TSC - Webex Meeting Ft. Bragg-Runway 05-23 Rehab.pptx

PPTX presentation 11 MB Posted

Attached to
Removal and Replacement of Existing Electrical Equipment , Including Airfield Lighting and Airfield Vault Equipment and Reconstruction of Runway 05-23 PAAF, NC.
Solicitation number
W912HN20B3010
Issued by

About this file

This document provides details for a federal contract solicitation to remove and replace existing electrical equipment including airfield lighting and airfield vault equipment and reconstruct Runway 05-23 at Pope Army Airfield in North Carolina. The solicitation was posted on August 28, 2020 under number W912HN20B3010 by the Department of the Army Corps of Engineers Engineering District Savannah. Bids are due by October 15, 2020 at 1:00pm Eastern Time. The solicitation package includes four drawings files, four specifications files, a construction entrance gate PDF, and a PowerPoint file. Any blacked out or unclickable file links have been replaced by updated files of the same name. Clickable blue links comprise the entire solicitation package as amended. The opportunity is for construction services and has a bid due date of October 15, 2020.

View the file

Other files

File Type Posted
B.04 Abstract (W912HN20B3010).pdf PDF
C.04 Bid Opening Roster.pdf PDF
20B3010 Pkg1vol1.PDF PDF
W912HN20B30100006.pdf PDF
20B3010 Pkg3.PDF PDF
20B3010 Pkg1vol2.PDF PDF
20B3010 Pkg3.PDF PDF
20B3010 Pkg2.PDF PDF
Projnet Bidder Inquiries List with Responses.pdf PDF
20B3010 Pkg1vol1.PDF PDF
B.08 W912HN20B30100005.pdf PDF
USAASA Response to Pope AAF PERM Waiver OCT2020.pdf PDF
W912HN-20-B-3010_AMD4_PACK2.pdf PDF
B.08 W912HN20B30100004.pdf PDF
20B3010 Pkg2.PDF PDF
W912HN-20-B-3010_AMD4_PACK3.pdf PDF
20B3010 Pkg1vol2.PDF PDF
20B3010 Pkg3.PDF PDF
20B3010 Pkg1vol1.PDF PDF
W912HN-20-B-3010_AMD4_PACK1.pdf PDF
B.08 W912HN20B30100003.pdf PDF
W912HN-20-B-3010_AMD2_PACK2.pdf PDF
B.08 W912HN20B30100002.pdf PDF
W912HN-20-B-3010_AMD2_PACK1.pdf PDF
W912HN-20-B-3010_AMD2_PACK3.pdf PDF
20B3010 Pkg1vol1.PDF PDF
20B3010 Pkg1vol2.PDF PDF
Webex Chat Log FA-80003-18.txt TXT text file
20B3010 Pkg1vol1.PDF PDF
B.08 W912HN20B30100001.pdf PDF
SAS-Webex Meeting PAAF Repairs Slides.pptx PPTX presentation
Site Visit Sign-In Sheet.pdf PDF
CMT Webex Meeting Ft. Bragg FA-80003-18-X.rev.02.pptx PPTX presentation
A.02 PAAF Runway Repair - Location of Construction Entrance.pptx PPTX presentation
A.02 FA-80003-18_Construction Entrance_20200804.pdf PDF
20B3010 Pkg1vol2.PDF PDF
FA-80003-18-2-FULL.pdf PDF
20B3010 Pkg2.PDF PDF
20B3010 Pkg1vol1.PDF PDF
FA-80003-18-3-FULL.pdf PDF
FA-80003-18-1-VOL 1-FULL.pdf PDF
20B3010 Pkg3.PDF PDF
FA-80003-18-1-VOL 2-FULL.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Bragg (Pope AAF), NC – Runway 05-23 Pavement and airfield lighting rehabilitation Matthew Hoyle Transportation Systems Center Date: 8 September 2020

Awareness of Airfield Pavement Construction Requirements

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Introduction

Certifications/Validations

Materials

Mix Designs

Construction overview

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

UFGS 32 13 14.13 – Concrete Pavement for Airfields and Other Heavy Duty Pavements (08/19) Advertised documents:

UFGS 32 12 15.13 – Asphalt Paving for Airfields (11/17)

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

This presentation is not a substitute for the contract documents. Information presented does not alter or change the contract documents in any way. Presentation is merely intended to make bidders aware of key requirements of the pavement specifications.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Highlight specification requirements that may be overlooked during the bidding process

Obtain an understanding of project specification:

Materials quality and specialized testing requirements

Mix Designs

Personnel Qualification

Equipment Requirements objectives

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Using agency concerns United States Army United States Navy United States Air Force

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

-Why? Owner of the facilities; Contractors are only required a 1 year warranty unless otherwise agreed upon.

- Airfield pavement specifications are a Tri-Service effort

- Tri-services are annually evaluating improvements as determined by US Government and Industry representatives

What’s the Issue?

What are the impacts?

Early Age Pavement Issues

Segregation Joint Density Raveling Cracking (shrinkage, plastic) Surface Problems (Pop-outs, ASR, etc.)

Quality of Construction and Workmanship

Impact

Increased O&M Costs Changes to Mission and Airfield Operations Disruptions to accommodate repairs Closure of Taxiways and Runways Personnel and Aircraft Safety

Foreign Object Debris (FOD)

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Aircraft intake

Jet engines can ingest debris & fragments on pavement surfaces leading to engine damage and/or failure. Rotary wing aircraft can cause other safety concerns with nearby personnel and aircraft.

Construction of high quality, durable pavements cannot be over emphasized.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Joints

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Introduction

Certifications/Validations

Materials

Mix Designs

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Airfield PCC Paving Laboratory Requirements

Independent Onsite Laboratory

Shall meet requirements of ASTM D1077

USACE Validation by the Materials Testing Must be validated for all tests performed including ASTM, AASHTO, CRD-C, etc.

Validation includes parent and plant testing laboratory.

Validation must remain active throughout the duration of project

Laboratory may be at the plant or job site.

Shall meet requirements of ASTM D3666

USACE Validation by the Materials Testing Must be validated for all tests performed including ASTM, AASHTO, CRD-C, etc.

Validation includes parent and plant testing laboratory.

Validation must remain active throughout the duration of project

Airfield Asphalt Paving https://mtc.erdc.dren.mil/index.aspx See project specifications for additional requirements.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

USACE Materials Testing Center

Above is example only. Project may require more or less specific accreditations/validations.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

UFGS 32 13 14.13 & UFGS 32 12 15.13 Staff

CQC Manager per UFGS 01 45 00.00 10 Airfield Concrete CQC Manager 10 years airfield experience 3 years in supervisory role

ACI Transportation Inspector

Field & Laboratory Technicians (see next slide)

Equipment Representatives Batch Plant Manufacturer’s Representative Slipform Paving Equipment Manufacturer’s Representative Contractor quality control (CQC)

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Add CQC SLIDES

Airfield PCC Paving Personnel qualification/certifications

ACI Certified Field Testing Technicians – Grade I

ACI Certified Lab Testing Technicians, Grade I or II

ACI Certified Concrete Transportation Inspector

ACI Concrete Flatwork Technician/Finisher (Lead Foreman)

NRMCA Plant Manager/NRMCA Certificate of Conformance

Verify Certifications at:

https://www.concrete.org/certification/verifyacertification.aspx

Airfield Asphalt QC Manager

Airfield Asphalt Pavement Inspector

Airfield Asphalt Pavement Technician

Verify Certifications at:

http://airfieldasphaltcert.com/

Airfield Asphalt Paving Quality Control Staff may have stringent minimum qualifications.

See project specifications for additional personnel requirements.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Materials

Mix Designs

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Department of Defense Airfield Pavement Specifications Require Use of High Quality Aggregates Military airfield aggregate quality

Los Angeles Abrasion (Wear)

Soundness (Magnesium or Solidum Sulfate)

Flat and Elongated

Alkali Silica Reactivity

Deleterious Materials (Moderate or Severe Exposure)

Uncompacted Void Content (Fine Aggregate Angularity)

Clay Content (Sand Equivalent)

Fractured Faces

Natural Sand Content

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

UFGS 32 13 14.13

Concrete Paving for airfields and other heavy duty pavements Specification requires use of ASTM C33 size No. 4, No. 67, and fine aggregate. Intermediate aggregate is recommended.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

All Coarse and Fine Aggregates -Freeze Thaw Testing Required

- ASTM C 666 Procedure A

OR

Satisfactory Service Record Report -Qualified and Experienced P.E. or Petrographer in Concrete/Materials and Related Distresses -Three Concrete Pavement Projects -Minimum 5 years Service Life Durability of aggregate Durability Factor of 80 or more

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Clay Lumps and Friable Particles 0.2 Max.

Shale 0.1 Max.

Material Finer Than 0.075 mm (No. 200) 0.5 Max.

Lightweight Particles (2.0 Sp.G) 0.2 Max.

Clay Ironstone 0.1 Max.

Chert and Cherty Stone (<2.4 Sp.G) 0.1 Max.

Claystone, Mudstone, Siltstone 0.1 Max.

Shaly and Argillaceous Limestone 0.2 Max.

Other Soft Particles 1.0 Max.

Total of All Deleterious Materials Except Material Finer Than 0.075mm 1.0 Max.

COARSE AGGREGATES Severe Deleterious Materials - PCC

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Differences in UFGS and astm

Coarse AggregateUFGS
ASTM
Clay Lumps and Friable Particles0.2 Max.3.0 Max.
Shale0.1 Max.No requirement
Material Finer than 0.075mm (No. 200)*0.5 Max.1.0 Max.
Lightweight Particles (2.0 Sp. G)0.2 Max.0.5 Max.
Clay Ironstone0.1 Max.No Requirement
Chert and Cherty Stone (<2.4 Sp. G)0.1 Max.5.0 Max.
Claystone, Mudstone, Siltstone0.1 Max.5.0 Max.
Shaly and Argillaceous Limestone0.2 Max.No Requirement
Other Soft Particles1.0 Max.No Requirement
Total of All Deleterious Materials (excluding material finer than 0.075mm)1.0 Max.No Requirement

Above table is only intended to display differences in material requirements for work performed under UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements and ASTM C33 which is commonly referenced in DOT applications. * See Notes in Contract

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

FINE AGGREGATES

Clay Lumps and Friable Particles 1.0 Max.

Material Finer Than 0.075 mm (No. 200) 3.0 Max.

Lightweight Particles (Medium Sp. G = 2.0) 0.5 Max.

Total of All Deleterious Materials 3.0 Max.

Deleterious Materials

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

ASR Testing

Test Individual Aggregates (Coarse and Fine) (C-1260)

Test Aggregate(s) with Expansions >0.08% Use ASTM C 1567, Project Cement & SCM or Lithium Nitrate

Length Change Determined Over a 28-day Period

If Test Fails- Reject Aggregate- Contractor to Submit New Source

Alkali-Silica Reactivity Testing Requirements

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Supplementary Cementitious MaterialMinimum
ContentMaximum

Content Fly Ash Class F and Class N

SiO2 + Al2O3 + Fe2O3 > 70%25%35%
SiO2 + Al2O3 + Fe2O3 > 80%20%35%
SiO2 + Al2O3 + Fe2O3 > 90%15%35%
UFFA and UFP7%16%
GGBF Slag Cement40%50%

SCM Allowable dosage rates

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

UFGS 32 12 15.13

asphalt paving for airfields Gradation 2 (NMAS ¾ inch) for Binder Course on Shoulders Gradation 3 (NMAS ½ inch) for Surface Course on Shoulders Gradation 2 (NMAS ¾ inch) for Binder Course & Surface Course on Assault Strip (Option)

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Hoyle, Matthew M CIV USARMY CENWO (USA) (HMMCUC( [2]) - NMSA vs. NMAS - C125 COARSE AGGREGATES (retained on No. 4)

LA Abrasion<40%
Soundness<12% Sodium Sulfate
<18% Magnesium Sulfate

Clay Lumps and Friable Particles 0.3 Max.

Total of All Deleterious Materials 3.0 Max.

Fractured Faces75% by weight (2+)
Flat and Elongated (3:1)< / = 20%

Aggregate Quality

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Fractured faces is at least 2 or more.

FINE AGGREGATES (passing No. 4 and retained on No. 200)

Natural Sand< 15%
Sand Equivalent> 45
Uncompacted Void Content> 45

Clay Lumps and Friable Particles 0.3 Max.

Fractured Faces75% by weight (2+)
Flat and Elongated (3:1)< / = 20%

Mineral Filler (passing No. 200)

Non-Plastic meeting requirements of ASTM D242/D242M Aggregate Quality

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Fractured faces is at least 2 or more.

Asphalt Cement Binder

PG 64-22

Binder and surface course mixes on airfield shoulders

PG 76-22

Binder and surface courses utilized on assault strip (Option) For modified binders, perform PG Plus test requirements per ASTM D6084 Procedure B on RTFO aged binder Provide minimum elastic recovery of 75

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Introduction

Certifications/Validations

Materials

Mix Designs

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Multiple concrete mix designs MAY be required due to project timeline. Different material sources should be considered due to material source availability, placement technique (e.g. fixed form, hand placement), etc.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Placement methods Material source changes

See project specification for other mix design requirements UFGS 32 13 14.13 Mix designs

Accredited/Validated Laboratory: Meeting ASTM C1077

Three different water/cement ratios REQUIRED for EACH mix Proportioning Study Maximum w/c ratio = 0.45 Minimum w/c ratio = 0.37

Follow methodology for trial mixtures as described in ACI 211.1 & ACI 325.14R

Use TSPWG M 3-250-04.97-05 for Proportioning Concrete Mixtures with Graded Aggregates for Rigid Airfield Pavements

Proportion Test Batches at Maximum Allowable Air Content and Maximum Allowable Slump

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

See project specification for other mix design requirements UFGS 32 12 15.13 Mix designs

Accredited/Validated Laboratory: Meeting ASTM C3666

Follow guidance in Asphalt Institute MS-2 (7th Edition or current)

Follow ASTM in lieu of AASHTO unless otherwise specified

Target 4% laboratory air voids

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Shoulder Pavements 50 Gyrations

Assault Strip (Option) 75 Gyrations Asphalt Laboratory Compaction 600 kPa

1.16

See project specification for other mix design requirements

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Materials

Mix Designs

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Concrete Batch Plant

Multiple On-site Plants may be required

Plant(s) must be minimum of 250 yd3/hr

Paver-Finisher

Minimum weight of 2200 lb/ft of lane width

Electronic Vibrator Monitoring Device

Alternate methods *may* be acceptable for isolated, irregular, odd-shaped slaps Concrete production

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Transfer Spreader

Deposits concrete evenly in front of paver

Operates outside paving lane(s).

Curing

Spraying machine shall be self-propelled and span paving lane

Two-coat Application: 400 sq. ft/gal

One-coat Application: 200 sq. ft/gal

Concrete production

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Pavement Characteristics

Surface Smoothness

Grade

Thickness

Edge Slump

Joint Face Deformation

Strength

Surface – Free of Irregularities, Tears, Voids, Continuities

Concrete Acceptance

Pay Adjustments

No Pay Adjustment (Meet Specification)

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Asphalt Plant

Meets requirements of AASHTO M 156

Storage Silos: 3 hours for non-insulated 8 hours for insulated

Material Transfer Vehicle

Required for asphalt pavement

Self propelled; operated outside paving lane Asphalt production

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Longitudinal

Cut back if irregular, damaged, uncompacted, cold (less than 175°F)

Asphalt – Concrete Interface

Place high (greater than 1/8” – less than 1/4”)

Compact with Steel Wheel and Rubber tire

Diamond grind asphalt so less than 1/8”

Joints

Note: Contractors to review overlap & set-back requirements for longitudinal and transverse joints.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Pavement Characteristics

In-Place Density Mat Density Joint Density

Laboratory Air Voids

Smoothness

Plan Grade

Asphalt Acceptance

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

Again, the information and views presented in this workshop are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

THANK YOU FOR YOUR ATTENDANCE

All questions should be directed to ProjNet

The information and views presented in this presentation are strictly meant for informational purposes only and do not represent official direction by the U.S. Government or legal advice. Please refer to the specific detailed requirements for your project in the applicable Contract documents.

image4.png image5.png image6.png image7.jpeg image8.png image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.wmf image14.jpg image15.jpg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.png image21.png image22.png image23.png image24.png image25.png image26.jpeg image27.png image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.png image33.png image34.jpeg image35.wmf image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image1.png image2.png image3.png

File details come from the government source that posted it. Updated .