This abstract of offers document summarizes bids received in response to a solicitation to remove and replace existing electrical equipment including airfield lighting and vault equipment, and reconstruct Runway 05-23 at Pope Army Airfield in North Carolina. The solicitation was posted on August 28, 2020 with a bid due date of October 15, 2020. Two bids were received from Kiewit Infrastructure South Co. and a joint venture between RC Construction Co. and Millstone Weber. The document provides pricing details for base line items and 15 options related to asphalt and concrete repair, lighting replacements, and other airfield work. Total bid pricing ranged from approximately $76.8 million to $94.9 million. The Corps of Engineers will review the bids to determine a reasonable contract cost for award.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
28-Aug-20 23-Oct-20 1 1
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
Bruce Helms
SIGNATURE DATE SIGNED
23-Oct-20
5. PROJECT TITLE: 8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E and F.)
A. OFFEROR A. OFFEROR
A. HIRED LABOR
X
7A.
ITEM NO.
7B. DESCRIPTION OF OFFERED ITEM
7C.
EST QTY.
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
0001 Base- Repair/Replace Runway 05-23 1 Job $ 65,015,993.00 $ 65,015,993.00 $ 77,411,000.00 $ 77,411,000.00 $ 65,770,300.00 $ 65,770,300.00
OPTION 1-Assault Strip Mill/Overlay to include 4" and Variable Milling, 4" HMA Placement, Temporary/Permanent Pavement Markings and Grooving
1 Job 1,016,287.00$ 1,016,287.00$ 1,200,000.00$ 1,200,000.00$ 1,022,600.00$ 1,022,600.00$
0003 OPTION 6 - Undercut (includes all material and hauling to Subtitle D landfill, and backfilling with suitable material) 5,000 Cubic Yard 38.59$ 192,933.00$ 63.00$ 315,000.00$ 32.50$ 162,500.00$
0004 OPTION 7 - Additional milling and overlay due to scabbing (includes removal from jobsite and cleanup). Yard-Inch 2,750 Yard $ 24.80 $ 68,213.00 $ 20.00 $ 55,000.00 $ 15.50 $ 42,625.00
0005 OPTION 8 - Additional 12" deep soil cement at 62.5# of cement 10,000 Square Yard $ 23.59 $ 235,907.00 $ 14.00 $ 140,000.00 $ 8.00 $ 80,000.00
0006 OPTION 9 - Crack Sealing in Asphalt after Milling (up to 3/4 inch wide) 24,800 Linear Foot 3.63$ 90,053.00$ 1.20$ 29,760.00$ 1.50$ 37,200.00$
0007 OPTION 10 - Crack Sealing in asphalt after Milling (from 3/4 inch to 1-1/2 inch) 12,500 Linear Foot 5.83$ 72,927.00$ 1.70$ 21,250.00$ 2.20$ 27,500.00$
0008 OPTION 11 - Bituminous Crack Repairs (greater than 1-1/2" wide) 3,750 Linear Foot $ 7.32 $ 27,443.00 $ 11.00 $ 41,250.00 $ 10.00 $ 37,500.00
0009 OPTION 12 - Crack Repair in Concrete to Remain (not to be used for new concrete) 100 Linear Foot $ 153.13 $ 15,313.00 $ 40.00 $ 4,000.00 $ 2.00 $ 200.00
0010 OPTION 13 - Shoulder and Full Strength Pavement Replacement Base Repair at 6" Depth 5,170 Square Yard 99.93$ 516,637.00$ 14.00$ 72,380.00$ 8.70$ 44,979.00$
0011 OPTION 14 - 15 Inch Slab Replacement at 18.75' by 18.75' in Existing Concrete Not to be used for new concrete 1 Job 439,838.00$ 439,838.00$ 25,000.00$ 25,000.00$ 17,300.00$ 17,300.00$
0012 OPTION 15 - Shoulder Grading, Top soiling and Sodding Along Existing Shoulder where edge drop-off exceeds 1-1/2" 1,750 Square Yard $ 21.07 $ 36,876.00 $ 21.00 $ 36,750.00 $ 9.00 $ 15,750.00
South Taxiway Package Do not bid this CLIN.
See subCLINs 0013AA through 0013AG South Taxiway Package consists of Options 2, 4 and 16 through 20
0013AA OPTION 2 - South Taxiway Airfield shoulder pavement rehabilitation and complete airfield lighting rehabilitation 1 Job 3,927,440.00$ 3,927,440.00$ 6,100,000.00$ 6,100,000.00$ 5,341,000.00$ 5,341,000.00$
0013AB OPTION 4 - Apron Lighting Improvements Replace Existing Fixtures on Existing Poles and/or Hangar 1 Job 207,522.00$ 207,522.00$ 1,174,000.00$ 1,174,000.00$ 1,041,800.00$ 1,041,800.00$
0013AC OPTION 16 - Crack Sealing in Asphalt after Milling (up to 3/4 inch wide) 15,000 Linear Foot $ 4.12 $ 61,870.00 $ 1.20 $ 18,000.00 $ 1.50 $ 22,500.00
0013AD OPTION 17 - Crack Sealing in Asphalt after Milling (from 3/4 inch to 1-1/2 inch) 7,500 Linear Foot $ 6.63 $ 49,703.00 $ 1.70 $ 12,750.00 $ 2.00 $ 15,000.00
0013AE OPTION 18 - Bituminous Crack Repairs (greater than 1-1/2" wide) 2,250 Linear Foot 8.31$ 18,704.00$ 11.00$ 24,750.00$ 10.00$ 22,500.00$
0013AF OPTION 19 - Shoulder and Full Strength Pavement Replacement Base Repair at 6" Depth 3,100 Square Yard 113.51$ 351,878.00$ 14.00$ 43,400.00$ 11.25$ 34,875.00$
0013AG OPTION 20 - Shoulder Grading, Top soiling and Sodding Along Existing Shoulder where edge drop-off exceeds 1-1/2" 3,100 Square Yard 23.94$ 74,201.00$ 21.00$ 65,100.00$ 9.00$ 27,900.00$
North Taxiway Package Do not bid this CLIN.
See subCLINs 0014AA through 0014AG North Taxiway Package consists of Options 3,5 and 21 through 25
0014AA Option 3 - North Taxiway - Airfield 1 Job $ 3,321,032.00 $ 3,321,032.00 $ 4,800,000.00 $ 4,800,000.00 $ 4,446,700.00 $ 4,446,700.00
0014AB OPTION 5 - Apron Lighting Improvements Replace Existing Fixtures on Existing Poles 1 Job 461,242.00$ 461,242.00$ 3,080,000.00$ 3,080,000.00$ 3,153,500.00$ 3,153,500.00$
0014AC OPTION 21 - Crack Sealing in Asphalt after Milling (up to 3/4 inch wide) 16,500 Linear Foot 4.15$ 68,478.00$ 1.20$ 19,800.00$ 1.50$ 24,750.00$
0014AD OPTION 22 - Crack Sealing in Asphalt after Milling (from 3/4 inch to 1-1/2 inch) 8,250 Linear Foot $ 6.67 $ 55,011.00 $ 1.70 $ 14,025.00 $ 2.00 $ 16,500.00
0014AE OPTION 23 - Bituminous Crack Repairs (greater than 1-1/2" wide) 2,500 Linear Foot $ 8.36 $ 20,910.00 $ 11.00 $ 27,500.00 $ 10.00 $ 25,000.00
0014AF OPTION 24 - Shoulder and Full Strength Pavement Replacement Base Repair at 6" Depth 3,450 Square Yard 114.22$ 394,068.00$ 14.00$ 48,300.00$ 11.00$ 37,950.00$
0014AG OPTION 25 - Shoulder Grading, Top soiling and Sodding Along Existing Shoulder where edge drop-off exceeds 1-1/2" 3,500 Square Yard 24.08$ 84,293.00$ 21.00$ 73,500.00$ 9.00$ 31,500.00$
TOTAL BASE BID (CLIN 0001) 65,015,993.00$ 77,411,000.00$ 65,770,300.00$
TOTAL OPTIONS 1 & 4 through 13 (CLINS 0002 through 0012) 2,712,427.00$ 1,940,390.00$ 1,488,154.00$
TOTAL OPTIONS 2 (CLINS 0013AA through 0013AG) 4,691,318.00$ 7,438,000.00$ 6,505,575.00$
TOTAL OPTION 3 (CLINS 0014AA through 0014AG) 4,405,034.00$ 8,063,125.00$ 7,735,900.00$
TOTAL AMOUNT OF BASE CLINS 0001-00014AG: 76,824,772.00$ 94,852,515.00$ 81,499,929.00$
NO. 1
Contracting Officer
W912HN20B3010
Pope Army Airfield, Removal and replacement of existing electrical equipment, including airfield lighting and lighting vault equipment and the reconstruction of Runway 05-23, Pope Field, NC
ABSTRACT OF OFFERS - CONSTRUCTION
Department of the Army, Corps of Engineers Savannah District Contracting Office 100 W Oglethorpe Ave.
Savannah, GA 31401
9. OFFERS
NO. 2
I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.
KIEWIT Infrastructure South Co.
2062 Energy Drive
Apex NC 27502
RC Construction Co and Millstone Weber a Joint Venture
310 West Park Avenue Greenvwood MS 38930
6. NUMBER OF AMENDMENTS ISSUED: 6
Unrestricted Solicitation
C. REASONABLE CONTRACT
(INCLUDING PROFIT)
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
B. REASONABLE CONTRACT
(WITHOUT PROFIT)
B. BID SECURITY (Type and Amount) 20%
B. BID SECURITY (Type and Amount) 20%
| 2020-10-26T13:35:47-0400 | |
| HELMS.BRUCE.A.1054395090 |