DRAFT RFP W912HN23R1000.pdf

PDF 4 MB Posted

Attached to
FY23 Carolina Group OPTIMIZED REMEDIATION CONTRACT
Solicitation number
W912HN23R1000
Issued by

About this file

This request for proposal outlines environmental remediation services at multiple military bases. The contractor will undertake activities at fifty-four Installation Restoration Program sites and eleven Military Munitions Response Program sites at Joint Base Charleston in South Carolina and North Carolina, and Seymour Johnson Air Force Base in North Carolina. Services include maintaining remedies, optimizing applicable sites, and achieving site-specific objectives over ten years. The solicitation will utilize best value tradeoff for evaluation, weighting technical approach highest, then past performance, and price least important. The electronic proposal due date will be specified in the solicitation to be issued on or about January 31, 2023 exclusively through Procurement Integrated Enterprise Environment.

View the file

Other files

File Type Posted
Site Visit Enclosure 3 - SJAFB Special Events Pass Request - Guest Info Sheet.xlsx XLSX spreadsheet
PWS Enclosure 2A - Admin Record_Charleston AFB-Air SC_Aug 01 2022.xlsx XLSX spreadsheet
RFP Enclosure 5 - JBCA_Bldg 532 JG10E-2423 SVE Manual.pdf PDF
PWS Enclosure 3 - CIP Update PWS and Outline v2.docx DOCX document
PWS Enclosure 5 - CPSMR template- 25Aug2019.docx DOCX document
RFP Enclosure 1 - AFCEC Chemistry Data Quality Fact Sheet April 2020.pdf PDF
Site Visit Enclosure 2 - SJAFB Special Events Pass Request.pdf PDF
RFP Enclosure 2 - AFCECCZTE Chemistry UFP-QAPP.pdf PDF
PWS Enclosure 2A - Admin Record_Charleston-Weapons Station SC_Aug 01 2022.xlsx XLSX spreadsheet
RFP Enclosure 4 - Interim Guidance on 1-4 Dioxane Environmental Restoration Program.pdf PDF
RFP Enclosure 6 - JBCA_Bldg 543 SVE Manual_Optimized.pdf PDF
RFP Section L Attachment 4 - Proposal Schedule.xlsx XLSX spreadsheet
PWS Enclosure 6 - ORC PMP Guidance v3.1_20221201.docx DOCX document
Site Visit Enclosure 1 - Joint Base Charleston Base Access Worksheet - Form 111 (Aug 22).pdf PDF
PWS Enclosure 1 - ACRONYMS AND DEFINITIONS.docx DOCX document
PWS Enclosure 2B - GFI Spreadsheets 2.0.xlsx XLSX spreadsheet
RFP Enclosure 3 - AFGM2019-32-01 AFFF Related Waste Mgmt Implementation Guidance 5 September 2019_508.pdf PDF
RFP Section L Attachments 1-3.docx DOCX document
PWS Enclosure 4 - FY23 Carolina Group ORC_Final Sub-CLINs.xlsx XLSX spreadsheet
PWS Enclosure 2C - SITE ADDED CONSIDERATIONS SUMMARIES.docx DOCX document
PWS Enclosure 2A - Admin Record_Seymour Johnson AFB NC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Seymour Johnson AFB NC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC_Final Sub-CLINs_17 Nov 22.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosure 2B - GFI Spreadsheets 2.0.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosures 1 - 2B.docx DOCX document
FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Charleston AFB-Air SC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Charleston-Weapons Station SC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC_Final PWS_28NOV22.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until TBD local time TBD

X

A X B X C

D

EX

X G F 683 - 698

699 - 711 X H 712 - 719

David.a.jimenez@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 719

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912HN 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

PIEE

conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

DAVID A JIMENEZ 912-652-5165

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 443

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

444 - 555 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

556 - 572 573 - 611

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 612 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 613 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

614 - 681

PART II - CONTRACT CLAUSES

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912HN23R1000

Version 1 January 2023 Page 2

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Complete Project Management Plan (PMP)-FFP

INFO ONLY. Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS).

NET AMT

0001AA 1 Job Complete PMP-FFP

Base Year - Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS). Period of Performance is one (1) year.

FOB: Destination

PSC CD: F999

Version 1 January 2023 Page 3

0001AB 1 Job OPTION Update PMP-FFP

Option Task - Update PMP in accordance with Table 1 of the Performance Work Statement (PWS). Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Transition PBR Documents-FFP

INFO ONLY. Finalize and complete unfinished and transitioned Performance Based Remediation (PBR) documents in accordance with paragragh 1.3.2 and 8.2 of the PWS.

Version 1 January 2023 Page 4

0002AA 1 Job OPTION Transition PBR Documents-FFP

Option Tasks - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Air. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0002AB 1 Job OPTION Transition PBR Documents-FFP

Option Tasks - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Weapons. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 5

0002AC 1 Job OPTION Transition PBR Documents-FFP

Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for SJAFB. Once exercised, the Period of Performance is three

(3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Develop IMS / MPS and Update Quarterly-FFP

INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS.

Version 1 January 2023 Page 6

0003AA 1 Job Develop IMS and MPS-FFP

Base Year - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS.

Period of Performance is one (1) year.

0003AB 1 Job OPTION Update IMS and MPS-FFP

Option Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 7

0003AC 1 Job OPTION Update IMS and MPS-FFP

Option Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AD 1 Job OPTION Update IMS and MPS-FFP

Option Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 8

0003AE 1 Job OPTION Update IMS and MPS-FFP

Option Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AF 1 Job OPTION Update IMS and MPS-FFP

Option Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 9

0003AG 1 Job OPTION Update IMS and MPS-FFP

Option Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AH 1 Job OPTION Update IMS and MPS-FFP

Option Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 10

0003AJ 1 Job OPTION Update IMS and MPS-FFP

Option Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AK 1 Job OPTION Update IMS and MPS-FFP

Option Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 11

JBC-Air Basewide QPPs-FFP

INFO ONLY. Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS.

0004AA 1 Job JBC-Air Basewide QPPs-FFP

Base Year - Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Period of Performance is one (1) year.

Version 1 January 2023 Page 12

0004AB 1 Job OPTION JBC-Air Basewide QPPs-FFP

Option Tasks - Update basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air RAB Support-FFP

INFO ONLY. Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS.

Version 1 January 2023 Page 13

0005AB 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 2 (FY24) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AC 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 3 (FY25) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 14

0005AD 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 4 (FY26) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AE 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 5 (FY27) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 15

0005AF 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 6 (FY28) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AG 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 7 (FY29) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 16

0005AH 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 8 (FY30) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AJ 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 9 (FY31) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 17

0005AK 1 Job OPTION JBC-Air RAB Support-FFP

Option Year 10 (FY32) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air CIP-FFP

INFO ONLY. Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS.

Version 1 January 2023 Page 18

0006AA 1 Job JBC-Air CIP-FFP

Base Year - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Period of Performance is one (1) year.

0006AB 1 Job OPTION JBC-Air CIP-FFP

Option Year 3 (FY25) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 19

0006AC 1 Job OPTION JBC-Air CIP-FFP

Option Year 5 (FY27) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0006AD 1 Job OPTION JBC-Air CIP-FFP

Option Year 7 (FY29) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 20

0006AE 1 Job OPTION JBC-Air CIP-FFP

Option Year 9 (FY31) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air Basewide Well IIRAR-FFP

INFO ONLY. Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the

PWS.

Version 1 January 2023 Page 21

0007AA 1 Job JBC-Air Basewide Well IIRAR-FFP

Base Year (FY23) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Period of Performance is one (1) year.

0007AB 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 2 (FY24) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 22

0007AC 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 3 (FY25) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007AD 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 4 (FY26) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

Version 1 January 2023 Page 23

0007AE 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 5 (FY27) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AF 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 6 (FY28) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

Version 1 January 2023 Page 24

0007AG 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 7 (FY29) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AH 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 8 (FY30) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

Version 1 January 2023 Page 25

0007AJ 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 9 (FY31) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007AK 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Year 10 (FY32) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 26

0007CA 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP

Option Task - Abandon up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CB 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP

Option Task - Abandon up to five (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 27

0007CC 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP

Option Task - Abandon up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CD 1 Job OPTION JBC-Air - Install Basewide Wells-FFP

Option Task - Install up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 28

0007CE 1 Job OPTION JBC-Air - Install Basewide Wells-FFP

Option Task - Install up to fiive (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CF 1 Job OPTION JBC-Air - Install Basewide Wells-FFP

Option Task - Install up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 29

JBC-Air Tier I Meetings-FFP

INFO ONLY. Complete tier I meeting facilitation and support for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS.

0008AB 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 2 (FY24) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 30

0008AC 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 3 (FY25) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AD 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 4 (FY26) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 31

0008AE 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 5 (FY27) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AF 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 6 (FY28) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 32

0008AG 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 7 (FY29) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AH 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 8 (FY30) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 33

0008AJ 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 9 (FY31) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AK 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Year 10 (FY32) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 34

0009 1 Job JBC-Air Dioxane Sampling and Reporting-FFP

Base Year - complete 1,4 Dioxane sampling and reporting for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.

0010 1 Job JBC-Air Vapor Intrusion Study-FFP

Base Year - complete basewide Vapor Intrusion Study for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.

Version 1 January 2023 Page 35

0011 1 Job JBC-Air Basewide Background Studies-FFP

Base Year - complete basewide Background Studies for pesticides, PAHs, metals for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.

0012 1 Job OPTION JBC-Air Installation RCRA Permit-FFP

Option Year 6 (FY28) - support renewal of the installation RCRA permit for JBC- Air in accordance with paragragh 1.1 and 4.10 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 36

JBC-Air, Site DD540 (AOC P)-FFP

INFO ONLY. Site DD540 (AOC P): Conduct RA-O with optimization for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.

0013AA 1 Job JBC-Air, Site DD540 (AOC P)-FFP

Base Year - Site DD540 (AOC P): Prepare Performance Model and achieve the interim performance goals years 2 and 3 for JBC-Air in accordance with paragragh

1.2.4 and Table 1 of the PWS. Period of Performance is five (5) years.

Version 1 January 2023 Page 37

0013AB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task - Achieve the performance goals years 4, 5, and 6 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013AC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task - Achieve the performance goals years 7, 8 and develop an Optimization Summary and Forecasting Report for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 38

0013AD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task - Achieve the performance goal year 9 and final performance goal year 10 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.

Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CA 1 Job JBC-Air, Site DD540 (AOC P)-FFP

Base Year - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Period of Performance is three (3) years.

Version 1 January 2023 Page 39

0013CB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 2 (FY24) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 3 (FY25) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 40

0013CD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 4 (FY26) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CE 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 5 (FY27) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 41

0013CF 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 6 (FY28) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CG 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 7 (FY29) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 42

0013CH 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 8 (FY30) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CJ 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 9 (FY31) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 43

0013CK 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Year 10 (FY32) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air, Site FT003 (SWMU 55)-FFP

INFO ONLY. Site FT003 (SWMU 55): Conduct RA-O/LTM and reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS.

Version 1 January 2023 Page 44

0014CA 1 Job JBC-Air, Site FT003 (SWMU 55)-FFP

Base Year - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Period of Performance is three (3) years.

0014CB 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 2 (FY24) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 45

0014CC 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 3 (FY25) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CD 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 4 (FY26) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 46

0014CE 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 5 (FY27) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CF 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 6 (FY28) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 47

0014CG 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 7 (FY29) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CH 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 8 (FY30) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC, and complete the Reduce LCC Summary Report for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 48

0014CJ 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 9 (FY31) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CK 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Year 10 (FY32) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 49

JBC-Air, Site LF002 (SWMU 69)-FFP

INFO ONLY. Site LF002 (SWMU 69): Conduct LTM for JBC-Air in accordance with Table 1 of the PWS.

0015CA 1 Job JBC-Air, Site LF002 (SWMU 69)-FFP

Base Year - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.

Version 1 January 2023 Page 50

0015CB 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 2 (FY24) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CC 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 3 (FY25) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 51

0015CD 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 4 (FY26) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CE 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 5 (FY27) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 52

0015CF 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 6 (FY28) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CG 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 7 (FY29) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 53

0015CH 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 8 (FY30) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CJ 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 9 (FY31) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Version 1 January 2023 Page 54

0015CK 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Year 10 (FY32) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air, Site LF004 (SWMU 66)-FFP

INFO ONLY. Site LF004 (SWMU 66): Conduct LTM for JBC-Air in accordance

Version 1 January 2023 Page 55

0016CA 1 Job JBC-Air, Site LF004 (SWMU 66)-FFP

Base Year - Site LF004 (SWMU 66): Maintain…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .