This document is an amendment to a solicitation for the Moody AFB Personnel Recovery Hangar project. The amendment revises technical specifications and contract drawings, and adds new specification sections and drawings to the solicitation. Revisions include changes to Sections 01 91 00.15, 10 51 13, 07 41 63, 32 11 23, 10 21 13, 33 46 16, 13 34 19, and Appendix A; and the addition of Sections 23 05 48.19, 09 67 23.15, 33 11 23, and 10 45 32 13. Revised and new contract drawings are also included across two volumes. The solicitation was originally posted on June 23, 2020 for the Moody AFB Personnel Recovery Hangar project as a full and open competition with four specifications files, two plans/drawings files, and a bid opening date of June 23, 2020 at 2:00pm Eastern Time. The Department of the Army Corps of Engineers Engineering District Savannah is the contracting agency.

View the file

Other files

File Type Posted
Bid Opening Attendence Sheet.pdf PDF
Bid Abstract_W912HN20B3002.pdf PDF
B.08 W912HN20B30020006.pdf PDF
B.08 20B3002vol4.PDF PDF
B.08 W912HN-20-B-3002_VOL1_AMD5.pdf PDF
B.08 W912HN20B30020005.pdf PDF
B.08 ProjNet Inquiries and Responses Report.pdf PDF
B.08 20B3002vol1.PDF PDF
B.08 20B3002vol2.PDF PDF
B.08 W912HN-20-B-3002_VOL2_AMD5.pdf PDF
B.08 W912HN20B30020004.pdf PDF
W912HN-20-B-3002_VOL1_AMD3.PDF PDF
B.08 20B3002vol1.PDF PDF
W912HN-20-B-3002_VOL2_AMD3.PDF PDF
B.08 20B3002vol2.PDF PDF
B.08 20B3002vol3.PDF PDF
B.08 20B3002vol4.PDF PDF
W912HN20B3002 conformed.pdf PDF
W912HN-20-B-3002_Pre-Bid Visit.pdf PDF
W912HN-20-B-3002_AMD2_VOLUME2.PDF PDF
W912HN-20-B-3002_AMD2_VOLUME1.PDF PDF
20B3002 FIO Drawings.pdf PDF
B.08 W912HN20B30020002 Conformed.pdf PDF
20B3002vol1.pdf PDF
B.08 W912HN20B30020002.pdf PDF
20B3002vol2.pdf PDF
20B3002vol1.pdf PDF
B.08 W912HN20B30020001.pdf PDF
B.08 W912HN20B30020001 Conformed.pdf PDF
20B3002vol2.pdf PDF
20B3002vol1.pdf PDF
Moody AFB_Corrected RTA_Volume II_Drawings.pdf PDF
Moody AFB_Corrected RTA_Volume I_Drawings.pdf PDF
20B3002vol4.pdf PDF
20B3002vol3.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QSEU083023

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: QSEU08-3023, Personnel Recovery Hangar, Moody AFB, Georgia.

A. This solicitation is hereby amended: See Summary of changes.

B. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN20B3002

X 9B. DATED (SEE ITEM 11)

23-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2020

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN20B3002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

A. CONTRACT CHANGES:

B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised by Amendment No. 0003) are hereby added to and made a part of the solicitation.

Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections Added Sections 01 91 00.15 10 51 13 07 41 63 32 11 33 08 60 45 32 13 14.13 09 67 23.15 33 11 23 10 21 13 33 46 16 13 34 19 Appendix A 23 05 48.19

C. CONTRACT DRAWINGS – File No. 141-185-01:

Volume 1:

Sheets BB610, CD101, CG101, S-001, S-101C, S-101D, S-102C, S-111, S-302, S-501, A-101C, A-111, A-112, A-411, A-622, IN101C, IN102C, IN401, IN502, and IF101D, with Revision 1 dated 27 JULY 2020 are hereby added to and made a part of the Contract Drawings.

Sheets CS503, CG101, A-401, A-610, and IN601, with Revision 2 dated 27 JULY 2020 are hereby added to and made a part of the Contract Drawings.

Volume 2:

Sheets TS102 and TY601, with Revision 1 dated 27 JULY 2020 are hereby added to and made a part of the Contract Drawings.

Sheet T-201 with Revision 2 dated 27 JULY 2020 is hereby added to and made a part of the Contract Drawings.