W912HN-20-B-3002_Pre-Bid Visit.pdf

PDF 121 KB Posted

Attached to
Moody AFB Personnel Recovery Hanger - W912HN20B3002
Solicitation number
W912HN20B3002
Issued by

About this file

This document contains minutes from a pre-bid site visit for solicitation number W912HN20B3002 to construct a personnel recovery hangar at Moody Air Force Base. The site visit was hosted by the project manager from the US Army Corps of Engineers Savannah District and attended by 41 representatives from various construction and engineering firms. The project manager provided a general overview of the site and directed attendees to submit any technical questions through the Procurement Notices website to allow time to answer questions before the bid opening date of July 23, 2020. The related federal contract opportunity is a full and open unrestricted competition to construct the personnel recovery hangar in accordance with the specifications and drawings provided.

View the file

Other files

File Type Posted
Bid Opening Attendence Sheet.pdf PDF
Bid Abstract_W912HN20B3002.pdf PDF
B.08 W912HN20B30020006.pdf PDF
B.08 20B3002vol4.PDF PDF
B.08 W912HN-20-B-3002_VOL1_AMD5.pdf PDF
B.08 W912HN20B30020005.pdf PDF
B.08 ProjNet Inquiries and Responses Report.pdf PDF
B.08 20B3002vol1.PDF PDF
B.08 20B3002vol2.PDF PDF
B.08 W912HN-20-B-3002_VOL2_AMD5.pdf PDF
B.08 W912HN20B30020004.pdf PDF
W912HN-20-B-3002_VOL1_AMD3.PDF PDF
B.08 20B3002vol1.PDF PDF
W912HN-20-B-3002_VOL2_AMD3.PDF PDF
B.08 20B3002vol2.PDF PDF
B.08 20B3002vol3.PDF PDF
B.08 20B3002vol4.PDF PDF
W912HN20B3002 conformed.pdf PDF
W912HN20B30020003.pdf PDF
W912HN-20-B-3002_AMD2_VOLUME2.PDF PDF
W912HN-20-B-3002_AMD2_VOLUME1.PDF PDF
20B3002 FIO Drawings.pdf PDF
B.08 W912HN20B30020002 Conformed.pdf PDF
20B3002vol1.pdf PDF
B.08 W912HN20B30020002.pdf PDF
20B3002vol2.pdf PDF
20B3002vol1.pdf PDF
B.08 W912HN20B30020001.pdf PDF
B.08 W912HN20B30020001 Conformed.pdf PDF
20B3002vol2.pdf PDF
20B3002vol1.pdf PDF
Moody AFB_Corrected RTA_Volume II_Drawings.pdf PDF
Moody AFB_Corrected RTA_Volume I_Drawings.pdf PDF
20B3002vol4.pdf PDF
20B3002vol3.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Minutes of Pre-Bid Site Visit for IFB# W912HN-20-B-3002 Personnel Recovery 4-Bay Hangar/HMU at Moody Air Force Base, Georgia 14-Jul-2020, 0930 Hours

The attached list is the registered attendees for the subject site visit. Attending representatives were cleared at the Security Forces Access control and allowed to drive to the project on their own.

Mr. Craig Harrell, Savannah District (SAS) Project Manager hosted the visit, with supporting attecndance by Mr. Jeremiah Jackson, 23d Civil Engineer Squadron, Mr. Allan Diaz, SAS QA Rep, and Mr. Dale Barlow, SAS Area Engineer.

Mr. Harrell noted to attendees that no specific technical questions would be answered, and called attention to the ProjNet.org inquiry system all technical and administrative questions. Mr. Harrell noted general site features as points of reference when bidders review the plans. Mr. Harrell urged attendees to input their inquiries as early as possible with the intent of holding to the scheduled bid opening date.

The site visit concluded at approximately 1130hrs.

NAME Company POC Email Address

1 Michael Nettie ASSA ABLOY Entrance Systems US IMike.Nettie@assaabloy.com 2 Donald L. Quesenberry Jr. Jarrett Construction don.quesenberry@builder-mail.com 3 Pauly, Kenneth Corey Copper Construction kpauly@copperga.com 4 Reid Wolfe LeebCor Services reid.wolfe@leebcor.com 5 Ralph Holden Harrison MJW Consolidated, Inc rharrison@mjwood.com 6 Joseph John Amon II MLV Group jonathan@mvl-group.com 7 Jonathan Nathan Clapper MLV Group jonathan@mvl-group.com 8 Bryon Matthew Schoenfeld HP Glazing bschoenfeld@hpglazing.us 9 Avinash Rachmale LG Corp nancy.acerbo@lgccorp.com

10 Bruce Coulliette Dykes WG Yates bcdykes@wgyates.com 11 Jeremy Brian Higginbotham Orion Management J.Higginbotham@orionmngt.com 12 Thomas Wilson KieWit Thomas.Wilson3@kiewit.com 13 Michael Rittenberry KieWit Michael.Rittenberry@kiewit.com 14 Scott Sinclair Bennor MJ Wood SBennor@mjwood.com 15 LC Miller MSCM Group mrobinson@mscmgrp.com 16 Lucian Earle Walbridge asmith@walbridge.com 17 Derrick Black ACE Electric Kevin.Cowart@aceelectric.net 18 Ken Corbett ACE Electric Kevin.Cowart@aceelectric.net 19 Elbert Hurst ACE Electric Kevin.Cowart@aceelectric.net 20 Daniel Ward Holzworth WG Yates bcdykes@wgyates.com 21 Basana Allah WG Yates bcdykes@wgyates.com 22 Keith Allen Ball Siemens keithaball@siemens.com 23 Joseph Clyde Grant Siemens keithaball@siemens.com 24 Scott Carlson C.A. Murren cpowers@camurren.com 25 Wesley Paul Rich McKnight Constr blakely@mcknightconstructionco.com 26 Charles Pitchford Powers C.A. Murren cpowers@camurren.com 27 Kris Michael Keith Roy Anderson Corp Cherish.Smith@rac.com 28 Leonard C. Ash III Roy Anderson Corp Cherish.Smith@rac.com 29 Christopher Brent Gray Roy Anderson Corp Cherish.Smith@rac.com 30 Joshua Scott Cagna Roy Anderson Corp Cherish.Smith@rac.com 31 Joseph Walter Courtault Roy Anderson Corp Cherish.Smith@rac.com 32 Robert Lee Blumenthal Jr. ACC Construction bobby@acccon.net 33 Matthew McWhorter McKnigACC Construction matt@acccon.net 34 Matthew Scott Pike Brad Cole Construction Matt@bradcoleconstruction.com 35 Justin Beck Paulk Hensel Phelps WFeliciano-Zayas@henselphelps.com 36 Sutton Claire Waller Hensel Phelps WFeliciano-Zayas@henselphelps.com 37 Allen Reitcheck WG Yates areitche@wgyates.com 38 Andrew Whisenhunt ACC Construction awhisenhunt@acccon.net 39 Brian Talbot WG Yates areitche@wgyates.com 40 David Probst WG Yates areitche@wgyates.com 41 Howard Ayers Windamir hayers@windamir.com

Minutes of PreBid_W912HN-20-B-3002
HangarSiteVisit Contractors
Sheet1

File details come from the government source that posted it. Updated .