This is a Price and Payment Procedures section establishing the billing structure for a design-build water supply construction project in Bazum Village, Armenia. The contract uses a combination of lump sum job payments and unit price payment items to compensate the contractor for all work required under the project.
The payment structure includes three base items: Base Item 0001 covers design of tanks and supply system (lump sum); Base Item 0002 covers hydraulic survey of the area including watershed and groundwater analysis (lump sum); and Base Item 0003 covers construction of tanks, chlorination system, electrical, plumbing, fence repairs, security lighting, and associated demolition (lump sum). Two mutually exclusive options are available: Option 1 consists of Items 0004AA and 0004AB for water supply via well, with 0004AA as a lump sum job payment for well head construction and 0004AB as a unit price item (per meter) for well drilling to an estimated depth of 150 meters; Option 2 (Item 0005) provides water supply via stilling basin as a lump sum job payment including structures, electrical, pumps, and piping. All unit price items require contractor submission of a Quantity Measurement Plan for government approval prior to work commencement. The contractor must include all labor, materials, equipment, quality control, environmental protection, safety compliance, and testing within the respective payment items, with no separate compensation for work unless explicitly identified as a distinct line item.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
05/24 08/26
PART 1 GENERAL
PAYMENT TYPES
The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).
Single Job Payment Items
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
Unit Price Payment Items
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
For each unit price payment item identified in the SCHEDULE OF ITEMS, the contractor shall submit a Quantity Measurement Plan describing the procedures they will employ to ensure accurate measurement and recording of quantities submitted for payment. This plan must be approved prior to performing any work associated with the applicable items.
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Quantity Measurement Plan; G
SCHEDULE OF ITEMS: BASE ITEMS
Base Item 0001: Design of Tanks and Supply System
Unit of Measure: Job.
Payment will be made for costs associated with design of the water supply system as indicated in the SECTION 01 10 10 (Statement of Work) and shown on the conceptual layout, with the exceptions of the bid options listed below.
Base Item 0002: Hydraulic Survey of Area
Unit of Measure: Job.
Payment will be made for costs associated with the study and survey of the area in the solicitation for hydraulic conditions of the watershed and ground water survey as described in the SECTION 01 10 10 (Statement of Work) and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0003: Construction of Tanks and Supply System
Payment will be made for costs associated with construction of the tanks, chlorination system, electrical, plumbing from chlorination system to the tanks, fence repairs, communications to support automation systems, and interior and site security lighting as indicated in the SECTION 01 10 10 (Statement of Work) and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
SCHEDULE OF ITEMS: OPTION ITEMS
Awarding of Options
The Government reserves the right to award any option or combination of options in any order and the exercise of any option will not commit the Government to award any other option(s) except as noted below.
Options 1 (0004AA and 0004AB) and 2 (0005), if awarded, will not be awarded together (that is, Option 2 will not be awarded if Option 1 is awarded and vice versa).
Option 1: Item 0004: Water Supply via Well
Item 0004AA: Well Head Unit of measure: Job.
Payment will be made for costs associated with the design and construction of a ground water well. This will include electrical connections of the well, piping from the well to the chlorination system, pump enclosure, pump, and structures related to the construction of the well and well head as indicated in SECTION 01 10 10 (Statement of Work) and the conceptual layout, with the exceptions of the bid options listed below.
Item 0004AB: Well Drilled to Estimated Depth Unit of measure: Meters.
The unit price for this item represents the cost associated with the design and construction of ground water well. This will include the drilling of the well to the estimated depth of 150 m and the correctly sized pump
The unit price shall include all costs for labor, equipment, and materials for drilling and construction of the well to depth and the sizing of the pump to the final depth and shall include all plant, supervision, labor, materials, quality control, safety, and equipment incidental to the completion of this item.
Option 2: Item 0005: Water Supply via Stilling Basin
Payment will be made for costs associated with the design and construction of a stilling basin in the nearby river. This includes any required structures, electrical to for the stilling basin, pumps, pump enclosure, piping from collection point to chlorination system, additional length of piping based on additional length between Option 1 and Option 2’s conceptional layouts as indicated in SECTION 01 10 10 (Statement of Work) and the conceptual layout.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3