FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Seymour Johnson AFB NC_Aug 01 2022.xlsx

XLSX spreadsheet 99 KB Posted

Attached to
FY23 Carolina Group OPTIMIZED REMEDIATION CONTRACT
Solicitation number
W912HN23R1000
Issued by

About this file

This pre-solicitation synopsis outlines requirements for an optimized remediation contract to conduct environmental remediation activities at multiple sites in South Carolina and North Carolina. Work will include maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives at 54 Installation Restoration Program sites and 11 Military Munitions Response Program sites. The contract type will be firm-fixed-price for a period of performance of ten years. The solicitation will utilize full and open competition set aside for small businesses and will be evaluated using a best value tradeoff methodology with the most important factor being technical approach and the least important being price. The anticipated solicitation release date is January 31, 2023 with proposal submissions required electronically through the Procurement Integrated Enterprise Environment system.

View the file

Other files

File Type Posted
Site Visit Enclosure 3 - SJAFB Special Events Pass Request - Guest Info Sheet.xlsx XLSX spreadsheet
PWS Enclosure 2A - Admin Record_Charleston AFB-Air SC_Aug 01 2022.xlsx XLSX spreadsheet
DRAFT RFP W912HN23R1000.pdf PDF
RFP Enclosure 5 - JBCA_Bldg 532 JG10E-2423 SVE Manual.pdf PDF
PWS Enclosure 3 - CIP Update PWS and Outline v2.docx DOCX document
PWS Enclosure 5 - CPSMR template- 25Aug2019.docx DOCX document
RFP Enclosure 1 - AFCEC Chemistry Data Quality Fact Sheet April 2020.pdf PDF
Site Visit Enclosure 2 - SJAFB Special Events Pass Request.pdf PDF
RFP Enclosure 2 - AFCECCZTE Chemistry UFP-QAPP.pdf PDF
PWS Enclosure 2A - Admin Record_Charleston-Weapons Station SC_Aug 01 2022.xlsx XLSX spreadsheet
RFP Enclosure 4 - Interim Guidance on 1-4 Dioxane Environmental Restoration Program.pdf PDF
RFP Enclosure 6 - JBCA_Bldg 543 SVE Manual_Optimized.pdf PDF
RFP Section L Attachment 4 - Proposal Schedule.xlsx XLSX spreadsheet
PWS Enclosure 6 - ORC PMP Guidance v3.1_20221201.docx DOCX document
Site Visit Enclosure 1 - Joint Base Charleston Base Access Worksheet - Form 111 (Aug 22).pdf PDF
PWS Enclosure 1 - ACRONYMS AND DEFINITIONS.docx DOCX document
PWS Enclosure 2B - GFI Spreadsheets 2.0.xlsx XLSX spreadsheet
RFP Enclosure 3 - AFGM2019-32-01 AFFF Related Waste Mgmt Implementation Guidance 5 September 2019_508.pdf PDF
RFP Section L Attachments 1-3.docx DOCX document
PWS Enclosure 4 - FY23 Carolina Group ORC_Final Sub-CLINs.xlsx XLSX spreadsheet
PWS Enclosure 2C - SITE ADDED CONSIDERATIONS SUMMARIES.docx DOCX document
PWS Enclosure 2A - Admin Record_Seymour Johnson AFB NC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC_Final Sub-CLINs_17 Nov 22.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosure 2B - GFI Spreadsheets 2.0.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosures 1 - 2B.docx DOCX document
FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Charleston AFB-Air SC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC PWS_Enclosure 2A - Admin Record_Charleston-Weapons Station SC_Aug 01 2022.xlsx XLSX spreadsheet
FY23 Carolina Group ORC_Final PWS_28NOV22.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

Installation NameAR FileDocument DateSubject/TitleAuthorAuthor AffiliationRecipientRecipient AffiliationSite #ROD DocsImage Number
Seymour Johnson AFB, NCAR-001Nov/16/2005Administrative Record Index4 CES/CEVRBasewideAR-001.pdf
Seymour Johnson AFB, NCAR-002May/01/1982Installation Restoration Program Phase I - Records Search DraftE.J. Schroeder, P.E.ES, Inc.Bernard LindenbergAFESC/DEVP and HQ TAC/DEEFT-07|LF-06|LF-08|LF-15|LF-16|OT-11|OT-17|OT-17|OT-18|SD-02|SD-03|SS-04|SS-05|ST-01AR-002.pdf
Seymour Johnson AFB, NCAR-003Jul/01/1982Installation Restoration Program Phase I - Records SearchE.J. Schroeder, P.E.ES, Inc.Bernard LindenbergAFESC/DEVP and HQ TAC/DEEFT-07|LF-06|LF-08|LF-15|LF-16|OT-11|OT-17|OT-17|OT-18|SD-02|SD-03|SS-04|SS-05|ST-01AR-003.pdf
Seymour Johnson AFB, NCAR-004Feb/01/1983Recommended Scope of Work for Conducting Phase II Installation Restoration WorkWater and Air Research, Inc.Occupational and Environmental Health LaboratoryFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-004.pdf
Seymour Johnson AFB, NCAR-005Aug/19/1983Installation Restoration Program Phase II SOW Field EvaluationDryden, Richie S, ColHQ TAC/SGPAHQ TAC/DEEVFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-005.pdf
Seymour Johnson AFB, NCAR-006Oct/18/1983NCDNRCD Letter to Base Concerning Results of Meeting, 18 Sep 83Wilms, R PaulNorth Carolina Department of Natural Resources and Community DevelopmentScarpino, C T, Col4 CSG/CCFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-006.pdf
Seymour Johnson AFB, NCAR-007Jan/09/1984NCDNRCD Letter to Base Granting Permission to Construct 21 Wells for Water Quality MonitoringHelms, Robert FNorth Carolina Department of Natural Resources and Community DevelopmentRousey, James E, Col4 CSG/CCFT-07|LF-06|LF-08|LF-16|SS-09|SS-10AR-007.pdf
Seymour Johnson AFB, NCAR-008Jan/17/1984Base Letter to HQ TAC Request for Additional Sampling Parameters Under Phase IIB of the Installation Restoration Program (IRP)McCarty, Brian D, CaptUSAF Hosp/SGPBHQ TAC/SGPBFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-008.pdf
Seymour Johnson AFB, NCAR-009Feb/07/1984HQ TAC Letter to OEHL Request for Additional Sampling Parameters, IRP Phase IIBDougherty, Jerry P, ColHQ TAC/SGPBUSAF OEHL/CVTFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-009.pdf
Seymour Johnson AFB, NCAR-010Feb/14/1984DOI Letter to Base Transmitting Copy of MOU Between USGS and USAF/OEHLTurner, James FDepartment of the InteriorDobbs, Robert S4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-010.pdf
Seymour Johnson AFB, NCAR-011Feb/14/1984DOI Letter to USAF Hosp/SGPB Transmitting Copy of MOU Between USGS and USAF/OEHLTurner, James FDepartment of the InteriorMcCarty, Brian D, CaptUSAF Hosp/SGPBFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-011.pdf
Seymour Johnson AFB, NCAR-012May/30/1984Base Letter to NCDNRCD Concerning Groundwater Sampling DataRousey, James E, Col4 CSG/CCAdams, BarryNorth Carolina Department of Natural Resources and Community DevelopmentFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-012.pdf
Seymour Johnson AFB, NCAR-013Jul/17/1984Installation Restoration Program Phase II Field EvaluationCenter for Environmental Measurements4 CES/CEVRFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-013.pdf
Seymour Johnson AFB, NCAR-014Aug/01/1984Draft Research Triangle Institute Installation Restoration Program Phase II Problem Confirmation and QuantificationCenter for Environmental MeasurementsOccupational and Environmental Health LaboratoryFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-014.pdf
Seymour Johnson AFB, NCAR-015Nov/06/1984Base Letter to NCDNRCD Staff Summary SheetSmith, Robert L, LtCol4 MG/SGPBAdams, BarryNorth Carolina Department of Natural Resources and Community DevelopmentFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-015.pdf
Seymour Johnson AFB, NCAR-016Feb/01/1985Installation Restoration Program Phase II - Confirmation/Quantification Stage 1 Draft ReportCenter for Environmental MeasurementsOccupational and Environmental Health LaboratoryFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-016.pdf
Seymour Johnson AFB, NCAR-017Feb/26/1985Base Letter to NCDNRCD Concerning Phase II Final Draft ReportRousey, James E, Col4 CSG/CCAdams, BarryNorth Carolina Department of Natural Resources and Community DevelopmentFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-017.pdf
Seymour Johnson AFB, NCAR-018Oct/07/1988EPA Letter to Base Concerning Confirmation of VSIScarbrough, James HEPA Region IVManning, Ed, Capt4 CSG/CCFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-018.pdf
Seymour Johnson AFB, NCAR-019Mar/27/1985EPA Letter to Base Transmitting Comments on Phase II Stage 1 Draft ReportLinton, Arthur GEPA Region IVBousum, Roger E, CaptUSAF Hosp/SGPBFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-019.pdf
Seymour Johnson AFB, NCAR-020Apr/18/1985HQ TAC Letter to Base Transmitting Comments on IRP Phase II Stage 1 Draft Final ReportDougherty, Jerry P, ColHQ TAC/SGPB4 CES/CEVRFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-020.pdf
Seymour Johnson AFB, NCAR-021May/01/1985Feasibility Study and Development of Interim Remedial Action Plan for Fuel Spill CleanupSanders, D AUSAF Occupational and Environmental Health LaboratoryDr. Gutnecht4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-021.pdf
Seymour Johnson AFB, NCAR-022May/23/1985USAF OEHL/TS Letter on IRP Phase II ReportSanders, D AUSAF OEHL/TSGutnecht, DrResearch Triangle InstituteFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-022.pdf
Seymour Johnson AFB, NCAR-023Jul/01/1985Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 1Hazardous Materials Technical Center4 CES/CEVRFT-07|LF-06|LF-08|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|ST-01AR-023.pdf
Seymour Johnson AFB, NCAR-024Jul/01/1985Remedial Action Plan for Areas A and BDougherty, Jerry P, ColHQ TAC/SGPB4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-024.pdf
Seymour Johnson AFB, NCAR-025Aug/05/1985HQ TAC Letter to Base Concerning Installation Restoration Program (IRP) Phase II Stage 1 Final ReportDougherty, Jerry P, ColHQ TAC/SGPBUSAF Hosp/SGPBFT-07|LF-06|LF-08|SD-02|SS-04|SS-05|SS-09|SS-10|ST-01AR-025.pdf
Seymour Johnson AFB, NCAR-026Nov/06/1991Designation to TRC CharterSullivan, Will RCounty of WayneSchauffele, Walter W, Col4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-026.pdf
Seymour Johnson AFB, NCAR-027Oct/03/1985HQ TAC Letter to Base Concerning Transfer of Installation Restoration Program Sites to Phase IVDougherty, Jerry P, ColHQ TAC/SGPB4 CES/CEVRFT-07|LF-06|SD-02|SD-03|SS-04|SS-05|ST-01AR-027.pdf
Seymour Johnson AFB, NCAR-028Oct/24/1985NCDNRCD Letter to Base Transmitting Comments on Remedial Action PlanJeter, William CNorth Carolina Department of Natural Resources and Community DevelopmentJones, Donny E4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-028.pdf
Seymour Johnson AFB, NCAR-029May/07/1986HQ TAC Letter to Base Transmitting Draft Statement of Work (SOW) for Installation Restoration Program (IRP) Phase II, Stage 2Dougherty, Jerry P, ColHQ TAC/SGPBUSAF Hosp/SGPBFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-029.pdf
Seymour Johnson AFB, NCAR-030Sep/18/1986NCDNRCD Letter to Base Transmitting Well Construction Permit No. 95-0131-WM-0108Mulligan, JimNorth Carolina Department of Environment Health and Natural ResourcesWarren, Steve, CaptUSAF Hosp/SGPBFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-030.pdf
Seymour Johnson AFB, NCAR-031Oct/01/1986Research Triangle Institute Technical Operations Plan Phase II, Stage 2 Installation Restoration ProgramHazardous Materials Technical Center4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-031.pdf
Seymour Johnson AFB, NCAR-032Nov/01/1986Remedial Action Plan for Areas A and BAlexander, W JState of North Carolina Dept of Natural Resources and Community DevelopmentHardison, Willie4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-032.pdf
Seymour Johnson AFB, NCAR-033Nov/03/1986Research Triangle Letter to NCDNRCD Concerning Well Construction Permit No. 95-0131-WM-0108Alexander, W JResearch Triangle InstituteHardison, WillieNorth Carolina Department of Natural Resources and Community DevelopmentFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-033.pdf
Seymour Johnson AFB, NCAR-034Aug/01/1987Remedial Action Plan for Areas A and BResearch Triangle Institute4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-034.pdf
Seymour Johnson AFB, NCAR-035Aug/17/1987Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 1 of 3Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-035.pdf
Seymour Johnson AFB, NCAR-036Aug/17/1987Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 2 of 3Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-036.pdf
Seymour Johnson AFB, NCAR-037Aug/17/1987Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 3 of 3Hazardous Materials Technical Center4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-037.pdf
Seymour Johnson AFB, NCAR-038Aug/21/1987Draft Designs and Specifications for Remedial Action Plan for Areas A and B4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-038.pdf
Seymour Johnson AFB, NCAR-039Sep/01/1993Superfund Technical Assistance GrantsLinton, Arthur GUnited States Environmental Protection Agency4 CES/CEVRDP-30|FT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|SS-31|ST-01|ST-14|WP-27AR-039.pdf
Seymour Johnson AFB, NCAR-040Oct/26/1987EPA Letter to Base Concerning Installation Restoration Program (IRP), Remedial Action Plan for Areas A and BLinton, Arthur GEPA Region IVFerrell, James T, Col4 CSG/CCSD-02|SD-03|SS-04|SS-05|ST-01AR-040.pdf
Seymour Johnson AFB, NCAR-041Nov/06/1987Newspaper Article, "Environmental Protection, A Seymour Johnson Review"Ball, William J, Col4 FW/CCPublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-041.pdf
Seymour Johnson AFB, NCAR-042Feb/04/1988Base Letter to HQ TAC Concerning Remedial Action Plan for Installation Restoration ProgramCostigan, Robert R Lt Col4 CES/CCHQ TAC/DEEVSD-02|SD-03|SS-04|SS-05|ST-01AR-042.pdf
Seymour Johnson AFB, NCAR-043Jun/01/1988Technical Document to Support No Further Action Installation Restoration Program Site 6, Coal Pile Storage Area4 CES/CEVROT-1111AR-043.pdf
Seymour Johnson AFB, NCAR-044Jun/01/1988Technical Document to Support No Further Action Installation Restoration Program Site 3, Landfill No. 1Research Triangle Institute4 CES/CEVRLF-086AR-044.pdf
Seymour Johnson AFB, NCAR-045Jun/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 1 of 4Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-045.pdf
Seymour Johnson AFB, NCAR-046Jun/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 2 of 4Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-046.pdf
Seymour Johnson AFB, NCAR-047Jun/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 3 of 4Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-047.pdf
Seymour Johnson AFB, NCAR-048Jun/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 4 of 4Cobey, William W, JrNorth Carolina Dept of Environment and Natural ResourcesSchauffele, Walter W, Col4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-048.pdf
Seymour Johnson AFB, NCAR-049Nov/21/1991NCDEHNR Letter to Base Concerning Establishment of a TRCCobey, William W, JrNorth Carolina Department of Environment, Health and Natural ResourcesSchauffele, Walter W, Col4 CSG/CCFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-049.pdf
Seymour Johnson AFB, NCAR-050Apr/29/1988NCDNRCD Letter to Base Transmitting Installation Restoration Program Phase 2, Stage 2-CommentsPowers, Richard RNorth Carolina Department of Natural Resources and Community DevelopmentAlbrecht, Frederick R, 1Lt4 AMDS/SGPBFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-050.pdf
Seymour Johnson AFB, NCAR-051Sep/07/1988HQ TAC Comments on Installation Restoration Program Phase II Stage 2 Second Draft ReportDougherty, Jerry P, ColHQ TAC/SGPBUSAF OEHL/TSFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-051.pdf
Seymour Johnson AFB, NCAR-052Sep/29/1988Base Memorandum Concerning Visit by North Carolina Department of Natural Resources and Community Development PersonnelAlbrecht, Frederick R, 1Lt4 MG/SGPB4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-052.pdf
Seymour Johnson AFB, NCAR-053Nov/01/1988Draft Hazard Evaluation ReportResearch Triangle Institute4 CES/CEVRBasewideAR-053.pdf
Seymour Johnson AFB, NCAR-054Nov/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 1 of 4Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-054.pdf
Seymour Johnson AFB, NCAR-055Nov/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 2 of 4Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-055.pdf
Seymour Johnson AFB, NCAR-056Nov/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 3 of 4Research Triangle Institute4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-056.pdf
Seymour Johnson AFB, NCAR-057Nov/01/1988Research Triangle Institute Installation Restoration Program Phase II - Confirmation/Quantification Stage 2 Volume 4 of 4Smith, Lee Ann and Seaburn, Gerald E.Law Environmental, Inc.Laird, Joe4 CES/CEVRFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-057.pdf
Seymour Johnson AFB, NCAR-058Dec/01/1988Final A-E Quality Control Plan/Field Investigation Plan and A-E Safety, Health and Emergency Response PlanKline, GayleA T Kearney, Inc.Sheffield, Rowena4 CES/CEVRFT-07|LF-06|LF-16|SS-09AR-058.pdf
Seymour Johnson AFB, NCAR-059Dec/15/1988Interim RCRA Facility Assessment (RFA) ReportKline, GayleA T Kearney, Inc.Sheffield, RowenaEPA Region IVFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-059.pdf
Seymour Johnson AFB, NCAR-060Jan/05/1989News Release United States Air Force, "Phase II, Stage 2, IRP Report"PublicFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-060.pdf
Seymour Johnson AFB, NCAR-061Feb/15/1989NCDNRCD Letter to Base Concerning Installation Restoration Program Interim Report - 1Powers, Richard RNorth Carolina Department of Natural Resources and Community DevelopmentRake, Geoffrey W, Jr, Col4 AMDS/SGPBFT-07|LF-06|LF-08|LF-16|OT-11|SS-09AR-061.pdf
Seymour Johnson AFB, NCAR-062May/01/1989Analytical Data Report for Site - 1 Fire Training Area Site - 2 Landfill No. 4 Site - 4 Landfill No. 3 Site - 5 DPDO Waste Storage Area Remedial Investigations4 CES/CEVRFT-07|LF-06|LF-16|SS-09AR-062.pdf
Seymour Johnson AFB, NCAR-063Aug/01/1989Appendix D Monitoring Well Installation Diagrams4 CES/CEVRFT-07|LF-06|LF-16|SS-09AR-063.pdf
Seymour Johnson AFB, NCAR-064Aug/01/1989Appendix B Monitoring Well Installation Diagrams Temporary Well Point Installation Diagrams4 CES/CEVRLF-08|SS-04|SS-13|ST-14AR-064.pdf
Seymour Johnson AFB, NCAR-065Jun/01/1993Scope of Services for Community Relations PlanSmith, Lee Amy and Richardson, Thomas L.Law Environmental, Inc.Laird, Joe4 CES/CEVRCOMRELAR-065.pdf
Seymour Johnson AFB, NCAR-066Nov/01/1989Remedial Investigation Draft Final Report for Site 1 - Fire Training Area No. 3 Site 2 - Landfill No. 4 Site 4 - Landfill No. 3 Site 5 - DPDO Waste Storage Area Remedial Investigations Part 1 of 2.Mungin-Davis, Queenie and Richardson, Thomas L.Law Environmental, Inc.Laird, Joe4 CES/CEVRFT-07|LF-06|LF-16|SS-09AR-066.pdf
Seymour Johnson AFB, NCAR-066Nov/01/1989Remedial Investigation Draft Final Report for Site 1 - Fire Training Area No. 3 Site 2 - Landfill No. 4 Site 4 - Landfill No. 3 Site 5 - DPDO Waste Storage Area Remedial Investigations Part 2 of 2.Mungin-Davis, Queenie and Richardson, Thomas L.Law Environmental, Inc.Laird, Joe4 CES/CEVRFT-07|LF-06|LF-16|SS-0929_72053_opt_2.pdf
Seymour Johnson AFB, NCAR-067Dec/01/1989Draft Facility Studies Report for Site 3 - Landfill No. 1 Site 11 - SAC Fuel Hydrant System Site 12 - Rapcon Fuel Spill Site 13 - BX Service StationButler, JackNorth Carolina Dept of Environment and Natural ResourcesSchacter, Arthur4 CES/CEVRLF-08|SS-04|SS-13|ST-14AR-067.pdf
Seymour Johnson AFB, NCAR-068Apr/21/1993NCDEHNR Letter to USACE Concerning North Carolina Superfund Quarterly Activities ReportButler, JackNorth Carolina Department of Environment, Health and Natural ResourcesSchacter, ArthurUS Army Corps of Engineers - Omaha DistrictFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-068.pdf
Seymour Johnson AFB, NCAR-069Apr/18/1990Newspaper Article, "Goldsboro Ranked Low Among Cities"Wooten, LynnThe Goldsboro News ArgusPublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-069.pdf
Seymour Johnson AFB, NCAR-070Jul/01/1990Newspaper Article, "Base Environmental Problems Addressed"Young, KarinneThe Goldsboro News ArgusPublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-070.pdf
Seymour Johnson AFB, NCAR-071Sep/17/1990Revised Scope of Services for Investigation/Feasibility Study at Sites 14 and 15McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-071.pdf
Seymour Johnson AFB, NCAR-072Dec/01/1990Final Chemical Data Acquisition Plan (CDAP) for Remedial Investigation/Feasibility Study at Sites 14 and 15McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-072.pdf
Seymour Johnson AFB, NCAR-073Jan/01/1991Final Site Safety and Health Plan (SSHP) for Remedial Investigation/Feasibility Study at Sites 14 and 15McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-073.pdf
Seymour Johnson AFB, NCAR-074Apr/01/1991Draft Final Facility Studies Report for Site LF-08 - Landfill No. 1 Site SS-12 - SAC Fuel Hydrant System Site SS-13 - RAPCON Fuel Spill Site ST-14 - BX Service Station (Formerly Sites 3, 11, 12 and 13)McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRLF-08|SS-04|SS-13|ST-14AR-074.pdf
Seymour Johnson AFB, NCAR-075May/01/1991Addendum to the Quality Control Summary Report for Site LF-08 - Landfill No. 1 Site SS-12 - SAC Fuel Hydrant System Site SS-13 - RAPCON Fuel Spill Site ST-14 - BX Service Station (Formerly Sites 3, 11, 12 and 13)McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRLF-08|SS-12|SS-13|ST-14AR-075.pdf
Seymour Johnson AFB, NCAR-076Jul/01/1991Quality Control Summary Report Remedial Investigation/Feasibility Study at Sites 14 and 15IT Corporation4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-076.pdf
Seymour Johnson AFB, NCAR-077Jul/01/1991Appendix J Raw Data, Field SamplesMcCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-077.pdf
Seymour Johnson AFB, NCAR-078Aug/01/1991Final Remedial Investigation Report for Site FT-07 - Fire Training Area No. 3 Site LF-06 - Landfill No. 4 Site LF-16 - Landfill No. 3 Site SS-09 - DPDO Waste Storage Area (Formerly Sites 1, 2, 4 and 5)McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.White, Linda4 CES/CEVRFT-07|LF-06|LF-16|SS-09AR-078.pdf
Seymour Johnson AFB, NCAR-079Sep/01/1991Pre-Draft Remedial Investigation Report for Sites ST-01, SD-02, SD-03, SS-04, and ST-05 (Sites 14 and 15) Part 1 of 2.4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-079.pdf
Seymour Johnson AFB, NCAR-079Sep/01/1991Pre-Draft Remedial Investigation Report for Sites ST-01, SD-02, SD-03, SS-04, and ST-05 (Sites 14 and 15) Part 2 of 2.4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-0129_72021_opt_2.pdf
Seymour Johnson AFB, NCAR-080Oct/16/1991Base Letter to EPA Concerning TRC MeetingSchauffele, Walter W, Col4 SG/CCEPA Region IVFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-080.pdf
Seymour Johnson AFB, NCAR-081Nov/01/1991Final Facility Studies Report for Site LF-08 - Landfill No. 1 Site SS-12 - SAC Fuel Hydrant System Site SS-13 - RAPCON Fuel Spill Site ST-14 - BX Service Station (Formerly Sites 3, 11, 12 and 13)4 CES/CEVRLF-08|SS-12|SS-13|ST-14AR-081.pdf
Seymour Johnson AFB, NCAR-082Dec/01/1997Management Action PlanMcCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.Christenson, Ken4 CES/CEVRBasewideAR-082.pdf
Seymour Johnson AFB, NCAR-083Feb/01/1992Draft Feasibility Study Report for Sites ST-01, SD-02, SD-03, SS-04 and ST-05 (Sites 14 and 15)McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.Christenson, Ken4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-083.pdf
Seymour Johnson AFB, NCAR-084Mar/01/1992Draft Remedial Investigation Report for Site ST-01, SD-02, SD-03, SS-04 and ST-05 (Sites 14 and 15)McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.Christenson, Ken4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-084.pdf
Seymour Johnson AFB, NCAR-085Mar/13/1992Law Environmental Letter to USACE Transmitting Pre-Draft Remedial Investigation Report Comment Responses Remedial Investigation/Feasibility Study at Sites ST-01, SD-02, SD-03, SS-04 and ST-05Richardson, Thomas LLaw Environmental, Inc.Christenson, KenUS Army Corps of Engineers - Omaha DistrictSD-02|SD-03|SS-04|SS-05|ST-01AR-085.pdf
Seymour Johnson AFB, NCAR-086May/13/1992News Release United States Air Force, "Underground Tanks Replaced"PublicST-14AR-086.pdf
Seymour Johnson AFB, NCAR-087Jun/24/1992NCDEHNR Letter to Base Concerning Initial Site Characterization and Free Product RemovalMoran, LeAnnNorth Carolina Department of Environment, Health and Natural ResourcesHornburg, Hal M, Col4 FW/CCSS-04|SS-12AR-087.pdf
Seymour Johnson AFB, NCAR-088Jun/25/1992NCDEHNR Letter to Base Concerning Remedial Investigation, Feasibility, and the Facility Study Reports for Various Installation Restoration Program SitesPowers, Richard RNorth Carolina Department of Natural Resources and Community DevelopmentJohnson, Silas R, Jr, Col4 FW/CCFT-07|LF-06|LF-08|LF-16|SD-02|SD-03|SS-04|SS-05|SS-09|SS-12|SS-13|ST-01|ST-14AR-088.pdf
Seymour Johnson AFB, NCAR-089Jul/06/1992Base Letter to USACE Transmitting Recommendations and Comments on the Installation Restoration Program (IRP) Reports from the State of North Carolina, Department of Environment, Health and Natural ResourcesCunningham, James E4 CES/CEVReckmeyer, DrewUS Army Corps of Engineers - Omaha DistrictFT-07|LF-06|LF-08|LF-16|SD-02|SD-03|SS-04|SS-05|SS-09|SS-12|SS-13|ST-01|ST-14AR-089.pdf
Seymour Johnson AFB, NCAR-090Aug/01/1992Draft Work Plan For Free Floating Fuel Recovery4 CES/CEVRSS-04|SS-12AR-090.pdf
Seymour Johnson AFB, NCAR-091Aug/11/1992Draft Scope of Services for Rapid Response Project Free Floating Fuel RecoveryIT Corporation4 CES/CEVRSS-04|SS-12AR-091.pdf
Seymour Johnson AFB, NCAR-092Aug/21/1992Contractor Sampling and Analysis Plan (CSAP) for Remediation Services of Free Floating ProductIT Corporation4 CES/CEVRSS-04|SS-12AR-092.pdf
Seymour Johnson AFB, NCAR-093Aug/21/1992Draft Site Safety and Health Plan Rapid Response Project Free-Floating Fuel RecoveryCunningham, James E4 CES/CCReckmeyer, Drew4 CES/CEVRSS-04|SS-12AR-093.pdf
Seymour Johnson AFB, NCAR-094Sep/03/1993NCDEHNR Letter to USACE Transmitting North Carolina Department of Environment, Health, and Natural Resources (NCDEHNR) Comments and Suggestions on the Draft Final Predesign Testing ResultsCunningham, James E4 CES/CEVReckmeyer, DrewUS Army Corps of Engineers - Omaha DistrictSD-02|SD-03|SS-04|SS-05|ST-01AR-094.pdf
Seymour Johnson AFB, NCAR-095Sep/01/1992News Release, "Installation Restoration Program"PublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-095.pdf
Seymour Johnson AFB, NCAR-096Sep/01/1992Draft Work Plan for Free Floating Fuel RecoveryIT Corporation4 CES/CEVRSS-04|SS-12AR-096.pdf
Seymour Johnson AFB, NCAR-097Sep/01/1992Final Work Plan for Free Floating Fuel RecoveryIT Corporation4 CES/CEVRSS-04|SS-12AR-097.pdf
Seymour Johnson AFB, NCAR-098Sep/02/1992Site Safety and Health Plan Rapid Response Project Free-Floating Fuel Recovery Draft4 CES/CEVRSS-04|SS-12AR-098.pdf
Seymour Johnson AFB, NCAR-099Sep/03/1992Final Revised Scope of Services for Rapid Response Project Free Floating Fuel RecoveryReedy, BartUnited States Environmental Protection AgencyBartels, Vern4 CES/CEVRSS-04|SS-12AR-099.pdf
Seymour Johnson AFB, NCAR-100Sep/10/1992EPA Letter to Base Concerning Hazard Ranking System Data NeedsReedy, BartEPA Region IVBartels, Vern4 CES/CEVRFT-19|LF-08|LF-15|LF-16|OT-29|SS-09AR-100.pdf
Seymour Johnson AFB, NCAR-101Oct/01/1992Base Newsletter, "IRP Update"PublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-101.pdf
Seymour Johnson AFB, NCAR-102Oct/05/1992Scope of Services for Sites 14 and 15, JP-4 Remediation Appendix "A"Mulligan, JimNorth Carolina Department of Environment, Health and Natural ResourcesBartels, Vern4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-102.pdf
Seymour Johnson AFB, NCAR-103Oct/16/1992NCDEHNR Letter to Base Transmitting Well Construction Permit No. 95-0131-WM-0222Mulligan, JimNorth Carolina Department of Environment, Health and Natural ResourcesBartels, Vern4 CES/CEVRSS-04|SS-12AR-103.pdf
Seymour Johnson AFB, NCAR-104May/07/1993Base Letter to NCDEHNR Concerning Financial Responsibility/Ownership FormAbrams, Donald4 CES/CEVMcClain, Patrick HNorth Carolina Department of Environment, Health and Natural ResourcesFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-104.pdf
Seymour Johnson AFB, NCAR-105Nov/01/1992Final Feasibility Study Report for Site ST-01, SD-02, SD-03, SS-04 and ST-05 (Sites 14 and 15)McCroan Smith, Laura and Richardson, Thomas L.Law Environmental, Inc.Christenson, Ken4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-105.pdf
Seymour Johnson AFB, NCAR-106Nov/01/1992Final Remedial Investigation Report for Site ST-01, SD-02, SD-03, SS-04 and ST-05 (Sites 14 and 15) Part 1 of 2.4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-106.pdf
Seymour Johnson AFB, NCAR-106Nov/01/1992Final Remedial Investigation Report for Site ST-01, SD-02, SD-03, SS-04 and ST-05 (Sites 14 and 15) Part 2 of 2.4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-0129_71759_opt_2.pdf
Seymour Johnson AFB, NCAR-107Feb/03/1993Installation Restoration Program for the Technical Review Committee Environmental ReviewMulligan, JimNorth Carolina Department of Environment, Health and Natural ResourcesRogers, Randal L, Jr4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-107.pdf
Seymour Johnson AFB, NCAR-108Nov/06/1992NCDEHNR Letter to Contractor Concerning Modification to Work Plan for Free Product RecoveryMulligan, JimNorth Carolina Department of Environment, Health and Natural ResourcesRogers, Randal L, JrIT Corp.SS-04|SS-12AR-108.pdf
Seymour Johnson AFB, NCAR-109Jul/01/1993Final Report - Volume I Free Floating Fuel Recovery4 CES/CEVRSS-04|SS-12AR-109.pdf
Seymour Johnson AFB, NCAR-111Nov/09/1992Newspaper Article, "Jet Fuel is Being Removed"PublicSS-04|SS-12AR-111.pdf
Seymour Johnson AFB, NCAR-112Nov/10/1992Newspaper Article, "Jet Fuel Cleanup at SJAFB To Protect People and Environment"PublicSS-04|SS-12AR-112.pdf
Seymour Johnson AFB, NCAR-113Aug/26/1993NCDEHNR Letter to Base Concerning Draft Final - Predesign Testing Results for Sites ST-01, SD-02, SD-03, SS-05, and ST-04Schaffer, Jeffrey RNorth Carolina Department of Environment, Health and Natural ResourcesBartels, Vern4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-113.pdf
Seymour Johnson AFB, NCAR-114Nov/12/1992Contractor Letter to Base Concerning Recovery Well Permit for POL IT Project No. 519019Rogers, Randal L, JrIT Corp.Bartels, Vern4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-114.pdf
Seymour Johnson AFB, NCAR-115Nov/17/1992News Release United States Air Force, "IRP Repositories"PublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-115.pdf
Seymour Johnson AFB, NCAR-116Nov/18/1992Newspaper Article, "Seymour Extracts Spilled Jet Fuel From Underground"Cahoon, Cecil IIThe Goldsboro News ArgusPublicSS-04|SS-12AR-116.pdf
Seymour Johnson AFB, NCAR-117May/27/1993Agreement Between Seymour Johnson Air Force Base and the Wayne County Public LibraryDavis, K W4 FW/PAWayne County LibraryFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-117.pdf
Seymour Johnson AFB, NCAR-118Nov/24/1992NCDEHNR Letter to Base Transmitting Well Construction Permit No. 95-0131-WM-0226Mulligan, JimNorth Carolina Department of Environment, Health and Natural ResourcesBartels, Vern4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-118.pdf
Seymour Johnson AFB, NCAR-119Nov/30/1992Scope of Services Preparation of Plans and Specifications for Hazardous Material Cleanup at Fort Fisher Recreation Area4 CES/CEVRTU503AR-119.pdf
Seymour Johnson AFB, NCAR-120Dec/01/1992Draft Operation and Maintenance Manual Free Floating Fuel Recovery SystemsIT Corporation4 CES/CEVRSS-04|SS-12AR-120.pdf
Seymour Johnson AFB, NCAR-121Dec/01/1992Draft Decision Document for United States Air Force Installation Restoration Program DOD Sites ST-01, SD-02, SD-03, and ST-05 Bulk Fuel Storage AreaLaw Environmental, Inc.US Army Corps of Engineers - Omaha DistrictSD-02|SD-03|SS-05|ST-0138AR-121.pdf
Seymour Johnson AFB, NCAR-122Dec/01/1992Draft Decision Document for United States Air Force Installation Restoration Program DOD Site SS-04 TAC Fuel Hydrant System AreaLaw Environmental, Inc.US Army Corps of Engineers - Omaha DistrictSS-0424AR-122.pdf
Seymour Johnson AFB, NCAR-123Jul/01/1993Draft Final Predesign Testing Results, Sites ST-01, SD-02, SD-03, SS-05, and ST-04B and V Waste Science and Technology Corp4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-123.pdf
Seymour Johnson AFB, NCAR-124Dec/11/1992Newspaper Article, "Information on Restoration Program"PublicFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-124.pdf
Seymour Johnson AFB, NCAR-125Jun/01/1991U.S. Air Force Installation Restoration Program for Site SS-10, JP-4 Contamination Site (Formerly Site No. 08) Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRSS-1028AR-125.pdf
Seymour Johnson AFB, NCAR-126Jun/01/1991U.S. Air Force Installation Restoration Program for Site OT-11, Coal Pile Storage Area (Formerly Site No. 06) Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVROT-1112AR-126.pdf
Seymour Johnson AFB, NCAR-127Jun/01/1991U.S. Air Force Installation Restoration Program for Site LF-15, Landfill 2 (Formerly Site No. 07) Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRLF-157AR-127.pdf
Seymour Johnson AFB, NCAR-128Jun/01/1991U.S. Air Force Installation Restoration Program for Site OT-17, Munitions Residue Burial (Formerly Site No. 10) Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVROT-17|OT-1714AR-128.pdf
Seymour Johnson AFB, NCAR-129Jun/01/1991U.S. Air Force Installation Restoration Program for Site OT-18, B-52 Crash Site (Formerly Site No. 09) Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVROT-1816AR-129.pdf
Seymour Johnson AFB, NCAR-130Jun/01/1991U.S. Air Force Installation Restoration Program for Site FT-19, Fire Protection Training Area No. 1 Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRFT-192AR-130.pdf
Seymour Johnson AFB, NCAR-131Jun/01/1991U.S. Air Force Installation Restoration Program for Site FT-20, Fire Protection Training Area No. 2 Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRFT-203AR-131.pdf
Seymour Johnson AFB, NCAR-132Jun/01/1991U.S. Air Force Installation Restoration Program for Site OT-21, Existing Entomology Shop Area Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVROT-2119AR-132.pdf
Seymour Johnson AFB, NCAR-133Jun/01/1991U.S. Air Force Installation Restoration Program for Site SS-22, KC-135 Crash Site Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRSS-2231AR-133.pdf
Seymour Johnson AFB, NCAR-134Jun/01/1991U.S. Air Force Installation Restoration Program for Site LF-23, Hardfill Disposal Site Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRLF-238AR-134.pdf
Seymour Johnson AFB, NCAR-135Jun/01/1991U.S. Air Force Installation Restoration Program for Site SS-24, Inactive Drummed Waste Storage Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRSS-2433AR-135.pdf
Seymour Johnson AFB, NCAR-136Jun/01/1991U.S. Air Force Installation Restoration Program for Site SS-25, PCB Storage Site Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRSS-2535AR-136.pdf
Seymour Johnson AFB, NCAR-137Jun/01/1991U.S. Air Force Installation Restoration Program for Site OT-26, Inactive Refuse Incinerator Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVROT-2620AR-137.pdf
Seymour Johnson AFB, NCAR-138Jun/01/1991U.S. Air Force Installation Restoration Program for Site WP-27, Inactive Sewage Treatment Plant Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVRWP-2740AR-138.pdf
Seymour Johnson AFB, NCAR-139Jun/01/1991U.S. Air Force Installation Restoration Program for Site OT-28, Dare County Bombing Range Decision Document (Final)EA Engineering, Science, and Technology, Inc.4 CES/CEVROT-2822AR-139.pdf
Seymour Johnson AFB, NCAR-140Jan/01/1993Draft Work Plan Free Floating Fuel RecoveryIT Corporation4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-140.pdf
Seymour Johnson AFB, NCAR-141Aug/06/1993Base Letter to HQ ACC Concerning ACC Policy on Technical Review CommitteesCunningham, James E4 CES/CEVRoss, JennyHQ ACC/CEVREFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-141.pdf
Seymour Johnson AFB, NCAR-142Jan/25/1993Draft Contractor Sampling and Analysis Plan (CSAP) for Remediation Services of Free Floating ProductIT Corporation4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-142.pdf
Seymour Johnson AFB, NCAR-143Jan/27/1993Draft Site Safety and Health Plan Free Floating Fuel RecoveryIT Corporation4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-143.pdf
Seymour Johnson AFB, NCAR-144Feb/01/1993Draft Decision Documents for Site FT-07 - Fire Training Area No. 3 Site LF-06 - Landfill No. 4 Site LF-16 - Landfill No. 3 Site SS-09 - DPDO Waste Storage Area Site LF-08 - Landfill No. 1 Site SS-13 - RAPCON Fuel Spill Site ST-14 - BX Service StationMcCroan Smith, Laura and Richardson, Thomas L.Law Engineering and Environmental ServicesBarrett, John4 CES/CEVRFT-07|LF-06|LF-08|LF-16|SS-09|SS-13|ST-144AR-144.pdf
Seymour Johnson AFB, NCAR-145Feb/01/1993Final Work Plan Free Floating Fuel RecoveryIT Corporation4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-145.pdf
Seymour Johnson AFB, NCAR-146Jul/01/1993Draft Operation and Maintenance Manual Free Floating Fuel Recovery SystemsIT Corporation4 CES/CEVRSD-02|SD-03|SS-05|ST-01AR-146.pdf
Seymour Johnson AFB, NCAR-147Feb/10/1993Trip FeedbackPoland, JohnHQ ACC/CEVRBartels, Vern4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-147.pdf
Seymour Johnson AFB, NCAR-148Feb/12/1993Predesign Activities Chemical Data Acquisition Plan for Sites ST-01, SD-02, SD-03, and ST-05 and SS-04B and V Waste Science and Technology Corp4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-148.pdf
Seymour Johnson AFB, NCAR-149Feb/12/1993Predesign Activities Site Safety and Health Plan for ST-01, SD-02, SD-03, SS-04, and ST-05B and V Waste Science and Technology Corp4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-149.pdf
Seymour Johnson AFB, NCAR-150Aug/18/1993Base Letter to NCDEHNR Concerning Monthly Status ReportCunningham, James E4 CES/CEVSchaffer, Jeffrey, RNorth Carolina Department of Environment, Health and Natural ResourcesSD-02|SD-03|SS-04|SS-05|SS-12|ST-01AR-150.pdf
Seymour Johnson AFB, NCAR-151Mar/12/1993Base Letter to USACE Transmitting State of North Carolina Department of Environment, Health and Natural Resources (NCDEHNR) Comments on the RCRA Facility Investigation Work Plan and the Installation Restoration Program (IRP) Remedial Investigation/FeasibiCunningham, James E4 CES/CEVReckmeyer, DrewUS Army Corps of Engineers - Omaha DistrictSD-02|SD-03|SS-04|SS-05|ST-01AR-151.pdf
Seymour Johnson AFB, NCAR-152Apr/15/1993USEPA Region IV Letter to Base Acknowledging Receipt of Draft RFI Work PlanJohnston, Jon DEPA Region IVJoersz, Eldon, BrigGen4 FW/CCSD-02|SD-03|SS-04|SS-05|ST-01AR-152.pdf
Seymour Johnson AFB, NCAR-153Mar/23/1993Meeting Minutes of the Technical Review Committee (TRC) on 3 Feb 93Bryan, Steven A, Col4 CES/CEVTRC MembersFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-11|OT-17|OT-17|OT-18|OT-21|OT-26|OT-28|OT-29|SD-02|SD-03|SS-04|SS-05|SS-09|SS-10|SS-12|SS-13|SS-22|SS-24|SS-25|ST-01|ST-14|WP-27AR-153.pdf
Seymour Johnson AFB, NCAR-154Mar/01/1993Final Predesign Activities Final Chemical Data Acquisition Plan for Sites ST-01, SD-02, SD-03, and ST-05 and SS-04B and V Waste Science and Technology Corp4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-154.pdf
Seymour Johnson AFB, NCAR-155Mar/01/1993Final Site Safety and Health Plan for Sites ST-01, SD-02, SD-03, and ST-05 and SS-04B and V Waste Science and Technology Corp4 CES/CEVRSD-02|SD-03|SS-04|SS-05|ST-01AR-155.pdf
Seymour Johnson AFB, NCAR-156Dec/01/1993Final Decision Documents for Site FT-07 - Fire Training Area No. 3 Site LF-06 - Landfill No. 4 Site LF-16 - Landfill No. 3 Site SS-09 - DPDO Waste Storage Area Site LF-08 - Landfill No. 1 Site SS-13 - RAPCON Fuel Spill Site ST-14 - BX Service StationLaw Engineering and Environmental Services4 CES/CEVRFT-07|LF-06|LF-08|LF-16|SS-09|SS-13|ST-145AR-156.pdf
Seymour Johnson AFB, NCAR-157Aug/01/1994Final Sampling and Analysis Plan Tower Road Radar Site (Site OT-29) and Refueling Maintenance ShopRust Environment and Infrastructure4 CES/CEVROT-29|SS-31AR-157.pdf
Seymour Johnson AFB, NCAR-158Aug/01/1994Final Site Safety and Health Plan Tower Road Radar Site (Site OT-29) and Refueling Maintenance Shop4 CES/CEVROT-29|SS-31AR-158.pdf
Seymour Johnson AFB, NCAR-159Aug/01/1994Final Preliminary Assessment/Site Investigation Work Plan4 CES/CEVRDP-30AR-159.pdf
Seymour Johnson AFB, NCAR-160Dec/05/1994USEPA Region IV Letter to Base Concerning Draft Preliminary Assessment/Site Investigation ReportPope, Robert HEPA Region IVDitzler, Gregory G4 CES/CEVRDP-30AR-160.pdf
Seymour Johnson AFB, NCAR-161Dec/05/1994NCDEHNR Letter to Base Concerning Comments on Draft Preliminary Assessment/Site Investigation ReportRaynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesDitzler, Gregory G4 CES/CEVRDP-30AR-161.pdf
Seymour Johnson AFB, NCAR-162Dec/08/1994USEPA Region IV Letter to Base Concerning Draft Preliminary Assessment/Site Investigation ReportJohnston, Jon DEPA Region IVDitzler, Gregory G4 CES/CEVRDP-30AR-162.pdf
Seymour Johnson AFB, NCAR-163Mar/31/1995Draft Chemical Data Acquisition Plan for Soil Sampling and Monitoring Well Installation Program Site Investigation POL Storage Area (Sites SD-02, SD-03, ST-05) and SAC Fuel Hydrant System (Site SS-12)IMS PC Environmental and Engineering4 CES/CEVRSD-02|SS-04|SS-05|SS-12|ST-01AR-163.pdf
Seymour Johnson AFB, NCAR-164Apr/07/1995NCDEHNR Letter to Base Concerning Collection of Additional SamplesRaynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesEpperson-Schaeffer, Ralph N4 CES/CEVRDP-30AR-164.pdf
Seymour Johnson AFB, NCAR-165May/08/1995USEPA Region IV Letter to Base Concerning Preliminary Design Document, Various IRP SitesPope, Robert HEPA Region IVEpperson-Schaeffer, Ralph N4 CES/CEVRSD-02|SD-03|SS-04|SS-05|SS-12|ST-01AR-165.pdf
Seymour Johnson AFB, NCAR-166Aug/17/1995USEPA Region 4 Letter to Base Concerning Draft Final Expanded Site Investigation/RCRA Facility Investigation Report Tower Road Site (OT-29), Former Fire Training Pit Site, and Refueling Maintenance Shop (RMS) SitePope, Robert HEPA Region IVEpperson-Schaeffer, Ralph N4 CES/CEVROT-29|SS-31AR-166.pdf
Seymour Johnson AFB, NCAR-167Sep/01/1995Base Newsletter, "RAB Conducts First Meeting"PublicRestoration AdvisoryAR-167.pdf
Seymour Johnson AFB, NCAR-168Oct/01/1995Site-Specific Action Memorandum (SSAM) for the Tower Road Site (OT-29)Radian Corporation4 CES/CEVROT-29AR-168.pdf
Seymour Johnson AFB, NCAR-169Oct/31/1995Final Work Plan for Soil Sampling and Monitor Well Installation Program Site Investigation POL Storage Area (Site SD-02, SD-03, ST-05) and SAC Fuel Hydrant System (Site SS-12)IMS PC Environmental and Engineering4 CES/CEVRSD-02|SD-03|SS-04|SS-05|SS-12|ST-01AR-169.pdf
Seymour Johnson AFB, NCAR-170Dec/06/1995Meeting Minutes of the RAB Meeting for 6 Dec 95Epperson-Schaeffer, Ralph N4 CES/CEVPublicRestoration AdvisoryAR-170.pdf
Seymour Johnson AFB, NCAR-171Dec/21/1995NCDEHNR Letter to Base Concerning Comments on Draft Final Expanded Site Investigation/RCRA Facility Investigation - Tower Road Radar Site (Site OT-29), Former Fire Training Pit Site, and Refueling Maintenance Shop SiteRaynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesEpperson-Schaeffer, Ralph N4 CES/CEVROT-29|SS-31AR-171.pdf
Seymour Johnson AFB, NCAR-172Jan/10/1996USEPA Region 4 Letter to Base Concerning Site-Specific Action Memorandum (SSAM) for the Tower Road Site (OT-29)Pope, Robert HEPA Region IVEpperson-Schaeffer, Ralph N4 CES/CEVROT-29AR-172.pdf
Seymour Johnson AFB, NCAR-173Jan/24/1996NCDEHNR Letter to Base Concerning Comments on Draft Site-Specific Action Memorandum (SSAM) for the Tower Road Site (OT-29)Raynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesEpperson-Schaeffer, Ralph N4 CES/CEVROT-29AR-173.pdf
Seymour Johnson AFB, NCAR-174Feb/01/1996Final Expanded Site Investigation/RCRA Facility Investigation Tower Road Radar Site (Site OT-29), Former Fire Training Pit Site, and Refueling Maintenance Shop Site Volume IRust Environmental and Infrastructure4 CES/CEVROT-29|SS-31AR-174.pdf
Seymour Johnson AFB, NCAR-175Feb/01/1996LCS - DCS Report Part 1 of 2.4 CES/CEVROT-29|SS-31AR-175.pdf
Seymour Johnson AFB, NCAR-175Feb/01/1996LCS - DCS Report Part 2 of 2.4 CES/CEVROT-29|SS-3129_71885_opt_2.pdf
Seymour Johnson AFB, NCAR-176Mar/01/1996Site-Specific Action Memorandum (SSAM) for the Tower Road Site (OT-29)Radian Corporation4 CES/CEVROT-29AR-176.pdf
Seymour Johnson AFB, NCAR-177May/24/1996NCDEHNR Letter to Base Concerning Comments on the Final Design Analysis, Specifications and Drawings Tower Road Radar Site (OT-29)Raynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesEpperson-Schaeffer, Ralph N4 CES/CEVROT-29AR-177.pdf
Seymour Johnson AFB, NCAR-178Jun/26/1996Meeting Minutes of the RAB Meeting for 26 June 1996Epperson-Schaeffer, Ralph N4 CES/CEVPublicRestoration AdvisoryAR-178.pdf
Seymour Johnson AFB, NCAR-179Dec/01/1996Dare Range Analysis Request Part 1 of 2.4 CES/CEVRDP-30AR-179.pdf
Seymour Johnson AFB, NCAR-179Dec/01/1996Dare Range Analysis Request Part 2 of 2.4 CES/CEVRDP-3029_71598-opt_2.pdf
Seymour Johnson AFB, NCAR-180Jan/01/1997Phase I Work Plan Refueling Maintenance ShopIT Corporation4 CES/CEVROT-29AR-180.pdf
Seymour Johnson AFB, NCAR-181Feb/04/1997Charter of the Seymour Johnson Air Force Base Installation Restoration Program Restoration Advisory BoardDitzler, Gregory G4 CES/CEVRPublicRestoration AdvisoryAR-181.pdf
Seymour Johnson AFB, NCAR-182Jan/15/1997Meeting Minutes of the RAB Meeting for January 15, 1997Ditzler, Gregory G4 CES/CEVRPublicRestoration AdvisoryAR-182.pdf
Seymour Johnson AFB, NCAR-183Feb/01/1997Phase I Report Refueling Maintenance ShopIT Corporation4 CES/CEVROT-29AR-183.pdf
Seymour Johnson AFB, NCAR-184Feb/07/1997NCDEHNR Letter to Base Concerning Comments on the Draft Site Investigation Report POL Storage Area (Sites SD-02, SD-03 and ST-05) and SAC Fuel Hydrant System (Site SS-12)Raynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesDitzler, Gregory G4 CES/CEVRSD-02|SS-05|SS-12|ST-01AR-184.pdf
Seymour Johnson AFB, NCAR-185Apr/01/1997Final Long-Term Monitoring Work Plan Part 1 of 2.Beyak, Richard AURSRowe, Steve4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-21|SS-09|SS-24|ST-14|WP-27AR-185.pdf
Seymour Johnson AFB, NCAR-185Apr/01/1997Final Long-Term Monitoring Work Plan Part 2 of 2.Beyak, Richard AURSRowe, Steve4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-21|SS-09|SS-24|ST-14|WP-2729_71729_opt_2.pdf
Seymour Johnson AFB, NCAR-186Apr/14/1997NCDEHNR Letter to Base Concerning Comments on the Draft Long-Term Monitoring Work Plan for Sites LF-06, LF-08, LF-15, LF-16, LF-23, FT-07, FT-19, FT-20, SS-09, SS-24, OT-21, ST-14, WP-27Raynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesDitzler, Gregory G4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|SS-09|SS-22|ST-14|WP-27AR-186.pdf
Seymour Johnson AFB, NCAR-187Apr/15/1997NCDEHNR Letter to Base Concerning Monitoring Requirements for IRP Sites LF-06, LF-08, LF-16, LF-23, FT-07, FT-19, FT-20, SS-09, SS-24, OT-21, ST-14 and WP-27Raynor, Linda FNorth Carolina Department of Environment, Health and Natural ResourcesDitzler, Gregory G4 CES/CEVRFT-07|FT-19|FT-20|LF-06|LF-08|LF-15|LF-16|LF-23|OT-21|SS-09|SS-24|ST-14|WP-27AR-187.pdf
Seymour Johnson AFB, NCAR-188Jun/01/1997Phase I Report Refueling Maintenance Shop - 1IT Corporation4 CES/CEVROT-29AR-188.pdf
Seymour Johnson AFB, NCAR-189Jul/16/1997Meeting Minutes of the RAB Meeting for July 16, 1997Ditzler, Gregory G4 CES/CEVRPublicRestoration AdvisoryAR-189.pdf

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .