PWS Enclosure 2B - GFI Spreadsheets 2.0.xlsx
XLSX spreadsheet 40 KB Posted
- Solicitation number
- W912HN23R1000
About this file
This pre-solicitation notice and related performance work statement describe a requirement for environmental remediation services at multiple military installations in South Carolina and North Carolina. The contractor will undertake activities to achieve performance objectives at fifty-four Installation Restoration Program sites and eleven Military Munitions Response Program sites. The services include maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives. The acquisition will be a 100% small business set-aside firm fixed price contract with a period of performance of ten years. The solicitation is anticipated to be issued on January 31, 2023 via the Procurement Integrated Enterprise Environment system. Evaluation will be based on technical approach, past performance, and price factors.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI List JBC Air
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | Carolina Group |
| Installation: | JBC Air |
| Date: | 30-Sep-22 |
| Item | Document Date | Document Title | Site | CD Number | Comments | |
| 1 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR SITE DD540 (AOC P) | DD540 (AOC P) | Summary of discussions with the regulator regarding the site | ||||
| 2 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR FT003 (SWMU 55) | FT003 (SWMU 55) | Summary of discussions with the regulator regarding the site | ||||
| 3 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR OT012 (SWMU 58) | OT012 (SWMU 58) | Summary of discussions with the regulator regarding the site | ||||
| 4 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR OT016 (SWMU 137) ZONE 2 | Zone 2 (OT016) | Summary of discussions with the regulator regarding the site | ||||
| 5 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR SS042 (SWMU 149) ZONE 4 | SS042 (SWMU 149 - Zone 4) | Summary of discussions with the regulator regarding the site | ||||
| 6 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR ST027 (SWMU 145) | ST027 (SWMU 145) | Summary of discussions with the regulator regarding the site | ||||
| 7 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR TS837 (AOC X) | TS837 (AOC X) | Summary of discussions with the regulator regarding the site | ||||
| 8 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR TU542 (AOC V) SHOPPETTE | TU542 (AOC V) | Summary of discussions with the regulator regarding the site | ||||
| 9 | Sep-22 | Enclosure 2C- | ||||
| JBC-AIR TU543 (SWMU 108) | TU543 (SWMU 108) | Summary of discussions with the regulator regarding the site | ||||
| Documents Pending, to be Submitted by Current Contractors | ||||||
| 1 | pending | Supplemental Groundwater Investigation Work Plan for SWMU 55 (FT003), Fire Protection Training Area No. 3, | FT003 (SWMU 55) | Awaiting draft | ||
| 2 | pending | Draft Final 2021 Annual Groundwater Monitoring/Corrective Measures Implementation (CMI) Progress Report, Zone 2 (OT016) | Zone 2 (OT016) | Report is final and to be uploaded to AR | ||
| 3 | pending | Final Corrective Measures Study (CMS) Addendum for SWMU 118, Building 371 Former Wash Rack | SWMU 118 | Draft final submitted to SCDHEC for review and comment | ||
| 4 | pending | Final Corrective Measures Implementation (CMI) Work Plan for SWMU 118, Building 371 Former Wash Rack | SWMU 118 | Awaiting draft (November 2022) | ||
| 5 | pending | 2022 Semi-Annual Groundwater Monitoring Report (CASE Report – December 2021 and March 2022) | ST027 (SWMU 145) | Draft final submitted to SCDHEC for review and comment | ||
| 6 | pending | Draft Final Supplemental Sampling Report, SWMU 82 (OW507)/ SWMU 101 (TU522) – Building 210 OWS and Sand Trap; SWMU 83 (OW508)/ SWMU 109 (TU527)/ SWMU 110 (TU528) – Building 239 OWS, Holding Tank 1, and Holding Tank 2; and SWMU 123 (RW052) – Building 548 Wash Rack | OW507 (SWMU 82) |
TU522 (SWMU 101)
| RW052 (SWMU 123) | Draft final submitted to SCDHEC for review and comment | ||||
| Documents on the AR Needing Explanation | |||||
| 1 | June 2018 - April 2022 | Annual Groundwater Reports, SWMU 69 (LF002), AR# 3261, 3260, 3208, 2110, & 3139. These reports summarize groundwater monitoring sampling activities and results. | SWMU 69 (LF002) | SCDHEC only approves annual sampling at this time based on their concern of potential migration of the groundwater plume off base. | |
| 2 | July 2010 - August 2019 | Decision Documents, AR #2104, 3141, 3015, 2504, 2505, 2741, 2537, 2446, 2334, 1641, & 1644. These reports summarize assessment activities to date | TS837 (AOC X) | A Draft Final Feasibility Study recommending land use controls has been submitted, but has not been approved by SCDHEC to date. The situation is currently in Tier 2 discussions. | |
| 3 | March 2012 - February 2022 | Recent Remediation Decision and Monitoring Documents, AR #3259, 3258, 3238, 3086, 3216, 2102, 3149, 3132, 2982, 2964, & 2965. These reports summarize recent remediation and monitoring activities. | DD540 (AOC P) | Current remediation system does not appear to be treating entire groundwater plume (see GFI Item 1 reference above). | |
| 4 | September 2012 - December 2021 | Recent Remediation Decision and Monitoring Documents, AR #3246, 3243, 3268, 2111, 3159, 3150, 3069, 3021, 3006, 3009, 3008, 2873, 2913, 2914, 2798, 2485, 2369, 2326, 2381, 2347, 2346, 2583, & 2426. These reports summarize recent remediation, assessment and groundwater monitoring activities. | FT003 (SWMU 55) | Additional groundwater assessment conducted in 2022 to delineate the extents of the chlorinated solvent groundwater plume upgradient of the current remediation treatment area. PFAS impacted soil, groundwater, and surface water present at the site, but to be managed under a separate contract. | |
| 5 | September 2015 - March 2020 | Recent Remediation Decision and Monitoring Documents, AR #2107, 3144, 3148, 2972, 3127, 2846, 2723, & 2765. These reports summarize recent remediation and groundwater monitoring activities. | OT012 (SWMU 58) | Drainage ditch construction (2014) through the site has resulted in a change in groundwater direction. Regulator requests additional delineation of strontium and molybdenum in groundwater. | |
| 6 | September 2016 - June 2022 | Recent Remediation Decision and Monitoring Documents, AR #3270, 3244, 3230, 1881, 1878, 1876, 3138, 3075, 1890, 1891, 1886, 2953, 2952, 2015, 2941, & 2937. These reports summarize recent remediation and monitoring activities. | SS042 (SWMU 149 - Zone 4) | No additional remediation activities planned for the remainder of current contract. Groundwater monitoring, remedial system O&M, and LUC inspections to be conducted under current contract until 2025. | |
| 7 | May 2016 - March 2022 | Recent Remediation Decision and Monitoring Documents, AR #3248, 3253, 3240, 3239, 3130, 3263, 3210, 3209, 2026, 2105, 3158, 3190, 3193, 3151, 3120, 2996, 3089, 2971, 2922, 2878, 2847, 2776, 2804. These reports summarize recent remediation and groundwater monitoring activities. | ST027 (SWMU 145) | Monitoring well MW20-24 is located in a low spot adjacent to a stormwater drop inlet. The well was repaired in June 2022 because surface runoff was infiltrating the well, which is believed to be the source of the naphthalene. Documentation of well repair is provided in the pending 2022 Semi-Annual Groundwater Monitoring Report. | |
| 8 | February 2015 - November 2021 | Recent Remediation Decision and Monitoring Documents, AR #2371, 2908, 2909, 2856, 2971, 2977, 2100, 3091, 3120, 2164, 2101, 2054, 2094, 2075, & 3266. These reports summarize recent remediation and groundwater monitoring activities. | TU542 (AOC V) | Spill from UST system in 2021 has resulted in a new incident at the site. Regulator is requesting annual groundwater monitoring to commence for new incident in 2023. | |
| 9 | January 2014 - June 2022 | Recent Remediation Decision and Monitoring Documents, AR #3269, 3234, 3265, 2292, 3189, 3192, 2932, 2877, 2779, 2373, 2782, 2783, 2825, 2474, & 2570. These reports summarize recent remediation and groundwater monitoring activities. | TU543 (SWMU 108) | A Corrective Measures Study and Statement of Basis needed to document remediation. Regulator will grant NFA when no measurable LNAPL (<0.01 foot) is observed and naphthalene concentrations are less than the RBSL (25 µg/L) for 3 years of annual groundwater monitoring. | |
| 10 | August 2012 - August 2021 | Recent Remediation Decision and Monitoring Documents, AR #3224, 3225, 1810, 1815, 3093, 3033, 2963, 2957, 2956, 2882, 2853, 2870, 2772, 2867, 2721, 2394, 2454, 2411, 2349, 2387, 2616, 2623, 2624, 2397, 2677, & 2429. These reports summarize recent remediation, assessment and groundwater monitoring activities. | Zone 2 (OT016) | Monitoring well network reduced in 2021 Annual Groundwater Monitoring/Corrective Measures Implementation (CMI) Progress Report (to be uploaded to AR). |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N
Only applicable for JBCA
| Installation | Site | Item Name | Description | Manufacturer | Model Number | Serial Number | Manufacture Date | Quantity | Location | Is Equipment Currently Operational? (Y or N) | Is Equipment Reaching End of Life Cycle ( Y or N)? | If Reaching End of Life Cycle, When Should it Be Replaced? | Notes | |
| JBCA | ST027 | ST027 Biosparge Trailer | Rietschle DLR 100 compressor | Rietschle | DLR 100 | NA | NA | 1 | JBCA at ST027 | Yes | No | Note that FPM agrees that the FPM owned system will become GFP once contract modifications are submitted and approved to change the site objectives from SC to allow systems to continue to operate. | ||
| JBCA | DD540 | DD540 Biosparge Trailer | Rietschle DLR 400 Compressor 30HP | Rietschle | DLR 400 | NA | NA | 1 | JBCA at DD540 | Yes | No | Note that FPM agrees that the FPM owned system will become GFP once contract modifications are submitted and approved to change the site objectives from SC to allow systems to continue to operate. | ||
| JBCA | SS042 | |||||||||||||
| Zone 4 | SVE System | Soil Vapor Extraction System | Gash | JG10E-2423 | 7/29/10 | 2 | Zone 4 | Yes | No | |||||
| JBCA | SS042 | |||||||||||||
| Zone 4 | SVE System | Soil Vapor Extraction System | Mid Atlandic Environmental Equipment Ltd | 50097-System A | 5/2/06 | 1 | Zone 4 | Yes | No |
NA - not available
GFI List JBC Weapons
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | Carolina Group |
| Installation: | JBC Weapons |
| Date: | 30-Sep-22 |
| Item | Document Date | Document Title | Site | CD Number | Comments | |
| 1 | Dec-22 | Enclosure 2C- | ||||
| JBC-WEAPONS DA017 (SWMU 17) | DA017 (SWMU 17) | Summary of discussions with the regulator regarding the site and field work updates | ||||
| 2 | Sep-22 | Enclosure 2C- | ||||
| JBC-WEAPONS FL066 (SWMU 66) | FL066 (SWMU 66) | Summary of discussions with the regulator regarding the site | ||||
| 3 | Sep-22 | Enclosure 2C- | ||||
| JBC-WEAPONS SA036 (SWMU 36) | SA036 (SWMU 36) | Summary of discussions with the regulator regarding the site | ||||
| 4 | Sep-22 | Enclosure 2C- | ||||
| JBC-WEAPONS ST042 (AOC G) | ST042 (AOC G) | Summary of discussions with the regulator regarding the site | ||||
| 5 | Nov-22 | Enclosure 2C- | ||||
| JBC-WEAPONS TU927 (AOC B-2) | TU927 (AOC B-2) | Summary of discussions with the regulator regarding the site and field activities with report results | ||||
| 6 | Nov-22 | Enclosure 2C- | ||||
| JBC-WEAPONS TU939 (AOC B-3) | TU939 (AOC B-3) | Summary of discussions with the regulator regarding the site and recent field activities | ||||
| Documents Pending, to be Submitted by Current Contractors | ||||||
| 1 | pending | 2022 Semi-Annual Monitoring Report, TU014 (SWMU 14) | TU014 (SWMU 14) | Draft final submitted to SCDHEC for review and comment | ||
| 2 | pending | SWMU 23 LUCIP | CS023 (SWMU 23) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | ||
| 3 | pending | SWMU 23 LUC Report #1 | CS023 (SWMU 23) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | ||
| 4 | pending | AOC Q LUCIP | DA951 (AOC Q) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | ||
| 5 | pending | 2021 Annual LUC Inspection Report (AOC Q & SWMU 25) | DA951 (AOC Q) | |||
| XE005 (SWMU 25) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | |||||
| 6 | pending | SWMU 25 LUCIP | XE005 (SWMU 25) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | ||
| 7 | pending | SWMU 3 LUCIP | LF003 (SWMU 3) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | ||
| 8 | pending | SWMU 3 LUC Report 1 | LF003 (SWMU 3) | Draft final submitted to SCDHEC. Approval pending RCRA Permit Renewal | ||
| 9 | pending | 2022 RCRA Permit Renewal | Basewide | Pending issuance from SCDHEC |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2
GFI List NAAF
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | Carolina Group |
| Installation: | NAAF |
| Date: | 30-Sep-22 |
| Item | Document Date | Document Title | Site | CD Number | Comments | |
| 1 | Sep-22 | Enclosure 2C- | ||||
| NAAF DA100 AND TA001 | DA100/TA001 | Summary of discussions with the regulator regarding the site. Site DA100 is made up of 4 site areas: DA100-1, DA100-2, DA100-3, and DA100-4. DA100-5 is not an ERP site, but requires contractor support. | ||||
| 2 | Sep-22 | Enclosure 2B- | ||||
| SCDHEC comments on Site Inspection Report | DA100/TA001 | |||||
| Documents Pending, to be Submitted by Current Contractors | ||||||
| 1 | Jul-22 | Final Site Inspection Report | DA100/TA001 | Report is final and to be uploaded to AR | ||
| Documents on the AR Needing Explanation | ||||||
| 1 | Various Reports, AR# 3236, 3241, & 3256. These reports summarize assessment activities to date. | DA100/TA001 | In the Admin Record, NAAF documents are listed under Charleston AFB, SC - recommend using the Full metadata search field for "NAAF" |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2
GFI List SJAFB
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | Carolina Group ORC |
| Installation: | SJAFB |
| Date: | 30-Sep-22 |
| Item | Document Date | Document Title | Site | Comments |
| 1 | Sep-22 | Enclosure 2 - Additional GFI | SS033 | PWS |
| 2 | Sep-22 | Enclosure 2 - Additional GFI | RW502 | PWS |
| 3 | SS033 and RW502 GROUNDWATER MONITORING REPORT 4 | SS033/RW502 | Electronic Copy | |
| Optimized Exit Strategy Plan Site RW502 (Bulk Fuel Storage Area Parking Area) | RW502 | Electronic Copy | ||
| 4 | SITE OT029 CONSTRUCTION COMPLETION REPORT | OT029 | Electronic Copy | |
| 5 | OT029 REMEDIAL ACTION – OPERATION REPORT | OT029 | Electronic Copy | |
| 6 | SITE FT007 CONSTRUCTION COMPLETION REPORT FOR OZONE INJECTION REMEDIAL ACTION | FT007 | Electronic Copy | |
| 7 | Aug-19 | FT007 Sodium Persulfate Injection Memorandum | FT007 | Electronic Copy & Administrative Record #609576 |
| 8 | Oct-20 | Site FT007 Remedial Action – Operation Report #3 | FT007 | Electronic Copy & Administrative Record #609577 |
| 9 | SITE SS009CONSTRUCTION COMPLETION REPORT FOR OZONE INJECTION REMEDIAL ACTION | SS009 | Electronic Copy | |
| 10 | Jul-17 | Optimized Exit Strategy Plan Site SS033 (Old Engine Test Facility) | SS033 | Electronic Copy |
| 11 | 8/25/19 | STATE OF NC, DIVISION OF WASTE MANAGEMENT, HAZARDOUS WASTE MANAGEMENT PERMIT (RCRA Permit #NC7570024474R2) | All | Electronic Copy |
| 12 | 8/19/20 | LANDFILLS LF006, LF008, LF015, AND LF016 OPTIMIZED EXIT STRATEGY IMPLEMENTATION COMPLETION REPORT | LF006/ LF008/ LF015/ LF016 | Administrative Record #606788 |
| 13 | 2/26/21 | Landfill Inspection Report (2020) for Former Landfill Site LF006 (SWMU 4) | LF006 | Administrative Record #607636 |
| 14 | 2/26/21 | Landfill Inspection Report (2020) for Former Landfill Site LF008 (SWMU 1) | LF008 | Administrative Record #607637 |
| 15 | 2/26/21 | Landfill Inspection Report (2020) for Former Landfill Site LF015 (SWMU 2) | LF015 | Administrative Record #607638 |
| 16 | 2/26/21 | Landfill Inspection Report (2020) for Former Landfill Site LF016 (SWMU 3) | LF016 | Administrative Record #607639 |
| 17 | 6/2/20 | Multi-Site Oxidant Injection Memorandum Carolina Group PBR | Multi | Administrative Record #606778 |
| 18 | 6/5/20 | SS009 Remedial Action – Operation Report 3 | SS009 | Administrative Record #606915 |
| 19 | 5/24/17 | Site SA501 Corrective Measures Implementation Work Plan | SA501 | Administrative Record #609585 |
| 20 | 7/9/20 | SA501 Annual Groundwater Monitoring Report | SA501 | Administrative Record #609530 |
| 21 | ||||
| 22 | ||||
| 23 | ||||
| Documents Pending, to be Submitted by Current Contractors | ||||
| 1 | 2022 | Site Closeout Report | FT007, SS009, OT029, and SA501 | NFA Requests have been submitted to NCDEQ for these sites and AF is currently waiting for SC confirmation |
| 2 | ||||
| 3 | ||||
| 4 | ||||
| Documents on the AR Needing Explanation | ||||
| 1 | ||||
| 2 | ||||
| 3 |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2
File details come from the government source that posted it. Updated .