B.08 RFP_Att#2a_Conceptual Site Plan_Option-1.pdf
PDF 685 KB Posted
- Solicitation number
- W912GB26RA030
- Issued by
-
Department of the Army European Command
About this file
This is a conceptual site plan drawing (Attachment 2.1) for a water supply system project in Bazum Village, Armenia, prepared by the U.S. Army Corps of Engineers, Europe District. The project (Project #574554) is designated as an RFP and presents Option 1 for the village water infrastructure.
The proposed system includes two 100,000-liter water storage tanks with a shared concrete foundation, a stilling basin with pump intake to draw water directly from the river, an enclosed pump and water treatment station with chlorination capability (separated by an internal wall), and associated infrastructure including water lines, power supply, lighting, and telecommunications. The design incorporates erosion protection and a weir structure at the river intake to maintain adequate water levels for pumping. Key site features shown include an existing abandoned water collection tank (to be abandoned in place with existing concrete fence repaired), an existing electrical substation, Highway M3, and existing chain link fencing requiring relocation. The plan specifies that contractors must verify all existing conditions in the field, ensure water tanks are accessible to maintenance vehicles, provide secure fencing with authorized personnel access, and house the pump and chlorination stations in an enclosed structure with environmental protection. The site plan uses aerial imagery, GIS data, and site visit photos to depict existing conditions at a scale of 1:300.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS
E E E E E E E E E E E E E E E
COMM COMM COMM COMM COMM COMM COMM
E E
E E
C O
M M
C O
M M
W
W W
W W
W W
W
W
W
W
W
W
W
W W
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
G
ER
M
AN
Y
AN
SI
D
W
AT
ER
S
U
PP
LY
S
YS
TE
M F
O R
B
AZ
U M
V
IL
LA
G
E
AR
M
EN
IA
VI
LL
AG
E O
F
BA
ZU
M
, A R
M
EN
IA
PR
O
JE
C T
R
FP
M
YE
R
KL
EI
N
KL
EI
N
C O
N C
EP
TU
AL
S
IT
E
PL
AN
O
PT
IO
N
ATT 2.1
SCALE: 1:300
CONCEPT SITE PLANA1
GENERAL SHEET NOTES
1. DRAWINGS PROVIDED FOR INFORMATION ONLY AND MUST BE
VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. EXISTING CONDITIONS SHOWN ARE THE COMBINED RESULT OF
AERIAL IMAGERY, GIS, AND SITE VISIT PHOTOS. CONTRACTOR MUST
FIELD VERIFY ALL EXISTING CONDITIONS.
3. THERE WILL BE ONE FOUNDATION FOR THE TWO PROPOSED
WATER TANKS.
4. OPTION 1 IS TAKING WATER DIRECTLY FROM THE RIVER FROM A
STILLING BASIN.
5. THE PUMP STATION AND CHLORINATION STATION SHALL BE
ENCLOSED FOR SECURITY AND TO PROTECT THEM FROM THE
ELEMENTS.
6. THE PUMP AND CHLORINATION STATION CAN SHARE AN
ENCLOSURE, BUT MUST BE SEPARATED BY A WALL.
7. PROVIDE A STILLING BASIN TO ALLOW THE WATER TO SETTLE
BEFORE PUMPING IT OUT. PROVIDE EROSION PROTECTION AND A
WEIR STRUCTURE TO HELP KEEP THE WATER AT A LEVEL TO
ALLOW PUMPING.
8. THE EXISTING WATER COLLECTION TANK WAS PROPOSED TO BE
ABANDONED IN PLACE. THE CUSTOMER SUGGESTED REPAIRING
THE EXISTING CONCRETE FENCE TO LIMIT ACCESS TO THE
ABANDONED STRUCTURE.
9. ENSURE THAT THE PROPOSED WATER TANKS ARE ACCESSIBLE TO
WATER TRUCKS AND MAINTENANCE VEHICLES.
10.THE EXISTING CHAIN LINK FENCE WILL REQUIRE RELOCATION.
11.PROVIDE FENCING WITH GATES TO PREVENT UNAUTHORIZED
ACCESS TO THE SITE FEATURES BUT ALLOW EASY ACCESS TO
AUTHORIZED PERSONNEL.
KEYNOTESXX
1 EXISTING HIGHWAY M3
EXISTING ABANDONED WATER COLLECTION TANK2
EXISTING ELECTRICAL SUBSTATION3
PROPOSED TWO 100,000 LITER WATER STORAGE TANKS
WITH CONCRETE FOUNDATION
PROPOSED STILLING BASIN WITH PUMP INTAKE
PROPOSED ENCLOSURE AND CONCRETE FOUNDATION FOR
PUMP AND WATER TREATMENT STATION
EXISTING CONCRETE FENCE
LEGEND
EXISTING FENCE
W W WPROPOSED WATER LINE
PROPOSED CONCRETE PAVEMENT
Meters
24120
E E EPROPOSED POWER SUPPLY
EXISTING CHAIN LINK FENCE
10 PROPOSED CHLORINATION SYSTEM
EXISTING BUILDING FOOTPRINT
PROPOSED STILLING BASIN
EXISTING APPROXIMATE
RIVER PATH
PROPOSED CHLORINATION STATION
PROPOSED INTAKE PUMP
PROPOSED INTAKE PUMP TO BRING WATER FROM THE
STILLING BASIN
EXISTING UNUSED BUILDING WITH ALTERNATE ELECTRICAL
SUBSTATION
COMMPROPOSED POWER SUPPLY
PROPOSED LIGHT POLE
PROPOSED TELECOMMUNICATIONS ENCLOSURE WITH
CONCRETE PAD
PROPOSED FENCE
| Sheets and Views |
| RFP ATT 2 -OP 1 |
File details come from the government source that posted it. Updated .