W912HN-21-B-3008_DRAWINGS_VOL1A_AMD2.pdf

PDF 866 KB Posted

Attached to
PN ST-22018-8P Vincent Hall Renovation, Phase 1, Fort Gordon, GA
Solicitation number
W912HN21B3008
Issued by

About this file

This solicitation is for a construction project to renovate Vincent Hall at Fort Gordon, Georgia. The project scope includes interior renovation of 56,555 square feet to create learning environments and support spaces, as well as mechanical, electrical and life safety infrastructure to support both phases of renovation. The estimated value is between $10 million and $25 million. The solicitation is fully competitive with NAICS code 236220. A price evaluation preference will be applied for HUBZone small businesses. Bids are due in accordance with specifications and drawings provided in eight files, with award by the Department of the Army Corps of Engineers Savannah District. Utilities including fire protection, potable water, sanitation and power up to five feet from the building footprint will be designed and installed by respective utility owners.

View the file

Other files

File Type Posted
C.04. W912HN21B3008 - Vincent Hall Reno. -HUB zone preference ABSTRACT.pdf PDF
W912HN21B3008 BID OPENING ATTENDEES.pdf PDF
C.04. W912HN21B3008 - Vincent Hall Reno. -HUB zone preference.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D_AMD2.pdf PDF
B.08 W912HN21B3008 Amendment 0002.pdf PDF
B.08 W912HN21B3008 Amendment 0002 CC.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1B_AMD1.pdf PDF
B.08 W912HN21B3008 Amendment 0001.pdf PDF
Phase1_RTA_V2-C_Div_25-33_Appendices_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1C_AMD1.pdf PDF
Phase1_RTA_V2-A_Div_00-07_AMD1.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D_AMD1.pdf PDF
Phase1_RTA_V2-B_Div_08-23_AMD1.pdf PDF
B.08 W912HN21B3008 Amendment 0001 CC.pdf PDF
Vincent Hall Site Visit Attendance Roster.pdf PDF
Vincent Hall Pre-Bid Site Visit Synopsis.docx DOCX document
B.08 - Solicitation W912HN21B3008 - Vincent Hall.pdf PDF
Phase1_RTA_V2-A_Div_00-07.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1C.pdf PDF
Phase1_RTA_V2-B_Div_08-23.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1A.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1D.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1B.pdf PDF
W912HN-21-B-3008_DRAWINGS_VOL1E.pdf PDF
B.08_W912HN20B3008 Vincent Hall Solicitation.pdf PDF
Phase1_RTA_V2-C_Div_25-33 Appendices.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIMITS OF DISTURBANCE

LIMITS OF DISTURBANCE

BRAINARD AVENUE

VINCENT HALL

BUILDING #21401

F.F.E.=472.11

ND

S

TR

EE

T

X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X

X

X

X

X

BFP

1- 1/

4"

NG

1- 1/

4"

NG

1- 1/

4"

NG

2"

NG

2"

NG

S 8"SS

6"SS

C.O.

I.E.=460.75

MH

T/EL=466.24

I.E.6"=460.44 I.E.=459.71

6"W C.I.6"W C.I.

S

WYE

I.E.=460.71

S

MH 31

(ABANDONED) 8"

SS

8"

SS

8"

SS

8"

SS

8"

SS

(A

BA

ND

ON

ED

8"

SS

8"

SS

8"

SS

(A

BA

ND

ON

ED

4"NG

MH 26

T/EL=468.73

I.E.=461.71

4"NG4"NG4"NG4"NG4"NG4"NG

S

MH 38

T/EL=471.59

I.E.=468.04

S

MH 37

T/EL=473.97

I.E.=466.77

8"SS 8"SS (VCP) 8"SS

8"

SS

8"

SS

8"

SS

8"

SS

8"

SS

1-1/4"NGGM

E

E

E

T

UGPUGPUGP

UG

P

UGP

UG

T

UG

T

T

T UGT UGT UGT

UG

T

UG

T

S

ASPHALT

PARKING

ASPHALT

GRASS AREA

GRASS AREA

ASPHALT

ASPHALT

GRASS AREA

SATELLITE

DISH PAD

SATELLITE

DISH PAD

GRASS AREA

GRASS AREA

GRASS AREA

GRASS

AREA

GRASS

AREA

SATELLITE

DISH PAD

AT/FP BARRIER WALL

AT/FP BARRIER WALL

18"ØSD

"R

CP

"R

CP

"R

CP

"R

CP

"R

CP

"Ø

SD

18"RCP

6"PVC

18"ØSD

15"ØSD15"ØSD

15"ØRCP 15"ØSD

15"ØSD15"ØSD 15"ØSD

TBM F.H. 2-128

ON THE LETTER "F"

ON FHY. EL.=470.12

MECH. YARD

MECH.

YARD

S

S

S

S

8"

SS

S

8"W 8"W 8"W 8"W 8"W 8"W 8"W 8"W 8"W 8"W 8"W

6" W

(C I)

6" W

(C I)

8"W

8" W

8" W

8" W

8" W

8" W

8" W

8" W

8" W

(C

IP

8" W

LU

KE

TI

NA

H

AL

L

PIV

X X

X X

XXXXXX

X X X X X X

X X

X

CO

NC

. P

AV

EM

EN

T

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

3" W

(C

IP

ASPHALT

PARKING

ST

S

TR

EE

T

20"CYP(2)

28"DW

AS

PH

AL

T

PA

VE

M

EN

T

CONC.

CO

NC

GRASS AREA

24"SYC

18"SYC

UGPUGPUGP

LP

LP

LP

6"W C.I.

8"

SS

8"

SS

8"

SS

8"

SS

8"

SS

AS

PH

AL

T

PA

VE

M

EN

T

AS

PH

AL

T

PA

VE

M

EN

T

ASPHALT PAVEMENT

CONC.

PAD

MH

T/EL=473.25

I.E.=465.6±

MH

T/EL=472.73

I.E.=464.9±

CONC. PAD

"R

CP

"Ø

SD

"Ø

SD

"Ø

SD

"Ø

SD

15"ØSD

8"

SS

(A

BA

ND

ON

ED

EXIST. CONC. SIDEWALK

PLANTER (EARTH BERM, TYP.)

PLANTER (EARTH BERM, TYP.) CONC. SIDEWALK

CLL CLL

CLL

C

LL

CLL

C

LL

C

LL

CLL

CLL

8" W

(A

BA

ND

ON

ED

6" W

(C I)

6" W

(C I)

AT

/F

P

BA

RR

IE

R W

AL

L

UGP

1 - 8" x 6" TEE

1 - 6" VALVE & BOX PER AUD STD.

DET. 1.3 (C-501-P1) & 1.15 (C-502-P1)

BFP WM

C.O.

DOGHOUSE M.H. WITH DROP PER

AUD STD. DET. 2.4 & 2.5 ON SHT.

C-502-P1

MATCH EXIST. I.E.

1 - 8" x 4" TEE

1 - 4" VALVE & BOX PER AUD STD.

DET. 1.3 (C-501-P1) & 1.15 (C-502-P1)

SEE FIRE PROTECTION

PLAN SHT. FX101-P1

SEE PLUMBING DWGS. FOR

ADDITIONAL INFORMATION

SEE PLUMBING & WASTE PLAN

FOR ADDITIONAL INFORMATION

I.E.(OUT)=469.61

36 LF - 6" PVC SDR35

@ 1.00% MIN. GRADE

4"PW

AUD FIRE VAULT PER

AUD STD. DET. 1.29 ON

SHT. C-502-P1

6"FW

SS

EE

SWITCHGEAR

UGPUGP

SEE ELECTRICAL DWG. ES101-P1

FOR ADDITIONAL INFORMATION

C.O.

S

1 - 8" x 8" CUT-IN TEE

AUD STD. DET. 1.8 ON SHT.

C-501-P1

1 - 8" VALVE & BOX AUD STD.

DET. 1.3 (C-501-P1) & 1.15

(C-502-P1)

8" DIP WITH 48"

MINIMUM COVER

8" W

8" W

8" W

CONNECT TO EXISTING 6" WM

1 - 8" x 6" REDUCER

1 - 6" VALVE AND BOX PER AUD STD.

DET. 1.3 (C-501-P1) & 1.15 (C-502-P1)

4" WATER METER PER AUD STD.

DET. 1.32 ON SHT. C-502-P1

BACKFLOW PREVENTER (RPZ)

PER AUD STD. DET. 1.21 ON SHT.

C-502-P1

E E E E

E

SWITCH GEAR

E

E

UGP

UGP

UGP

B

C

D

E

F

G

2 3 4 5 6 7 8 9 101

A

File Path:

Plot Date:

K:\10392001\CIVIL\10053876-VHALL-CU101-P1.DWG

8/24/2021 11:29 AM

US Army Corps of Engineers ®

READY TO ADVERTISE (RTA)

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

TE

D B

Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

S O

LI

C

IT

A

TI

O

N N

O

D A

TE

M

A R

K D

E S

C R

IP

TI

O N

VHALL

FO

R

T G

O R

D O

N , G

E O

R G

IA

S

A V

A N

N A

H D

IS

TR

IC

T

W E

S T

O G

LE

TH

O R

P E

A V

A N

U E

S A

V A

N N

A H

, G A

. 3

H D

R A

R

LI

N G

TO

N

, V

IR

G

IN

IA

JU

N

E

V

IN

C E

N T

H A

LL

R

E N

O V

A

TI

O N

P H

A S

E

T.

M

A H

E R

T.

W

IM

B

E R

LY

C . E

C

LA

V E

A

T.

W

IM

B

E R

LY

W

2H N

B

C A

TE

G

O R

Y C

O D

E

1-

-0

FY

P N

A1

SCALE 1" = 30'

30' 60'15'CIVIL - SITE UTILITY PLAN - PHASE 1

N

(GEORGIA - 1-800-282-7411)

THREE WORKING DAYS BEFORE YOU DIG

UTILITIES PROTECTION CENTER

UTILITY WARNING:

The underground utilities shown have been located from field survey information and existing drawings. The engineer makes no guarantee that the underground utilities shown comprise all such utilities in the area, either in service or abandoned. The engineer further does not warrant that the underground utilities shown are in the exact location indicated although he does certify that they are located as accurately as possible from information available. The engineer has not physically located the underground utilities. CU101-P1

C

IV

IL

S

IT

E U

TI

LI

TY

P

LA

N

P

H A

S E

LEGEND:

PROPOSED

BLDG. STRUCTURE

TREE LINE

FENCE (TYPE)

CLEAN-OUT/SS SERVICE C.O.

(SIZE)PWPOTABLE WATER

SS

SD

SANITARY SEWER

STORM DRAIN

S

ROOF DRAIN RD

FIRE WATER (SIZE)FW

GATE VALVE

FIRE HYDRANT

NOTES:

1. CONTRACTOR REQUIRED TO CONTACT

GEORGIA811 THREE (3) DAYS PRIOR TO ANY

DIGGING OR COMMENCING CONSTRUCTION.

2. FIRE WATER, POTABLE WATER AND SANITARY

SERVICES WILL BE DESIGNED AND INSTALLED

BY THE AUGUSTA UTILITIES DEPARTMENT UP

TO FIVE (5) FEET OF THE BUILDING FOOTPRINT.

3. NATURAL GAS MAIN WILL BE DESIGNED AND

INSTALLED BY THE ATLANTA GAS LIGHT UP TO

FIVE (5) FEET OF THE BUILDING FOOTPRINT.

4. POWER SERVICE WILL BE DESIGNED AND

INSTALLED BY THE GEORGIA POWER UP TO

FIVE (5) FEET OF THE BUILDING FOOTPRINT.

5. THE UTILITY LAYOUT SHOWN IS FOR

INFORMATION ONLY AS A POTENTIAL

SOLUTION. THE OFFICIAL DESIGN WILL BE

PROVIDED BY THE PRIVATIZED UTILITY

COMPANIES.

CONCRETE PAVEMENT/SIDEWALK

ASPHALT PAVEMENT

CONSTRUCTION LIMIT LINE CLL

BENCHMARK

LIMITS OF DISTURBANCE

08/25/21

R

E V

IS

E

D

IN

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/2

5/

AutoCAD SHX Text

WV

AutoCAD SHX Text

GV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

FDC

AutoCAD SHX Text

FDC

AutoCAD SHX Text

WV

CU101-P1 CIVIL - SITE UTILITY PLAN - PHASE 1

File details come from the government source that posted it. Updated .