W912HN-21-B-3008_DRAWINGS_VOL1C.pdf
PDF 37 MB Posted
- Solicitation number
- W912HN21B3008
About this file
This solicitation is for project number ST-22018-8P to renovate Vincent Hall at Fort Gordon, Georgia. The project includes interior renovation of 56,555 square feet as well as new mechanical, electrical and life safety systems to support both phases of renovation. Pricing will be evaluated with a preference for HUBZone small businesses. Bids are due by the date specified in the solicitation, which was issued as full and open competition under NAICS code 236220 by the Department of the Army Corps of Engineers Savannah District. Accompanying the solicitation are eight specifications and drawing files.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
HDR Architecture
3001 WASHINGTON BLVD., SUITE 200
ARLINGTON, VIRGINIA 22201
(703)518-8500
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
SAVANNAH DISTRICT
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
JUNE 2021
W912HN21B3008
VINCENT HALL RENOVATION PHASE 1
C:\rvt\2019\10053876-A-VHALL-Central_hdr-alx-rcruz.rvt
7/8/2021 10:44:35 AM
FORT GORDON, GEORGIA
FY20 PN 92894
GI021-P1
G E
N E
R A
L
C O
V E
R S
H E
E T
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
N T
R A
N
R C
R U
Z
T M
A H
E R
H E
Z Z
E D
D
IN
E
C A
T E
G O
R Y
C O
D E
F Y
P
N
1296 Broad Street | Augusta, GA 30901 | (706) 724-5756
T E C H N O L O G I E S 10440 Little Patuxent Parkway, Suite 900 | Columbia, MD 21044 | (443) 832-3308
10280 Old Columbia Road | Columbia, MD 21046 | (410) 290-9301
1C
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\rvt\2019\10053876-A-VHALL-Central_hdr-alx-rcruz.rvt
7/8/2021 3:16:21 PM
GI022-P1
G E
N E
R A
L
IN
D
E X
O F
D R
A W
IN
G
S
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
N T
R A
N
R C
R U
Z
T M
A H
E R
H E
Z Z
E D
D
IN
E
C A
T E
G O
R Y
C O
D E
F Y
P
N
A-101E-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA E - PHASE 1
A-101D-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
A-101C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
A-101B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
A-101-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
AD501-P1 ARCHTIECTURAL - DEMOLITION DETAILS - PHASE 1
AD201-P1 ARCHITECTURAL - DEMOLITION ELEVATIONS - PHASE 1
AD112-P1 ARCHITECTURAL - TEMPORARY PARTITION LOCATION PLAN - LEVEL 2 - PHASE 1
AD111-P1 ARCHITECTURAL - TEMPORARY PARTITION LOCATION PLAN - LEVEL 1 - PHASE 1
AD103-P1 ARCHITECTURAL - DEMOLITION PLAN - ROOF - PHASE 1
AD102-P1 ARCHITECTURAL - DEMOLITION PLAN - LEVEL 2 - PHASE 1
AD101-P1 ARCHITECTURAL - DEMOLITION PLAN - LEVEL 1 - PHASE 1
AD001-P1 ARCHITECTURAL - GENERAL DEMOLITION NOTES - PHASE 1
ARCHITECTURAL
GI014-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
GI013-P1 GENERAL - INDEX OF DRAWINGS
GI012-P1 GENERAL - INDEX OF DRAWINGS
GI011-P1 GENERAL - COVER SHEET
GENERAL - VOLUME 1B
S-540-P1 STRUCTURAL - MASONRY - TYPICAL DETAILS
S-523-P1 STRUCTURAL - STEEL - SECTIONS AND DETAILS
S-522-P1 STRUCTURAL - STEEL - SECTIONS AND DETAILS
S-521-P1 STRUCTURAL - STEEL - TYPICAL DETAILS
S-520-P1 STRUCTURAL - STEEL - TYPICAL DETAILS
S-503-P1 STRUCTURAL - CONCRETE - TYPICAL DETAILS
S-502-P1 STRUCTURAL - CONCRETE - TYPICAL DETAILS
S-501-P1 STRUCTURAL - CONCRETE - TYPICAL DETAILS
S-213-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-212-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-211-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-210-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
SF104-P1 STRUCTURAL - PARTIAL FRAMING PLANS - PHASE 1
SF103D-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA D - PHASE 1
SF103C-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA C - PHASE 1
SF103B-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA B - PHASE 1
SF103-P1 STRUCTURAL - FRAMING PLAN - ROOF, OVERALL - PHASE 1
SF102E-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA E - PHASE 1
SF102D-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA D - PHASE 1
SF102C-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA C - PHASE 1
SF102B-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA B - PHASE 1
SF102-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, OVERALL - PHASE 1
SF101E-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, AREA E - PHASE 1
SF101D-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, AREA D - PHASE 1
SF101C-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, AREA C - PHASE 1
SF101-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, OVERALL - PHASE 1
SD103D-P1 STRUCTURAL - DEMOLITION PLAN - ROOF, AREA D - PHASE 1
SD103C-P1 STRUCTURAL - DEMOLITION PLAN - ROOF, AREA C - PHASE 1
SD103-P1 STRUCTURAL - DEMOLITION PLAN - ROOF, OVERALL - PHASE 1
SD102E-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA E - PHASE 1
SD102D-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA D - PHASE 1
SD102C-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA C - PHASE 1
SD102B-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA B - PHASE 1
SD102-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, OVERALL - PHASE 1
SD101E-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, AREA E - PHASE 1
SD101D-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, AREA D - PHASE 1
SD101C-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, AREA C - PHASE 1
SD101-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
S-006-P1 COMPONENTS & CLADDING WIND PRESSURES
S-005-P1 COMPONENTS & CLADDING WIND PRESSURES
S-004-P1 STRUCTURAL - SCHEDULE OF SPECIAL INSPECTION
S-003-P1 STRUCTURAL - SCHEDULE OF SPECIAL INSPECTION
S-002-P1 STRUCTURAL - GENERAL NOTES (CONT)
S-001-P1 STRUCTURAL - GENERAL NOTES
STRUCTURAL
CE502-P1 CIVIL - E.S.P.C. DETAILS & NOTES - PHASE 1
CE501-P1 CIVIL - E.S.P.C. DETAILS & NOTES - PHASE 1
CE101-P1 CIVIL - E.S.P.C. PLAN - PHASE 1
C-502-P1 CIVIL - SITE DETAILS - PHASE 1
C-501-P1 CIVIL - SITE DETAILS - PHASE 1
CG101-P1 CIVIL - PARTIAL GRADING AND DRAINAGE PLAN - PHASE 1
CU101-P1 CIVIL - SITE UTILITY PLAN - PHASE 1
CS101-P1 CIVIL - SITE LAYOUT PLAN - PHASE 1
CD101-P1 CIVIL - SITE DEMOLITION PLAN - PHASE 1
CV101-P1 CIVIL - SITE EXISTING CONDITIONS PLAN - PHASE 1
C-001-P1 CIVIL - GENERAL NOTES, LEGEND & LOCATION MAP - PHASE 1
CIVIL
G-112-P1 LIFE SAFETY FLOOR PLAN - LEVEL 2 - OVERALL - FINAL - PHASE 1
G-111-P1 LIFE SAFETY FLOOR PLAN - LEVEL 2 - OVERALL - FINAL - PHASE 1
G-102-P1 LIFE SAFETY FLOOR PLAN - LEVEL 2 - OVERALL - CONSTRUCTION - PHASE 1
G-101-P1 LIFE SAFETY FLOOR PLAN - LEVEL 1 - OVERALL - CONSTRUCTION - PHASE 1
G-100-P1 LIFE SAFETY - SITE PLAN - PHASE 1
G-012-P1 LIFE SAFETY BUILDING CODES ANALYSIS - PHASE 1
G-011-P1 LIFE SAFETY BUILDING CODES ANALYSIS - PHASE 1
G-010-P1 LIFE SAFETY BUILDING CODES ANALYSIS - PHASE 1
LIFE SAFETY
GI007-P1 GENERAL - SCOPE DIAGRAMS - PHASE 1
GI006-P1 GENERAL - LOCATION AND VICINITY MAPS
GI004-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
GI003-P1 GENERAL - INDEX OF DRAWINGS
GI002-P1 GENERAL - INDEX OF DRAWINGS
GI001-P1 GENERAL - COVER SHEET
GENERAL - VOLUME 1A
Sheet ID Drawing Title
Vincent Hall Drawing Index
A-611-P1 ARCHITECTURAL - INT. DEMOUNTABLE & EXT. STOREFRONT SCHEDULE, ELEVATIONS & DETAILS - PHASE 1
A-605-P1 ARCHITECTURAL - DOOR & FRAME DETAILS - PHASE 1
A-604-P1 ARCHITECTURAL - DOOR & FRAME DETAILS - PHASE 1
A-603-P1 ARCHITECTURAL - DOOR & FRAME DETAILS - PHASE 1
A-602-P1 ARCHITECTURAL - DOOR FRAME TYPES - PHASE 1
A-601-P1 ARCHITECTURAL - DOOR SCHEDULE - PHASE 1
A-555-P1 ARCHITECTURAL - EXTERIOR DETAILS - ROOF - PHASE 1
A-554-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-553-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-552-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-551-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-542-P1 ARCHITECTURAL - DETAILS - INTERIOR FINISH - PHASE 1
A-541-P1 ARCHITECTURAL - NOTES AND FINISH LEGEND - PHASE 1
A-531-P1 ARCHITECTURAL - INTERIOR CASEWORK DETAILS - PHASE 1
A-522-P1 ARCHITECTURAL - RAISED ACCESS FLOOR DETAILS - PHASE 1
A-521-P1 ARCHITECTURAL - RAISED ACCESS FLOOR DETAILS - PHASE 1
A-512-P1 ARCHITECTURAL - CEILING DETAILS - PHASE 1
A-511-P1 ARCHITECTURAL - CEILING DETAILS - PHASE 1
A-506-P1 ARCHITECTURAL - COLUMN PLAN DETAILS - PHASE 1
A-505-P1 ARCHITECTURAL - COLUMN PLAN DETAILS - PHASE 1
A-504-P1 ARCHITECTURAL - STANDARD PARTITION DETAILS - PHASE 1
A-503-P1 ARCHITECTURAL - STANDARD PARTITION DETAILS - PHASE 1
A-502-P1 ARCHITECTURAL - STANDARD PARTITION DETAILS - PHASE 1
A-501-P1 ARCHITECTURAL - PARTITION TYPES - PHASE 1
A-452-P1 ARCHITECTURAL - ENLARGED INTERIOR ELEVATIONS - PHASE 1
A-451-P1 ARCHITECTURAL - ENLARGED INTERIOR ELEVATIONS - PHASE 1
A-441-P1 ARCHITECTURAL - FURNITURE PLAN - TYPICAL ROOMS - PHASE 1
A-433-P1 ARCHITECTURAL - ELEVATOR DETAILS - PHASE 1
A-432-P1 ARCHITECTURAL - ELEVATOR 1 ROOF VESTIBULE ELEVATIONS - PHASE 1
A-431-P1 ARCHITECTURAL - ENLARGED PLANS & SECTIONS - ELEVATOR 1 - PHASE 1
A-426-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-425-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-424-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-423-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-422-P1 ARCHITECTURAL - ENLARGED PLANS & SECTIONS - STAIR 3 - PHASE 1
A-421-P1 ARCHITECTURAL - ENLARGED PLANS & SECTIONS - STAIR 1 - PHASE 1
A-419-P1 ARCHITECTURAL - TYPICAL LAYOUTS & MOUNTING HEIGHTS - PHASE 1
A-418-P1 ARCHITECTURAL - TYPICAL LAYOUTS & MOUNTING HEIGHTS - PHASE 1
A-414-P1 ARCHITECTURAL - ENLARGED ELEVATIONS - TOILETS - PHASE 1
A-413-P1 ARCHITECTURAL - ENLARGED FINISH PLANS - EAST TOILETS LEVEL 1 & 2 - PHASE 1
A-412-P1 ARCHITECTURAL - ENLARGED PLANS - EAST TOILETS LEVEL 2 - PHASE 1
A-411-P1 ARCHITECTURAL - ENLARGED PLANS - EAST TOILETS LEVEL 1 - PHASE 1
A-312-P1 ARCHITECTURAL - EXTERIOR WALL SECTIONS AND ELEVATIONS - PHASE 1
A-311-P1 ARCHITECTURAL - EXTERIOR WALL SECTIONS AND ELEVATIONS - PHASE 1
A-201-P1 ARCHITECTURAL - EXTERIOR ELEVATIONS - PHASE 1
A-152E-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA E - PHASE 1
A-152D-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA D - PHASE 1
A-152C-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA C - PHASE 1
A-152B-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA B - PHASE 1
A-152-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, OVERALL - PHASE 1
A-151C-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 1, AREA C - PHASE 1
A-151B-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 1, AREA B - PHASE 1
A-151-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 1, OVERALL - PHASE 1
A-142E-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA E - PHASE 1
A-142D-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA D - PHASE 1
A-142C-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA C - PHASE 1
A-142B-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA B - PHASE 1
A-142-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, OVERALL - PHASE 1
A-141E-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA E - PHASE 1
A-141D-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA D - PHASE 1
A-141C-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA C - PHASE 1
A-141B-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA B - PHASE 1
A-141-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, OVERALL - PHASE 1
A-132E-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
A-132D-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
A-132C-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
A-132B-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
A-132-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
A-131D-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
A-131C-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
A-131B-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
A-131-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
A-122E-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA E - PHASE 1
A-122D-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA D - PHASE 1
A-122C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C - PHASE 1
A-122B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B - PHASE 1
A-122-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, OVERALL - PHASE 1
A-121E-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA E - PHASE 1
A-121D-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA D - PHASE 1
A-121C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA C - PHASE 1
A-121B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA B - PHASE 1
A-121-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, OVERALL - PHASE 1
A-112-P1 ARCHITECTURAL - ACOUSTIC BOUNDARY FLOOR PLAN - LEVEL 2 - PHASE 1
A-111-P1 ARCHITECTURAL - ACOUSTIC BOUNDARY FLOOR PLAN - LEVEL 1 - PHASE 1
A-103D-P1 ARCHITECTURAL - ROOF PLAN - AREA D - PHASE 1
A-103C-P1 ARCHITECTURAL - ROOF PLAN - AREA C - PHASE 1
A-103B-P1 ARCHITECTURAL - ROOF PLAN - AREA B - PHASE 1
A-103-P1 ARCHITECTURAL - ROOF PLAN - OVERALL - PHASE 1
A-102E-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
A-102D-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
A-102C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
A-102B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
A-102-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
Sheet ID Drawing Title
Vincent Hall Drawing Index
P-651-P1 PLUMBING - SCHEDULES
P-630-P1 PLUMBING - RISER DIAGRAM - NATURAL GAS
P-620-P1 PLUMBING - RISER DIAGRAM - SUPPLY
P-610-P1 PLUMBING - RISER DIAGRAM - WASTE AND VENT
P-502-P1 PLUMBING - DETAILS
P-501-P1 PLUMBING - DETAILS
PP102E-P1 PLUMBING - SUPPLY PLAN - LEVEL 2, AREA E-PHASE 1
PP102D-P1 PLUMBING - SUPPLY PLAN - LEVEL 2, AREA D-PHASE 1
PP102C-P1 PLUMBING - SUPPLY PLAN - LEVEL 2, AREA C-PHASE 1
PP102-P1 PLUMBING - SUPPLY PLAN - LEVEL 2,OVERALL-PHASE 1
PP101D-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, AREA D-PHASE 1
PP101C-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, AREA C-PHASE 1
PP101B-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, AREA B-PHASE 1
PP101-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, OVERALL-PHASE 1
PL103E-P1 PLUMBING - WASTE AND VENT PLAN - ROOF, AREA E-PHASE 1
PL103D-P1 PLUMBING - WASTE AND VENT PLAN - ROOF, AREA D-PHASE 1
PL103-P1 PLUMBING - WASTE AND VENT PLAN - ROOF, OVERALL-PHASE 1
PL102E-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 2, AREA E-PHASE 1
PL102D-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 2, AREA D-PHASE 1
PL102-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 2,OVERALL-PHASE 1
PL101D-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 1, AREA D-PHASE 1
PL101C-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 1, AREA C-PHASE 1
PL101-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 1, OVERALL-PHASE 1
PL100D-P1 PLUMBING - WASTE AND VENT PLAN - UNDERGROUND, AREA D-PHASE1
PL100C-P1 PLUMBING - WASTE AND VENT PLAN - UNDERGROUND, AREA C -PHASE1
PL100-P1 PLUMBING - WASTE AND VENT PLAN - UNDERGROUND, OVERALL-PHASE1
PD103-P1 PLUMBING - DEMOLITION - ROOF, OVERALL-PHASE 1
PD102-P1 PLUMBING - DEMOLITION - LEVEL 2,OVERALL-PHASE 1
PD101-P1 PLUMBING - DEMOLITION - LEVEL 1, OVERALL-PHASE 1
PD100-P1 PLUMBING - DEMOLITION - UNDERGROUND, OVERALL-PHASE 1
P-001-P1 PLUMBING - SYMBOLS AND ABBREVIATIONS
PLUMBING
FX902-P1 FIRE SUPPRESSION ISOMETRIC - FINAL - PHASE 1
FX901-P1 FIRE SUPPRESSION ISOMETRIC - EXISTING - PHASE 1
FX503-P1 FIRE SUPPRESSION DETAILS - PHASE 1
FX502-P1 FIRE SUPPRESSION DETAILS - PHASE 1
FX501-P1 FIRE SUPPRESSION DETAILS - PHASE 1
FX401-P1 FIRE SUPPRESSION SECTIONS - PHASE 1
FX103C-P1 FIRE SUPPRESSION PLAN - LEVEL 3, AREA C - PHASE 1
FX103-P1 FIRE SUPPRESSION PLAN - LEVEL 3, OVERALL - PHASE 1
FX102F-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA F - PHASE 1
FX102E-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA E - PHASE 1
FX102D-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA D - PHASE 1
FX102C-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA C - PHASE 1
FX102B-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA B - PHASE 1
FX102A-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA A - PHASE 1
FX102-P1 FIRE SUPPRESSION PLAN - LEVEL 2, OVERALL - PHASE 1
FX101F-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA F - PHASE 1
FX101E-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA E - PHASE 1
FX101D-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA D - PHASE 1
FX101C-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA C - PHASE 1
FX101B-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA B - PHASE 1
FX101-P1 FIRE SUPPRESSION PLAN - LEVEL 1, OVERALL - PHASE 1
FD112-P1 FIRE SUPPRESSION DEMOLITION PLAN - LEVEL 2, OVERALL - PHASE 1
FD111-P1 FIRE SUPPRESSION DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
FX001-P1 FIRE SUPPRESSION ABBREVIATIONS, SYMBOLS AND GENERAL NOTES - PHASE 1
FA602-P1 FIRE ALARM RISER DIAGRAMS - PHASE 1
FA601-P1 FIRE ALARM MATRIX - PHASE 1
FA502-P1 FIRE ALARM DETAILS - PHASE 1
FA501-P1 FIRE ALARM DETAILS - PHASE 1
FA103C-P1 FIRE ALARM PLAN - LEVEL 3, AREA C - PHASE 1
FA103B-P1 FIRE ALARM PLAN - LEVEL 3, AREA B - PHASE 1
FA103-P1 FIRE ALARM PLAN - LEVEL 3, OVERALL - PHASE 1
FA102E-P1 FIRE ALARM PLAN - LEVEL 2, AREA E - PHASE 1
FA102D-P1 FIRE ALARM PLAN - LEVEL 2, AREA D - PHASE 1
FA102C-P1 FIRE ALARM PLAN - LEVEL 2, AREA C - PHASE 1
FA102B-P1 FIRE ALARM PLAN - LEVEL 2, AREA B - PHASE 1
FA102-P1 FIRE ALARM PLAN - LEVEL 2, OVERALL - PHASE 1
FA101E-P1 FIRE ALARM PLAN - LEVEL 1, AREA E - PHASE 1
FA101D-P1 FIRE ALARM PLAN - LEVEL 1, AREA D - PHASE 1
FA101C-P1 FIRE ALARM PLAN - LEVEL 1, AREA C - PHASE 1
FA101B-P1 FIRE ALARM PLAN - LEVEL 1, AREA B - PHASE 1
FA101-P1 FIRE ALARM PLAN - LEVEL 1, OVERALL - PHASE 1
FD102-P1 FIRE ALARM DEMOLITION PLAN - LEVEL 2, OVERALL - PHASE 1
FD101-P1 FIRE ALARM DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
FA001-P1 FIRE ALARM ABBREVIATIONS, SYMBOLS AND GENERAL NOTES - PHASE 1
FIRE PROTECTION
GI024-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
GI023-P1 GENERAL - INDEX OF DRAWINGS
GI022-P1 GENERAL - INDEX OF DRAWINGS
GI021-P1 GENERAL - COVER SHEET
GENERAL - VOLUME 1C
AG507-P1 WAYFINDING - SIGN DETAILS - TYPICAL MOUNTING
AG506-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES IPM, GFD, REG
AG505-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES ARA, ARAD, IPS
AG504-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES FIRE, EVAC, GFG1, FEC
AG503-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES RIDI, RIDP, CID, FAC, EXIT, RID, RRP, SID, WID, MRID, IDM.P, SEG
AG502-P1 WAYFINDING - SIGN DETAILS - COLORS, MATERIALS, PICTOGRAMS
AG501-P1 WAYFINDING - SIGN DETAILS - PROJECT TYPOGRAPHY
AG102-P1 WAYFINDING - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
AG101-P1 WAYFINDING - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
WAYFINDING
Sheet ID Drawing Title
Vincent Hall Drawing Index
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\rvt\2019\10053876-A-VHALL-Central_hdr-alx-rcruz.rvt
7/8/2021 3:16:30 PM
GI023-P1
G E
N E
R A
L
IN
D
E X
O F
D R
A W
IN
G
S
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
N T
R A
N
R C
R U
Z
T M
A H
E R
H E
Z Z
E D
D
IN
E
C A
T E
G O
R Y
C O
D E
F Y
P
N
M-871-P1 MECHANICAL - BCS - DETAILS - PHASE 1
M-870-P1 MECHANICAL - BCS - DETAILS - PHASE 1
M-861-P1 MECHANICAL - BCS - CHILLER ROOM VENTILATION CONTROL- PHASE 1
M-860-P1 MECHANICAL - BCS - MISCELLANEOUS CONTROLS- PHASE 1
M-851-P1 MECHANICAL - BCS - HYDROGEN MONITORING SYSTEM POINTS LIST AND SEQUENCE OF OPERATION -...
M-850-P1 MECHANICAL - BCS - HYDROGEN MONITORING SYSTEM DIAGRAM - PHASE 1
M-845-P1 MECHANICAL - BCS - TERMINAL UNIT POINTS AND SEQUENCE OF OPERATIONS - PHASE 1
M-844-P1 MECHANICAL - BCS - TERMINAL UNIT DIAGRAMS - PHASE 1
M-843-P1 MECHANICAL - BCS - HIGH POWERED ROOM CONTROL POINTS AND SEQUENCE OF OPERATIONS- PHASE 1
M-842-P1 MECHANICAL - BCS - HIGH POWERED ROOM CONTROL DIAGRAMS - PHASE 1
M-841-P1 MECHANICAL - BCS - ROOM CONTROL POINTS AND SEQUENCE OF OPERATIONS - PHASE 1
M-840-P1 MECHANICAL - BCS - ROOM CONTROL DIAGRAMS - PHASE 1
M-832-P1 MECHANICAL - BCS - CONDENSER WATER SYSTEM POINTS AND SEQUENCE OF OPERATIONS - PHASE 1
M-831-P1 MECHANICAL - BCS - CONDENSER WATER SYSTEM DIAGRAM B - PHASE 1
M-830-P1 MECHANICAL - BCS - CONDENSER WATER SYSTEM DIAGRAM A - PHASE 1
M-825-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM SEQEUNCE OF OPERATIONS - PHASE 1
M-824-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM POINTS - PHASE 1
M-823-P1 MECHANICAL - BCS - CHILLED WATER DISTRIBUTION - HVAC - PHASE 1
M-822-P1 MECHANICAL - BCS - CHILLED WATER DISTRIBUTION - ACB - PHASE 1
M-821-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM CONTROL DIAGRAM B - PHASE 1
M-820-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM CONTROL DIAGRAM A - PHASE 1
M-815-P1 MECHANICAL - BCS - AHU-3 AND 4 POINTS LIST AND SEQUENCE OF OPERATIONS - PHASE 1
M-814-P1 MECHANICAL - BCS - AHU-3 AND 4 CONTROL - PHASE 1
M-813-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM SEQUENCE OF OPERATIONS - PHASE 1
M-812-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM POINTS - PHASE 1
M-811-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM CONTROL B - PHASE 1
M-810-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM CONTROL A - PHASE 1
M-803-P1 MECHANICAL - BCS - SYSTEM ARCHITECTURE DRAWING - PHASE 1
M-802-P1 MECHANICAL - BCS - SYMBOLS AND ABBREVIATIONS (B) - PHASE 1
M-801-P1 MECHANICAL - BCS - SYMBOLS AND ABBREVIATIONS (A) - PHASE 1
M-654-P1 MECHANICAL - SCHEDULES - PHASE 1
M-653-P1 MECHANICAL - SCHEDULES - PHASE 1
M-652-P1 MECHANICAL - SCHEDULES - PHASE 1
M-651-P1 MECHANICAL - SCHEDULES - PHASE 1
M-614-P1 MECHANICAL - FLOW DIAGRAM - CHILLED WATER - DISTRIBUTION - ACB - PHASE 1
M-613-P1 MECHANICAL - FLOW DIAGRAM - CHILLED WATER - DISTRIBUTION - PHASE 1
M-612-P1 MECHANICAL - FLOW DIAGRAM - CHILLED WATER - PHASE 1
M-601-P1 MECHANICAL - FLOW DIAGRAM - AIR - PHASE 1
M-506-P1 MECHANICAL DETAILS - PHASE 1
M-505-P1 MECHANICAL DETAILS - PHASE 1
M-504-P1 MECHANICAL DETAILS - PHASE 1
M-503-P1 MECHANICAL DETAILS - PHASE 1
M-502-P1 MECHANICAL DETAILS - PHASE 1
M-501-P1 MECHANICAL DETAILS - PHASE 1
M-401-P1 MECHANICAL - ENLARGED PLANS - MECHANICAL ROOMS - PHASE 1
MP102E-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA E - PHASE 1
MP102D-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA D - PHASE 1
MP102C-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA C - PHASE 1
MP102B-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA B - PHASE 1
MP101E-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA E - PHASE 1
MP101D-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA D - PHASE 1
MP101C-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA C - PHASE 1
MP101B-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA B - PHASE 1
MH103D-P1 MECHANICAL HVAC/ PIPING - PLAN - ROOF LEVEL - AREA D - PHASE 1
MH103C-P1 MECHANICAL HVAC/ PIPING - PLAN - ROOF LEVEL - AREA C - PHASE 1
MH103B-P1 MECHANICAL HVAC/ PIPING - PLAN - ROOF LEVEL - AREA B - PHASE 1
MH102E-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA E - PHASE 1
MH102D-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA D - PHASE 1
MH102C-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA C - PHASE 1
MH102B-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA B - PHASE 1
MH101E-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA E - PHASE 1
MH101D-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA D - PHASE 1
MH101C-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA C - PHASE 1
MH101B-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA B - PHASE 1
M-103-P1 MECHANICAL - PLAN - ROOF LEVEL - OVERALL - PHASE 1
M-102-P1 MECHANICAL - PLAN - LEVEL 2 - OVERALL - PHASE 1
M-101-P1 MECHANICAL - PLAN - LEVEL 1 - OVERALL - PHASE 1
MD402-P1 MECHANICAL DEMOLITION ENLARGED PLANS - PHASE 1
MD401-P1 MECHANICAL DEMOLITION ENLARGED PLANS - PHASE 1
MD103-P1 MECHANICAL DEMOLITION - PLAN - ROOF LEVEL - OVERALL - PHASE 1
MD102-P1 MECHANICAL DEMOLITION - PLAN - LEVEL 2 - OVERALL - PHASE 1
MD101-P1 MECHANICAL DEMOLITION - PLAN - LEVEL 1 - OVERALL - PHASE 1
M-002-P1 MECHANICAL SCOPE DIAGRAMS - PHASE 1
M-001-P1 MECHANICAL SYMBOLS AND ABBREVIATIONS - PHASE 1
MECHANICAL
Sheet ID Drawing Title
Vincent Hall Drawing Index
E-651-P1 ELECTRICAL - RECEPTACLE RELAY PANEL SCHEDULE
E-619-P1 ELECTRICAL PANEL SCHEDULES
E-618-P1 ELECTRICAL PANEL SCHEDULES
E-617-P1 ELECTRICAL PANEL SCHEDULES
E-616-P1 ELECTRICAL PANEL SCHEDULES
E-615-P1 ELECTRICAL PANEL SCHEDULES
E-614-P1 ELECTRICAL PANEL SCHEDULES
E-613-P1 ELECTRICAL PANEL SCHEDULES
E-612-P1 ELECTRICAL PANEL SCHEDULES
E-611-P1 ELECTRICAL PANEL SCHEDULES
E-610-P1 ELECTRICAL PANEL SCHEDULES
E-609-P1 ELECTRICAL PANEL SCHEDULES
E-608-P1 ELECTRICAL PANEL SCHEDULES
E-607-P1 ELECTRICAL PANEL SCHEDULES
E-606-P1 ELECTRICAL TRANSFORMER AND FEEDER SCHEDULES
E-605-P1 ELECTRICAL GROUNDING RISER PLAN - PHASE 1
E-604-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-603-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-602-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-601-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
ED601-P1 ELECTRICAL ONE-LINE DIAGRAM DEMOLITION - PHASE 1
E-502-P1 ELECTRICAL - DETAILS
E-501-P1 ELECTRICAL - DETAILS
E-404-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
E-403-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
E-402-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
E-401-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
EP103D-P1 ELECTRICAL - POWER PLAN - ROOF LEVEL - AREA D - PHASE 1
EP103C-P1 ELECTRICAL - POWER PLAN - ROOF LEVEL - AREA C - PHASE 1
EP103B-P1 ELECTRICAL - POWER PLAN - ROOF LEVEL - AREA B - PHASE 1
EP102E-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA E - PHASE 1
EP102D-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA D - PHASE 1
EP102C-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA C - PHASE 1
EP102B-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA B - PHASE 1
EP102-P1 OVERALL ELECTRICAL PLAN - LEVEL 2 - PHASE 1
EP101E-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA E - PHASE 1
EP101D-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA D - PHASE 1
EP101C-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA C - PHASE 1
EP101B-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA B - PHASE 1
EP101-P1 OVERALL ELECTRICAL PLAN - LEVEL 1 - PHASE 1
EG103-P1 OVERALL ELECTRICAL GROUNDING PLAN - ROOF LEVEL - PHASE 1
EG102-P1 OVERALL ELECTRICAL GROUNDING PLAN - LEVEL 2 - PHASE 1
EG101-P1 OVERALL ELECTRICAL GROUNDING PLAN - LEVEL 1 - PHASE 1
EL630-P1 ELECTRICAL - LIGHTING FIXTURE SCHEDULE
EL604-P1 ELECTRICAL - LIGHTING FIXTURE SCHEDULE
EL603-P1 ELECTRICAL - LIGHTING CONTROL MATRIX
EL602-P1 ELECTRICAL - LIGHTING CONTROL DETAILS
EL601-P1 ELECTRICAL - LIGHTING CONTROL DETAILS
EL502-P1 ELECTRICAL - LIGHTING FIXTURE DETAILS
EL501-P1 ELECTRICAL - LIGHTING FIXTURE DETAILS
EL401-P1 ELECTRICAL - STAIR SECTION
EL103C-P1 ELECTRICAL - LIGHTING PLAN - ROOF LEVEL - AREA C - PHASE 1
EL102E-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA E - PHASE 1
EL102D-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA D - PHASE 1
EL102C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA C - PHASE 1
EL102B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA B - PHASE 1
EL102-P1 OVERALL ELECTRICAL LIGHTING PLAN - LEVEL 2 - PHASE 1
EL101E-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA E - PHASE 1
EL101D-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA D - PHASE 1
EL101C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA C - PHASE 1
EL101B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA B - PHASE 1
EL101-P1 OVERALL ELECTRICAL LIGHTING PLAN - LEVEL 1 - PHASE 1
ED102-P1 OVERALL ELECTRICAL DEMOLITION PLAN - LEVEL 2 - PHASE 1
ED101-P1 OVERALL ELECTRICAL DEMOLITION PLAN - LEVEL 1 - PHASE 1
ES101-P1 ELECTRICAL - POWER SITE PLAN
E-002-P1 ELECTRICAL GENERAL NOTES
E-001-P1 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ELECTRICAL
GI034-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
GI033-P1 GENERAL - INDEX OF DRAWINGS
GI032-P1 GENERAL - INDEX OF DRAWINGS
GI031-P1 GENERAL - COVER SHEET
GENERAL - VOLUME 1D
Sheet ID Drawing Title
Vincent Hall Drawing Index
TA401-P1 AUDIO VISUAL - ELEVATIONS
TA202D-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, AREA D - PHASE 1
TA202C-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C - PHASE 1
TA202B-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B - PHASE 1
TA202-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, OVERALL - PHASE 1
TA201C-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 1, AREA C - PHASE 1
TA201B-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 1, AREA B - PHASE 1
TA201-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 1, OVERALL - PHASE 1
TA102D-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
TA102C-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
TA102B-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
TA102-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
TA101C-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
TA101B-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
TA101-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
TA041-P1 AUDIO VISUAL - GENERAL NOTES AND SYMBOLS LEGEND
AUDIO VISUAL
TY602-P1 SECURITY - RISER DIAGRAM - PHASE 1
TY601-P1 SECURITY - RISER DIAGRAM - PHASE 1
TY502-P1 SECURITY - DETAILS - PHASE 1
TY501-P1 SECURITY - DETAILS - PHASE 1
TY102E-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
TY102D-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
TY102C-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
TY102B-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
TY102-P1 SECURITY - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
TY101E-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA E - PHASE 1
TY101D-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
TY101C-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
TY101B-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
TY101-P1 SECURITY - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
TD112-P1 SECURITY - DEMOLITION PLAN - LEVEL 2 - OVERALL -PHASE 1
TD111-P1 SECURITY - DEMOLITION PLAN - LEVEL 1 - OVERALL -PHASE 1
TY001-P1 SECURITY - GENERAL NOTES AND SYMBOL LEGEND - PHASE 1
SECURITY
T-603-P1 TELECOMMUNICATIONS - COPPER BACKBONE RISER DIAGRAM - PHASE 1
T-602-P1 TELECOMMUNICATIONS - FIBER OPTIC BACKBONE RISER DIAGRAM - PHASE 1
T-601-P1 TELECOMMUNICATIONS - CONDUIT RISER DIAGRAM - PHASE 1
T-505-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-504-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-503-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-502-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-501-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-401-P1 TELECOMMUNICATIONS - ENLARGED PLANS - PHASE 1
T-103C-P1 TELECOMMUNICATIONS - ROOF PLAN - AREA C - PHASE 1
T-103-P1 TELECOMMUNICATIONS - ROOF PLAN - OVERALL - PHASE 1
T-102E-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
T-102D-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
T-102C-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
T-102B-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
T-102-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
T-101E-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA E - PHASE 1
T-101D-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
T-101C-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
T-101B-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
T-101-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
TD102-P1 TELECOMMUNICATIONS - DEMOLITION PLAN - LEVEL 2 - OVERALL -PHASE 1
TD101-P1 TELECOMMUNICATIONS - DEMOLITION PLAN - LEVEL 1 - OVERALL -PHASE 1
T-100-P1 TELECOMMUNICATIONS - SITE PLAN - PHASE 1
T-001-P1 TELECOMMUNICATIONS - GENERAL NOTES AND SYMBOLS LEGEND - PHASE 1
TELECOMMUNICATIONS
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\rvt\2019\10053876-A-VHALL-Central_hdr-alx-rcruz.rvt
7/8/2021 3:16:37 PM
GI024-P1
G E
N E
R A
L
IN
D
E X
O F
D R
A W
IN
G
S
B
ID
A L T
E R
N A
T E
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
N T
R A
N
R C
R U
Z
T M
A H
E R
H E
Z Z
E D
D
IN
E
C A
T E
G O
R Y
C O
D E
F Y
P
N
EL704C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA C - PHASE 1 - ALT #1
EL704B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA B - PHASE 1 - ALT #1
ELECTRICAL
A-705-P1 ARCHITECTURAL - UPFOLDING PARTITION DETAILS - PHASE 1 - BID ALT #1
A-704C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C - PHASE 1 - BID ALT #1
A-704B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B - PHASE 1 - BID ALT #1
A-702C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1 - BID ALT #1
A-702B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1 - BID ALT #1
ARCHITECTURE
S-710-P1 STRUCTURAL - STEEL - TYPICAL DETAILS - BID ALT #1
SF703C-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA C - PHASE 1 - BID ALT #1
SF703B-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA B - PHASE 1 - BID ALT #1
STRUCTURAL
GI042-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
GI041-P1 GENERAL - COVER SHEET - BID ALTERNATE
GENERAL - VOLUME 1E - BID ALTERNATE
S
CO
C
S
F
FACP
RACP
AOM
AIM
LOC
FAT
ANN
KNOX
LED
NAC
S
S
CO
C
S
F
FACP
RACP
AOM
AIM
LOC
FAT
ANN
KNOX
LED
NAC
S
S
CO
C
S
F
FMCP
RMCP
AOM
AIM
LOC
FAT
ANN
LED
KNOX
RELAY
NAC
SMOKE DETECTOR (YY - SEE ABBREVIATIONS)
DUCT SMOKE DETECTOR
CARBON MONOXIDE DETECTOR
SPEAKER /STROBE (CLEAR)
(C - CEILING MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
SPEAKER (C - CEILING MOUNTED)
(YY - SEE ABBREVIATIONS)
STROBE (CLEAR) (CEILING MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
STROBE (CLEAR) (WALL MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
MANUAL PULL STATION
FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
REMOTE MASS NOTIFICATION CONTROL PANEL
ADDRESSABLE OUTPUT MODULE
ADDRESSALBE INPUT MODULE
LOCAL OPERATING CONSOLE
FIRE ALARM TRANSMITTER
FIRE ALARM ANNUNCIATOR
KNOX BOX
NOTIFICATION APPLIANCE CIRCUIT PANEL
MASS NOTIFICATION TEXT SIGN
AREA OF REFUGE PHONE STATION
ANNUNCIATION ZONE BOUNDARY LINE
SMOKE DETECTOR (YY - SEE ABBREVIATIONS)
DUCT SMOKE DETECTOR
CARBON MONOXIDE DETECTOR
SPEAKER /STROBE (CLEAR)
(C - CEILING MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
SPEAKER (C - CEILING MOUNTED)
(YY - SEE ABBREVIATIONS)
STROBE (CLEAR) (CEILING MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
STROBE (CLEAR) (WALL MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
MANUAL PULL STATION
FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
REMOTE MASS NOTIFICATION CONTROL PANEL
ADDRESSABLE OUTPUT MODULE
ADDRESSALBE INPUT MODULE
LOCAL OPERATING CONSOLE
FIRE ALARM TRANSMITTER
FIRE ALARM ANNUNCIATOR
KNOX BOX
NOTIFICATION APPLIANCE CIRCUIT PANEL
MASS NOTIFICATION TEXT SIGN
AREA OF REFUGE PHONE STATION
ANNUNCIATION ZONE BOUNDARY LINE
SMOKE DETECTOR (YY - SEE ABBREVIATIONS)
DUCT SMOKE DETECTOR
CARBON MONOXIDE DETECTOR
SPEAKER /STROBE (CLEAR)
(C - CEILING MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
SPEAKER (C - CEILING MOUNTED)
(YY - SEE ABBREVIATIONS)
STROBE (CLEAR) (CEILING MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
STROBE (CLEAR) (WALL MOUNTED)
(XX - CANDELA RATING)
(YY - SEE ABBREVIATIONS)
MANUAL PULL STATION
FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
REMOTE MASS NOTIFICATION CONTROL PANEL
ADDRESSABLE OUTPUT MODULE
(XXX - SEE ABBREVIATIONS)
ADDRESSALBE INPUT MODULE
(XXX - SEE ABBREVIATIONS)
LOCAL OPERATING CONSOLE
FIRE ALARM TRANSMITTER
FIRE ALARM ANNUNCIATOR
RELAY PANEL
KNOX BOX
NOTIFICATION APPLIANCE CIRCUIT PANEL
MASS NOTIFICATION TEXT SIGN
AREA OF REFUGE PHONE STATION
ANNUNCIATION ZONE BOUNDARY LINE
US Army Corps of Engineers ®
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\Users\dlittle\Documents\10053876-F-VHALL-Central_dlittle@stantonengineering.com.rvt
7/8/2021 12:42:53 PM
FA001-P1
F
IR
E A
L A
R M
A B
B R
E V
IA
T
IO
N
S
S Y
M B
O L S
A N
D G
E N
E R
A L N
O T
E S
P
H A
S E
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
T
IR
W
IN
D L
IT
T L E
T M
A H
E R
D C
A N
D
IA
C A
T E
G O
R Y
C O
D E
F Y
P
N
INV EMERGENCY LIGHTING INVERTER BATTERY DISCONNECT
ID INSIDE DIAMETER
HT HEAT TRACING
HL HI/LOW AIR SUPERVISORY
HGT HEIGHT
GF GENERATOR FAULT
GR GENERATOR RUNNING
GPM GALLONS PER MINUTE
GC GENERAL CONTRACTOR
GA GAUGE
FT FEET
FS FLOW SWITCH
FPT FIRE PUMP TRANSFER SWITCH IN EMERGENCY POSITION
FPR FIRE PUMP RUNNING
FPP FIRE PUMP PHASE REVERSAL
FPO FIRE PUMP POWER AVAILABLE
FPL FIRE PUMP POWER/PHASE LOSS
FPF FIRE PUMP FAULT
FPE FIRE PUMP EMERGENCY ISOLATING SWITCH OPEN
FP FIRE PUMP
FM FACTORY MUTUAL
FLR FLOOR
FHV FIRE HOSE VALVE ZCA ZONE CONTROL ASSEMBLY
FHC FIRE HOSE CABINET WS WET SYSTEM
FFE FINISHED FLOOR ELEVATION WP WEATHERPROOF
FEC FIRE EXTINGUISHER CABINET W/O WITHOUT
FE FIRE EXTINGUISHER WMG WATER MOTOR GONG
FDC FIRE DEPARTMENT CONNECTION W/ WITH
FD FLOOR DRAIN VAC VOLT, ALTERNATING CURRENT
FMCP FIRE ALARM/MASS NOTIFICATION CONTROL PANEL UNO UNLESS NOTED OTHERWISE
FA FIRE ALARM UL UNDERWRITERS' LABORATORY
EXIST EXISTING UG UNDERGROUND
ETR EXISTING TO REMAIN TYP TYPICAL
EST ELEVATOR SHUNT TRIP TS TAMPER SWITCH
EQUIP EQUIPMENT TOR TOP OF RISER
EPS ELEVATOR SHUNT TRIP POWER MONITORING TEMP TEMPERATURE
EPR ELEVATOR PRIMARY FLOOR RECALL SYST-FEED SPRINKLER SYSTEM FEED MAIN
EMER EMERGENCY SYST SYSTEM
ELEV ELEVATOR STS SHUNT TRIP SUPERVISION
EL ELEVATION STOR STORAGE
EJ EXPANSION JOINT STP STANDPIPE
EH EXTRA HAZARD ST STROBE
EFS ELEVATOR FIRE HAT SOLID SSI SECURITY SYSTEM INTERFACE
EFF ELEVATOR FIRE HAT FLASHING SR SLEEPING ROOM
EF EXHAUST FAN SQ SQUARE
EB ELECTRIC BELL SP/ST SPEAKER/ STROBE
EAR ELEVATOR ALTERNATE FLOOR RECALL SPKR SPRINKLER
EA EACH SPEC SPECIFICATION
E ELEVATOR RECALL SP SPEAKER
DN DOWN/DROP NIPPLE SO SOUND SYSTEM OVERRIDE
DIM DIMENSION SIM SIMILAR
DIA DIAMETER SGV SUPERVISED GATE VALVE
DH DOOR HOLD SDC SMOKE DAMPER CONTROL
DD DUCT SMOKE DETECTOR SD SMOKE DETECTOR
DC DIRECT CURRENT SCV SUPERVISED CONTROL VALVE
DEMO DEMOLISH, DEMOLITION SCHED SCHEDULE
DBA DECIBEL A-WEIGHTED SBV SUPERVISED BUTTERFLY VALVE
DACT DIGITAL ALARM COMMUNICATOR TRANSMITTER S SUPPLY
CV CONTROL VALVE RPZ REDUCED PRESSURE ZONE
CTR CENTER RN RISER NIPPLE
COR CONTRACTING OFFICER'S REPRESENTATIVE RM ROOM
CONT CONTINUE/ CONTINUOUS REQ REQUIRED
CLG CEILING RCV RISER CONTROL VALVE
CIS COMMON INTELLIGIBILITY SCORE R RISER/RADIUS/RETURN
CHV CHECK VALVE PSI POUNDS PER SQUARE INCH
BOR BOTTOM OF RISER PS PRESSURE SWITCH
BFP BACK FLOW PREVENTER PER PRIMARY ELEVATOR RECALL
BATT BATTERY OH ORDINARY HAZARD
AUD AUGUSTA UTILITIES DEPARTMENT OD OUTSIDE DIAMETER
AS AUTOMATIC SPRINKLER MNS MASS NOTIFICATION SYSTEM
ALV ALARM CHECK VALVE LOC LOCAL OPERATING CONSOLE
AHU AIR HANDLING UNIT LH LIGHT HAZARD
AFF ABOVE FINISHED FLOOR LCS LIGHTING CONTROL SYSTEM INTERFACE
AAR AUTOMATIC AIR RELEASE KH KITCHEN HOOD SUPPRESSION SYSTEM
FIRE ALARM ABBREVIATIONS FIRE ALARM LEGEND -
EXISTING
FIRE ALARM LEGEND -
NEW
FIRE ALARM LEGEND -
DEMOLITION
FIRE ALARM
GENERAL NOTES
1. THE FIRE ALARM AND MASS NOTIFICATION SCOPE FOR THIS PROJECT
INCLUDES MODIFICATION OF THE EXISTING BUILDING FIRE ALARM
SYSTEM AND PROVIDING A NEW, INTEGRATED FIRE ALARM AND MASS
NOTIFICATION SYSTEM AS SHOWN ON PLANS. AT THE END OF PHASE 1
THE EXISTING AND NEW SYSTEM SHALL FUNCTION AS A SINGLE
SYSTEM THAT FOLLOWS THE EXISTING FIRE ALARM SYSTEM’S
SEQUENCE OF OPERATION.
2. AREAS THAT ARE OCCUPIED DURING ALTERATION WORK SHALL BE
PROTECTED BY A FUNCTIONING FIRE ALARM AND DETECTION SYSTEM
THROUGHOUT THE PHASE. EXISTING EQUIPMENT TO BE DEMOLISHED
SHALL BE MAINTAINED AS LONG AS POSSIBLE, EITHER UNTIL
DEMOLITION NECESSITATES REMOVAL OR DISCONNECTION, OR UNTIL
NEW SYSTEM IS IN SERVICE. SYSTEM MAY BE SHUTDOWN
TEMPORARILY WHEN NECESSARY FOR DISCONNECTION AND
RECONNECTION TO NEW SYSTEM.
3. IDENTIFIED EXISTING CONTROL EQUIPMENT AND NAC PANELS SHOWN
TO BE DEMOLISHED SHALL BE DEMOLISHED BY THE END OF THE
PHASE. ANY EQUIPMENT IN OCCUPIED AREAS SHALL EITHER BE
PROTECTED OR MOVED, AND ANY CIRCUITS SERVED BY CONTROL
EQUIPMENT IDENTIFIED TO BE DEMOLISHED SHALL BE CONNECTED TO
NEW CONTROL EQUIPMENT SO THAT THE NEW EQUIPMENT SERVES
THE EXISTING EQUIPMENT. CIRCUITS THAT ARE TO BE PARTLY
DEMOLISHED, SHALL BE MODIFIED SO THAT EXISTING TO REMAIN
EQUIPMENT REMAINS FUNCTIONAL.
4. THE FIRE ALARM AND MASS NOTIFICATION SYSTEM SHALL BE
DESIGNED, INSTALLED, AND TESTED IN ACCORDANCE WITH THE
FOLLOWING CODES AND STANDARDS:
A. UFC 3-600-01, 2016 CHANGE 5
B. UFC 4-021-01, 2008 CHANGE 1
C. USACE ECB 2018-17
D. NFPA 72, 2019 EDITION
E. NFPA 70, 2020 EDITION
F. THE ARCHITECTURAL BARRIERS ACT
5. FOR COMPLETE SYSTEM CONTROL, SEE MATRIX OF OPERATIONS ON
SHEET FA601.
6. INSTALLATION SHALL NOT COMMENCE UNTIL APPROVAL IS PROVIDED
FOR PRECONSTRUCTION SUBMITTALS, SHOP DRAWINGS AND
PRODUCT DATA. FINAL FIRE ALARM SYSTEM TESTING SHALL BE
WITNESSED BY THE FT. GORDON DPW FIRE PROTECTION ENGINEER
ANY OTHER REQUIRED CONTRACTING OFFICER’S REPRESENTATIVES.
7. DEVICES SHOWN ON THE DRAWINGS ARE THE REQUIRED TYPE IN
APPROXIMATE LOCATIONS. AUDIO/VISUAL DEVICES ARE REQUIRED IN
ALL NORMALLY OCCUPIED, PUBLIC AND COMMON USE AREAS
(INCLUDING ALL OFFICES) AS SHOWN ON THE DRAWINGS HEREIN.
CONTRACTOR IS RESPONSIBLE FOR INSTALLING THE FIRE ALARM
DEVICES IN ACCORDANCE WITH NFPA 72.
8. AUDIBLE FIRE ALARM SOUND LEVEL SHALL BE AT LEAST 15 DBA ABOVE
THE AVERAGE AMBIENT SOUND LEVEL OR 5 DBA ABOVE THE MAXIMUM
SOUND LEVEL HAVING A DURATION OF AT LEAST 60 SECONDS,
WHICHEVER IS GREATER, MEASURING 5 FEET ABOVE THE FLOOR IN
THE OCCUPIABLE AREA, BUT NOT GREATER THAN 120 DBA AT THE
MINIMUM HEARING DISTANCE FROM THE AUDIBLE APPLIANCE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL SPEAKER QUANTITY
IN ORDER TO COMPLY WITH NFPA 72 AUDIBILITY REQUIREMENTS.
9. SPEAKER SYSTEM INTELLIGIBILITY SHALL HAVE CIS VALUE 0.8 CIS
MINIMUM (POINT MEASUREMENTS OF 0.75 MAY BE ROUNDED TO 0.8).
AREAS OF THE BUILDING WHERE OCCUPANTS ARE NOT EXPECTED TO
BE NORMALLY PRESENT, MECHANICAL, ELECTRICAL, COMMUNICATION
ROOMS, STORAGE ROOMS, AND ELEVATOR MACHINE ROOMS ARE
PERMITTED TO HAVE A CIS SCORE LESS THAN 0.8 IF PERSONNEL CAN
DETERMINE THAT A VOICE SIGNAL IS BEING BROADCAST AND THEY
MUST WALK NO MORE THAN 50 FT TO A LOCATION WITH AT LEAST THE
MINIMUM REQUIRED CIS VALUE WITHIN THE SAME AREA.
INTELLIGIBILITY BY MEASUREMENT AFTER INSTALLATION.
MEASUREMENTS SHOULD BE TAKEN NEAR THE HEAD LEVEL
APPLICABLE FOR MOST PERSONNEL IN THE SPACE UNDER NORMAL
CONDITIONS (E.G., STANDING IN CORRIDORS, SITTING IN CLASSROOMS
AND OFFICES, AS APPROPRIATE).
10. ALL NOTIFICATION APPLIANCE CIRCUITS SHALL BE CLASS B. ALL
SIGNALING LINE CIRCUITS SHALL BE CLASS B. ALL PATHWAYS SHALL
HAVE A SURVIVABILITY OF LEVEL 1.
11. FIRE ALARM AND MASS NOTIFICATION CIRCUIT ZONING SHALL BE AS
FOLLOWS:
A. SEPARATE CIRCUITS (STROBES & SPEAKERS) FOR EACH
FLOOR;
B. SEPARATE CIRCUIT FOR OUTDOOR SPEAKERS.
12. EACH NOTIFICATION APPLIANCE CIRCUIT MUST INCLUDE 25% SPARE
CAPACITY.
13. CIRCUITS FOR AIR HANDLER UNIT SHUTDOWN AND DOOR HOLD OPEN
DEVICES SHALL BE CONNECTED TO ADDRESSABLE INPUT/OUTPUT
MODULES.
14. TAMPER SWITCHES AND FLOW SWITCHES SHALL BE INSTALLED UNDER
DIVISION 21, BUT SHALL BE CONNECTED TO THE FIRE ALARM SYSTEM
UNDER DIVISION 28. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING THE REQUIRED NUMBER OF MODULES TO INTERFACE
THIS EQUIPMENT.
15. PROVIDE "LOCK ON" DEVICE FOR CIRCUIT BREAKERS SUPPLYING FIRE
ALARM EQUIPMENT. IDENTIFY BREAKER WITH COLOR RED.
16. ALL CONDUCTORS SHALL BE INSTALLED IN CONDUIT, EMT MINIMUM.
PAINTING AND LABELING OF CONDUIT SHALL BE AS OUTLINED IN
SPECIFICATION 28 31 76.
17. MAIN CONTROL PANEL AND EACH LOCAL OPERATING CONSOLE SHALL
HAVE ABILITY TO DELIVER PRE-RECORDED MESSAGES, MANUALLY
PAGE, AND SHUTDOWN ALL MECHANICAL FAN UNITS (VIA MASTER
SWITCH).
18. A MICROPHONE SHALL BE PROVIDED AS INDICATED ON THE DRAWINGS
TO PROVIDE NON-EMERGENCY PAGING FUNCTIONS AND SHALL UTILIZE
THE FIRE INTERIOR FIRE ALARM AND MASS NOTIFICATION SPEAKERS
FOR PAGING. THIS FUNCTION SHALL NOT ACTIVATE ANY STROBES OR
SEND A SUPERVISORY CONDITION TO THE SUPERVISING STATIONS.
THIS FUNCTION SHALL HAVE THE LOWEST PRIORITY OF ANY
NOTIFICATION FUNCTIONS.
19. ALL PANELS LOCATED IN FINISHED SPACES SHALL BE FLUSH MOUNTED
TO INTERIOR PARTITIONS.
20. FIRE AND SMOKE STOP ALL PENETRATIONS THROUGH RATED
ASSEMBLIES. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEM
PER UL 1479 AND SPECIFICATIONS.
21. ALL WORK THAT IS REQUIRED TO BE PERFORMED WITHIN AREAS IN
AREAS THAT ARE OCCUPIED (REFER TO SHEET GI007-P1 FOR AREAS
IDENTIFIED AS OCCUPIED), SHALL FOLLOW WORK RESTRICTION
REQUIREMENTS IN 01 14 00.
22. ANY SYSTEM SERVING AN AREA THAT IS OCCUPIED DURING
ALTERATION OPERATIONS MUST REMAIN OPERATIONAL AT ALL TIMES.
IMPAIRMENT IS PERMITTED UP TO THE LENGTH OF A SINGLE SHIFT.
SYSTEM MAY ONLY BE PLACED OUT OF SERVICE AFTER THE START OF
THE SHIFT AND MAY NOT REMAIN OUT OF SERVICE AFTER THE END OF
THE SHIFT. CONTRACTOR MUST NOTIFY CONTRACTING OFFICER, POST
FIRE DEPARTMENT AND DEPARTMENT OF PUBLIC WORKS PRIOR TO
PLACING SYSTEM OUT OF SERVICE. CONTRACTING SHALL PROVIDE
FIRE WATCH AS LONG AS THE SYSTEM IS OUT OF SERVICE.
H C
H
H C
H
H C
H
H C
H
H C
H
H C
H
H C
H
H C
H
H
H
C
H
H
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
H C
H
H
F F
S
S
FACP
F
C
C
S
S
S
F
C S S S
C
F
C
C S
S
S
S C
S C
S S C
S C
S S S S C C C
F
S S
C C
S C
S C
S C
S C
S C
S C
S
C
C
FSS
C
S
C
S
C
C
SSSSS
S
S
S
C
CC
SSS
S C
S C
CC
C
S S
CS
C
S C
S C
SSS
S
S
S
S
S
CC
C
C
F
SS
S
S
F S C
S C
S C
S C
NAC
C S
C S
SS
C
S
S
S
C
S
C
S C
S C
S C
S C
S C
S C
NAC
F F
S
FS
C
S C
SSS
S
CC
C
S
S
S
S
S
C F
C S
S C
S
S
C S
C
S C
S
SSSS
CCCF FAT
AIM AIM
KNOX
NAC
A
A
B D E F
G
G
H
H
J
J K L M N P
Q
Q
A.1 B.1 C.1 D.1 E.1 F.1 J.1 K.1 L.1 M.1 N.1 P.1
ADMIN
113113
ADMIN
112112
ADMIN
105105
CLASSRM
XXI
095095
COMMON
CORE
094094
COMMON
CORE
093093
ADMIN
091091
ADMIN
092092
ADMIN
106106
ADMIN
107107
WOMEN
110110
MEN
111111
ELEV
#1 EQ
108108
ELEV
#1
ELV01ELV01
GUARD
004004
TEL
005005
JAN
109109
TERMINALS
CLASSRM
077077
NAVY
CLASSRM
082082
CLASSIFIED
STORAGE
078078
STAIR
S102S102
BREAK
ROOM
036036
BREAK
ROOM
037037
USMC
CLASSRM
038038
TACSAT
CLASSRM
045045
COMMON
CORE
LAB
053053
TACSAT
CLASSRM
051051
XMTR
RM
052052
ELECTRICALRM
063063
TERMINALS
LAB
064064
XMTR
RM
065065
USMC
CLASS
RM
039039
TACSAT
CLASSRM
044044
TACSAT
CLASSRM
043043
TACSAT
CLASSRM
040040
COMMON
CORE
LAB
055055
COMMON
CORE
LAB
056056
TERMINALS
LAB
057057
COMMON
CORE
LAB
054054
ADMIN
121121
ADMIN
120120
ADMIN
119119
ADMIN
118118
ADMIN
117117
ADMIN
116116
ADMIN
115115
ADMIN
114114
CLASSRM
101101
CLASSRM
102102
CLASSRM
103103
CLASSRM
104104
MECH
EQ
100100
TERMINAL
CLASS
RM
098098
COMMON
CORE
INSTRUCTOR
097097
TERMINAL
INSTRUCTOR
096096
TEL/
TV
099099
WOMEN
073073
MEN
072072
JAN
071071
TERMINALS
CLASSRM
074074
COMMON
CORE
CLASSRM
075075
DCSS
STEP
CLASSRM
080080
GSC-52
DCSS/CR
079079
TERMINALS
CLASSRM
076076
TERMINALS
CLASSRM
081081
COMMON
CORE
LAB
066066
TERMINALS
LAB
070070
COMMON
CORE
LAB
067067
COMMON
CORE
LAB
068068
COMMON
CORE
LAB
069069
CORRIDOR
089089
STAIR
11031103
COVERED
WALKWAY
N/AN/A
STORAGE
99A99A
STAIR
S104S104
CORRIDOR
122122
CORRIDOR
084084
CORRIDOR
086086
CORRIDOR
088088
CORRIDOR
087087
CORRIDOR
124124
CORRIDOR
059059
CORRIDOR
062062
CORRIDOR
090090
CORRIDOR
085085
CORRIDOR
061061
CORRIDOR
123123
LOBBY
001001
COVERED
WALKWAY
N/AN/A
FS TS
2 2
2 2
ZONE 4 ZONE 3
ZONE 2 ZONE 1
ADMIN
002002 CONF
003003
ADMIN
007007
ADMIN
008008
ADMIN
009009
ADMIN
010010
ADMIN
011011
ADMIN
012012
ADMIN
013013
ADMIN
014014
ADMIN
015015
ADMIN
023023
ADMIN
022022
ADMIN
021021
ADMIN
020020
ADMIN
019019
ADMIN
018018
ADMIN
017017
ADMIN
016016
COMMON
CORE
026026
USMC
LMST
027027
TACSAT
CLASSRM
028028
TACSAT
INSTRUCTOR
029029
TACSAT
EMPTY
030030
TACSAT
CLASSRM
031031
MECH
EQ
032032
TEL/
TV
033033
STAIR
S101S101
CORRIDOR
034034
CORRIDOR
035035
ADMIN
025025
ADMIN
024024
TACSAT
CLASSRM
042042
TACSAT
CLASSRM
041041
CORRIDOR
060060
WOMEN
046046
MEN
047047
JAN
048048
STAIR
S103S103
COVERED
WALKWAY
WK102WK102
STORAGE
001A001A
AKIMA
049049
AKIMA
050050
LEGEND
NOT IN SCOPE
TEMPORARY 1 HR. FIRE RATED
CONSTRUCTION PARTITION
ZONE BOUNDARY
US Army Corps of Engineers ®
G
2 3 4 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
VHALL
J U
N E
W H
N B
-- 1 -3
-0
READY TO ADVERTISE (RTA)
V
IN
C E
N T
H A
L L R
E N
O V
A T
IO
N
P H
A S
E
C:\Users\dlittle\Documents\10053876-F-VHALL-Central_dlittle@stantonengineering.com.rvt
7/8/2021 12:44:51 PM
FD101-P1
F
IR
E A
L A
R M
D E
M O
L
IT
IO
N
P L A
N
L E
V E
L
O
V E
R A
L L
P H
A S
E
F O
R T
G O
R D
O N
G
E O
R G
IA
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
A
H D
R A
R L
IN
G T
O N
V
IR
G
IN
IA
T
IR
W
IN
D L
IT
T L E
T M
A H
E R
D C
A N
D
IA
C A
T E
G O
R Y
C O
D E
F Y
P
N
NORTH
KEY PLAN
A B C
F E D
1" = 20'-0" A1
FIRE ALARM DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
20'10' 40'0
SCALE: 1" = 20'-0"
20'10' 40'0
SCALE: 1" = 20'-0"
20'10' 40'0
SCALE: 1" = 20'-0"
20'10' 40'0
SCALE: 1" = 20'-0"
GENERAL NOTES:
A. CONTRACTOR SHALL REVIEW PLANS TO FULLY
UNDERSTAND AREAS WITHIN EXTENT OF WORK,
NOT IN SCOPE, OCCUPIED AREAS WITH LIMITED
WORK, AND OCCUPIED AREAS WITH NO SCOPE.
THE BUILDING SHALL REMAIN OCCUPIED
THROUGHOUT CONSTRUCTION. REFER TO
GI007-P1 AND 01 14 00 FOR ADDITIONAL
INFORMATION. REFER TO DRAWINGS AND
SPECIFICATIONS FOR DETAILED PROJECT
SCOPE.
B. AREAS OUTSIDE THE SCOPE SHALL HAVE
OPERATIONAL FIRE ALARM PROTECTION AT ALL
TIMES. EQUIPMENT NOT IN SCOPE THAT IS
SERVED BY CIRCUITS OR PANELS THAT ARE TO
BE DEMOLISHED SHALL HAVE CIRCUITS
EXTENDED FROM EXISTING TO REMAIN
EQUIPMENT, SHALL HAVE THE PANELS
RELOCATED IN LIEU OF DEMOLITION, OR SHALL
HAVE NEW CIRCUITS FROM NEW PANELS TO
SERVE THE EQUIPMENT IN ORDER TO MAINTAIN
OPERATION. SYSTEM MAY BE SHUTDOWN
TEMPORARILY WHEN NECESSARY FOR
DISCONNECTION AND RECONNECTION TO NEW
SYSTEMS OR TO SWITCH CIRCUITS.
C. DEMOLISH BOXES, CABLING, CONDUIT,
EQUIPMENT, AND MATERIALS ASSOCIATED WITH
EQUIPMENT IDENTIFIED TO BE DEMOLISHED
THAT DOES NOT SERVE EXISTING TO REMAIN
EQUIPMENT.
D. CONTRACTOR SHALL MAINTAIN EXISTING
PROTECTION IN SCOPE AREA AS LONG AS
FEASIBLE (I.E. UNTIL WALLS AND CEILINGS MUST
BE DEMOLISHED) AND NEW SYSTEM SHALL BE
PLACED INTO SERVICE AS SOON AS PRACTICAL.
SLC CIRCUITS SHALL REMAIN IN SERVICE AT ALL
TIMES IN DEMOLITION AND RENOVATION AREAS
UNTIL NEW SYSTEM IS IN SERVICE. MANUAL
PULL STATIONS, SPRINKLER FLOW SWITCHES,
AND TAMPER SWITCHES IN DEMOLITION AND
RENOVATION AREAS SHALL REMAIN IN SERVICE
AT ALL TIMES UNTIL NEW SYSTEM IS IN SERVICE.
EXISTING HEAT DETECTORS, SMOKE
DETECTORS, AND OTHER SLC DEVICES THAT
ARE TO BE DEMOLISHED MAY BE DEMOLISHED
AS LONG AS EXISTING SLC IS PLACED BACK INTO
SERVICE.
1 DEMOLISH EXISTING FIRE ALARM EQUIPMENT THIS
ROOM (INACCESSIBLE DURING SURVEY). FOR
BIDDING PURPOSES ASSUME ONE HORN/STROBE
DEVICE.
2 DURING ALTERATION SHIFT DEVICE LOCATION TO
THE OCCUPIED SIDE OF TEMPORARY PARTITION.
ONCE NEW EQUIPMENT IS ACCEPTED AND TESTED
AND TEMPORARY PARTITION IS REMOVED,
DEMOLISH THIS DEVICE. CONTRACTOR MAY
UTILIZE MC CABLE TO ACCOMPLISH MOVING THIS
EQUIPMENT FOR TEMPORARY INSTALLATION
DURING ALTERATION OPTIONS. IF EXISTING
DEVICE CANNOT BE INSTALLED IN NEW LOCATION
(I.E. EXISTING CEILING MOUNT MUST BE INSTALLED
ON WALL), REPLACE DEVICE WITH EQUIPMENT
THAT MEETS INSTALLATION REQUIREMENTS.
3 EXISTING FIRE ALARM TRANSMITTER SHALL NOT BE
DEMOLISHED UNTIL NEW TRANSMITTER IS
INSTALLED, TESTED AND ACCEPTED.
4 DEVICE TO REMAIN IN SERVICE UNTIL SPRINKLER
PIPING IN THIS LOCATION IS DEMOLISHED.
KEYED NOTES:#
S S
S S
S S
C
C
C
F
H
H
AOM
AIM
S S C C
S
H
H
S S C C
S C
S
S
S
S
SC
F
C
S S
S
F
S S S C C C
AOM
AIM
AOM
AIM H
S
S S
C C
S
C
S
S C F
S
S SSSSS
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
HH
HHH
H
NAC
S S
S
S S S
S
S
H
H
HH
H
H
H
C
C C C
NAC
F
C
S S S S S SS
S C C C C
S
S
S
S
S
S
S
C
S
C
S
C
C
S
S
F S
S S
S
C
S
C
A
A
B D E F
G
G
H
H
J
J K L M N P
Q
Q
A.1 B.1 C.1 D.1 E.1 F.1 J.1 K.1 L.1 M.1 N.1 P.1
25D
LAB
255255
25D
SERVERS
256256
25D
LAB
257257
25D
LAB
258258
25D
LAB
259259
BREAK
ROOM
261261
STORAGE
260260
VAULT
247247
VAULT
265265
MAINTENANCE
248248
MAINTENANCE
249249
CORRIDOR
262262
STAIR
STAIR
S202S202
NAVY
CLASSRM
235235
NAVY
CLASSRM
234234
NAVY
CLASSRM
233233
MEN
239239
WOMEN
240240
STORAGE
242242 STORAGE
243243
JAN
241241
25P
STORAGE
250B250B
25P
TCF
CLASSRM
251B251B
25P
CLASSRM
252B252B
25P
CLASSRM
253B253B
25P
INSTRUCTOR
254B254B
COMSEC
CLASSRM
254A254A
25P
CLASSRM
253A253A
25P
CLASSRM
252A252A
25P
TCF
CLASSRM
251A251A
25P
STORAGE/
ADMIN
250A250A
BALCONY
N/AN/A
BALCONY
CORRIDOR
244…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .