DRAFT RFP W912HN23R1000.pdf
PDF 4 MB Posted
- Solicitation number
- W912HN23R1000
About this file
This request for proposal outlines environmental remediation services at multiple military bases. The contractor will undertake activities at fifty-four Installation Restoration Program sites and eleven Military Munitions Response Program sites at Joint Base Charleston in South Carolina and North Carolina, and Seymour Johnson Air Force Base in North Carolina. Services include maintaining remedies, optimizing applicable sites, and achieving site-specific objectives over ten years. The solicitation will utilize best value tradeoff for evaluation, weighting technical approach highest, then past performance, and price least important. The electronic proposal due date will be specified in the solicitation to be issued on or about January 31, 2023 exclusively through Procurement Integrated Enterprise Environment.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until TBD local time TBD
X
A X B X C
D
EX
X G F 683 - 698
699 - 711 X H 712 - 719
David.a.jimenez@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 719
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912HN 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
PIEE
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
DAVID A JIMENEZ 912-652-5165
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 443
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
444 - 555 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
556 - 572 573 - 611
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 612 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 613 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
614 - 681
PART II - CONTRACT CLAUSES
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912HN23R1000
Version 1 January 2023 Page 2
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Complete Project Management Plan (PMP)-FFP
INFO ONLY. Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS).
NET AMT
0001AA 1 Job Complete PMP-FFP
Base Year - Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS). Period of Performance is one (1) year.
FOB: Destination
PSC CD: F999
Version 1 January 2023 Page 3
0001AB 1 Job OPTION Update PMP-FFP
Option Task - Update PMP in accordance with Table 1 of the Performance Work Statement (PWS). Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Transition PBR Documents-FFP
INFO ONLY. Finalize and complete unfinished and transitioned Performance Based Remediation (PBR) documents in accordance with paragragh 1.3.2 and 8.2 of the PWS.
Version 1 January 2023 Page 4
0002AA 1 Job OPTION Transition PBR Documents-FFP
Option Tasks - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Air. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0002AB 1 Job OPTION Transition PBR Documents-FFP
Option Tasks - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Weapons. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 5
0002AC 1 Job OPTION Transition PBR Documents-FFP
Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for SJAFB. Once exercised, the Period of Performance is three
(3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Develop IMS / MPS and Update Quarterly-FFP
INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS.
Version 1 January 2023 Page 6
0003AA 1 Job Develop IMS and MPS-FFP
Base Year - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS.
Period of Performance is one (1) year.
0003AB 1 Job OPTION Update IMS and MPS-FFP
Option Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 7
0003AC 1 Job OPTION Update IMS and MPS-FFP
Option Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AD 1 Job OPTION Update IMS and MPS-FFP
Option Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 8
0003AE 1 Job OPTION Update IMS and MPS-FFP
Option Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AF 1 Job OPTION Update IMS and MPS-FFP
Option Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 9
0003AG 1 Job OPTION Update IMS and MPS-FFP
Option Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AH 1 Job OPTION Update IMS and MPS-FFP
Option Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 10
0003AJ 1 Job OPTION Update IMS and MPS-FFP
Option Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AK 1 Job OPTION Update IMS and MPS-FFP
Option Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 11
JBC-Air Basewide QPPs-FFP
INFO ONLY. Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS.
0004AA 1 Job JBC-Air Basewide QPPs-FFP
Base Year - Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Period of Performance is one (1) year.
Version 1 January 2023 Page 12
0004AB 1 Job OPTION JBC-Air Basewide QPPs-FFP
Option Tasks - Update basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air RAB Support-FFP
INFO ONLY. Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS.
Version 1 January 2023 Page 13
0005AB 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 2 (FY24) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AC 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 3 (FY25) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 14
0005AD 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 4 (FY26) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AE 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 5 (FY27) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 15
0005AF 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 6 (FY28) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AG 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 7 (FY29) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 16
0005AH 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 8 (FY30) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AJ 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 9 (FY31) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 17
0005AK 1 Job OPTION JBC-Air RAB Support-FFP
Option Year 10 (FY32) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air CIP-FFP
INFO ONLY. Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS.
Version 1 January 2023 Page 18
0006AA 1 Job JBC-Air CIP-FFP
Base Year - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Period of Performance is one (1) year.
0006AB 1 Job OPTION JBC-Air CIP-FFP
Option Year 3 (FY25) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 19
0006AC 1 Job OPTION JBC-Air CIP-FFP
Option Year 5 (FY27) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0006AD 1 Job OPTION JBC-Air CIP-FFP
Option Year 7 (FY29) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 20
0006AE 1 Job OPTION JBC-Air CIP-FFP
Option Year 9 (FY31) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air Basewide Well IIRAR-FFP
INFO ONLY. Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the
PWS.
Version 1 January 2023 Page 21
0007AA 1 Job JBC-Air Basewide Well IIRAR-FFP
Base Year (FY23) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Period of Performance is one (1) year.
0007AB 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 2 (FY24) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 22
0007AC 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 3 (FY25) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007AD 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 4 (FY26) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
Version 1 January 2023 Page 23
0007AE 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 5 (FY27) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AF 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 6 (FY28) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
Version 1 January 2023 Page 24
0007AG 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 7 (FY29) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AH 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 8 (FY30) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
Version 1 January 2023 Page 25
0007AJ 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 9 (FY31) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007AK 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Year 10 (FY32) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 26
0007CA 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP
Option Task - Abandon up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CB 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP
Option Task - Abandon up to five (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 27
0007CC 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP
Option Task - Abandon up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CD 1 Job OPTION JBC-Air - Install Basewide Wells-FFP
Option Task - Install up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 28
0007CE 1 Job OPTION JBC-Air - Install Basewide Wells-FFP
Option Task - Install up to fiive (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CF 1 Job OPTION JBC-Air - Install Basewide Wells-FFP
Option Task - Install up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 29
JBC-Air Tier I Meetings-FFP
INFO ONLY. Complete tier I meeting facilitation and support for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS.
0008AB 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 2 (FY24) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 30
0008AC 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 3 (FY25) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AD 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 4 (FY26) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 31
0008AE 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 5 (FY27) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AF 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 6 (FY28) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 32
0008AG 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 7 (FY29) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AH 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 8 (FY30) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 33
0008AJ 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 9 (FY31) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AK 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Year 10 (FY32) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 34
0009 1 Job JBC-Air Dioxane Sampling and Reporting-FFP
Base Year - complete 1,4 Dioxane sampling and reporting for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.
0010 1 Job JBC-Air Vapor Intrusion Study-FFP
Base Year - complete basewide Vapor Intrusion Study for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.
Version 1 January 2023 Page 35
0011 1 Job JBC-Air Basewide Background Studies-FFP
Base Year - complete basewide Background Studies for pesticides, PAHs, metals for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.
0012 1 Job OPTION JBC-Air Installation RCRA Permit-FFP
Option Year 6 (FY28) - support renewal of the installation RCRA permit for JBC- Air in accordance with paragragh 1.1 and 4.10 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 36
JBC-Air, Site DD540 (AOC P)-FFP
INFO ONLY. Site DD540 (AOC P): Conduct RA-O with optimization for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.
0013AA 1 Job JBC-Air, Site DD540 (AOC P)-FFP
Base Year - Site DD540 (AOC P): Prepare Performance Model and achieve the interim performance goals years 2 and 3 for JBC-Air in accordance with paragragh
1.2.4 and Table 1 of the PWS. Period of Performance is five (5) years.
Version 1 January 2023 Page 37
0013AB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task - Achieve the performance goals years 4, 5, and 6 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013AC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task - Achieve the performance goals years 7, 8 and develop an Optimization Summary and Forecasting Report for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 38
0013AD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task - Achieve the performance goal year 9 and final performance goal year 10 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.
Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CA 1 Job JBC-Air, Site DD540 (AOC P)-FFP
Base Year - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Period of Performance is three (3) years.
Version 1 January 2023 Page 39
0013CB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 2 (FY24) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 3 (FY25) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 40
0013CD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 4 (FY26) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CE 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 5 (FY27) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 41
0013CF 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 6 (FY28) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CG 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 7 (FY29) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 42
0013CH 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 8 (FY30) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CJ 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 9 (FY31) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 43
0013CK 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Year 10 (FY32) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air, Site FT003 (SWMU 55)-FFP
INFO ONLY. Site FT003 (SWMU 55): Conduct RA-O/LTM and reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS.
Version 1 January 2023 Page 44
0014CA 1 Job JBC-Air, Site FT003 (SWMU 55)-FFP
Base Year - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Period of Performance is three (3) years.
0014CB 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 2 (FY24) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 45
0014CC 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 3 (FY25) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CD 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 4 (FY26) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 46
0014CE 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 5 (FY27) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CF 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 6 (FY28) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 47
0014CG 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 7 (FY29) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CH 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 8 (FY30) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC, and complete the Reduce LCC Summary Report for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 48
0014CJ 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 9 (FY31) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CK 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Year 10 (FY32) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 49
JBC-Air, Site LF002 (SWMU 69)-FFP
INFO ONLY. Site LF002 (SWMU 69): Conduct LTM for JBC-Air in accordance with Table 1 of the PWS.
0015CA 1 Job JBC-Air, Site LF002 (SWMU 69)-FFP
Base Year - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.
Version 1 January 2023 Page 50
0015CB 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 2 (FY24) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CC 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 3 (FY25) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 51
0015CD 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 4 (FY26) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CE 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 5 (FY27) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 52
0015CF 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 6 (FY28) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CG 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 7 (FY29) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 53
0015CH 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 8 (FY30) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CJ 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 9 (FY31) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Version 1 January 2023 Page 54
0015CK 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Year 10 (FY32) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air, Site LF004 (SWMU 66)-FFP
INFO ONLY. Site LF004 (SWMU 66): Conduct LTM for JBC-Air in accordance
Version 1 January 2023 Page 55
0016CA 1 Job JBC-Air, Site LF004 (SWMU 66)-FFP
Base Year - Site LF004 (SWMU 66): Maintain…