PAGES

03 35 00 SD-03 Product Data Part 2Recycled Content Products

SD-04 Samples 1.3.1Field Test Panels 1.3.1.1Sample Wall Panels 1.3.1.2Slab Panels

03 39 00 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports 3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions 2.1Curing Compound

04 20 00 SD-02 Shop Drawings

1.4.5 G RODetail Drawings

SD-03 Product Data 2.2Clay or Shale Brick 2.7.3Cement

1.6.2 G ROCold Weather Installation

2.8Water-Repellant Admixture

1.2.1LEED

SD-04 Samples

2.4 G ROConcrete Masonry Units (CMU)

2.2 G ROClay or Shale Brick

2.5 G ROArchitectural Cast Stone Items

2.10Anchors, Ties, and Bar

Positioners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 95 PAGES

04 20 00 2.14Expansion-Joint Materials 2.11Joint Reinforcement 1.4.3Portable Panel

SD-06 Test Reports 3.20.3Efflorescence Test 3.20.1Field Testing of Mortar 3.20.2Field Testing of Grout 2.7.3Masonry Cement 1.4.4Masonry Inspector Qualifications 2.4.4Fire-Rated CMU

SD-07 Certificates 2.2Clay or Shale Brick 2.3Concrete Brick 2.4Concrete Masonry Units (CMU) 2.10Anchors, Ties, and Bar

Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 2.7.3Masonry Cement 2.7.1Admixtures for Masonry Mortar 2.9.1Admixtures for Grout 1.4.2Contamination

SD-08 Manufacturer’s Instructions 2.7.3Masonry Cement

05 12 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 95 PAGES

05 12 00 1.5.1 G DOErection and Erection Bracing Drawings

SD-02 Shop Drawings

1.5.2 G DOFabrication Drawings

SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer

Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 95 PAGES

05 12 00 2.5Galvanizing 1.3AISC Structural Steel Fabricator

Quality Certification 1.5.3Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods 3.7.1.1Certified Welding Inspector 3.7.1.2NDT Technician 3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.4 G ROFabrication Drawings

SD-03 Product Data

2.2Accessories 2.1Deck Units 2.1.3Galvanizing Repair Paint 2.2.12Mechanical Fasteners 2.1.3Touch-Up Paint

SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 G RODeck Units

SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3.1Fire Safety

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 95 PAGES

05 30 00 1.3.3.2Wind Storm Resistance 1.3.1Manufacturer's Certificate

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 G DOFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products SD-05 Design Data

1.6.2 G DOMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds 05 50 13 SD-02 Shop Drawings

2.10 G ROStructural Steel Door Frames

2.3Access Doors And Panels 2.6Expansion Joint Covers

2.9 G ROAngles And Plates

SD-03 Product Data 2.3Access doors and panels 2.4Control-joint covers 2.6Expansion joint covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 95 PAGES

05 50 13 2.10Structural steel door frames SD-04 Samples

2.6Expansion joint covers 2.4Control-joint covers

05 51 33 SD-02 Shop Drawings 2.3Ladders

SD-03 Product Data 2.3Ladders 2.3.1Ladder Safety Devices

SD-07 Certificates 1.3Fabricator Certification for Ladder

Assembly 1.3Fabricator Certification for Ships

Ladder Assembly 05 52 00 SD-02 Shop Drawings

1.2 G ROFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips SD-03 Product Data

1.2 G ROStructural-Steel Plates, Shapes, and Bars

2.2.2 G ROConcrete Inserts

2.1.2 G ROProtective Coating

2.2.4 G ROSteel Railings and Handrails

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 95 PAGES

05 52 00 1.2 G ROAnchorage and Fastening Systems

SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions 3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.1 G RONailing Strips

SD-03 Product Data

1.9LEED

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.8Certificates of grade 1.7Preservative treatment

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data

1.7LEED

SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance

06 41 16 SD-02 Shop Drawings 1.5.2Shop Drawings 2.11Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 95 PAGES

06 41 16 Part 3Installation SD-03 Product Data

2.1Wood Materials 2.9Wood Finishes 2.11.4.3Finish Schedule

1.3LEED

SD-04 Samples 2.3Plastic Laminates 2.6Cabinet Hardware

SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework Part 3Laminate Clad Casework

06 61 16 SD-02 Shop Drawings 1.5.2Detail Drawings 3.1Installation

SD-03 Product Data 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications

1.3LEED

SD-04 Samples

2.1 G ROMaterial

2.3.6 G ROCounter Tops

SD-06 Test Reports 2.1Solid polymer material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 95 PAGES

06 61 16 SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G ROThermal Imaging Camera

SD-07 Certificates

1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G ROPressure Test Procedures

3.5.5 G ROAir Leakage Test Report

3.6.5 G RODiagnostic Test Report

07 21 13 SD-03 Product Data 2.1Block or board insulation 2.2Vapor retarder 2.3Pressure sensitive tape 2.4Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 95 PAGES

07 21 13 2.4.1Adhesive 07 21 16 SD-03 Product Data

2.1Blanket Insulation 2.3Accessories

1.5LEED

SD-08 Manufacturer’s Instructions 3.3Insulation

07 22 00 SD-02 Shop Drawings 2.1.4Tapered Roof Insulation

SD-03 Product Data 2.3Fasteners 2.1Insulation

1.4.3LEED

SD-06 Test Reports 1.4.1Flame spread and smoke developed ratings SD-07 Certificates

1.3Qualifications SD-08 Manufacturer’s Instructions

2.3Fasteners 2.1Insulation

07 27 10 SD-02 Shop Drawings

1.3.2 G CAAir Barrier Assembly

SD-03 Product Data

2.1 G ROFluid-Applied Air Barrier/Moisture

Membrane

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 95 PAGES

07 27 10 2.2 G ROAir Barrier Component Materials SD-04 Samples

3.1.2 G ROMock-up

SD-06 Test Reports

1.8 G DODesign Review Report

3.1.3 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 41 00 SD-02 Shop Drawings

2.1 G ROSoffit Panels

2.1 G ROSoffit Panels

SD-03 Product Data

2.1 G ROSoffit panels

2.1 G ROSoffit panels

2.2Attachment clips 2.3Accessories 2.3.1Fasteners 2.3.2Sealants

SD-04 Samples 2.1Soffit panels 2.1Soffit panels 2.3Accessories 2.3.2Sealants

SD-06 Test Reports 3.5Field Inspection 1.4.2Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 95 PAGES

07 41 00 SD-08 Manufacturer’s Instructions 3.3Installation

07 41 13 SD-02 Shop Drawings

1.4.5 G DORoofing Panels

1.4.5Flashing And Accessories

SD-03 Product Data 2.1Roof panels 1.4.5Factory-Applied Color Finish 2.4Accessories 1.4.5Fasteners 1.4.5Pressure Sensitive Tape 2.6Underlayment 2.7Gaskets and Sealing/Insulating

Compounds 1.4.5Coil Stock

1.10LEED

SD-04 Samples

2.1 G RORoof Panels

1.4.5 G ROFactory-applied Color Finish

2.4Accessories 1.4.5Fasteners 1.4.5Flashing And Accessories 1.4.5Gutter/Downspout Assembly 1.4.5Gaskets and Sealant/Insulating

Compounds SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 95 PAGES

07 41 13 1.2.2Wind Uplift Resistance SD-06 Test Reports

1.2.1 G CALeakage Test Report

1.2.2Wind Uplift Test Report 2.2Factory Finish and Color

Performance Requirements SD-07 Certificates

2.1Roof Panels 1.4.5Coil stock compatibility 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SD-08 Manufacturer’s Instructions 1.4.5Installation Manual

SD-11 Closeout Submittals

1.8 G ROWarranties

3.9 G ROInformation Card

07 42 13 SD-01 Preconstruction Submittals

1.5.3 G ROQualification of Manufacturer

1.5.4 G ROQualification of Installation

Contractor

1.5.4 G ROQualification of Welders

1.8 G ROWarranty

SD-02 Shop Drawings

1.5.1.1 G ROInstallation Drawings

SD-03 Product Data 2.1LEED Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 95 PAGES

07 42 13 2.2.1 G ROWall Panels 1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3Galvanizing Repair Paint 1.5.3Enamel Repair Paint 1.5.5Accessories 2.5Accessories

SD-04 Samples

2.2.1 G ROWall Panels

1.5.3 G ROFasteners

2.5.3 G ROMetal Closure Strips

2.2.3 G ROFactory Finish

SD-05 Design Data

1.5.1.2 G ROWind Load Design Analysis

SD-06 Test Reports

3.7.2 G ROLeakage Tests

1.3.2 G ROWind Load Tests

2.2.3.3 G ROCoating

2.2.3.3 G ROChalking

1.3.2 G ROSeismic Tests

SD-07 Certificates

1.5.3 G ROCoil Stock

1.5.3 G ROFasteners

1.5.3 G ROGalvanizing Repair Paint

1.5.3 G ROEnamel Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 95 PAGES

07 42 13 SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-09 Manufacturer’s Field Reports

3.8 G ROManufacturer's Field Reports

SD-10 Operation and Maintenance Data

1.5.6 G ROMaintenance Instructions

SD-11 Closeout Submittals

1.8 G ROWarranty

07 60 00 SD-02 Shop Drawings

3.1.22Covering on flat, sloped, or curved surfaces

3.1.15Gutters 3.1.16Downspouts 3.1.23Expansion joints 3.1.19Splash pans 3.1.17Flashing for Roof Drains 3.1.10Base flashing 3.1.11Counterflashing 3.1.24Flashing at roof penetrations 3.1.12Reglets 3.1.18Scuppers 3.1.14Drip edge 3.1.20Open valley flashing 3.1.21Eave flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 95 PAGES

07 60 00 3.1.26Soffit and Fascia SD-03 Product Data

1.5LEED

07 61 14 SD-02 Shop Drawings

1.2.5 G RORoofing

SD-03 Product Data

2.2 G RORoofing Panels

2.4Attachment Clips 2.5.1Closures 2.5Accessories 2.5.2Fasteners 2.5.3Sealants 2.6Insulation

1.7 G ROWarranty

SD-04 Samples 2.2Panel 2.5Accessories 2.5.3Sealants 2.3Intermediate Support

SD-05 Design Data 1.5Design Calculations

SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 95 PAGES

07 61 14 1.6.3Manufacturer's Technical Representative

1.6.4Installer's Qualifications

2.2 G ROCoil Stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-11 Closeout Submittals 3.8Information Card

2.2 SEnergy Star Label for Steel

Roofing Product

2.2.1 SRecycled Content for Steel

Roofing Product

2.2 SHeat Island Reduction

1.7Warranty

07 84 00 SD-02 Shop Drawings 1.2.3Firestopping Materials, with related assemblies SD-03 Product Data

1.6LEED

SD-07 Certificates

1.4.2Manufacturer's Technical Representative

Part 2Firestopping Materials 1.4.1Installer 3.3Inspection

07 92 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 95 PAGES

07 92 00 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-03 Product Data

2.1 G RODoors

2.7 G ROFrames

2.5Moldings

1.5LEED

08 11 16 SD-02 Shop Drawings

1.5.1 G RODoors, windows and frames

SD-03 Product Data

1.6LEED

SD-04 Samples 1.5.2Finish sample

SD-05 Design Data 1.2.1Calculations

1.5.3 G RODesign Analysis

SD-06 Test Reports 1.5.4Minimum Condensation

Resistance Factor

1.2.5.3 G ROStandard Airblast Test

SD-08 Manufacturer’s Instructions 2.1Doors and frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 95 PAGES

08 14 00 SD-02 Shop Drawings

2.1 G RODoors

SD-03 Product Data 2.1Doors 2.2Accessories 2.3.6Water-resistant sealer 1.5warranty

2.1.2 G ROFire resistance rating

1.3LEED

SD-04 Samples 2.1Doors

2.3.5.2 G RODoor finish colors

SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance

08 34 73 SD-02 Shop Drawings 2.1Wood Sound Retardant Doors 2.1Door Frames

SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Intumescent Seals and Gasketing

SD-06 Test Reports 1.3.3Acoustical Tests 1.3.3Air Infiltration Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 95 PAGES

08 34 73 1.3.3Positive Pressure Tests SD-07 Certificates

2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds

08 51 13 SD-02 Shop Drawings

2.1 G ROWindows

1.10Fabrication Drawings

SD-03 Product Data 2.1Windows 2.2.2Fasteners

1.11 G ROWindow performance

2.3Mullions 2.2.4Accessories 1.11.5Thermal performance

1.7LEED

SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample

SD-05 Design Data

2.1 G DOStructural Calculations For

Deflection

1.4.3 G DODesign Analysis

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 95 PAGES

08 51 13 1.4.4Minimum Condensation Resistance Factor

1.11.2.3 G DOStandard Airblast Test

SD-10 Operation and Maintenance Data

2.1 G ROWindows

08 71 00 SD-02 Shop…