About this file

This document provides details on a federal contract solicitation posted by the Department of the Army Corps of Engineers Engineering District Savannah. The solicitation, numbered W912HN20B3002, is for the Moody AFB Personnel Recovery Hanger project and was posted on June 23, 2020. It is a full and open unrestricted competition seeking bids for specifications files and plans/drawings files related to the construction project. The bid opening date and time is June 23, 2020 at 2:00pm Eastern Time. No other salient details are provided in the document beyond identifying the relevant opportunity and agency.

View the file

Other files

File Type Posted
Bid Opening Attendence Sheet.pdf PDF
Bid Abstract_W912HN20B3002.pdf PDF
B.08 W912HN20B30020006.pdf PDF
B.08 20B3002vol4.PDF PDF
B.08 W912HN-20-B-3002_VOL1_AMD5.pdf PDF
B.08 W912HN20B30020005.pdf PDF
B.08 ProjNet Inquiries and Responses Report.pdf PDF
B.08 20B3002vol1.PDF PDF
B.08 20B3002vol2.PDF PDF
B.08 W912HN-20-B-3002_VOL2_AMD5.pdf PDF
B.08 W912HN20B30020004.pdf PDF
W912HN-20-B-3002_VOL1_AMD3.PDF PDF
B.08 20B3002vol1.PDF PDF
W912HN-20-B-3002_VOL2_AMD3.PDF PDF
B.08 20B3002vol2.PDF PDF
B.08 20B3002vol3.PDF PDF
B.08 20B3002vol4.PDF PDF
W912HN20B3002 conformed.pdf PDF
W912HN20B30020003.pdf PDF
W912HN-20-B-3002_Pre-Bid Visit.pdf PDF
W912HN-20-B-3002_AMD2_VOLUME2.PDF PDF
W912HN-20-B-3002_AMD2_VOLUME1.PDF PDF
20B3002 FIO Drawings.pdf PDF
B.08 W912HN20B30020002 Conformed.pdf PDF
20B3002vol1.pdf PDF
B.08 W912HN20B30020002.pdf PDF
20B3002vol1.pdf PDF
B.08 W912HN20B30020001.pdf PDF
B.08 W912HN20B30020001 Conformed.pdf PDF
20B3002vol2.pdf PDF
20B3002vol1.pdf PDF
Moody AFB_Corrected RTA_Volume II_Drawings.pdf PDF
Moody AFB_Corrected RTA_Volume I_Drawings.pdf PDF
20B3002vol4.pdf PDF
20B3002vol3.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Moody AFB, Georgia

Solicitation Number

W912HN-20-B-3002

Personnel Recovery 4-Bay Hangar/HMU Volume 2 of 4: Specification Divisions 08 - 22

PN QSEU083023

June 2020

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Personnel Recovery 4-Bay Hangar/HMU 20B3002 Moody AFB, GA

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 61 15 ALUMINUM STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 16.20 VERTICAL LIFT FABRIC DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 60 45 TRANSLUCENT WALL PANELS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.20 INTERIOR SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 *2 WINDOW BLINDS

12 36 00 COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 FURNITURE AND FURNITURE INSTALLATION

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 METAL BUILDING SYSTEMS

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.19 BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 13 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

HYDRAULIC PASSENGER ELEVATORS

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

FIRE AND LIFE SAFETY SYSTEMS

25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

INTERIOR DISTRIBUTION SYSTEM

25 05 11.05 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

SWITCHBOARDS

25 05 11.06 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

POWER SYSTEMS AND METERING

25 05 11.07 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR

LIGHTING SYSTEMS

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED SECTIONALIZING CABINET

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

PROJECT TABLE OF CONTENTS Page 3

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 64 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 31 16.13 CHEMICAL TERMITE CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 20 BASE COURSE FOR RIGID PAVING

32 11 23 AGGREGATE BASE COURSES

32 11 23.23 BASE COURSE DRAINAGE LAYERS

32 11 29 LIME-MODIFIED SUBGRADE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 ASPHALT PAVING FOR AIRFIELDS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 16 15 WATER STORAGE STEEL TANKS

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

41 22 23.19 MONORAIL HOISTS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION TABLE OF CONTENTS

DIVISION 08 - OPENINGS

SECTION 08 11 13

STEEL DOORS AND FRAMES

02/10

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 DELIVERY, STORAGE, AND HANDLING

1.4 SUSTAINABLE DESIGN REQUIREMENTS

1.4.1 Recycled Content

1.4.2 Regional Materials

1.4.3 Low-Emittting Materials-Paints and Coatings

PART 2 PRODUCTS

2.1 STANDARD STEEL DOORS

2.1.1 Classification - Level, Performance, Model

2.1.1.1 Heavy Duty Doors

2.1.1.2 Extra Heavy Duty Doors

2.1.1.3 Maximum Duty Doors

2.2 CUSTOM HOLLOW METAL DOORS

2.3 INSULATED STEEL DOOR SYSTEMS

2.4 SOUND RATED STEEL DOORS

2.5 ACCESSORIES

2.5.1 Louvers

2.5.1.1 Interior Louvers

2.5.1.2 Exterior Louvers

2.5.2 Astragals

2.5.3 Moldings

2.6 INSULATION CORES

2.7 STANDARD STEEL FRAMES

2.7.1 Welded Frames

2.7.2 Stops and Beads

2.7.3 Cased Openings

2.7.4 Anchors

2.7.4.1 Wall Anchors

2.7.4.2 Floor Anchors

2.8 FIRE ANDSMOKE DOORS AND FRAMES

2.8.1 Labels

2.8.2 Oversized Doors

2.8.3 Astragal on Fire and Smoke Doors

2.9 WEATHERSTRIPPING

2.9.1 Integral Gasket

2.10 HARDWARE PREPARATION

2.11 FINISHES

2.11.1 Factory-Primed Finish

2.11.2 Hot-Dip Zinc-Coated and Factory-Primed Finish

2.11.3 Electrolytic Zinc-Coated Anchors and Accessories

2.12 FABRICATION AND WORKMANSHIP

SECTION 08 11 13 Page 1

2.12.1 Grouted Frames

2.13 PROVISIONS FOR GLAZING

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Frames

3.1.2 Doors

3.1.3 Fire and Smoke Doors and Frames

3.2 PROTECTION

3.3 CLEANING

-- End of Section Table of Contents --

SECTION 08 11 13 Page 2

SECTION 08 11 13

STEEL DOORS AND FRAMES

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A653/A653M (2019) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface

ASTM A924/A924M (2018) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2017) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C612 (2014; R 2019) Mineral Fiber Block and Board Thermal Insulation

ASTM D2863 (2017a) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)

ASTM E1300 (2016) Standard Practice for Determining Load Resistance of Glass in Buildings

ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

SECTION 08 11 13 Page 3

ASTM F2248 (2012) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.115 (2016) Hardware Preparation in Steel Doors and Steel Frames

NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)

NAAMM HMMA 810 (2009) Hollow Metal Doors

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 105 (2016; TIA 16-1) Standard for Smoke Door Assemblies and Other Opening Protectives

NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies

NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR 111 (2009) Recommended Selection and Usage Guide for Standard Steel Doors, Frames and Accessories

SDI/DOOR 113 (2001; R2006) Standard Practice for Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies

SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames

SDI/DOOR A250.4 (2011) Test Procedure and Acceptance Criteria for Physical Endurance for Steel Doors and Hardware Reinforcing

SDI/DOOR A250.6 (2003; R2009) Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames

SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames

UNDERWRITERS LABORATORIES (UL)

UL 10C (2016) UL Standard for Safety Positive Pressure Fire Tests of Door Assemblies

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design

SECTION 08 11 13 Page 4 and Construction (LEED-NC)

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Doors ; G

Frames ; G

Accessories

Weatherstripping

Show elevations, construction details, metal gages, hardware provisions, method of glazing, and installation details.

Schedule of doors ; G

Schedule of frames ; G

Submit door and frame locations.

SD-03 Product Data

Doors ; G

Frames ; G

Accessories

Weatherstripping

Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction.

Recycled Content ; S

Regional Materials ; S

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Provide temporary steel spreaders securely fastened to the bottom of each welded frame. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.

SECTION 08 11 13 Page 5

1.4 SUSTAINABLE DESIGN REQUIREMENTS

Products in this section may contribute towards credits in LEED BD+C.

1.4.1 Recycled Content

Use materials with recycled content. See Section 01 33 29 SUSTAINABILITY REPORTING for cumulative total recycled content requirements. Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project

1.4.2 Regional Materials

Use materials or products extracted, harvested, or recovered, as well as, manufactured, within a 500 mile radius from the project site, if avalable from a minimum of three source. See Section 01 33 29 LEED ™ DOCUMENTATION for cumulative total of local material requirements. Concrete materials may be locally available. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw materials origin from project site. Indicate relative dollar value of local/regional materials to total dollar value of the products included in the project.

1.4.3 Low-Emittting Materials-Paints and Coatings

Paints and coatings used on the interior of the building (i.e., inside of the weatherproofing system and applied on-site) must comply with Third Party Certification of Low VOC Emissions.

PART 2 PRODUCTS

2.1 STANDARD STEEL DOORS

SDI/DOOR A250.8 , except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00 . Undercut where indicated. Exterior doors shall have top edge closed flush and sealed to prevent water intrusion. Doors shall be 1-3/4 inch thick, unless otherwise indicated. Provide exterior glazing in accordance with ASTM F2248 and ASTM E1300.

2.1.1 Classification - Level, Performance, Model

2.1.1.1 Heavy Duty Doors

SDI/DOOR A250.8 , Level 2, physical performance Level B, Model 2, with core construction as required by the manufacturer for interior doors and for exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners shall be filled with mineral board insulation. Provide Level 2 in individual spaces in hangar areas.

2.1.1.2 Extra Heavy Duty Doors

SDI/DOOR A250.8 , Level 3, physical performance Level A, Model 12 with core construction as required by the manufacturer for interior doors and for indicated exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners

SECTION 08 11 13 Page 6 shall be filled with mineral board insulation. Provide Level 3 for interior egress doors in hangar areas.

2.1.1.3 Maximum Duty Doors

SDI/DOOR A250.8 , Level 4, physical performance Level A, Model 2 with core construction as required by the manufacturer for interior doors and for indicated exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners shall be filled with mineral board insulation.Provide Level 4 for entry doors that are not aluminum.

2.2 CUSTOM HOLLOW METAL DOORS

Provide custom hollow metal doors where nonstandard steel doors are indicated. At the Contractor's option, custom hollow metal doors may be provided in lieu of standard steel doors. Door size(s), design(s), materials, construction, gages, and finish shall be as specified for standard steel doors and shall comply with the requirement of NAAMM HMMA 810. Fill all spaces in doors with insulation. Close top and bottom edges with steel channels not lighter than 16 gage . Close tops of exterior doors flush with an additional channel and seal to prevent water intrusion. Prepare doors to receive hardware specified in Section 08 71 00 DOOR HARDWARE. Undercut doors where indicated. Doors shall be 1-3/4 inch thick, unless otherwise indicated.

2.3 INSULATED STEEL DOOR SYSTEMS

At the option of the Contractor, insulated steel doors and frames may be provided in lieu of Level 1 standard steel doors and frames. Door size(s), design, and material shall be as specified for standard steel doors. Insulated steel doors shall have a core of polyurethane foam and an R factor of 10.0 or more (based on a k value of 0.16); face sheets, edges, and frames of galvanized steel not lighter than 23 gage , 16 gage , and 16 gage respectively; magnetic weatherstripping; nonremovable-pin hinges;

thermal-break aluminum threshold; and vinyl door bottom. Doors and frames shall receive phosphate treatment, rust-inhibitive primer, and baked acrylic enamel finish. Doors shall have been tested in accordance with SDI/DOOR A250.4 and shall have met the requirements for Level C. Prepare doors to receive specified hardware.Doors shall be 1-3/4 inch thick.

Provide insulated steel doors and frames where shown.

2.4 SOUND RATED STEEL DOORS

Doors shall have a Sound Transmission Class (STC) as indicated on the drawings.

2.5 ACCESSORIES

2.5.1 Louvers

2.5.1.1 Interior Louvers

SDI/DOOR 111 , Louvers shall be stationary sightproof type where scheduled. Detachable moldings on room or non security side of door; on security side of door, moldings to be integral part of louver. Form louver frames of 20 gage steel and louver blades of a minimum 24 gage .

Sightproof louvers to be inverted "V" blade design with minimum 55and blade design with minimum 40 percent net-free opening.

SECTION 08 11 13 Page 7

2.5.1.2 Exterior Louvers

Louvers shall be inverted "V" type with minimum of 35 percent net-free opening. Weld or tenon louver blades to continuous channel frame and weld assembly to door to form watertight assembly. Form louvers of hot-dip galvanized steel of same gage as door facings. Louvers shall have steel-framed insect screens secured to room side and readily removable.

Provide aluminum wire cloth, 18 by 18 inch mesh, for insect screens .

Net-free louver area to be before screening.

2.5.2 Astragals

For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, as specified in Section 08 71 00 DOOR HARDWARE provide overlapping steel astragals with the doors. For interior pairs of fire rated andsmoke control doors, provide stainless steel astragals complying with NFPA 80 for fire rated assemblies and NFPA 105 for smoke control assemblies.

2.5.3 Moldings

Provide moldings around glass of interior and exterior doors and louvers of interior doors. Provide nonremovable moldings on outside of exterior doors and on corridor side of interior doors. Other moldings may be stationary or removable. Secure inside moldings to stationary moldings, or provide snap-on moldings. Muntins shall interlock at intersections and shall be fitted and welded to stationary moldings.

2.6 INSULATION CORES

Insulated cores shall be of type specified, and provide an apparent U-factor of .48 in accordance with SDI/DOOR 113 and shall conform to:

a. Rigid Cellular Polyisocyanurate Foam: ASTM C591, Type I or II, foamed-in-place or in board form, with oxygen index of not less than 22 percent when tested in accordance with ASTM D2863; or

b. Rigid Polystyrene Foam Board: ASTM C578, Type I or II; or

c. Mineral board: ASTM C612, Type I.

2.7 STANDARD STEEL FRAMES

SDI/DOOR A250.8 , Level 234, except as otherwise specified. Form frames to sizes and shapes indicated, with welded corners Provide steel frames for doors, cased openings, and interior glazed panels, unless otherwise indicated.

2.7.1 Welded Frames

Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.

Weld frames in accordance with the recommended practice of the Structural Welding Code Sections 1 through 6, AWS D1.1/D1.1M and in accordance with the practice specified by the producer of the metal being welded.

SECTION 08 11 13 Page 8

2.7.2 Stops and Beads

Form stops and beads from 20 gage steel. Provide for glazed and other openings in standard steel frames. Secure beads to frames with oval-head, countersunk Phillips self-tapping sheet metal screws or concealed clips and fasteners. Space fasteners approximately 12 to 16 inch on center.

Miter molded shapes at corners. Butt or miter square or rectangular beads at corners.

2.7.3 Cased Openings

Fabricate frames for cased openings of same material, gage, and assembly as specified for metal door frames, except omit door stops and preparation for hardware.

2.7.4 Anchors

Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage .

2.7.4.1 Wall Anchors

Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.

a. Masonry: Provide anchors of corrugated or perforated steel straps or 3/16 inch diameter steel wire, adjustable or T-shaped;

b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding;

c. Completed openings: Secure frames to previously placed concrete or masonry with expansion bolts in accordance with SDI/DOOR 111 ;

and

Anchors on each side of frame for fastening to structural members or ceiling construction above. Size and type of strut anchors shall be as recommended by the frame manufacturer.

2.7.4.2 Floor Anchors

Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member. Where floor fill occurs, terminate bottom of frames at the indicated finished floor levels and support by adjustable extension clips resting on and anchored to the structural slabs.

2.8 FIRE ANDSMOKE DOORS AND FRAMES

NFPA 80 and NFPA 105 and this specification. The requirements of NFPA 80 and NFPA 105 shall take precedence over details indicated or specified.

2.8.1 Labels

Fire doors and frames shall bear the label of Underwriters Laboratories (UL), Factory Mutual Engineering and Research (FM), or Warnock Hersey

SECTION 08 11 13 Page 9

International (WHI) attesting to the rating required. Testing shall be in accordance with NFPA 252 or UL 10C . Labels shall be metal with raised letters, and shall bear the name or file number of the door and frame manufacturer. Labels shall be permanently affixed at the factory to frames and to the hinge edge of the door. Door labels shall not be painted.

2.8.2 Oversized Doors

For fire doors and frames which exceed the size for which testing and labeling are available, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.

2.8.3 Astragal on Fire and Smoke Doors

On pairs of labeled fire doors, conform to NFPA 80 and UL requirements.

2.9 WEATHERSTRIPPING

As specified in Section 08 71 00 DOOR HARDWARE.

2.9.1 Integral Gasket

Black synthetic rubber gasket with tabs for factory fitting into factory slotted frames, or extruded neoprene foam gasket made to fit into a continuous groove formed in the frame, may be provided in lieu of head and jamb seals specified in Section 08 71 00 DOOR HARDWARE. Insert gasket in groove after frame is finish painted. Air leakage of weatherstripped doors shall not exceed 0.5 1.25 cubic feet per minute of air per square foot of door area when tested in accordance with ASTM E283.

2.10 HARDWARE PREPARATION

Provide minimum hardware reinforcing gages as specified in SDI/DOOR A250.6 .

Drill and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware in accordance with the applicable requirements of SDI/DOOR A250.8 and SDI/DOOR A250.6 . For additional requirements refer to ANSI/BHMA A156.115 . Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory. Locate hardware in accordance with the requirements of SDI/DOOR A250.8 , as applicable. Punch door frames , with the exception of frames that will have weatherstripping or soundproof gasketing, to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.

2.11 FINISHES

2.11.1 Factory-Primed Finish

All surfaces of doors and frames shall be thoroughly cleaned, chemically treated and factory primed with a rust inhibiting coating as specified in SDI/DOOR A250.8 . , or paintable A25 galvannealed steel without primer.

Where coating is removed by welding, apply touchup of factory primer.

2.11.2 Hot-Dip Zinc-Coated and Factory-Primed Finish

Fabricate exterior doors and frames from hot dipped zinc coated steel, SECTION 08 11 13 Page 10 alloyed type, that complies with ASTM A924/A924M and ASTM A653/A653M . The coating weight shall meet or exceed the minimum requirements for coatings having 0.4 ounces per square foot , total both sides, i.e., A40. Repair damaged zinc-coated surfaces by the application of zinc dust paint.

Thoroughly clean and chemically treat to insure maximum paint adhesion.

Factory prime as specified in SDI/DOOR A250.8 .

2.11.3 Electrolytic Zinc-Coated Anchors and Accessories

Provide electrolytically deposited zinc-coated steel in accordance with ASTM A879/A879M , Commercial Quality, Coating Class A. Phosphate treat and factory prime zinc-coated surfaces as specified in SDI/DOOR A250.8 .

2.12 FABRICATION AND WORKMANSHIP

Finished doors and frames shall be strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Molded members shall be clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints shall be well formed and in true alignment. Conceal fastenings where practicable. On wraparound frames for masonry partitions, provide a throat opening 1/8 inch larger than the actual masonry thickness. Design frames in exposed masonry walls or partitions to allow sufficient space between the inside back of trim and masonry to receive caulking compound.

2.12.1 Grouted Frames

For frames to be installed in exterior walls and to be filled with mortar or grout, fill the stops with strips of rigid insulation to keep the grout out of the stops and to facilitate installation of stop-applied head and jamb seals.

2.13 PROVISIONS FOR GLAZING

Materials are specified in Section 08 81 00 , GLAZING.

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Frames

Set frames in accordance with SDI/DOOR A250.11 . Plumb, align, and brace securely until permanent anchors are set. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners. Build in or secure wall anchors to adjoining construction. Where frames require ceiling struts or overhead bracing, anchor frames to the struts or bracing. Backfill frames with mortar. Coat inside of frames with corrosion-inhibiting bituminous material. For frames in exterior walls, ensure that stops are filled with rigid insulation before grout is placed.

3.1.2 Doors

Hang doors in accordance with clearances specified in SDI/DOOR A250.8 .

After erection and glazing, clean and adjust hardware.

SECTION 08 11 13 Page 11

3.1.3 Fire and Smoke Doors and Frames

Install fire doors and frames, including hardware, in accordance with NFPA 80 . Install fire rated smoke doors and frames in accordance with NFPA 80 and NFPA 105 .

3.2 PROTECTION

Protect doors and frames from damage. Repair damaged doors and frames prior to completion and acceptance of the project or replace with new, as directed. Wire brush rusted frames until rust is removed. Clean thoroughly. Apply an all-over coat of rust-inhibitive paint of the same type used for shop coat.

3.3 CLEANING

Upon completion, clean exposed surfaces of doors and frames thoroughly.

Remove mastic smears and other unsightly marks.

-- End of Section --

SECTION 08 11 13 Page 12

SECTION TABLE OF CONTENTS

DIVISION 08 - OPENINGS

SECTION 08 11 16

ALUMINUM DOORS AND FRAMES

05/17

PART 1 GENERAL

1.1 REFERENCES

1.2 PERFORMANCE REQUIREMENTS

1.2.1 Structural Calculations

1.2.2 Air Infiltration

1.2.3 Water Penetration

1.2.4 Thermal Transmittance, Solar Heat Gain, Visible Light

Transmittance

1.2.4.1 U-Factor

1.2.4.2 Solar Heat Gain Coefficient (SHGC)

1.2.4.3 Visible Light Transmittance (VLT)

1.3 SUBMITTALS

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 QUALITY CONTROL

1.5.1 Shop Drawing

1.5.2 Finish Samples

1.5.3 Design Analysis

1.5.4 Test Reports

1.5.5 Operation and Maintenance Data

1.6 QUALITY ASSURANCE

1.6.1 Engineer Qualifications for Blast Design

1.7 SUSTAINABLE DESIGN REQUIREMENTS

PART 2 PRODUCTS

2.1 RECYCLED CONTENT

2.2 DOORS AND FRAMES

2.3 MATERIALS

2.3.1 Anchors

2.3.2 Weatherstripping

2.3.3 Aluminum Alloy for Doors and Frames

2.3.4 Fasteners

2.3.5 Structural Steel

2.3.6 Aluminum Paint

2.4 FABRICATION

2.4.1 Aluminum Frames

2.4.2 Aluminum Doors

2.4.2.1 Full Glazed Stile and Rail Doors

2.4.3 Welding and Fastening

2.4.4 Weatherstripping

2.4.5 Anchors

2.4.6 Provisions for Hardware

2.4.7 Provisions for Glazing

2.4.8 Finishes

2.4.8.1 Organic Coating

SECTION 08 11 16 Page 1

PART 3 EXECUTION

3.1 INSTALLATION

3.2 PROTECTION FROM DISSIMILAR MATERIALS

3.2.1 Dissimilar Metals

3.2.1.1 Protection

3.2.2 Drainage from Dissimilar Metals

3.2.3 Masonry and Concrete

3.3 SEALING AROUND ASSEMBLIES

3.4 CLEANING

3.5 PROTECTION

SECTION 08 11 16 Page 2

SECTION 08 11 16

ALUMINUM DOORS AND FRAMES

05/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)

AAMA 2604 (2017a) Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 90.1 - IP (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM B209M (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)

ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM B221M (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference

ASTM F1643 (2012) Standard Test Methods for Detention Sliding Door Locking Device Assembly

SECTION 08 11 16 Page 3

ASTM F2247 (2011; R 2017) Standard Test Method for Metal Doors Used in Blast Resistant Applications (Equivalent Static Load Method)

NATIONAL FENESTRATION RATING COUNCIL (NFRC)

NFRC 100 (2014) Procedure for Determining Fenestration Product U-Factors

NFRC 200 (2014) Procedure for Determining Fenestration Product Solar Heat Gain Coefficient and Visible Transmittance at Normal Incidence

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)

1.2 PERFORMANCE REQUIREMENTS

1.2.1 Structural Calculations

1.2.2 Air Infiltration

When tested in accordance with ASTM E283, air infiltration per door leaf must not exceed 0.6 cubic feet per minute per square foot of fixed area at a test pressure of 6.24 pounds per square foot .

1.2.3 Water Penetration

When tested in accordance with ASTM E331, there must be no water penetration at a pressure of 2.86 pounds per square foot of fixed area.

1.2.4 Thermal Transmittance, Solar Heat Gain, Visible Light Transmittance

Provide products bearing NFRC Project Label Certificates for Fenestration verifying compliance with requirements for each assembly indicated. An NFRC Bid Report, or approved equal, for field assembled exterior doors may be submitted in lieu of Project Label Certificates for Fenestration if such reports are created in accordance with NFRC CAMP procedures and are provided by the manufacturer. Such alternate reports may be submitted with shop drawings, however, NFRC validated Project Label Certificates for Fenestration are required as a Closeout Submittal. Contact NFRC for information on NFRC 100 and NFRC 200 Compliance and Monitoring Program (CAMP) rating requirements:

http://www.nfrc.org/industry/certification/compliance-and-monitoring-program-camp/

1.2.4.1 U-Factor

Provide exterior glazed assemblies, including aluminum entrances doors with greater than 50 percent glazed area, certified by the NFRC as having a whole window U-factor of .32 or less as determined in accordance with ASHRAE 90.1 - IP and as verified in accordance with NFRC 100.

SECTION 08 11 16 Page 4

1.2.4.2 Solar Heat Gain Coefficient (SHGC)

Provide exterior glazed assemblies, including aluminum entrances doors with greater than 50 percent glazed area, certified by the National Fenestration Rating Council with a whole window SHGC of 0.40 or less as determined in accordance with ASHRAE 90.1 - IP and as verified in accordance with NFRC 200.

1.2.4.3 Visible Light Transmittance (VLT)

Provide exterior glazed assemblies, including aluminum entrances doors with greater than 50 percent glazed area, certified by the NFRC with a whole window VLT of 40 percent or greater as determined in accordance with ASHRAE 90.1 - IP and as verified in accordance with NFRC 200.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

For Each Type of Door and Frame Assembly ; G

SD-03 Product Data

For Each Type of Door and Frame Assembly ; G

Recycled Content ; S

SD-04 Samples

Finish Samples ; G

SD-05 Design Data

Design Analysis ; G

Structural Calculations for Deflection and Antiterrorism; G

SD-06 Test Reports

Air Infiltration ; G

Water Penetration ; G

SD-07 Certificates

NFRC Project Label Certificates for Fenestration ; G

SD-08 Manufacturer's Instructions

Installation of Each Type of Door and Frame Assembly ; G

SD-10 Operation and Maintenance Data

SECTION 08 11 16 Page 5

Adjustments, Cleaning, and Maintenance ; G

SD-11 Closeout Submittals

NFRC Project Label Certificates for Fenestration ; G

1.4 DELIVERY, STORAGE, AND HANDLING

Inspect materials delivered to the site for damage. Unload and store with minimum handling. Provide storage space in dry location with adequate ventilation, free from dust or water, and easily accessible for inspection and handling. Stack materials on non-absorptive strips or wood platforms. Do not cover doors and frames with tarps, polyethylene film, or similar coverings. Protect finished surfaces during shipping and handling using manufacturer's standard method. Do not apply coatings or lacquers to surfaces to which caulking and glazing compounds must adhere.

1.5 QUALITY CONTROL

1.5.1 Shop Drawing

Indicate elevations and sections for each type of door and frame assembly .

Show sizes and details of each assembly, frame construction,subframe attachment, thickness and gages of metal, details of door and frame construction, proposed method(s) of anchorage, glazing details, provisions for an location of hardware, mullion details, method and materials for flashing and weatherstripping, miscellaneous trim, installation details, and other related items necessary for a complete representation of all components. A qualified blast engineer must perform testing or calculations for door system design resistance to specified blast loads.

1.5.2 Finish Samples

Submit two color charts and two finish sample chips from manufacturer's standard color and finish options for each type of finish indicated.

1.5.3 Design Analysis

Submit design analysis with calculations showing that the design of each different size and type of door unit and its anchorage to the structure meets the minimum antiterrorism standards required by paragraph MINIMUM ANTITERRORISM PERFORMANCE, unless conformance is demonstrated by standard blast test results. Calculations verifying the performance of each door proposed for use, under the given loads, must be prepared and signed by a registered Professional Engineer. The door components and anchorage devices to the structure, as determined by the design analysis, must be reflected in the shop drawings.

1.5.4 Test Reports

Test door assembly including glazing for evaluation of hazards generated from airblast loading in accordance with ASTM F2247 by an independent testing agency regularly engaged in blast testing. This test method and the resulting data are valid for the door size tested and smaller doors of identical construction.

The acceptance criteria for the proposed door systems, as determined by the damage level/door response damage criterial of ASTM F2247, will provide a performance equivalent to or better than a category IV; door

SECTION 08 11 16 Page 6 damage level rating. Door glazing performance must be equivalent to or better than H4 - Low hazard rating in accordance with ASTM F1643.

1.5.5 Operation and Maintenance Data

Submit detailed instructions for installation, adjustments, cleaning, and maintenance of each type of assembly indicated.

1.6 QUALITY ASSURANCE

1.6.1 Engineer Qualifications for Blast Design

All blast design calculations must be performed by or under the direct supervision of a registered engineer with a minimum of 5 years' experience performing blast design. The engineering firm performing the blast design must be able to demonstrate experience on similar size projects using similar design methods to meet the requirements outlined in this specification.

1.7 SUSTAINABLE DESIGN REQUIREMENTS

Products in this section may contribute towards credits in LEED BD+C.

PART 2 PRODUCTS

2.1 RECYCLED CONTENT

Provide products with recycled content and provide certificates of compliance in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.

2.2 DOORS AND FRAMES

Provide swing-type aluminum doors and frames of size, design, and location indicated. Provide doors complete with frames, framing members, subframes, transoms, adjoining side lites , trim, and accessories.

Coordinate side lites with Section 08 41 13 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS.

2.3 MATERIALS

2.3.1 Anchors

Stainless steel.

2.3.2 Weatherstripping

Continuous wool pile, silicone treated, or type recommended by door manufacturer.

2.3.3 Aluminum Alloy for Doors and Frames

ASTM B221M, ASTM B221, Alloy 6063-T5 for extrusions. ASTM B209M, ASTM B209, alloy and temper best suited for aluminum sheets and strips.

2.3.4 Fasteners

Hard aluminum or stainless steel.

SECTION 08 11 16 Page 7

2.3.5 Structural Steel

ASTM A36/A36M.

2.3.6 Aluminum Paint

Aluminum door manufacturer's standard aluminum paint.

2.4 FABRICATION

2.4.1 Aluminum Frames

Extruded aluminum shapes with contours approximately as indicated.

Provide removable glass stops and glazing beads for frames accommodating fixed glass. Use countersunk stainless steel Phillips screws for exposed fastenings, and space not more than 12 inches on center. Mill joints in frame members to a hairline fit, reinforce, and secure mechanically.

2.4.2 Aluminum Doors

Of type, size, and design indicated and minimum 1-3/4 inch thick. minimum wall thickness, 0.125 inch , except beads and trim, 0.050 inch . Door sizes shown are nominal; include standard clearances as follows: 0.093 inch at hinge and lock stiles, 0.125 inch between meeting stiles, 0.125 inch at top rails, 0.187 inch between bottom and threshold, and 0.687 inch between bottom and floor. Provide bevel single-acting doors 0.063 or 0.125 inch at lock, hinge, and meeting stile edges.

2.4.2.1 Full Glazed Stile and Rail Doors

Provide doors with medium stiles and rails as indicated. Fabricate from extruded aluminum hollow seamless tubes or from a combination of open-shaped members interlocked or welded together. Fasten top and bottom rail together by means of welding or by 3/8 or 1/2 inch diameter cadmium-plated tensioned steel tie rods. Provide an adjustable mechanism of jack screws or other methods in the top rail to allow for minor clearance adjustments after installation.

2.4.3 Welding and Fastening

Where possible, locate welds on unexposed surfaces. Dress welds on exposed surfaces smoothly. Select welding rods, filler wire, and flux to produce a uniform texture and color in finished work. Remove flux and spatter from surfaces immediately after welding. Exposed screws or bolts will be permitted only in inconspicuous locations, and must have countersunk heads. Weld concealed reinforcements for hardware in place.

2.4.4 Weatherstripping

Provide on stiles and rails of exterior doors. Fit into slots which are integral with doors or frames. Weatherstripping must be replaceable without special tools, and adjustable at meeting rails of pairs of doors.

During installation, verify doors swing freely and close positively.

Refer to paragraph AIR INFILTRATION for air leakage requirements and testing.

2.4.5 Anchors

On the backs of subframes, provide anchors of the sizes and shapes

SECTION 08 11 16 Page 8 indicated for securing subframes to adjacent construction. Anchor transom bars at ends and mullions at head and sill. Reinforce and anchor freestanding door frames to floor construction as indicated on approved shop drawings and in accordance with manufacturer's recommendation. Place anchors near top and bottom of each jamb and at intermediate points not more than 25 inch apart.

2.4.6 Provisions for Hardware

Coordinate with Section 08 71 00 DOOR HARDWARE. Deliver hardware templates and hardware (except field-applied hardware) to the door manufacturer for use in fabrication of aluminum doors and frames. Cut, reinforce, drill, and tap doors and frames at the factory to receive template hardware. Provide doors to receive surface-applied hardware, except push plates, kick plates, and mop plates, with reinforcing only;

drill and tap in the field. Provide hardware reinforcements of stainless steel or steel with hot-dipped galvanized finish, and secure with stainless steel screws.

2.4.7 Provisions for Glazing

Provide extruded aluminum snap-in glazing beads on interior side of doors. Design glazing beads to receive thickness indicated for each glazed assembly. Coordinate requirements with Section 08 81 00 GLAZING.

2.4.8 Finishes

Provide exposed aluminum surfaces with factory finish of anodic coating or organic coating.

2.4.8.1 Organic Coating

Clean and prime exposed aluminum surfaces. Provide a high-performance finish in accordance with AAMA 2604 with total dry film thickness of minimum 1.2 mils . Finish color to be dark bronze anodizod or matching fluoropolymor finish (e.g. kinar 500) to match Moody AFB standard.

PART 3 EXECUTION

3.1 INSTALLATION

Plumb, square, level, and align frames and framing members to receive doors, transoms, adjoining side lites. Anchor frames to adjacent construction as indicated and in accordance with manufacturer's printed instructions and the approved shop drawings. Anchorage must comply with applicable structural requirements. Anchor bottom of each frame to rough floor construction with 3/32 inch thick minimum stainless steel angle clips secured to back of each jamb and to floor construction; use stainless steel bolts and expansion rivets for fastening clip anchors.

Hang doors to produce clearances specified in paragraph ALUMINUM DOORS.

After erection and glazing, adjust doors and hardware to operate properly.

3.2 PROTECTION FROM DISSIMILAR MATERIALS

3.2.1 Dissimilar Metals

Where aluminum surfaces come in contact with metals other than stainless steel, zinc, or small areas of white bronze, protect from direct contact to dissimilar metals.

SECTION 08 11 16 Page 9

3.2.1.1 Protection

Provide one of the following systems to protect surfaces in contact with dissimilar metals:

a. Paint the dissimilar metal with one coat of heavy-bodied bituminous paint.

b. Apply elastomeric sealant between aluminum and dissimilar metals in accordance with Section 07 92 00 JOINT SEALANTS.

c. Paint dissimilar metals with one coat of primer and one coat of aluminum paint.

d. Use a non-absorptive tape or gasket in permanently dry locations.

3.2.2 Drainage from Dissimilar Metals

In locations where drainage from dissimilar metals has direct contact with aluminum, provide protective paint to prevent aluminum discoloration.

3.2.3 Masonry and Concrete

Provide aluminum surfaces in contact with mortar, concrete, or other masonry materials with one coat of heavy-bodied bituminous paint.

3.3 SEALING AROUND ASSEMBLIES

Seal all penetrations of the air barrier by sealing around door openings as necessary to achieve compliance with air leakage requirements indicated in the air barrier sections of the specifications. Flash all doors with corrosion resistant flashing to prevent water intrusion.

3.4 CLEANING

Upon completion of installation, clean door and frame surfaces in accordance with door manufacturer's written recommended procedure. Do not use abrasive, caustic, or acid cleaning agents.

3.5 PROTECTION

Protect doors and frames from damage and from contamination by other materials such as cement mortar. Prior to completion and acceptance of the work, restore damaged doors and frames to original condition, or replace with new ones.

SECTION 08 11 16 Page 10

SECTION TABLE OF CONTENTS

DIVISION 08 - OPENINGS

SECTION 08 14 00

WOOD DOORS

08/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 CERTIFICATIONS

1.3.1 Certified Wood Grades

1.3.2 Certified Sustainably Harvested Wood

1.3.3 Indoor Air Quality Certification

1.3.3.1 Composite Wood, Wood Structural Panel and Agrifiber

Products

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 WARRANTY

1.6 SUSTAINABLE DESIGN REQUIREMENTS

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Certified Sustainably Harvested Wood

2.1.2 Recycled Content for Wood Doors

2.1.3 Reduce Volatile Organic Compounds (VOC) (Low-Emitting

Materials) for Products

2.2 DOORS

2.2.1 Flush Doors

2.2.1.1 Interior Flush Doors

2.2.2 Fire Doors

2.3 ACCESSORIES

2.3.1 Door Louvers

2.3.2 Door Light Openings

2.4 FABRICATION

2.4.1 Marking

2.4.2 Quality and Construction

2.4.3 Preservative Treatment

2.4.4 Adhesives and Bonds

2.4.5 Prefitting

2.4.6 Finishes

2.4.6.1 Factory Finish

2.4.6.2 Color

2.4.7 Water-Resistant Sealer

2.5 SOURCE QUALITY CONTROL

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Fire and Smoke Doors

SECTION 08 14 00 Page 1

SECTION 08 14 00 Page 2

SECTION 08 14 00

WOOD DOORS

08/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2226 (2015a) Standard Practice for Application of Hose Stream

CALIFORNIA AIR RESOURCES BOARD (CARB)

CARB 93120 (2007) Airborne Toxic Control Measure (ATCM) to Reduce Formaldehyde Emissions from Composite Wood Products

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

FOREST STEWARDSHIP COUNCIL (FSC)

FSC STD 01 001 (2015) Principles and Criteria for Forest Stewardship

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 105 (2016; TIA 16-1) Standard for Smoke Door Assemblies and Other Opening Protectives

NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies

NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives

UNDERWRITERS LABORATORIES (UL)

UL 10B (2008; Reprint Feb 2015) Fire Tests of Door Assemblies

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)

SECTION 08 14 00 Page 3

WINDOW AND DOOR MANUFACTURERS ASSOCIATION (WDMA)

ANSI/WDMA I.S.1A (2013) Interior Architectural Wood Flush Doors

ANSI/WDMA I.S.6A (2013) Interior Architectural Stile and Rail Doors

WOODWORK INSTITUTE (WI)

NAAWS 3.1 (2017; 2018 Errata Edition) North American Architectural Woodwork Standards

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Doors ; G

Submit drawings or catalog data showing each type of door unit .

Indicate within drawings and data the door types and construction, sizes, thickness, door louvers, and glazing,.

SD-03 Product Data

Doors ; G

Accessories

Water-resistant Sealer

Sample Warranty

Fire Resistance Rating ; G

Recycled Content ; S

SD-04 Samples

Doors

Prior to the delivery of wood doors, submit a sample section of each type of door which shows the veneer, finish, and core construction.

SD-06 Test Reports

Cycle-Slam

Hinge Loading Resistance

Submit cycle-slam test report for doors tested in accordance with ANSI/WDMA I.S.1A , and hinge loading…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .