This document summarizes a bid inquiry report for a federal construction contract opportunity posted by the Department of the Army Corps of Engineers Engineering District Savannah. The solicitation seeks bids for the construction of a Personnel Recovery Hangar and Hazardous Materials Unit at Moody Air Force Base, with bid opening on 23 June 2020. Over 260 bid inquiries were received and responded to related to specifications, drawings, site visits, and other procurement questions. Key project details include construction of a new 4-bay hangar and HMU facility, with associated site work, utilities, and security systems. The full package of specifications, drawings, and addenda must be reviewed for all requirements.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: MOODY PERSONNEL RECOVERY HANGAR/HMU Review: Personnel Recovery Hangar -BIDDER
INQUIRY (00002)
(sorted by CommentID ) Displaying 260 inquiries.
Id Discipline Sheet Detail Spec
8664377 Contracting FAR 52.236-27
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the site visit date of 6/30/20 and the due date/time for registration.
Item c says that visitors were supposed to have provided their information 4 days prior (6/19) to the release of the solicitation (6/23).
On: Jun 24 2020.
Government Response. . Amendment 0001 is forthcoming. It is anticipated to change the site visit date to 14-Jul-2020 at 0930hrs with a deadline for providing requested info of 6-July-20. Please follow posted solicitation amendments if there is any discrepancy with a ProjNet response. On: Jun 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667077 Architectural 086045
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraph 2.4.2 incorrectly provides requirements for the translucent panel as follows:
a. No translucent panel can provide 90% LT - Is the intent 30% LT?
b. No translucent panel manufacturer has a 12" system. Is the intent between 2.5" and 4"?
c. Translucent Polycarbonate systems do not require a grid and therefore not needed.
On: Jun 25 2020.
Government Response. . a. Yes, the Light transmission shall be 30% b. Assembled panel thickness shall be 2.75" c. Provide framing pattern (grid) as indicated on sheet A-622 On: Jun 26 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667520 Architectural IN601 Schedules
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Several Questions regarding the Interior Finish Legend on IN601:
1) Legend lists both PNT-1 and PNT-2 as specification 09 67 23.13, however this specification has not been provided. Please clarify the correct specifications for these finishes.
2) Legend lists ACT-2 as specification 09 51 23, however this specification has not been provided. Please advise.
3) Legend lists WB-1 as specification 12 21 00, however this specification has not been provided. Please advise.
On: Jun 25 2020.
Government Response. . 1. Correct specification section should be 09 67 23.15 Fuel Resistive Resinous Flooring, 3-coat system.
2. Incorrect specification listed for ACT-2. The correct Section is 09 51 00.
3. Spec section will be provided. On: Jun 26 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8667524 Architectural IN601 Finish schedule
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
IN 601, Finish Schedule, Room 101 Hanger, Notes PNT-1 extending 10' AFFL on walls. Please clarify the following items:
1) Will the walls receive the same 3 coat system with slip resistant grit finish?
2) Confirm the demising wall along 2 line will be unfinished above 10'.
Page 1 of 55ProjNet: Logged In User
8/11/2020https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
On: Jun 25 2020.
Government Response. . 1. The slip resistant grit will not need to be on the wall.
2. Remaining demising wall will need to be painted (PNT-3). On: Jun 26 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8674062 Architectural A-622 086045
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per Inquiry 8667077, you stated the required panel thickness was 2.75". Panel thickness does not correlate to performance and there is nothing special about a 2.75" thick panel. It is only the thickness of one manufacturer.
Performance is the significant issue and not thickness. Per your desire to use the framing as shown on A-622, the system appears to be a storefront glass system. You cannot insert a 2.75" panel into a storefront system. Also, multiwall polycarbonate should never be used in a system designed for glass. The glass system has a bite of 1/2" which is far too shallow for multiwall. The advantage of a multiwall system is that no intermediate framing is required with a tongue and groove panel. Only the head, sill and jamb framing is needed which reduces cost but provides for a high performing glazing system. What is the intent?
On: Jun 30 2020.
Government Response. . Panel thickness is to be between 2.5" and 4" as required to meet the performance requirements. Different manufacturers have different standards. The intent is NOT to have a storefront glass system, the intent is to create a design pattern to break up the large panel area, Thus, even though the intermediate framing may not be required, it is the intent to have the grid pattern in the panels which may be accomplished with a Panel Grid Core. This is a high performance translucent building wall system to be bid as such, not as a storefront framing/glass system. On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8674390 Mechanical 23 09 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We would like to know who is prefer HVAC Control Contractor for Moody Air Force Base. Can you please provide who does all of the HVAC Control System for the base so we can get an HVAC control price.
On: Jun 30 2020.
Government Response. . The Moody AFB HVAC controls is Siemens. No specific contractor is intended.
What is required is 100% compatibility with the existing Moody Siemens system. A firm by the name of Apogee has current experience on Moody AFB, but any HVAC controls contractor who works with and knows the Siemen system should be sought for pricing On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8676267 Other N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
REGARDING FAR CLAUSE 52.228-1 BID GUARANTEE - The front end documents do not specify, but is there a form we are required to use for the bid bond, such as Standard Form 24?
On: Jun 30 2020.
Government Response. . The bid bond is the most commonly submitted type and the SF24 is the form used for bid bonds, if that method is used. The SF24 used must be the current version that is not expired.
Expiration date is listed at the bottom of the form.
The bidder chooses what type of bid guarantee it wants to submit with the bid that complies with 52.228-1.
On: Jul 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8677503 Specifications 00 21 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 2 of 55ProjNet: Logged In User
Reference Section 00 21 13 Instruction To Bidders, para 2.c.- W.G. Yates and Sons is a closely held corporation and out financial information is confidential. Could the financial information requested in the referenced paragraph be provided under separate cover?
On: Jul 01 2020.
Government Response. . All bids are submitted electronically and only Contracting personnel will be the recipient of all bid material submitted. Financial statement information is protected from disclosure by the Contracting Officer. Please submit bids per the solicitation requirements. On: Jul 02 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8677504 Specifications 142423
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Division 142423, paras 1.3.2 and 2.6.2- Please confirm that "factory training" referenced in these paragraphs refers to company provided training provided to his licensed installers or maintenance personnel and not another maintenance company or base maintenance personnel.
On: Jul 01 2020.
Government Response. . The factory training refers to elevator company training provided to their installers and maintenance providers. On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8685257 Equipment IF101 thru IF102 12 50 00.13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec section 12 50 00.13 states to purchase and install furniture and indicates an FF&E attachment. There is no attachment included with the documents.
Sheet IF101C note C. indicates furniture on plan for reference only.
Is the FF&E to be included or are these items be furnished & installed by others?
On: Jul 06 2020.
Government Response. . FF&E is by others On: Jul 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8689980 Other Solictiation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the Davis-Bacon Wage Determination, there is not a classification for Asbestos Worker / Heat and Frost Insulator.
Please provide this classification so that we may properly bid the work?
On: Jul 08 2020.
Government Response. . Since the wage determination (WD) for Lowndes County does not have an Asbestos Worker / Heat and Frost Insulator listed, bidders can use a national average at $18.32 per hour, or an average of skills similar (no laborers or operators) on the WD which comes to about $16.40 per hour and $3.70 in fringe benefits (total $20.10 per hour). Another way to estimate the labor cost is to use local union rates for the project location (if available). Do not consider apprentice rates unless the contractor has a bona fide currently registered apprenticeship program. When and after the contract is awarded, the awardee MUST submit a SF-1444 with the requested rates so every rate on the certified payroll matches the WD with additions (SF-1444). On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690008 Architectural A-601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The door schedule on A-601 shows doors 109, 109A, 114A, 114E, 114F, 116, 124A, and 124D to be "Door Type BB," However the door sizes are shown to be a single leaf door. The doors located on the floor plans A-101C and A-101D show these doors to be double leaf doors. Please advise.
On: Jul 08 2020.
Page 3 of 55ProjNet: Logged In User
Government Response. . Doors 109, 109A, 114A, 114E, 114F, 116, 124A and 124D are double leaf doors with each leaf 3'-0" wide for a total door width of 6'-0" On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690009 Architectural A-601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The door schedule on A-601 list a door 109B. This door can not be located on the floor plan. Is this door required for this project? Please advise.
On: Jul 08 2020.
Government Response. . Door 109B is indicated on sheet A-101D between Corr 109 and Corr 109B.
This door is also a pair of doors with each leaf at 3'-0" wide for a total door opening width of 6'-0". On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690013 Architectural A-601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The door schedule on A-601 shows stairwell doors 1SC, 1SD, and 2SC to be 60 minute rated wood doors. Is this correct or should they be hollow metal doors? Please advise.
On: Jul 08 2020.
Government Response. . Doors 1SC, 1SD and 2SC should be 60 min rated wood doors as indicated.
On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690015 Architectural A-601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The door schedule on A-601 shows door 118D to be "Door Type B," However there is no glass type listed. Please advise what glass type should be assigned at this door.
On: Jul 08 2020.
Government Response. . Door 118D should be a "Door Type A" with no glazing. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690017 Architectural A-401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On drawing A-401, The accessory tags located on the enlarged plans are not consistent with the accessory schedule located on the same page. Please clarify if these are supposed to match or if there are some items that need to be added to the schedule.
On: Jul 08 2020.
Government Response. . The Toilet Accessory Schedule on sheet A-401 and the accessory tags on the Large Scale Plans do not match and need clarifying. Revised Sheet A-401 to be issued for clarification. On:
Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690019 Architectural A-401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On drawing A-401, toilet accessories A104 and A105 Mirrors and A114 Mop and Broom holders are not labeled or drawn. Please provide locations of these items if they are required.
On: Jul 08 2020.
Page 4 of 55ProjNet: Logged In User
Government Response. . Accessory A104 occurs in Toilet 122, Accessory A105 occurs in Women 113, Accessory A114 occurs in Jan 132 and Jan 219 On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690023 Architectural A-401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On drawing A-401, A107 (Paper Towel Dispenser) and A110 (Soap Dispensers) are only shown at TLT 122 and the sink just outside of this room. Are other PT Dispensers and Soap Dispensers required at the other restrooms?
Please advise.
On: Jul 08 2020.
Government Response. . Paper Towel Dispenser occurs in all 5 toilet spaces. Soap Dispensers occur in all 5 toilet spaces. Revised Sheet A-401 to be issued for additional clarification. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690026 Architectural A-401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On drawing A-401, There are three separate accessories tagged A12. The items appear to be some sort of combination paper towel dispenser and waste receptacle unit, similar to the items tagged A113. Please clarify that these units are intended to be for correct pricing.
On: Jul 08 2020.
Government Response. . The items listed in the Description column of the Toilet Accessory Schedule are correct items to be used in the project. The accessory tags on the Large Scale Plans are not consistent with the Toilet Accessory Schedule. Revised Sheet A-401 to be issued for clarification On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690030 Architectural 10 28 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification section 10 28 13 Toilet Accessories list some additional accessories that are not shown on the plans, I.E. Facial Tissue Dispensers, Towel Pins, Toilet Seat Cover Dispensers. Are these items required for this project. If so please provide locations
On: Jul 08 2020.
Government Response. . Facial tissue dispensers, Towel Pins and Toilet seat Covers are not required.
On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690129 General 00 21 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference 00 21 13 - Instructions to Bidders / NOTICE TO BIDDERS, Part 2.b. concerning bid guarantee. Is the original bid guarantee due at the address provided prior to the proposal due date and time?
On: Jul 08 2020.
Government Response. . Yes, per the paragraph, "An electronic copy of the bid guarantee must be submitted with the electronic bid submission. Also, the original bid guarantee shall be mailed to:
U.S. Army Corps of Engineers, Savannah District CECT-SAS-E (Dan Helmig) 100 W. Oglethorpe Ave.
Savannah, GA 31401"
The original bid guarantee must be received by the bid opening date and time. On: Jul 08 2020
Current Request Status: Request Closed
Page 5 of 55ProjNet: Logged In User
Information for this report is procurement sensitive.
8690177 General 00 21 13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference 00 21 13 - Instructions to Bidders / NOTICE TO BIDDERS, Part 2.c. concerning financial statement. Part 2.c. states to provide a current financial statement electronically with the proposal. Part 3 in this same section states "The Offeror's bid shall not contain classified data." We would classify the company's financial statement as classified data. Please clarify how this is to be handled. Can financial data be provided at a later date under separate cover if still needed and the offeror is in contention for an award?
On: Jul 08 2020.
Government Response. . For this solicitation, classified data is information that has been classified for national security by the US Government and requires a US Government security clearance to access.
Company financial statements are not US Government classified data, even if the company deems them to include sensitive or protective business data. Please see response to Inquiry ID: 8677503 and submit bids per the solicitation requirements. On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690548 General 01 50 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference spec section 01 50 00, Part 3.3.2 and 3.3.3. If temporary electricity, potable water and natural gas will be made available without charge, is metering still required as mentioned in part 3.3.3?
On: Jul 08 2020.
Government Response. . Metering will NOT be required On: Jul 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8690561 Commissioning 01 91 00.15
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference 01 91 00.15 Part 3.1. Considering this is a fully designed project, is part 3.1 Design Phase applicable?
On: Jul 08 2020.
Government Response. . Paragraph 3.1 is a standard UFGS paragraph, and not applicable to a contractor for this Design-Bid Build project. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8691863 Contracting 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that FAR 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns is incorporated and applicable to this solicitation.
On: Jul 08 2020.
Government Response. . Confirmed that this clause is present and applicable in the solicitation. On: Jul 08 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8692942 Equipment 14 24 23
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Does CLASS I Elevator Mechanic Certification by Georgia Department of Insurance suffice requirements detailed in Specs per Section 14 24 23 Paragraph 1.3.1.1 a. b.?
On: Jul 09 2020.
Page 6 of 55ProjNet: Logged In User
Government Response. . Per endorsement letter from the elevator manufacturer, an elevator technician certified by the Georgia State Office of Insurance and Safety Fire Commissioner with a minimum of three years experience will suffice. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8693948 General Spec Section 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide the Davis Bacon Wage Rates for the project.
On: Jul 09 2020.
Government Response. . The wage determination applicable to this project is listed in the solicitation on page 58 of 844 of file 20B3002vol1.pdf on beta.sam.gov. On: Jul 09 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8693975 Architectural 08 71 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the Schlage door hardware be substituted with Assa Abbloy door hardware?
On: Jul 09 2020.
Government Response. . Equal substitutions are allowed except for cylinders and cores and keying which must match Base Standard - interchangeable core system manufactured by Best Lock Co. On: Jul 14
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8694156 Civil General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide depth for concrete dumpster pad.
On: Jul 09 2020.
Government Response. . The depth of the concrete dumpster pad is 8". On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8694161 Civil CG103-104
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify type of material needed for 15" Header pipe. Sheets CG103 & CG104
On: Jul 09 2020.
Government Response. . The type of material needed for 15" header pipe shown on sheets CG101 and CG104 is PVC. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8694164 Civil CU201
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify who is responsible for purchase and installation of Fire Tank shown on CU201.
On: Jul 09 2020.
Government Response. . The contractor is responsible for purchase and installation of Fire Tank shown on CU201. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8694167 Civil CU201
Page 7 of 55ProjNet: Logged In User
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify who is responsible for all piping connecting the pumphouse to the Fire Water Tank shown on sheet
CU201.
On: Jul 09 2020.
Government Response. . The Contractor is responsible for all piping connecting the pumphouse to the Fire Water Tank shown on sheet CU201. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8694171 Plumbing P502 Detail 1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide pipe size and type for "Tank Overflow to Storm" Sheet P502 Detail 1 (Rainwater Cistern Tank Detail).
On: Jul 09 2020.
Government Response. . Provide same size and material of incoming downspout. Provide downspout boot at connection to underground overflow piping. On: Jul 14 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8694205 Contracting RFI Submission Date
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Page 8 of 53 of the RFP, it states that technical inquiries and questions are due 10 days prior to bid date.
Amendment 1 moved the proposal due date to 8/6 due to a delayed site visit.
ProjNet, however, still indicates the system will be open from Jun 23 2020 - Jul 13 2020, which is before the organized site visit on July 14.
Please confirm that questions will be accepted until 10 days prior to bid submission to allow for questions that arise from the site visit.
On: Jul 09 2020.
Government Response. . Confirmed that questions are accepted until 10 days prior to bid opening date per the solicitation instructions. On: Jul 09 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697544 Civil General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify height of Chain link Security Fence.
On: Jul 10 2020.
Government Response. . Fence fabric should be 6' height per specs. section 32 31 13.53 2.1.1 On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697546 Civil CG103
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per sheet CG103. Please provide detail showing Concrete Lined Swale.
On: Jul 10 2020.
Government Response. . Refer to GDOT Detail D-10, use 1' Depth. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697548 Fire Protection/Life
Safety
FX520
Page 8 of 55ProjNet: Logged In User
Sheet FX520 Detail 5 shows concrete encasement. Is this only referring to the pipe penetration through the concrete slab for the tank? Please clarify?
On: Jul 10 2020.
Government Response. . Per General Note 2 on sheet FX320, all buried piping between the tank and the pump building shall be concrete encased. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697552 Civil CG104 / 201
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet CG104 list Rainwater Tank Overflow as 15" PVC. Sheet CG201 list it as 10" PVC. Please Clarify.
On: Jul 10 2020.
Government Response. . Use 15" PVC Throughout On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697553 Civil General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify thickness of concrete pad for Rainwater Tank.
On: Jul 10 2020.
Government Response. . Refer to Typical Exterior Equipment Pad Detail 7/S-501 on Sheet S-501 On:
Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697554 Civil C301
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet C-301 Detail 5. Which apron is this referring to?
On: Jul 10 2020.
Government Response. . Please disregard this detail On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697556 Utilities Engineering General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is contractor responsible for installation of 3" Natural Gas installation and Meter?
On: Jul 10 2020.
Government Response. . Contractor is responsible for all natural gas piping and equipment downstream of the gas meter as shown on detail. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697557 Civil General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide detail for sidewalk.
On: Jul 10 2020.
Government Response. . Refer to GDOT Detail A3. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 9 of 55ProjNet: Logged In User
8697558 Civil General
Please provide detail of paving design for "Concrete Addition to Loading Dock".
On: Jul 10 2020.
Government Response. . Refer to detail 13 / C501. Concrete thickness is 8". On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697561 Civil CS502
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet CS502. Is the 2' concrete mow strip required on both sides of the security fence?
On: Jul 10 2020.
Government Response. . Mow strip is required on one or both sides where turf is present. On: Jul 16
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697563 Civil General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide Heavy Duty Paving Detail.
On: Jul 10 2020.
Government Response. . Heavy duty pavement detail will be added to dwg. CS503 in Amendment 02 forthcoming. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8697564 Civil General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is Temp. Fencing required along the entire limits of construction or only where shown on plans?
On: Jul 10 2020.
Government Response. . Place temporary fencing where shown on the drawings. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702291 Mechanical MH102D Note C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet MH102D note C states "Exposed duct shall be double wall, finish selected by Architect" Does this include the exposed low pressure duct that is in the conditioned space? If it does, can this duct be converted to spiral with the grilles mounted in the spiral duct. That would give the system a better look than trying to make small rectangular duct double wall.
On: Jul 14 2020.
Government Response. . Yes this applies to all exposed duct. Yes the low pressure rectangular duct can be converted to spiral duct. On: Jul 21 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702293 Architectural M401, A201-202
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet M-401, Keynote 23.022 and 23 says to refer to Architectural for louver details.
Sheet A-201 & 202 shown the louvers with sizes and louver designation (L1 or L2), cannot find a louver schedule.
Page 10 of 55ProjNet: Logged In User
The louvers appear to be in the Architectural scope and not in the mechanical scope. Can the government provide a mechanical louver schedule for the contractor to price?
On: Jul 14 2020.
Government Response. . Please see sheet A-622 for the Louver Schedule On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702303 Civil CU201
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There are notes saying "By Others", pointing to the Building 677 Pumphouse and the Fire Tank. Are these 2 structures part of this RFP?
On: Jul 14 2020.
Government Response. . Refer to the architectural and fire protection plans for additional information.
On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702308 Security TY Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would you please tell us what security equipment/products are currently in use on the base? Since this appears to be a new construction Hangar, we assume that it would need to match existing camera and access control systems of the base or buildings around it. If not, is this an open spec?
On: Jul 14 2020.
Government Response. . See Specification 28 10 05 para 2.5 that requires ONVIF conformance. Will clarify Sheet T-001 Symbols Legend. On: Jul 21 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702309 Security TY Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Video Surveillance Cameras --The camera icons on the drawings do not show any association with the camera details. Please confirm what type of cameras are required.
On: Jul 14 2020.
Government Response. . Cameras that can be mounted in ACT-type ceiling should be mounted as detailed, and cameras that must be wall mounted should be as detailed. On: Jul 21 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702310 Security TY Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Intrusion Detection System: The security (intrusion, cameras, access) are all under the same Spec section. We noticed the intrusion is Vindicator. Is this hard spec'd or will another Intrusion system be acceptable?
On: Jul 14 2020.
Government Response. . See Specification 28 10 05 Para. 2.1 On: Jul 21 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702888 Architectural IF-101C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are all lockers and entrance mats provided under the FFE package or will they be the responsibility of the contractor?
On: Jul 14 2020.
Page 11 of 55ProjNet: Logged In User
Government Response. . Lockers & locker benches to be provided by contractor. EFM-1, RG-1 and RG-2 to be by contractor. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702898 Architectural Fire Extinguishers
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There's no specification for fire extinguishers nor are they located on the plans. Please advise if the contractor is to provide or if they are provided by the owner.
On: Jul 14 2020.
Government Response. . No portable contractor-provided fire extinguishers are required as this is an alarmed/sprinkled building, and the hangar bay will have user-furnished portable equipment as required On:
Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702904 Communications T-602 - Detail 3
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing Sheet T-602/Detail 3 – indicates Cat6 U/FTP cable to be installed from the Comm room patch panels to the workstations outlet locations. However, Specification 271000 Building Telecommunications Cabling System indicates Category 6 UTP cable. Please confirm the cable type required. Category 6 U/FTP or Category 6 UTP?
On: Jul 14 2020.
Government Response. . Category 6 UTP is required. See Sheet T-602/Detail 3 and 4 for clarification.
On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702906 Communications T-Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
T-Series drawings – Some drawings indicate "Provide and install 12-strand Singlemode". However, drawing sheet T-201 0 details indicate that the fiber optic enclosures are NIC (not in contract). Is the outside plant and inside plant fiber optic cable to be included in our pricing and scope of work?
On: Jul 14 2020.
Government Response. . Outside plant and inside plant cabling is to be included in the bid. See T-series drawings for additional information. See specifications divisions 27, 28, and 33 for additional information.
Sheet T-201 will be revised to remove NIC from elevations for the fiber patch panel. Security fiber patch panel is required to be provided by Contractor. Coversheet Security Legend and Security riser diagram will be revised for clarity to indicate cabling and conduit for CCTV cameras is required to be provided by Contractor in next amendment. On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702907 Communications T Drawings & TY
Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
T-Series and TY-Series drawings – Legend T-001 indicates outlet for CCTV camera location. However, the description is for 1" conduit and pull string only. Is cabling for the CCTV cameras to be included in our pricing and scope? If so, please provide the requirements for CCTV camera cable type. Also, is the communications contractor or security contractor responsible for furnishing and installing the CCTV camera cabling?
On: Jul 14 2020.
Government Response. . Specifications speak to cabling to be provided for CCTV camera. Symbols Legend will be clarified in forthcoming amendment On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 12 of 55ProjNet: Logged In User
8702910 Communications T-201 & T-401
Are racks or cabinets required the in the comm rooms? If cabinets are required, please provide the size dimensions.
On: Jul 14 2020.
Government Response. . Cabinets are required. See specification 27 10 00 Para. 2.4.2. On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8702913 Communications T-201 & T-401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the communications contractor or the security contractor responsible for furnishing and installing the security racks/cabinets?
On: Jul 14 2020.
Government Response. . The successful bidder of Div 27 owes equipment cabinets for communications system. The successful bidder of Div 28 owes equipment cabinets for security system. Coordination between Div 27 and Div 28 is required by Specification 28 10 05 Para. 2.13. On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703031 Communications T-601 2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Plate T-601 shows new manhole CM17. TS102 shows it as existing. Is manhole CM17 new or existing?
On: Jul 14 2020.
Government Response. . CM17 manhole is new as per sheet T-601. On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703037 Electrical ESD101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There is an existing 30' CCTV pole around 65' Southeast of the existing highmast pole P05, installed on a precast base. It is fed from the 120V panel being relocated with the P05 rack. Does this pole need to be relocated and a new base provided/installed? Does the relocated CCTV pole need the 120V ckt reconnected to it? Is a quazite box required to serve a pull point for the branch ckt?
On: Jul 14 2020.
Government Response. . As best we can tell, this inquiry appears to be un-related to this solicitation.
We can't find anything on the drawings noting this CCTV pole. If you can clarify this further, please enter a new inquiry On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703040 Electrical ES101 & ES102
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that the lateral feeds for teh padmount should not be #2 15kV EPR with #2 ground. Drawings show #2/0.
On: Jul 14 2020.
Government Response. . Provide service laterals feeds for the padmounts phase(hots), neutral and grounds as #2/0 15KV EPR. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703055 Architectural IN601 Interior Finish Legend 09 67 23.15
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 13 of 55ProjNet: Logged In User
Spec Section 09 67 23.15, Paragraph 2.2 specifies the flooring to have a thickness ranging from 13 to 20 mils. The Interior Finish Legend, PNT-1: Resinous Flooring states for the resinous flooring to be Stonhard GS: Stonkote GS4;
Stonseal GS6 System. The system specified in the specifications is at a bare minimum 1/8" thick and for hangars it is recommended to be 3/16"-1/4" thick. Please specify which system is to be followed: the specification performance requirement or the basis of design on the drawings.
On: Jul 14 2020.
Government Response. . Follow the basis of design on the drawings for the correct mil layers based on the Stonhard GS finishes. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703099 Architectural 01 91 00.15
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec Section 01 91 00.15: Appendix B - Basis of Design and Appendix C - Design Phase Commissioning Plan are blank past the page headers. Please specify if there will be documents added by amendment or if these pages are to remain blank.
On: Jul 14 2020.
Government Response. . The Basis of Design and FIO Design Phase Commissioning Plan will not be provided in this section. Section 01 91 00.15 10 will be revised in future amendment so that these attachments will not be indicated. On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703135 Architectural DD Form 1423 (page 120 of 844)
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On page 120 of 844, there is a back page of DD Form 1423, which is instructions to complete the form, but no front page and it is not listed in the attachments to Section 00 73 00. Please provide the front page of DD Form 1423.
On: Jul 14 2020.
Government Response. . This will be corrected in Amendment #3 On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8703150 Architectural 01 00 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 01 00 00, Item 11. Please provide the Davis Bacon Wage Rate for plumbers, as it is not listed.
On: Jul 14 2020.
Government Response. . The bidder must estimate the plumber rate(s) based on industry standard and/or the prevailing wages in the area. Perhaps a local plumbers union for journeyman wage rates for an accurate bid estimate. On: Jul 17 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704899 Civil Reference Drawings -
RA-1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are the Benson tanks still in building 655 and are they empty and clean?
On: Jul 15 2020.
Government Response. . Bldg 655 is completely empty On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704907 Civil Reference Drawings -
RC-1
Page 14 of 55ProjNet: Logged In User
Do you have drawings, showing dimensions, on the two tanks outside and are they clean?
On: Jul 15 2020.
Government Response. . Available drawings of the tanks and pumphouse will be added by forthcoming amendment as a For Information Only supplemental file On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704910 Civil Reference Drawings -
RC-1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is there an asbestos and lead report for the buildings to be demolished?
On: Jul 15 2020.
Government Response. . A report was accomplished and no lead paint or asbestos was identified requiring abatement On: Jul 24 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704914 Civil Reference Drawings -
RC-1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are there any HVAC units in the two buildings being demolished and if so will the Freon removal be by the contractor or the by the base?
On: Jul 15 2020.
Government Response. . There are no HVAC units at either building On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704916 Civil Reference Drawings -
RC-1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will all salvage belong to the demolition contractor?
On: Jul 15 2020.
Government Response. . yes, all salvage will belong to the contractor On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704918 Civil RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
When is the anticipated start date for this project?
On: Jul 15 2020.
Government Response. . No precise date is available. Assuming the bids received on 6-Aug result in an awardable project, the contract award could be on/about 30-Aug. Notice to Proceed would then be coordinated upon receipt and approval of contractor performance and payment bonds On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8704936 Electrical E-516, E-517, E-702
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would you please provide a specification for the pole for type "J" fixture? Sheet E-516, E-517 and E-702 has no information for the pole.
Page 15 of 55ProjNet: Logged In User
On: Jul 15 2020.
Government Response. . Refer to specification 26 56 00 for pole requirements. Mounting height of the lighting fixture is 15ft. On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8705503 Sustainability Division 07
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is air barrier testing required for this project?
On: Jul 15 2020.
Government Response. . Air barrier testing is not required to meet LEED v2009, however the air barrier system will require visual inspection and sign-off to comply with UFC requirements. Note: due to the large doors and overhead coiling doors an air presssure test is not possible. On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8705738 General Reference 00 21 13 Instructions to Bidders Part 2(c)
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference 00 21 13 - Instructions to Bidders / NOTICE TO BIDDERS, Part 2(c) where it states "Current Financial Statement (e.g. the last three years financial statement, Annual Reports, Dun and Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount."
If the offeror is a Joint Venture (JV), how should this requirement be applied? Do you only want the requested information for the JV, or from each individual firm that make up the JV?
On: Jul 15 2020.
Government Response. . If the JV has been in existence for 3 or more years, provide financial statements for the JV. If JV has not been in existence for 3 years, provide financial statements for both entities that comprise the JV along with any financial statements for the years that the JV has been in existence. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8705767 Architectural Metal Wall Panels
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide a specification for Metal Wall Panels.
On: Jul 15 2020.
Government Response. . See specification section 13 34 19 METAL BUILDING SYSTEMS for Metal Panels On: Jul 22 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8705768 Electrical CD101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The existing water tanks have Cathodic protection on them. The new drawings do not reference reinstalling this system once they have been relocated. Please verify this requirement.
On: Jul 15 2020.
Government Response. . No new cathodic protection is not required. The existing water tanks will not be relocated. See fire protection drawings for new fire water tank & system. On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8705772 Electrical EP101A and EP101B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 16 of 55ProjNet: Logged In User
The drawings reference 400HZ frequency converters 1,2,3 and 4 but we have not seen Cat # for the preferred unit or Cat # for the appropriate receptacle. Please provide this information if available.
On: Jul 15 2020.
Government Response. . To be coordinated with building user post-award. Budget for typical On: Jul 23
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8706953 Structural S-001 Special Inspections - Note 2 01 45 35 - Special
Inspections
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 2 states, "OWNER, OR ARCHITECT/STRUCTURAL ENGINEER OF RECORD ACTING AS THE OWNER'S
AGENT, SHALL DIRECTLY EMPLOY
AND PAY FOR SERVICES OF THE SPECIAL INSPECTORS TO PERFORM REQUIRED SPECIAL INSPECTIONS."
Please confirm that the contractor is NOT required to provide Special Inspection services for any scope of work on this project.
On: Jul 16 2020.
Government Response. . Contractor is responsible for providing special inspection services as called for on designated features for this project. On: Jul 28 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8707080 Civil C-301 32 13 14.13
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide Spec Section 32 13 14.13 for Airfield PCC Pavement or confirm if 32 12 15.13 applicable. Drawing details on Vol #1 - Sheet C-301 reference PCC Pavement to 32 13 14.13, not provided within Specifications.
On: Jul 16 2020.
Government Response. . Specification Section 32 13 15.13 will be provided for Airfield PCC Pavement as part of next amendment #3 On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8707089 Contracting SOW 01 00 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm Small Business Plan for this project. The stated targets add up to 53.5% exceeding the 50% overall.
Small Business – 50% Small Disadvantaged Business – 17% Women Owned Small Business – 18% HUBZone Small Business – 10% Veteran-Owned Small Business – 8.5% Service-Disabled Veteran-Owned Small Business – 4%
On: Jul 16 2020.
Government Response. . Per Section 00 21 13 Notice to Bidders under item 2 (on page 6 of 53), the apparent low bidder (if not a small business), upon request by the Contracting Officer after the bid opening but before award, shall submit a subcontracting plan pursuant to 52.219-9 Alt I.
Many small businesses are categorized under multiple socioeconomic categories instead of only one category. Therefore, the socioeconomic category targets do not add up to the same target percentage as the Small Business target. On: Jul 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8707095 Architectural IN401, IN501, IN502 06 20 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 17 of 55ProjNet: Logged In User
Please reference sheets IN401, IN501, IN502 and specification section 06 20 00.
Regarding the construction of the cabinets, the documents appear to require 'face frames'. These are very expensive and highly uncommon for commercial use. 'Full overlay' is the more common construction. Please advise which type of cabinets should be priced.
Regarding finishes, the drawings call for interiors (aka semi-exposed surfaces) stained to match the exterior of the cabinets. This to is very expensive and highly uncommon. White melamine with a particle board core is most common. However, a more common 'high end' approach is to use wood veneer on a plywood core with a clear natural finish. Please advise which material should be priced for the cabinet interiors.
On: Jul 16 2020.
Government Response. . Bid as shown On: Jul 23 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8707142 Communications 27 & 28
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the CCTV/IDS/ACS systems for…
This is the start of the file's text. The full file is on GovTribe.