FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Charleston AFB-Air SC_Aug 01 2022.xlsx
XLSX spreadsheet 388 KB Posted
- Solicitation number
- W912HN23R1000
About this file
This pre-solicitation synopsis describes a requirements contract for environmental remediation services at multiple military installations in South Carolina and North Carolina. The services include maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives at fifty-four IRP sites and eleven MMRP sites. The period of performance is ten years. The solicitation will be issued on or about January 31, 2023 as a 100% small business set-aside and will result in a firm fixed price contract award. Evaluation will be based on technical approach, past performance, and price, with technical approach being the most important factor. Proposals must be submitted electronically through the PIEE solicitation module by the due date specified in the solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Installation Name | AR File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site # | ROD Docs | Image Number |
| Charleston AFB, SC | 00261 | Dec/07/1996 | Base Letter to SCDHEC Requesting Approval to Perform Geoprobe Groundwater Screening in SWMUs 88, 104, 122, 29, 118 and in AOC O | Urrutia, Al | 437 CES/CEVR | Hargrove, Donald C | South Carolina Department of Health and Environmental Control | OW512|RW532|SS042|ST001 | AR-261.pdf | |
| Charleston AFB, SC | 00268 | Jan/03/1997 | Final Monitoring Well Approval Form for SWMUs 88, 104, and 122 | Hargrove, Donald C | South Carolina Department of Health and Environmental Control | Urrutia, Al | 437 CES/CEVR | OW512|SS042 | AR-268.pdf | |
| Charleston AFB, SC | 00269 | Jul/24/1998 | Base Letter to SCDHEC Transmitting Revised 1998 Cooperative Agreement Submittal | Urrutia, Al | 437 CES/CEVR | King, Melissa | South Carolina Department of Health and Environmental Control | DP033|DP034|DP035|FT003/FT003P-Sub|FT005|FT009|FT019|FT020|LF002|LF004|LF006|LF017|OT007|OT011|OT012|OT016|OT038|OT040|OW517|OW518|OW519|RW536|RW537|SD014|SD015|SD018|SD021|SS022|SS023|SS026|SS039|SS042|ST013|ST028|TU525|TU526|TU538|WP036 | AR-269.pdf | |
| Charleston AFB, SC | 00270 | Jan/03/1997 | Monitoring Well Approval Form for Installation of Push Groundwater Sampling Points Within SWMU 29 | Hargrove, Donald C | South Carolina Department of Health and Environmental Control | Urrutia, Al | 437 CES/CEVR | SS042 | AR-270.pdf | |
| Charleston AFB, SC | 00395 | Dec/31/1996 | Base Memorandum to SCDHEC Transmitting Draft Final Work Plan for SWMUs 29, 88, 104, 118, 122 and AOCs C and O | Urrutia, Al | 437 CES/CEVR | Hargrove, Donald C | South Carolina Department of Health and Environmental Control | OW512|RW532|SS042|ST001 | AR-395.pdf | |
| Charleston AFB, SC | 00491 | Jun/07/2001 | SCDHEC Letter to Base Approving Final Supplemental RFI Report for SWMUs 74, 114, 138, 144 | Scaturo, David, P.G., P.E. | South Carolina Department of Health and Environmental Control | Urrutia, Al | 437 CES/CEVR | OT007|SS026|ST028|WP008 | AR-491.pdf | |
| Charleston AFB, SC | 01253 | Nov/20/2008 | SCDHEC Letter to Base Transmitting Review Comments on the Bases Response to Comments for No Further Action Identified in the 1995 Basewide RFI Investigation Report Dated June 30, 1995 for SWMUs 67, 134, 143, AOC H and AOC M | Poole, Rachel | South Carolina Department of Health and Environmental Control | Urrutia, Al | 437 CES/CEVR | LF017|OT038|SS023|SS039|WP036 | AR-1253.pdf | |
| Charleston AFB, SC | 01807 | Aug/08/2017 | March 2017 Draft Final Semi-Annual Groundwater Monitoring Letter Report, AOC O and OT-16 (under Cover Letter, with SCDHEC Approval) | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX01807.pdf | |||
| Charleston AFB, SC | 01810 | Dec/19/2019 | Draft Final 2019 Annual Groundwater Monitoring-Corrective Measures Implementation Progress Report, Zone 2 (OT016) (with Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | OT016 | DKFX01810_DF 2019 Annual GW Monitoring Rpt Zone 2 with all correspondence.pdf | |||
| Charleston AFB, SC | 01815 | Jul/25/2019 | Draft Final March 2019 Semi-Annual Groundwater Monitoring Letter Report for AOC O and OT016 (Zone 2) (Correspondence, Report, Approval) Part 1 of 5 | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX01815_Part1.pdf | |||
| Charleston AFB, SC | 01815 | Jul/25/2019 | Draft Final March 2019 Semi-Annual Groundwater Monitoring Letter Report for AOC O and OT016 (Zone 2) (Correspondence, Report, Approval) Part 2 of 5 | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX01815_Part2.pdf | |||
| Charleston AFB, SC | 01815 | Jul/25/2019 | Draft Final March 2019 Semi-Annual Groundwater Monitoring Letter Report for AOC O and OT016 (Zone 2) (Correspondence, Report, Approval) Part 3 of 5 | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX01815_Part3.pdf | |||
| Charleston AFB, SC | 01815 | Jul/25/2019 | Draft Final March 2019 Semi-Annual Groundwater Monitoring Letter Report for AOC O and OT016 (Zone 2) (Correspondence, Report, Approval) Part 4 of 5 | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX01815_Part4.pdf | |||
| Charleston AFB, SC | 01815 | Jul/25/2019 | Draft Final March 2019 Semi-Annual Groundwater Monitoring Letter Report for AOC O and OT016 (Zone 2) (Correspondence, Report, Approval) Part 5 of 5 | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX01815_Part5.pdf | |||
| Charleston AFB, SC | 01816 | Jun/23/2018 | Draft Final Debris Removal/Burial Report SWMU 69 (LF002) Landfill Area No 4. (+Correspondence and Approval) | FPM Remediations, Inc. | FPM Remediations, Inc. | LF002 | DKFX01816.pdf | |||
| Charleston AFB, SC | 01872 | May/11/2011 | SCDHEC Correspondence RE Approval, Soil Sampling Summary Reported dated Feb 3, 2011, AOC M, supporting No Further Action | Rachel Poole | SCDHEC | Dana Holsclaw | JBCS | SS039 | DKFX01872_AOC M Soil Report_NFA Granted_11May2011.pdf | |
| Charleston AFB, SC | 01875 | Sep/09/2019 | Draft Final 2019 Annual Groundwater Monitoring Report-Corrective Action System Evaluation Report, March and June 2019 Event, AOC I (ST013) (Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX01875p2pdf.pdf | |||
| Charleston AFB, SC | 01876 | Apr/27/2019 | Draft Final Semi-Annual Corrective Measures Implementation Progress Report #5, Zone 4 (SS042) (Correspondence and Approval) Part 1 of 3 | AECOM | SCDHEC/JBCHS | SS042 | DKFX01876_Part1a.pdf | |||
| Charleston AFB, SC | 01876 | Apr/27/2019 | Draft Final Semi-Annual Corrective Measures Implementation Progress Report #5, Zone 4 (SS042) (Correspondence and Approval) Part 1 of 3 - Superseded 09-NOV-2020 14.48.18 | AECOM | SCDHEC/JBCHS | SS042 | DKFX01876_Part1a.pdf | |||
| Charleston AFB, SC | 01876 | Apr/27/2019 | Draft Final Semi-Annual Corrective Measures Implementation Progress Report #5, Zone 4 (SS042) (Correspondence and Approval) Part 2 of 3 | AECOM | SCDHEC/JBCHS | SS042 | DKFX01876_Part2opt.pdf | |||
| Charleston AFB, SC | 01876 | Apr/27/2019 | Draft Final Semi-Annual Corrective Measures Implementation Progress Report #5, Zone 4 (SS042) (Correspondence and Approval) Part 3 of 3 | AECOM | SCDHEC/JBCHS | SS042 | DKFX01876_Part3a.pdf | |||
| Charleston AFB, SC | 01877 | Jun/13/2019 | Revised Final Corrective Measures Study (CMS) for SWMU 118, Building 371 Former Wash Rack (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX01877opt.pdf | |||
| Charleston AFB, SC | 01878 | Jun/28/2019 | Draft Final Corrective Measures Implementation (CMI) Semi-Annual Progress Report #6, Zone 4 (SS042) (under CL, with SCDHEC Approval) | AECOM | SCDHEC/JBCHS | SS042 | DKFX01878.pdf | |||
| Charleston AFB, SC | 01881 | Jul/23/2020 | Draft Final Corrective Measures Implementation (CMI) Semi-Annual Progress Report #7/8, Zone 4 (SS042) (under CL, with SCDHEC Approval) Part 1 of 6 | AECOM | SCDHEC/JBCHS | SS042 | DKFX03207_extract 1.pdf | |||
| Charleston AFB, SC | 01881 | Jul/23/2020 | Draft Final Corrective Measures Implementation (CMI) Semi-Annual Progress Report #7/8, Zone 4 (SS042) (under CL, with SCDHEC Approval) Part 2 of 6 | AECOM | SCDHEC/JBCHS | SS042 | DKFX03207_extract 2.pdf | |||
| Charleston AFB, SC | 01881 | Jul/23/2020 | Draft Final Corrective Measures Implementation Semi-Annual Progress Report #7/8, Zone 4 (SS042) (under CL, with SCDHEC Approval) Part 3 of 6 | AECOM | SCDHEC/JBCHS | SS042 | DKFX03207_extract 3.pdf | |||
| Charleston AFB, SC | 01881 | Jul/23/2020 | Draft Final Corrective Measures Implementation Semi-Annual Progress Report #7/8, Zone 4 (SS042) (under CL, with SCDHEC Approval) Part 4 of 6 | AECOM | SCDHEC/JBCHS | SS042 | DKFX03207_extract 4.pdf | |||
| Charleston AFB, SC | 01881 | Jul/23/2020 | Draft Final Corrective Measures Implementation Semi-Annual Progress Report #7/8, Zone 4 (SS042) (under CL, with SCDHEC Approval) Part 5 of 6 | AECOM | SCDHEC/JBCHS | SS042 | DKFX03207_extract 5a.pdf | |||
| Charleston AFB, SC | 01881 | Jul/23/2020 | Draft Final Corrective Measures Implementation Semi-Annual Progress Report #7/8, Zone 4 (SS042) (under CL, with SCDHEC Approval) Part 6 of 6 | AECOM | SCDHEC/JBCHS | SS042 | DKFX03207_extract 5b.pdf | |||
| Charleston AFB, SC | 01886 | May/17/2017 | Draft Final Corrective Measures Implementation (CMI) Semi-Annual Progress Report #1, Zone 4 (SS042) (under CL) Part 1 of 2 (AR#03074 is Approval) | AECOM | SCDHEC/JBCHS | SS042 | DKFX01886_Part1of2.pdf | |||
| Charleston AFB, SC | 01886 | May/17/2017 | Draft Final Corrective Measures Implementation Semi-Annual Progress Report #1, Zone 4 (SS042) (under CL) Part 2 of 2 (AR#03074 is Approval) | AECOM | SCDHEC/JBCHS | SS042 | DKFX01886_Part2of2.pdf | |||
| Charleston AFB, SC | 01890 | Dec/19/2017 | Draft Final Corrective Measures Implementation Semi-Annual Progress Report #2, Zone 4 (SS042) (under CL, with SCDHEC Approval) | AECOM | SCDHEC/JBCHS | SS042 | DKFX01890.pdf | |||
| Charleston AFB, SC | 01891 | Jun/21/2017 | Draft Final Construction Completion Report (CCR), 2016 Remedial Injections, Zone 4 (SS042) (under CL) (AR#03085 is SCDHEC Approval) | AECOM | SCDHEC/JBCHS | SS042 | 20170621_DF Construction Completion Report 2016 Remedial Injections_Zone 4_DKFX01891.pdf | |||
| Charleston AFB, SC | 02015 | Sep/15/2016 | Draft Final Uniform Federal Policy-Quality Assurance Project Plan (UFP-QAPP), 2016 Update, Zone 4 (SS042) Long Term Management and Long Term Operations and Maintenance (under CL, amends AR 02388, Approved by AR 02936) | AECOM | SCDHEC/JBCHS | SS042 | 20160915 SS042 (Zone 4) Draft Final UFP-QAPP Project Plan for LTM and L-T O&M under CL_DKFX02015.pdf | |||
| Charleston AFB, SC | 02075 | Jun/04/2019 | SCDHEC Approval, Conditional No Further Action (CNFA), AOC V (TU542) based on 2018 Annual Groundwater Monitoring Report (GWMR) Received March 04, 2019 and Monitoring Well Options Response Received May 13, 2019 (AR#02054 is report) | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | TU542 | DKFX02075.pdf | |
| Charleston AFB, SC | 02094 | May/13/2019 | Monitoring Well Abandonment Options, AOC V (TU542) | Dana Holsclaw | JBCHS | Robert Dunn | SCDHEC | TU542 | DKFX02094.pdf | |
| Charleston AFB, SC | 02100 | Feb/21/2017 | Draft Final 2017 Site Specific Work Plan (SSWP), AOC V (TU542) (under Cover Letter) | Dana Holsclaw | JBCHS | Robert Dunn | SCDHEC | TU542 | DKFX02100.pdf | |
| Charleston AFB, SC | 02101 | Mar/01/2019 | Draft Final 2019 Site Specific Work Plan (SSWP), AOC V (TU542) (under Cover Letter) | Dana Holsclaw | JBCHS | Robert Dunn | SCDHEC | TU542 | DKFX02101.pdf | |
| Charleston AFB, SC | 02113 | Aug/07/2020 | Final August 2020 Off-Base Drinking Water Site Inspection (PFAS Sampling and Analysis) Uniform Federal Policy-Quality Assurance Project Plan (UFP-QAPP) Addendum, North Auxiliary Airfield (NAAF), Orangeburg County, South Carolina (Correspondence and SCDHEC | USACE | SCDHEC/JBCHS | FT010|SA001P|SS005P|SS006P | DKFX02113.pdf | |||
| Charleston AFB, SC | 02883 | Dec/18/2019 | Draft Final Preliminary Assessment (PA) Report Addendum for Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA), JBCHS Air, North Auxiliary Airfield, and Short Stay Recreation Area, South Carolina (+SCDHEC Review) | AFCEC | JBCHS ISS | SCDHEC | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX02883.pdf | ||
| Charleston AFB, SC | 02884 | May/27/2016 | SCDHEC Correspondence Re Final Preliminary Assessment (PA) Report for Perfluorinated Compounds dated January 2016 (AR#03154 is report) | William Britton | SCDHEC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SA501|SS002P|SS005P|SS006P | F_PFC PA Report_JBCHS_SCDHEC Comments_27May2016_DKFX02884.pdf | |
| Charleston AFB, SC | 02940 | May/16/2016 | Draft Final 2nd Quarter 2015 Groundwater Monitoring Report, AOC I (ST013), Base Gasoline Station Leak (GWPD #13446) (With correspondence and SCDHEC Approval) | FPM Remediations, Inc. | JBCHS/SCDHEC | ST013 | DKFX02940_opt for upload.pdf | |||
| Charleston AFB, SC | 02970 | Jan/27/2017 | Final Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) for Site Inspections of Fire Fighting Foam Usage at Various Air Force Bases in the Eastern US, Addendum 7 Field Sampling Plan, and Monitoring Well Request/Permit (+ Correspondence) | USACE Savannah District | JBCHS/SCDHEC | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | JBCA_DF UFP QAPP Addendum7_DKFX02970.pdf | |||
| Charleston AFB, SC | 02984 | Jan/29/2016 | Final Quality Assurance Project Plan (QAPP) for Site Inspections of Fire Fighting Foam Usage at Various Air Force Bases in the Eastern United States, Jan 2016 | USACE Savannah District | AFCEC | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | Final PFC QAPP 29 Jan 2016_DKFX02984.pdf | |||
| Charleston AFB, SC | 02987 | Apr/22/2019 | Draft Final Corrective Action System Evaluation (CASE) Report, September and December 2018 Events, AOC I (ST013) Base Gasoline Station Leak (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX02987Revised.pdf | |||
| Charleston AFB, SC | 03074 | Jun/27/2017 | SCDHEC Approval, Draft Final Semi-Annual Corrective Measures Implementation (CMI) Progress Report #1 (2Q2016-3Q2016) for Zone 4 received May 18, 2017 (Report is AR#01886) | William Britton | SCDHEC | Dana Holsclaw | JBCHS | SS042 | DKFX03074.pdf | |
| Charleston AFB, SC | 03075 | Oct/04/2018 | Draft Final Semi-Annual Corrective Measures Implementation (CMI) Progress Report No. 4 (4th Quarter 2017 - 1st Quarter 2018) for Zone 4 (SS042) (under CL, with SCDHEC Approval) | AECOM | SCDHEC/JBCHS | SS042 | DKFX03075_SS042 (Zone 4) Draft Final SA CMI 4Q17-1Q18 PR#4.pdf | |||
| Charleston AFB, SC | 03090 | Nov/17/2017 | Final 2017 Annual Groundwater Monitoring Report (includes the Interim Corrective Action Completion Information) AOC T(TU544) - Building 129 Underground Storage Tank | FPM Remediations | Robert Dunn | SCDHEC | TU544 | 569687 A.pdf | ||
| Charleston AFB, SC | 03091 | Sep/13/2017 | Final 2017 Annual Groundwater Monitoring Report AOC V(TU542) - Shoppette UST and Distribution Lines (Cover Letter, RTCs, and Errata) | FPM Remediations, Inc. | Robert Dunn | SCDHEC | TU542 | 569688 A.pdf | ||
| Charleston AFB, SC | 03094 | Oct/01/2017 | Final 2016 Long-Term Groundwater Monitoring Report SWMU 68 (LF006) (1 of 2) - Superseded 05-DEC-2019 13.13.11 | FPM Remediations, Inc. | LF006 | Pages from 571777 A.pdf | ||||
| Charleston AFB, SC | 03094 | Oct/01/2017 | Final 2016 Long-Term Groundwater Monitoring Report SWMU 68 (LF006) (2 of 2) - Superseded 05-DEC-2019 13.40.02 | FPM Remediations, Inc. | LF006 | Pages from 571777 A-2.pdf | ||||
| Charleston AFB, SC | 03094 | Apr/05/2018 | Revised Final 2016 Long-Term Groundwater Monitoring Report SWMU 68 (LF006) Part 1 of 2 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF006 | 593570-a.pdf | |||
| Charleston AFB, SC | 03094 | Apr/05/2018 | Revised Final 2016 Long-Term Groundwater Monitoring Report SWMU 68 (LF006) Part 2 of 2 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF006 | DKFX03094_2of2 ps-reduced-opt.pdf | |||
| Charleston AFB, SC | 03095 | May/27/2016 | SCDHEC Correspondence Re Groundwater monitoring report review AOC I (ST013), Base Gasoline Station Leak, UST Permit # 13446, Release reported December 16, 1993, Draft Final Third Quarter Groundwater Monitoring Report received January 7, 2016 | Joel Padgett | SCDHEC | Dana Holsclaw | JBCHS | ST013 | DKFX03095.pdf | |
| Charleston AFB, SC | 03096 | Dec/15/2016 | SCDHEC Correspondence Re Groundwater monitoring report review AOC I (ST013), Base Gasoline Station Leak, UST Permit # 13446, Release reported December 16, 1993, Draft Final 2016 Annual Groundwater Monitoring Report received December 8, 2016 | Joel Padgett | SCDHEC | Dana Holsclaw | JBCHS | ST013 | DKFX03096.pdf | |
| Charleston AFB, SC | 03097 | Feb/24/2017 | SCDHEC Correspondence Re Monitoring Report Review and Site-Specific Work Plan Request SWMU 145 (ST027), Building 575, UST Permit #01829, Release reported January 29, 1988, Draft Final Corrective Action Plan Amendment received May 19, 2016 and Draft Final | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | ST027 | DKFX03097.pdf | |
| Charleston AFB, SC | 03098 | Feb/17/2017 | SCDHEC Correspondence Re Delineation Technical Memorandum Review & Excavation Approval, AOC I (ST013), Base Gasoline Station Leak | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | ST013 | DKFX03098.pdf | |
| Charleston AFB, SC | 03099 | May/18/2017 | SCDHEC Approval, Proposed Step-Out Sampling Locations for SWMU 118, received May 12, 2017 (See AR#03030 for plan) | William Britton | SCDHEC | Dana Holsclaw | JBCHS | RW532 | DKFX03099.pdf | |
| Charleston AFB, SC | 03100 | Jul/27/2017 | SCDHEC Correspondence Re Approval Draft Final Interim Measure Completion Report at Solid Waste Management Unit (SWMU) 147, received June 1, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | ST013 | DKFX03100.pdf | |
| Charleston AFB, SC | 03101 | Jul/24/2017 | SCDHEC Correspondence Re Public Notice of Proposed Corrective Action AOC I (ST013), Base Gasoline Station Leak, UST Permit #13446, Release reported January 28, 1994, Draft Final revised Corrective Action Plan received June 22, 2017 | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | ST013 | DKFX03101.pdf | |
| Charleston AFB, SC | 03102 | Jun/01/2017 | SCDHEC Correspondence Re Draft Final Interim Corrective Action Completion Report Review AOC U (TU545), Building 1800, UST Permit #16345, Release reported December 16, 1994, Site-Specific Work Plan (SSWP) received january 31, 2017, 2016 Annual Groundwater | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | TU545 | DKFX03102.pdf | |
| Charleston AFB, SC | 03103 | Aug/07/2017 | SCDHEC Correspondence Re Monitoring Report Review and Site-Specific Work Plan Request AOC V. TU542, AAFES Shoppette, UST Permit #14727, Release reported September 20, 1991, Draft Final 2017 Annual Groundwater Monitoring Report | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | TU542 | DKFX03103.pdf | |
| Charleston AFB, SC | 03104 | Aug/08/2017 | SCDHEC Correspondence Re Approval March 2017 Draft Final Semi-Annual Groundwater Monitoring Letter Report for Area of Concern (AOC O) and OT-16 Site, received June 26, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | OT016 | DKFX03104.pdf | |
| Charleston AFB, SC | 03105 | Aug/16/2017 | SCDHEC Correspondence Re AOC I (ST013) - Approval for Draft Final Revised Corrective Action Plan received June 22, 2017, Issuance of Underground Injection Control Permit SCHE03020248M2 dated Aug 2, 2017, and Public Notice Completed Aug 11, 2017 | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | ST013 | DKFX03105.pdf | |
| Charleston AFB, SC | 03106 | Aug/15/2017 | SCDHEC Correspondence Re Review Draft Final 2017 Annual Groundwater Monitoring Report for Solid Waste Management Unit (SWMU) 108/Building 58 UST Site, received June 26, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | TU543 | DKFX03106.pdf | |
| Charleston AFB, SC | 03107 | Nov/16/2017 | SCDHEC Correspondence Re Draft Final Statement of Basis (SoB) for Solid Waste Management Unit (SWMU) 66, received October 17, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | LF004 | DKFX03107.pdf | |
| Charleston AFB, SC | 03108 | Oct/31/2017 | SCDHEC Correspondence Re Approval Draft Final Second Quarter 2017 Semi-Annual Long-term Groundwater Monitoring and Interim Measure Report for Solid Waste Management Unit (SWMU) 55, received October 4, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | FT003/FT003P-Sub | DKFX03108.pdf | |
| Charleston AFB, SC | 03109 | Sep/13/2017 | SCDHEC Correspondence Re Review Draft Final 2016 Long-Term Groundwater Monitoring Report for Solid Waste Management Unit (SWMU) 68, received June 27, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | LF006 | DKFX03109.pdf | |
| Charleston AFB, SC | 03110 | Oct/04/2017 | SCDHEC Correspondence Re Draft Final 2017 Annual Groundwater Monitoring Report Review, AOC T(TU544), Building 129, UST Permit #16344, Release reported December 16, 1993, Site-Specific Work Plan received January 31, 2017, Draft Final 2017 Annual Groundwate | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | TU544 | DKFX03110.pdf | |
| Charleston AFB, SC | 03111 | Oct/13/2017 | SCDHEC Correspondence Re Approval Response to Comments on the Draft Final 2016 Groundwater Monitoring Report for Area of Concert (AOC) P-Flight Line Drainage Ditch, received August 3, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | DD540 | DKFX03111.pdf | |
| Charleston AFB, SC | 03112 | Oct/12/2017 | SCDHEC Correspondence Re Review Draft Final 2017 Annual Groundwater Monitoring Report for Solid Waste Management Units (SWMUs) 66 and 67, received September 6, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | LF004|LF017 | DKFX03112.pdf | |
| Charleston AFB, SC | 03113 | Oct/19/2017 | SCDHEC Approval, Re Final 2017 Annual Groundwater Monitoring Report, Response to Comments, and Errata, and Site Specific Work Plan (SSWP) | Robert Dunn | SCDHEC | Dana Holsclaw | JBCHS | TU542 | DKFX03113.pdf | |
| Charleston AFB, SC | 03114 | Oct/20/2017 | SCDHEC Correspondence Re Review Draft Final 2017 Groundwater Monitoring Report for Area of Concern (AOC) P-Flight Line Drainage Ditch, received August 3, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | DD540 | DKFX03114.pdf | |
| Charleston AFB, SC | 03115 | Oct/19/2017 | SCDHEC Correspondence Re Approval Responses to SCDHEC Comments and Errata Pages, Final 2017 Annual Groundwater Monitoring Report for Solid Waste Management Unit (SWMU) 108/Building 58 UST Site, received September 7, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | TU543 | DKFX03115.pdf | |
| Charleston AFB, SC | 03116 | Sep/21/2017 | Final 2017 Land Use Control Inspection Results SWMU 55 (FT003) - Fire Protection Training Area No. 3 | Scott Saroff | FPM Remediations, Inc. | Dana Holsclaw | JBCHS | FT003/FT003P-Sub | DKFX03116.pdf | |
| Charleston AFB, SC | 03118 | Jan/11/2018 | SCDHEC Correspondence Re Review Draft/Final Revised Corrective Action Plan Modification for Area of Concern (AOC) P-Flight Line Drainage Ditch, received November 22, 2017 | William Britton | SCDHEC | Dana Holsclaw | JBCHS | DD540 | DKFX03118.pdf | |
| Charleston AFB, SC | 03119 | Nov/29/2017 | Base Letter to SCDHEC Re Reporting Planned Changes and Free Product Recovery and Sparge Well Abandonment Request, AOC P (DD540), Flight Line Drainage Ditch | Dana Holsclaw | JBCHS | William Britton | SCDHEC | DD540 | DKFX03119.pdf | |
| Charleston AFB, SC | 03120 | Mar/13/2018 | Final 2018 Annual Contractor Quality Assurance Plan (ACQAP) for the SCDHEC Underground Storage Tank (UST) Program (under cover letter, DHEC approved) | FPM Remediations, Inc. | JBCHS/SCDHEC | ST013|ST027|TU542|TU544|TU545 | DKFX03120 _DF 2018 ACQAP for USTS_ 13 March 2018.pdf | |||
| Charleston AFB, SC | 03127 | Jan/19/2017 | Draft Final UFP-QAPP Addendum for SWMUs 58, 60, 66, 67, 68, and 69 received November 17, 2016 (includes SCDHEC approval) | URS Group | Dana Holsclaw | JBCHS | LF002|LF004|LF006|LF017|OT011|OT012 | DKFX03127.pdf | ||
| Charleston AFB, SC | 03131 | Feb/07/2018 | Final Meeting Minutes Joint Base Charleston-Air/SCDHEC Tier I Partnering Meeting | Mark Holmes | AGEISS, Inc. | JBCHS/SCDHEC | DD540|FT003/FT003P-Sub|OT011|RW532|SS042|SS043|ST013|ST027|TS836|TS837|TU538|TU542|TU543|TU544|TU545|ZZ050|ZZ051 | DKFX03131.pdf | ||
| Charleston AFB, SC | 03132 | Feb/14/2018 | Final Corrective Action Plan, Modification (Revised) Area of Concern (AOC) P (DD540) Flight Line Ditch (Final Report + Approval + Correspondence + RTCs and Errata Pages) Part 1 of 3 | FPM Remediations, Inc. | AFCEC | DD540 | DKFX03132_Part1.pdf | |||
| Charleston AFB, SC | 03132 | Feb/14/2018 | Final Corrective Action Plan, Modification (Revised) Area of Concern (AOC) P (DD540) Flight Line Ditch (Final Report + Approval + Correspondence + RTCs and Errata Pages) Part 2 of 3 | FPM Remediations, Inc. | AFCEC | DD540 | DKFX03132_Part2.pdf | |||
| Charleston AFB, SC | 03132 | Feb/14/2018 | Final Corrective Action Plan, Modification (Revised) Area of Concern (AOC) P (DD540) Flight Line Ditch (Final Report + Approval + Correspondence + RTCs and Errata Pages) Part 3 of 3 | FPM Remediations, Inc. | AFCEC | DD540 | DKFX03132_Part3.pdf | |||
| Charleston AFB, SC | 03137 | May/25/2018 | Draft Final 2017 Long-Term Monitoring (LTM) Report for SWMU 60 (OT011), received April 17, 2018 (correspondence + final report) | FPM Remediations, Inc. | SCDHEC | OT011 | DKFX03137.pdf | |||
| Charleston AFB, SC | 03138 | Mar/14/2018 | Draft Final Semi-Annual Corrective Measures Implementation Progress Report No. 3 (2nd Quarter 2017 - 3rd Quarter 2017) for Zone 4 (correspondence + final report) | AECOM | SCDHEC/JBCHS | SS042 | DKFX03138.pdf | |||
| Charleston AFB, SC | 03139 | Jun/28/2018 | Final 2017 Annual Groundwater Monitoring Report for Solid Waste Management Unit (SWMU) 69 (correspondence + RTCs + errata pages + and final report) Part 1 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF002 | 576984-a.pdf | |||
| Charleston AFB, SC | 03139 | Jun/28/2018 | Final 2017 Annual Groundwater Monitoring Report for Solid Waste Management Unit (SWMU) 69 (correspondence + RTCs + errata pages + and final report) Part 2 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF002 | 576985-a.pdf | |||
| Charleston AFB, SC | 03139 | Jun/28/2018 | Final 2017 Annual Groundwater Monitoring Report for Solid Waste Management Unit (SWMU) 69 (correspondence + RTCs + errata pages + and final report) Part 3 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF002 | DKFX03139_Part3.pdf | |||
| Charleston AFB, SC | 03140 | Jan/23/2018 | Draft Final Monitoring Well Abandonment and Site Closeout Report for the Area of Concern (AOC) Z (Water Tower 1), AOC AA (Water Tower 2), and AOC BB (Water Tower 3) Sites, received November 2, 2017 (Approval + Correspondence + Report) | FPM Remediation, Inc. | SCDHEC/JBCHS | ZZ049|ZZ050|ZZ051 | DKFX03140.pdf | |||
| Charleston AFB, SC | 03141 | Jan/11/2018 | Revised Draft Final Remedial Investigation Report for AOC W, Skeet Range 1 Site and AOC X, Skeet Range 2 Site, received November 1, 2017 (with RTCs and SCDHEC Approval) Part 1 of 5 (See AR#02815, 02577, 02359 for additional correspondence) | FPM Remediations, Inc. | SCDHEC/JBCHS | TS836|TS837 | DKFX03141_Part1.pdf | |||
| Charleston AFB, SC | 03141 | Jan/11/2018 | Revised Draft Final Remedial Investigation Report for AOC W, Skeet Range 1 Site and AOC X, Skeet Range 2 Site, received November 1, 2017 (with RTCs and SCDHEC Approval) Part 2 of 5 (See AR#02815, 02577, 02359 for additional correspondence) | FPM Remediations, Inc. | SCDHEC/JBCHS | TS836|TS837 | 576989-a.pdf | |||
| Charleston AFB, SC | 03141 | Jan/11/2018 | Revised Draft Final Remedial Investigation Report for AOC W, Skeet Range 1 Site and AOC X, Skeet Range 2 Site, received November 1, 2017 (with RTCs and SCDHEC Approval) Part 3 of 5 (See AR#02815, 02577, 02359 for additional correspondence) | FPM Remediations, Inc. | SCDHEC/JBCHS | TS836|TS837 | DKFX03141_Part3.pdf | |||
| Charleston AFB, SC | 03141 | Jan/11/2018 | Revised Draft Final Remedial Investigation Report for AOC W, Skeet Range 1 Site and AOC X, Skeet Range 2 Site, received November 1, 2017 (with RTCs and SCDHEC Approval) Part 4 of 5 (See AR#02815, 02577, 02359 for additional correspondence) | FPM Remediations, Inc. | SCDHEC/JBCHS | TS836|TS837 | DKFX03141_Part4.pdf | |||
| Charleston AFB, SC | 03141 | Jan/11/2018 | Revised Draft Final Remedial Investigation Report for AOC W, Skeet Range 1 Site and AOC X, Skeet Range 2 Site, received November 1, 2017 (with RTCs and SCDHEC Approval) Part 5 of 5 (See AR#02815, 02577, 02359 for additional correspondence) | FPM Remediations, Inc. | SCDHEC/JBCHS | TS836|TS837 | DKFX03141_Part5.pdf | |||
| Charleston AFB, SC | 03142 | May/29/2018 | Final Site Closeout Report SWMU 147 (TU538) - Building 672 UST | FPM Remediations, Inc. | Dana Holsclaw | JBCHS | TU538 | DKFX03142.pdf | ||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 1 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143_Part1.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 10 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 578622A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 11 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 578623A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 12 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 578625A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 13 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 578628A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 14 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part14.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 15 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part15.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 16 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part16.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 17 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part17.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 18 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part18.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 19 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part19.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 2 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143_Part2.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 20 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | DKFX03143 re-optimized_Part20.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 3 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 576995A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 4 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 576996A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 5 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 576998A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 6 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 577006A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 7 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 577007A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 8 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 578620A.pdf | |||
| Charleston AFB, SC | 03143 | May/18/2018 | Final SWMU 118 (RW532) - Building 371 Former Wask Rack Supplemental RCRA Facility Investigation Report (Approval + RTCs + Errata Pages + Report) Part 9 of 20 | FPM Remediations, Inc. | SCDHEC/JBCHS | RW532 | 578621A.pdf | |||
| Charleston AFB, SC | 03144 | Jun/27/2018 | Draft Final Corrective Measures Implementation (CMI) Report for SWMUs 58, 60, 66, and 67, received June 6, 2018 (Approval + Correspondence + Report) Part 1 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF004|LF017|OT011|OT012 | 577443a.pdf | |||
| Charleston AFB, SC | 03144 | Jun/27/2018 | Draft Final Corrective Measures Implementation (CMI) Report for SWMUs 58, 60, 66, and 67, received June 6, 2018 (Approval + Correspondence + Report) Part 2 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF004|LF017|OT011|OT012 | 577444a.pdf | |||
| Charleston AFB, SC | 03144 | Jun/27/2018 | Draft Final Corrective Measures Implementation (CMI) Report for SWMUs 58, 60, 66, and 67, received June 6, 2018 (Approval + Correspondence + Report) Part 3 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF004|LF017|OT011|OT012 | 578619a.pdf | |||
| Charleston AFB, SC | 03144 | Jun/27/2018 | Draft Final Corrective Measures Implementation (CMI) Report for SWMUs 58, 60, 66, and 67, received June 6, 2018 (Approval + Correspondence + Report) Part 3 of 3 - Superseded 29-OCT-2018 08.05.18 | JBCHS | SCDHEC | LF004|LF017|OT011|OT012 | DKFX03144_Part3.pdf | |||
| Charleston AFB, SC | 03145 | Jun/22/2018 | Draft Final Corrective Action Plan Implementation Report Review AOC I (ST013), Base Gasoline Station Leak, Site-Specific Work Plan received March 9, 2018, Draft Final Corrective Action Plan Implementation Report received June 5, 2018 Part 1 of 4 | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX03145_Part1.pdf | |||
| Charleston AFB, SC | 03145 | Jun/22/2018 | Draft Final Corrective Action Plan Implementation Report Review AOC I (ST013), Base Gasoline Station Leak, Site-Specific Work Plan received March 9, 2018, Draft Final Corrective Action Plan Implementation Report received June 5, 2018 Part 2 of 4 | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX03145_Part2.pdf | |||
| Charleston AFB, SC | 03145 | Jun/22/2018 | Draft Final Corrective Action Plan Implementation Report Review AOC I (ST013), Base Gasoline Station Leak, Site-Specific Work Plan received March 9, 2018, Draft Final Corrective Action Plan Implementation Report received June 5, 2018 Part 3 of 4 | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | 577448-2A1.pdf | |||
| Charleston AFB, SC | 03145 | Jun/22/2018 | Draft Final Corrective Action Plan Implementation Report Review AOC I (ST013), Base Gasoline Station Leak, Site-Specific Work Plan received March 9, 2018, Draft Final Corrective Action Plan Implementation Report received June 5, 2018 Part 4 of 4 | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX03145_Part3_Part2.pdf | |||
| Charleston AFB, SC | 03146 | Jun/29/2018 | Draft Final 2018 Annual Groundwater and Surface Water Monitoring Report for SWMUs 66 (LF004 -Landfill No. 1), and 67 (LF017 - Landfill No. 2) (Approval + Correspondence + Report) Part 1 of 4 | Christi Pickett | SCDHEC | Dana Holsclaw | JBCHS | LF004|LF017 | 595246_a.pdf | |
| Charleston AFB, SC | 03146 | Jun/29/2018 | Draft Final 2018 Annual Groundwater and Surface Water Monitoring Report for SWMUs 66 (LF004 -Landfill No. 1), and 67 (LF017 - Landfill No. 2) (Approval + Correspondence + Report) Part 2 of 4 | Christi Pickett | SCDHEC | Dana Holsclaw | JBCHS | LF004|LF017 | 595247_a.pdf | |
| Charleston AFB, SC | 03146 | Jun/29/2018 | Draft Final 2018 Annual Groundwater and Surface Water Monitoring Report for SWMUs 66 (LF004 -Landfill No. 1), and 67 (LF017 - Landfill No. 2) (Approval + Correspondence + Report) Part 3 of 4 | Christi Pickett | SCDHEC | Dana Holsclaw | JBCHS | LF004|LF017 | 595248_a.pdf | |
| Charleston AFB, SC | 03146 | Jun/29/2018 | Draft Final 2018 Annual Groundwater and Surface Water Monitoring Report for SWMUs 66 (LF004 -Landfill No. 1), and 67 (LF017 - Landfill No. 2) (Approval + Correspondence + Report) Part 4 of 4 | Christi Pickett | SCDHEC | Dana Holsclaw | JBCHS | LF004|LF017 | 595249_a.pdf | |
| Charleston AFB, SC | 03154 | Jan/01/2016 | Final Preliminary Assessment (PA) Report for Perfluorinated Compounds at Joint Base Charleston South Carolina (See AR#02884) | CH2M HILL | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03154 Final_Preliminary_Assessment_Report_Charleston.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, SCDHEC Review) Part 1 of 6 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part1.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, SCDHEC Review) Part 1 of 6 - Superseded 14-DEC-2020 15.36.54 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part1.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, and SCDHEC Review) Part 2 of 6 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part2.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, and SCDHEC Review) Part 3 of 6 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part3.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, and SCDHEC Review) Part 4 of 6 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part4.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, and SCDHEC Review) Part 5 of 6 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part5.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, and SCDHEC Review) Part 6 - Superseded 14-DEC-2020 15.49.45 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part6.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charleston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, and SCDHEC Review) Part 6 of 6 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part6.pdf | ||
| Charleston AFB, SC | 03155 | May/29/2018 | Final Site Inspections Report of Fire Fighting Foam Usage at Joint Base Charleston-Air, Charlston County, and North Auxiliary Airfield, Orangeburg County, South Carolina (Correspondence, RTCs, SCDHEC Review) Part 1 of 6 - Superseded 22-JUL-2020 08.44.24 | Aerostar SES LLC | Dana Holsclaw | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | DKFX03155 Final Joint Base Charleston SI Report 29 May 2018_Part1.pdf | ||
| Charleston AFB, SC | 03156 | Aug/17/2018 | Draft Final March 2018 Semi-Annual Groundwater Monitoring Letter Report, AOC O and OT-16 (under Cover Letter, with Approval) | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX03156.pdf | |||
| Charleston AFB, SC | 03158 | Apr/05/2019 | Draft Final Corrective Action Plan (CAP) Amendment for Mobile Biosparge Soil and Groundwater Treatment at AOC I (ST013), SWMU 145 (ST027), AOC T (TU544), and AOC U (TU545) and Underground Injection Control Permit Effective April 1, 2019 for AOC I | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013|ST027|TU544|TU545 | DKFX03158.pdf | |||
| Charleston AFB, SC | 03160 | Feb/11/2019 | Draft Final 2018 Annual Groundwater Monitoring Report and Corrective Action System Evaluation Report - May 2018 Event, AOC 1 (ST013) Base Gasoline Station Leak (+ Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX03160_2018 GWMR, CASE rpt May 2018.pdf | |||
| Charleston AFB, SC | 03162 | Feb/11/2019 | Draft Final Corrective Action System Evaluation (CASE) Report, June 2018 Event, AOC I (ST013), Base Gasoline Leak (Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX03158.pdf | |||
| Charleston AFB, SC | 03188 | Apr/22/2019 | Draft Final Corrective Action System Evaluation Report, September and December 2018 Events, AOC U (TU545) Building 1800 Former Diesel Underground Storage Tank (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | TU545 | DKFX03188.pdf | |||
| Charleston AFB, SC | 03189 | Aug/30/2019 | Draft Final 2019 Annual Groundwater Monitoring Report, SWMU 108 (TU543) Building 58 Underground Storage Tank (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | TU543 | DKFX03189.pdf | |||
| Charleston AFB, SC | 03190 | Apr/01/2019 | Draft Final 2018 Semi-Annual Groundwater Monitoring Report, Corrective Action System Evaluation (CASE) Report - June and September 2018, SWMU 145 (ST027) Building 575 JP-4 Tank Leak (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | ST027 | DKFX03190.pdf | |||
| Charleston AFB, SC | 03191 | Sep/12/2019 | Draft Final Site Closeout Report, SWMU 28 (SA501) - AH-1 Waste Accumulation Area (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | SA501 | DKFX03191.pdf | |||
| Charleston AFB, SC | 03192 | Apr/18/2019 | Draft Final Interim Measure Workplan for Mobile Biosparge Groundwater Treatment SWMU 108 (TU543) - Building 58 UST (+Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | TU543 | DKFX03192.pdf | |||
| Charleston AFB, SC | 03193 | Apr/01/2019 | Draft Final 2019 Site Specific Work Plan (SSWP), SWMU 145 (ST027), Building 575 JP-4 Tank Leak, UST Permit #01823 | FPM Remediations, Inc. | SCDHEC/JBCHS | ST027 | DKFX03193.pdf | |||
| Charleston AFB, SC | 03194 | Mar/10/2020 | Draft Final Corrective Action System Evaluation (CASE) Report, August and November 2019 Events, AOC 1 (ST013) Base Gasoline Station Leak (+ Correspondence and Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | ST013 | DKFX03194.pdf | |||
| Charleston AFB, SC | 03195 | May/17/2016 | Draft Final Corrective Measures Study (CMS) Report for SWMU 28 (SA501) | FPM Remediations, Inc. | William Britton | SCDHEC | SA501 | DKFX03195.pdf | ||
| Charleston AFB, SC | 03196 | Jun/25/2012 | Sampling and Analysis Plan for Groundwater Sampling and Monitoring Well Installation Request, SWMU 28 AH-1 Waste Accumulation Area | Dana Holsclaw | JBCHS | Christi Pickett | SCDHEC | SA501 | DKFX03196.pdf | |
| Charleston AFB, SC | 03197 | May/26/2015 | Draft Final Corrective Measures Study, Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP), SWMU 28 AH-1 Waste Accumulation Area (SA501) | FPM Remediations, Inc. | SCDHEC/JBCHS | SA501 | DKFX03197.pdf | |||
| Charleston AFB, SC | 03198 | Jul/19/2018 | Draft Final Monitoring Well Abandonment Plan for SWMU 28, Correspondence and Approval | Dana Holsclaw | JBCHS | William Britton | SCDHEC | SA501 | DKFX03198.pdf | |
| Charleston AFB, SC | 03199 | May/04/2018 | RCRA Final Permit Modification, Effective May 4, 2018. Permit Number SC3 570 024 460 | SCDHEC | JBCHS | AT551/AT552P|DD539|DD540|DP032|DP033|DP034|DP035|FT003/FT003P-Sub|FT005|FT009|FT010|FT019|FT020|LF002|LF004|LF006|LF017|OT007|OT011|OT012|OT016|OT038|OT040|OT550|OW507|OW508|OW509|OW510|OW511|OW512|OW513|OW514|OW515|OW516|OW517|OW518|OW519|OW520|OW521|RW052|RW530|RW532|RW533|RW534|RW536|RW537|SA501|SA502|SD014|SD015|SD018|SD021|SS022|SS023|SS026|SS038|SS039|SS041|SS042|SS043|SS044|SS046|ST-01|ST001|ST013|ST027|ST028|ST029|ST030|TS836|TS837|TS838|TU047|TU048|TU522|TU523|TU524|TU525|TU526|TU527|TU528|TU538|TU542|TU543|TU544|TU545|WP008|WP024|WP025|WP036|ZZ049|ZZ050|ZZ051 | DKFX#03199.pdf | |||
| Charleston AFB, SC | 03200 | Jul/31/2019 | RCRA Part B Final Permit, Effective July 31, 2019 through August 16, 2029. Permit Number SC3 570 024 460 | SCDHEC | JBCHS | AT551/AT552P|DD539|DD540|DP032|DP033|DP034|DP035|FT003/FT003P-Sub|FT005|FT009|FT010|FT019|FT020|LF002|LF004|LF006|LF017|OT007|OT011|OT012|OT016|OT038|OT040|OT550|OW507|OW508|OW509|OW510|OW511|OW512|OW513|OW514|OW515|OW516|OW517|OW518|OW519|OW520|OW521|RW052|RW530|RW532|RW533|RW534|RW536|RW537|SA501|SA502|SD014|SD015|SD018|SD021|SS022|SS023|SS026|SS038|SS039|SS041|SS042|SS043|SS044|SS046|ST-01|ST001|ST013|ST027|ST028|ST029|ST030|TS836|TS837|TS838|TU047|TU048|TU522|TU523|TU524|TU525|TU526|TU527|TU528|TU538|TU542|TU543|TU544|TU545|WP008|WP024|WP025|WP036|ZZ049|ZZ050|ZZ051 | JBCA RCRA Part B Permit_31Jul2019.pdf | |||
| Charleston AFB, SC | 03201 | Oct/16/1990 | SCDHEC Memorandum RE Final Technical Document to Support No Further Action at Sites 9, 11, 15, 16, 18, and 19 | Joe Bowers | SCDHEC | David Baize | SCDHEC | FT009|FT019|FT020|OT012|SS022|SS023 | DKFX#03201.pdf | |
| Charleston AFB, SC | 03202 | Aug/16/1999 | SCDHEC Approval, No Further Response Action Planned (NFRAP) Documents for SWMU 57 | David Scaturo | SCDHEC | Al Urrutia | JBCHS | FT020 | DKFX#03202.pdf | |
| Charleston AFB, SC | 03203 | Jun/02/2020 | SCDHEC Correspondence, RE Clarification regarding PFOS/PFOA Investigations at North Auxillary Airfield (NAAF, FT010), Concurrence for No Further Response Action Planned (NFRAP) | William Britton | SCDHEC | Christopher Wargo | JBCHS | FT010 | DKFX03203.pdf | |
| Charleston AFB, SC | 03203 | Jun/02/2020 | SCDHEC Correspondence, RE Clarification regarding PFOS/PFOA Investigations at North Auxillary Airfield (NAAF, FT010), Concurrence for No Further Response Action Planned (NFRAP) - Superseded 24-JUL-2020 10.24.59 | William Britton | SCDHEC | Christopher Wargo | JBCHS | FT010 | DKFX03203.pdf | |
| Charleston AFB, SC | 03204 | May/08/2012 | SDHEC Comments on Data Gap Investigation for SWMU 28, received Feb 12, 2012 | Christi Pickett | SCDHEC | Dana Holsclaw | JBCHS | SA501 | DKFX03204.pdf | |
| Charleston AFB, SC | 03205 | Jun/19/2020 | DRAFT Relative Risk Site Evaluation (RRSE) Fact Sheet for PUBLIC REVIEW, Aqueous Film Forming Foam (AFFF) Sites 1, 2, 3, 4, 5, 6, 7, 8, and 9, PFOS/PFOA Investigations | AFCEC Environmental Restoration Program | Chris Wargo | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | JB_Charleston_ESOHMIS_RRSE_23062020.pdf | ||
| Charleston AFB, SC | 03205 | Jun/19/2020 | DRAFT Relative Risk Site Evaluation (RRSE) Fact Sheet for PUBLIC REVIEW, Aqueous Film Forming Foam (AFFF) Sites 1, 2, 3, 4, 5, 6, 7, 8, and 9, PFOS/PFOA Investigations - Superseded 05-AUG-2020 11.29.02 | AFCEC Environmental Restoration Program | Chris Wargo | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | JB_Charleston_ESOHMIS_RRSE_23062020.pdf | ||
| Charleston AFB, SC | 03205 | Jun/19/2020 | DRAFT Relative Risk Site Evaluation (RRSE) Fact Sheet for PUBLIC REVIEW, Aqueous Film Forming Foam (AFFF) Sites 1, 2, 3, 4, 5, 6, 7, 8, and 9, PFOS/PFOA Investigations - Superseded 21-AUG-2020 13.31.53 | AFCEC Environmental Restoration Program | Chris Wargo | JBCHS | JB_Charleston_ESOHMIS_RRSE_23062020.pdf | |||
| Charleston AFB, SC | 03205 | Jun/19/2020 | DRAFT Relative Risk Site Evaluation (RRSE) Fact Sheet for PUBLIC REVIEW, Aqueous Film Forming Foam (AFFF) Sites 1, 2, 3, 4, 5, 6, 7, 8, and 9, PFOS/PFOA Investigations - Superseded 30-JUL-2020 12.27.40 | Chris Wargo | JBCHS | AT551/AT552P|FT003/FT003P-Sub|FT010|SA001P|SS001P|SS002P|SS005P|SS006P | JB_Charleston_ESOHMIS_RRSE_23062020.pdf | |||
| Charleston AFB, SC | 03206 | Dec/05/2019 | Draft Final August 2019 Semi-Annual Groundwater Monitoring Letter Report, AOC O and OT-16 (Correspondence and SCDHEC Approval) | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX03206_Draft Final AOC O OT-16 Aug 2019 Sampling Letter Report_ 5 Dec 2019.pdf | |||
| Charleston AFB, SC | 03207 | May/26/2020 | Draft Final 2019 Long Term Management Report, SWMU 68 (LF006) (Correspondence and SCDHEC Approval) Part 1 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF006 | DKFX03207_Draft Final 2019 SWMU 68 LTM Report_LF006_ 26 May 2020.pdf | |||
| Charleston AFB, SC | 03207 | May/26/2020 | Draft Final 2019 Long Term Management Report, SWMU 68 (LF006) (Correspondence and SCDHEC Approval) Part 2 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF006 | DKFX03207_Draft Final 2019 SWMU 68 LTM Report_LF006_ 26 May 2020_Part2.pdf | |||
| Charleston AFB, SC | 03207 | May/26/2020 | Draft Final 2019 Long Term Management Report, SWMU 68 (LF006) (Correspondence and SCDHEC Approval) Part 3 of 3 | FPM Remediations, Inc. | SCDHEC/JBCHS | LF006 | DKFX03207_Draft Final 2019 SWMU 68 LTM Report_LF006_ 26 May 2020_Part3of 3.pdf | |||
| Charleston AFB, SC | 03208 | May/26/2020 | Draft Final 2019 Annual Groundwater Monitoring Report, SWMU 69 (LF002) (Correspondence and SCDHEC Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | LF002 | DKFX03208_Draft Final 2019 SWMU 69 LTM Report_LF002_ 26 May 2020.pdf | |||
| Charleston AFB, SC | 03223 | Apr/07/2020 | Errata Pages for the Draft Final UFP-QAPP for Architect-Engineering Services to Support Supplemental Remedial Investigation and Groundwater Sampling at AOC O and OT-16 Work Plan (Amends AR#03214) | URS Group, Inc. | SCDHEC/JBCHS | OT016|ST001 | DKFX03223_Draft Final AOC-O-OT-16 UFP-QAPP errata amended 2020-02, signed.pdf | |||
| Charleston AFB, SC | 03224 | Mar/02/2021 | Draft Final 2020 Annual Groundwater Monitoring/Corrective Measures Implementation (CMI) Progress Report, Zone 2 (OT016) (All correspondence, errata, and SCDHEC Approval) | FPM Remediations, Inc. | SCDHEC/JBCHS | OT016 | AR_JBCA Zone 2 (OT016) 2020 LTM Report.pdf | |||
| Charleston AFB, SC | 03225 | Mar/02/2021 | Draft Final 2020 Zone 2 (OT016) Long-Term Monitoring (LTM) Supplemental Groundwater Data Report (Correspondence and SCDHEC Approval) | URS Group, Inc. | SCDHEC/JBCHS | OT016 | DKFX03225_JBCA Zone 2 (OT016) 2020 LTM Supplemental Report_2 Mar 2021.pdf | |||
| Charleston AFB, SC | 03226 | Mar/03/2021 | Draft Final 2020 Long-Term Monitoring (LTM) Report for SWMU 60 (OT011) (Correspondence and SCDHEC Approval) | URS Group, Inc. | FPM Remediations, Inc | SCDHEC/JBCHS | OT011 | DKFX03226_Draft Final 2020 SWMU 60 LTM Report_3 Mar 2021.pdf | ||
| Charleston AFB, SC | 03227 | Feb/10/2021 | Draft Final Site-Specific Work Plan (SSWP) for Groundwater Sampling, AOC T (TU544) Bldg. 129 (Correspondence and SCDHEC Approval) | Niels van Hoesel | FPM Remediations, Inc. | SCDHEC/JBCHS | TU544 | DKFX03227_PSro.pdf |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .