This abstract of offers is for a construction project to renovate Vincent Hall at Fort Gordon, Georgia. The project includes interior renovation of 56,555 square feet as well as new mechanical, electrical and life safety systems to support both phases of renovation. Eight offers were received in response to the full and open solicitation. Offer prices ranged from $22.1 million to $30 million including base bids and options. ACC Construction Company provided the apparent low bid of $23.7 million. However, with the application of the 10% price evaluation preference for HUBZone small businesses, Ashford Leebcor Enterprises V, LLC was determined to be the apparent low bidder at $24.1 million. The solicitation was issued by the Department of the Army Corps of Engineers Savannah District and work will be performed at Fort Gordon.

View the file

Other files

File Type Posted
W912HN21B3008 BID OPENING ATTENDEES.pdf PDF
C.04. W912HN21B3008 - Vincent Hall Reno. -HUB zone preference.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A_AMD2.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D_AMD2.pdf PDF
B.08 W912HN21B3008 Amendment 0002.pdf PDF
B.08 W912HN21B3008 Amendment 0002 CC.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1B_AMD1.pdf PDF
B.08 W912HN21B3008 Amendment 0001.pdf PDF
Phase1_RTA_V2-C_Div_25-33_Appendices_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1C_AMD1.pdf PDF
Phase1_RTA_V2-A_Div_00-07_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D_AMD1.pdf PDF
Phase1_RTA_V2-B_Div_08-23_AMD1.pdf PDF
B.08 W912HN21B3008 Amendment 0001 CC.pdf PDF
Vincent Hall Site Visit Attendance Roster.pdf PDF
Vincent Hall Pre-Bid Site Visit Synopsis.docx DOCX document
B.08 - Solicitation W912HN21B3008 - Vincent Hall.pdf PDF
Phase1_RTA_V2-A_Div_00-07.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1C.pdf PDF
Phase1_RTA_V2-B_Div_08-23.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1B.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1E.pdf PDF
B.08_W912HN20B3008 Vincent Hall Solicitation.pdf PDF
Phase1_RTA_V2-C_Div_25-33 Appendices.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Issues Date Opened Page of Pages 17/26/2021 9-Sep-21 1

Name & Title of Certifying Official (Type)

Signature Date Signed

Yes Yes

Business size: Large Business size: Large

Item Number Description of Offered Item Estimated

Quantity Unit Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount

0001 Renovation of the facility Within 5’ of the building line, complete.

Inclusive of all materials, plant, labor and equipment and site. 1 Job 18,394,696.03$ 18,394,696.03$ 20,085,011.00$ 20,085,011.00$ 25,858,547.00$ 25,858,547.00$

Supporting Facilities Site Preparation and Development Outside the 5’ building line, complete. Inclusive of all materials, plant, labor and equipment and site.

1 Job 320,165.64$ 320,165.64$ 1,033,386.00$ 1,033,386.00$ 1,070,420.00$ 1,070,420.00$

0003 Augusta Utilities Department - Pre-Priced 1 Job 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 0004 Georgia Power Primary Power - Pre-Priced 1 Job 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 0005 Atlanta Gas & Light Pre-Priced 1 Job 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 0006 Option 1: Operable Partitions 1 Job 502,181.10$ 502,181.10$ 588,436.00$ 588,436.00$ 493,743.36$ 493,743.36$

0007 Option 2: Installation of tele-communications horizontal cabling, 1 Job 571,546.08$ 571,546.08$ 1,389,609.00$ 1,389,609.00$ 786,383.00$ 786,383.00$

Subtotal: Base Bid (CLINS 0001-0005 including pre-priced): 19,276,475.21$ 21,680,010.54$ 27,490,580.54$ Subtotal: Options (CLINS 0006-0007): 1,073,727.18$ 1,978,045.00$ 1,280,126.36$

Total Amount of CLINS (Base and Options): 20,350,202.39$ 23,658,055.54$ 28,770,706.90$

Over/Under IGE: 3,307,853.15$ 8,420,504.51$ 16.25% 41.38%

Apparent Low Bidder is ACC Construction Company Inc at $23,658055.54

2,365,805.55$ 2,877,070.69$ 26,023,861.09$ 31,647,777.59$

10% HubZone Preference Added to Large Business Total Evaluated Price with HubZone Preference 52.219-4

Government Estimate

Hired Labor

Offeror No. 1

Contracting Officer

W912HN21B3008

Department of the Army, Corps of Engineers

Offers Offeror No. 2

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.100 W Oglethorpe Ave.

Savannah, GA 31401

Ameresco, Inc.Title: Vincent Hall Renovation Project Number: ST-22018-8P Location: Fort Gordon, GA.

Reasonable Contract (Without Profit)

Reasonable Contract (Including Profit )

Savannah District Contracting Office

Framingham, MA

Solicitation Number:

Issuing Office:

Project Title:

100% Competitive, Full and Open with HUB Zone Preference

Abstract of Offers - Construction

Magdalena Bernard

Augusta, Georgia

Amendments Acknowledged

Yes

ACC Construction Company Inc.

Yes

Amendments Acknowledged

Bid Security (Type and Amount) Bid Security (Type and Amount)

Total Evaluated Price with HubZone Preference 52.219-4 $26,023,861.09 10% HubZone Preference Added to Large Business $2,365,805.55

Apparent Low Bidder after HUBZone preference is applied is Ashford Leebcor Enterprises V, LLC. with a Bid of $24,078,833.54

Number of Amendments Issued:

If there is a small business, are they HUBZone? N/A N/A

Magdalena Bernard Contracting Officer

Page of Pages 2 3 yes yes yes yes

Business size: Small Business size: Large Business size: Small Business size: Large Business size:

Item Number

Estimated Quantity Unit Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Item Number Estimated

Quantity Unit Unit Price Estimated Amount Unit Price Estimated Amount Unit Price

0001 1 Job 20,357,671.00$ 20,357,671.00$ 24,098,066.46$ 24,098,066.46$ 23,678,684.97$ 23,678,684.97$ 22,105,000.00$ 22,105,000.00$

0002 1 Job 1,354,535.00$ 1,354,535.00$ 334,320.00$ 334,320.00$ 644,008.91$ 644,008.91$ 691,000.00$ 691,000.00$

0003 1 Job 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 141,287.89$ 0004 1 Job 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 415,825.65$ 0005 1 Job 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 0006 1 Job 497,619.00$ 497,619.00$ 836,692.00$ 836,692.00$ 597,000.00$ 597,000.00$ 440,000.00$ 440,000.00$

0007 1 Job 1,307,395.00$ 1,307,395.00$ 1,453,725.00$ 1,453,725.00$ 1,400,000.00$ 1,400,000.00$ 1,401,000.00$ 1,401,000.00$

22,273,819.54$ 24,994,000.00$ 24,884,307.42$ 23,357,613.54$ -$ -$ 1,805,014.00$ 2,290,417.00$ 1,997,000.00$ 1,841,000.00$ -$ -$

24,078,833.54$ 27,284,417.00$ 26,881,307.42$ 25,198,613.54$ -$ -$

3,728,631.15$ 6,934,214.61$ 6,531,105.03$ 4,848,411.15$ 18.32% 34.07% 32.09% 23.82%

10% HubZone Preference Added to Large Business 2,728,441.70$ 2,519,861.35$ Total Evaluated Price with HubZone Preference 52.219-4 30,012,858.70$ 27,718,474.89$

Title: Vincent Hall Renovation ubtotal: Base Bid (CLINS 0001-0005 including pre-priced)

Subtotal: Options (CLINS 0006-0007):

Total Amount of CLINS (Base and Options):

Bid Security (Type and Amount)

Project Number: ST-22018-8P

Offeror No. 3 Offeror No. 4Title: Vincent Hall Renovation

Bid Security (Type and Amount) Bid Security (Type an

Contract Terms Amendments Acknowledged Amendments Acknowledged Amendments Acknow

100% Competitive, Full and Open with HUB Zone

Location: Fort Gordon

Project Title: Offers (Continued) Offeror No. 7 Offeror No. 8 Offeror

Solicitation Number:

W912HN21B3002

Abstract of Offers -- Abstract of Offers - Construction Sheet, when more than 2 offers are received on a construction contract items to conform to the number of items which can be entered on page 1. Use addition additional continuation Sheets as needed.

Construction Continuation SheetAbstract of Offers - Construction Sheet, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 10 - 20 contract items to conform to the number of items which can be entered on page 1. Use additional continuation sheets for contract items in excess of 20 and attach additional continuation Sheets as needed.

Solicitation Number:

Abstract of Offers -- Construction Continuation Sheet

Ashford Leebcor Enterprises V, LLC COPPER CONSTRUCTION COMPANY, INC Nisou LGC JV II LLC

Offers (Continued)Project Title:

Offeror No. 5 Offeror No. 6

Detroit, MI

W912HN21B3008

Williamsburg, VA

N/A No N/A

Bid Security (Type and Amount) Bid Security (Type and Amount)

Amendments Acknowledged

Yes

Project Number: ST-22018-8P Location: Fort Gordon, GA.

100% Competitive, Full and Open with HUB Zone

Vidalia, Georgia Sauer Construction LLC

Bid Security (Type and Amount) Bid Security (Type and Amount)

Yes

Amendments Acknowledged Amendments Acknowledged

Yes Yes

Amendments Acknowledged

Total Amount of CLINS (Base and Options):

Subtotal: Options (CLINS 0006-0007):

Subtotal: Base Bid (CLINS 0001-0005 including pre-priced):

Contract Terms

YES

Magdalena Bernard Contracting Officer