About this file

This document contains an amendment to a federal solicitation for construction services. The solicitation is being amended to revise the statement of work and add technical specification sections. The opportunity is for the removal and replacement of existing electrical equipment including airfield lighting and vault equipment, and reconstruction of Runway 05-23 at Pope Army Airfield in North Carolina. Services required include demolition, electrical work, paving, and seeding disturbed areas. The bid due date is October 15, 2020. The amendment provides additional specification documents and clarifies the scope of runway and infrastructure repairs to meet current codes since the entire facility is considered to be in a failing condition.

View the file

Other files

File Type Posted
B.04 Abstract (W912HN20B3010).pdf PDF
C.04 Bid Opening Roster.pdf PDF
20B3010 Pkg1vol1.PDF PDF
W912HN20B30100006.pdf PDF
20B3010 Pkg3.PDF PDF
20B3010 Pkg1vol2.PDF PDF
20B3010 Pkg3.PDF PDF
20B3010 Pkg2.PDF PDF
Projnet Bidder Inquiries List with Responses.pdf PDF
20B3010 Pkg1vol1.PDF PDF
B.08 W912HN20B30100005.pdf PDF
USAASA Response to Pope AAF PERM Waiver OCT2020.pdf PDF
W912HN-20-B-3010_AMD4_PACK2.pdf PDF
B.08 W912HN20B30100004.pdf PDF
20B3010 Pkg2.PDF PDF
W912HN-20-B-3010_AMD4_PACK3.pdf PDF
20B3010 Pkg1vol2.PDF PDF
20B3010 Pkg3.PDF PDF
20B3010 Pkg1vol1.PDF PDF
W912HN-20-B-3010_AMD4_PACK1.pdf PDF
B.08 W912HN20B30100003.pdf PDF
W912HN-20-B-3010_AMD2_PACK2.pdf PDF
B.08 W912HN20B30100002.pdf PDF
W912HN-20-B-3010_AMD2_PACK1.pdf PDF
W912HN-20-B-3010_AMD2_PACK3.pdf PDF
20B3010 Pkg1vol1.PDF PDF
20B3010 Pkg1vol2.PDF PDF
Webex Chat Log FA-80003-18.txt TXT text file
20B3010 Pkg1vol1.PDF PDF
TSC - Webex Meeting Ft. Bragg-Runway 05-23 Rehab.pptx PPTX presentation
SAS-Webex Meeting PAAF Repairs Slides.pptx PPTX presentation
Site Visit Sign-In Sheet.pdf PDF
CMT Webex Meeting Ft. Bragg FA-80003-18-X.rev.02.pptx PPTX presentation
A.02 PAAF Runway Repair - Location of Construction Entrance.pptx PPTX presentation
A.02 FA-80003-18_Construction Entrance_20200804.pdf PDF
20B3010 Pkg1vol2.PDF PDF
FA-80003-18-2-FULL.pdf PDF
20B3010 Pkg2.PDF PDF
20B3010 Pkg1vol1.PDF PDF
FA-80003-18-3-FULL.pdf PDF
FA-80003-18-1-VOL 1-FULL.pdf PDF
20B3010 Pkg3.PDF PDF
FA-80003-18-1-VOL 2-FULL.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Number: 97338, Removal and replacement of existing electrical equipment, including airfield lighting and airfield lighting vault equipment and the reconstruction of Runw ay 05-23. The purpose of this amendment is to revise the Solicitation as outlined below . All other terms and condiitons remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN20B3010

X 9B. DATED (SEE ITEM 11)

28-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2020

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN20B3010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

A. CONTRACT CHANGES: A Statement of Work Correction. The Site Visit Sign-In Sheet, Webex Chat Log, CMT Webex Meeting Ft. Bragg FA-8003-18-X.rev.02.pptx, SAS – Webex Meeting PAAF Repairs Slides.pptx, TC – Webex Meeting Ft. Bragg-Runway 05-23 Rehab.pptx are added.

B. TECHNICAL SPECIFICATION CHANGES: The added Section listed below (added by Amendment No. 0001) is hereby added to and made a part of the solicitation.

Added Section Appendix A

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

STATEMENT OF WORK

PN97338 Repair Pope Army Airfield Runway and Lighting System

The scope of work for this project is for the removal and replacement of existing electrical equipment, including airfield lighting and airfield lighting vault equipment and the reconstruction of Runway 05-23, Pope Army Airfield, NC full depth with Portland Cement Concrete (PCC) pavement and Hot Mix Asphalt (HMA) shoulders. Project repairs or repairs by replacement failing fixed wing runway. Project scope includes the removal and replacement of PCC runway shoulders and base course, removal and replacement of the failing asphalt concrete runway and base course, painting repaired runway and shoulders, placing erosion control measures and seeding all disturbed areas. Airfield lighting, airfield lighting building with emergency generator and communications infrastructure will be added to meet current codes as the entire runway is considered to be in a failing condition.

Pope Army Airfield at Fort Bragg is located within multiple urban areas with several PCC and HMA producers and contractors. Availability of quality materials and workmanship is not expected to be an issue. A desktop study of the suitability of the local aggregate sources to meet the UFGS specifications will be completed as the design progresses. The desktop study may not be able to gauge the ability of the local aggregate suppliers to meet project demand as this ability is contingent upon several factors, such as current workload and workload at the time this project is constructed. State highway construction may be at a peak or a lull, which could negatively or positively impact the ability of the suppliers to meet demand. Attempts will be made to determine the ability of supply to meet the project demand. The contractor should be encouraged at the time of contract award to begin stockpiling suitable aggregates at the proposed batch plant site in order to meet project demand.

The electrical components required for this project are typically manufactured on demand, with several items needing long lead time, such as airfield regulators and approach lighting equipment. Typically, these items are available for delivery within six (6) to eight (8) weeks of ordering after shop drawing review and approval. Components known to be dropped from manufacturing support will not be specified for this project. For example, the BRITE controller often used for landing zone (assault strip) lighting to reduce the number of circuits required to operate the lighting in both covert and overt modes is being discontinued by the manufacturer with support ending in approximately five years. This system will not be specified for use by the project to ensure the airfield has a final product with a long manufacturer support structure life.

To complete the work at the most accelerated pace, the contractor would be expected to work 6 or 7 days per week, 10 to 14 hours per day, with multiple demolition, electrical, and paving crews working simultaneously. Work inside the airfield lighting vault would also run concurrently with the runway work such that the runway circuits are powered from the reconfigured airfield lighting vault when it is re-opened.

The Contractor will be allowed to completely close Runway 05-23 to air traffic for the duration of the construction after all material submittal reviews and procurement of long lead time items has begun. An extended 120-180 day Mobilization phase will allow for these material submittals, mix design submittals, erection of the concrete batch plant and other contract related items. Once the runway is closed, Pope Army Airfield will be available only to rotary wing aircraft. While there will be no movement of fixed wing aircraft except under tow, the Contractor will not need to maintain cross-field access except for emergency responders from Ft.

Bragg Fire Department Station 7. The Contractor will be required to maintain continuous access across the field for fire truck and emergency responder access via aggregate surfaced roads through or around the construction zone. The Contractor will be required to coordinate these access routes and maintain them in a manner satisfactory to Fort Bragg throughout the duration of the construction.

Note: If there is a discrepancy between this summary scope of work and the plans and specifications, the plans and specifications will take precedence.

(End of Summary of Changes)