This solicitation is for a construction project to renovate Vincent Hall at Fort Gordon, Georgia. Phase 1 of the project includes interior renovation of 56,555 square feet as well as new mechanical, electrical and life safety systems to support both phases of construction. The project is constrained by infrastructure costs associated with the new systems, service elevator and fire protection upgrades. The acquisition is being conducted as a full and open competition with set-asides for HUBZone small businesses. Bids are due in accordance with specifications contained in the solicitation and eight accompanying documents issued by the Department of the Army Corps of Engineers Savannah District.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cyber Center of Excellence
Ready to Advertise Submittal
Vincent Hall Renovation Phase 1 Volume 2 Specifications - A - Divisions 00-07
Solicitation No.: W912HN21B3008
June 25, 2021 Fort Gordon, Georgia
THIS PAGE INTENTIONALLY LEFT BLANK
Vincent Hall Renovation Phase 1 | READY TO ADVERTISE Seals & Signatures
TREVOR WIMBERLY
Civil
GONZALO KOOSAU
Structural
NHU TRAN
Architecture
JEFF WURMLIGER
Mechanical
Vincent Hall Renovation Phase 1 | READY TO ADVERTISE Seals & Signatures
DAVID KURTEN
Plumbing
TOM CHAPMAN
Communications Distribution
TOM IRWIN
Fire Protection
LUEL BAYLON
Electrical
FY20 PN 92894 Vincent Hall Renovation Phase 1 Ft Gordon, GA W912HN21B3008 Ready to Advertise (RTA) – June 25, 2021
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/11 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 03 00 12/18 OPTIONS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 20 00 11/20 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS
01 30 00.00 23 07/19 FORT GORDON, GA INSTALLATION SPECIFIC
REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 08/18 SUBMITTAL PROCEDURES
01 33 29 08/18 SUSTAINABILITY REPORTING
01 35 26 11/20 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 10 06/20 ABBREVIATIONS - TERMINOLOGY
01 45 00.00 10 11/16 QUALITY CONTROL
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19 PROJECT IDENTIFICATION
01 73 29 08/18 CUTTING AND PATCHING
01 74 19 01/07 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
01 74 23 08/18 CLEANING
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION AND DECONSTRUCTION
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 83 00 11/18 LEAD REMEDIATION
02 84 33 05/20 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DI VI SI ON 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 39 23.13 06/20 CHEMICAL COMPOUND MEMBRANE CONCRETE
CURING
DI VI SI ON 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18 STRUCTURAL STEEL
PROJECT TABLE OF CONTENTS Page 1
05 30 00 05/15 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/16 ROUGH CARPENTRY
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 16 00.01 05/13 VAPOR EMISSION CONTROL FOR CONCRETE
FLOORS WITH FINISH FLOORING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 13 05/11 METAL WALL PANELS (MPS-1)
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 08/08 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
07 95 00 06/19 EXPANSION JOINTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 23 08/20 OVERHEAD COILING DOORS
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 02/16 DOOR HARDWARE
08 81 00 08/11 GLAZING
08 87 33 01/18 DECORATIVE FILM
DI VI SI ON 09 - FI NI SHES
09 22 16 01/18 NON-STRUCTURAL METAL FRAMING
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 68 00 11/17 CARPETING
09 69 13 11/15 RIGID GRID ACCESS FLOORING
09 84 20 08/16 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 19 08/17 DEMOUNTABLE AND MOVABLE PARTITIONS
PROJECT TABLE OF CONTENTS Page 2
10 22 29 03/18 UPFOLDING PANEL PARTITIONS (Bid Alternate #1)
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
DI VI SI ON 11 - EQUI PMENT
11 24 26 07/18 SAFETY TIE-BACKS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 05/16 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
22 07 19.00 40 08/16 PLUMBING PIPING INSULATION
22 14 29.00 40 05/17 SUMP PUMPS
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 01 30.41 02/15 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 08/15 VIBRATION AND SEISMIC CONTROLS FOR
HVAC PIPING AND EQUIPMENT
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
PROJECT TABLE OF CONTENTS Page 3
25 05 11.00 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - UMCS
25 05 11.01 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - UCS
25 05 11.02 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FLS
25 05 11.03 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - C/VTS AND ES
25 10 10 02/19 CYBERSECURITY FOR UTILITY MONITORING
AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 09 43 03/20 PLUG-LOAD CONTROL SYSTEM
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 16.00 40 08/19 PANELBOARDS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 28.36 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 48 00 03/21 UNDERPINNING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 19 08/17 SEEDING
32 92 23 04/06 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
PROJECT TABLE OF CONTENTS Page 4
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
PROJECT TABLE OF CONTENTS (APPENDIX) Page 1
APPENDIX A
AUGUSTA UTILITIES DEPARTMENT (AUD) SPECIFICATIONS
14.2 WATER DISTRIBUTION SYSTEMS DESIGN & CONSTRUCTION
14.3 WASTEWATER COLLECTION SYSTEMS DESIGN & CONSTRUCTION
14.4 EXCAVATION AND BACKFILLING
-- End of Project Table of Contents (Appendix) --
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Sheet ID Drawing Title
GENERAL - VOLUME 1A
GI001-P1 GENERAL - COVER SHEET
GI002-P1 GENERAL - INDEX OF DRAWINGS
GI003-P1 GENERAL - INDEX OF DRAWINGS
GI004-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
GI006-P1 GENERAL - LOCATION AND VICINITY MAPS
GI007-P1 GENERAL - SCOPE DIAGRAMS - PHASE 1
LIFE SAFETY
G-010-P1 LIFE SAFETY BUILDING CODES ANALYSIS - PHASE 1
G-011-P1 LIFE SAFETY BUILDING CODES ANALYSIS - PHASE 1
G-012-P1 LIFE SAFETY BUILDING CODES ANALYSIS - PHASE 1
G-100-P1 LIFE SAFETY - SITE PLAN - PHASE 1
G-101-P1 LIFE SAFETY FLOOR PLAN - LEVEL 1 - OVERALL - CONSTRUCTION -
PHASE 1
G-102-P1 LIFE SAFETY FLOOR PLAN - LEVEL 2 - OVERALL - CONSTRUCTION -
PHASE 1
G-111-P1 LIFE SAFETY FLOOR PLAN - LEVEL 2 - OVERALL - FINAL - PHASE 1
G-112-P1 LIFE SAFETY FLOOR PLAN - LEVEL 2 - OVERALL - FINAL - PHASE 1
CIVIL
C-001-P1 CIVIL - GENERAL NOTES, LEGEND & LOCATION MAP - PHASE 1
CV101-P1 CIVIL - SITE EXISTING CONDITIONS PLAN - PHASE 1
CD101-P1 CIVIL - SITE DEMOLITION PLAN - PHASE 1
CS101-P1 CIVIL - SITE LAYOUT PLAN - PHASE 1
CU101-P1 CIVIL - SITE UTILITY PLAN - PHASE 1
CG101-P1 CIVIL - PARTIAL GRADING AND DRAINAGE PLAN - PHASE 1
C-501-P1 CIVIL - SITE DETAILS - PHASE 1
C-502-P1 CIVIL - SITE DETAILS - PHASE 1
CE101-P1 CIVIL - E.S.P.C. PLAN - PHASE 1
CE501-P1 CIVIL - E.S.P.C. DETAILS & NOTES - PHASE 1
CE502-P1 CIVIL - E.S.P.C. DETAILS & NOTES - PHASE 1
STRUCTURAL
S-001-P1 STRUCTURAL - GENERAL NOTES
S-002-P1 STRUCTURAL - GENERAL NOTES (CONT)
S-003-P1 STRUCTURAL - SCHEDULE OF SPECIAL INSPECTION
S-004-P1 STRUCTURAL - SCHEDULE OF SPECIAL INSPECTION
S-005-P1 COMPONENTS & CLADDING WIND PRESSURES
S-006-P1 COMPONENTS & CLADDING WIND PRESSURES
DOCUMENT 00 01 15 Page 1
Sheet ID Drawing Title
SD101-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
SD101C-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, AREA C - PHASE 1
SD101D-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, AREA D - PHASE 1
SD101E-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 1, AREA E - PHASE 1
SD102-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, OVERALL - PHASE 1
SD102B-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA B - PHASE 1
SD102C-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA C - PHASE 1
SD102D-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA D - PHASE 1
SD102E-P1 STRUCTURAL - DEMOLITION PLAN - LEVEL 2, AREA E - PHASE 1
SD103-P1 STRUCTURAL - DEMOLITION PLAN - ROOF, OVERALL - PHASE 1
SD103C-P1 STRUCTURAL - DEMOLITION PLAN - ROOF, AREA C - PHASE 1
SD103D-P1 STRUCTURAL - DEMOLITION PLAN - ROOF, AREA D - PHASE 1
SF101-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, OVERALL - PHASE 1
SF101C-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, AREA C - PHASE 1
SF101D-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, AREA D - PHASE 1
SF101E-P1 STRUCTURAL - FRAMING PLAN - LEVEL 1, AREA E - PHASE 1
SF102-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, OVERALL - PHASE 1
SF102B-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA B - PHASE 1
SF102C-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA C - PHASE 1
SF102D-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA D - PHASE 1
SF102E-P1 STRUCTURAL - FRAMING PLAN - LEVEL 2, AREA E - PHASE 1
SF103-P1 STRUCTURAL - FRAMING PLAN - ROOF, OVERALL - PHASE 1
SF103B-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA B - PHASE 1
SF103C-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA C - PHASE 1
SF103D-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA D - PHASE 1
SF104-P1 STRUCTURAL - PARTIAL FRAMING PLANS - PHASE 1
S-210-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-211-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-212-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-213-P1 STRUCTURAL - STEEL BRACED FRAME ELEVATIONS
S-501-P1 STRUCTURAL - CONCRETE - TYPICAL DETAILS
S-502-P1 STRUCTURAL - CONCRETE - TYPICAL DETAILS
S-503-P1 STRUCTURAL - CONCRETE - TYPICAL DETAILS
S-520-P1 STRUCTURAL - STEEL - TYPICAL DETAILS
S-521-P1 STRUCTURAL - STEEL - TYPICAL DETAILS
S-522-P1 STRUCTURAL - STEEL - SECTIONS AND DETAILS
S-523-P1 STRUCTURAL - STEEL - SECTIONS AND DETAILS
S-540-P1 STRUCTURAL - MASONRY - TYPICAL DETAILS
GENERAL - VOLUME 1B
GI011-P1 GENERAL - COVER SHEET
GI012-P1 GENERAL - INDEX OF DRAWINGS
GI013-P1 GENERAL - INDEX OF DRAWINGS
GI014-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
ARCHITECTURAL
AD001-P1 ARCHITECTURAL - GENERAL DEMOLITION NOTES - PHASE 1
AD101-P1 ARCHITECTURAL - DEMOLITION PLAN - LEVEL 1 - PHASE 1
AD102-P1 ARCHITECTURAL - DEMOLITION PLAN - LEVEL 2 - PHASE 1
AD103-P1 ARCHITECTURAL - DEMOLITION PLAN - ROOF - PHASE 1
AD111-P1 ARCHITECTURAL - TEMPORARY PARTITION LOCATION PLAN - LEVEL 1 -
PHASE 1
AD112-P1 ARCHITECTURAL - TEMPORARY PARTITION LOCATION PLAN - LEVEL 2 -
PHASE 1
AD201-P1 ARCHITECTURAL - DEMOLITION ELEVATIONS - PHASE 1
AD501-P1 ARCHTIECTURAL - DEMOLITION DETAILS - PHASE 1
A-101-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
A-101B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
DOCUMENT 00 01 15 Page 2
Sheet ID Drawing Title
A-101C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
A-101D-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
A-101E-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 1, AREA E - PHASE 1
A-102-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
A-102B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
A-102C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
A-102D-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
A-102E-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
A-103-P1 ARCHITECTURAL - ROOF PLAN - OVERALL - PHASE 1
A-103B-P1 ARCHITECTURAL - ROOF PLAN - AREA B - PHASE 1
A-103C-P1 ARCHITECTURAL - ROOF PLAN - AREA C - PHASE 1
A-103D-P1 ARCHITECTURAL - ROOF PLAN - AREA D - PHASE 1
A-111-P1 ARCHITECTURAL - ACOUSTIC BOUNDARY FLOOR PLAN - LEVEL 1 - PHASE 1
A-112-P1 ARCHITECTURAL - ACOUSTIC BOUNDARY FLOOR PLAN - LEVEL 2 - PHASE 1
A-121-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, OVERALL -
PHASE 1
A-121B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA B -
PHASE 1
A-121C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA C -
PHASE 1
A-121D-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA D -
PHASE 1
A-121E-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 1, AREA E -
PHASE 1
A-122-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, OVERALL -
PHASE 1
A-122B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B -
PHASE 1
A-122C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C -
PHASE 1
A-122D-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA D -
PHASE 1
A-122E-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA E -
PHASE 1
A-131-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
A-131B-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
A-131C-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
A-131D-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
A-132-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
A-132B-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
A-132C-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
A-132D-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
A-132E-P1 ARCHITECTURAL - RAISED FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
A-141-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, OVERALL - PHASE 1
A-141B-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA B - PHASE 1
A-141C-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA C - PHASE 1
A-141D-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA D - PHASE 1
A-141E-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 1, AREA E - PHASE 1
A-142-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, OVERALL - PHASE 1
A-142B-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA B - PHASE 1
A-142C-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA C - PHASE 1
A-142D-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA D - PHASE 1
A-142E-P1 ARCHITECTURAL - FINISH PLAN - LEVEL 2, AREA E - PHASE 1
A-151-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 1, OVERALL - PHASE 1
A-151B-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 1, AREA B - PHASE 1
A-151C-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 1, AREA C - PHASE 1
A-152-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, OVERALL - PHASE 1
A-152B-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA B - PHASE 1
DOCUMENT 00 01 15 Page 3
Sheet ID Drawing Title
A-152C-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA C - PHASE 1
A-152D-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA D - PHASE 1
A-152E-P1 ARCHITECTURAL - FURNITURE PLAN - LEVEL 2, AREA E - PHASE 1
A-201-P1 ARCHITECTURAL - EXTERIOR ELEVATIONS - PHASE 1
A-311-P1 ARCHITECTURAL - EXTERIOR WALL SECTIONS AND ELEVATIONS - PHASE 1
A-312-P1 ARCHITECTURAL - EXTERIOR WALL SECTIONS AND ELEVATIONS - PHASE 1
A-411-P1 ARCHITECTURAL - ENLARGED PLANS - EAST TOILETS LEVEL 1 - PHASE 1
A-412-P1 ARCHITECTURAL - ENLARGED PLANS - EAST TOILETS LEVEL 2 - PHASE 1
A-413-P1 ARCHITECTURAL - ENLARGED FINISH PLANS-EAST TOILETS LEVEL 1 & 2 -
PHASE 1
A-414-P1 ARCHITECTURAL - ENLARGED ELEVATIONS - TOILETS - PHASE 1
A-418-P1 ARCHITECTURAL - TYPICAL LAYOUTS & MOUNTING HEIGHTS - PHASE 1
A-419-P1 ARCHITECTURAL - TYPICAL LAYOUTS & MOUNTING HEIGHTS - PHASE 1
A-421-P1 ARCHITECTURAL - ENLARGED PLANS & SECTIONS - STAIR 1 - PHASE 1
A-422-P1 ARCHITECTURAL - ENLARGED PLANS & SECTIONS - STAIR 3 - PHASE 1
A-423-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-424-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-425-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-426-P1 ARCHITECTURAL - STAIR DETAILS - PHASE 1
A-431-P1 ARCHITECTURAL - ENLARGED PLANS & SECTIONS - ELEVATOR 1 - PHASE 1
A-432-P1 ACHITECTURAL - ELEVATOR 1 ROOF VESTIBULE ELEVATIONS - PHASE 1
A-433-P1 ARCHITECTURAL - ELEVATOR DETAILS - PHASE 1
A-441-P1 ARCHITECTURAL - FURNITURE PLAN - TYPICAL ROOMS - PHASE 1
A-451-P1 ARCHITECTURAL - ENLARGED INTERIOR ELEVATIONS - PHASE 1
A-452-P1 ARCHITECTURAL - ENLARGED INTERIOR ELEVATIONS - PHASE 1
A-501-P1 ARCHITECTURAL - PARTITION TYPES - PHASE 1
A-502-P1 ARCHITECTURAL - STANDARD PARTITION DETAILS - PHASE 1
A-503-P1 ARCHITECTURAL - STANDARD PARTITION DETAILS - PHASE 1
A-504-P1 ARCHITECTURAL - STANDARD PARTITION DETAILS - PHASE 1
A-505-P1 ARCHITECTURAL - COLUMN PLAN DETAILS - PHASE 1
A-506-P1 ARCHITECTURAL - COLUMN PLAN DETAILS - PHASE 1
A-511-P1 ARCHITECTURAL - CEILING DETAILS - PHASE 1
A-512-P1 ARCHITECTURAL - CEILING DETAILS - PHASE 1
A-521-P1 ARCHITECTURAL - RAISED ACCESS FLOOR DETAILS - PHASE 1
A-522-P1 ARCHITECTURAL - RAISED ACCESS FLOOR DETAILS - PHASE 1
A-531-P1 ARCHITECTURAL - INTERIOR CASEWORK DETAILS - PHASE 1
A-541-P1 ARCHITECTURAL - NOTES AND FINISH LEGEND - PHASE 1
A-542-P1 ARCHITECTURAL - DETAILS - INTERIOR FINISH - PHASE 1
A-551-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-552-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-553-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-554-P1 ARCHITECTURAL - EXTERIOR DETAILS - PHASE 1
A-555-P1 ARCHITECTURAL - EXTERIOR DETAILS - ROOF - PHASE 1
A-601-P1 ARCHITECTURAL - DOOR SCHEDULE - PHASE 1
A-602-P1 ARCHITECTURAL - DOOR FRAME TYPES - PHASE 1
A-603-P1 ARCHITECTURAL - DOOR & FRAME DETAILS - PHASE 1
A-604-P1 ARCHITECTURAL - DOOR & FRAME DETAILS - PHASE 1
A-605-P1 ARCHITECTURAL - DOOR & FRAME DETAILS - PHASE 1
A-611-P1 ARCHITECTURAL - INT. DEMOUNTABLE & EXT. STOREFRONT SCHEDULE,
ELEVATIONS & DETAILS - PHASE 1
WAYFINDING
AG101-P1 WAYFINDING - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
AG102-P1 WAYFINDING - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
AG501-P1 WAYFINDING - SIGN DETAILS - PROJECT TYPOGRAPHY
AG502-P1 WAYFINDING - SIGN DETAILS - COLORS, MATERIALS, PICTOGRAMS
AG503-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES RIDI, RIDP, CID, FAC,
EXIT, RID, RRP, SID, WID, MRID, IDM.P, SEG
DOCUMENT 00 01 15 Page 4
Sheet ID Drawing Title
AG504-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES FIRE, EVAC, GFG1, FEC
AG505-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES ARA, ARAD, IPS
AG506-P1 WAYFINDING - SIGN DETAILS - SIGN TYPES IPM, GFD, REG
AG507-P1 WAYFINDING - SIGN DETAILS - TYPICAL MOUNTING
GENERAL - VOLUME 1C
GI021-P1 GENERAL - COVER SHEET
GI022-P1 GENERAL - INDEX OF DRAWINGS
GI023-P1 GENERAL - INDEX OF DRAWINGS
GI024-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
FIRE PROTECTION
FA001-P1 FIRE ALARM ABBREVIATIONS, SYMBOLS AND GENERAL NOTES - PHASE 1
FD101-P1 FIRE ALARM DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
FD102-P1 FIRE ALARM DEMOLITION PLAN - LEVEL 2, OVERALL - PHASE 1
FA101-P1 FIRE ALARM PLAN - LEVEL 1, OVERALL - PHASE 1
FA101B-P1 FIRE ALARM PLAN - LEVEL 1, AREA B - PHASE 1
FA101C-P1 FIRE ALARM PLAN - LEVEL 1, AREA C - PHASE 1
FA101D-P1 FIRE ALARM PLAN - LEVEL 1, AREA D - PHASE 1
FA101E-P1 FIRE ALARM PLAN - LEVEL 1, AREA E - PHASE 1
FA102-P1 FIRE ALARM PLAN - LEVEL 2, OVERALL - PHASE 1
FA102B-P1 FIRE ALARM PLAN - LEVEL 2, AREA B - PHASE 1
FA102C-P1 FIRE ALARM PLAN - LEVEL 2, AREA C - PHASE 1
FA102D-P1 FIRE ALARM PLAN - LEVEL 2, AREA D - PHASE 1
FA102E-P1 FIRE ALARM PLAN - LEVEL 2, AREA E - PHASE 1
FA103-P1 FIRE ALARM PLAN - LEVEL 3, OVERALL - PHASE 1
FA103B-P1 FIRE ALARM PLAN - LEVEL 3, AREA B - PHASE 1
FA103C-P1 FIRE ALARM PLAN - LEVEL 3, AREA C - PHASE 1
FA501-P1 FIRE ALARM DETAILS - PHASE 1
FA502-P1 FIRE ALARM DETAILS - PHASE 1
FA601-P1 FIRE ALARM MATRIX - PHASE 1
FA602-P1 FIRE ALARM RISER DIAGRAMS - PHASE 1
FX001-P1 FIRE SUPPRESSION ABBREVIATIONS, SYMBOLS AND GENERAL NOTES -
PHASE 1
FD111-P1 FIRE SUPPRESSION DEMOLITION PLAN - LEVEL 1, OVERALL - PHASE 1
FD112-P1 FIRE SUPPRESSION DEMOLITION PLAN - LEVEL 2, OVERALL - PHASE 1
FX101-P1 FIRE SUPPRESSION PLAN - LEVEL 1, OVERALL - PHASE 1
FX101B-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA B - PHASE 1
FX101C-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA C - PHASE 1
FX101D-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA D - PHASE 1
FX101E-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA E - PHASE 1
FX101F-P1 FIRE SUPPRESSION PLAN - LEVEL 1, AREA F - PHASE 1
FX102-P1 FIRE SUPPRESSION PLAN - LEVEL 2, OVERALL - PHASE 1
FX102A-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA A - PHASE 1
FX102B-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA B - PHASE 1
FX102C-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA C - PHASE 1
FX102D-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA D - PHASE 1
FX102E-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA E - PHASE 1
FX102F-P1 FIRE SUPPRESSION PLAN - LEVEL 2, AREA F - PHASE 1
FX103-P1 FIRE SUPPRESSION PLAN - LEVEL 3, OVERALL - PHASE 1
FX103C-P1 FIRE SUPPRESSION PLAN - LEVEL 3, AREA C - PHASE 1
FX401-P1 FIRE SUPPRESSION SECTIONS - PHASE 1
FX501-P1 FIRE SUPPRESSION DETAILS - PHASE 1
FX502-P1 FIRE SUPPRESSION DETAILS - PHASE 1
FX503-P1 FIRE SUPPRESSION DETAILS - PHASE 1
FX901-P1 FIRE SUPPRESSION ISOMETRIC - EXISTING - PHASE 1
FX902-P1 FIRE SUPPRESSION ISOMETRIC - FINAL - PHASE 1
DOCUMENT 00 01 15 Page 5
Sheet ID Drawing Title
PLUMBING
P-001-P1 PLUMBING - SYMBOLS AND ABBREVIATIONS
PD100-P1 PLUMBING - DEMOLITION - UNDERGROUND, OVERALL-PHASE 1
PD101-P1 PLUMBING - DEMOLITION - LEVEL 1, OVERALL-PHASE 1
PD102-P1 PLUMBING - DEMOLITION - LEVEL 2,OVERALL-PHASE 1
PD103-P1 PLUMBING - DEMOLITION - ROOF, OVERALL-PHASE 1
PL100-P1 PLUMBING - WASTE AND VENT PLAN - UNDERGROUND, OVERALL-PHASE1
PL100C-P1 PLUMBING - WASTE AND VENT PLAN - UNDERGROUND, AREA C -PHASE1
PL100D-P1 PLUMBING - WASTE AND VENT PLAN - UNDERGROUND, AREA D-PHASE1
PL101-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 1, OVERALL-PHASE 1
PL101C-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 1, AREA C-PHASE 1
PL101D-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 1, AREA D-PHASE 1
PL102-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 2,OVERALL-PHASE 1
PL102D-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 2, AREA D-PHASE 1
PL102E-P1 PLUMBING - WASTE AND VENT PLAN - LEVEL 2, AREA E-PHASE 1
PL103-P1 PLUMBING - WASTE AND VENT PLAN - ROOF, OVERALL-PHASE 1
PL103D-P1 PLUMBING - WASTE AND VENT PLAN - ROOF, AREA D-PHASE 1
PL103E-P1 PLUMBING - WASTE AND VENT PLAN - ROOF, AREA E-PHASE 1
PP101-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, OVERALL-PHASE 1
PP101B-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, AREA B-PHASE 1
PP101C-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, AREA C-PHASE 1
PP101D-P1 PLUMBING - SUPPLY PLAN - LEVEL 1, AREA D-PHASE 1
PP102-P1 PLUMBING - SUPPLY PLAN - LEVEL 2,OVERALL-PHASE 1
PP102C-P1 PLUMBING - SUPPLY PLAN - LEVEL 2, AREA C-PHASE 1
PP102D-P1 PLUMBING - SUPPLY PLAN - LEVEL 2, AREA D-PHASE 1
PP102E-P1 PLUMBING - SUPPLY PLAN - LEVEL 2, AREA E-PHASE 1
P-501-P1 PLUMBING - DETAILS
P-502-P1 PLUMBING - DETAILS
P-610-P1 PLUMBING - RISER DIAGRAM - WASTE AND VENT
P-620-P1 PLUMBING - RISER DIAGRAM - SUPPLY
P-630-P1 PLUMBING - RISER DIAGRAM - NATURAL GAS
P-651-P1 PLUMBING - SCHEDULES
MECHANICAL
M-001-P1 MECHANICAL SYMBOLS AND ABBREVIATIONS - PHASE 1
M-002-P1 MECHANICAL SCOPE DIAGRAMS - PHASE 1
M-101-P1 MECHANICAL - PLAN - LEVEL 1 - OVERALL - PHASE 1
M-102-P1 MECHANICAL - PLAN - LEVEL 2 - OVERALL - PHASE 1
M-103-P1 MECHANICAL - PLAN - ROOF LEVEL - OVERALL - PHASE 1
MD101-P1 MECHANICAL DEMOLITION - PLAN - LEVEL 1 - OVERALL - PHASE 1
MD102-P1 MECHANICAL DEMOLITION - PLAN - LEVEL 2 - OVERALL - PHASE 1
MD103-P1 MECHANICAL DEMOLITION - PLAN - ROOF LEVEL - OVERALL - PHASE 1
MD401-P1 MECHANICAL DEMOLITION ENLARGED PLANS - PHASE 1
MD402-P1 MECHANICAL DEMOLITION ENLARGED PLANS - PHASE 1
MH101B-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA B - PHASE 1
MH101C-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA C - PHASE 1
MH101D-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA D - PHASE 1
MH101E-P1 MECHANICAL HVAC - PLAN - LEVEL 1 - AREA E - PHASE 1
MH102B-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA B - PHASE 1
MH102C-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA C - PHASE 1
MH102D-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA D - PHASE 1
MH102E-P1 MECHANICAL HVAC - PLAN - LEVEL 2 - AREA E - PHASE 1
MH103B-P1 MECHANICAL HVAC/ PIPING - PLAN - ROOF LEVEL - AREA B - PHASE 1
MH103C-P1 MECHANICAL HVAC/ PIPING - PLAN - ROOF LEVEL - AREA C - PHASE 1
MH103D-P1 MECHANICAL HVAC/ PIPING - PLAN - ROOF LEVEL - AREA D - PHASE 1
MP101B-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA B - PHASE 1
MP101C-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA C - PHASE 1
MP101D-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA D - PHASE 1
DOCUMENT 00 01 15 Page 6
Sheet ID Drawing Title
MP101E-P1 MECHANICAL PIPING - PLAN - LEVEL 1 - AREA E - PHASE 1
MP102B-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA B - PHASE 1
MP102C-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA C - PHASE 1
MP102D-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA D - PHASE 1
MP102E-P1 MECHANICAL PIPING - PLAN - LEVEL 2 - AREA E - PHASE 1
M-401-P1 MECHANICAL - ENLARGED PLANS - MECHANICAL ROOMS - PHASE 1
M-501-P1 MECHANICAL DETAILS - PHASE 1
M-502-P1 MECHANICAL DETAILS - PHASE 1
M-503-P1 MECHANICAL DETAILS - PHASE 1
M-504-P1 MECHANICAL DETAILS - PHASE 1
M-505-P1 MECHANICAL DETAILS - PHASE 1
M-506-P1 MECHANICAL DETAILS - PHASE 1
M-601-P1 MECHANICAL - FLOW DIAGRAM - AIR - PHASE 1
M-612-P1 MECHANICAL - FLOW DIAGRAM - CHILLED WATER - PHASE 1
M-613-P1 MECHANICAL - FLOW DIAGRAM - CHILLED WATER - DISTRIBUTION -
PHASE 1
M-614-P1 MECHANICAL - FLOW DIAGRAM - CHILLED WATER - DISTRIBUTION -
ACB - PHASE 1
M-651-P1 MECHANICAL - SCHEDULES - PHASE 1
M-652-P1 MECHANICAL - SCHEDULES - PHASE 1
M-653-P1 MECHANICAL - SCHEDULES - PHASE 1
M-654-P1 MECHANICAL - SCHEDULES - PHASE 1
M-801-P1 MECHANICAL - BCS - SYMBOLS AND ABBREVIATIONS (A) - PHASE 1
M-802-P1 MECHANICAL - BCS - SYMBOLS AND ABBREVIATIONS (B) - PHASE 1
M-803-P1 MECHANICAL - BCS - SYSTEM ARCHITECTURE DRAWING - PHASE 1
M-810-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM CONTROL A -
PHASE 1
M-811-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM CONTROL B -
PHASE 1
M-812-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM POINTS - PHASE 1
M-813-P1 MECHANICAL - BCS - DEDICATED OUTSIDE AIR SYSTEM SEQUENCE OF
OPERATIONS - PHASE 1
M-814-P1 MECHANICAL - BCS - AHU-3 AND 4 CONTROL - PHASE 1
M-815-P1 MECHANICAL - BCS - AHU-3 AND 4 POINTS LIST AND SEQUENCE OF
OPERATIONS - PHASE 1
M-820-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM CONTROL DIAGRAM A -
PHASE 1
M-821-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM CONTROL DIAGRAM B -
PHASE 1
M-822-P1 MECHANICAL - BCS - CHILLED WATER DISTRIBUTION - ACB - PHASE 1
M-823-P1 MECHANICAL - BCS - CHILLED WATER DISTRIBUTION - HVAC - PHASE 1
M-824-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM POINTS - PHASE 1
M-825-P1 MECHANICAL - BCS - CHILLED WATER SYSTEM SEQEUNCE OF OPERATIONS -
PHASE 1
M-830-P1 MECHANICAL - BCS - CONDENSER WATER SYSTEM DIAGRAM A - PHASE 1
M-831-P1 MECHANICAL - BCS - CONDENSER WATER SYSTEM DIAGRAM B - PHASE 1
M-832-P1 MECHANICAL - BCS - CONDENSER WATER SYSTEM POINTS AND SEQUENCE OF
OPERATIONS - PHASE 1
M-840-P1 MECHANICAL - BCS - ROOM CONTROL DIAGRAMS - PHASE 1
M-841-P1 MECHANICAL - BCS - ROOM CONTROL POINTS AND SEQUENCE OF
OPERATIONS - PHASE 1
M-842-P1 MECHANICAL - BCS - HIGH POWERED ROOM CONTROL DIAGRAMS - PHASE 1
M-843-P1 MECHANICAL - BCS - HIGH POWERED ROOM CONTROL POINTS AND
SEQUENCE OF OPERATIONS- PHASE 1
M-844-P1 MECHANICAL - BCS - TERMINAL UNIT DIAGRAMS - PHASE 1
M-845-P1 MECHANICAL - BCS - TERMINAL UNIT POINTS AND SEQUENCE OF
OPERATIONS - PHASE 1
M-850-P1 MECHANICAL - BCS - HYDROGEN MONITORING SYSTEM DIAGRAM - PHASE 1
DOCUMENT 00 01 15 Page 7
Sheet ID Drawing Title
M-851-P1 MECHANICAL - BCS - HYDROGEN MONITORING SYSTEM POINTS LIST AND
SEQUENCE OF OPERATION - PHASE 1
M-860-P1 MECHANICAL - BCS - MISCELLANEOUS CONTROLS- PHASE 1
M-861-P1 MECHANICAL - BCS - CHILLER ROOM VENTILATION CONTROL- PHASE 1
M-870-P1 MECHANICAL - BCS - DETAILS - PHASE 1
M-871-P1 MECHANICAL - BCS - DETAILS - PHASE 1
GENERAL - VOLUME 1D
GI031-P1 GENERAL - COVER SHEET
GI032-P1 GENERAL - INDEX OF DRAWINGS
GI033-P1 GENERAL - INDEX OF DRAWINGS
GI034-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
ELECTRICAL
E-001-P1 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-002-P1 ELECTRICAL GENERAL NOTES
ES101-P1 ELECTRICAL - POWER SITE PLAN
ED101-P1 OVERALL ELECTRICAL DEMOLITION PLAN - LEVEL 1 - PHASE 1
ED102-P1 OVERALL ELECTRICAL DEMOLITION PLAN - LEVEL 2 - PHASE 1
EL101-P1 OVERALL ELECTRICAL LIGHTING PLAN - LEVEL 1 - PHASE 1
EL101B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA B - PHASE 1
EL101C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA C - PHASE 1
EL101D-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA D - PHASE 1
EL101E-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 1 - AREA E - PHASE 1
EL102-P1 OVERALL ELECTRICAL LIGHTING PLAN - LEVEL 2 - PHASE 1
EL102B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA B - PHASE 1
EL102C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA C - PHASE 1
EL102D-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA D - PHASE 1
EL102E-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA E - PHASE 1
EL103C-P1 ELECTRICAL - LIGHTING PLAN - ROOF LEVEL - AREA C - PHASE 1
EL401-P1 ELECTRICAL - STAIR SECTION
EL501-P1 ELECTRICAL - LIGHTING FIXTURE DETAILS
EL502-P1 ELECTRICAL - LIGHTING FIXTURE DETAILS
EL601-P1 ELECTRICAL - LIGHTING CONTROL DETAILS
EL602-P1 ELECTRICAL - LIGHTING CONTROL DETAILS
EL603-P1 ELECTRICAL - LIGHTING CONTROL MATRIX
EL604-P1 ELECTRICAL - LIGHTING FIXTURE SCHEDULE
EL630-P1 ELECTRICAL - LIGHTING FIXTURE SCHEDULE
EG101-P1 OVERALL ELECTRICAL GROUNDING PLAN - LEVEL 1 - PHASE 1
EG102-P1 OVERALL ELECTRICAL GROUNDING PLAN - LEVEL 2 - PHASE 1
EG103-P1 OVERALL ELECTRICAL GROUNDING PLAN - ROOF LEVEL - PHASE 1
EP101-P1 OVERALL ELECTRICAL PLAN - LEVEL 1 - PHASE 1
EP101B-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA B - PHASE 1
EP101C-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA C - PHASE 1
EP101D-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA D - PHASE 1
EP101E-P1 ELECTRICAL - POWER PLAN - LEVEL 1 - AREA E - PHASE 1
EP102-P1 OVERALL ELECTRICAL PLAN - LEVEL 2 - PHASE 1
EP102B-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA B - PHASE 1
EP102C-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA C - PHASE 1
EP102D-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA D - PHASE 1
EP102E-P1 ELECTRICAL - POWER PLAN - LEVEL 2 - AREA E - PHASE 1
EP103B-P1 ELECTRICAL - POWER PLAN - ROOF LEVEL - AREA B - PHASE 1
EP103C-P1 ELECTRICAL - POWER PLAN - ROOF LEVEL - AREA C - PHASE 1
EP103D-P1 ELECTRICAL - POWER PLAN - ROOF LEVEL - AREA D - PHASE 1
E-401-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
E-402-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
E-403-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
E-404-P1 ELECTRICAL ENLARGED PLANS - PHASE 1
DOCUMENT 00 01 15 Page 8
Sheet ID Drawing Title
E-501-P1 ELECTRICAL - DETAILS
E-502-P1 ELECTRICAL - DETAILS
ED601-P1 ELECTRICAL ONE-LINE DIAGRAM DEMOLITION - PHASE 1
E-601-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-602-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-603-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-604-P1 ELECTRICAL ONE-LINE DIAGRAM - PHASE 1
E-605-P1 ELECTRICAL GROUNDING RISER PLAN - PHASE 1
E-606-P1 ELECTRICAL TRANSFORMER AND FEEDER SCHEDULES
E-607-P1 ELECTRICAL PANEL SCHEDULES
E-608-P1 ELECTRICAL PANEL SCHEDULES
E-609-P1 ELECTRICAL PANEL SCHEDULES
E-610-P1 ELECTRICAL PANEL SCHEDULES
E-611-P1 ELECTRICAL PANEL SCHEDULES
E-612-P1 ELECTRICAL PANEL SCHEDULES
E-613-P1 ELECTRICAL PANEL SCHEDULES
E-614-P1 ELECTRICAL PANEL SCHEDULES
E-615-P1 ELECTRICAL PANEL SCHEDULES
E-616-P1 ELECTRICAL PANEL SCHEDULES
E-617-P1 ELECTRICAL PANEL SCHEDULES
E-618-P1 ELECTRICAL PANEL SCHEDULES
E-619-P1 ELECTRICAL PANEL SCHEDULES
E-651-P1 ELECTRICAL - RECEPTACLE RELAY PANEL SCHEDULE
TELECOMMUNICATIONS
T-001-P1 TELECOMMUNICATIONS - GENERAL NOTES AND SYMBOLS LEGEND - PHASE 1
T-100-P1 TELECOMMUNICATIONS - SITE PLAN - PHASE 1
TD101-P1 TELECOMMUNICATIONS - DEMOLITION PLAN - LEVEL 1 - OVERALL -
PHASE 1
TD102-P1 TELECOMMUNICATIONS - DEMOLITION PLAN - LEVEL 2 - OVERALL -
PHASE 1
T-101-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
T-101B-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
T-101C-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
T-101D-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
T-101E-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 1, AREA E - PHASE 1
T-102-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
T-102B-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
T-102C-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
T-102D-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
T-102E-P1 TELECOMMUNICATIONS - FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
T-103-P1 TELECOMMUNICATIONS - ROOF PLAN - OVERALL - PHASE 1
T-103C-P1 TELECOMMUNICATIONS - ROOF PLAN - AREA C - PHASE 1
T-401-P1 TELECOMMUNICATIONS - ENLARGED PLANS - PHASE 1
T-501-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-502-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-503-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-504-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-505-P1 TELECOMMUNICATIONS - DETAILS - PHASE 1
T-601-P1 TELECOMMUNICATIONS - CONDUIT RISER DIAGRAM - PHASE 1
T-602-P1 TELECOMMUNICATIONS - FIBER OPTIC BACKBONE RISER DIAGRAM -
PHASE 1
T-603-P1 TELECOMMUNICATIONS - COPPER BACKBONE RISER DIAGRAM - PHASE 1
SECURITY
TY001-P1 SECURITY - GENERAL NOTES AND SYMBOL LEGEND - PHASE 1
TD111-P1 SECURITY - DEMOLITION PLAN - LEVEL 1 - OVERALL -PHASE 1
TD112-P1 SECURITY - DEMOLITION PLAN - LEVEL 2 - OVERALL -PHASE 1
DOCUMENT 00 01 15 Page 9
Sheet ID Drawing Title
TY101-P1 SECURITY - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
TY101B-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
TY101C-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
TY101D-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA D - PHASE 1
TY101E-P1 SECURITY - FLOOR PLAN - LEVEL 1, AREA E - PHASE 1
TY102-P1 SECURITY - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
TY102B-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
TY102C-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
TY102D-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
TY102E-P1 SECURITY - FLOOR PLAN - LEVEL 2, AREA E - PHASE 1
TY501-P1 SECURITY - DETAILS - PHASE 1
TY502-P1 SECURITY - DETAILS - PHASE 1
TY601-P1 SECURITY - RISER DIAGRAM - PHASE 1
TY602-P1 SECURITY - RISER DIAGRAM - PHASE 1
AUDIO VISUAL
TA041-P1 AUDIO VISUAL - GENERAL NOTES AND SYMBOLS LEGEND
TA101-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 1, OVERALL - PHASE 1
TA101B-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 1, AREA B - PHASE 1
TA101C-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 1, AREA C - PHASE 1
TA102-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, OVERALL - PHASE 1
TA102B-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1
TA102C-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1
TA102D-P1 AUDIO VISUAL - FLOOR PLAN - LEVEL 2, AREA D - PHASE 1
TA201-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 1, OVERALL -
PHASE 1
TA201B-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 1, AREA B -
PHASE 1
TA201C-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 1, AREA C -
PHASE 1
TA202-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, OVERALL -
PHASE 1
TA202B-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B -
PHASE 1
TA202C-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C -
PHASE 1
TA202D-P1 AUDIO VISUAL - REFLECTED CEILING PLAN - LEVEL 2, AREA D -
PHASE 1
TA401-P1 AUDIO VISUAL - ELEVATIONS
GENERAL - VOLUME 1E - BID ALTERNATE
GI041-P1 GENERAL - COVER SHEET - BID ALTERNATE
GI042-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
STRUCTURAL
SF703B-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA B - PHASE 1 - BID ALT #1
SF703C-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA C - PHASE 1 - BID ALT #1
S-710-P1 STRUCTURAL - STEEL - TYPICAL DETAILS - BID ALT #1
ARCHITECTURE
A-702B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA B - PHASE 1 -
BID ALT #1
A-702C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA C - PHASE 1 -
BID ALT #1
A-704B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B -
PHASE 1 - BID ALT #1
A-704C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C -
PHASE 1 - BID ALT #1
DOCUMENT 00 01 15 Page 10
Sheet ID Drawing Title
A-705-P1 ARCHITECTURAL - UPFOLDING PARTITION DETAILS - PHASE 1 -
BID ALT #1
ELECTRICAL
EL704B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA B - PHASE 1 -
ALT #1
EL704C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA C - PHASE 1 -
ALT #1
-- End of Document --
DOCUMENT 00 01 15 Page 11
DOCUMENT 00 01 15 Page 12
SECTION 01 03 00
OPTIONS
12/18
PART 1 GENERAL
1.1 SUMMARY
This section specifies administrative and procedural requirements for options along with their technical descriptions.
1.2 DEFINITIONS
"CLIN" means Contract Line Item Number.
"Option" means a unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional supplies or services called by the contract, or may elect to extend the term of the contract.
Notice to proceed of individual options as noted below shall not affect the Completion Date of the base Contract as determined by the base Contract Notice to Proceed.
1.3 GENERAL
1.3.1 Base Bid
CLIN 0001 = Within 5 feet of the building line, complete. Inclusive of all materials, plant, labor and equipment and site.
CLIN 0002 = Supporting Facilities Site Preparation and Development Including Utilities, Paving Outside the 5 feet building line, complete.
Inclusive of all materials, plant, labor and equipment and site.
CLIN 0004 = Augusta Utilities Department connection fee (Pre-Priced CLIN)
CLIN 0005 = Georgia Power Primary Power Connection Fee (Pre-Priced CLIN)
CLIN 0006 = Georgia Power Site Lighting (Pre-Priced CLIN)
1.3.2 Bid Options
The extent of work for each option is indicated in the documents. In the event of any differences between the documents and the options described below, the descriptions below shall govern.
1.4 COORDINATION
The Contractor shall coordinate related work and modify or adjust adjacent work as necessary to ensure that work affected by each exercised option is complete and fully integrated into the project. The Contractor shall be provided appropriate detailing to properly terminate or transition from option to base bid work and option to option work. Contractor shall coordinate work with utility companies.
The Contracting Officer shall review and approve in writing any and all Contractor generated documents.
SECTION 01 03 00 Page 1
1.5 NOTIFICATION
Each optional bid item, if awarded, will be awarded according to the schedule below. However, the Government is under no obligation to award any optional bid item.
Per FAR Clause 52.217-7 of the base contract, for Option CLINs 0007 through 0015, the Contracting Officer may exercise at time of award or by written notice to the Contractor within 120 calendar days after the Issuance of Notice to Proceed. If any option is awarded, the contract period of performance is not impacted, the work will be performed concurrently with the base work for a total contract period of performance not to exceed 1080 calendar days.
1.6 SCHEDULE
A "Schedule of Options" is included as part of this section. Specification sections, referenced in the schedule contain requirements for materials and methods necessary to achieve the work described under each option.
Include as part of each option, miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation whether or not mentioned as part of the option.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 SCHEDULE OF OPTIONS
3.1.1 CLIN 004 Bid Alternate #1 - Up-Folding Partitions
Includes five (5) Up-folding partitions that allow for two adjacent learning environments to be combined into one larger space. The Base Design includes a solid partition (STC 50).
GENERAL - VOLUME 1E - BID ALTERNATE
GI041-P1 GENERAL - COVER SHEET - BID ALTERNATE
GI042-P1 GENERAL - INDEX OF DRAWINGS - BID ALTERNATE
STRUCTURAL
SF703B-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA B -
PHASE 1 - BID ALT #1
SF703C-P1 STRUCTURAL - FRAMING PLAN - ROOF, AREA C -
PHASE 1 - BID ALT #1
S-710-P1 STRUCTURAL - STEEL - TYPICAL DETAILS
ARCHITECTURE
A-702B-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA B -
PHASE 1 - BID ALT #1
A-702C-P1 ARCHITECTURAL - FLOOR PLAN - LEVEL 2, AREA C -
SECTION 01 03 00 Page 2
PHASE 1 - BID ALT #1
A-704B-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA B -
PHASE 1 - BID ALT #1
A-704C-P1 ARCHITECTURAL - REFLECTED CEILING PLAN - LEVEL 2, AREA C -
PHASE 1 - BID ALT #1
A-705-P1 ARCHITECTURAL - UPFOLDING PARTITION DETAILS -
PHASE 1 - BID ALT #1
ELECTRICAL
EL704B-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA B - PHASE 1 - ALT #1
EL704C-P1 ELECTRICAL - LIGHTING PLAN - LEVEL 2 - AREA C - PHASE 1 - ALT #1
-- End of Section --
SECTION 01 03 00 Page 3
SECTION 01 03 00 Page 4
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Architect/Engineer approval is required for submittals marked with an "AE" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Phasing Plan; G, AE
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
Vincent Hall is a phased renovation, with Phase 1 consisting of 60,172 square feet. The remainder of the building will be occupied and used for classroom instruction during the course of the Phase 1 renovation. The facility, identified as Building 21401, is located on Brainard Avenue between 21st and 22nd streets at the Fort Gordon Installation in Georgia.
The building was originally constructed in 1986, with subsequent renovations since 1997 to provide minor upgrades. The existing building systems are now reaching the point of needing full replacement, along with other code upgrades. The building is 34 feet high, two-story, steel-framed structure with approximately 165,000 square feet of interior space primarily on raised floors. It has a brick veneer and a flat roof that is oriented with the entrance at true north. The only glazing on the building is at the entry storefront; there are no windows in the building. The building contains the following distinct functional features:
a. Academic and Research: Consisting of unclassified acoustically treated learning environments.
b. Administrative: Consisting of instructor space, storage, break area conference rooms, open office workstations.
c. Building Systems and Core: The project includes upgrades to the mechanical, electrical, life safety, security and communications systems. In addition, new toilet rooms, electrical closets and comms rooms will be constructed.
1.2.2 Location
The work is located at the Ft Gordon, GA, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building will be occupied during performance of work under this Contract.
SECTION 01 11 00 Page 1
Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of any excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.6 PHASING PLAN
Provide phasing plan for project. Plan to include short term work in adjacent, occupied spaces that are in addition to the phasing of the project. Phasing plan to identify trade(s) involved, restrictions, and temporary construction barriers. Contractor to confirm access availability to spaces with contracting officer and to not assume spaces will be available. Coordinate scheduling and notification requirements detailed in specification with contracting officer. Refer to 01 14 00-1.3
SPECIAL SCHEDULING REQUIREMENTS.
SECTION 01 11 00 Page 2
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
SECTION 01 11 00 Page 3
SECTION 01 11 00 Page 4
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-450-01 (2003) Vibration Criteria for Building Structures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Architect/Engineer approval is required for submittals marked with an "AE" designation. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
Construction Noise and Vibration Management Plan; G, AE
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Coordination is required with all affected utilities, public or private that impact the operation of the facility.
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
c. The building will remain in operation during the entire construction period. The Contractor must conduct their operations to cause the least possible interference with normal operations. Specific items of work to which this requirement applies includes:
1. Any interruption of building systems or utilities that would affect the day to day operations of the occupied portions of the facility must be coordinated in advance with the contracting officer.
d. Delivery of materials, staging, or storage of construction supplies must be within the designated construction area at all times.
1. See paragraph QUIET HOURS.
e. Permission to interrupt any roads, sidewalks, driveways or parking lots. Utility outages service must be requested in writing to the Contracting Officer a minimum of thirty (30) calendar days prior to
SECTION 01 14 00 Page 1 the desired date of interruption. Road Closures: Road Closures shall not be allowed. Utility installations that affect roads and parking shall be accomplished in a manner to provide through traffic at all times.
f. Permission to conduct work in occupied areas of the building during Quiet Hours must be requested in writing to the Contracting Officer 14 calendar days prior to the desired date of work. Written notification shall include specific areas impacted, description of the work and duration. Access to areas outside the limits of construction are to be coordinated as part of the biweekly construction meetings.
Government escort is not required for accessing occupied areas.
1.4 SPECIAL SCHEDULING REQUIREMENTS
First floor existing south labs are programmed as pods consisting of three classrooms each: Pod 1: 051-054, Pod 2: 055-057, Pod 3: 064-067 and Pod 4: 068-070. A maximum of one pod can be worked on at one time, while the other pods shall remain operational. Majority of work shall take place during non-quiet hours, with fabrication and preassembly taking place in non-occupied space to minimize installation time frames.
1.5 CONTRACTOR ACCESS AND USE OF PREMISES
1.5.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity…