This solicitation is for an invitation for bid for a renovation project at Fort Gordon, Georgia. The project scope includes interior renovation of 56,555 square feet to create learning environments and support space, as well as new mechanical, electrical, and life safety systems infrastructure to ultimately serve both Phase 1 and Phase 2 construction. The magnitude of work is estimated between $10 million and $25 million. Bids are due in accordance with FAR Clause 52.219-4, which provides a price evaluation preference for HUBZone small businesses. Offerors must be registered in the System for Award Management. The Army Corps of Engineers Engineering District Savannah is the contracting agency. Accompanying the solicitation are eight specifications and drawing files.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 " W
(A B
A N
D O
N E
D
BFP
8"W
PIV
3 " W
(C I P
UGPUGPUGP
U G
P
UGP
UGPUGPUGP
UGP
GM
BRAINARD AVENUE
N
D S
T R
E E
T
S
T S
T R
E E
T
S
S
S
S
S
GV
E
E
E
S
F D C
S
S
S
S
S
UGP
UGP
UGP
UGP
UG
P
SEE ELECTRICAL DWG.
ES101-P1 FOR ADDITIONAL
INFORMATION
BFP WM
EEE E E E
E
SWITCH GEAR
E
E
4"PW
6"FW
" W
"W
"W
SS S
J J
J J
J J
J J
J J
J J
J J
J J
J J
J J
J J
J
J J
J J
J J
J J
J J
J J
J J
J J
J J
VFD
VFD
VFD
V F
D J
J J J
J J
J J
J J
J J
J J
J J
J J
J J
J J J
J J
J J
J J
J J
J J
J J
J
J J
J
VFD
VFD
J
J J
J J
J
J
J
POWER GENERAL NOTES
POWER KEYNOTES
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEETS E-601-P1--E604-P1 FOR ELECTRICAL ONE
LINE DIAGRAMS.
C. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
D. PROVIDE UTILITY EQUIPMENT HOUSEKEEPING PADS PER
GEORGIA POWER SPECIFICATIONS.
E. COORDINATE WITH GEORGIA POWER FOR UTILITY EQUIPMENT
GROUNDING CONNECTION.
F. CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS PRIOR
TO COMMENCING WORK. NOTIFY ENGINEER OF ANY
DISCOVERIES OR DISCREPANCIES THAT ARE NOT SHOWN
PRIOR TO COMMENCING WORK.
G. ANY ELECTRICAL DEVICE OR EQUIPMENT NOT NOTED TO BE
REMOVED OR RELOCATED SHALL REMAIN UNCHANGED. IT
SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTACT
THE ARCHITECT/ENGINEER REGARDING ANY ITEM IN QUESTION.
H. CONTRACTOR MUST UNDER NO CIRCUMSTANCE DEMOLISH OR
DISCONNECT EXISTING FEEDERS WITHOUT COORDINATION AND
APPROVAL FROM OWNER.
I. CONTRACTOR MUST BLUE STAKE ALL AREAS DESIGNATED FOR
EXCAVATION AND TRENCHING PRIOR TO COMMENCING WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL
UTILITIES UNDERGROUND OR OTHERWISE DAMAGED DURING
CONSTRUCTION.
J. COORDINATE ALL UNDERGROUND UTILITIES ROUTING WITH
CIVIL DRAWINGS AND WITH GEORGIA POWER.
US Army Corps of Engineers ®
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\rvt\2019\10053876-M-VHALL-Central_Johnny.EstradaRL62D.rvt
8/25/2021 11:05:12 AM
ES101-P1
E L E
C T
R
IC
A L P
O W
E R
S
IT
E P
L A
N
P H
A S
E
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
C C
A N
E T
T I
D A
D A
M
T M
A H
E R
L B
A Y
L O
N
C A
T E
G O
R Y
C O
D E
F Y
P
N
NORTH
KEY PLAN
A B C
F E D
1. EXISTING SECTIONALIZING SWITCH OWNED BY GEORGIA
POWER CO.
2. EXISTING PRIMARY DUCTBANK AND MANHOLE OWNED BY
GEORGIA POWER CO.
3. EXISTING PRIMARY SWITCHGEAR OWNED AND OPERATED BY
GEORGIA POWER CO.
4. EXISTING UTILITY TRANSFORMERS WITH OVERHEAD
SECONDARY BUSDUCT SYSTEM. TRANSFORMERS ARE OWNED
BY GEORGIA POWER CO.
5. PRIMARY AND SECONDARY CONDUIT STUB-UPS TO BE CAPPED
AT TRANSFORMER PAD FOR FUTURE PHASE 2 ELECTRICAL
SERVICE.
6. PROVIDE HOUSEKEEPING PAD PER GEORGIA POWER
SPECIFICATIONS FOR NEW BUILDING UTILITY TRANSFORMER
TO BE OWNED AND INSTALLED BY GEORGIA POWER CO.
7. PRIMARY DUCTBANK TO BE INSTALLED AND OWNED BY
GEORGIA POWER CO.
8. PROVIDE AND INSTALL CONCRETE ENCASED DUCT BANK FOR
SECONDARY FEEDERS. THERE ARE TWO SECONDARY FEEDER
DUCTBANK, ONE FOR PHASE 1 AND THE OTHER IS FOR PHASE 2.
PHASE 2 WILL BE CONDUITS ONLY AND WILL BE STUB INSIDE
THE MAIN ELECTRICAL ROOM. EACH DUCT BANK SHALL BE (10)
4" CONDUITS FROM NEW UTILITY TRANSFORMER TO EXTERIOR
WAL OF THE BUILDING. REFER TO ONE LINE DIAGRAM SHEET
E-601 FOR CONDUCTOR SIZE. REFER TO ON SHEET E-502-P1
DETAIL C5 FOR DUCT BANK DETAIL. COORDINATE ALL WORK
WITH GEORGIA POWER. PHASE 2 CONDUCTORS WILL BE PULLED
DURING PHASE 2 PROJECT.
9. AT THIS LOCATION THE DUCT BANK CONDUITS SHALL TURN 90
DEGREES UP AND CONTINUE UP THE EXTERIOR BUILDING WALL
TO APPROXIMATELY 12' ABOVE THE GROUND. THE CONDUITS
WILL THEN TURN 90 DEGREES HORIZONTALLY PENETRATING
THE WALL INTO THE NEW MAIN ELECTRICAL ROOM. THE
VERTICAL RUN OUTSIDE THE BUILDING SHALL BE PROVIDED
WITH STRUCTURAL SUPPORT. FOR CONTINUATION REFER TO
ENLARGED PLAN A1 ON SHEET E-401-P1. ALL PENETRATION
SHALL BE WATER TIGHT SEALED AS REQUIRED.
10. THE EXISTING BUILDING SERVICE MUST REMAIN FUNCTIONAL
SERVING THE UN-RENOVATED AREAS DURING THE
CONSTRUCTION OF PHASE 1. THE EXISTING BUILDING SERVICE
WILL BE DE-ENERGIZED AND DEMOLISHED AT THE END OF
PHASE 2 BY GEORGIA POWER CO. THE SECONDARY OVERHEAD
BUSDUCT WILL BE REMOVED BY THE CONTRACTOR AFTER
BEING DE-ENERGIZED.
11. THE NEW SECOND BUILDING SERVICE HAS TO BE INSTALLED
AND ENERGIZED IN PARALLEL WITH THE EXISTING MAIN
ELECTRICAL SERVICE.
12. SWITCHING CUBICAL OWNED AND INSTALLED BY GEORGIA
POWER CO.
(TYP. OF 4)
1" = 30'-0" A1
ELECTRICAL POWER SITE PLAN - PHASE 1
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
ONE-LINE GENERAL NOTES
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
C. REFER TO SHEET E-606-P1 FOR TRANSFORMER SCHEDULE,
TRANSFORMER PRIMARY AND SECONDARY FEEDER SIZES.
D. PROVIDE 100% RATED BREAKERS FOR ALL BREAKERS RATED
400A AND LARGER.
E. FOR ALL PANELBOARDS AND DISTRIBUTION BOARDS SHOWN
WITH SURGE PROTECTION DEVICES (SPDS) CONNECTED IN
FIELD LOCATE SPD ABOVE OR BELOW EQUIPMENT.
ONE-LINE KEYNOTES
30A 3P
NSG1M1 - (NORMAL)
SWITCHGEAR
3200A, 277/480V, 3PH, 4W
65kAIC
2 3 43200AF
3200AT
3P,NC
ZSI,
LSIG
800AF
800AT
3P,NC,
ZSI
LSIG
11 12
NDH1NE1 - (LVL 1 NE)
DISTRIBUTION BOARD
(SEE E-602-P1 FOR
CONTINUATION)
NDH1SE1 - (LVL 1 SE)
DISTRIBUTION BOARD
(SEE E-602-P1 FOR
CONTINUATION)
NDH2NE1- (LVL 2 NE)
DISTRIBUTION BOARD
(SEE E-603-P1 FOR
CONTINUATION)
NDH2SE1- (LVL 2 SE)
DISTRIBUTION BOARD
(SEE E-603-P1 FOR
CONTINUATION)
5 6 7 8 9 10
SPD
100A 3P
100A 3P
100A
3PBATT SYS
90MIN @100%
LOADING EOL
LVR1M1
60kVA, LIGHTING
INVERTER
277/480V, 3PH,4W
W/90 MINUTE BATTERY
BACKUP
30A 3P
60A 3P
60A 3P
1 2
60A 3P
SPARE
3 4
30A 3P
60A 3P
SPARE
6 7 8
SPACE SPACE
100A
3P SPD
LDL1M1 - EMERGENCY
DISTRIBUTION BOARD
100A, 277/480V, 3PH, 4W
22kAIC
LPH1NE1
60A MCB
277/480V
3PH,4W
LPH2SE1
60A MCB
277/480V
3PH,4W
6Y 6Y
SPD SPD
LPL1M1
50A MCB
120/208V
3PH,4W
LTR1M1
T15K 480V-120/208V, 3PH, 4W
60A 3P
SPARE
80Y 80Y 80Y 80Y 10Y
320Y
UTILITY TRANSFORMER
T-1
13.2KV-277/480VAC
3P,4W 60Hz
QDH1EM1 - (MECHANICAL)
DISTRIBUTION
BOARD
(SEE E-604-P1 FOR
CONTINUATION)
QDH1EM2 - (MECHANICAL)
DISTRIBUTION
BOARD
(SEE E-604-P1 FOR
CONTINUATION)
QDH2NE1 - (MECHANICAL)
DISTRIBUTION
BOARD
(SEE E-604-P1 FOR
CONTINUATION)
VFD
ECH 01
182KW
VFD
CH 02
180KW
80Y 80Y 80Y
800AF
SPACE
3P
40 40
QDH1M1 - (MECHANICAL)
DISTRIBUTION
BOARD
(SEE E-604-P1 FOR
CONTINUATION)
40Y
DM
800AF
800AT
3P,NC,
ZSI
LSIG
DM
800AF
800AT
3P,NC,
ZSI
LSIG
DM
800AF
800AT
3P,NC,
ZSI
LSIG
DM
800AF
800AT
3P,NC,
ZSI
LSIG
800AF
800AT
3P,NC,
ZSI
LSIG
800AF
800AT
3P,NC,
ZSI
LSIG
DM DM DM DM DM DM
800AF
500AT
3P,NC,
ZSI
LSIG
800AF
500AT
3P,NC,
ZSI
LSIG
800AF
400AT
3P,NC,
ZSI
LSIG
800AF
800AT
3P,NC,
ZSI
LSIG
800AF
800AT
3P,NC,
ZSI
LSIG
DM DM
14 15
100AF
100AT
3P,NC,
ZSI
LSIG
DM
RTU
DM
TO 120V
TO BCS
SPARE SPARE
US Army Corps of Engineers ®
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\rvt\2019\10053876-M-VHALL-Central_Johnny.EstradaRL62D.rvt
8/25/2021 11:06:05 AM
E-601-P1
E L E
C T
R
IC
A L O
N E
-L
IN
E D
IA
G
R A
M
P H
A S
E
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
C C
A N
E T
T I
D A
D A
M
T M
A H
E R
L B
A Y
L O
N
C A
T E
G O
R Y
C O
D E
F Y
P
N
N.T.S.
A1
ELECTRICAL - ONE LINE DIAGRAM - PHASE 1
1. PRIMARY FEEDER ( PROVIDED AND INSTALLED BY GEORGIA
POWER) TO GEORGIA POWER PAD MOUNTED SWITCHGEAR
(PROVIDED BY GEORGIA POWER). COORDINATE WORK WITH
GEORGIA POWER.
2. UTILITY TRANSFORMER WITH UTILITY METERING. PROVIDED
AND INSTALLED BY GEORGIA POWER. TRANSFORMER SIZE
WILL BE DESIGNED BY GEORGIA POWER.
3. PROVIDE SECONDARY FEEDER FROM TRANSFORMER TO NEW
SWITCHGEAR. REFER TO POWER SITE PLAN SHEET ES-101 AND
POWER PLAN EP-101-P1 FOR ADDITIONAL INFORMATION.
COORDINATE ALL WORK WITH GEORGIA POWER.
4. TO BCS COORDINATE WITH CONTROLS CONTRACTOR AND
DIVISION 23 SPECIFICATIONS.
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
| ES101-P1 ELECTRICAL - POWER SITE PLAN |