This solicitation is for an invitation for bid for a renovation project at Fort Gordon, Georgia. The project scope includes interior renovation of 56,555 square feet to create learning environments and support space, as well as new mechanical, electrical, and life safety systems infrastructure to ultimately serve both Phase 1 and Phase 2 construction. The magnitude of work is estimated between $10 million and $25 million. Bids are due in accordance with FAR Clause 52.219-4, which provides a price evaluation preference for HUBZone small businesses. Offerors must be registered in the System for Award Management. The Army Corps of Engineers Engineering District Savannah is the contracting agency. Accompanying the solicitation are eight specifications and drawing files.

View the file

Other files

File Type Posted
C.04. W912HN21B3008 - Vincent Hall Reno. -HUB zone preference ABSTRACT.pdf PDF
W912HN21B3008 BID OPENING ATTENDEES.pdf PDF
C.04. W912HN21B3008 - Vincent Hall Reno. -HUB zone preference.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A_AMD2.pdf PDF
B.08 W912HN21B3008 Amendment 0002.pdf PDF
B.08 W912HN21B3008 Amendment 0002 CC.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1B_AMD1.pdf PDF
B.08 W912HN21B3008 Amendment 0001.pdf PDF
Phase1_RTA_V2-C_Div_25-33_Appendices_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1C_AMD1.pdf PDF
Phase1_RTA_V2-A_Div_00-07_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D_AMD1.pdf PDF
Phase1_RTA_V2-B_Div_08-23_AMD1.pdf PDF
B.08 W912HN21B3008 Amendment 0001 CC.pdf PDF
Vincent Hall Site Visit Attendance Roster.pdf PDF
Vincent Hall Pre-Bid Site Visit Synopsis.docx DOCX document
B.08 - Solicitation W912HN21B3008 - Vincent Hall.pdf PDF
Phase1_RTA_V2-A_Div_00-07.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1C.pdf PDF
Phase1_RTA_V2-B_Div_08-23.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1B.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1E.pdf PDF
B.08_W912HN20B3008 Vincent Hall Solicitation.pdf PDF
Phase1_RTA_V2-C_Div_25-33 Appendices.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8 " W

(A B

A N

D O

N E

D

BFP

8"W

PIV

3 " W

(C I P

UGPUGPUGP

U G

P

UGP

UGPUGPUGP

UGP

GM

BRAINARD AVENUE

N

D S

T R

E E

T

S

T S

T R

E E

T

S

S

S

S

S

GV

E

E

E

S

F D C

S

S

S

S

S

UGP

UGP

UGP

UGP

UG

P

SEE ELECTRICAL DWG.

ES101-P1 FOR ADDITIONAL

INFORMATION

BFP WM

EEE E E E

E

SWITCH GEAR

E

E

4"PW

6"FW

" W

"W

"W

SS S

J J

J J

J J

J J

J J

J J

J J

J J

J J

J J

J J

J

J J

J J

J J

J J

J J

J J

J J

J J

J J

VFD

VFD

VFD

V F

D J

J J J

J J

J J

J J

J J

J J

J J

J J

J J

J J J

J J

J J

J J

J J

J J

J J

J

J J

J

VFD

VFD

J

J J

J J

J

J

J

POWER GENERAL NOTES

POWER KEYNOTES

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEETS E-601-P1--E604-P1 FOR ELECTRICAL ONE

LINE DIAGRAMS.

C. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

D. PROVIDE UTILITY EQUIPMENT HOUSEKEEPING PADS PER

GEORGIA POWER SPECIFICATIONS.

E. COORDINATE WITH GEORGIA POWER FOR UTILITY EQUIPMENT

GROUNDING CONNECTION.

F. CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS PRIOR

TO COMMENCING WORK. NOTIFY ENGINEER OF ANY

DISCOVERIES OR DISCREPANCIES THAT ARE NOT SHOWN

PRIOR TO COMMENCING WORK.

G. ANY ELECTRICAL DEVICE OR EQUIPMENT NOT NOTED TO BE

REMOVED OR RELOCATED SHALL REMAIN UNCHANGED. IT

SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTACT

THE ARCHITECT/ENGINEER REGARDING ANY ITEM IN QUESTION.

H. CONTRACTOR MUST UNDER NO CIRCUMSTANCE DEMOLISH OR

DISCONNECT EXISTING FEEDERS WITHOUT COORDINATION AND

APPROVAL FROM OWNER.

I. CONTRACTOR MUST BLUE STAKE ALL AREAS DESIGNATED FOR

EXCAVATION AND TRENCHING PRIOR TO COMMENCING WORK.

CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL

UTILITIES UNDERGROUND OR OTHERWISE DAMAGED DURING

CONSTRUCTION.

J. COORDINATE ALL UNDERGROUND UTILITIES ROUTING WITH

CIVIL DRAWINGS AND WITH GEORGIA POWER.

US Army Corps of Engineers ®

G

2 3 4 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

VHALL

J U

N E

W H

N B

-- 1 -3

-0

READY TO ADVERTISE (RTA)

V

IN

C E

N T

H A

L L R

E N

O V

A T

IO

N

P H

A S

E

C:\rvt\2019\10053876-M-VHALL-Central_Johnny.EstradaRL62D.rvt

8/25/2021 11:05:12 AM

ES101-P1

E L E

C T

R

IC

A L P

O W

E R

S

IT

E P

L A

N

P H

A S

E

F O

R T

G O

R D

O N

G

E O

R G

IA

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

A

H D

R A

R L

IN

G T

O N

V

IR

G

IN

IA

C C

A N

E T

T I

D A

D A

M

T M

A H

E R

L B

A Y

L O

N

C A

T E

G O

R Y

C O

D E

F Y

P

N

NORTH

KEY PLAN

A B C

F E D

1. EXISTING SECTIONALIZING SWITCH OWNED BY GEORGIA

POWER CO.

2. EXISTING PRIMARY DUCTBANK AND MANHOLE OWNED BY

GEORGIA POWER CO.

3. EXISTING PRIMARY SWITCHGEAR OWNED AND OPERATED BY

GEORGIA POWER CO.

4. EXISTING UTILITY TRANSFORMERS WITH OVERHEAD

SECONDARY BUSDUCT SYSTEM. TRANSFORMERS ARE OWNED

BY GEORGIA POWER CO.

5. PRIMARY AND SECONDARY CONDUIT STUB-UPS TO BE CAPPED

AT TRANSFORMER PAD FOR FUTURE PHASE 2 ELECTRICAL

SERVICE.

6. PROVIDE HOUSEKEEPING PAD PER GEORGIA POWER

SPECIFICATIONS FOR NEW BUILDING UTILITY TRANSFORMER

TO BE OWNED AND INSTALLED BY GEORGIA POWER CO.

7. PRIMARY DUCTBANK TO BE INSTALLED AND OWNED BY

GEORGIA POWER CO.

8. PROVIDE AND INSTALL CONCRETE ENCASED DUCT BANK FOR

SECONDARY FEEDERS. THERE ARE TWO SECONDARY FEEDER

DUCTBANK, ONE FOR PHASE 1 AND THE OTHER IS FOR PHASE 2.

PHASE 2 WILL BE CONDUITS ONLY AND WILL BE STUB INSIDE

THE MAIN ELECTRICAL ROOM. EACH DUCT BANK SHALL BE (10)

4" CONDUITS FROM NEW UTILITY TRANSFORMER TO EXTERIOR

WAL OF THE BUILDING. REFER TO ONE LINE DIAGRAM SHEET

E-601 FOR CONDUCTOR SIZE. REFER TO ON SHEET E-502-P1

DETAIL C5 FOR DUCT BANK DETAIL. COORDINATE ALL WORK

WITH GEORGIA POWER. PHASE 2 CONDUCTORS WILL BE PULLED

DURING PHASE 2 PROJECT.

9. AT THIS LOCATION THE DUCT BANK CONDUITS SHALL TURN 90

DEGREES UP AND CONTINUE UP THE EXTERIOR BUILDING WALL

TO APPROXIMATELY 12' ABOVE THE GROUND. THE CONDUITS

WILL THEN TURN 90 DEGREES HORIZONTALLY PENETRATING

THE WALL INTO THE NEW MAIN ELECTRICAL ROOM. THE

VERTICAL RUN OUTSIDE THE BUILDING SHALL BE PROVIDED

WITH STRUCTURAL SUPPORT. FOR CONTINUATION REFER TO

ENLARGED PLAN A1 ON SHEET E-401-P1. ALL PENETRATION

SHALL BE WATER TIGHT SEALED AS REQUIRED.

10. THE EXISTING BUILDING SERVICE MUST REMAIN FUNCTIONAL

SERVING THE UN-RENOVATED AREAS DURING THE

CONSTRUCTION OF PHASE 1. THE EXISTING BUILDING SERVICE

WILL BE DE-ENERGIZED AND DEMOLISHED AT THE END OF

PHASE 2 BY GEORGIA POWER CO. THE SECONDARY OVERHEAD

BUSDUCT WILL BE REMOVED BY THE CONTRACTOR AFTER

BEING DE-ENERGIZED.

11. THE NEW SECOND BUILDING SERVICE HAS TO BE INSTALLED

AND ENERGIZED IN PARALLEL WITH THE EXISTING MAIN

ELECTRICAL SERVICE.

12. SWITCHING CUBICAL OWNED AND INSTALLED BY GEORGIA

POWER CO.

(TYP. OF 4)

1" = 30'-0" A1

ELECTRICAL POWER SITE PLAN - PHASE 1

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

ONE-LINE GENERAL NOTES

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

C. REFER TO SHEET E-606-P1 FOR TRANSFORMER SCHEDULE,

TRANSFORMER PRIMARY AND SECONDARY FEEDER SIZES.

D. PROVIDE 100% RATED BREAKERS FOR ALL BREAKERS RATED

400A AND LARGER.

E. FOR ALL PANELBOARDS AND DISTRIBUTION BOARDS SHOWN

WITH SURGE PROTECTION DEVICES (SPDS) CONNECTED IN

FIELD LOCATE SPD ABOVE OR BELOW EQUIPMENT.

ONE-LINE KEYNOTES

30A 3P

NSG1M1 - (NORMAL)

SWITCHGEAR

3200A, 277/480V, 3PH, 4W

65kAIC

2 3 43200AF

3200AT

3P,NC

ZSI,

LSIG

800AF

800AT

3P,NC,

ZSI

LSIG

11 12

NDH1NE1 - (LVL 1 NE)

DISTRIBUTION BOARD

(SEE E-602-P1 FOR

CONTINUATION)

NDH1SE1 - (LVL 1 SE)

DISTRIBUTION BOARD

(SEE E-602-P1 FOR

CONTINUATION)

NDH2NE1- (LVL 2 NE)

DISTRIBUTION BOARD

(SEE E-603-P1 FOR

CONTINUATION)

NDH2SE1- (LVL 2 SE)

DISTRIBUTION BOARD

(SEE E-603-P1 FOR

CONTINUATION)

5 6 7 8 9 10

SPD

100A 3P

100A 3P

100A

3PBATT SYS

90MIN @100%

LOADING EOL

LVR1M1

60kVA, LIGHTING

INVERTER

277/480V, 3PH,4W

W/90 MINUTE BATTERY

BACKUP

30A 3P

60A 3P

60A 3P

1 2

60A 3P

SPARE

3 4

30A 3P

60A 3P

SPARE

6 7 8

SPACE SPACE

100A

3P SPD

LDL1M1 - EMERGENCY

DISTRIBUTION BOARD

100A, 277/480V, 3PH, 4W

22kAIC

LPH1NE1

60A MCB

277/480V

3PH,4W

LPH2SE1

60A MCB

277/480V

3PH,4W

6Y 6Y

SPD SPD

LPL1M1

50A MCB

120/208V

3PH,4W

LTR1M1

T15K 480V-120/208V, 3PH, 4W

60A 3P

SPARE

80Y 80Y 80Y 80Y 10Y

320Y

UTILITY TRANSFORMER

T-1

13.2KV-277/480VAC

3P,4W 60Hz

QDH1EM1 - (MECHANICAL)

DISTRIBUTION

BOARD

(SEE E-604-P1 FOR

CONTINUATION)

QDH1EM2 - (MECHANICAL)

DISTRIBUTION

BOARD

(SEE E-604-P1 FOR

CONTINUATION)

QDH2NE1 - (MECHANICAL)

DISTRIBUTION

BOARD

(SEE E-604-P1 FOR

CONTINUATION)

VFD

ECH 01

182KW

VFD

CH 02

180KW

80Y 80Y 80Y

800AF

SPACE

3P

40 40

QDH1M1 - (MECHANICAL)

DISTRIBUTION

BOARD

(SEE E-604-P1 FOR

CONTINUATION)

40Y

DM

800AF

800AT

3P,NC,

ZSI

LSIG

DM

800AF

800AT

3P,NC,

ZSI

LSIG

DM

800AF

800AT

3P,NC,

ZSI

LSIG

DM

800AF

800AT

3P,NC,

ZSI

LSIG

800AF

800AT

3P,NC,

ZSI

LSIG

800AF

800AT

3P,NC,

ZSI

LSIG

DM DM DM DM DM DM

800AF

500AT

3P,NC,

ZSI

LSIG

800AF

500AT

3P,NC,

ZSI

LSIG

800AF

400AT

3P,NC,

ZSI

LSIG

800AF

800AT

3P,NC,

ZSI

LSIG

800AF

800AT

3P,NC,

ZSI

LSIG

DM DM

14 15

100AF

100AT

3P,NC,

ZSI

LSIG

DM

RTU

DM

TO 120V

TO BCS

SPARE SPARE

US Army Corps of Engineers ®

G

2 3 4 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

VHALL

J U

N E

W H

N B

-- 1 -3

-0

READY TO ADVERTISE (RTA)

V

IN

C E

N T

H A

L L R

E N

O V

A T

IO

N

P H

A S

E

C:\rvt\2019\10053876-M-VHALL-Central_Johnny.EstradaRL62D.rvt

8/25/2021 11:06:05 AM

E-601-P1

E L E

C T

R

IC

A L O

N E

-L

IN

E D

IA

G

R A

M

P H

A S

E

F O

R T

G O

R D

O N

G

E O

R G

IA

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

A

H D

R A

R L

IN

G T

O N

V

IR

G

IN

IA

C C

A N

E T

T I

D A

D A

M

T M

A H

E R

L B

A Y

L O

N

C A

T E

G O

R Y

C O

D E

F Y

P

N

N.T.S.

A1

ELECTRICAL - ONE LINE DIAGRAM - PHASE 1

1. PRIMARY FEEDER ( PROVIDED AND INSTALLED BY GEORGIA

POWER) TO GEORGIA POWER PAD MOUNTED SWITCHGEAR

(PROVIDED BY GEORGIA POWER). COORDINATE WORK WITH

GEORGIA POWER.

2. UTILITY TRANSFORMER WITH UTILITY METERING. PROVIDED

AND INSTALLED BY GEORGIA POWER. TRANSFORMER SIZE

WILL BE DESIGNED BY GEORGIA POWER.

3. PROVIDE SECONDARY FEEDER FROM TRANSFORMER TO NEW

SWITCHGEAR. REFER TO POWER SITE PLAN SHEET ES-101 AND

POWER PLAN EP-101-P1 FOR ADDITIONAL INFORMATION.

COORDINATE ALL WORK WITH GEORGIA POWER.

4. TO BCS COORDINATE WITH CONTROLS CONTRACTOR AND

DIVISION 23 SPECIFICATIONS.

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

ES101-P1 ELECTRICAL - POWER SITE PLAN
E-601-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1

File details come from the government source that posted it. Updated .