This solicitation is for an Optimized Remediation Contract to conduct environmental remediation activities at multiple military bases in South Carolina and North Carolina. The scope of work includes maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives at fifty-four Installation Restoration Program sites and eleven Military Munitions Response Program sites over a ten-year period of performance. The solicitation will be issued electronically on or around January 31, 2023 as a 100% small business set-aside and evaluated based on technical approach, past performance, and price, with technical approach being the most important factor. Offerors must register in SAM and PIEE and submit proposals electronically through PIEE by the specified due date. The Army Corps of Engineers will award a firm fixed-price contract.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure 1 – ACRONYMS AND DEFINITIONS
Enclosure 1 – ACRONYMS AND DEFINITIONS
ACRONYMS
| AF | Air Force |
| AFCEC | Air Force Civil Engineer Center |
| AFFF | Aqueous Film Forming Foam |
| AFI | Air Force Instruction |
| AFSSI | Air Force Systems Security Instruction |
| AGC | Advanced Geophysical Classification |
| API | American Petroleum Institute |
| APP | Accident Prevention Plan |
| ASTM | American Society for Testing and Materials |
| BCE | Base Civil Engineer |
| bgs | Below Ground Surface |
| BRAC | Base Realignment and Closure |
| CAC | Common Access Cards |
| CADD | Computer-Aided Design and Drafting |
| CD | Compact Discs |
| CERCLA | Comprehensive Environmental Response, Compensation, and Liability Act |
| CFR | Code of Federal Regulations |
| CIP | Common Installation Picture/Community Involvement Plan |
| CLIN | Contract Line Item Number |
| CMI | Corrective Measures Implementation |
| CMRA | Contractor Manpower Reporting Application |
| CO/KO | Contracting Officer |
| COC | Contaminants of Concern |
| CMS | Corrective Measure Study |
| CONUS | Continental United States |
| COR | Contracting Officer’s Representative |
| CPSMR | Contractor’s Progress, Status, and Management Report |
| CQP | Construction Quality Plan |
| CSDGM | Content Standards for Digital Geospatial Metadata |
| CSM | Conceptual Site Model |
| CWM | Chemical Warfare Material |
| DAGCAP | DoD Advanced Geophysical Classification Accreditation Program |
| DD | Decision Document |
| DERP | Defense Environmental Restoration Program |
| DFAR | Department of Defense Federal Acquisition Regulation |
| DISA | Defense Information Systems Agency |
| DLH | Data Loading Handbook |
| DMM | Discarded Military Munitions |
| DoD | Department of Defense |
| DoDD | Department of Defense Directive |
| DoDM | Department of Defense Manual |
| DOT | Department of Transportation |
| DQO | Data Quality Objectives |
Enclosure 1: Acronyms and Definitions (CONT’D)
| EE/CA | Engineering Evaluations/Cost Analysis |
| EESOH-MIS | Enterprise Environmental, Safety, and Occupational Health Management Information System |
| ELAP | Environmental Laboratory Accreditation Program |
| EMS | Environmental Management System |
| EO | Executive Order |
| EOD | Explosive Ordnance Disposal |
| EPCRA | Emergency Planning and Community Right-to-Know Act |
| ERP | Environmental Restoration Program |
| ERPIMS | Environmental Resources Program Information Management System |
| ESD | Explanation of Significant Differences |
| ESRI | Environmental Systems Research Institute's |
| ESS | Enterprise Sourcing Squadron |
| ESTCP | Environmental Security Technology Certification Program |
| FAR | Federal Acquisition Regulation |
| FFA | Federal Facility Agreement |
| FGDC | Federal Geographic Data Committee |
| FS | Feasibility Study |
| FUSRAP | Formerly Utilized Sites Remedial Action Program |
| FY | Fiscal Year |
| GCO | Geophysical Classification Organization |
| GeoBase | Installation Execution Support |
| GFI | Government Furnished Information |
| GFP | Government Furnished Property |
| GIO | Geospatial Integration Office |
| GIS | Geographic Information System |
| GPS | Global Positioning Systems |
| GSR | Green and Sustainable Remediation |
| HSP | Health and Safety Plan |
| IBC | International Building Code |
| IDW | Investigation Derived Waste |
| IMS | Integrated Master Schedule |
| IRP | Installation Restoration Program |
| ISAP | Installation Specific Action Plan |
| ITRC | Interstate Technology and Regulatory Council |
| LCC | Life-cycle Cost |
| LTM | Long Term Management |
| MC | Munitions Constituents |
| MCL | Maximum Contaminant Level |
| MD | Management Directive |
| MDL | Master Document List |
| MDS | Mission Data Set |
| MEC | Munitions and Explosives of Concern |
| MMRP | Military Munitions Response Program |
| MOU | Memorandum of Understanding |
| MPS | Milestone Payment Schedule |
Enclosure 1: Acronyms and Definitions (CONT’D)
| MXD | Map Exchange Files |
| NACE | National Association of Corrosions Engineers |
| NAD83 | North American Datum 1983 |
| NCP | National Oil and Hazardous Substances Contingency Plan |
| NEC | National Electrical Code |
| NFA | No Further Action |
| NFPA | National Fire Protection Association |
| NIST | National Institute of Standards and Technology |
| NOV | Notice of Violation |
| NPL | National Priorities List |
| O&M | Operations and Maintenance |
| OGC | Office of the General Counsel |
| ORC | Optimized Remediation Contract |
| OSHA | Occupational Safety and Health Administration |
| OSWER | Office of Solid Waste and Emergency Response (USEPA) |
| PA | Preliminary Assessment |
| PAO | Public Affairs Officer |
| PCB | Polychlorinated Biphenyls |
| PFOA | Perfluorooctanoic Acid |
| PFOS | Perfluorooctane Sulfonate |
| PM | Program Manager |
| PMP | Project Management Plan |
| PMR | Project Management Review |
| PO | Performance Objectives |
| POC | Point of Contact |
| POP | Period of Performance (overall contract/task order) |
| PP | Performance Period (specific to Performance Objective) |
| PWS | Performance Work Statement |
| QA/QC | Quality Assurance and Quality Control |
| QASP | Quality Assurance Surveillance Plan |
| QPP | Quality Program Plan |
| RAB | Restoration Advisory Board |
| RACR | Remedial Action Completion Report |
| RA-O | Remedial Action-Operation |
| RAO | Remedial Action Objectives |
| RC | Response Complete |
| RCRA | Resource Conservation and Recovery Act |
| RECAP | Risk Evaluation Corrective Action Program |
| RFI | RCRA Facility Investigation |
| RI | Remedial Investigation |
| RIP | Remedy in Place |
| ROD | Records of Decision |
| RPM | Remedial Project Manager |
| SARA | Superfund Amendments and Reauthorization Act |
| SC | Site Closeout |
| SDSFIE | Spatial Data Standards for Facilities, Infrastructure, and Environment |
Enclosure 1: Acronyms and Definitions (CONT’D)
| SERDP | Strategic Environmental Research and Development Program |
| SHM | Safety and Health Manager |
| SI | Site Inspection |
| SoB | Statement of Basis |
| SRG | Security Requirements Guides |
| SSHP | Site Safety and Health Plan |
| SSI | Supplemental Site Investigation |
| SSPC | Steel Structures and Painting Counsel |
| STIG | Secure Technical Implementation Guides |
| TCE | Trichloroethene |
| UFC | Uniform Fire Code/Unified Facilities Criteria |
| UFP-QAPP | Uniform Federal Policy for Quality Assurance Project Plans |
| USACE | United States Army Corps of Engineers |
| USEPA | United States Environmental Protection Agency |
| UTM | Universal Transverse Mercator |
| UXO | Unexploded Ordinance |
| WP | Work Plan |
DEFINITIONS
The definitions included in this Enclosure were adapted from the following sources:
1. New Jersey Department of Environmental Protection Site Remediation Program Technical Guidance for Preparation and Submission of a Conceptual Site Model dated 16 December 2011.
1. Air Force Instruction 32-7020 dated 7 November 2014.
1. Council on Environmental Quality Aligning National Environmental Policy Act Processes with Environmental Management Systems, A Guide for NEPA and EMS Practitioners dated April 2007.
1. Interstate Technical Regulatory Council Green and Sustainable Remediation: A Practical Framework dated November 2011.
1. Air Force Civil Engineer Center Optimized Exit Strategy Compendium for Performance- Based Remediation dated October 2014.
1. 42 U.S. Code § 9601 Comprehensive Environmental Response, Compensation, and Liability Act Definitions.
1. United States Environmental Protection Agency Guide to Preparing Superfund Proposed Plans, Records of Decision, and Other Remedy Selection Decision Documents dated July 1999.
1. National Academies Press Contaminants in the Subsurface: Source Zone Assessment and Remediation dated 2005.
In the case where the definition provided below does not align with the source reference, the source reference shall prevail.
image4.emf image5.emf image1.emf image2.emf image3.emf
File details come from the government source that posted it. Updated .