W912HN24Q5008 Questions and Answers.pdf

PDF 74 KB Posted

Attached to
Dissolved Oxygen Vertical Turbine Pumps (VTP) Refurbishment Services
Solicitation number
W912HN24Q5008
Issued by

About this file

This document is a set of Questions and Answers related to Solicitation W912HN24Q5008 for Dissolved Oxygen Vertical Turbine Pumps (VTP) Refurbishment Services.

The key details are:

  • The contractor will be responsible for repairing or replacing all worn components of the VTPs, as described in the appendices to the solicitation, to return them to like-new condition. Replacement of major components such as bowls, impellers, or columns will be handled via contract modification if necessary.
  • The existing marine coating, Intershield 300V, is required unless an equivalent is accepted per the manufacturer's specifications.
  • The electrical motors will be removed from the pumps and stored onsite by the contractor, who will provide power to the motor heaters during storage.
  • Contractors without experience repairing VTPs for saltwater environments are disqualified from bidding.

The overall objective is for the contractor to refurbish the dissolved oxygen VTPs to restore them to like-new condition, as detailed in the Performance Work Statement.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1: Do you have a base scope of work that needs to be included? “Repair or replace all components worn beyond acceptable conditions as described by manufacturer’s documentation with new components”, is a little misleading. We can include all the shafts, bearings, enclosure tubes and all the wear rings. But assuming award is given to GWI, what would happen if we find that major components need to be replaced? Such as bowls, impellers, columns or a complete bowl assembly?

A1: All components that should be considered for replacement during typical rebuild/refresh are described in the appendices provided with this solicitation. Of particular interest would be Appendix B and Appendix C.

Q2: Is our price that will be submitted on this quote firm even if we find major components needing to be replaced? Would a change order be placed for each major component we find that needs to be replaced?

A2: Any items that require replacement during the rebuild effort, which are not included in the

Contractor’s proposal or not described as being typically replaced during rebuild/refresh operations in the manufacturer’s data in the appendices to this solicitation, will be handled via modification if deemed necessary by the Government.

Q3: These pumps were coated with the Intershield 300V marine coating. Is the Intershield 300V required or will an equivalent be accepted?

A3: As described in the solicitation, the pumps are to be retuned to like-new condition in accordance with requirements described in the Manufacturer’s literature provided in the appendices to this solicitation. All acceptable material and/or product information is provided in that documentation.

Q4: I just want to confirm that the electrical motors are not getting repaired. They are getting removed from the pumps and stored on site specified by the government, correct? With this being said will there be power to hook up for the heaters while being stored? Also, are we able to pull two pumps at a time or will it need to be 1 at a time?

A4: -Yes, the electrical motors are not getting repaired.

-Yes, the motors are getting removed from the pumps and stored on site, specified by the government. CLARIFICATION: the contractor is performing all of the labor, material, tools, cranes, etc., to remove the motors from the pumps and moving the motors to the storage location onsite and maintaining the motors while they are refurbishing the pumps. The only involvement by the government is providing, is showing the contractor where to store the motors onsite - after collaborating with both the VTP contractor and the O&M contractor.

-Yes, there is exterior power receptacles to hook up for the heaters while being stored, the contractor is to provide any and all extension cords, material, labor, tools, etc. to \bring power to the motors while they are being stored onsite.

-# of pumps to pull at time: means and methods are up to the contractor.

Q5: While we have repaired many VTPs of this kind, we have not repaired any intended for a saltwater environment. Does this disqualify us from bidding?

A5: Yes, you not having the experience repairing any VTPs intended for saltwater environment would disqualify you from responding to this requirement.